1 Technical Memorandum #1 Hydrologic Impact Analyses

2 DRAFT STETSON ENGINEERS INC. TECHNICAL M E M 0 RAN DUM NO E. Francisco Blvd., Suite K San Rafael, California TEL: (415) FAX: (415) curtisl@stetsonengineers.com To: John Gray DAn:: April 23, 2004 URS Corp., Santa Barbara, CA FROM: Curtis Lawler JOB No.: 1944 RE: HYDROLOGIC IMPACT ANALYSES FOR CITY OF SOLVANG'S CEQA ENVIRONMENTAL DOCUMENT FOR A TIME EXTENSION FOR WATER RIGHTS PERMIT INTRODUCTION This draft memorandum is prepared for the City of Solvang'S CEQA environmental document in connection with the petition to the State Water Resources Control Board (SWRCB) for extension oftime for Permit Consistent with the City's May 2002 Water System Master Plan Update, the City of Solvang is planning to expand water production from wells along the Santa Ynez River. This memorandum analyzes the hydrologic impacts of three sets of scenarios of City of Solvang's river well pumping, including: 1. No change from current river well pumping by Solvang (varies roughly from about 400 to 1,000 acre-feet/year in years ) 2. Total river well pumping by Solvang of2,400 acre-feet per year and maximum diversion of 5 cfs per Table 7 of the Water System Master Plan 3. Total river well pumping by Solvang of3,600 acre-feet per year and maximum diversion of 5 cfs per Permit Although the exact alternatives for the Environmental Impact Report (EIR) by the City of Solvang are not completely known, this memorandum analyzes twelve alternatives which overlie the above three sets of Solvang river pumping on four alternatives set forth in the Cachuma Water Rights Draft EIR by the State Water Resources Control Board (August 2003). For each of these twelve potential EIR alternatives, analyses of surface water hydrologic impacts were performed, Stetson Engineers Inc. F:IDATAII944ISURFACEWATERITM SW RESULTS V7.DOC Page I

3 DRAFT using the Santa Ynez River Hydrology Model (SYRHM). Included in this memorandum are the EIR hydrologic impact analyses for: Cachuma Reservoir Operations Cachuma Storage and Elevations Santa Ynez River Flows Groundwater Storage in the Above Narrows Riparian Aquifer Water Rights Releases (WR 89-18) Cachuma Project Deliveries In addition to this technical memorandum, hydrologic analyses for salinity impacts and additional ground-water impacts (including water level changes and possible well interferences) are provided in separate technical memoranda. 2. SYRHM OVERVIEW AND MODELING FOR FISH FLOW OPERATIONS, SURCHARGING, AND SOLVANG RIVER WELL PUMPING The SYRHM became the basis for numerous hydrologic studies of releases for fish, water quality, and water rights in preparation ofthe Biological Assessment, NOAA Fisheries Biological Opinion (BO), the Lower Santa Ynez River Fish Management Plan, the Settlement Agreement of 2002, the State Board Draft EIR (2003), and the Draft EIRJEIS (2003) on the Fish Management Plan and the BO (see references). The analyses for the additional City of Solvang river well pumping use the same programming model logic and assumptions as these previous studies. For example, previous SWRCB EIR modeling analyses assumed that Solvang pumps on average 600 acre-feet per year. Based on 34% return flow consistent with the SYRHM, the net pumping for Solvang was set at 396 acre-feet per year. This pumping amount will be used for the baseline runs to maintain consistency with previous analyses. In all twelve alternatives analyzed in this memorandum, all of the original flow inputs are kept the same, with various combinations of changes in City of Solvang river well pumping, fish flow operations, and surcharging, as shown in Table 1. Each ofthese three Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7,DOC Page

4 DRAFT components (Solvang pumping, fish flow operations, and surcharging) as well as the SYRHM are discussed in more detail below. TABLE 1 KEY ELEMENTS OF AL TERNA TIVES REVIEWED FOR THE CITY OF SOLVANG EIR USING SYRHM City of Solvang Cachuma Gross Net Reservoir ID Alternatives Pumping Pumping l ) Surcharge afy Afy ft SWRCB EIR Alt none Fish Flow Operations 2 SWRCB EIR Alt 2 (current operations) Interim BOIFMP 3 SWRCB EIR Alt 3A Final BOIFMP 4 SWRCB EIR Alt 3C (proposed operations) Final BOIFMP 5 SWRCB EIR Alt 1 with Solvang Pumping 3600 afy 3,600 2,376 0 none 6 SWRCB EIR Alt 2 with Solvang Pumping 3600 afy 3,600 2, Interim BOIFMP 7 SWRCB EIR Alt 3A with Solvang Pumping 3600 afy 3,600 2, Final BOIFMP 8 SWRCB EIR Alt 3C with Solvang Pumping 3600 afy 3,600 2, Final BOIFMP 9 SWRCB EIR Alt 1 with Solvang Pumping 2400 afy 2,400 1,584 0 none 10 SWRCB EIR Alt 2 with Solvang Pumping 2400 afy 2,400 1, Interim BOIFMP 11 SWRCB EIR Alt 3A with Solvang Pumping 2400 afy 2,400 1, Final BOIFMP 12 SWRCB EIR Alt 3C with Solvang Pumping 2400 afy 2,400 1, Final BOIFMP 1) A return flow of 34% is assumed. 2.1 SYRHM OVERVIEW The SYRHM was first developed in 1979 and has been used in the past to evaluate various management alternatives in the Santa Ynez River basin. The SYRHM was developed by the Santa Barbara County Water Agency (SBCWA). Over the last two decades, the SYRHM has been expanded and modified in consultation with the Santa Ynez River Hydrology Committee. The Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

5 DRAFT model is written in Microsoft Quick Basic code and is publicly available from SBCW A. The SYRHM has been expanded by Stetson Engineers for fish flow operations, surface water salinity, and State Water Project imports (Stetson, 2004). In all of the model runs, watershed runoffbased on historical hydrology is routed through the Santa Ynez River basin and alternatives are varied based on the differences in Cachuma Reservoir operations, State Water Proj ect (S WP) water deliveries, and municipal and industrial pumping by the City of Solvang. The impacts to surface water and ground-water conditions downstream of Cachuma Reservoir and Solvang river wells are then compared among the alternatives. Figure 1 shows how flows ofthe Santa Ynez River are routed through the Santa Ynez River basin. The SYRHM includes operations of Juncal, Gibraltar, and Bradbury Dams, the Santa Ynez River alluvial ground-water basins, and Santa Ynez River recharge (percolation) in Lompoc basin. The model uses historical records of rainfall, runoff, evaporation, and tunnel infiltration for the period 1918 through Reservoir releases, diversions, streamflow percolation, ground-water pumping, and depletions are based on simulated model operations using monthly time steps. The model includes the Gibraltar operations under the Upper Santa Ynez River Operations Agreement, and the Cachuma operations under the SWRCB Order WR as amended by WR As indicated above, the model has been expanded to include fish flow operations, surface water salinity, and SWP water deliveries through the Bradbury Dam outlet works (Santa Ynez River Hydrology Model Manual, April 2004). The model expansion for surface water salinity and the SWP imports was done in consultation with the Santa Ynez River Water Quality Technical Committee. The Santa Ynez River between Bradbury Dam and Lompoc Narrows is divided into three main subunits in the model: (1) Bradbury Dam-Solvang (Santa Ynez subarea); (2) Solvang-Buellton Bend (Buellton sub-area); and (3) Buellton Bend-Narrows (Santa Rita sub-area). Recently, the SBCW A expanded the operation model (SYRHM) to incorporate a detailed version ofthe Bradbury Solvang reach, in which the reach is divided into 12 segments between tributaries. This allows for a direct modeling oftributary flow contributions in the Bradbury Dam-Solvang reach ofthe SYRHM. This version of the model is referred to as SYRHM 498, and was used for the analyses of the Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

6 DRAFT Biological Assessment resulting in the Biological Opinion. The same version ofthe model (SYRHM 498) has been used for the analyses ofthe Cachuma water rights draft EIR. The same version is also used for the impact analyses of the City of Solvang's wells as provided in this memorandum. The City of Solvang's wells are located near Solvang Bridge (also sometimes referred to as Alisal or Mission Bridge), which is right on the boundary between the Santa Ynez and Buellton sub-areas. 2.2 CACHUMA FISH FLOW OPERATIONS Releases from Cachuma Reservoir for steelhead rearing habitat and passage have been modeled for two sets of operating criteria in the SYRHM. Both are derived from the issuance ofthe Biological Opinion (BO) by the National Marine Fisheries Service (NMFS) (Sep. 2000) and the Lower Santa Ynez Fish Management Plan (FMP) (Oct. 2000). The first set of operating criteria involves releases for steelhead rearing associated with the interim phase, as outlined in the BO and FMP. The interim phase of Cachuma fish flow operations is occurring currently. The second set of operating criteria involves releases for steelhead rearing and passage associated with the final phase (long term) as outlined in the BO and FMP. One element that is common to both sets of the fish release operating criteria is the conjunctive operation of water rights releases with fish releases. This conjunctive use operation would extend the period of time each year when instream flows improve fisheries habitat for oversummering and juvenile rearing within the mainstem river. Interim (present-condition) flow targets in the Santa Ynez River at the Highway 154 Bridge are shown in Table 2. Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

7 DRAFT TABLE 2 INTERIM MAIN STEM SANTA YNEZ RIVER REARING TARGET FLOWS BASED ON BIOLOGICAL OPINION AND FISH MANAGEMENT PLAN Lake Cachuma Storage Reservoir Spill Target Flow Target Site > 120,000 AF Spill> 20,000 AF 5 cfs Highway 154 Bridge > 120,000 AF Spill <20,000 AF or No Spill 2.5 cfs Highway 154 Bridge < 120,000 AF No Spill 1.5 cfs Highway 154 Bridge <30,000 AF No Spill Periodic Release;.:s30AF per month Stilling Basin and Long Pool Source: Lower Santa Ynez River Fish Management Plan. October 2, 2000, pg In years when Cachuma Reservoir spills 20,000 acre-feet or more, a target flow of 5 cfs will be maintained at the Highway 154 Bridge. In years when Cachuma Reservoir does not spill or spills less than 20,000 acre-feet, the Highway 154 target flow will be determined at the start of each month based on reservoir storage: 2.5 cfs when storage is greater than 120,000 acre-feet and 1.5 cfs when storage is less than 120,000 acre-feet. Periodic releases to refresh the Stilling Basin and Long Pool will be made when storage is less than 30,000 acre-feet. In addition, the BO requires a 2 cfs minimum flow in Hilton Creek once a pump is installed as a part of the terms and conditions to implement Reasonable and Prudent Measure No.2 ofthe Biological Opinion. Also, both the BO and FMP under the interim phase include a provision that the U.S. Bureau of Reclamation (USBR) shall maintain residual pool depth in Alisal and Refugio reaches downstream of the Highway 154 Bridge during spill years and the first year after spill years if steelhead are present. Because the quantity of water needed to maintain residual pool depth has not yet been determined and is necessary only when steelhead are present, this provision has not been included in the SYRHM. Table 3. Final (long term) flow targets in the Santa Ynez River for steelhead habitat are shown in Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

8 TABLE 3 FINAL PHASE MAINSTEM SANTA YNEZ RIVER REARING TARGET FLOWS BASED ON BIOLOGICAL OPINION AND FISH MANAGEMENT PLAN Lake Cachuma Storage Reservoir Spill Target Flow Target Site > 120,000 AF Spill> 20,000 AF 10 cfs Highway 154 Bridge > 120,000 AF Spill> 20,000 AF 1.5 cfs \) Alisal Road Bridge > 120,000 AF Spill <20,000 AF or No Spill 5 cfs Highway 154 Bridge < 120,000 AF No Spill 2.5 cfs Highway 154 Bridge >30,000 AF Spill < 20,000 AF or No Spill <30,000 AF No Spill 1.5 cfs \) Alisal Road Bridge 2) Periodic Release; :s30af per month 1) When rainbow troutlsteelhead are present in the Alisal Reach. 2) This target will be met in the year immediately following a year with spill> 20,000 AF. Source: Lower Santa Ynez River Fish Management Plan, October 2, 2000, pg DRAFT Stilling Basin and Long Pool In years when Cachuma Reservoir spills 20,000 acre-feet or more, a target flow of 10 cfs will be maintained at the Highway 154 Bridge up to the capacity of Hilton Creek supplemental watering system of 10 cfs. In years when Cachuma Reservoir does not spill or spills less than 20,000 acrefeet, the Highway 154 target flow will be determined at the start of each month based on reservoir storage: 5.0 cfs when storage is greater than 120,000 acre-feet and 2.5 cfs when storage is less than 120,000 acre-feet. Periodic releases to refresh the Stilling Basin and Long Pool will be made when storage is less than 30,000 acre-feet. In addition, the BO requires a 2 cfs minimum flow in Hilton Creek once a pump is installed as a part of the terms and conditions to implement Reasonable and Prudent Measure No.2. Also, both the BO and FMP under the final phase the USBR shall provide a target flow of 1.5 cfs at Alisal Road Bridge in years with spill greater than 20,000 acre-feet and the first year after such spill years if steelhead are present. In addition, under the final implementation phase of the BO and FMP, specific volumes of water are dedicated for the "Fish Passage Account" (3,200 acre-feet) and for the "Adaptive Management Account" (500 acre-feet) for a total of3,700 acre-feet. The water in these two accounts is allowed to carry-over from one year to the next; however, the accounts are deemed to spill first Stetson Engineers Inc. F:IOATAI1944ISURFACEWATERITM SW RESULTS V7.00C Page

9 DRAFT and are then reset to their maximum amount of 3,700 acre-feet. Water in the passage account is planned to be used to supplement storms by augmenting the descending limb of the storm hydro graph below Bradbury Dam. Table 4 lists some ofthe passage supplementation criteria which were incorporated into analyses for the Biological Opinion and Fish Management Plan. TABLE 4 PASSAGE SUPPLEMENTATION CRITERIA Passage releases will be made in years following a spill until accounts have run out Passage releases will only occur January through May. Passage releases will only occur during a storm and there is continuous flow to the ocean. Santa Ynez River at Solvang reaches 25 cfs during a storm 1 51 Storm in January may not be supplemented Cachuma releases through outlet works based on matching Cachuma inflow decay curve and boosting storm peak to 150 cfs at Solvang The modeled fish releases for rearing and passage in these analyses for the City of Solvang use the same model programming code for releases for steelhead rearing habitat and passage as used in previous model runs for the BO, FMP, and SWCRB draft EIR and are completely compatible. 2.3 CACHUMA RESERVOIR SURCHARGING AND MAXIMUM STORAGE CAPACITIES The Cachuma Lake bathymetric survey of year 2000 (MNSCE, Oct. 2000) shows that Cachuma Lake capacity at elevation feet msl is 188,035 acre-feet, a reduction of2,374 acrefeet from the year 1989 survey capacity of 190,409 acre-feet. Table 5 shows the maximum surface elevation and storage capacity associated with various surcharge quantities based on the 2000 survey for the alternatives listed in Table 1 of 0, 0.75, and 3.0 feet. Currently, Cachuma reservoir is surcharged 0.75 feet above the historical maximum elevation of feet. Stetson Engineers Inc. F:IOATAI1944ISURFACEWATERITM SW RESULTS V7.00C Page

