2 TABLE OF CONTENTS I. INTRODUCTION... 1 II. PROJECT IDENTIFICATION... 1 III. PROJECT SELECTION... 1 Safety...1 Non-reimbursable Portions of Relocation Projects...2 Load Growth Improvements...2 Reliability...2 Target Areas...2 IV. LIST OF PROJECTS Undergrounding Projects Spreadsheet...3 APPENDIX A Underground Project Summary Sheets 2015 Girdwood Olympic Mountain Loop... A Old Seward Hwy - 92nd Ave (State Relocation)... A Spring Hill Estates... A Autumn Ridge... A Bentzen Subdivision...A Heritage Heights... A Dowling Substation Feeder 512 and 34.5 kv Upgrade... A Spenard 312 to LaTouche A Dowling LaTouche 122-4/0 Upgrade... A Dowling 412/612-4/0 Upgrade to 750 kcmil... A Jewel Lake Road - Strawberry to 84th... A Dowling Subdivision... A Arctic Boulevard... A Muldoon Road - Creekside to Northern Lights... A DeBarr Road - Creekside to Muldoon... A Old Seward Hwy - O'Malley Rd. to Huffman Rd.... A Wisconsin Street... A Old Seward Hwy - Dimond Blvd. to O'Malley Rd.... A-18

3 I. INTRODUCTION On March 1, 2005, the Anchorage Assembly adopted certain revisions to Section 21.07, Utility Distribution Facilities, of the Anchorage Municipal Code. These revisions required an electric utility to include as part of its annual capital improvement plan, a five-year undergrounding program ( F.1). In each of the years of this program the electric utility shall plan on expending at least two percent of a three-year average of its annual gross retail revenues derived from utility service connections within the municipality ( G.1a). This requirement means that Chugach Electric Association (Chugach) is required to spend approximately $3.2 million annually to underground existing overhead facilities. Over expenditures or under expenditures may be carried over as an adjustment to the following year s obligation. In the development of the five-year undergrounding program the electric utility is allowed to choose which existing lines to underground. Specifically, priorities for the program shall be based on undergrounding in conjunction with the electric utility s essential system improvements and then by target area ( F.1). The following document contains Chugach s five-year undergrounding program. Overall, the plan calls for $16,050,000 to be expended on undergrounding existing overhead lines from 2015 to 2019, for an average of $3,210,000 annually. The projects were chosen taking into account Chugach's overall system needs and consideration of the designated target areas. The inclusion of a project within this plan does not guarantee that the project will be constructed in the designated year. II. PROJECT IDENTIFICATION In order to reduce the overall financial impact of the ordinance on the utility ratepayers, in the revisions adopted by the Anchorage Assembly, provisions were made for utilities to choose projects that have benefits that are not just aesthetic. Therefore, following the direction of the ordinance, Chugach has determined projects essential to the continued reliable operation of the electrical system by reviewing its system outage data, results from an ongoing inspection program, load growth analysis and target areas. III. PROJECT SELECTION Chugach s undergrounding projects are intended to implement one or a combination of five main objectives. These objectives are listed in order of priority; however, the priority of a project can change depending on the specific project and how it relates to maintaining the integrity of the Chugach system. 1. Safety: These projects will improve the safety of our system by retiring overhead facilities as they are identified where clearances or strength requirements are less than mandated by the National Electric Safety Code (NESC). Lines over residential houses or buildings, although not necessarily a code violation, pose a 1

4 potential safety concern and will attempt to be relocated underground as part of this plan. 2. Non-reimbursable Portions of Relocation Projects: State and Municipal road projects often include the relocation of existing utility facilities at the expense of the road project. Under this category, Chugach will fund any betterment undertaken by the utility embedded within the relocation work or add small system improvements that may lie just outside of the scope of the road project but that are ideal to construct at the same time. 3. Load Growth Improvements: Existing overhead facilities are sometimes insufficient to handle the additional load of a large commercial or residential development. Instead of reconductoring an existing pole line with larger conductor, these projects will install larger underground conductor and retire the overhead facilities. 4. Reliability: Chugach realizes the need for reliable electrical service and on an ongoing basis analyzes the system to ensure this reliability remains at an acceptable standard. These projects include loop closures to provide an alternate feed for radial underground circuits. Some areas have higher numbers of wind related or tree related outages. These areas may benefit by retiring overhead systems and replacing them with underground facilities. 5. Target Areas: Existing overhead facilities located in target areas as defined in Designation of Target Areas ( F) emphasize locations that would benefit significant numbers of people. Some of the areas specifically listed include central business areas, major traffic corridors, parks and recreational areas, and school and university areas. IV. LIST OF PROJECTS The following spreadsheet lists the undergrounding projects to be performed in the years from 2015 to Project summary sheets have been created and are included in Appendix A. 2

5 $ 16,050,000 $ 3,200,000 $ 3,200,000 $ 3,150,000 $ 3,300,000 $ 3,200,000 Last Revised: 12/09/ WK Overhead to Underground Projects Chugach Electric Association, Inc. Project Description Page Number Grid Work Order Cost Estimate Girdwood Olympic Mountain Loop - OH to UG Conversion A E $ 100,000 $ 100,000 $ - $ - $ - $ - Old Seward Hwy - 92nd Ave (State Relocation) A E $ 225,000 $ 225,000 $ - $ - $ - $ - Spring Hill Estates - OH to UG Conversion A E $ 160,000 $ 160,000 $ - $ - $ - $ - Autumn Ridge - OH to UG Conversion A E $ 110,000 $ 110,000 $ - $ - $ - $ - Bentzen Subdivision - OH to UG Conversion A E $ 150,000 $ 150,000 $ - $ - $ - $ - Heritage Heights - OH to UG Conversion A E $ 200,000 $ 200,000 $ - $ - $ - $ - Dowling Substation Feeder OH to UG Conversion A7 1935, 2035 E $ 130,000 $ 130,000 $ - $ - $ - $ - Dowling Substation Upgrade 34.5kV - OH to UG Conversion A7 1935, 2035 E $ 525,000 $ 525,000 $ - $ - $ - $ - Spenard 312 to Latouche OH to UG Conversion A , 1832 E $ 2,800,000 $ 1,600,000 $ 1,200,000 Dowling Latouche 122-4/0 upgrade OH to UG conversion A TBA $ 500,000 $ - $ 500,000 $ - $ - $ - Dowling 412/612-4/0 upgrade to 750kcmil - OH to UG Conv. A TBA $ 1,500,000 $ - $ 1,500,000 $ - $ - $ - Jewel Lake Road - Strawberry to 84th OH to UG Conversion A , 2225 TBA $ 1,250,000 $ - $ - $ 1,250,000 $ - $ - Dowling Subdivision - OH to UG Conversion A TBA $ 600,000 $ - $ - $ 600,000 $ - $ - Arctic Boulevard - OH to UG Conversion A , 2229 TBA $ 1,300,000 $ - $ - $ 1,300,000 $ - $ - Muldoon Road - Creekside to Northern Lights OH to UG Conv. A , 1540, 1640 TBA $ 1,750,000 $ - $ - $ - $ 1,750,000 $ - DeBarr Road - Creekside to Muldoon OH to UG Conversion A TBA $ 550,000 $ - $ - $ - $ 550,000 $ - Old Seward Hwy - O'Malley Rd to Huffman Rd OH to UG A TBA $ 1,000,000 $ - $ - $ - $ 1,000,000 $ - Wisconsin Street - OH to UG Conversion A , 1726 TBA $ 1,500,000 $ - $ - $ - $ - $ 1,500,000 Old Seward Hwy - Dimond Blvd to O'Malley Rd OH to UG A , 2432, 2532 TBA $ 1,700,000 $ - $ - $ - $ - $ 1,700,000 OH to UG: overhead to underground Estimated Project Expenditures for Five-Year Plan $ 16,050,000 Estimated Spending Requirements for Five-Year Plan $ 15,725,674

