FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY

Size: px
Start display at page:

Download "FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY"

Transcription

1 FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY Prepared For: Mr. Tom Bowen Florida Department of Transportation District Three Chipley, Florida Prepared By: Post, Buckley, Schuh & Jernigan, Inc. Chipley, Florida August 28

2 Staging Sites for Bay County Contact Information for Site Managers Site No. Site Name Description of Staging Area Type of Operation Location of Staging Area Agency Contact Debris Contractor 1 Bay LP Site This site consists of Grinding, Burning From the intersection of US Lewis Howell (St. Joe) Eddy Wilson FDOT approximately 2 acres that has when Permitted 98 and US 79, go north on (O) Highway 9 been cleared. US 79 to Titi Rd. Turn ( C ) Chipley, FL Right. Head East on Titi Rd. Jeff Walker (O) ext. 259 to Water Treatment facility, ( C ) site is behind Treatment facility. 2 Deerpoint/ Grinding, Burning From the intersection of Lewis Howell (St. Joe) Eddy Wilson FDOT Cedar Grove Site This site consists of apprximately 6 acres that has been cleared. when Permitted Hwy 231 and Hwy 2321, go (O) Highway 9 North on 2321 to Titus Rd. ( C ) Chipley, FL Entrance to pit is just ahead Jeff Walker (O) ext. 259 on left at the beginning of ( C ) the curve.

3 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (2.7 W) TN Scale 1 : 62,5 ¼ ½ ¾ 1 mi km ½ 1 1½ 2 1" = 5,28.3 ft Data Zoom 12-

4 Latitude N Longitude W

5

6 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (2.9 W) TN Scale 1 : 34, ft m " = 2,864.6 ft Data Zoom 13-

7 Latitude N Longitude W

8

9 Staging Sites for Franklin County Contact Information for Site Managers Site No. Site Name Description of Staging Area Type of Operation Location of Staging Area Agency Contact Debris Contractor 1 This site consists of an Grinding, Burning Lewis Howell (St. Joe) Eddy Wilson FDOT St. Teresa Site approximate 5 acres that has when Permitted From the Intersection of US (O) Highway 9 been cleared. 319 and US 98, go East on ( C ) Chipley, FL US 98 to Bay North Drive. Jeff Walker (O) ext. 259 There are three unamed ( C ) roads off the North side of US 98. Pit is down at the end of the third road. 2 Hwy 98 Site This site consists of an Grinding, Burning Lewis Howell (St. Joe) Eddy Wilson FDOT approximate 5 acres that has been cleared. when Permitted From Apalachicola, take US 98 West to the Intersection of US 98 and CR 385. Site is located on the South side of US 98. (O) Highway 9 ( C ) Chipley, FL Jeff Walker (O) ext ( C )

10 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (3.2 W) TN Scale 1 : 1, ½ 1 1½ 2 mi km " = 1.58 mi Data Zoom 11-

11 Latitude N Longitude W

12

13 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (3.6 W) TN Scale 1 : 1, ½ 1 1½ 2 mi km " = 1.58 mi Data Zoom 11-

14 Latitude N Longitude W

15

16

17 Staging Sites for Gulf County Site No. Site Name Description of Staging Area Type of Operation Location of Staging Area Contact Information for Site Managers 1 Hwy 71 Site #1 This site consists of an Grinding, Burning Lewis Howell (St. Joe) Eddy Wilson FDOT approxiamte 5 acres that has when Permitted From the intersection of SR 22 (O) Highway 9 been cleared. and SR 71 in Wewahitchka, go ( C ) Chipley, FL South on SR 71 approximately Jeff Walker (O) ext miles site will be off the ( C ) West side of SR Hwy 71 Site #2 This site consists of an Grinding, Burning Lewis Howell (St. Joe) Eddy Wilson FDOT approxiamte 5 acres that has been cleared. when Permitted From the intersection of SR 22 (O) Highway 9 and SR 71 in Wewahitchka, go ( C ) Chipley, FL South on SR 71 approximately Jeff Walker (O) ext miles site will be off the ( C ) West side of SR Gulf LP Site This site consists of an Grinding, Burning Lewis Howell (St. Joe) Eddy Wilson FDOT approxiamte 4 acres that has when Permitted From the intersection of US 98 (O) Highway 9 been cleared. and SR 71, go north on SR 71 ( C ) Chipley, FL to Arena Rd. Turn Right. Site Jeff Walker (O) ext. 259 is at the end of Rd ( C )