10 DRAFT Surcharge (feet) TABLES CACHUMA RESERVOIR SURCHARGE Maximum Maximum Storage Difference from Maximum Elevation Storage No Surcharge Surface Area (feet) (acre-feet) (acre-feet) (acres) , , ,336 2,301 3, ,343 9,308 3, CITY OF SOLVANG RIVER WELL PUMPING Municipal river well pumping is handled in the SYRHM by using net pumping, which implicitly includes return flows. Typically, urban areas have a higher municipal return flow percentage (>50%) while more rural areas have a lower municipal return flow percentage. This analysis uses a municipal return flow of 34% consistent with the SYRHM. This estimate roughly matches estimates by the SBCW A in 1991, which examined return flows from each water purveyor in the basin and determined that 4,485 acre-feet, or 32%, of 14,016 acre-feet of water produced returned to the basin for reuse. In 1992, Stetson Engineers estimated municipal return flows of 30 percent for ID #1 and 40 percent for the City of Solvang (Stetson, 1992). In addition, the municipal return flows in the SYRHM are assumed to return within the same month. Table 6 shows both the net and gross pumping by the City of Solvang used for these analyses, including the three scenarios of City of Solvang's gross pumping from the Santa Ynez River wells of 600; 2,400; and 3,600 acre-feet per year. The three scenarios also correspond to current pumping, four times current pumping, and six times current pumping, respectively. The annual pumping of 600 acre-feet represents the average amount of water pumped from the river wells by the City of Solvang in years 2000 (787 acre-feet) and 2001 (465 acre-feet). The City of Solvang Water System Master Plan Update (Table 7, Provost and Pritchard, May 2002) provides the proposed river well pumping and represents the buildout condition of2,400 acre-feet Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

11 TABLE 6 CITY OF SOLVANG MONTHLY DIVERSIONS FROM SANTA YNEZ RIVER WELLS SIMULATED IN SANTA YNEZ RIVER HYDROLOGY MODEL (SYRHM) Currently Used in SYRHM 1 ) Proposed Water System Master Plan 2 ) Maximum un Solvang River Wells acre-feet/year Solvang River Wells - 2,400 acre-feet/year Solvang River We Difference %of Net %of Net Gross Gross w/ Current Gross Annual Volume Annual Volume Volume Pumped Demand Pumped 4 ) DemandS) Volume Pumped Pumped 4 SYRHMNet Volume Pumped ) Pumping 6 ) acre-feet cfs acre-feet acre-feet cfs acre-feet acre-feet acre-feet cfs Jan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec Notes ,400 1,584 1,188 3,600 J) SYRHM includes a total 0/2000 acre-feet per year a/net river pumping/or municipal demand, including City a/solvang, SYRWCD ID No. 2) Table 7, Water System Master Plan Update, May 2002, p. 15 3) The City a/solvang has filed a petition/or a time extension with the SWRCB. 4) A return flow 0/34% is assumed. 5) January and December monthly pumping reduced by.05 percent/rom Table 7 (see note #2) to make annual total equal 100 percent 6) The difference with the current net pumping is the component added to the model/or increased Solvang river well pumping. Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page 10

12 DRAFT per year. The monthly percentage of annual demand in the Water Master Plan is based on 2000 and 2001 seasonal demands, and the river well volume represents the amount of water needed from the Santa Y nez River underflow to meet average day demand. The net pumping amounts corresponding to the increased Solvang gross pumping of2,400 and 3,600 acre-feet are used in the model analysis. The SYRHM assumes that the well yields for these increased pumping scenarios would not decrease even during critical droughts, so these analyses are considered conservative. 2.5 MODEL LIMIT A TIONS OF THE SYRHM The intended use ofthe SYRHM is for comparative purposes between the EIR alternatives. The simulated flow data generated from the SYRHM is not meant to be predictive, but to be used as an analytical tool for statistical and comparative purposes. Since the model is used for comparative analyses, some of the inherent inaccuracies in the model are expected to cancel out when comparing the results of one scenario with another. The SYRHM operations have some limitations because the model uses monthly time steps. Other limitations of the SYRHM are related to real time management decisions. For example, WR89-18 releases, project delivery reductions in times of shortages, and SWP deliveries could vary based on real time management decisions. Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

13 DRAFT 3. SYRHM OPERATIONAL MODELING RESULTS 3.1 CACHUMA RESERVOIR OPERATIONS The surface water budget for Cachuma Reservoir for all ofthe alternatives is shown in Table 7 for the hydrologic period Table 7 shows that on average over the hydrologic period, the amount of water passed through at Bradbury Dam, either by spills and leakage, water right releases, and fish releases, is relatively the same (less than 1 % variation l ). In summary, the major changes to the Santa Ynez River flow system due to changes in Cachuma Reservoir operations are that when there are more low flow releases, such as for water rights or releases for fish, there are fewer spills or high flow releases. The first four columns (Alternative Nos. 1-4) in Table 7 show that the water to be used for steelhead rearing and passage releases under the interim phase (Alt 2) and final phase (Alts 3A and 3C) of the BO comes not just from the surcharge (i. e., reduction in spills) but also from a reduction in water right releases and Cachuma Project deliveries. Table 7 shows that water right releases, on average, are reduced significantly under the fish release alternatives (Alternative Nos. 2, 3, and 4) when compared as a percentage of water right releases without fish release requirements (Alternative No.1). Project deliveries are reduced the most during critical drought periods, as discussed in a later section of this memorandum. Table 7 shows that the largest difference in Cachuma Project operations for increased Solvang river well pumping scenarios (Alternative Nos. 5-12) is an increase in water rights releases. For example, under Alt 3C with fish flow operations and surcharge, the difference in water rights releases is about 540 acre-feet per year between Solvang river well pumping scenarios of 600 afy (Alternative No.4) and 3,600 afy (Alternative No.8). The increase in water rights releases from Cachuma 1 Note: The precipitation and evaporation vary for each of the EIR alternatives due to differences in the surface area of the reservoir. Also, Tecolote Tunnel infiltration is not shown on these tables but is considered a component of the Project yield. Tecolote Tunnel infiltration averages about 2,050 acre-feet/year for the period and 1,620 acre-feet/year during the drought period Stetson Engineers Inc. F:\DATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

14 TABLE 7 SURFACE WATER BUDGETS FOR CACHUMA RESERVOIR AVERAGE VALVES FROM SYRHM, (76 YEARS) 1) (ACRE-FEET!YEAR) Alternative No. 1 Fish Flow Operations/Surcharge Alt 1 City of Solvang Pumping (afy) 600 INFLOW Runoff 74,171 Precipitation 3,869 OUTFLOW SWPwater 2 ) 0 Total Inflow 78,040 Evaporation 10,876 SpillslLeakage 37,580 Project Deliveries (no tunnel) 3) 23,262 WR89-18 releases 6,322 FishlHabitat releases 0 SWP Exchange 4) 0 SWP Deliveries to South Coast 0 Total Outflow 78,040 Change in Storage 0 Cachuma Spills & Releases 43,902 Difference from A1t 2 (AFY) -176 Difference from Alt 2 (%) -0.4% No. of Spill months 84 No. of Spill Water Years 26 No. of Spill Water Years >20,000 af 17 EIR AL TERNA TIVES Alt2 Alt3A Alt3C Alt 1 Alt2 Alt3A Alt3C ,171 74,171 74,171 74,171 74,171 74,171 74,171 3,869 3,827 3,935 3,856 3,847 3,803 3,911 7,619 7,648 7, ,619 7,648 7,663 85,659 85,646 85,769 78,027 85,637 85,622 85,745 10,876 10,752 11,067 10,841 10,819 10,682 11,000 36,693 36,037 35,415 37,193 36,219 35,639 35,032 23,069 22,855 23,076 23,252 23,047 22,734 22,988 6,023 5,658 5,737 6,751 6,581 6,236 6,273 1,362 2,690 2, ,334 2,677 2,692-2,512-2,490-2, ,512-2,490-2,512 10,131 10,138 10, ,131 10,138 10,175 85,642 85,640 85,673 78,037 85,619 85,616 85, MEAN WATER PASSING THROVGH CACHUMA (Spills and Releases) 44,078 44,385 43,867 43,944 44,134 44,552 43, % -0.5% -0.3% 0.1% 1.1% -0.2% NOTES 1) See Table 1 for description of alternatives; fish releases include rearing and passage flows. 2) Includes SWP deliveries in outlet works and into Cachuma Reservoir. 3) Does not include Tecolote Tunnel infiltration which averages about 2,050 acre-feetlyear 4) Includes SWP exchange with SYRWCD ID No 1. 9 Alt ,171 3, ,034 10,866 37,331 23,266 6, , , % Stetson Engineers Inc. Page 13

15 DRAFT Reservoir with increased Solvang pumping is due to an increase in water production and associated increase in the total dewatered storage levels, which affect the Above Narrows Account. Fish flow operations are about the same when Solvang increases well pumping because (1) the primary management reach for fish flows is the Highway 154 reach, located about seven miles upstream of the City of Solvang river wells; (2) the increase in water rights releases conjunctively decreases the flows needed for fish; and (3) the number of spill years greater than 20,000 acre-feet, which triggers fish flow targets at the Alisal Bridge, is reduced. Figures 2a-b and 3a-b show the frequency of releases and spills from Cachuma Reservoir for all alternatives on different scales of flow. Figures 2a-b indicate that flow distribution frequencies under the various alternatives in terms of high flows are nearly similar. Figures 3a-b show the differences among the alternatives for flows less than 50 cfs. The alternatives with fish flow operations (SWRCB Alternatives 2, 3A, and 3C) show higher rates and longer duration in flows between 0 and 10 cfs. The alternatives with increased Solvang river well pumping (Alternative Nos. 5-12) show higher rates and longer duration in flows between 10 and 50 cfs. 3.2 LAKE STORAGE AND ELEVATION The minimum storage level (minimum pool) is set to 12,000 acre-feet, which occurs during the critical drought of for all alternatives. Table 8 summarizes average Lake Cachuma elevation and storage for each alternative. In general, the median elevation, storage, and surface area for all alternatives are very similar. Stetson Engineers Inc. F:\OATA\1944\SURFACEWATER\TM SW RESULTS V7.00C Page

16 TABLE 8 MEDIAN MONTHLY AND ANNUAL CACHUMA LAKE STORAGE AND ELEVATIONS (76 YEARS) Alternative No. Fish Flow Operations/ Surcharge Solvang River Well Pumping afy 1 Alt Alt A1t3A Alt3C Altl Alt A1t3A Alt 3C Alt A1t A1t3A A1t3C 2400 Median Median Median Median Surcharge November February April July Storage Storage Storage Storage ft af af af af 0 130, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,321 Median Annual Elevation ft Median February Elevation ft Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page 15

17 DRAFT 3.3 SANTA YNEZ RIVER FLOWS7 Figures 4a-b through 9a-b show the frequency of flows at six different locations downstream of Cachuma Reservoir for the various alternatives based on the results of the SYRHM. Figures 5a-b and 6a-b illustrate the key differences among the increased Solvang river well pumping scenarios. Figures 5a-b show the frequency of flows of the Santa Ynez River at the Highway 154 Bridge, in which Solvang increases in river well pumping result in little change. Figures 6a-b show the frequency of flows of the Santa Ynez River at the A1isa1 Bridge, in which the differences in flow between pumping scenarios are more apparent. Figure 6a indicates that Alt 3C/2400 afy (shown in green), produces low flows over a greater frequency than the present conditions, Alt afy (shown in blue). Figure 6b shows the lowest flows at Solvang Bridge occur for the Alt afy scenario. Appendix A contains the monthly flows for the twelve alternatives from 1918 through 1993 (912 months). Table 9 compares the mean annual stream flows at key sites downstream ofcachumareservoir. The mean or average statistic differs from the frequency graphs in that this statistic can be influenced by infrequent, extremely large storm events. For example, fish flow operations in Alt 3A and Alt 3C are the same except that Alt 3C has a surcharge to 3.0 ft and fewer spills, so Alt 3C's average annual flows are slightly smaller than 3A. For the scenarios of increased Solvang river well pumping, mean annual flows at Highway 154 bridge are similar. However, the Santa Ynez River mean annual flows at the Alisal Bridge and Lompoc Narrows are reduced by 532 to 1,735 acre-feet per year in the scenarios with increased Solvang pumping (Alternative Nos. 5-12). Tables loa-c also show the median monthly flows at the Highway 154 Bridge to be similar, and the median monthly flows at Alisal Bridge and Lompoc Narrows to be less for the increased Solvang river well pumping scenarios. The median statistic is based on 50 percent exceedance and shows a pattern similar to that of the frequency graphs (Figures 4a-b through 9a-b ). Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

18 TABLE 9 MEAN ANNUAL FLOWS AT HIGHWAY 154 BRIDGE, ALISAL BRIDGE, AND LOMPOC NARRO (76 YEARS) Alternative No. Fish Flow Operations/ Surcharge Solvang River Well Pumping afy 1 Alt Alt Alt3A Alt3C Altl 3,600 6 Alt2 3,600 7 Alt3A 3,600 8 Alt 3C 3,600 9 Alt 1 2, Alt 2 2, Alt 3A 2, Alt3C 2,400 Surcharge ft Average Difference in Me Average Flow Average Flow Flow at with at Hwy 154 at Lompoc Alisal Bridge Narrows Hwy 154 Bridge Bridge afy afy Afy afy 45,741 49,135 66, ,920 49,128 65, ,229 49,372 65, ,711 48,845 65, ,783 47,848 64, ,978 47,788 64, ,396 48,083 64, ,842 47,527 64, ,743 48,326 65, ,972 48,338 65, ,324 48,596 65, ,794 48,061 64, Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page 17

19 TABLE loa MEDIAN MONTHLY FLOW OF SANTA YNEZ RIVER AT HIGHWAY 154 BRIDGE IN CF (76 YEARS) Fish Flow Solvang Alt Operations/ River Well No. Surcharge Pumping Surcharge Oct Nov Dec Jan Feb Mar Apr May Jun Jul 1 Alt Alt Alt3A Alt 3C Alt Alt Alt3A Alt 3C Alt Alt Alt3A Alt 3C Stetson Engineers Inc. Page 18

20 TABLE lob MEDIAN MONTHLY FLOW OF SANTA YNEZ RIVER AT ALISAL BRIDGE IN CFS (76 YEARS) Fish Flow Solvang AIt Operations/ River Well No. Surcharge Pumping Surcharge Oct Nov Dec Jan Feb Mar Apr May Jun Jul 1 Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt 3C Alt Alt Alt3A l Alt3C Stetson Engineers Inc. Page 19

21 TABLE 10C MEDIAN MONTHLY FLOW OF SANTA YNEZ RIVER AT LOMPOC NARROWS IN CFS (76 YEARS) Fish Flow Solvang Alt Operations/ River Well No. Surcharge Pumping Surcharge Oct Nov Dec Jan Feb Mar Apr May Jun Jul 1 Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt3C Alt Alt Alt3A A1t3C Stetson Engineers Inc. Page 20

22 DRAFT 3.4 GROUNDWATER STORAGE IN THE ABOVE NARROWS RIPARIAN AQUIFER During the low flow periods, there is more percolation into the Above Narrows Riparian Aquifer in the scenarios with releases for steelhead. Figures 10A-C show the changes in total dewatered storage in the entire Above Narrows Riparian Aquifer. These figures show less total dewatered storage during low flow periods when there are more fish releases. An opposite effect is that there is more total dewatered storage when Solvang river well pumping increases. As shown in Figure loa, the Above Narrows Riparian Aquifer recovers to the same levels with the recharge of winter runoff under the various alternatives. The key differences in water levels between the alternatives occur during the droughts. For the purposes of comparison, Figure lob shows that Alt 3A afy (shown in red), results in slightly more dewatered storage levels in the Above Narrows Aquifer than Alt 3A1 600 afy (shown in blue). This difference is due to the increased Solvang river well pumping. Figure lob shows that there is only a very small to no difference between Alternatives 3A and 3C on groundwater storage in the Above Narrows Riparian Aquifer. Figure 10C shows that the largest dewatered storage levels would occur for Altll 3600 afy (shown in red). Figures 11A-C, 12A-C, and 13A-C show the effects to total dewatered storage for the three different sub-units ofthe above Narrows riparian aquifer, the Santa Ynez, Buellton, and Santa Rita sub-basins. The greatest effect is on the Santa Ynez sub-basin. Tables 11 through 14 show statistics on monthly total dewatered storage for the Above Narrows Riparian Aquifer and for the three different sub-units. For comparison, the last four columns show the difference in dewatered storage relative to Alternative 2 (present conditions). For example, Table 11 shows that Alt 3CI 2400 afy (Alternative No. 12), results in 219 acre-feet more dewatered storage on a median basis than the present conditions, Alt afy (Alternative No.2). The average decrease in dewatered storage due to fish releases (Alternative Nos. 3 and 4) reverses to an average increase in dewatered storage under higher Solvang river well pumping scenarios (Alternative Nos. 5-12) when compared with present conditions (Alternative No.2). The increase in dewatered storage levels shown in Table 11 for the Solvang river well pumping scenarios would Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