6 Appendix A Underground Project Summary Sheets 4

7 GWSS UNDERGROUNDING PROJECT GIRDWOOD MOUNTAIN LOOP OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $100,000 This project will retire five distribution poles in the Girdwood/Alyeska area and install underground facilities. Chugach is using a Municipality of Anchorage / State of Alaska road project to facilitate this underground project. Costs associated with stream crossing, SWPPP and traffic control will be included under the road contractor s project. Chugach will not only underground these existing facilities, but at the same time loop two underground single phase radials in the process. For additional information concerning this project, please contact Shelly Schmitt at Secondary Overhead Conductor ASPEN RD GWSS 322 GWSS 422 BRIGHTON RD ALYESKA AV GARMISCH RD LOVELAND RD CORTINA RD DAVOS RD ALYESKA HWY Snow Ridge Condos ARLBERG AV CR YSTA L RD GWSS 422 GWSS Alyeska Day Lodge Alyeska Race Training Center TAOS RD ,560 2,340 3,120 1 inch = 448 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :5,376 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\Contents\2015 Girdwood Mountain Loop.mxd Last Updated: 10/23/2014 WK

8 LONG ST NEW SEWARD HWY SLSS UNDERGROUNDING PROJECT OLD SEWARD HWY AND 92ND AVENUE OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $225,000 This safety and capacity project will replace 0.3 mile of the three-phase overhead 336 kcmil underbuild circuit with750 kcmil underground cable in duct. This work is in conjunction with the State of Alaska DOT road relocation project at Old Seward Hwy and 92nd Ave. For additional information concerning this project, please contact Shelly Schmitt at house of critters K&W Interiors Full Swing Golf 2431 OLD SEWARD HWY ABBOTT RD SHORT ST ,150 1,725 2,300 1 inch = 333 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 BRAYTON DR SLSS 412 SLSS 412 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2015 Old Seward Hwy 92nd Ave.mxd Last Updated: 12/9/2014 WK

9 DLSS 212 CARLSON RD JUPITER DR OMSS 412 OMSS UNDERGROUNDING PROJECT SPRING HILL ESTATES OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $160,000 The overhead distribution along the west side of Spring Hill Drive will be converted to underground. This line has exposure to large trees and was impacted heavily during the 2012 windstorm. The circuit feeds AK Child & Family s Jesse Lee Campus (formerly Alaska Children s Services) as well as an underground residential circuit. The new underground circuit will be fed directly from the Hillside feeder. Feeders are high priority circuits to be re-energized during major windstorm outages; customers with underground feeder ties will see shorter outage durations. For additional information concerning this project, please contact Shelly Schmitt at SOLAR DR 2336 DLSS 212 BIRCH RUN DR 2436 E 96TH AVE MARS DR DLSS 212 Jesse Lee Home-Bldg 1 Jesse Lee Home-Gilbert Center Jesse Lee Home-Bldg 4 ABBOTT RD Jesse Lee Home-Benson Center BLUE HERO N CIR SAHALEE DR SPRING HILL DR TRAILSIDE ELEMENTARY SCHOOL 2337 NICKELL CIR Elitas Golden Home Care ,560 2,340 3,120 1 inch = 448 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :5,376 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\Contents\2015 Spring Hills Estates.mxd Last Updated: 12/11/2014 WK

10 OMSS 212 STRUTZ AV OMSS 212 OMSS 412 OMSS UNDERGROUNDING PROJECT AUTUMN RIDGE OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $110,000 The overhead distribution line along the east side of Strutz Avenue will be converted to underground. This line has exposure to large trees and feeds a residential underground circuit with many homes; it was impacted heavily during the 2012 windstorm. The project will provide an underground feed directly from the main feeder. Feeder circuits are high priority to be re-energized during major windstorm outages; customers with no overhead obstructions between them and the feeder circuit will see shorter outage durations. For additional information concerning this project, please contact Shelly Schmitt at SAHALEE DR SPRING HILL DR TRAILSIDE ELEMENTARY SCHOOL NICKELL CIR Service High Pool SERVICE SENIOR HIGH SCHOOL Elitas Golden Home Care E NINETY-EIGHTH AV ABBOTT RD ZIEML AK CIR ,560 2,340 3,120 1 inch = 448 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :5,376 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\Contents\2015 Autumn Ridge.mxd Last Updated: 12/09/2014 WK

11 SPSS 412 SPSS 412 SPSS 412 SPSS 412 SPSS UNDERGROUNDING PROJECT BENTZEN SUBDIVISION - ADDITION #5 OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $150,000 The overhead distribution line from Northwood Drive to Melvin Avenue along Aspen Drive will be converted from overhead to underground. Five poles and 700 feet of #2 ACSR conductor will be retired and replaced with underground 1/0 concentric cable. The overhead line was impacted heavily by fallen trees during the 2012 windstorm; converting it to underground will decrease the number and duration of outages in this area. For additional information concerning this project, please contact Shelly Schmitt at LAKESHORE MOTOR INN Chandler Inn 1827 APSS 412 APSS 412 ASPEN DR Comfort Suites APSS 412 IRIS DR APSS 412 FORREST RD MALIBU RD KLAMATH DR MELVIN AVE W INTERNATIONAL AIRPORT RD Anchorage Montessori TERRACE BY THE LAKE - BLDG. A NORTHWOOD ELEMENTARY SCHOOL AMERICAN fst FREIGHT MICROTEL INN & SUITE ,560 2,340 3,120 1 inch = 448 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :5,376 OLD INT. AIRPORT RD SPSS 212 SPSS 412 ATSS 712 HA RU LA NORTHWOOD DR SPSS 212 W FORTY-FIFTH AVE W FORTY-EIGHTH AVE VAN BUREN ST 1828 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\Contents\2015 Bentzen Subdivision.mxd Last Updated: 10/27/2014 WK