18 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (3. W) TN Scale 1 : 75, ½ 1 1½ 2 mi km " = 1.18 mi Data Zoom 11-7

19 Latitude N Longitude W

20

21 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (3.1 W) TN Scale 1 : 15, mi km " = 2.37 mi Data Zoom 1-7

22 Latitude N Longitude W

23

24 Street Atlas USA 28 Plus Data use subject to license. 27 DeLorme. Street Atlas USA 28 Plus. MN (3.1 W) TN Scale 1 : 15, mi km " = 2.37 mi Data Zoom 1-7

25 Latitude N Longitude W

26

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Columbia County Road Department. Department Presentation June, 2013 By David Hill Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and

More information

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Over-Dimensional Vehicle Restriction Study for US 129 in TN Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

APPENDIX E. Case Study Scores

APPENDIX E. Case Study Scores APPENDIX E Case Study Scores Principles AR AZ CA CO-1 CO-2 CO-3 CT-1 DC FL IA IL AR 215, Ozark Nal SR 179 Sedona Mandela Improvem ent, Oakland Pass Mountain Access - Phases 1 and 2, Arapaho Nal US 285,

More information

The Run Ozaukee 2018

The Run Ozaukee 2018 Fs t A n n u a l 2 1 8 Rules Race Guide The course is open, unmarked, and unsupported o The course is the Interurban Trail, follow Interurban Trail signage o Runners are responsible for own safety and

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Agenda Item: NB-4 Meeting Date:

Agenda Item: NB-4 Meeting Date: MEMORANDUM Agenda Item: NB-4 Meeting Date: 02-06-14 TO: City Commission FROM: Robert DiSpirito, City Manager ~ DATE: January 27,2014 SUBJECT: Speed Limit Reduction on Michigan Boulevard RECOMMENDATION:

More information

Taylors Ferry on Bankhead Lake Off the Grid Cabins

Taylors Ferry on Bankhead Lake Off the Grid Cabins Taylors Ferry on Bankhead Lake Off the Grid Cabins Successful Development Cabin Examples Interior Examples Interior Examples Latest Solar, Battery and Energy Efficiency Technology Off Grid Cabin Options

More information

DRIVING INNOVATION AND OPPORTUNITY Tampa Bay is ready to connect to Autonomous Vehicle Technology

DRIVING INNOVATION AND OPPORTUNITY Tampa Bay is ready to connect to Autonomous Vehicle Technology DRIVING INNOVATION AND OPPORTUNITY Tampa Bay is ready to connect to Autonomous Vehicle Technology CONTENTS Testing autonomous vehicle technologies in a real-world environment...2 All roads lead to Tampa

More information

Hurricane Andrew Photovoltaic Traffic Control Relief Preliminary Report

Hurricane Andrew Photovoltaic Traffic Control Relief Preliminary Report Hurricane Andrew Photovoltaic Traffic Control Relief Preliminary Report Author William R. Young, Jr. Publication Number FSEC-CR-550-92 Copyright Copyright Florida Solar Energy Center/University of Central

More information

14138 SR 50-Clermont FL- Automobi

14138 SR 50-Clermont FL- Automobi 14138 SR 50-Clermont FL- Automobi Presented by Coldwell Banker Commercial SRD Property Details This property has three components; First is the dealership with 54,000sf in four buildings is situated on

More information

Tennessee Electronic Traffic Crash Report

Tennessee Electronic Traffic Crash Report 11/22/2016 11:45 AM Master Record Number 101365465 Type Of Crash Property Damage Approved By 858 Tennessee Electronic Traffic Crash Report Incident Information Date of Crash Day Of Crash Local Agency Number