23 TABLE 11 STATISTICS ON MONTHLY TOTAL DEWATERED STORAGE FOR ABOVE NARROWS RIPARIAN AQUIFER, (ACRE-FEET) Alt No Fish Flow Solvang Operations/ River Well Difference with Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimu afy ft AIt ,524 10,952 2,329 36, AIt ,769 10,517 2,324 32, AIt3A ,332 10,102 2,314 31, Alt3C ,281 10,081 2,315 30, Alt ,480 12,291 2,486 41,965 2,711 1, AIt ,440 11,681 2,486 38,469 1,671 1, AIt3A ,751 11,183 2,488 36, AIt3C ,714 11,151 2,488 36, AIt ,568 11,755 2,395 39,864 1,799 1, Alt ,667 11,120 2,397 36, Alt 3A ,144 10,763 2,385 34, AIt3C ,093 10,736 2,386 34, Stetson Engineers Inc. Page 22

24 TABLE 12 STATISTICS ON MONTHLY TOTAL DEWATERED STORAGE FOR THE SANTA YNEZ RIPARIAN SUBAREA ( ) (ACRE-FEET) Alt No Fish Flow Solvang Operations/ River Well Difference with Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimu afy ft A1t ,471 2, , Alt ,926 1, , Alt3A ,734 1, , A1t3C ,704 1, , Alt ,053 3, ,331 2,126 1, Alt ,199 2, ,166 1, Alt3A ,716 2, , Alt3C ,695 2, , Alt ,265 2, ,309 1,338 1, Alt ,585 2, , Alt3A ,274 2, , A1t3C ,243 2, , Stetson Engineers Inc. Page 23

25 TABLE 13 STATISTICS ON MONTHLY TOTAL DEWATERED STORAGE FOR THE BUELLTON RIPARIAN SUBAREA ( ) (ACRE-FEET) Alt No Fish Flow Solvang Operations/ River Well Difference with Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimu afy ft Alt ,691 5,634 2,164 11, Alt ,598 5,570 2,160 11, Alt 3A ,485 5,447 2,166 10, A1t3C ,471 5,442 2,153 10, Alt ,953 5,896 2,222 11, Alt ,890 5,826 2,222 11, Alt3A ,795 5,762 2,223 11, Alt3C ,790 5,754 2,224 11, Alt ,856 5,794 2,182 11, Alt ,779 5,725 2,181 11, Alt3A ,672 5,627 2,182 11, Alt3C ,666 5,621 2,182 11, Stetson Engineers Inc. Page 24

26 TABLE 14 STATISTICS ON MONTHLY TOTAL DEWATERED STORAGE FOR THE SANTA RITA RIPARIAN SUBAREA ( ) (ACRE-FEET) Alt No Fish Flow Solvang Operations/ River Well Difference with Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimu afy ft Alt ,363 3, , Alt ,244 3, , Alt 3A ,113 2, , Alt3C ,105 2, , Alt ,474 3, , Alt ,351 3, , Alt3A ,240 3, , Alt3C ,229 3, , Alt ,448 3, , Alt ,303 3, , Alt3A ,198 3, , Alt3C ,184 3, , Stetson Engineers Inc. Page 25

27 DRAFT affect WR89-18 releases from Cachuma Reservoir. Tables 12 through 13 show that this impact on groundwater storage is larger in the Santa Ynez sub-unit; which is the sub-unit closest to Bradbury Dam and also includes Highway 154 and Alisal Bridge, which are the fish releases' target sites, and is the sub-unit in which Solvang river wells are located. Tables 15 through 18 show the impact of the EIR alternatives on the average water level elevations in the Santa Ynez, Buellton, and Santa Rita sub-basins of the Above Narrows Riparian Aquifer. Relationships developed by Reclamation between groundwater storage and groundwater elevation were used to develop the relative changes in depths to water for various alternatives, with values being rounded to the nearest foot. The most significant change among the EIR alternatives occurs in the Santa Ynez subarea, with water levels in the groundwater decreasing one to five feet on average. The largest differences occur during droughts. Table 15 indicates that Alt 3CI 2400 afy (Alternative No. 12), results in water levels in the Santa Ynez sub-area five feet lower during the critical drought period than under the present conditions, Alt afy (Alternative no. 2). The SYRHM is limited in predicting water level changes beyond the large groundwater subunits of Santa Ynez, Buellton, and Santa Rita because it does not take into account aquifer properties. Stetson Engineers is performing a more detailed analysis using a numerical groundwater model to determine the local changes in groundwater levels due to increased Solvang river well pumping. Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

28 Ait No TABLE 15 STATISTICS ON MONTHLY AVERAGE WATER LEVEL ELEVATION FOR THE SANTA YNEZ RIPARIAN SUBAREA ( ) (ACRE-FEET) -- - Fish Flow Solvang Operations/ River Well Difference with Alt Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimum afy ft Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt3C Stetson Engineers Inc. Page 27

29 TABLE 16 STATISTICS ON MONTHLY AVERAGE WATER LEVEL ELEVATION FOR THE BUELLTON RIPARIAN SUBAREA ( ) (ACRE-FEET) Fish Flow Solvang Alt Operations/ River Well I Difference with Alt No. Surcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimum M afy ft 1 Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt3C Alt Alt Alt3A Alt3C Stetson Engineers Inc. Page 28

30 TABLE 17 STATISTICS ON MONTHLY AVERAGE WATER LEVEL ELEVATION FOR THE SANTA RITA RIPARIAN SUBAREA ( ) (ACRE-FEET) Alt No Fish Flow Solvang Operations/ River Well Difference with Al Snrcharge Pumping Surcharge Mean Median Minimum Maximum Mean Median Minimum afy ft Ait I Alt Alt3A Alt3C Ait Ait Alt3A Alt3C Alt Alt Alt3A Alt3C Stetson Engineers Inc. Page 29

31 DRAFT 3.4 WATER RIGHTS RELEASES (WR 89-18) Table 18 shows the impacts to water rights releases for the various alternatives as determined by the SYRHM. The Above Narrows Account is dependent upon groundwater storage in the Above Narrows Riparian Aquifer because the account can not be larger than the dewatered storage. Table 18 indicates that WR89-18 releases would be increased as a result of increased pumping by Solvang. For example, the average annual release would increase by about 300 acre-feet under Alt 3C/ 2400 (Alternative No. 12) when compared to Alt 3C/ 600 (Alternative No.4). Alt No. Fish Flow Operations/ Surcharge TABLE 18 IMPACTS TO WATER RIGHT RELEASES FOR WATER YEARS Solvang River Well Pumping afy (ACRE-FEET) Surcharge ft WR89-18 Releases Alt ,322 2 Alt ,023 3 Alt3A ,658 4 Alt 3C ,737 5 Altl 3,600 6,751 6 Alt2 3, ,581 7 Alt3A 3, ,236 8 Alt3C 3, ,273 9 Altl 2,400 6, Alt 2 2, , A1t3A 2, , A1t3C 2, ,046 Differences in WR Releases w/ Alt Stetson Engineers Inc. F:\DATA\1944\SURFACEWATER\TM SW RESULTS V7.DOC Page

32 DRAFT 3.5 CACHUMA PROJECT DELIVERIES Shortages in water supply from the Cachuma Project during droughts are determined using SYRHM. The historical precipitation at Gibraltar Dam from 1947 through 1951 was 35% to 60% below normal. The shortages to water supply during the last three years of this critical period for the various EIR alternatives are shown in Table 19. TABLE 19 IMPACTS OF SCENARIOS ON PROJECT WATER SUPPLY IN CRITICAL DROUGHT PERIOD, (ACRE-FEET) Cumulative Fish Flow Solvang Shortage!) in Shortage in Shortage as Alt Operations/ River Well Critical Drought Shortage as Critical Drought Percentage of No. Surcharge Pumping Surcharge Year Percentage of Period Annual Draft for afy ft (1951) Annual Draft 2) ( ) 3) Three Years A1tl ,070 27% 14,210 18% 2 Alt ,810 38% 20,130 26% 3 Alt 3A ,810 46% 24,850 32% 4 Alt 3C ,890 38% 19,920 26% 5 Alt ,440 29% 15,070 20% 6 Alt ,660 38% 19,760 26% 7 A1t3A ,630 49% 26,970 35% 8 Alt3C ,640 41% 21,790 28% 9 Alt ,250 28% 14,640 19% 10 Alt ,900 39% 20,360 26% 11 Alt 3A ,230 48% 25,930 34% 12 Alt 3C ,460 41% 21,300 28% Notes 1) Shortage rounded to nearest 10 acre-feet 2) Annual Draft from Cachuma Project is 25,714 acre-feet 3) Period corresponds with Project water supply year, May April As shown in the above table, the Cachuma operations proposed in Alternative 3C already will produce substantially greater shortages in the Cachuma Project yield during the critically dry period compared with Alternative 1. During the last three years of the critical period ( ), a cumulative shortage of approximately 5,900 acre-feet would occur between present conditions Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

33 DRAFT (Alternative No.2) and historical conditions (Alternative No.1). In the worst year of the critical period, a reduction in yield of2,740 acre-feet would occur. Alt 3C/ 2400 afy (Alternative No. 12), increases these already large shortages by an additional 1,380 acre-feet in the last three years ofthe critical period. This increase in project shortages in critical droughts is the result of the increased water rights releases due to the increase in Solvang's river well pumping. Similarly, Alt 3C/ 2400 afy (Alternative No. 12) would increase the project shortage by about 570 acre-feet in critical drought year (1951) when compared to Alt 3C/ 600 afy (Alternative No.4). It is also important to note that the shortages just described are in addition to shortages in available water supplies that would occur under WR89-18 Cachuma operations during the historical drought condition. The Cachuma Project members, which include the City of Santa Barbara, Goleta WD, Montecito WD, Carpinteria CWD, and SYRWCD ID No.1, all share the shortages. Stetson Engineers Inc. F:\OATA\1944\SURFACEWATER\TM SW RESULTS V7.00C Page

34 DRAFT 4. BIBLIOGRAPHY Boyle Engineering Corporation, July 8, City of Solvang Water System Master Plan Final Draft Report. Cachuma Operation and Maintenance Board and Department of the Interior, Bureau of Reclamation, June Draft Program and Project Specific Environmental Impact Report/Environmental Impact Statement of the Lower Santa Ynez River Fish Management Plan and Cachuma Project Biological Opinion for Southern Steelhead Trout National Marine Fisheries Service (NMFS), September 11, Biological Opinion. U.S. Bureau of Reclamation Operation and Maintenance of the Cachuma Project on the Santa Ynez River in Santa Barbara County, California. Provost and Pritchard, Inc. May City of Solvang, CA Water System Master Plan Update. Santa Barbara County Water Agency, Santa Ynez River Hydrology Model Manual, Draft, 9/9/1997, expanded by Stetson Engineers Inc.. April Santa Barbara County Flood Control and Water Conservation District, Precipitation Data Report. Santa Barbara County Water Agency, March 15, 1991, Santa Barbara County Growth Inducement Potential of State Water Importation, 29 p. Santa Ynez River Technical Advisory Committee (SYRTAC), October 2,2000. Lower Santa Ynez River Fish Management Plan. Volumes I and II. Prepared for the Santa Ynez River Consensus Committee, Santa Barbara, CA. Final RepOli. State Water Resources Control Board, Division of Water Rights, August Draft Environmental Impact Report. Consideration of Modifications to the U.S. Bureau of Reclamation's Water Right Permits and (Applications and 11332) To Protect Public Trust Values and Downstream Water Rights on the Santa Ynez River Below Bradbury Dam (Cachuma Reservoir). Stetson Engineers Inc., August 31, Santa Ynez River Water Resources Management Planning Process, Phase I. Baseline Data and Background Information. Stetson Engineers Inc., Technical Memorandum No.1. Impacts ofeir Alternatives using the Santa Ynez River Hydrology Model. Prepared for the Bureau of Reclamation and COMB for the Water Rights EIR. Technical Memorandum No.2. Impacts ofeir Stetson Engineers Inc. F:\DATAII944ISURFACEWATERITM SW RESULTS V7.DOC Page

35 DRAFT Alternatives on Stee1head. Prepared for the Bureau of Reclamation and COMB for the Water Rights EIR. Technical Memorandum No.3. Hydrologic Analysis of Surface Water Salinity. Prepared for the Bureau of Reclamation and COMB for the Water Rights EIR. Technical Memorandum No.4. Cachuma Water Rights EIR Alternatives - Results of USGS and HCI Lompoc Groundwater Flow and Transport Models. Prepared for the Bureau of Reclamation and COMB for the Water Rights EIR. United States Department of the Interior, Bureau of Reclamation, March 1973 pp Groundwater and Percolation Data For Use in Determining Downstream Releases, Santa Ynez River, Cachuma Project, CA. United States Department of the Interior, Bureau of Reclamation, April 7, Biological Assessment for Cachuma Project Operations and the Lower Santa Ynez River. Prepared for the National Marine Fisheries Service. United States Department of the Interior, Bureau of Reclamation, June 13,2000. Revised Section 3 (Proposed Project) of the Biological Assessment for Cachuma Project Operations and the Lower Santa Ynez River. Prepared for the National Marine Fisheries Service. Stetson Engineers Inc. F:IDATAI1944ISURFACEWATERITM SW RESULTS V7.DOC Page

36 Figures

37 SCHEMATIC PRESENTATION OF THE HYDROLOGIC MODEL FOR THE SANTA YNEZ WATERSHED (SYRHM) FIGURE 1 PRECIPITATION RUNOFF EVAPORATION Juncal Dam SPILLS ~~~-I - RUNOFF PRECI PITA TION DOUL TON TUNNEL.. DIVERSION PLUS TUNNEL INFILTRATION TO MONTECITO WD EVAPORATION RELEASES --~~--I Gibraltar Dam SPILLS PRECIPITATION DIVERSION TO SYRWCD ID # RUNOFF.-~------~------~-. Bradbury Dam STATE WATER PROJECT~ L r ' DELIVERIES SPILLS & Leakage DOWNSTREAM RELEASES (includes WR89-18, SWP deliveries, and Fish Releases) +- RUNOFF ~ EVAPORATION MISSION TUNNEL DIVERSION PLUS TUNNEL INFILTRATION TO CITY OF SANTA BARBARA TECOLOTE TUNNEL DIVERSION PLUS TUNNEL INFILTRATION TO SOUTH COAST AND DELIVERIES OF SWP M&I / CONSUMPTIVE USE PERCOLATION ~ BANK INFLOW/OUTFLOW.---~ Santa Ynez River Alluvial Ground Water Basin AGRICUL TURAL CONSUMPTIVE USE N ARROWS OUTFLOW ~r ~ PHREATOPHYTE CONSUMPTIVE USE PERCOLATION Lompoc Plain.. Ground Water Basin SANTA YNEZ RIVER FLOW AT FLORADALE AVE. IN LOMPOC

38 FIGURE 2a FREQUENCY OF SPILLS AND DOWNSTREAM RELEASES FROM CACHUMA RESERVOIR (WY ) , ~ ~--~- ~ ~ ~-- ~ ~-----~~~~~~~~~., CI) LL () c Q) (J) ro Q) Q) 0:: "- 0 Q. CI) >..c... c 0 ~ "0.$ ro ::J E CI) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 2/ 600 afy ---- Alt 3C/ 600 afy ---- Alt 2/ 3600 afy ---- Alt 3C/ 3600 afy ---- Alt 2/ 2400 afy ---- Alt 3C/ 2400 afy -----~----~----' 200 o PERCENT OF TIME FLOW AT OR BELOW

