1 ELECTRIC GENERATION AND TRANSMISSION IN THE RAILBELT Joe Griffith General Manager, MEA Chief Executive Officer, ARCTEC Commonwealth North November 15,
2 RAILBELT MAKEUP Electrical utilities are all cooperatives or municipalities Anchorage Municipal Light & Power Seward Electric System Chugach Electric Association Golden Valley Electric Association Homer Electric Association Matanuska Electric Association 2
3 RAILBELT ELECTRICAL GENERATION 1 Eklutna Generation Station (EGS) 2 Bradley Lake 3 Soldotna 4 Nikiski 5 Fire Island 6 SPP 7 ML&P Plants 2 & 2A 8 Beluga 9 Mount Spurr Geothermal Project 10 Watana 11 Eva Creek 12 Healy 2 (HCC) 13 Battery Energy Storage System (BESS) 14 Zehnder 15 North Pole 3
4 RAILBELT GENERATION SUITE Chugach Beluga, South Anchorage, IGT, Cooper Lake hydro, Eklutna hydro AML&P Plant 1, 2, & 2A (soon to be built), Eklutna hydro GVEA North Pole, Eva Creek Wind, Healy 1 & 2, Aurora (IPP), BESS, Zehnder MEA Eklutna Generation Station, Eklutna hydro, + 2 small IPPs HEA Nikiski combined cycle, Soldotna, Bernice Lake SES Seward plant Note: All above participate in Bradley Lake hydro (state-owned IPP)- 124 mw capacity 4
5 RAILBELT GENERATION All utilities have or will soon have their own generation capability New generation cost is approximately $1 billion Utility balance sheets are stressed No additional debt-assuming capability 5
6 SITUATION New generation system changes playing field due to transmission constraints Limits Bradley Lake power deliveries when needed most. Railbelt economy demands reasonably-priced power (as does the rest of Alaska) 6
7 RAILBELT TRANSMISSION SYSTEM What it does Connects utilities Facilitates economic dispatch Transfers power Shares reserves Two main challenges Physical infrastructure constraints Management 7
8 AEA TRANSMISSION STUDY Southern section upgrades proposed: Quartz creek to University (AC) Additional conductor from Quartz Creek to Daves Creek 230 kv upgrade from Daves Creek to University s/s DC tie line from Bernice Lake to Beluga 2 nd 115kV line from Bradley Junction to Soldotna Anchorage battery Northern Upgrades 230 kv Lake Lorraine to Douglas upgrade Douglas to Healy upgrade 8
9 Current Railbelt Transmission System 9
10 Proposed Upgrades to Transmission System 10
11 AEA TRANSMISSION STUDY CASES MODELED Scenario 1: All transmission upgrades Scenario 2: Southern transmission upgrades Scenario 3: Northern transmission upgrades Scenario 4: No transmission upgrades 11
12 AEA TRANSMISSION STUDY NO TRANSMISSION UPGRADES The system operates as 5 separate utilities Each provides its own reserves The interface limit for Kenai North is 75 MW The transfer limit from Stevens (Talkeetna) to Cantwell is 75 MW North Pole combined cycle plant is must-run October through March Bradley Spin is only 10 MW Commitment/Dispatch hurdles exist between all utilities Opportunity cost of over $140 million per year 12
13 AEA TRANSMISSION STUDY VALUE OF PROPOSED UPGRADES $140,000,000 per year 13
14 SHORT-TERM ENERGY DELIVERY MITIGATIONS Decongest the transmission system to facilitate optimum use of Bradley Lake energy and capacity Create a single transmission operator Maintain Cook Inlet gas market Foster more exploration in Cook Inlet Import LNG and/or propane 14
15 ARCTEC 2014 REQUESTS Unconstrain Bradley Lake Silvertip Creek to Hope Substation 115 kv transmission line 4,500,000 Powerline Pass to Indian 115 kv transmission line 5,000,000 Eklutna hydro transmission upgrade 4,000,000 Battle Creek Diversion into Bradley Lake $24,000,000 50/50 Shared cost between State of Alaska and utilities. TOTAL REQUEST: $37,500,000 15
16 Transco Transco - A transmission owning entity A regulated entity which owns, constructs, and maintains transmission lines used to transmit wholesale power It may or may not handle power dispatch and coordination Secures financing Executes project 16
17 ISO An Independent System Operator Description An ISO owns no assets It is neutral party responsible for planning, management and control of the electric transmission grid in a state or region Characteristics Ensures non-discriminatory access; Possession of operational authority for all transmission facilities under the ISO s control; and Exclusive authority to maintain short-term reliability. Regulatory Compact Plans, conditions and approves projects 17