12 OMSS 212 OMSS UNDERGROUNDING PROJECT HERITAGE HEIGHTS OH to UG Conversion PROJECT NUMBER: E PROJECT COST: $200,000 The overhead distribution line running parallel to and north of Barry Avenue will be removed and converted to underground. This line has exposure to large trees and feeds a residential underground circuit with many homes. These homes were impacted heavily during the 2012 windstorm. This project will provide an underground feed directly from the main feeder to avoid the overhead obstructions that are present. Feeder circuits are a high priority to re-energize during an outage; undergound laterals tied to the feeder experience higher reliability and shorter resoration times. For additional information concerning this project, please contact Shelly Schmitt at BIRCH RD ABBOTT RD CHISANA WY YUKON RD OLYMPIA CIR OMSS BARRY AV BRIEN ST OMSS 212 MAIN TREE DR ,150 1,725 2,300 1 inch = 333 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2015 Heritage Heights.mxd Last Updated: 12/9/2014 WK

13 DLSS UNDERGROUNDING PROJECT DOWLING SUBSTATION FEEDER 512 AND 34.5kV UPGRADE PROJECT NUMBERS: E AND E PROJECT COST: $655,000 This reliability and capacity improvement project will replace the 34.5kV overhead getaway with parallel 1000kcmil underground circuits (INSS 732 and UVSS 1232) in duct. One critical load limiting 4/0 ACSR overhead span at the source end of feeder DLSS 512 will be replaced with 750kcmil underground in duct. A vault will provide for the future underground conversion of DLSS 412 and 612. For additional information concerning this project, please contact Shelly Schmitt at DLSS DLSS 412 DLSS 412 DLSS 612 DLSS 512 Project Location DLSS DLSS 212 DLSS 512 DLSS 212 DLSS 512 DLSS ,150 1,725 2,300 1 inch = 333 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 DLSS 212 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2015 Dowling Substation Feeder 512 and 34.5kV Upgrade.mxd Last Updated: 12/9/2014 gc/wk

14 CORDOVA ST C ST B ST A ST DENALI ST LASS 166 EAGLE ST BERING ST INGRA ST KOYUK AVE W FORTY-EIGHTH AVE JUNEAU ST E FIFTY-THIRD AVE TOGIAK CIR B ST A ST LASS 155 ATSS 612 LASS 155 A ST UNDERGROUNDING PROJECT PROJECT COST: $2,800,000 SPENARD 312 TO LATOUCHE 166 4/0 ACSR Three-Phase Upgrade to 750 kcmil PROJECT NUMBER: E W FORTY-SECOND AVE Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\ Spenard 312 to Latouche 166.mxd Last Updated: 12/11/2014 WK E FORTY-SECOND PL 1731 State Farm Insurance US FISH AND WILDLIFE / Tudor Bus Ctr TUDOR PARK PLAZA Office Depot Hampton Inn AM Vets / Music Man ³ E TUDOR RD W TUDOR RD Parkwood Inn West Center Car Quest Hilton Garden Inn Central Environmental Inc FAIRBANKS ST EAGLE ST E FORTY-FIFTH AVE LASS 166 AIH Buildings Homewood Suites Hotel 1832 EGAVIK DR UHAUL main bldg Continental Motors Rehab Center Alaska Village Electric Co-op Strip Mall PROVIDENCE EXTENDED CARE FACILITY E FIFIETH AV This project will replace 1.0 mile of 4/0 ACSR 3-phase overhead with 750 kcmil underground on the Spenard 312 to LaTouche 166 tie (Grids , and 1832). This upgrade will improve the system capacity for existing and new load growth in addition to improving reliability. The summer peak loading is near the capacity limit of the 4/0 ACSR circuit. Under n-1 contingency conditions this represents one of the top three heaviest loaded 4/0 overhead line segments on the distribution system. The overhead line is presently located on the south boundary of the ML&P service area and will be relocated to the south side of Tudor Road (north boundary of the Chugach service area) where it will be available to feed loads in the increasingly densely loaded C Street corridor. The relocation of the line on a heavily used arterial meets the "target area" underground conversion focus. GCI Warehouse Alaska Rock Gym Rodda Paints E FIFTIETH AVE Continental Honda/Acura Motel 6 Fairfield Inn Suites This is for reference and review purposes only of proposed Undergrounding Projects and is for official Chugach RODDA PAINTS Fats Suto Service Crowne Plaza Hotel Korean Christian Church For additional information concerning this project, please contact Lou Mass at E INTERNATIONAL AIRPORT RD AK Bearing Hilti F.A.T.S. Alaska Tent and Tarp Grand Duchess Hope Community Resources ATSS 312 ARCTIC ROAD RUNNER STUSSER ELECTRIC 1930 LITHIA HYUNDAI 0 1,450 2,900 POLAR SUPPLY 5,800 Bailey's Furniture 1 inch = 500 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :6, ATSS 312

15 LAUREL ST LASS 177 S TAHITI LP PIPER ST DLSS 412 DLSS 612 DLSS UNDERGROUNDING PROJECT DOWLING 412 TO LaTOUCHE 122 OH to UG Conversion PROJECT NUMBER: TBA PROJECT COST: $500,000 This safety and capacity improvement project will replace 0.6 miles of the 4/0 ACSR three-phase overhead underbuild circuit (DLSS 412) with a 750 kcmil underground circuit in duct. This is the second phase of a project from Dowling Substation and will complete the capacity upgrade that ties in to the existing 750kcmil feeder tie to Latouche Substation. The 34.5kV overhead ACSR feeder (INSS 732) will benefit from the increased pole strength capacity and conductor sag clearance. Under the N-1 contingency condition the DLSS 412 circuit has the heaviest loaded 4/0 ACSR segment the remains on the Chugach distribution system. For additional information concerning this project, please contact Shelly Schmitt at SAMOA ST US Post Office 1934 NORTHERN LIGHTS ABC ELEMENTARY American Hyperbarics 2033 TONGA ST FIJI ST TINIAN ST RAYMOND ST MEGO ST E DOWLING RD MEADOW VIEW DR ROSE HIP CIR E SIXTY-FOURTH AVE NADINE ST NEWT DR DOIL DR G R O SS DR NORM DR 2034 DOIL CIR AWWU Well ,740 2,610 3,480 1 inch = 500 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2016 Dowling 412 TO 122.mxd Last Updated: 12/11/2014 WK