More information

Available Land - Sacramento

Available Land - Sacramento Pacific Tech Park 5995-611 Pacific Street Rocklin, CA 95677 Building SQFT: 36, Max SF: 36, 6,1 Year Built: 218 1 Land SQFT: 183,823 Asking Rate PSF: Sale Price: Land $ Per SQFT: $. $16.8 ±36, SF Total

More information

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79 Engineering Report: Shasta-Trinity National Forest Shasta McCloud Management Unit Analysis of National Forest System Road 37N79 (milepost 0.56 to 2.28) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST

More information

Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901

Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901 Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901 On 10-29-2015, at 1:30PM, Bryan Tipton, Program Specialist with the SDDA requested that Sherrie Petersen, AG Inspector, investigate 2700 gallons

More information

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Session 1 Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Joe Santos, PE, FDOT, State Safety Office October, 23, 2013 Florida Statistics

More information

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020 CFS SUMMARY Updated: 01/18/2011 CATEGORY / PROJECT NAME FY10-11 FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 LOCAL OPTION SALES TAX SUMMARY LOCAL OPTION SALES TAX 6,700,000 6,834,000

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

PRESS RELEASE Tahoe Fire and Fuels Team

PRESS RELEASE Tahoe Fire and Fuels Team PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 24, 2015 Prescribed fire operations to continue next week Contacts: U.S. Forest Service, Lisa Herron 530-543-2815 Nevada Division

More information

PRESS RELEASE Tahoe Fire and Fuels Team

PRESS RELEASE Tahoe Fire and Fuels Team PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 6, 2015 Multiple agencies to conduct prescribed fire operations Contacts: North Lake Tahoe Fire Protection District, Isaac Powning

More information

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Presented March 6, 2013 by Alan Plunkett, INDOT Bill Smith, INDOT Tom Brennan, Purdue Alan Plunkett/Bill Smith US 231 MOTIVATION

More information

Page 1 of 7 YOUR TRIP: Total Route: 1 hr 55 min - 54.4 miles Est. Fuel cost: $3.23 - IRS Reimbursement: $29.39 650 9th Ave S, Safety Harbor, FL 34695-4246 1. Start out going west on 7th St S toward S Railroad

More information

INDUSTRIAL SPACE Pierce/South Counties

INDUSTRIAL SPACE Pierce/South Counties PIERCE COUNTY LPC Frederickson ONE 38 th Ave E & 200 th St E Frederickson, WA Bldg 1 Bldg 2 Bldg 4 Bldg 5 Bldg 6 478,142 512,432 409,980 976,200 64,500 Call for rates Bldg 1 to start construction 1Q 2019

More information

Smoothness Specification Update

Smoothness Specification Update Florida Department of TRANSPORTATION Smoothness Specification Update 38 th Annual Asphalt Conference September 9, 2014 Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness)

More information

IMAGE DRIVE FOR SALE SPARTANBUBRG SOUTH CAROLINA

IMAGE DRIVE FOR SALE SPARTANBUBRG SOUTH CAROLINA FOR SALE IMAGE DRIVE SPARTANBUBRG SOUTH CAROLINA For More Information, Contact: Meghan McDuff Associate Industrial & Investment Services O 864.301.8379 F 843.725.7201 C 305.720.4403 meghan.mcduff@avisonyoung.com

More information

Diesel Generators in the Data Center: When to Go Big

Diesel Generators in the Data Center: When to Go Big PowerHour webinar series for consulting engineers Experts you trust. Excellence you count on. Diesel Generators in the Data Center: When to Go Big April 11th, 2017 11:00 PDT / 13:00 CDT (1PDH issued by

More information

CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION

CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION Crow Wing County Highway Department 16589 CR 142 Brainerd, MN 56401 Crow Wing

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

Caltrans Shopp Lump Sum Projects and Backup List

Caltrans Shopp Lump Sum Projects and Backup List appendix d Caltrans Shopp Lump Sum Projects and Backup List 46 Tahoe Regional Planning Agency - Federal Transportation Improvement Program (Dollars in Whole) State Highway System DIST: PPNO: 03 COUNTY:

More information

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM Directions to Grand Lake, CO 625 mi about 13 hours 10 mins Loading... 1 of 5 2/13/09 8:26 AM Yellowstone East Entrance 1. Head east on E Entrance Rd/US-14/US-16/US-20 Continue to follow US-14/US-16/US-20

More information

TripTik Overview Directions. TripTik Overview Map. Directions

TripTik Overview Directions. TripTik Overview Map. Directions TripTik Overview TripTik Overview 50 mi 100 km Legend Trip Origin Trip Destination Stopover Controlled Access Toll Primary Secondary Local Unpaved Tunnel Ferry, Auto Ferry, Passenger Interstate TransCanadian

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Engineering Report: Shasta-Trinity National Forest. Trinity River Management Unit. Analysis of. National Forest System Road 37N08Y

Engineering Report: Shasta-Trinity National Forest. Trinity River Management Unit. Analysis of. National Forest System Road 37N08Y Engineering Report: Shasta-Trinity National Forest Trinity River Management Unit Analysis of National Forest System Road 37N08Y (milepost 0.00 to 8.70) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Year Built: ,972 sq. ft. (including basement) Roof: Replaced in drive-in doors and 1 dock-door. Yes partial wet system (basement)

Year Built: ,972 sq. ft. (including basement) Roof: Replaced in drive-in doors and 1 dock-door. Yes partial wet system (basement) FOR SALE / LEASE 415 BASELINE RD., BOWMANVILLE OFFICE BUILDING 34,972 SQ.FT ON 2.87 ACRES For further information contact: Robert Bellissimo President, Broker of Record rbellissimo@strategicpm.ca Jeff

More information

Click to edit Master title style

Click to edit Master title style P3s Come In All Shapes And Sizes Mr. Greg Slater, Administrator 7/26/2018 1 1 Customer-Driven Customer First TODAY S DISCUSSION Introduction to MDOT MDOT P3 Experience Full Delivery Stream Restoration

More information

Commercial Industrial Land Available

Commercial Industrial Land Available Commercial Industrial Land Available PID: 200970010 List Price $744,292 Price Per Square Foot: $3.00 Sq. Ft. Property Details Street Address: Laredo St. & South St. Parcel ID: 200970010 City: Belle Plaine

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

CR 510/85 Street from CR 512 to 58 Avenue

CR 510/85 Street from CR 512 to 58 Avenue Date: November 14, 2017 To: CR 510/ 85 Street PD& Project File From: Metric ngineering, Inc. Subject: FM No.: 405606-2-22-02 Air Quality Screening Test CR 510/85 Street from CR 512 to 58 Avenue Indian

More information

Steeplechase Builder Package Builder Permit-Ready Lots

Steeplechase Builder Package Builder Permit-Ready Lots Steeplechase Builder Package Builder Permit-Ready Lots B.J. Johanningmeier Broker / Manager RE/MAX Eagle Rock - Commercial Division 6028 Stallion Drive, Loveland, CO 80538 (970) 227-3393 bj@remax.net Ryan

More information

Leg 1 (D) 7.1 Miles - The Chase Begins. The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes.

Leg 1 (D) 7.1 Miles - The Chase Begins. The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes. 7.1 Miles - The Chase Begins Leg 1 (D) GPS START 37.93071,-85.653022 END 37.89913,-85.564764 The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes. 0.0

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

LCDOT DETOUR PROCEDURES. and GUIDELINES

LCDOT DETOUR PROCEDURES. and GUIDELINES LCDOT DETOUR PROCEDURES and GUIDELINES LCDOT Traffic Department (847) 377-7400 Rev 2/3/2017 ADVANCE ROAD CLOSED SIGNS (W20-3) These signs shall be a 48" x 48" Black Legend on Fluorscent Orange Sheeting.