18 The Railbelt Model TRANSCO = Alaska Railbelt Cooperative Transmission & Energy Company (ARCTEC) ISO = Railbelt Reliability Authority 18
19 ARCTEC as TRANSCO Non-discriminatory open access Existing assets from transmission providers are pooled for joint use with full cost recovery for all users Universal rates based on system load that will encourage economic transfer of generation across network Transition to Full implementation Single control area within 5 years Economic dispatch within 10 years Regional planning for all future transmission 19
20 Railbelt Reliability Authority as ISO Adoption of IMC Reliability Standards Plan and Condition Projects Enforce Standards Regulatory Compact Ensure Non-discriminatory Transmission Access Single System-wide Transmission Rate Responsible for Short-term Reliability 20
21 INDEPENDENT POWER PRODUCERS (IPPs) Federal law: Public Utility Regulatory Policies Act (PURPA, 1978) Avoided cost principle for Combined Heat and Power (CHP) utilities Must meet or beat avoided cost (2 types) Firm and non-firm Alaska RCA regulations mimic federal PURPA Rate of return: co-ops 3-5% / IPPs need 10%+ IPPs have filed with the RCA to change regulations IPPs pushing for Alaska statute changes to force utilities to accept their power at the expense of ratepayers 21
22 CONCLUSION Without a program to rectify transmission shortcoming asap Cost of electricity will continue to rise Possible savings will be forfeited Alaska will not achieve its alternative energy goal Railbelt will be captive to Cook Inlet natural gas pricing and supply issues 22
23 DISCUSSION / QUESTIONS 23
24 AEA TRANSMISSION STUDY ALL TRANSMISSION UPGRADES CASE Base Case The system operates as a single pool with a single system reserve requirement The interface limit for Kenai North is 125 MW Anchorage battery is 25 MW Bradley spin is 27 MW 24
25 AEA TRANSMISSION STUDY SOUTHERN TRANSMISSION CASES Case S1: Remove AC upgrades from Quartz Creek to University The system operates as a single pool with a single system reserve requirement The interface limit for Kenai North is 100 MW Anchorage battery is 25 MW Bradley spin is 27 MW Case S2: Remove DC tie The system operates as a single pool with a single system reserve requirement The interface limit for Kenai North is 75 MW Anchorage battery is 75 MW Bradley spin is 27 MW 25
26 AEA TRANSMISSION STUDY SOUTHERN TRANSMISSION CASES Case S3: Do both S1 and S2 The system effectively operates as 2 pools Railbelt minus HEA HEA Shared reserves HEA provides its own reserves The interface limit for Kenai North is 75 MW Bradley spin is 27 MW Commitment/Dispatch hurdles exist between all other companies and HEA 26
27 AEA TRANSMISSION STUDY SOUTHERN TRANSMISSION CASES Case S4: Case S3 + remove 2nd line from Bradley to Soldotna The system effectively operates as 2 pools Railbelt minus HEA HEA Shared reserves HEA provides its own reserves The interface limit for Kenai North is 75 MW Bradley spin is 10 MW Commitment/Dispatch hurdles exist between all other companies and HEA 27
ELECTRIC GENERATION AND TRANSMISSION ON THE RAILBELT
ELECTRIC GENERATION AND TRANSMISSION ON THE RAILBELT Joe Griffith General Manager, MEA Chief Executive Officer, ARCTEC Anchorage Mayor s Energy Task Force November 6, 2013 1 RAILBELT MAKEUP Electrical
More informationMayor s Energy Task Force. Railbelt Transmission November 6 th, 2013
Mayor s Energy Task Force Railbelt Transmission November 6 th, 2013 Current Certificated Service Territories 2 3 4 5 Existing Challenges Limited Interconnection Between Regions Transfer Capacity is Stretched
More informationMUNICIPALITY OF ANCHORAGE MAYOR S ENERGY TASK FORCE. Joe Griffith, President - 1/11/2012
MUNICIPALITY OF ANCHORAGE MAYOR S ENERGY TASK FORCE Joe Griffith, President - 1/11/2012 1 ARCTEC MEMBERS Board of Directors Rick Schikora, Chairman Brad Janorschke, Vice Chairman Janet Kincaid, Secretary
More informationDecision on Merced Irrigation District Transition Agreement
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation
More informationMULTI-STAGE ENERGY STORAGE SYSTEM COMBINED BATTERY & FLYWHEEL STORAGE PLATFORM FOR RENEWABLES INTEGRATION