16 DLSS 412 DLSS 612 DLSS UNDERGROUNDING PROJECT DOWLING 412/612 4/0 ACSR Three-Phase Upgrade to 750 kcmil PROJECT NUMBER: TBA PROJECT COST: $1,500,000 This project will replace 0.9 miles of 4/0 ACSR three-phase overhead with 750 kcmil underground on the Dowling 412 to 612 tie (Grid 2034). This upgrade will improve the system capacity for existing and new load growth in addition to improving reliability. The summer peak loading is near the capacity limit of the 4/0 ACSR circuit. Under n-1 contingency conditions, this represents the heaviest loaded 4/0 overhead line segment on the distribution system. The relocation of the line along a new arterial route with rapidly increasing traffic volumes should qualify as a Target Area for underground conversion. For additional information concerning this project, please contact Will Klatt at DLSS 412 DLSS DLSS DLSS 612 DLSS 512 DLSS 212 DLSS 212 DLSS ,320 1,980 2,640 AWWU Well 13 1 inch = 380 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 DLSS 412 DLSS 512 DLSS 512 DLSS 212 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2016 Dowling 612 to 412.mxd Last Updated: 12/12/2014 WK

17 RBSS 212 JLSS 132 LOGANBERRY ST RBSS 212 HUCKLEBERRY ST CRYSTAL ST JLSS 122 JLSS 122 JLSS 122 JLSS UNDERGROUNDING PROJECT JEWEL LAKE ROAD PROJECT NUMBER: TBA Strawberry to 84th Avenue PROJECT COST: $1,200, SAND LAKE ELEMENTARY SCHOOL Under this project, the existing 1/0 ACSR threephase line between Riser Pole 9866 (Grid 2125) and Riser Pole 9708 (Grid 2225) will be replaced with Chugach s standard 750 kcmil underground cable specified for main feeder circuits. Approximately 2200 feet of overhead Raspberry 212 main feeder circuit and 2800 feet of Jewel Lake 132 main feeder circuit along Jewel Lake Road, south of the Raspberry Road intersection, would be retired within the scope of this project. The first phase of this project from Raspberry to Strawberry was completed in The second phase is scheduled for Replacement of this 1/0 ACSR circuit with 750 kcmil cable would increase the feeder transfer capacity from 6 MVA to 13 MVA. This area has also been documented as an area with tree trimming difficulties. By relocating the facilities underground, the reliability associated with tree related outages should improve. This is for reference and review purposes only of proposed Undergrounding Projects and is for official Chugach For additional information concerning this project, please contact Will Klatt at SAND LAKE NORDALE ST CANAL ST 2225 ST. BENEDICT'S SUE ST DEL ST BRENTWOOD DR JEWEL LAKE RD W EIGHTIETH AV ST.BENEDICT'S ST. BENEDICT'S ANCHORAGE FIRE DEPARTMENT STORAGE FACILITY WESTLAKE AV 2325 JLSS 142 MOORLAND ST JLSS 142 STRAWBERRY RD 2226 GLORIA DEI LUTHERN CHURCH JLSS ,060 1,590 2,120 1 inch = 500 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 JLSS 122 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2016 Jewel Lake Road - Strawberry to 84th.mxd Last Updated: 10/29/2014 WK

18 LASS 122 SLSS 712 ROSEWOOD ST LATOUCHE ST SLSS 712 ROWAN ST DLSS 412 BURLWOOD ST DOW PL DLSS 412 DLSS 412 PETERSBURG ST 2017 UNDERGROUNDING PROJECT DOWLING SUBDIVISION PROJECT NUMBER: TBA PROJECT COST: $600,000 This project will upgrade eight spans of #2 ACSR on Dowling Substation Feeder 412 within Dowling Subdivision on the east side of the New Seward Highway between Dowling Road and E 64th Avenue with 750 kcmil underground cable. This project is a component of load reallocation between LaTouche, Sand Lake, Klatt, Dowling and the new substation on O'Malley Road. For additional information concerning this project, please contact Shelly Schmitt at Loomis Inc. GREENWOOD ST HOFFMAN STRAPPING & FASTENING E DOWLING RD HOMER DR NEW SEWARD HWY BRAYTON DR Polaris School M & M DIST SPEEDY AUTO REPAIR 2032 Shop Building 2033 E SIXTY-FOURTH AVE E SIXTY-SIXTH AVE LASS 122 E DRIFTWOOD ST BRAYTON DR ASHWOOD ST DLSS 412 MEADOW ST WATERWOOD Cir LILY POND CIR RIERI E DR E SIXTY-FOURTH AVE 1933 FYFE CIR Multiple Bus NorthSlope Telecom ASKELAND ST E SIXTY-SIXTH AVE ,750 2,625 3,500 1 inch = 500 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :6,000 DLSS 412 Path: I:\I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2017 Dowling Subdivision.mxd Last Updated: 10/29/2014 WK

19 ATSS 412 STANLEY DR ATSS 412 ATSS 412 ATSS 412 PAPAGO PL ATSS 412 ARCTIC BLVD ATSS 412 HART ST 2017 UNDERGROUNDING PROJECT ARCTIC BOULEVARD South of 68th to North of Dimond Boulevard PROJECT NUMBER: TBA PROJECT COST: $1,300,000 W SEVENTIETH AV This project will retire the overhead three-phase line along the west side of Arctic Boulevard from 68th Avenue south to the new underground facilities located 800 feet north of Dimond Boulevard. This main 4/0 ACSR feeder serves significant load off Arctic 412 and ties into the heavily loaded Sand Lake 812 feeder. Summer peak loadsfor Arctic 412 have been exceeding the continuous rated summer limit for 4/0 ACSR conductor of 258 amps. Contingency situations or increased load growth in this area would see overloads on the 4/0 ACSR portions of this feeder. By retiring the 4/0 ACSR and replacing it with 750 kcmil underground cable, the ampacity of this feeder will increase to 550 amps for summer conditions. This is for reference and review purposes only of proposed Undergrounding Projects and is for official Chugach For additional information concerning this project, please contact Shelly Schmitt at W SEVENTY-FIRST AV W SEVENTY-SECOND AV 2129 CAMPBELL ELEMENTARY SCHOOL L INDA LA W EIGHTIETH AV 2229 W SEVENTY-SECOND AV RAPPE CT ATSS HIG H LANDER DR ,050 1,575 2,100 1 inch = 500 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 BRANCHE DR ATSS 412 C ST SLSS 712 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2018 Arctic Blvd.mxd Last Updated: 10/29/2014 WK