39

40 FIGURE 2b FREQUENCY OF SPILLS AND DOWNSTREAM RELEASES FROM CACHUMA RESERVOIR (WY ) , ~, (/) LL () c Q) (/) cu Q) Q) 0:::... 0 c.. (/) >...c... c 0 ~ "'0.$ cu :::l E (/) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 1/ 600 afy ---- Alt 3A1 600 afy ---- Alt 1/3600 afy ---- Alt 3A afy ---- Alt 1/2400 afy ---- Alt 3A afy 200 o PERCENT OF TIM E FLOW AT OR BELOW

41

42 FIGURE 3a FREQUENCY OF SPILLS AND DOWNSTREAM RELEASES FROM CACHUMA RESERVOIR (WY ) 50 ~ (/) u.. () c Q) en co Q) Q) 0::: I (/) >..!::. -+-' C 0 ~ "0 Q) -+-' co :::J E (/) , _._ SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 2/ 600 afy ---- Alt 3C/ 600 afy ---- Alt 2/ 3600 afy ---- Alt 3C/ 3600 afy ---- Alt 2/ 2400 afy ---- Alt 3C/ 2400 afy 10 5 o ---\--'-'--'-'--'-'''''--''''--'''---'''---J~--rJ I I I i j t I I I! I I! 1 I I t f I I I o PERCENT OF TIM E FLOW AT OR BELOW

43

44 FIGURE 3b FREQUENCY OF SPILLS AND DOWNSTREAM RELEASES FROM CACHUMA RES ERVOIR (WY ) ,----, I I I! (J) LL () c Q) If) ro Q) Q) a::: '- 0 c.. (J) >-..c... c 0 ~ "'C Q)... ro :::l E (J) 45 I SW~~~-~ I~r~~i~~~~I~~ ; -~ ~~~~ ;e-;~~;ng ---- Alt 1/600 afy ---- Alt 3A1 600 afy Alt afy ---- Alt 3A afy ---- Alt 1/2400 afy ---- Alt 3A afy o PERCENT OF TIME FLOW AT OR BELOW 100

45

46 FIGURE 4a FREQU ENCY OF SANTA YN EZ RIVER FLOW BELOW HILTON CREEK (WY ) C/) LL () c ~ 0 LL "- Q) > (i: N Q) c > J9 25 c co C/) >.... c ~ "0.$ co :::J 15 E C/) SWRCB EIR Alternativel Solvang River Well Pumping ---- Alt afy ---- Alt 3CI 600 afy ---- Alt afy ---- Alt 3CI 3600 afy ---- Alt afy ---- Alt 3CI 2400 afy 10 I I j o PERCENT OF TIME FLOW AT OR BELOW

47

48 FREQUENCY OF SANTA YNEZ RIVER FLOW BELOW HILTON CREEK (WY ) FIGURE 4b 50 ~ ~7----~ I t, I (f) LL () c 3: 0 LL I... Q) > 0::: N Q) C >-... ro c ro (f) >...c... c 0 ~ "0.$ ro ::::l E (f) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 1/ 600 afy ---- Alt 3A/ 600 afy ---- Alt 1/ 3600 afy ---- Alt 3AI 3600 afy ---- Alt 1/ 2400 afy ---- Alt 3A/ 2400 afy o PERCENT OF TIME FLOW AT OR BELOW

49

50 FIGURE 5a FREQUENCY OF SANTA YNEZ RIVER FLOW AT 154 BRIDGE (WY ) 50 --, ,, I (j) u.. () c 3: 0 u..... Q) > 0:: N Q) C >- El c co (j) >-..c... c 0 ~ "0 Q)... co ::J E (j) ~ SWRCB EIR Alternativel Solvang River Well PumQing Alt afy Alt 3CI 600 afy 40 Alt afy Alt 3CI 3600 afy Alt afy Alt 3CI 2400 afy 10 5 o ,.1,--,.-,.,--, '-'...,,-, -" --'1 ---r-i 1 I I iltl--l-, I I t I I r I I I o PERCENT OF TIME FLOW AT OR BELOW

51

52 FIGURE 5b FREQUENCY OF SANTA YNEZ RIVER FLOW AT 154 BRIDGE (WY ) , , U) ~ 35 c ~ o u.. Q; 30 > ~ N Q) C > c co U), ~---~------~ SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 1/ 600 afy ---- Alt 3A/ 600 afy ---- Alt 1/ 3600 afy ---- Alt 3A/ 3600 afy ---- Alt 1/2400 afy ---- Alt 3A/ 2400 afy.!:... c o 20 ~ "0.$ co :::J E 15 U) 10 5 o PERCENT OF TIME FLOW AT OR BELOW

53

54 FIGURE 6a I FREQUENCY OF SANTA YNEZ RIVER FLOW ABOVE ALiSAL BRIDGE (WY ) 50 ~ C/) LL () c ~ o LL ID 30 > a:: N Q.) c ~.8 25 c co C/) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 2/ 600 afy ---- Alt 3C/ 600 afy ---- Alt 2/ 3600 afy ---- Alt 3C/ 3600 afy ---- Alt 2/ 2400 afy ---- Alt 3C/ 2400 afy ' ~.~ ~ ~ c... c o 20 ~ "0.$ co ::J E 15 C/) 10 5 o PERCENT OF TIME FLOW AT OR BELOW

55

56 FIGURE 6b I I FREQU ENCY OF SANTA YNEZ RIVER FLOW ABOVE ALiSAL BRIDGE (WY ) , _--.. _...-._-_._._ , Cf) ~ 35 c 3: o LL CD 30 > 0::: N CD c >-.s 25 c co Cf) SWRCB EIR Alternativel Solvang River Well Pumping ---- Alt afy ---- Alt 3A1 600 afy ---- Alt afy ---- Alt 3AI 3600 afy ---- Alt 1/2400 afy ---- Alt 3A afy L.... _ '.c...- o c 20 ~ "0.$ co E 15 U o ~~~~~~~~~~~~~~~~~~~~~~ I o PERCENT OF TIME FLOW AT OR BELOW

57

58 ~ ~- ~ ~ ~ FIGURE 7a FREQUENCY OF SANTA YNEZ RIVER FLOW NEAR BUELLTON (WY ) ---~~ o , (/) ~ 35 c 3: o u.. a; 30 > 0:: N Q) C >- JY 25 c ro (/) -!.c 1 20.$ ro ::l E 15 U5 SWRCB EIR Alternativel Solvang River Well Pumping ---- Alt afy ---- Alt 3CI 600 afy ---- Alt afy ---- Alt 3CI 3600 afy ---- Alt afy ---- Alt 3CI 2400 afy ' ~ ~ _ o PERCENT OF TIME FLOW AT OR BELOW

59

60 FIGURE 7b I FREQUENCY OF SANTA YNEZ RIVER FLOW NEAR BUELLTON (WY ) , ~ ~ I C/) u. () c ~ 0 u. "- Q) > 0:: N Q) C >- ~ c ro C/) >-..c... c 0 ~ "0 Q)... ro :::l E C/) 45 SWRCB E I ~~I~~ n~; iv-~/- ~Olva-~g Riv~ r - ~e;i -;U~~~ ---- Alt 1/600 afy ---- Alt 3A1 600 afy Alt afy ---- Alt 3A afy Alt 1/2400 afy ---- Alt 3A afy 10 5 o ~,,-rrrrr"ti~~~~~~~"~i-~i~"~~~~~~~ o PERCENT OF TIME FLOW AT OR BELOW

61

62 FIGURE 8a FREQU ENCY OF SANTA YNEZ RIVER FLOW ABOVE SALSIPUEDES CREEK CONFLUENCE (WY ) 50 ~ r----- \ I if) LL () 35 c ~ o LL Q5 30 > 0:: N Q) C >- El 25 c ro if)..c -c 20 o ~ "0.$ ro E 15 if), SWRCB EIR Alternativel Solvang River Well Pumping ---- Alt afy ---- Alt 3CI 600 afy ---- Alt afy ---- Alt 3CI 3600 afy ---- Alt afy ---- Alt 3CI 2400 afy " ~ o PERCENT OF TIME FLOW AT OR BELOW

63

64 FREQUENCY OF SANTA YNEZ RIVER FLOW ABOVE SALSIPUEDES CREEK CONFLUENCE (WY ) FIGURE 8b 50 ~~~~~~~~~~~~~~~~---~~~~~~~~~--,. I CJ) LL () c ~ 0 LL... Cl> > 0::: N Cl> C >-... ro c ro CJ) >-..c... c 0 ~ "'0... Cl> ro ::::I E Ci5 45 SWRCB EIR Alternative/ Solvang River Well Pumging Alt 1/ 600 afy Alt 3A/ 600 afy 40 Alt 1 / 3600 afy Alt 3A/ 3600 afy Alt 1/ 2400 afy Alt 3A/ 2400 afy o PERCENT OF TIME FLOW AT OR BELOW

65

66 FIGURE 9a, I FREQUENCY OF SANTA YNEZ RIVER FLOW AT LOMPOC NARROWS (WY ) y ~ CJ) t3 35 c 3: o u. CD 30 > n::: N Q) c >- ~ 25 c co CJ) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 2/ 600 afy ---- Alt 3C/ 600 afy ---- Alt 2/ 3600 afy ---- Alt 3C/ 3600 afy ---- Alt 2/ 2400 afy ---- Alt 3C/ 2400 afy..c ~ "0.$ co ::J E 15 CiS o PERCENT OF TIME FLOW AT OR BELOW

67

68 FIGURE 9b 50 --,----~ FREQUENCY OF SANTA YNEZ RIVER FLOW AT LOMPOC NARROWS (WY ) Cf) LL () c 3: 0 LL... Q) > 0::: N Q) C >- El c OJ Cf) >-.I::... c 0 ~ "0.$ OJ ::J E Cf) SWRCB EIR Alternative/ Solvang River Well Pumping ---- Alt 1/ 600 afy ---- Alt 3N 600 afy ---- Alt 1/ 3600 afy ---- Alt 3N 3600 afy ---- Alt 1/ 2400 afy ---- Alt 3N 2400 afy '-----~ ~ o PERCENT OF TIME FLOW AT OR BELOW

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94 Appendix A

95 Alternative 10 No, 1: SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,856 17,819 5, , ,796 2, , ,558 2,048 3,345 10, , ,192 4,795 1,975 -~ , ,175 7, ,336 26, , ,759 3,035 9, ,036 2, ,459 1,372 1,734 13, ,895 1, , ,596 2,279 6, , ,959 16,218 4, ,285 34, ,498 3,036 3,034 11, , ,117 3,013 2,306 2,366 15, , , , , , ,829 1,303 6, ,022 3,001 2,992 2,891 13,331 --~ , ,102 2,842 2,794 2,122 13, ,686 2,993 8, , , , ,099 25,388 16,981 1, ,916 3,037 52, , , ,315 15,955 2, , ,071 3,036 3,034 11, , ,105 2,418 2,276 12, , , , ,499 18,411 3, , ,820 6, ,600 13, ,460 28,910 66, , ,323 36,014 4, , ,999 2, ,054 2,072 16, , ,757 3,037 3,035 16, , ,492 3,035 3,035 1,634 2,327 16, , , , , , , , , ,997 13, ,757 2,040 1,679 27, , ,224 3,037 2,820 12, ,647 3,018 2,417 11, , ,626 1, , , , ,629 2,596 2, , ,070 40,777 9, , ,434 f,495.3,092 10, , , , , , , ,935 1, , ~ ~ _2., , , , ,935 3, , ,865 3,018 10, ,014 3, ,660 14,650 30,494 53,290 20, ,738 2, , _ , ,238 2,101 9, , , ,304 78,236 17,945 5, , , ,912 3,037 1,610 12, , ,597 3,036 3,035 2,046 14, , ,444 2, ,264 2,304 14, , ,252 21,128 7, ,708 34, , ,625 2,027 9, ,582 4, , ,246 3, , , , , , ,537 35,263 7, , ,767 21,163 11, ,008 39, ,453 40,858 7, , , ,372 2,195 6, ,112 3,037 3,034 11, , ,835 57, ,295 56,410 29,427 5, , ,698 4,836 1, ,439 3, , , ,053 2,707 2,089 8, ,892 4, ,542 14, , , ,048 4,242 2,573 2,648 1,064 12, ,220 1, , , , ,171 3,870 3,154 1,659 15, ,471 3,024 9, , , ,804 65,374 28,739 6, ,611 AVG ,336 9,313 17,321 6,559 1, ,509 1,606 1,297 44,970 MEDIAN ,629 1,285 11,230 EIR_MonthlyFlows 4/23/2004

96 Alternative ID No, 1 : SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,135 18,332 5, , ,331 1, , ,198 1,965 3,019 10, , ,517 1,789 9, , , ,416 12,635 7, ,077 28, , ,351 2,939 8, ,931 2, ,000 1,139 1,541 12, ,342 1, , , ,216 2,088 7, , ,094 16,487 4, ,952 36, ,123 2,939 2,923 10, , ,717 2,910 2,008 2,178 13, , , , , , ,429 1,151 7, ,661 2,903 2,879 2,770 12, ,690 2,738 2,466 1,952 12, ,251 2,892 8, , , , , ,673 26,464 17,390 1, ,714 2,964 54, , ,924 16,303 2, , ,730 2,936 2,921 10, , ,774 2,327 1,991 11, , ,145 69, , ,210 18,858 3, , ,988 6, ,335 13, ,454 29,560 68,066 10, , ,136 36,791 4, , ,908 2, ,847 16, , ,558 2,958 2,936 15, , ,187 2,944 2,929 1,367 2,113 15, , , , , , , , ,633 12, ,546 1,894 1,553 30, , ,903 2,947 2,534 11, ,279 2,923 2,316 10, , ,033 1, , ,604 2, , , ,175 2,500 2, , ,794 2,758 43,285 9, , ,063 2,403 2,780 9, , , , , , ,628 1, ,661 1, , , , , , ,081 3, , ,568 2,938 10, ,921 2, ,510 14,829 30,662 53,516 20, ,569 2, , , ,913 1,924 7, , , ,521 79,733 18,457 5, , , ,648 2,951 1,384 11, , ,310 2,944 2,927 1,942 13, , ,188 2, ,940 2,110 13, , ,395 3,181 21,580 7, ,436 37, , , ,359 1,839 9, ,027 13,678 5, , ,862 2, , , , , ,220 27, ,427 36,325 7, , ,049 21,556 11, , ,277 42,110 7, , , , ,997 2,009 6, ,793 2,946 2,928 11, , ,350 59, ,776 57,893 30,219 5, , ,682 4,948 1, ,236 2, , , ,378 1,920 7, ,582 7,669 4, ,297 15, , , ,547 4,030 2,503 2, , , , , , ,776 3,557 2,992 1,539 14, , ,145 2,935 11, , , ,141 66,721 29,334 6, ,769 AVG ,535 9,841 17,792 6,737 1, ,362 1,463 1,180 45,741 MEDIAN ,058 11,140 EIR_MonthlyFlows 4/23/2004