MULTI-STAGE ENERGY STORAGE SYSTEM COMBINED BATTERY & FLYWHEEL STORAGE PLATFORM FOR RENEWABLES INTEGRATION Is Energy Storage the Answer? Alaska s Railbelt System 5.1 sec 60.0 Hz Light Grid 59.4 Hz Renewables
More informationWIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool
WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on
More informationMerger of the generator interconnection processes of Valley Electric and the ISO;
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric
More informationElectric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy
Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask Gerald Deaver Manager Regional Transmission Policy Some Xcel Energy Statistics Transmission Business 19,000
More informationYukon s Independent Power Production Policy
Yukon s Independent Power Production Policy Updated October 2018 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy priorities,
More informationREGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST
REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST MEGAN O REILLY COALITION FOR CLEAN AFFORDABLE ENERGY EPE IRP STAKEHOLDER
More informationThe Green Line Project
The Green Line Project Presentation to the ISO-NE Planning Advisory Committee New England Independent Transmission Company, LLC December 18, 2007 1 500 kv DC transmission system with transfer capability
More informationENERGY STRATEGY FOR YUKON. Independent Power Production Policy
ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out
More informationState Electricity Profiles 2008
DOE/EIA- 0348(01)/2 March 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington, DC 20585 This report was prepared by the
More informationSPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations
SPP OVERVIEW Mike Ross Senior Vice President, Government Affairs and Public Relations 1 Our Mission Helping our members work together to keep the lights on today and in the future. 2 NORTH AMERICAN INDEPENDENT
More informationENERGY STORAGE IN TEXAS. Robert J. King Good Company Associates
ENERGY STORAGE IN TEXAS Robert J. King Good Company Associates Austin-based firm specializing in clean energy, Services include: Policy & Regulatory Business Development Coalition Building Analysis & Technical
More informationTransforming the Grid from the Distribution System Out
Power Systems Engineering Research Center Transforming the Grid from the Distribution System Out Tom Jahns Bob Lasseter University of Wisconsin - Madison PSERC Webinar Tuesday, November 4, 2014 2014 Changing
More informationKansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross
Briefing for the Kansas Legislature March 6, 2013 Paul Suskie & Mike Ross psuskie@spp.org mross@spp.org 501.614.3200 Presentation overview Who we are What we do How we benefit the consumer Industry dynamics
More informationCHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska REGULAR BOARD OF DIRECTORS MEETING AGENDA ITEM SUMMARY. May 28, 2014
CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska REGULAR BOARD OF DIRECTORS MEETING AGENDA ITEM SUMMARY May 28, 2014 ACTION REQUIRED AGENDA ITEM NO. VIII.B. X X Information Only Motion Resolution Executive
More informationElectricity Transmission Infrastructure Development in New England
Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly
More informationHigh Plains Regional Transmission Summit. Timelines for Planning Processes / Policy
High Plains Regional Transmission Summit John Lawhorn Director Regulatory & Economic Studies Midwest ISO November 2, 2009 Timelines for Planning Processes / Policy 1 year 20 year Planning Horizons Queue
More informationCreating A Cleaner Energy Future For the Commonwealth. Growing Solar in MA. MMA Annual Meeting. Boston, 1/24/14
MMA Annual Meeting Boston, 1/24/14 Growing Solar in MA Renewable Energy Generation in MA 3,500 GWH 3,000 2,500 2,000 1,500 1,000 Hydro Wind Solar Landfill Gas Biomass Anaerobic Digester 500 0 2003 2004
More informationWholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources
Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources Outline Tri-State Background Tri-State Generation Mix Power Delivery Wholesale Electricity Markets
More informationSTRAIGHT TALK ABOUT COSTS.