20 PATTERSON ST PAXSON DR TAGALAK DR MULDOON RD BRIN EAST VIEW DR EARLY VIEW DR MULDOON CIR This project is the last phase of the replacement of 4/0 ACSR three-phase with 750 kcmil cable in duct between Baxter and DeBarr Substations. The overhead line is non-compliant with regard to the NESC strength requirements and in a known high wind corridor. The capacity increase is required to feed DeBarr Feeder 142 and 152 from the Baxter Substation, particularly in the event of the loss of the DeBarr Substation (transformers, bus or 35 kv feed). The circuit is located along a high visibility arterial and in an area of local load growth. E SEVENTEENTH AVE CHESTER VALLEY ELEMENTARY SCHOOL 1439 YORKSHIRE LA UNDERGROUNDING PROJECT PROJECT NUMBER: TBA For additional information concerning this project, please contact Shelly Schmitt at CHANDALAR DR AUGUSTINE DR MULDOON ROAD Creekside to Northern Lights 1440 TIKCHIK CIR TANGLE CT E NORTHERN LIGHTS BLVD ISLAND DR SUSITNA ELEMENTARY SCHOOL 1640 KALGIN S T EASTBR OOK DR US POST OFFICE CARRS Muldoon PROJECT COST:$1,750,000 CARRS SATELLITE BRINK CT K DR PARK WAY DR STATE ST HALLIGAN ST POPCARY D R HAVITUR WY GREEN DALE DR E TWENTIETH AVE UNNAMED BYRNE DR 1541 E SEVENTEENTH AVE REBEL RIDGE DR H ALLIGAN DR MOLLY O PVT RIDGEWAY AV OWEN CIR VINCE N T ST E NORTHERN LIGHTS BLVD BROOKRIDGE DR ,250 2,500 3,750 5,000 1 inch = 800 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2018 Muldoon Road-Creekside to Northern Lights.mxd Last Updated: 10/29/2014 WK

21 DBSS 172 DBSS 172 DBSS 172 DBSS 172 DBSS 172 DBSS 152 BXSS 182 DBSS 152 DBSS 152 BOSTON ST DBSS UNDERGROUNDING PROJECT DEBARR ROAD Creekside to Muldoon PROJECT NUMBER: TBA PROJECT COST: $550,000 This project will retire 9 distribution poles along DeBarr Road south of Fred Meyer and install underground facilities. With the construction of the Creekside Town Center, Begich Middle School and Wal-Mart the loads in this area have increased and will continue to increase, initiating the need for system improvement projects in this area. DeBarr feeders 152, 162 and 172 were all constructed with 4/0 ACSR overhead main lines and will be upgraded to standard 750 kcmil underground construction. DeBarr 152 and 162 currently run as an overhead double circuit from Patterson to Muldoon along E 10th Avenue, and DeBarr 172 runs overhead down the north side of DeBarr Road from Patterson to Muldoon. For additional information concerning this project, please contact Shelly Schmitt at OLD HARBOR AVE 1340 FRED MEYER ALASKA COMMUNICATIONS SYSTEMS EAST WIRE CENTER DBSS BXSS 182 Hollywood Auto DEBARR RD MULDOON MALL ,400 2,100 2,800 American Legion 1 inch = 400 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS :4,800 DBSS 172 BXSS 182 BXSS 182 BXSS 182 MULDOON RD DBSS 152 DBSS 152 DBSS STATE ST 1441 BXSS 292 Path: I:\I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2018 DeBarr Road - Creekside to Muldoon.mxd Last Updated: 12/11/2014 WK

22 JOHNS RD GREGORY RD ELLEN AV DAVE LA CORDOVA ST HACE ST LANDMARK ST DIVISION ST CORNELIA ST HAWKINS LA LANG ST NEW SEWARD HWY READER RD READER RD 2018 UNDERGROUNDING PROJECT OLD SEWARD HWY O'MALLEY TO HUFFMAN OH to UG Conversion KLSS 412 and KLSS 812 PROJECT NUMBER: TBA PROJECT COST: $1,000,000 This safety improvement and capacity project will replace 0.9 miles of 336 ACSR three-phase overhead underbuild with a 750 kcmil underground circuit in duct. This is the second phase of the project to remove the distribution underbuild from the 34.5kV overhead to increase the structure strength capacity required to maintain compliance with the NESC. When these projects are completed the available ampacity of this circuit (RRSS 1132) can be uprated based on the additional sag clearance. For additional information concerning this project, please contact Shelly Schmitt at Air Land Transport Old Shop Concrete Forms Building Block Pland AS & G Headquarters LOW'S Alaska Club South Maintenance and Shop Facility A S & G Sales Value Liquor Angelus Memorial Park NIX C OLIVE LA Cellular One Sports Center Subway Sports Center Eagle Crest Independant Truck & Auto Main Office STG Shop Coshok's Canine Castle Building A OCEAN VIEW ELEMENTARY SCHOOL Building B U. S. Post Office Integraded Supply 8-PLEX APARTMENTS Tesoro 2- Go Wells Fargo Huffman Square Bldg B PETTIS RD W HUFFMAN RD T BOTANI C AL CIR DAILEY AVE DAILEY AV MARINER DR HUFFMAN RD CLIPPER SHIP CT O"MALLEY RD Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS E KLATT RD 2832 BRAYTON DR St. Johns United Methodist Church Alaska Baptist Convention AK Baptist Family Services Residential Cottage E 112TH AV OREN DR 2732 BRAYTON DR BOWMAN ELEMENTARY SCHOOL C I RCLEWO OD DR BRAYTON DR CHINOOK AV I LYN ST BRAN D RAINBOW AV MEANDE R DR ,800 3,600 5,400 7,200 1 inch = 1,083 feet Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2018 Old Seward Hwy O'Malley to Huffman.mxd Last Updated: 12/11/2014 WK

23 MC KENZIE DR FORREST RD 2019 UNDERGROUNDING PROJECT WISCONSIN STREET Northern Lights to 44th Avenue PROJECT NUMBER: TBA PROJECT COST:$1,500,000 SEPPALA DR 1526 W NORTHERN LIGHTS BLVD 1527 TURNAGAIN ELEMENTARY SCHOOL W 29TH AVE This project will retire 36 spans of overhead double-circuit primary conductor along the west side of Wisconsin Drive from Northern Lights Boulevard to W 44th Avenue. The northernmost 26 spans will be retired in addition to the poles, guy spans and guy wires. The southernmost 10 spans are underbuilt on 138 kv structures and will only have the conductor and any additional distribution facilities removed. These overhead facilities are located on Grids 1626 and 1726 and have a total distance of 5200 feet. Turnagain Substation is located on the east side of Wisconsin Drive on Grid 1627 and has four distribution feeders: Turnagain 112, 122, 132 and 142. All four feeders leave the substation as underground circuits and riser up to the pole structures on Wisconsin. Turnagain 112 and 122 go south as a double-circuit; and Turnagain 132 and 142 go north as a double-circuit. Double-circuit horizontal construction using one crossarm, as found on Wisconsin Street, creates working clearance problems and requires extra equipment and crew time whenever maintenance is needed. The majority of the poles supporting the 4/0 ACSR double-circuit overhead line do not meet the NESC grade C minimum strength requirements. Also, under an n-1 contingency, the Turnagain 132 circuit is undersized and not capable of picking up Woodland Park 242 under summer or winter peak loads without complex switching of the load. The total load provided by the Turnagain 122 tie with Spenard 212 is also approaching winter and summer capacity limits. Replacing the circuits with 750 kcmil would resolve both the NESC strength problem and contingency loading capacities. This is for reference and review purposes only of proposed Undergrounding Projects and is for official Chugach For additional information concerning this project, please contact Shelly Schmitt at W THIRTIETH AVE W THIRTY-FIRST AVE MILKY WAY DR LAKE HOOD ELEMENTARY SCHOOL CONSTELLATION AVE W THIRTY-SECOND AVE 1626 GRISSOM CIR ORION CIR W THIRTY-SIXTH AVE 1726 W FORTIETH AVE WISCONSIN ST FAITH CHRISTIAN COMMUNITY LAKESHORE DR 1826 Spenard Lake WILEY POST LP CROSSON DR W 30TH AVE W 31ST AVE Turnagain Substation W 32ND AVE MC RAE RD LAKESHORE MOTOR INN Lakeshore Tower Condos- A BALCHEN DR W 33RD AVE W 34TH AVE W 36TH AVE BENNETT AVE Chandler Inn BORLA ND DR MERRILL DR TURNAGAIN ST TURNAGAIN BLVD W FORTY-SECOND PL ,540 2,310 3,080 1 inch = 700 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2019 Wisconsin Street.mxd Last Updated: 10/29/2014 WK