97 Alternative 10 No.1: SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,741 20,137 5, , , , ,072 1,606 1,731 7, _'-C19'''2711_--9:cc4'''9t---5=c4'-'4t---c:-:c::.:ot---cc-;o:4::.:8t---::-1::.:5=-= ;-:-'2;:.:9c::7+---:~1~9+-_-::-:1~2+-_._c:cOc. _ ~~--,-16:;-;1+-_3=-"-,-49c.:0+-_-=-99oc7+---;;6,,,'c;-66:-:: ,463 2,099 7,803 14,606 8, , ,108 2,546 7, ,525 2, , , , , ,065 1,219 8, ,709 17,615 4, , ,988 2,527 2,461 8, , ,692 2, ,289 10, , , ,045 1, , , ,768 2,546 2,434 2,285 11,028 ~-~19~3~41--~19~6+---~0+---~0+--~8~2~8+--~2~8~1+-~~5~8\----:-=~2\--_~~0\--~2~,8~0~6\--~2~,3~8~6\--~1~,3~3~1\--~1~,1~3~6\--~9~,0725~ ,335 2, ,093 2,506 10, , , , ,260 31,297 18,640 1, ,931 2,647 65, , ,569 17,632 2, , ,746 2,543 2,478 8, ,864 1, , ,220 82, , ,826 20,186 3, , ,972 1, ,480 6, , ,414 31,737 74,499 11, , ,489 39,244 5, , ,961 10,067 3, , , ,868 2,620 2,531 14, , ,467 2,660 2, ,189 12, , , ,269 12, , , ,993 2,572 1,430 9, ,200 2,516 1,885 9, , , , ,207 5, , , ,005 2,130 1, ,382 \--_1~9~5~8\----~0t-_~-~0~--~0~--~85:~-~4,~46~4+_-~8,~03~4+_~5~3,~33~5+_~1=-'0,~90:;_;1+----'-74~6+_-~15~0+--~1~3+---=-33~3cl_--'-78~,=06~0 1--_1~9"'5=9f---=::.:0t---=::.:0t---~0t---4~3+--~9~8~3+- -1~3=21_-~4721_-~1701_--76j ~2~,9~6~11_-~l'0~2~1+--1~,5~7~1~~~7~,7~7~ , ,837 2, , , ~9~6~51----~0+---~0+---~0~1---4~4+---~2+---~2 1~--~9~379+--~76+---c1~,2~ :1~,8~ ~4~9 ~---=61---c4~,3~1~ ,034 1, ,494 2,570 11, ,527 2,532 1,185 6,137 15,975 31,567 54,697 22,416 1, ,917 2, , , ,072 4, , ,984 86,557 20,163 6, , , ,815 2, ,878 \--_~19~7~11_-~6~8~9_--~5~84~-~5~71~-~1= ~5+_--4~4+_--~12+_-~::.:0+_-~2,~65~2+_-2~,~63=c4+_-2~,=52::-:5+_-~1,=55~2+-~1~1,-,-49~ , ,620 2, ,212 9, ,508 9,842 23,284 8, , , , , ,369 16,644 5, , ,737 2, , , ,630 37, ,159 40,118 8, , ,882 22,790 12, , ,912 46,288 7,833 1, , , ,141 6, , ,914 2,585 2,506 10, , ,509 27,745 66, ,702 63,192 33,455 6, , ,569 5,334 2, ,632 2, , ,218 1,116 3, ,866 9,591 4, , ,134 2,170 1, , , ,317 2,040 1, , ,127 2, ,112 2,566 16, , ,277 72,411 31,755 7, ,972 AVG ,245 11,745 19,548 7,449 1, ,135 MEDIAN o ,660 EIR_MonthlyFlows 4/23/2004

98 Alternative ID No.1: SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,400 22,006 6,651 1, , , , , ,602 1,387 1,045 7, , , ,477 3,984 13,116 16,866 9,431 1, , , ,613 2,303 7, ,276 1, , , , , , , ,425 18,176 5, , ,551 2,285 2,193 8, , ,330 2, , , , , ,048 2, , , ,404 2,343 2,176 1,998 11, , ,410 2, , , ,336 4, ,576 2,252 14, ,604 1, , ,245 37,114 20,070 1, ,564 2,450 81, , ,106 19,264 2, , , ,382 2,327 2,230 9, ,474 1, , ,256 6,200 93, , ,853 21,895 3, , ,650 2,009 1,008 4,267 7, , ,187 34,249 79,999 12, , ,235 41,655 5,976 1, , ,022 10,484 3, , , ,517 2,410 2,291 14, , ,171 2,505 2, , , ,423 13,049 1, , ,735 1, ,578 2, , , ,678 2,236 1,595 9, , , ,806 8,027 1, , ,545 1, , ,466 15,286 64,910 12,362 1, , , ,526 1, , , ,532 5,165 1, , , , , , ,321 1,790 3,158 1, ,890 2,292 13, ,232 2,251 2,313 9,961 17,025 31,929 55,124 23,733 1, ,680 1, , , , , ,118 94,934 21,430 7,402 1, , , ,470 2, , ,335 2,461 2,299 1,335 10, , ,325 2, , ,874 18,406 24,888 9, , , , , , ,482 21,085 6,309 1, , ,380 2, , ,598 51, ,945 44,773 9,628 1, , ,520 6,537 24,674 13,994 1, , ,000 93,701 51,402 8,584 1, , , , , ,534 2,361 2,254 10, , ,841 34,463 75, ,010 67,095 36,374 7, , ,229 5,734 2, ,324 2, , , ,410 12,645 4, , ,738 1, , , ,821 1,387 1, , ,887 4,057 1, ,624 2,322 25, , ,329 78,984 34,809 8,354 1, ,845 AVG ,173 14,056 21,446 8,237 1, ,692 MEDIAN ,298 EIR_MonthlyFlows 4/23/2004

99 Alternative 10 No.1: SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feeuyear SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,248 24,076 7,811 1, , , , , ,901 1, , , , ,681 5,865 17,590 19,342 10,741 1, , , ,837 1,922 6, ,885 1, , , , , , , ,101 18,571 6, , ,876 1,901 1,764 6, , ,864 2, , , , , ,351 4, , , ,935 2,058 1,778 1,548 9, , ,914 1, , , ,996 5, ,832 1,878 16, ,400 1, , ,803 42,759 21,974 2, ,023 2,155 95, , ,210 21,368 2, , , ,883 1,998 1,839 9, , ,945 1, , ,474 8,905 97, , ,327 23,868 4,198 1, , ,528 2,666 1,290 4,927 8,201 1, , ,198 37,249 85,023 13,758 1, , ,100 44,095 6,837 1, , ,992 10,714 4, , , ,043 2,095 1,913 14, , ,898 2,350 2, , , ,810 13,037 1, , ,747 2, ,011 1, , , ,964 1,830 1,170 8, ,299 8,325 1, , ,835 1, , ,985 22,182 76,722 14,293 1, ,985 _ , ,882 1, , ,978 6,053 1, , ,019 -' ,396 3,834 1, ,972 1,876 11, ,791 1,837 3,318 13,508 18,237 32,593 55,821 25,259 1, ,259 1, , , , , , ,369 22,335 8,357 1, , , ,990 2, , ,977 2,229 1,954 1,001 8, , ,051 2, , ,660 26,773 26,090 10,795 1, , , , , ,792 24,589 7,091 1, , ,825 2, , ,545 64, ,563 49,992 11,013 1, , ,939 7,850 26,452 15,844 1, , , ,175 57,250 9,669 2, , ,501 1, , , ,993 2,020 1,857 10, , ,939 40,153 84, ,520 69,676 39,083 8,724 1, , ,593 6,305 2,762 1, ,977 2, , ,683 14,766 4, , ,993 1, , , , , ,267 6,166 2, ,939 1,971 34, , ,625 86,794 38,813 9,361 1, ,216 AVG ,906 16,008 23,102 8,958 2, ,206 MEDIAN ,533 EIR_MonthlyFlows 4/23/2004

100 Alternative 10 No.1: SWRCB EIR Alt 1 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,888 25,767 8,357 2, , , , ,268 1, ,815 1, , , , , ,940 7,364 22,128 21,255 11,598 2, , , ,732 1,878 7, ,835 1, , , , ,612 1, , , ,179 20,000 7,417 1, , , ,782 1,854 1,707 7, , ,794 1, , , , ,135 1,327 15,561 5,272 1, , , ,863 2,019 1,724 1,485 11, , ,843 1, , ,397 1,146 4,000 7, ,731 1,834 20, ,678 2,291 1, , ,001 47,353 23,263 2, ,943 2, , , ,116 22,663 2, , ,081 2, ,815 1,955 1,784 10, ,617 1, ,861 1, , ,201 11, , , ,980 25,558 4,913 1, , ,925 4,345 2,201 6,753 9,329 1, , ,083 39,207 88,964 14,720 1, , ,238 46,624 7,478 2, , ,826 11,313 4, , ,041 6, ,979 2,054 1,861 15, , ,851 2,323 2, , , , , ,508 13,330 1, , ,566 3, ,910 1, , , ,851 1,777 1,115 10, , ,417 15,483 2,609 1,188 1,736 1, ,624 r ,731 1, , ,273 29,107 85,182 15,177 2, , , ,795 1, , , ,597 9,795 1, , ,110 2,102 1, , , , ,054 3,699 6,141 2,768 1, ,846 1,826 21, ,737 1,782 3,778 17,425 18,694 33,015 56,741 25,720 1, ,170 1, , , , , , ,159 24,170 8,994 1, , , ,895 2, , ,895 2,186 1, , , ,967 2, , ,742 33,546 28,859 11,648 1, , , ,426 1, , , ,215 31,341 8,027 2, , ,761 1, , ,836 79, ,493 54,042 11,971 1, , ,008 9,981 29,127 16,828 2, , , ,821 61,432 10,416 2, , ,156 1, , ,008 4, ,920 1,979 1,804 11, , ,303 48,773 93, ,475 74,896 41,007 9,581 1, , ,959 6,834 3,084 1, ,925 2, , ,420 20,294 5, , , ,898 1, , , , , ,778 7,500 3,284 1, ,839 1,924 40, , ,175 90,053 39,994 9,900 1, ,833 AVG ,101 6,845 18,275 25,129 9,766 2, ,013 MEDIAN , EIR_MonthlyFlows 4/23/2004

101 Alternative ID No.2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM ,877 17,805 5, , ,380 1,456 1,512 9, ,206 1,320 2,449 9, , ,911 2,159 10, , ,055 10,108 7, ,034 24, , ,491 3,036 11, ,036 2, ,825 2,049 11, , ,005 2, , ,190 2,283 7, , ,701 16,214 4, ,634 31, ,232 3,037 3,035 12, , ,800 3,002 2,404 3,182 16, , ,689 1, , , , ,530 1,746 7, ,720 2,994 2, , ,148 2,994 2,911 2,606 14, ,494 2,994 10, , , , ,220 19,306 16,967 1, ,858 3,037 46, , ,333 15,947 2, , ,838 3,037 2,546 11, , , ,353 11, , , , ,502 18,398 3, , ,872 6, ,308 12, ,718 28,916 66,499 10, , ,522 36,009 4, , ,500 2, ,262 16, , ,670 3,038 3,035 16, , ,428 3,037 3,027 3,026 2,564 19, , , ,056 -~ , , , , , , ,767 13, ,125 4,515 27, ,091 2,694 2,695 11, ,812 1, ,210 3,019 3,080 14, , ,653 2, , , , ,309 2,143 3, , ,189 37,267 9, , ,206 2,397 2,820 11, , ,765 1, , , , , , , _ , , , ,079 J..~ ,974 3, , ,824 3,014 10, ,001 2, ,748 30,493 53,297 20, , , ,519 2,089 1,238 2,145 11, , , ,328 78,232 17,940 5, , , ,775 3,037 1,408 11, , ,434 3,037 3,036 2,111 15, , ,420 3, ,758 2,325 14, , ,371 20,176 7, ,074 34, , , ,283 2,154 9, ,594 4, , ,904 3,038 2,897 1,716 13, , , , ,558 35,264 7, , ,267 21,171 11, , ,038 40,858 7, , ,843 2,224 7, , ,915 3,037 3,035 12, , ,044 57, ,321 56,413 29,414 5, , ,081 4,833 1, ,430 2, , , ,767 2,111 8, ,695 4, ,468 15, ,376 1, , ,211 2,908 2,571 2,311 13, , , , , , ,821 2,218 3,025 1,758 14, , ,351 2,480 9, , , ,825 65,378 28,726 6, ,666 AVG ,363 9,110 17,162 6, , ,399 1,724 1,382 45,143 MEDIAN , EIR_MonthlyFlows 4/23/2004

102 Alternative ID No, 2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,211 18,287 5, , ,102 1,273 1,352 8, ,958 1,150 2,255 9, , ,591 1,956 9, , , ,536 10,586 7, , , ,210 2,955 10, ,942 2, ,457 1,880 10, ,698 2, , , ,894 2,093 7, , ,893 16,455 4, ,396 33, ,978 2,955 2,934 11, , ,563 2,922 2,309 2,851 15, , ,403 1, , , , , ,212 1,581 8, ,496 2,916 2, , ,879 2,912 2,624 2,437 13, ,206 2,912 10, , , , , ,916 20,599 17,333 1, ,673 2,966 49, , ,943 16,295 2, , ,597 2,951 2,449 10, , , ,100 10, , ,269 68, , ,213 18,845 3, , , ,073 6, ,089 13, ,827 29,566 68,068 10, , ,570 36,769 4, , ,510 2, ,990 16, , ,484 2,960 2,937 15, , ,215 2,962 2,933 2,914 2,246 18, , , , , , ,986 e , ,771 13, ,943 4,382 31, ,847 2,618 2,431 11, , ,956 2,937 2,802 14, , ,316 2, , ,746 2, , , ,047 2,076 2, , ,943 2,903 39,837 9, , ,952 2,321 2,547 10, , , , , , ,069 1, , , , , , , ,614 3, , ,532 2,934 11, ,909 2, ,736 8,920 30,610 53,542 20, , , ,293 2,017 1,026 1,949 10, , , ,545 79,729 18,452 5, , , ,541 2,955 1,198 10, , ,217 2,956 2,935 1,835 14, , ,230 2, ,512 2,128 13, , ,530 3,319 20,660 7, , , , , ,061 1,958 9, ,160 12,741 5, , ,674 2,960 2,798 1,460 12, , , ,494 22, ,406 36,358 7, , ,591 21,575 11, , ,085 42,110 7, , , ,566 2,037 7, , ,681 2,959 2,937 12, , ,626 59, ,840 57,897 30,206 5, , ,099 4,941 1, ,245 2, , , ,394 1,934 7, ,745 6,550 4, ,159 16, , , ,968 2,831 2,305 2,144 12, , , , , , ,566 2,029 2,841 1,631 13, , ,088 2,404 11, , , ,161 66,726 29,322 6, ,770 AVG ,548 9,658 17,642 6,763 1, ,289 1,581 1,246 45,920 MEDIAN EIR_MonthlyFlows 4/23/2004

103 Alternative 10 No.2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM f ,087 5, , , , , , ,394 7, ~-~ ,427 1,089 6, ,570 2,209 7,927 12,575 8, , ,226 2,607 8, ,569 1, ,206 1,064 6, , , , ,224 9, ,594 17,555 4, , ,158 2,603 2,515 9, , ,875 2,609 1,927 1,606 11, , , ,833 1, , , , ,867 2,614 2, , ,979 2,552 1,460 1,556 9, , ,567 2, ,196 2,554 12, , , , ,756 25,631 18,522 1, ,942 2,659 60, , ,592 17,624 2, , ,861 2,606 2,065 9, , ,131 6, ,392 82, , ,827 20,173 3, , ,159 1, ,624 6, , ,085 31,744 74,501 11, , ,558 39,231 5, , ,297 8,940 3, , , ,850 2,633 2,541 14, , ,702 2,727 2,606 2,492 1,132 14, , , , , ,462 13,003 1, ,052 3,592 41, ,027 1, ,070 2,285 1,384 9, , , ,172 2,582 1,684 11, , ,285 1, , ,450 5, , ,203 1,784 1, , ,765 8,281 49,967 10, , , ,122 1,991 1,465 8, ~ ,342 3, , , , , ,924 2, , ,021 1,222 1, ,450 2,564 11, ,514 2,524 1,276 4,449 10,085 31,433 54,731 22,386 1, , , ,709 1, ,092 6, , ,008 86,553 20,157 6, , , ,830 2, , ,682 2,672 2, , ,806 2, ,250 9, ,710 10,040 22,405 8, , , , ,101 9, ,598 15,855 5, , ,968 2,649 2, , , ,935 32, ,771 40,040 8, , ,535 22,847 12, , ,057 46,290 7,824 1, , , ,188 7, , ,983 2,634 2,542 11, , ,673 25,150 66, ,747 63,196 33,441 6, , ,093 5,324 2, ,682 1, , ,189 1,116 3, ,234 8,654 4, ,022 19, , ,158 2,499 1,257 1,319 8, , , , ,554 1,153 1, , ,382 2,259 1, ,173 2,082 16, , ,304 72,416 31,742 7, ,632 AVG ,218 11,585 19,429 7,464 1, , ,128 MEDIAN EIR_MonthlyFlows 4/23/2004