Our member-owned electric cooperative began back in 1945 with the goal of providing affordable, reliable electric power to its members. Much has been accomplished since those early days, but the mission
More informationSmart Grid Subcommittee Report
Smart Grid Subcommittee Report Marilyn Brown Subcommittee Vice-Chair U.S. Department of Electricity Electricity Advisory Committee February 20, 2018 Subcommittee Overview Statutory basis: The Energy Independence
More information2012 ASAA FOOTBALL SEASON SCHEDULE & RESULTS Updated 9/30
0 ASAA FOOTBALL SEASON SCHEDULE & RESULTS Updated 9/0 COOK INLET CONFERENCE BARTLETT GOLDEN BEARS WK Date Opponent BHS -Aug Wasilla L -Aug Service* 0 L -Aug at South Anchorage* 0 9 L -Aug West Anchorage*
More informationFERC 101 for Environmental Lawyers. Linda L. Walsh Hunton & Williams LLP February 11, 2015
FERC 101 for Environmental Lawyers Linda L. Walsh Hunton & Williams LLP February 11, 2015 What is FERC FERC is an independent agency within the Dept. of Energy (DOE) Current Commission: 2 3 Electricity
More information2015 Grid of the Future Symposium
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,
More informationDonna Painter, Executive Consultant February 27, 2013
Donna Painter, Executive Consultant February 27, 2013 Transmission What is it and How has it Evolved Legislation and Regulatory Impacts What is Next for AMEA and Others Transmission System High voltage
More informationDistributed Generation and the Importance of the Electric Power Grid
Distributed Generation and the Importance of the Electric Power Grid Rick Tempchin Executive Director, Retail Energy Services Edison Electric Institute Edison Electric Institute The Edison Electric Institute
More informationThe Direction of Renewable Energy
The Direction of Renewable Energy Shaping the Future of Business on Long Island Hydrogen / Natural Gas March 16th - 8:30am 12:00pm Small Business Development Center Stony Brook University Presented By:
More informationEconomic Development Benefits of Plug-in Electric Vehicles in Massachusetts. Al Morrissey - National Grid REMI Users Conference 2017 October 25, 2017
Economic Development Benefits of Plug-in Electric Vehicles in Massachusetts Al Morrissey - National Grid REMI Users Conference 2017 October 25, 2017 National Grid US Operations 3.5 million electric distribution
More informationThe Transmission Lay of the Land
The Transmission Lay of the Land Overview Energy Markets Transmission Planning Beth Soholt John Moore April 21, 2010 Overview Regional Transmission Organizations Organizations of transmission owners, users,
More informationOverview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only
Overview of Electricity Trade Agreement between Québec and Ontario May 10, 2017 For Information Purposes Only Purpose To provide an overview of the electricity trade agreement between the Independent Electricity
More informationA Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering
A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering Alaska Rural Energy Conference, April 28, 2016 (Technical Session 6, 10:30 am) EPA Regulations RICE NESHAP on or
More informationSession 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA CHHE LIDIN
Session 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA Seminar on Supporting Sustainable Development Goal 7, Target 7.1 By 2030 ensure universal access to affordable, reliable and modern energy
More informationGrid Energy Storage: Policies
Grid Energy Storage: Policies John Martin, P. Eng. Senior Tariff and Special Projects Advisor Alberta Electric System Operator (AESO) IEEE Northern Canada Section PES/IAS Chapter Seminar, 21 Nov 2017,
More informationOverview of ISO New England and the New England Wholesale Power Markets
Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England
More informationUpdates. Pat Reiten President and CEO, PacifiCorp Transmission
PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand
More information2017 Annual Report. Powering Alaska s Future
2017 Annual Report Powering Alaska s Future Our management team To our members 2017 was a busy and historic year for Chugach and its members. I am pleased to look back with you on the progress we ve made.