More information

LAND FOR SALE. INDIAN RIVER CITRUS GROVE 491± acres Indian River County, FL. Maury L. Carter & Associates, Inc

LAND FOR SALE. INDIAN RIVER CITRUS GROVE 491± acres Indian River County, FL. Maury L. Carter & Associates, Inc LOCATIO Located in Indian River County, 7 miles west on Hwy 60 from I-95, turn south on 154th Avenue (follow aerial map to property). SIZE 491± Acres PRICE - Price Reduced! OW: $2,111,300 WAS: $2,405,900

More information

CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE

CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE Arcola Middle School (Methacton School District) 4001 Eagleville Road Norristown, PA 19403 (610) 489-5000

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) LEVY COUNTY Highways: State Highways 4135251 D2-LEVY COUNTY TRAFFIC SIGNAL

More information

PRESS RELEASE Tahoe Fire and Fuels Team

PRESS RELEASE Tahoe Fire and Fuels Team PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 13, 2015 Widespread prescribed fire operation to continue Contacts: North Lake Tahoe Fire Protection District, Isaac Powning 775-

More information

ROKERS WELCOME www.pointecentre.com - Mile Radius - Mile Radius - Mile Radius - Mile Radius - Mile Radius - Mile Radius - Mile Radius - Mile Radius HICKORY VALLEY GOLF COURSE - Mile Radius 64 - Mile Radius

More information

For inspection purposes only.

For inspection purposes only. 6 Section D.1.3 Line Maintenance. Process Description The Line Maintenance Division, located primarily on the ramp at Dublin Airport provides aircraft turnaround, and aircraft maintenance support to contracted

More information

MS150 Rider Route (Highlighted) Preferred Vehicle Alternate Route

MS150 Rider Route (Highlighted) Preferred Vehicle Alternate Route Saturday Starting Line Tully Stadium VOLUNTEER HOURS - 5:00 AM TO 9:00 AM - The Starting Line is going to have some streets blocked by police to control traffic. You should be arriving early enough to

More information

Millridge Commercial Real Estate Inventory List February 2014

Millridge Commercial Real Estate Inventory List February 2014 Millridge Commercial Real Estate Inventory List February 2014 BUILDINGS WAKE COUNTY or Lease Heritage Office Building 3319 Heritage Trade Drive 2 story 1.01 Acre lot Yr. Built: 2006 Sale Price: $1,500,000

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

NICTI Alternatives Analysis

NICTI Alternatives Analysis EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite

More information

TOM'S BODY SHOP 174 Kings Highway, Fredericksburg, VA 22405

TOM'S BODY SHOP 174 Kings Highway, Fredericksburg, VA 22405 PROPERTY TYPE: AVAILABLE SF: LEASE RATE: LOT SIZE: Industrial Lease Space 4,524 SF $14.59 SF/Yr (MG) 0.69 Acres PROPERTY OVERVIEW Established Auto Body and Repair shop located at highly visible signalized

More information

Beneficial Use Designations for Stream Reaches: Clearwater River Watershed ( )

Beneficial Use Designations for Stream Reaches: Clearwater River Watershed ( ) Beneficial Use Designations for Stream Reaches: Clearwater River Watershed (09020305) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires moderate

More information

Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed ( )

Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed ( ) Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed (07020007) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. Introductions and TIM Updates provided by Dee Dee

More information

Non-ABM Component Status. Presented to project status meeting: 11/27/2017

Non-ABM Component Status. Presented to project status meeting: 11/27/2017 Non-ABM Component Status Presented to project status meeting: 11/27/2017 1 StreetLight update areas Airport» TOD splits» Distribution Internal/External» TOD splits» Distribution» External-External vs.

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

Assisted Living / Memory Care - South Forsyth

Assisted Living / Memory Care - South Forsyth ! Assisted Living / Memory Care - South Forsyth LOCATION: 6388 Post Road, Cumming, GA 30040 - Forsyth County Parcel ID - 037-012 2 nd District, 1 st Section, Land Lot 317 SIZE: 5.4723 acres +/- ZONING:

More information

Cleary Rd and Belvedere Rd West Palm Beach, FL Great Centralized PB County location. Easy access to I-95 and Fl. Turnpike

Cleary Rd and Belvedere Rd West Palm Beach, FL Great Centralized PB County location. Easy access to I-95 and Fl. Turnpike and Belvedere Rd For more information contact: John Hoecker, CCIM, CPM, CSM President 5613668424 John@JupiterRealtyCompany.com Great Centralized PB County location. Easy access to I-95 and Fl. Turnpike

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

Kendall Drive Premium Transit PD&E Study

Kendall Drive Premium Transit PD&E Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From

More information

VEHICLE NO.1- Your Vehicle. Began From. License Plate # (Street, Highway, Mile Marker, Terminal or Other Landmark) Near At VEHICLE NO.2.