104 Alternative 10 No, 2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER NEAR BUELLTON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,490 21,956 6,639 1, , a , , a , , , , , ,577 4,091 13,237 14,855 9,403 1, a 3 50, , ,744 2,369 8, ,324 1,521 a a a a a a , a , , , , , ,342 18,116 5, , , ,726 2,363 2,250 9, , ,514 2,405 1, , , , ,087 1,086 9,853 3, , a 0 0 1, ,513 2,416 2,235 a 9, , ,551 2, , , ,583 4, ,689 2,304 15, a 0 0 6,773 1, , ,742 31,495 19,950 1, ,580 2,464 76, , ,133 19,257 2, , , a 2,504 2,393 1,837 9, , a 2, , ,382 6,374 92, , ,857 21,883 3, , ,834 2,117 1,080 3,432 7,467 1, , ,862 34,256 80,001 12,426 1, , ,321 41,648 5,976 1, , ,353 9,380 3, , , ,512 2,428 2,305 14, , ,401 2,573 2,427 2, , a a a a a , ,677 14,030 1, ,058 59, ,735 1, a 2,650 2, , , a a 2,723 2, , a 747 1, , ,089 8,277 1, , ,748 1, , a ,808 15,566 61,576 12,340 1, ~ 1959 a , ,689 1, , , a a 0 a a a a a 0 a 34,210 5,844 1, , a 0 0 1,047 1, a -~ a a 0 0 a a 1, ,143 1, a 4, ,550 2,013 3,380 1, ,846 2,285 14, ,219 2,242 2,396 8,310 11,209 31,779 55,142 23,695 1, , , ,396 1, , a 166, ,146 94,931 21,426 7,389 1, , , a 2,498 2, , ,371 2,505 2, , , ,514 2, , ,080 18,608 24,021 9,557 1, , , , , a 0 1, ,713 20,311 6,308 1, a 34, ,608 2,447 2, , a a a a 0 4,936 46, ,542 44,696 9,625 1, , a a 25 1,652 6,195 24,725 13,974 1, , ,209 92,881 51,409 8,577 1, , ,114 1, , , ,618 2,416 2,295 11, , ,006 31,905 75, ,055 67,099 36,361 7,318 1, , ,763 5,726 2, ,376 1, , a , ,796 11,732 4, , ,747 2, , a a ,595 1, , , , ,149 4,207 1, a 2,690 1,858 25, , ,358 78,989 34,798 8,339 1, ,437 AVG ,144 13,898 21,328 8,246 2, ,591 MEDIAN ,012 EIR_MonthlyFlows 4/23/2004

105 Alternative 10 No.2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,325 24,024 7,799 1, , , , ,705 1, , , , ,350 ~... 62Joo ,785 5,973 17,715 17,340 10,712 1, , ,982 1,996 6, ,940 1, , , , , , ,062 18,503 6,761 1, , ,039 1,979 1,821 7, , ,051 2,119 1, , , , ,734 1,021 10,133 4, , , ,071 2,142 1, , , ,003 1, , , ,284 5, ,949 1,934 17, ,542 1,868 1, , ,331 37,186 21,845 2, ,047 2,171 91, , ,244 21,361 2, , , ,009 2,067 1,477 9, ,335 1, , , ,566 9,057 96, , ,331 23,855 4,183 1, , ,718 2,778 1,364 4,104 8,199 1, , ,873 37,238 85,019 13,749 1, , ,229 44,088 6,837 1, , ,333 9,644 4, , , ,052 2,117 1,931 13, , ,131 2,422 2,185 1, , , ,064 14,017 1, ,207 73, ,806 2, ,099 1, , ,593 1, ,086 1, , ,582 8,765 1, , , ,048 1, , ,487 22,547 73,440 14,271 1, , , ,034 1, , ,656 6,733 1, , , , , ,823 4,261 1, ,971 1,881 13, ,788 1,837 3,409 11,906 12,461 32,412 55,826 25,218 1, , , ,009 1, , , , ,367 22,330 8,345 1, , , ,033 2, , ,027 2,277 1, , , ,227 2, , ,837 26,965 25,226 10,779 1, , , ,494 1, , , ,039 23,848 7,093 1, , ,053 2,132 1, , ,883 58, ,483 50,017 11,043 1, , ,031 7,495 26,482 15,819 1, , , ,355 57,299 9,669 2, , ,884 1, , , ,077 2,076 1,898 11, , ,103 37,635 84, ,563 69,680 39,070 8,710 1, , ,156 6,301 2,759 1, ,028 1, , ,106 13,894 4, , ,020 1, , ,808 1, , , ,562 6,322 3, ,004 1,536 34, , ,634 86,799 38,801 9,346 1, ,766 AVG ,875 15,851 22,992 8,970 2, ,056 MEDIAN ,702 EIR_MonthlyFlows 4/23/2004

106 ~- Alternative ID No, 2: SWRCB EIR Alt 2 and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,964 25,715 8,345 2, , , , ,635 1, , , , , , ,044 7,476 22,255 19,253 11,569 2, , , ,877 1,952 8, ,891 1, , , ,479 1, , , ,140 19,932 7,406 1, , ,428 1, ,945 1,932 1,764 8, , ,981 2,081 1, , , , ,359 1,445 16,343 5,677 1, , , ,999 2,103 1, , , ,928 1, , ,766 1,358 4,312 7,612 1, ,847 1,890 22, a a ,822 2,390 1, a 19 a 14, a a a ,545 41,779 23,135 2, ,968 2, , a a , ,150 22,656 2,351 1, , a a ,237 2, ,941 2,024 1,427 11, a 0 a 241 1,723 1, ,941 0 a 6, a 0 2,274 11, , , ,984 25,545 4,898 1, , ,117 4,458 2,274 5,930 9,326 1, , ,758 39,196 88,960 14,711 1, , ,369 46,617 7,479 2, a 94, ,167 10,246 4, , a a ,208 5, ,989 2,076 1,878 14, , ,084 2,396 2,144 1, , a a a a a a a a a 0 1,175 a a a a 0 a 1, a a a a 0 a a 0 a a a 0 0 a a a a 0 32, ,762 14,311 1, ,977 89, ,719 3, ,999 1, , a a ,954 1, ,975 1, , a a a a 12,699 15,956 2,790 1,314 1,875 1, , a a ,938 1, a 4, a ,775 29,529 81,895 15,156 2, , , ,946 1, , a a 0 0 a 1, a a a 0 a ,275 10,472 2, a 79, a ,346 2,348 1, a 0 6, a a a a a 0 a , , ,425 4,209 6,591 2,999 1, ,847 1,831 22, ,734 1,782 3,869 15,827 12,918 32,831 56,745 25,679 1, , , a 1,927 1, , a 194, , ,157 24,166 8,981 2, , , a 1,938 2,061 a 11, , ,947 2,235 1,937 a 8, a 1, ,132 2, a 6, a ,920 33,734 27,995 11,632 1, , ,059 1,056 4,401 1, , , ,466 30,602 8,029 2, , ,986 2,095 1, , a a 0 0 a a a 0 9,174 74, ,436 54,067 12,001 2, , ,100 9,628 29,156 16,803 2, , , ,006 61,482 10,417 2,774 1, , ,540 2, a 17, a ,167 4, ,006 2,035 1,846 12, , ,467 46,256 93, ,518 74,900 40,994 9,567 1,834 1, , ,526 6,830 3,081 1, ,976 1, , , ,842 19,425 5, , , ,925 1, , a a ,627 1, , , ,074 7,609 3,413 1, ,904 1,494 41, , ,184 90,058 39,982 9,885 2, ,376 AVG ,128 6,814 18,119 25,019 9,778 2, ,863 MEDIAN ,479 1, ,422 EIR_MonthlyFlows 4/23/2004

107 Alternative ID No, 3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,877 17,805 5, , ,273 1,296 1, , ,228 12, , , ,478 11, , ,835 2,026 10, , ,048 5,278 7, , , , , ,259 3,037 14, , , ,299 12, , ,399 2, , ,748 2,304 7, , ,635 16,206 4, ,652 27, ,273 1,385 1, ,845 3,038 3,026 16, , ,552 3,002 1,484 2,411 15, , ,337 1, , , , ,022 1,867 7, , , ,903 2,994 2,993 2,992 14, , ,523 2,994 12, , , , ,220 15,126 16,965 1, , , ,274 32, ,333 15,947 2, , ,314 1,331 1, ,578 3,037 3,035 15, ,942 3,019 1,989 12, , , , ,502 18,398 3, , ,098 6, ,066 12, ,196 28,916 66,499 10, , ,673 36,007 4, , ,763 2, ,272 15, , , ,586 3,038 3,035 16, , ,430 3,037 3,028 3,017 2,379 20, , , , , , , , , , , , ,860 13, ,556 1,586 23, , , ,841 3,038 2,753 15, ,789 1, , ,010 2,554 2,810 16, , ,132 3, , ,892 1,107 6, , , , ,184 36,891 9, , , ,883 3,038 2,182 14, , , , , , , , , ,838 r , , , , _ ,976 3,084 1, , ,651 3,002 11,048 f ,993 2, ,207 30,487 53,299 20, ,669 2, , , , ,046 2,157 11, , , ,328 78,232 17,940 5, , , ,608 3,037 1,120 12, , ,428 3,038 3,036 2,100 15, , ,413 2, ,570 2,338 14, , ,328 16,553 7, , , , ,183 9, ,284 8,914 4, , , ,802 1,491 9, ,181 1, , , ,558 35,264 7, , ,959 21,171 11, , ,611 40,858 7, , , ,231 2,267 9, , , ,684 3,038 3,035 15, ,870 57, ,324 56,412 29,414 5, , ,504 4,833 1, ,070 25, , ,013 2,160 9, ,849 4, ,032 17, , , , , ,727 2,995 2,993 2,992 17, ,109 2, , , , ,702 2,995 2,200 3,974 16, , ,277 2,501 10, , , ,825 65,378 28,726 6, ,411 AVG ,370 9,114 17,179 6,610 1, ,307 1,713 1,449 45,450 MEDIAN , EIR_MonthlyFlows 4/23/2004

108 Alternative 10 No.3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,211 18,287 5, , ,160 1,251 1, , ,983 11, , , ,232 10, , ,539 1,833 10, , , ,529 5,787 7, , , ,247 1,288 1, ,029 2,962 14, , , ,039 11, , ,152 2, , , ,500 2,106 7, , ,884 16,387 4, ,413 29, ,160 1,490 1, ,651 2,962 2,930 15, , ,358 2,928 1,271 2,208 14, , ,093 1, , , , , ,757 1,691 9, , , ,672 2,916 2,891 2,876 14, , ,242 2,914 13, , , , , ,921 16,446 17,307 1, , , ,176 34, ,943 16,295 2, , ,264 1,342 1, ,390 2,958 2,936 15, ,717 2,937 1,748 11, , ,264 62, , ,213 18,845 3, , , ,321 6, , ,355 29,566 68,068 10, , ,795 36,740 4, , ,822 2, ,994 15, , , ,405 2,960 2,937 15, , ,251 2,969 2,938 2,908 2,075 18, , , , , , , , , , , ,792 13, ,396 1,442 27, , , ,641 2,964 2,661 15, , , ,793 2,480 2,545 16, , ,844 2, , ,756 2, , , , , , ,949 2,902 39,468 9, , , ,680 2,960 1,947 13, , , , , , , w ,085 1, , , , , , , ,649 2,954 1, , ,396 2,926 11, ,904 2, ,669 3,439 30,525 53,575 20, ,513 2, , , , ,960 10, , , ,545 79,729 18,452 5, , , ,399 2, , , ,237 2,961 2,939 2,002 15, , ,245 2, ,337 2,135 13, , ,526 3,279 17,051 7, , , , , ,939 9, ,849 10,137 5, , , ,491 1,347 8, ,000 1, , ,522 23, ,414 36,352 7, , ,331 21,563 11, , ,729 42,110 7, , , ,021 2,067 9, , , ,493 2,964 2,941 15, ,487 59, ,875 57,879 30,215 5, , ,542 4,938 1, ,794 24, , ,721 1,967 7, ,769 8,706 4, ,765 19, , , , , ,545 2,922 2,896 2,881 16, , , , , , ,460 2,920 2,111 3,622 16, , ,038 2,428 12, , , ,161 66,726 29,322 6, ,508 AVG ,552 9,663 17,655 6,790 1, ,206 1,574 1,313 46,229 MEDIAN , ,196 EIR_MonthlyFlows 4/23/2004

109 1--- Alternative ID No.3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,076 20,082 5, , ,150 1, , ,050 8, , , ,264 8, ,455 1,018 6, ,574 2,204 7,922 7,814 8, , ,130 1,291 1, ,176 2,635 11, , , ,047 7, , , , ,242 9, ,657 17,436 4, , ,847 1, ,000 2,639 2,534 13, , ,812 2, ,321 10, , , ,057 1, , , , , ,004 2,604 2,469 2,398 12, , , ,466 2, ,240 2,556 14, , , , , ,831 21,554 18,459 1, , , ,644 17,624 2, , ,150 1,436 1, ,785 2,638 2,546 13, ,987 2, , ,388 76, , ,829 20,173 3, , ,201 1, ,908 6, , ,779 31,753 74,505 11, , ,065 39,221 5, , ,425 7,405 3, , , ,803 2,639 2,546 14, , ,826 2,756 2,627 2,499 1,018 15, , , , , , , , ,471 13,068 1, , ,150 2, ,984 2,639 2,272 14, , ,321 1, ,085 2,158 1,481 13, , , , ,559 5, , , , , ,849 8,330 49,638 10, , , ,012 2,630 1,038 11, , , , ,361 3, , , , , ,290 2, , ,095 1,274 1, ,430 2,576 12, ,524 2,538 1,291 4,401 4,717 31,252 54,779 22,364 1, ,903 2, , , , ,099 7, , ,008 86,553 20,157 6, , , ,762 2, , ,747 2,689 2,564 1,627 12, , ,853 2, ,239 9, ,723 10,014 18,822 8, , , , ,007 8, ,272 13,401 5, , , , , , ,196 34, ,875 40,032 8, , ,442 22,879 12, , ,947 46,298 7,826 1, , , ,196 9, ,117 1, ,882 2,655 2,558 13, ,687 22,068 66, ,808 63,147 33,464 6, , ,603 5,319 2, , ,136 4, ,375 10,862 4, , , , , ,008 2,642 2,507 2,436 13, , , , ,551 2,562 1,703 2,131 14, ,416 2,266 1, ,177 2,114 17, , ,296 72,416 31,742 7, ,187 AVG ,206 11,602 19,451 7,496 1, , ,372 MEDIAN , EIR_MonthlyFlows 4/23/2004