More informationJoint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con
More informationRECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:
DATE: July 16,2007 TO: FROM: SUBJECT: CITY COUNCIL CITY MANAGER CONSIDERATION OF ADOPTION OF NEW FEDERAL STANDARDS RELATING TO ELECTRIC UTILITIES UNDER THE PUBLIC UTILITIES REGULATORY POLICIES ACT AND
More informationDG system integration in distribution networks. The transition from passive to active grids
DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution
More informationCity of Palo Alto (ID # 6416) City Council Staff Report
City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building
More informationSheffield-Highgate Export Interface SHEI. VSPC Quarterly Meeting October 18, 2017
Sheffield-Highgate Export Interface SHEI VSPC Quarterly Meeting October 18, 2017 Northern Vermont Export Study Update VELCO is providing information to enable evaluation of potential solutions Incremental
More informationVERMONT ELECTRIC POWER COMPANY (VELCO)
TRANSMISSION PROJECTS: AT A GLANCE Vermont Electric Power Company (VELCO) VERMONT ELECTRIC POWER COMPANY (VELCO) VELCO was formed in 1956 when local utilities joined together to create the nation s first
More informationAccommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009
Accommodating High Levels of Variable Generation EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Agenda About NERC About the Integration of Variable Generation Task Force
More informationGRID INNOVATION CAUCUS CO-CHAIRS
February 16, 2017 GRID INNOVATION CAUCUS CO-CHAIRS REP. JERRY NCNERNEY (D-CA) REP. BOB LATTA (R-OH) 2 WIRES UNIVERSITY Transmission 101: The Fundamentals Of High Voltage Transmission February 16, 2017
More informationElectricity industry structure and key players
Electricity industry structure and key players Growth in capacity, production and consumption, 2006 2017 Expected demand and addition to generation capacity, 2018 2027 Growth in transmission network and
More informationLegal Considerations Related to Distributed Energy Resources
Legal Considerations Related to Distributed Energy Resources Steve Pincus Associate General Counsel Steve Shparber Counsel Markets & Reliability Committee April 18, 2016 Overview of FERC Jurisdiction FERC
More informationNational Grid New Energy Solutions (NES)
National Grid New Energy Solutions (NES) March 1, 2017 National Grid US 3.3 m electric and 3.6 m gas customers 13,672 employees ~$9B rate base +$2B capital invest. 2 New Energy Solutions Add an image here
More informationSolutions for Smarter Power Markets
Solutions for Smarter Power Markets Eric GOUTARD Alstom Grid 6-8 March 2011 GRID 1 ALSTOM APEx- APAC Regional Meet 2011, 6th -8th March 2011, New Delhi Key Drivers for Smart Grids 1. Maximize CO2 free
More informationENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION
ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy
More informationSAIREC Panel Discussion
Text SAIREC Panel Discussion Cape Town 04-Oct-2015 Unlocking Grid Capacity for the Energy Mix Proposed in the IRP Cape Town International Convention Centre Sunday, 04 October 2015, 11:30 for 13:00 Highlights
More informationNext Generation Solar Incentive Program
COMMONWEALTH OF MASSACHUSETTS Charles D. Baker, Governor Karyn E. Polito, Lt. Governor Matthew A. Beaton, Secretary Judith Judson, Commissioner National RPS Summit Washington, D.C. December 1, 2016 Next
More informationCITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS
CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.