VEHICLE NO.1- Your Vehicle. Began From. License Plate # (Street, Highway, Mile Marker, Terminal or Other Landmark) Near At VEHICLE NO.2. Bates College Automobile Accident Report Please notify Security immediately after an incident. Complete and submit this report within 24 hours of the accident to Adam Mayo in Security. Please fill out

More information

City of Ironton WWTP. General Information County: Lawrence Counties Served: Lawrence. Type of System: Public: X Private: Year Established: 1953

City of Ironton WWTP. General Information County: Lawrence Counties Served: Lawrence. Type of System: Public: X Private: Year Established: 1953 City of Ironton WWTP General Information County: Lawrence Counties Served: Lawrence Type of System: Public: X Private: Year Established: 1953 Year of Upgrades: 1987 EPA District: Southeast Treatment Plant

More information

Olson-EcoLogic Engine Testing Laboratories, LLC

Olson-EcoLogic Engine Testing Laboratories, LLC Olson-EcoLogic Engine Testing Laboratories, LLC Fuel Economy Comparison TEST REPORT With Kia and Hyundai Automobiles When Tested Over the CARB Approved AMA Road Test Cycle For: SaviCorp 2530 South Birch

More information

SECONDARY ROAD CONSTRUCTION PROGRAM

SECONDARY ROAD CONSTRUCTION PROGRAM Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system

More information

Housing Development Corp of Dekalb

Housing Development Corp of Dekalb Housing Development Corp of Dekalb Campaign Contributions Disclosure Form Have you as applicant, agent for applicant, property owner, or person associated with the application for property, located at,

More information

Elkhart River Greenway Trail

Elkhart River Greenway Trail EXTENDED ROUTE Elkhart River Greenway Trail For more information on this trail, see page 34 of the Elkhart County 2017 Trail Guide. Start at the Elkhart River Greenway Trailhead in Studebaker Park and

More information

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements Project Information During the summer of 2016, construction will begin on a three year project to reconstruct the interchanges on Highway 2 at Gaetz Avenue and Taylor Drive near the City of Red Deer. The

More information

Speed Limit Bylaw Rangitikei District Council. Including the 2013, and 2014 and 2016 Amendments. 1 Introduction

Speed Limit Bylaw Rangitikei District Council. Including the 2013, and 2014 and 2016 Amendments. 1 Introduction Including the 2013, and 2014 and 2016 Amendments 1 Introduction 2 Title Pursuant to Section 684(1)(13) of the Local Government Act 1974, the Local Government Act 2002, the Land Transport Rule: Setting

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA IFB #Y DG LANDSCAPE MAINTENANCE AT ORANGE COUNTY PUMP STATIONS ADDENDUM NO.

BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA IFB #Y DG LANDSCAPE MAINTENANCE AT ORANGE COUNTY PUMP STATIONS ADDENDUM NO. March 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA IFB #Y17-1026-DG LANDSCAPE MAINTENANCE AT ORANGE COUNTY PUMP STATIONS ADDENDUM NO. 1 This addendum is hereby incorporated into the bid

More information

The 2018 Reciprocal Information Sheet

The 2018 Reciprocal Information Sheet Bear's Paw CC 2500 Golden Gate Pkwy s in The 2018 Reciprocal Information Sheet 18 2 s 262-1836 $47.00 $47.00 $73.00 $73.00 Take I 75 South to Golden Gate Pkwy (Exit 105). Head West on Golden Gate Pkwy

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In - Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.