24 KING ST JOHNS RD LANG ST CORDOVA ST A ST DALLAS ST OLIVE LA OLD SEWARD HWY GOOSE BERRY PL NEW SEWARD HWY LAKE OTIS RD LONG ST GOLOVIN ST DAKOTA ST ARLON ST ARLON ST LAKE OTIS RD LAKE OTIS PKWY 2019 UNDERGROUNDING PROJECT OLD SEWARD HWY DIMOND TO O'MALLEY OH to UG Conversion PROJECT NUMBER: TBA PROJECT COST: $1,700,000 This safety improvement project will replace 1.3 miles of the 336 ACSR three-phase overhead underbuild circuit with a 750 kcmil underground circuit in duct. This is the third phase of the project to remove the distribution underbuild from the 34.5kV overhead to increase the structure strength capacity required to maintain compliance with the NESC. When these projects are completed the available ampacity of this circuit (INSS 732) can be uprated based on the additional sag clearance. For additional information concerning this project, please contact Shelly Schmitt at W NINTY-SECOND AV SOUTH TOWN CENTER Home Depot Abbott DIMOND MALL Michaels Arts & Crafts Alaska Trade Center WALDEN POND CHARTER SCHOOL A.T. Publishing Carrs Quality Center AWWU OPERATIONS & MAINTENANCE K&W Interiors FERGUSONS 2430 NORCON Fairweather Inc. Holland Roofing house of critters Great Alaskan Holidays GENSCO Pacific Asphalt ASRC Galco Warehouse Bldg A BUILDERS CHOICE TRUSS PLANT Modular Plant PEPSI BUILDING C ST E EIGHTY-EIGHTH AV E NINETY-FIRST AV O"MALLEY RD KING CIR FAIRWEATHER ENVIRONMENT 2333 ABBOTT RD THIMB L E BERRY DR CREDIT UNION ONE Tikigaq Access Apartments Fred Meyers GRACE COMMUNITY CHURCH Commodore Park Senior Housing St. Johns United Methodist Church AS & G Headquarters Alaska Baptist Convention Independence Park Manor 1 0 1,150 2,300 LOW'S Alaska 4,600 Club South 6,900 Sprinkler/Utility Building 2633 Anchorage 9,200 Roofing Air Land Transport 1 inch = 1,375 feet Coordinate System: NAD83, State Plane, Alaska Zone 4, FIPS 5004 BRAYTON DR 2632 ACADEMY DR CEDRUS CT THUJA CIR THUJA AV V ANG UARD DR 2433 STURBRIDGE CIR 2533 COLONY LP RELIANCE DR ABBOTT RD VALLEY PARK DR RIVES CT OMALLEY RD Path: I:\Engineering\Planning Section\Undergrounding Projects\ Project Manual\2019 Old Seward Hwy Dimond to O'Malley.mxd Last Updated: 12/11/2014 WK

MUNICIPALITY OF ANCHORAGE Capital Improvement Program PRIORITY LIST BY DEPARTMENT (000's) PROJECT MANAGEMENT & ENGINEERING

MUNICIPALITY OF ANCHORAGE Capital Improvement Program PRIORITY LIST BY DEPARTMENT (000's) PROJECT MANAGEMENT & ENGINEERING YEAR PROJECT TITLE CATEGORY: Roadway Improvements MUNICIPALITY OF ANCHORAGE Capital Improvement Program PRIORITY LIST BY DEPARTMENT (000's) PROJECT MANAGEMENT & ENGINEERING DEPT PRIORITY GO BONDS MATCHING

More information

PROJECT MANAGEMENT & ENGINEERING

PROJECT MANAGEMENT & ENGINEERING PROJECT MANAGEMENT & ENGINEERING Goal The goal of the of Project Management and Engineering for the 2004-2009 Capital Improvement Budget/Program is to: enhance the safe and efficient movement of people

More information

PROJECT MANAGEMENT & ENGINEERING

PROJECT MANAGEMENT & ENGINEERING PROJECT MANAGEMENT & ENGINEERING Goal The goal of the of Project Management and Engineering for the 2006-2011 Capital Improvement Budget/Program is to: enhance the safe and efficient movement of people

More information

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions RECOMMENDATIONS 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 A Call to Action 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan

More information

PROJECT MANAGEMENT & ENGINEERING

PROJECT MANAGEMENT & ENGINEERING PROJECT MANAGEMENT & ENGINEERING Department Goal The goal of the Department of Project Management and Engineering for the - Capital Improvement Budget/Program is to improve the road and drainage facilities

More information

PROJECT MANAGEMENT AND ENGINEERING

PROJECT MANAGEMENT AND ENGINEERING PROJECT MANAGEMENT AND ENGINEERING PROJECT TITLE MUNICIPALITY OF ANCHORAGE Capital Improvement Program PROJECT LIST BY DEPARTMENT Project Mgmt & Engineering YEAR G.O. BONDS STATE FEDERAL OTHER TOTAL 100TH

More information

PROJECT MANAGEMENT AND ENGINEERING

PROJECT MANAGEMENT AND ENGINEERING PROJECT MANAGEMENT AND ENGINEERING PROJECT MANAGEMENT & ENGINEERING Goal The goal of the of Project Management and Engineering for the Capital Improvement Budget/Program is to improve the road and drainage

More information

MUNICIPALITY OF ANCHORAGE PLANNING AND ZONING COMMISSION RESOLUTION NO

MUNICIPALITY OF ANCHORAGE PLANNING AND ZONING COMMISSION RESOLUTION NO MUNICIPALITY OF ANCHORAGE PLANNING AND ZONING COMMISSION RESOLUTION NO. 2016-001 A RESOLUTION RECOMMENDING APPROVAL OF AN ORDINANCE AMENDING TITLE 21 (NEW CODE) TO ENABLE MARIJUANA ESTABLISHMENTS, AND

More information

July Service Change UPDATED 4/9/18

July Service Change UPDATED 4/9/18 July 2018 Service Change UPDATED 4/9/18 The Public Transportation Department regularly revises routes and service to recognize changes in travel patterns, improve on-time performance and serve you better.