More informationEric Johnson, Director, External Affairs, ISO New England
To: From: NECPUC and NESCOE Eric Johnson, Director, External Affairs, ISO New England Date: January 22, 2016 Subject: How Energy Storage Can Participate in New England s Wholesale Electricity Markets Interest
More informationOpportunities for Export and Trade Development: Electricity Export Expansion to Europe. Joint EFET & DTEK Legal Workshop
Opportunities for Export and Trade Development: Electricity Export Expansion to Europe Joint EFET & DTEK Legal Workshop March 2012 Electricity export: history and nowadays Ukraine provides electricity
More informationSCE Smart Grid. Creating a Cleaner, Smarter Energy Future. Metering, Billing / MDM America Conference. San Diego. March 9, 2010
SCE Smart Grid Creating a Cleaner, Smarter Energy Future Metering, Billing / MDM America Conference San Diego March 9, 2010 SOUTHERN CALIFORNIA EDISON Southern California Edison An Edison International
More informationTRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID.
A GUIDE TO TRANSPOWER 2009 TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID. Contents 01 Introduction 02 System Operator 24/7
More informationReport. the feasibility of
Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to
More informationTransmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting
Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid
More informationJuly 28, 2009 Presentation to the Illinois Statewide Smart Grid Collaborative
AMEREN ILLINOIS UTILITIES Stimulus Package July 28, 2009 Presentation to the Illinois Statewide Smart Grid Collaborative Ron Pate Vice President, Regional Operations Jackie Voiles Director, Regulatory
More informationCommissioner Anne E. Hoskins iiesi Workshop Copenhagen, Denmark May, 2014
Maryland s Competitive Electricity Markets: Where We ve Been and Where We re Going Commissioner Anne E. Hoskins iiesi Workshop Copenhagen, Denmark May, 2014 Where Exactly is Maryland? 2 Agency Overview
More informationBC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014
1 BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada IEEE PES Meeting July 2014 General BC Hydro Overview Crown Corporation Serving about 95% of province and 1.9 million customers
More informationWOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017
WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations
More information1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).
20 September 2017 Low-emissions economy inquiry New Zealand Productivity Commission PO Box 8036 The Terrace Wellington 6143 info@productivity.govt.nz Dear Commission members, Re: Orion submission on Low
More informationMESSAGE from the President & General Manager
MESSAGE from the President & General Manager On behalf of the Board of Directors and staff at Homer Electric Association (HEA), we would like to thank the members of Homer Electric Association for their
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More information2016 Load & Capacity Data Report
Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness
More informationSolar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011
Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011 Jim Calore Public Service Electric & Gas Co. Overview This
More informationBC Hydro OATT - Balancing Area Transmission Service Workshop. January 20, 2014
T BC Hydro OATT - Balancing Area Transmission Service Workshop January 20, 2014 1 AGENDA Topic Time Speaker Welcome and Introduction 09:00 09:15 Gord Doyle Background 09:15 10:00 Martin Huang Enforcement
More informationPlanning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014
Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014 The Clean Coalition recommends that state regulators and utilities account for potential
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL
PRINTER'S NO. 11 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 01 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE, NEILSON,
More informationThis page is intentionally left blank.
This page is intentionally left blank. Bipole III Southern Ground Electrode Line Route Selection Introduction Manitoba Hydro has recently selected a route for the southern ground electrode line (Map 1).
More informationThe Engineering Department recommends Council receive this report for information.
CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision
More informationThe Role of Electricity Storage on the Grid each location requires different requirements
Functional Requirements for Energy on the Utility Grid EPRI Renewable Council Meeting Bill Steeley Senior Project Manager Dan Rastler Program Manager April 5-6, 2011 The Role of Electricity on the Grid
More informationImplementing a Microgrid Using Standard Utility Control Equipment
Implementing a Microgrid Using Standard Utility Control Equipment Tom Fenimore Duke Energy Andy Gould and Larry Wright Schweitzer Engineering Laboratories, Inc. Copyright Duke Energy and SEL 2016 Overview
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More informationNATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016.
NATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016. 1 MOSIMANEGAPE MHALADI PRINCIPAL ENERGY ENGINEER ENERGY EFFICIENCY & CONSERVATION 22 nd MARCH 2016 PRESENTATION OUTLINE A.