More information

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway) CITY of NOVI CITY COUNCIL Agenda Item K August 27, 2012 SUBJECT: Approval to award an amendment to the engineering services agreement with Spalding DeDecker Associates, Inc. related to the 2012 Pathway

More information

Market Activity Report Southeast Minnesota Wabasha, Winona, Fillmore, & Houston Counties Raw Land 1 st Qtr 2018

Market Activity Report Southeast Minnesota Wabasha, Winona, Fillmore, & Houston Counties Raw Land 1 st Qtr 2018 Market Activity Report Southeast Minnesota Wabasha, Winona, Fillmore, & Houston Counties Raw Land 1 st Qtr 2018 Aaron Prescott Realtor Dave Mathes Realtor 2559 E 7 th Avenue North St. Paul MN 55109 651-362-0123

More information

DRAFT FINAL REPORT THE FLORIDA DEPARTMENT OF TRANSPORTATION SYSTEMS PLANNING OFFICE. on Project. Estimation of Capacities on Florida Freeways

DRAFT FINAL REPORT THE FLORIDA DEPARTMENT OF TRANSPORTATION SYSTEMS PLANNING OFFICE. on Project. Estimation of Capacities on Florida Freeways DRAFT FINAL REPORT to THE FLORIDA DEPARTMENT OF TRANSPORTATION SYSTEMS PLANNING OFFICE on Project Estimation of Capacities on Florida Freeways FDOT Contract BDV32 TWO 977-03 July 22, 2014 by Lily Elefteriadou,

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP 414 Nicollet Mall Minneapolis, MN 55401 March 13, 2017 Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101 Via Electronic Filing RE:

More information

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel 1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel 2. Incident I-110 South Bound, MM 4.1, overturned Greyhound Bus (full of passengers) multiple injuries, some critical

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA

2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA 2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA OV ERV IE W 2 0 4 2 L A K E T A H O E B O U L E VA R D ST AT EL IN E GO ND SOUTH LAKE TAHOE LV EB TAHOE VALLEY ER LA KE TA HO PIO NE EB LV D TR AIL D O AH

More information

High Risk Rural Road Program Road Safety Audit Report

High Risk Rural Road Program Road Safety Audit Report High Risk Rural Road Program Road Safety Audit Report Pasco County Audit Date: December 10-11, 2009 Task Work Order No. 16 District-wide Road Safety Audit Study FPN No.: 421040-1 prepared for: Florida

More information

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B)

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B) 520,000 SF ON 104.46 ACRES 460-480 RESEARCH DR. (PARCEL 43B) CENTERPOINT COMMERCE & TRADE PARK EAST PITTSTON TOWNSHIP, PA 18640 FACILITY EXPANDABLE TO 780,000 SF LERTA APPROVED! 10-YEAR, 100% REAL ESTATE

More information

IC Chapter 5. Heavy Duty Highways and Extra Heavy Duty Highways

IC Chapter 5. Heavy Duty Highways and Extra Heavy Duty Highways IC 9-20-5 Chapter 5. Heavy Duty Highways and Extra Heavy Duty Highways IC 9-20-5-1 Establishment and designation of heavy duty and extra heavy duty highways; removal of designation; publication of map

More information

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Nonprofit Insurance Trust (NIT) Preferred Shop Network Nonprofit Insurance Trust (NIT) Preferred Shop Network NPIA, Inc. on behalf of the Nonprofit Insurance Trust and its members, has implemented a Preferred Shop Network for vehicle repairs. These shops have

More information

ABB OVR Recloser and PCD Relay Training Program

ABB OVR Recloser and PCD Relay Training Program ABB OVR Recloser and PCD Relay Training Program 2009 OVR Recloser & PCD Relay Training Program Training Scope Discover how to best apply, operate, maintain, and test OVR Reclosers and PCD Relays to improve

More information

SPECIFICATIONS FOR 456,000 SF

SPECIFICATIONS FOR 456,000 SF 200 TECHNOLOGY DRIVE CENTERPOINT COMMERCE & TRADE PARK EAST JENKINS TOWNSHIP, PA SITE PLAN 1,038,500 SF SITE PLAN 456,000 SF - 775,000 SF Information shown is purported to be from reliable sources. No

More information

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN

Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Transportation Statistical Data Development Report BAY COUNTY 2035 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation,

More information