More information

2018 Capital Improvement Budget Project Management & Engineering Department

2018 Capital Improvement Budget Project Management & Engineering Department 2018 Capital Improvement Budget Project Management & Engineering Department (in thousands) Projects Bonds State Federal Other Total 120th Ave Upgrade - Johns Rd to Old Seward Hwy 400 - - - 400 27th Ave

More information

Map of Alaska. LIHTC Properties in Alaska through 2015

Map of Alaska. LIHTC Properties in Alaska through 2015 Map of Alaska LIHTC Properties in Alaska through 2015 PIS 2122 APTS 1300 N YORKTOWN DR KETCHIKAN AK 99901 1994 t 1995 Acquisition and Rehab 41 40 ACCESS APTS 9200 INDEPENDENCE ANCHORAGE AK 99507 1994 t

More information

2018 Capital Improvement Budget Project Management & Engineering Department

2018 Capital Improvement Budget Project Management & Engineering Department 2018 Capital Improvement Budget Project Management & Engineering Department (in thousands) Projects Bonds State Federal Other Total 120th Ave Upgrade - Johns Rd to Old Seward Hwy 400 - - - 400 27th Ave

More information

Department Budget Discussion

Department Budget Discussion Department Budget Discussion 2010 General Government Capital & Utilities Budgets Assembly Worksession October 30, 2009 M U N I C I P A L I T Y O F A N C H O R A G E. M A Y O R D A N S U L L I V A N General

More information

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities Appendix D Utilities This page intentionally left blank. Utilities There are numerous utilities present within the project area, including natural gas, sewer, water, electric, communications, and street

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

2015 Capital Improvement Budget Public Works Department

2015 Capital Improvement Budget Public Works Department 2015 Capital Improvement Budget Public Works Department (in thousands) Projects Bonds State Federal Other Total 1% for Art Conservation - 50 - - 50 100th Ave Extension Phase II - Minnesota Dr to C St -

More information

Undergrounding Utilities on Grandview Ave.

Undergrounding Utilities on Grandview Ave. j January 8, 2015 Undergrounding Utilities on Grandview Ave. Why? Every few years Xcel Energy comes down Grandview and reshapes everyone's trees on the north side of the street to keep them away from the

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault CIP_215 Title Pages 217:Layout 1 8/16/16 4:2 PM Page 7 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Underground Vault A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T

More information

M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD

M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Brown, Carlson, Mital, Simpson and Helgeson Rod Price, Chief Electric Engineering & Operations Officer, Tony McCallum, Line Crew

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic September 24, 2014 1 Reliability Analysis Update 2 AE Transmission Zone Generation Deliverability Violation: The Middle 230/69 kv is overloaded for line fault stuck

More information

COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA

COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA ~ &teauea~. 'l«e. PtUt tjutee a'~ 2929 Pa/mete. Ata414 99645. ~~/7

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power Wisconsin Public Utility Institute June 28, 2017 Minimum Distribution Charges Larry Vogt Director, Rates Mississippi Power 1 Costs of Service vs. Cost Recovery Residential Service Example Assuming that

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

As detailed in the previous chapter, federal, state, and local funds will be insuf-

As detailed in the previous chapter, federal, state, and local funds will be insuf- Chapter 7 RECOMMENDATIONS Informed decisions about transportation issues and about where and when to allocate limited infrastructure investments rely on two key knowledge areas: (1) understanding the shape,

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT V03 APTA Multimodal Operations Planning Workshop August 2016 Green Line LRT 2 Presentation Outline Past Present Future 3 16/03/2016 RouteAhead Update 4 4 16/03/2016 RouteAhead Update 5 5 16/03/2016 6 6

More information

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report Northeast Wisconsin/Upper Peninsula Separation 11/14/01 Incident Investigation Report Summary Contact by a high voltage electric transmission line with a tree in northeastern Wisconsin initiated a series

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING CIP_215 Title Pages 216:Layout 1 6/22/15 1:48 PM Page 19 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Rain or Shine WORK By Kent Pulver FY 216-22 Capital Improvement Program Description FY 215

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1 Energy Division P.O. Box 937 333 E. Barioni Blvd. Imperial, CA 92251 www.iid.com March 18, 2014 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Senior Power System Consultant Avista System

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

CITIZEN TASK FORCE PRESENTATION

CITIZEN TASK FORCE PRESENTATION CITIZEN TASK FORCE PRESENTATION SITKA ELECTRIC DEPARTMENT - Distribution Generation Transmission 5 Year Plan Fiscal Challenges - Rates & Revenue 10/2/2015 City and Borough of Sitka - Electric Department

More information

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS Larry Vogt Manager, Rates Minimum Distribution System What is MDS? MDS is an analysis module of the cost-of-service study in which distribution investment

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

PROJECTS $500K AND OVER FOR 2012

PROJECTS $500K AND OVER FOR 2012 EB-0-0 Page of PROJECTS $00K AND OVER FOR 0 EXTERNALLY INITIATED PLANT RELOCATIONS PORTFOLIO Table : Externally Initiated Plant Relocations Projects Estimate Estimated Cost Project Title Number ($ Millions)

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011 Network ENMAX Power Corporation Network Planning & Design November 4, 2011 ENMAX Fast Facts Service area of 1,044 square kilometers 1,738MVA Peak load (2009) Transmission System 266 km overhead 15km underground

More information

Industrial Facilities - Anchorage

Industrial Facilities - Anchorage Industrial Facilities - Anchorage 53 41 5152 49 13 1021 22 12 165 188 39 6 144 37 113 38 36 25 5 91 26 11 78 126 16 24 184 70 59 72 115 82 81 168 85 114 162 2 186 140 174 110 79 88 173 146 111 171 44 8

More information

All territory within the incorporated limits of the City and land owned or leased by the City.