More informationbest to you all Gail Carbiener Page 1 of 5
Please accept this attachment as my up dated response to the B2H DEIS. If this is not acceptable, please let me know. Nice meeting last Monday in Boardman. 300316 best to you all Gail Carbiener 2 Page
More informationSubmission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic
1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be
More information10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION
October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL
PRIOR PRINTER'S NO. PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE,
More informationElectric Vehicle Cost-Benefit Analyses
Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in eight US states Quick Take M.J. Bradley & Associates (MJB&A) evaluated the costs and States Evaluated benefits of
More informationEnergy Storage in FERC Territories
Clean Energy Group Webinar Energy Storage in FERC Territories Hosted by Todd Olinsky-Paul Project Director, Clean Energy Group Friday, January 9, 2015 Housekeeping About Clean Energy Group (CEG) Clean
More informationProgress and Challenges in Philippine Energy Sector Reform
Progress and Challenges in Philippine Energy Sector Reform A Presentation by: Lily Gutierrez Energy Policy Advisor Office of Energy and Environment Infrastructure for Rebuilding and Developing Countries
More informationAPPENDIX F: Project Need and Description
APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was
More informationService Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #
Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists
More informationMicrogrid solutions Delivering resilient power anywhere at any time
Microgrid solutions Delivering resilient power anywhere at any time 2 3 Innovative and flexible solutions for today s energy challenges The global energy and grid transformation is creating multiple challenges
More informationGetting to Market through your local Electric Cooperative
Getting to Market through your local Electric Cooperative Aleka Scott Vice President of Transmission and Contracts September 23, 2011 Why do Rural Electric Cooperatives exist? Federal support was needed
More informationBuilding Collaboration Between East African Nations via Transmission Interconnectors
Building Collaboration Between East African Nations via Transmission Interconnectors Eng. Christian M.A. Msyani Ag. DEPUTY MANAGING DIRECTOR TRANSMISSION - TANESCO CONTENTS 1. TANESCO - Existing Power
More informationNational Committee Kosovo. SEERC October 2017 Istanbul
National Committee Kosovo SEERC October 2017 Istanbul CIGRE National Committee KOSOVO The CIGRE National Committee of Kosovo was recognized by the Administrative Council of CIGRE, consulted by correspondence
More informationSTORAGE TECHNOLOGIES
ENERGY STORAGE STORAGE TECHNOLOGIES SOLID STATE BATTERIES Solid state batteries are the original battery, originally invented in 1800. Each contains a positive and negative terminal Electrolytes allow
More informationConsumers, Vehicles and Energy Integration (CVEI) project
Consumers, Vehicles and Energy Integration (CVEI) project Dr Stephen Skippon, Chief Technologist September 2016 Project aims To address the challenges involved in transitioning to a secure and sustainable
More informationThe SAARC Power Grid Nepal s Perspective
The SAARC Power Grid Nepal s Perspective Anil Rajbhandary Director, Power Trade Department, NEA Medium Term Vision for Energy Connectivity in the SAARC Region 10 March, 2015; Islamabad Energy Resources
More information1. Before Energy Reform
CFE on the right track September 2018 1. Before Energy Reform In 2012, there was a significant gap in the average industrial rate between the United States and Mexico. In 2012, the rate in Mexico, on average,
More informationState of the Energy Sector: National Perspective. David K. Owens E2Tech Expo November 17, 2016 Portland, ME
State of the Energy Sector: National Perspective David K. Owens E2Tech Expo November 17, 2016 Portland, ME 2 Trends Reshaping the Utility Industry Slow economic recovery Aging infrastructure Low natural
More informationAdvice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA
Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA George Horvath george.horvath@aecom.com Month Day, Year Part A Introduction
More informationCourse notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing
Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright 2018 Ross Baldick www.ece.utexas.edu/~baldick/classes/394v/ee394v.html 1 1 Recent History of
More informationCase 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA
Submission of Indicated New York Transmission Owners For Authority to Construct and Operate Electric Transmission Facilities in Multiple Counties in New York Case 13-M-0457 Edic to New Scotland 345 kv
More information