110 Alternative ID No.3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a ,748 21,957 6,641 1, , ,095 1, ,593 a 572 6, , , , a a a 2, , ,582 4,086 13,233 10,150 9,350 1, a 90 45, ,505 1,133 1,357 1, ,734 2,409 11, , ,604 a 557 6, a a a a a 1, a a a a 1, , , , ,445 17,994 5, a , a a ,107 1, ,632 2,420 2,287 12, ,251 a a ,483 2, , a a a 1, a a 2, a a a a 0 a a 200 a a a a a a 3,121 1,195 10,087 3, a , a a a 1, a a , a a a 1, a a 2,605 2,383 2,194 2,087 12, ,073 a a 2, ,452 4, a 2,714 2,301 17, ,251 a a a 6,650 1, a 0 2,806 a 13, a a ,818 27,452 19,884 1, , , ,244 19,273 2, , ,261 1,702 2, ,459 2,439 2,313 13, a 0 a ,597 2, , a 1,380 6,370 86, , ,856 21,882 3,725 1, , ,880 2,097 1,053 2,738 7,450 1, , ,619 34,276 80,015 12,430 1, , ,872 41,661 5,994 1, , a ,493 7,886 3, , , ,475 2,441 2,315 13, , ,529 2,605 2,455 2, , a a a a a a a a a 0 a 1,595 a 426 a a 0 a 2, a a a a 0 1, a 0 2, a a a a 0 a 0 a a a a a a a 0 18, ,721 14,107 1, , ,879 3, ,616 2,410 2,012 14, ,396 2, ,674 1, , a , , ,241 8,379 1, , a 0 a a , , , a 258 8,935 15,645 61,264 12,345 1, , a , ,634 2, , , a 711 a 3, a a a a a 0 a 265 a a a a a 0 34,328 6,063 1, , a a a a 1,213 1, a 3, a a 0 a a a a 347 a a 0 a a a 0 15 a 0 2, ,480 1, , a 1,651 2,089 3,441 1, a 2,859 2,308 14, ,239 2,263 2,423 8,277 5,946 31,588 55,181 23,668 1, ,668 1, , , , , , ,155 94,935 21,427 7,390 1, , , ,445 2, , ,442 2,528 2,351 1,415 11, , ,566 2,286 a , ,098 18,585 20,471 9,533 1, , , , , , ,375 17,911 6,313 1, a 8 33, a a a a 1, a , a a a a a 0 5,313 48, ,690 44,708 9,635 1, , ,768 5,143 24,774 13,989 1, , a a 11 1,351 91,878 51,440 8,587 1, , a ,839 1, , ,399 2, ,559 2,452 2,323 13, ,007 28,834 75, ,105 67,046 36,382 7,313 1, , ,282 5,722 2, , a , a ,976 13,928 4, a , , a 2, a a a , ,658 2,447 2,264 2,161 12, a a a a , a a a a a a a 0 a 0 a 6,785 1, ,037 2,314 1,442 1,282 16, a a ,177 4,212 1, ,704 1,892 26, , ,347 78,988 34,797 8,338 1, ,889 AVG ,113 13,908 21,342 8,270 2, ,704 MEDIAN 12 a ,003 1, ,186 EIR_MonthlyFlows

111 Alternative ID No.3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,580 24,024 7,800 1, , , , , ,051 1, , , , , ,785 5,967 17,710 12,652 10,653 1, , ,612 1,019 1,374 1, ,029 2,052 9, , , , , ,989 1, , , ,185 18,364 6,754 1, , ,799 1, ,085 2,076 1,891 9, , ,075 2, , , , ,768 1,145 10,425 4,778 1, , , , , ,074 2,065 1,766 1,599 10, , , ,138 5, ,967 1,930 18, , ,456 1,845 1, , , ,519 33,192 21,776 2, , , ,395 21,376 2,256 1, , ,176 1,883 3, ,027 2,133 1,939 13, , ,042 2, , ,570 9,061 90, , ,329 23,854 4,183 1, , ,789 2,770 1,344 3,421 8,184 1, , ,630 37,280 85,041 13,754 1, , ,954 44,129 6,859 1, , ,586 8,235 4, , , , ,039 2,137 1,947 12, , ,287 2,467 2,222 1, , , ,109 14,453 1, , ,953 3, ,119 2,064 1,610 13, ,309 2,707 1, ,102 1, , ,734 8,898 1, , , , , ,627 22,638 73,134 14,276 1, , , ,079 2,060 7_~ , o 1, ,774 6,951 1, , , , , ,922 4,351 1,660 1, ,013 1,912 14, ,814 1,864 3,448 11,887 7,262 32,194 55,852 25,187 1, ,276 1, , , , , , , ,370 22,331 8,346 1, , , ,031 2, , ,126 2,312 2,019 1,085 9, , ,321 2, , ,855 26,943 21,690 10,750 1, , , ,650 1, , , ,725 21,559 7,112 1, , , , ,260 61, ,739 50,029 11,053 1, , ,220 6,550 26,576 15,845 1, , , ,352 57,398 9,693 2, , ,692 1, , ,469 4, ,089 2,132 1,943 13, ,008 34,485 84, ,603 69,627 39,090 8,706 1, , ,703 6,300 2,760 1, , ,313 16,080 4, , , , , ,069 2,125 1,847 1,696 10, ,998 1, ,191 1,924 1, , ,630 6,335 3,086 1, ,031 1,573 35, , ,570 86,798 38,800 9,345 1, ,063 AVG ,819 15,852 23,001 8,999 2, ,106 MEDIAN EIR_MonthlyFlows 4/23/2004

112 Alternative ID No.3: SWRCB EIR Alt 3A and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,220 25,716 8,346 2, , ,037 1, , , ,993 1, , , , , , ,044 7,462 22,248 14,566 11,509 1, , ,536 1,217 1,661 1, ,931 2,009 11, , , , , ,651 1, , , ,263 19,792 7,400 1, , ,466 2, ,002 2,031 1,835 11, , ,011 2, , , , ,392 1,568 16,635 5,757 1, , , , , ,988 2,023 1,706 1,529 11, , ,594 1,259 4,167 7,502 1, ,864 1,886 23, , ,782 2,364 1, , , ,072 29,774 37,785 23,066 2, , , ,301 22,671 2,356 1, , ,408 2,273 3,763 1, ,964 2,090 1,886 15, ,568 1, ,959 1, , ,293 11, , , ,982 25,544 4,898 1,788 1, , ,191 4,450 2,254 5,248 9,312 1, , ,516 39,237 88,981 14,715 1,925 1, , ,100 46,658 7,500 2,226 1, , ,428 8,840 4, , , ,291 4, ,976 2,095 1,894 14, , ,243 2,442 2,182 1, , , , , ,806 14,746 1, , ,768 5, ,021 2,014 1,551 16, ,593 4,104 1, ,999 1, , ,851 16,073 2,828 1,332 1,893 1, , , , ,915 29,604 81,589 15,161 2, , ,073 1, ,995 2, , , , ,394 10,696 2, , ,503 2,487 1, , , , ,525 4,306 6,681 3,042 1, ,889 1,863 23, ,761 1,809 3,909 15,808 7,722 32,610 56,772 25,648 1, , , , , , , , , ,160 24,167 8,982 2, , , ,941 2, , , ,052 2,272 1,966 1,034 9, , ,249 2, , ,937 33,721 24,458 11,603 1, , ,247 1,086 3,559 1, , , ,148 28,321 8,047 2, , , , ,551 76, ,643 54,079 12,010 2,096 1, , ,289 8,686 29,248 16,829 2, , , ,007 61,581 10,440 2,784 1, , ,352 2, , ,619 4, ,022 2,092 1,891 14, ,339 43,096 93, ,558 74,847 41,014 9,563 1,867 1, , ,077 6,829 3,082 1, , , ,049 21,582 5, , , , , ,996 2,084 1,790 1,631 10, ,816 1, ,891 1, , ,141 7,745 3,428 1, ,932 1,530 41, , ,120 90,057 39,982 9,884 2, ,668 AVG ,133 6,757 18,119 25,027 9,808 2, ,912 MEDIAN , , ,463 EIR_MonthlyFlows

113 Alternative 10 No.4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,927 17,774 5, , ,273 1,296 1, , ,229 12, , , ,485 11, , ,836 2,026 10, , ,055 4,456 7, , , ,301 1,308 1, ,259 3,037 14, , , ,299 12, , ,399 2, , ,748 2,304 7, , ,607 13,983 4, ,671 25, ,273 1,385 1, ,845 3,038 3,035 16, , ,552 3,002 1,483 2,411 16, , ,337 1, , , , ,022 1,863 7, ,530 2,995 2, , ,026 2,994 2,680 3,974 15, ,451 2,994 10, , , , ,220 10,621 16,933 1, ,251 36, , ,273 27, ,383 15,924 2, , ,314 1,331 1, ,579 3,037 1,317 14, , ,810 2,718 1,804 12, , , , ,510 18,361 2, , , ,069 11, ,993 28,932 66,502 10, , ,477 35,996 4, , ,516 2, ,277 15, , , ,591 3,038 3,035 15, , ,430 3,037 3,037 3,026 2,378 20, , , , , , , , , , , , ,588 8, ,848 4,503 19, , ,876 3,038 2,263 13, ,792 1, , ,996 2,715 2,754 15, , ,132 3, , ,891 1,107 6, , , ,283 ~! ,184 32,604 9, ,203 ~ , ,884 3,038 2,185 14, , , , , , , , , , , , , , ,976 2,881 1, , ,645 3,002 11, ,993 2, ,298 53,316 20, ,677 3, , , , ,038 2,158 11, , , ,394 78,219 17,924 5, , , ,608 3,037 1,120 12, , ,428 3,038 3,036 2,162 16, , ,413 2, ,404 2,347 15, , ,328 15,541 7, , , , ,182 9, , ,284 8,491 4, , , ,799 1,492 9, ,185 1, , , ,625 35,260 7, , ,795 21,191 11, , ,305 40,857 6, , , ,231 2,267 9, , , ,681 3,038 3,035 15, ,167 57, ,391 56,423 29,377 5, , ,406 4,824 1, ,071 25, , ,013 2,160 9, ,248 3, ,041 17, , , , , ,682 2,995 2,993 2,992 17, ,111 2,211 1, , , , ,692 2,995 2,325 3,974 16, , ,275 2,531 10, , , ,879 65,394 28,690 6, ,612 AVG ,269 8,907 17,002 6,482 1, ,337 1,684 1,519 44,932 MEDIAN , EIR_MonthlyFlows 4/23/2004

114 Alternative ID No.4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,261 18,256 5, , ,160 1,251 1, , ,984 11, , , ,239 10, , ,540 1,833 10, "811 _ , ,398 2,536 4,973 7, , , ,247 1,288 1, ,029 2,962 14, , , ,039 11, , ,152 2, , , ,500 2,106 7, , ,857 14,172 4, ,431 27, ,160 1,490 1, ,651 2,962 2,939 15, , ,358 2,928 1,271 2,208 14, , ,093 1, , , , , ,757 1,687 9, ,341 2,921 2, , ,783 2,915 2,581 3,616 14, ,179 2,914 11, , , , , ,928 11,977 17,244 1, ,047 39, , ,162 29, ,977 16,282 2, , ,264 1,342 1, ,390 2,958 1,115 13, , ,595 2,639 1,570 11, , ,271 62, , ,221 18,808 3, , , ,087 6, , ,153 29,583 68,071 10, , ,599 36,727 4, , ,578 2, ,999 14, , , ,409 2,959 2,937 15, , ,251 2,969 2,947 2,917 2,074 18, , , , , , , , , , , ,665 8, ,666 4,360 23, , ,672 2,964 2,026 13, , , ,779 2,639 2,492 15, , ,845 2, , ,756 2, , , , , , ,949 2,902 35,192 9, , , ,681 2,960 1,949 13, , , , , , , ,085 1, , , , , , , ,649 2,755 1, , ,389 2,926 11, ,904 2, , ,253 53,618 20, ,521 2, , , , ,959 10, , , ,612 79,716 18,437 5, , , ,399 2, , , ,237 2,961 2,939 2,063 15, , ,245 2, ,189 2,141 13, , ,526 3,279 16,043 7, , , , , ,938 9, ,850 9,718 5, , , ,488 1,348 8, ,003 1, , ,529 23, ,472 36,355 7, , ,171 21,579 11, , ,424 42,109 7, , , ,020 2,067 9, , , ,490 2,964 2,941 15, ,789 59, ,950 57,882 30,182 5, , ,444 4,929 1, ,795 24, , ,721 1,967 7, ,769 8,110 4, ,773 18, , , , , ,510 2,923 2,897 2,881 16, , , , , , ,450 2,920 2,235 3,623 16, , ,037 2,457 12, , , ,174 66,778 29,266 6, ,711 AVG ,452 9,458 17,481 6,662 1, ,236 1,547 1,376 45,711 MEDIAN , ,054 EIR_MonthlyFlows 4/23/2004

115 f--- Alternative 10 No, 4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,126 20,051 5, , ,150 1, , ,051 8, , , ,270 8, ,455 1,018 6, ,574 2,204 7,929 7,007 8, , ,130 1,291 1, ,176 2,635 11, , , ,047 7, , , , ,242 9, ,630 15,234 4, , ,847 1, ,001 2,639 2,543 13, , ,812 2, ,321 10, , , ,057 1, , , ,818 2,642 2, , ,009 2,581 2,161 2,188 11, , ,587 2, ,220 2,565 12, , , , ,924 17,182 18,369 1, ,212 50, , , ,662 17,613 2, , ,150 1,436 1, ,785 2, , ,919 2, , ,411 76, , ,836 20,136 3, , ,236 1, ,685 6, , ,577 31,769 74,508 11, , ,870 39,208 5, , ,425 7,166 3, , , ,805 2,639 2,546 13, , ,826 2,756 2,636 2,508 1,018 15, , , , , , , , ,481 8, ,589 35, ,073 2, ,001 2,636 1,095 11, ,334 1, ,076 2,311 1,443 12, , , , ,559 5, , , , , ,849 8,330 45,379 10, , , ,013 2,630 1,039 11, , , , ,361 3, , , , , , ,342 1, , ,103 1,280 1, ,425 2,577 12, ,525 2,538 1,291 4,401 2,161 29,897 54,827 22,307 1, ,910 2, , , , ,098 7, , ,075 86,540 20,142 6, , , ,762 2, , ,747 2,689 2,564 1,683 12, , ,853 2, ,245 9, ,724 10,015 17,820 8, , , , ,007 8, ,280 12,992 5, , , , , , ,202 33, ,928 40,037 8, , ,289 22,889 12, , ,647 46,297 7,801 1, , , ,196 9, ,119 1, ,880 2,655 2,558 13, ,687 21,380 66, ,891 63,143 33,434 6, , ,507 5,308 1, , ,136 4, ,375 10,275 4, , , , , ,993 2,647 2,511 2,438 13, , , , ,557 2,566 1,822 2,145 14, ,420 2,267 1, ,176 2,142 17, , ,285 72,473 31,684 7, ,392 AVG ,109 11,402 19,282 7,373 1, , ,845 MEDIAN EIR_MonthlyFlows 4/23/2004