All territory within the incorporated limits of the City and land owned or leased by the City. A. APPLICABILITY: This schedule applies to all connections, expansions, and upgrades to the City's Electric Distribution System except those that serve street lighting or traffic signals. B. TERRITORY:

More information

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Fees and Charges PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY 1 SECTION TABLE OF CONTENTS Fees and Charges PAGE TABLE OF CONTENTS... 2 DELEGATED AUTHORITY... 3 ELECTRICAL FEES AND CHARGES... 4 SERVICE

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

Connect. Thrive. Develop. KC Streetcar Riverfront Extension & Multi-Modal Feasibility Study

Connect. Thrive. Develop. KC Streetcar Riverfront Extension & Multi-Modal Feasibility Study Connect. Thrive. Develop. Why go to the Riverfront? KC Streetcar is a proven catalyst for development & connecting people to Downtown. < $2 billion in adjacent development: new businesses, hotels, apartments

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER A19 ADMINISTRATIVE REPORT Report Date: July 10, 2007 Author: Chris Darwent Phone No.: 604.873.7358 RTS No.: 6866 VanRIMS No.: 13-1400-20 Meeting Date: July 24, 2007 TO: FROM: SUBJECT:

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic March 23, 2018 First Review Baseline Reliability and Supplemental Projects 2 AEC Transmission Zone: Supplemental Project 69/12kV Wenonah Substation Retire/Bypass

More information

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M of Need In-service Cost Alternatives Service Projects in PG&E Service Territory Mare Island - Ignacio 115 kv NERC Category 2010 Reconductor the limiting 19 $19M Connect Highway May 2012 Line re-rates and

More information

CRITICAL ISSUES DOWNTOWN CONTINGENCY PORTFOLIO

CRITICAL ISSUES DOWNTOWN CONTINGENCY PORTFOLIO EB-0-0 Tab Schedule Page of CRITICAL ISSUES DOWNTOWN CONTINGENCY PORTFOLIO THESL s DOWNTOWN CONTINGENCY WORK PROGRAM The purpose of this portfolio is to provide distribution load transfer capability from

More information

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee Transmission Expansion Advisory Committee March 6, 2014 1 2014 RTEP Update 2 2014 RTEP Update Initial 2019 Summer base case and corresponding machine list update complete PJM staff has been reviewing and

More information

Welcome. Liberty Utilities Reliability Reporting Workshop. October 3 & 6, 2017

Welcome. Liberty Utilities Reliability Reporting Workshop. October 3 & 6, 2017 Welcome Liberty Utilities Reliability Reporting Workshop October 3 & 6, 2017 1 Agenda Purpose of Workshops System Overview Key Utility Initiatives Reliability Performance Plans for Reliability Improvements

More information

ELECTRIC DISTRIBUTION CIRCUIT DESIGN

ELECTRIC DISTRIBUTION CIRCUIT DESIGN COURSE ELECTRIC DISTRIBUTION CIRCUIT DESIGN April 4-5, 2018 EUCI Conference Center Denver, CO TAG US #EUCIEvents FOLLOW US @EUCIEvents EUCI is authorized by IACET to offer 1.6 CEUs for the course OVERVIEW

More information

An Inside Look at Electric Reliability 2016 Electric Reliability Report

An Inside Look at Electric Reliability 2016 Electric Reliability Report An Inside Look at Electric Reliability 2016 Electric Reliability Report Stockton, Bakersfield, California California November November 6, 2017 3, 2016 Welcome 2 David Meier Senior Manager, Stockton Division

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

4.10 Off-Street Parking Regulations.

4.10 Off-Street Parking Regulations. 4.10. A. Parking for Buildings, Structures or Uses. All new development, Building additions or conversions of use for which an Improvement Location Permit is required by this Ordinance shall provide required

More information

Background Information about the Metrobus 29 Lines Study

Background Information about the Metrobus 29 Lines Study Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design The power supply to all single lot underground residential services is through front lot service. Single phase transformers

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN Twin Cities Minnesota Zone Meeting Xcel Energy May 11, 2005 Bloomington, MN Overview of Presentation Xcel Energy Projects: Aldrich to St Louis Park 115 kv line Eden Prairie to Edina 115 kv line Eden Prairie

More information

Proposed Program of Interrelated Projects

Proposed Program of Interrelated Projects DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead

More information

Table 1. Total Four-Year Program Summary AMATS FFY TIP Administrative Modification 2

Table 1. Total Four-Year Program Summary AMATS FFY TIP Administrative Modification 2 TRANSPORTATION IMPROVEMENTS Table 1. Total Four-Year Program Summary 2015 2016 2017 2018 Non-National Highway System (Table 3) Roadway Improvements without Pavement Replacement projects $16,900 $15,755

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019.

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019. EXECUTIVE SUMMARY PURPOSE To report the findings of the Feasibility Study for an Underground Utility District along Segment C of the proposed Park to Playa Trail. BACKGROUND The City of Los Angeles Department

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

DATE: September 5, 2018 FAX: PHONE: SUBJECT:

DATE: September 5, 2018 FAX: PHONE: SUBJECT: For 10/10/18 MEMORANDUM TO: Maren Brantner Manger STATE OF ALASKA Department of Transportation and Public Facilities Central Region DATE: September 5, 2018 FAX: 907-269-0521 PHONE: 907-269-0515 FROM: Aaron

More information

Parking and Loading. Page 1 of 7

Parking and Loading. Page 1 of 7 Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed

More information

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading

More information

Federal Way Link Extension

Federal Way Link Extension Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic August 24, 2018 Proposal Window Exclusion Definitions The following definitions explain the basis for excluding flowgates and/or projects from the competitive planning

More information

Chapter 7 - Appendix A

Chapter 7 - Appendix A Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost

More information

4/15/2015 Item #10D Page 1

4/15/2015 Item #10D Page 1 MEETING DATE: April 15, 2015 PREPARED BY: Jeff Murphy, Director DEPT. DIRECTOR: Jeff Murphy DEPARTMENT: Planning & Land Use INTERIM CITY MGR: Larry Watt SUBJECT: Introduction of City Council Ordinance

More information

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CONSTELLATION ENERGY FACILITIES STUDY EJO # F4PPAR0434 ICTT-2007-177 CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS 1498122 Revision:

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN APPENDIX E: Final EIS/EIR E-1 FINAL ENVIRONMENTAL IMPACT STATEMENT/ENVIRONMENTAL IMPACT REPORT APPENDIX E: THIS PAGE INTENTIONALLY LEFT BLANK E-2 May 2011 LOS ANGELES DEPARTMENT OF WATER AND POWER Barren

More information

West Station-West Cañon 115 kv Transmission Project

West Station-West Cañon 115 kv Transmission Project West Station-West Cañon 115 kv Transmission Project Project Sponsor: Additional Project Participants: Project Description: Black Hills Colorado Electric New 115 kv line from West Station to West Cañon

More information

ELECTRIC GENERATION AND TRANSMISSION IN THE RAILBELT

ELECTRIC GENERATION AND TRANSMISSION IN THE RAILBELT ELECTRIC GENERATION AND TRANSMISSION IN THE RAILBELT Joe Griffith General Manager, MEA Chief Executive Officer, ARCTEC Commonwealth North November 15, 2013 1 RAILBELT MAKEUP Electrical utilities are all

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

STATE OF NEW HAMPSHIRE Inter-Department Communication

STATE OF NEW HAMPSHIRE Inter-Department Communication STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of

More information