116 Alternative 10 No.4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER NEAR BUELLTON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MA Y JUN JUL AUG SEP SUM , ,789 21,923 6,600 1, , ,095 1, , , , , ,608 f-~1'09:::2-"-1 f-~~4",3~5 \--~ 3",0,,-0 \-----c~,,-o\--~-,1-'.4,,-8 f-~~4c::0'c-7 f---c-'.7-=2=-2 f- ~~-- --c-c'5:::2+-~-=c---0+-~---c,.::0+---'2"'-,8--: ~-5:::-0"-7+---'52'5::.:3'7l ,582 4,086 13,240 9,354 9,311 1, , ,505 1,133 1,357 1, ,734 2,409 11, , , , , , , , , ,419 15,815 5, , ,107 1, ,632 2,420 2,29512, , ,483 2, , , , ,121 1,195 10,087 3, , , ,490 2,454 2, , , ,587 2,352 1,891 1,366 10, , ,597 4, ,711 2,315 16,011 r-~1~9~3~6r-~~2~8~4r-~~~0r-~~0'1 ~~~0f-~6~,8~4~8f-~1~,2~9~8f-~~8~9~1f-~~69~1_~~~0~~~~0~~~6~32~~~~0~~1~0~,0~2~ ,918 23,123 19,791 1, ,765 66, , , ,259 19,261 2, , ,261 1,702 2, ,459 2, , , ,562 2, , ,413 6,411 86, , ,869 21,847 3,684 1, , ,914 2,132 1,056 2,521 7,432 1, , ,418 34,291 80,017 12,406 1, , ,679 41,648 5,973 1, , ,493 7,651 3, , , ,476 2,440 2,314 13, , ,529 2,605 2,463 2, , , , , ,012 1~ , ,774 9,621 1, ,045 53, ,785 3, ,622 2, , ,416 2, ,671 2, , , , ,242 8,379 1, , , , , ,935 15,645 57,026 12,287 1, , , ,634 2, ,853 f-~'019:::6c::0~~_4~52~~~3~17~~~~13~~~6~0~~~1,~69~0~~~8~6~~~-=22~4~~~6~0~~--,2~4~~~~0~~~75~9~~~~oc~ 3~,~68~ ,340 6,072 1, ,084 r-~~19~6~3r-~ ~0r-~ ~0r- ~~Oi ~0r-~1~,2~1~5r-~1~,1~3~4r-~~5~3~9r- ~2~2~4r-~~7~4r-~~1~8~2r-~~1-=2~7r-~~0~ ~3~,4~9~51 f-~'019:::6~4~~~.~0+_~~~0+-~~~0+-~~~0+-~~~0+-~~~0+_~~~0'f-~_4~5~7~_~~~0\--_.~~~0\-- ~~0\--~~~Oj ~~4~5~ , ,536 1, ,026 ~:=6r-~~=01 ~1~,6~676r-~2~,1~0~1r-~3~,4~5~1r-~1~,3~95~~~7774~~~1754~_~~1776~ ~~80~~~~0~~~2,~8=57~~~2,~3=09~_~1~4,~9::.:62~ ,239 2,264 2,424 8,278 3,458 30,232 55,217 23,606 1, ,673 2, , , , , , ,220 94,922 21,411 7,355 1, , , ,445 2, , ,442 2,528 2,351 1,469 11, , ,566 2, , ,103 18,588 19,480 9,497 1, ,106 f-~~19~7~4r-~~1~4~0'r-~_1~5~8r-~~5~1r-~5~,0~9~1r-~~6~373'r-~2~,0~5~4r-~~8~0=9r-~~3~98~~_~~76~~~~107r ~1~66~~~~5~35~~1~0~,1~20~ , ,386 17,509 6,297 1, , , , ,319 47, ,740 44,712 9,588 1, , ,768 4,993 24,783 13,957 1, , ,355 91,583 51,440 8,564 1, , ,839 1, , ,402 2, ,557 2,452 2,323 13, ,007 28,152 75, ,186 67,042 36,352 7,273 1, , ,188 5,712 2, , , ,977 13,348 4, , , , , ,648 2,454 2,269 2,166 12, ,800 1, ,044 2,319 1,554 1,297 16, ,183 4,214 1, ,704 1,919 26, , ,323 79,039 34,736 8,296 1, ,122 AVG ,017 13,712 21,175 8,149 2, ,163 MEDIAN ,059 1, EIR_MonthlyFlows 4/23/2004

117 Alternative ID No, 4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,576 23,988 7,758 1, , , , , ,051 1, , , , , ,785 5,967 17,716 11,859 10,613 1, , ,613 1,019 1,374 1, ,029 2,052 9, , , , , ,989 1, , , ,159 16,194 6,713 1, , ,800 1, ,085 2,076 1,898 9, , ,075 2, , , , ,768 1,145 10,425 4,778 1, , , ,085 2,190 1, , , ,048 2,033 1, , , ,309 5, ,974 1,947 18, ,611 1,889 1, , ,500 28,861 21,666 2, ,047 80, , , ,425 21,363 2,218 1, , ,176 1,883 3, ,028 2, , ,333 1, ,036 1, , ,590 9,092 90, , ,343 23,819 4,142 1, , ,822 2,805 1,346 3,206 8,166 1, , ,429 37,295 85,044 13,729 1, , ,763 44,114 6,838 1, , ,586 8,002 4, , , , ,039 2,136 1,946 12, , ,287 2,466 2,230 1, , , ,161 10,153 1, ,198 68, ,877 3, ,122 2, , ,321 2,713 1, ,099 1, , ,735 8,897 1, , , , , ,627 22,638 68,907 14,215 1, , , ,080 2, , , , o , ,786 6,960 1, , , , ,945 4,371 1,663 1, ,013 1,914 14, ,816 1,865 3,450 11,889 4,813 30,822 55,877 25,123 1, ,280 2, , , , , , , ,357 22,316 8,310 1, ~ , ,031 2, , ,126 2,312 2,019 1,135 9, , ,321 2, , ,849 26,938 20,702 10,711 1, , , ,441 1, , , ,768 21,182 7,099 1, , , , ,265 60, ,789 50,033 11,006 1, , ,220 6,404 26,582 15,813 1, , , ,058 57,413 9,672 2, , ,693 1, , ,476 4, ,089 2,133 1,943 13, ,009 33,811 84, ,684 69,623 39,061 8,665 1, , ,610 6,289 2,746 1, , ,315 15,507 4, , , , , ,081 2,139 1,857 1,704 10, ,013 1, ,191 1,926 1, , ,640 6,337 3,088 1, ,031 1,598 35, , ,473 86,849 38,739 9,303 1, ,305 AVG ,725 15,660 22,835 8,881 2, ,560 MEDIAN , EIR_MonthlyFlows 4/23/2004

118 Alternative 10 No.4: SWRCB EIR Alt 3C and Solvang River Well Pumping of 600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM a ,216 25,679 8,304 2, , ,037 1, , , ,993 1, , , , , , ,044 7,462 22,254 13,773 11,469 1, , ,537 1,217 1,661 1, ,931 2,009 11, , , , , ,651 1, , , ,236 17,622 7,359 1, , ,466 2, ,002 2,031 1,843 11, , ,011 2, , , ,090 f--j ,392 1,568 16,635 5,757 1, , , ,012 2,151 1, , , ,973 1,992 1, , ,839 1,381 4,339 7,634 1, ,872 1,903 22, ,891 2,411 1, , ,711 33,454 22,956 2, ,931 92, , , ,332 22,658 2,318 1, , ,408 2,273 3,763 1, ,964 2, , ,705 1, ,953 1, , ,310 11, , , ,996 25,509 4,857 1,788 1, , ,224 4,485 2,257 5,033 9,294 1, , ,315 39,253 88,984 14,691 1,925 1, , ,909 46,643 7,479 2,226 1, , ,428 8,608 4, , , ,291 4, ,976 2,094 1,893 14, , ,243 2,442 2,190 1, , , , , ,859 10,446 1, ,967 83, ,788 4, ,025 2, , ,576 4,094 1, ,994 1, , ,852 16,072 2,828 1,332 1,893 1, , , , ,915 29,604 77,362 15,099 2, , ,071 1, ,996 2, , , , f ,405 10,707 2, , ,506 2,490 1, , ~ , , ,550 4,327 6,701 3,045 1, ,889 1,864 23, ,762 1,810 3,911 15,810 5,274 31,236 56,796 25,584 1, ,200 2, , , , , , , ,147 24,152 8,947 2, , , ,941 2, , , ,052 2,272 1,966 1,083 9, , ,249 2, , ,932 33,715 23,470 11,564 1, , ,247 1,086 3,350 1, , , ,192 27,944 8,035 2, , , , ,557 75, ,692 54,083 11,964 2,096 1, , ,289 8,541 29,254 16,797 2, , , ,713 61,595 10,420 2,753 1, , ,353 2, , ,626 4, ,021 2,092 1,892 14, ,340 42,422 93, ,639 74,842 40,984 9,522 1,867 1, , ,983 6,818 3,068 1, , , ,051 21,010 5, , , , , ,007 2,098 1,800 1,639 10, ,831 1, ,891 1, , ,152 7,751 3,430 1, ,932 1,556 41, , ,023 90,107 39,920 9,842 2, ,910 AVG ,134 6,661 17,926 24,862 9,690 2, ,366 MEDIAN , , ,942 EIR_MonthlyFlows 4/23/2004

119 Alternative 10 No, 5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,856 17,819 5, , ,081 2,299 1, , ,676 4,706 2,379 3,924 13, , ,635 4,828 2,249 12, , ,440 7, ,570 23, ,819 4,812 3,037 10, ,037 1, ,775 2, , , , ,558 3,007 2,615 10, , ,894 16,216 4, ,885 31, ,680 3,037 3,035 12, , ,599 1,541 3,060 2,290 14, ,789 1,115 1, , , , ,284 2,320 1, , ,974 4,358 3,003 2, , ,901 4,405 2,995 3,947 2,411 16, ,848 2,994 9, ,655 2,992 1,478 9, ,100 17,819 16,978 1, , , , , ,315 15,955 2, , ,374 3,036 3,034 11, , ,452 3,018 3,035 14, , , , ,499 18,411 3, , ,820 6, ,086 13, ,976 28,910 66,497 10, , ,653 36,014 4, , ,943 2, ,920 1,000 16, , ,093 3,038 3,035 16, , ,949 3,036 2,483 2,701 2,438 17, , , , , , , , , ,024 13, ,135 1, , ,288 1,711 2, , ,294 2,048 4,866 3,021 4,001 18, , ,951 1, , ,397 1, , ,167 2,992 1, , ,070 38,988 9, ,017 53, ,832 2,784 4,018 -~ , , , , , , , , , , , ,935 3,977 1, , ,333 2,864 3,497 1,308 12, ,260 14,652 30,494 53,290 20, ,944 3, , , ,016 3,037 3,035 3,232 15, , , ,304 78,236 17,945 5, , , ,287 3,037 2,497 13, ,616 1, ,931 3,037 3,035 2,512 15, ,434 1, , ,911 2,470 14, , ,209 18,508 7, ,901 32, , ,803 1,264 10, ,172 4, , ,477 1,097 2, , , , , ,537 35,263 7, , ,277 21,163 11, , ,365 40,858 7, , , ,004 1,918 7, ,595 3,037 3,034 11, , ,246 57, ,295 56,410 29,427 5, , ,698 4,836 1, ,683 3,037 3,035 32, ,221 1, ,228 2, , ,565 4, , , , , ,976 2,363 2, , , , , , ,181 2,994 2,112 3,959 15, , ,595 4,977 3,023 17, , ,804 65,374 28,739 6, ,084 AVG ,227 9,258 17,124 6,538 2,129 1,083 1,734 1,594 1,263 45,012 MEDIAN , EIR_MonthlyFlows 4/23/2004

120 Alternative ID No, 5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,135 18,332 5, , ,677 2, , ,368 4,513 2,314 3,637 12, , ,153 4,635 2,082 11, , , ,403 10,894 7, ,295 26, ,450 4,596 2,968 9, ,951 1, ,378 1, , , , , ,048 2,828 2,471 10, , ,061 16,453 4, ,635 33, ,400 2,955 2,934 11, , ,192 1,329 2,836 2,145 13, , , , , , ,073 1, , ,598 4,182 2,938 2, , ,319 4,236 2,930 3,664 2,274 15, ,527 2,911 9, , ,190 2,881 1,217 9, ,723 19,014 17,347 1, , , , , ,924 16,303 2, , ,045 2,942 2,925 10, , ,117 2,924 2,733 13, , ,157 64, , ,210 18,858 3, , ,988 6, ,794 14, ,001 29,560 68,066 10, , ,558 36,791 4, , ,854 2, , , , ,886 2,959 2,937 16, , ,631 2,948 2,387 2,381 2,260 16, , , , , , , , , ,659 12, ,832 1, , ,008 1,580 2, , ,938 1,924 4,744 2,961 3,744 17, , ,302 1, , ,602 2, ,045 1, , ,723 2,886 1, , ,788 2,754 41,494 9, ,781 58, ,477 2,696 3,695 11, , , , , ,597 1, , , , , , , ,081 3,659 1, , ,001 2,716 3,350 1,208 12, ,045 14,869 30,660 53,517 20, ,772 2, , , ,721 2,948 2,928 2,914 13, , , ,521 79,733 18,457 5, , , ,014 2,954 2,238 12, , ,640 2,948 2,930 2,402 14, , , ,617 2,305 13, , ,391 3,142 18,971 7, ,618 35, , , ,481 1,139 10, ,026 13,270 5, , , , , , , ,220 31, ,427 36,325 7, , ,583 21,554 11, , ,204 42,110 7, , , , ,673 1,778 7, ,252 2,948 2,930 10, , ,766 59, ,782 57,893 30,219 5, , ,682 4,948 1, ,475 2,956 2,935 31, ,125 1, ,810 2, , ,555 4,366 3, , , , , ,250 2,217 2, , , , , , ,921 2,907 2,024 3,409 15, , , ,312 4,825 2,852 18, , ,141 66,721 29,334 6, ,319 AVG ,423 9,786 17,594 6,713 2, ,586 1,489 1,149 45,783 MEDIAN , ,159 EIR_MonthlyFlows 4/23/2004

121 Alternative ID No, 5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,255 20,050 5, , , ,297 1,885 2,073 8, , ,472 1~ t--. 6, ,142 1,890 7,507 12,620 8, , ,284 2,521 6, , , , , , , ,297 1,389 1,330 9, ,197 17,251 4, , ,064 2,470 2,389 8, , , ,486 1,194 8, , , , , ,109 2,477 2, , ,127 2,461 2,031 1,200 10, ,081 2, ,178 2,453 9, , ,767 2, , ,030 23,548 18,321 1, , , , ,320 17,546 2, , ,708 2,446 2,378 8, , ,798 2,428 1,328 8, ,129 78, , ,624 20,159 3, , ,776 1, ,260 6, , ,479 31,402 74,249 11, , ,565 38,836 5, , ,664 9,555 2, , , ,877 2,524 2,432 13, , ,409 2,518 1, ,200 11, , ,296 12, , , , , ,521 1,037 3,750 2,493 2,151 11, , , , ,877 4, , ,278 2, , ,862 7,371 50,903 10, , ,969 2,165 1,992 8, ,800 2, , , , ,283 1, , , ,410 1,526 2, , ,953 15,495 31,008 54,099 22, ,930 2, , ,584 2,502 2,395 1,434 9, , ,473 86,449 20,098 6, , , ,785 2,484 1,007 9, ,587 2,519 2,413 1,876 11, , , ,206 1,276 7, ,280 9,523 20,413 8, , , , , , ,074 15,743 5, , , ,629 40, ,221 39,233 8, , ,107 22,312 12, , ,427 45,721 7,741 1, , , , , ,880 2,458 2,383 8, , ,287 26,570 66, ,414 63,163 33,319 6, , ,183 5,197 1, ,618 2,555 2,465 29, , , , ,281 5,850 3, , , , , , ,937 2,493 1,660 1,544 12, , ,633 1, ,114 3,725 1,664 17, , ,870 71,721 31,143 7, ,711 AVG ,033 11,539 19,167 7,304 1, ,848 MEDIAN EIR_MonthlyFlows 4/23/2004

122 Alternative 10 No.5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 74, ,896 21,909 6,516 1, a 238, a a a a a a a , ,798 1,647 1,319 7, a a 333 2, , ,092 3,749 12,794 14,872 9,237 1, a a 27 48, a - a 1, a 59 2,767 2,274 6, , a a 176 a a 0 2, a 5, a a 0 a a a a a a 1, a a a a 1, , , ,926 17,796 5, , a a a ,605 2,222 2,114 8, ,091 0 a a a 2, , a 0 a a a a a 1, a a 0 a 0 0 a a 0 a a a a 1932 a a 2, ,959 2, a 16, a a a 1, ,713 2,270 2,084 a 8, a a 1, ,703 2,236 1, , a 0 0 1, ,078 3, ,635 2,191 13, a , a 2,315 2, , a a ,990 29,410 19,733 1, ,536 a 70, , ,826 19,170 2, , , ,324 2,222 2,122 8, ,384 2, , ,249 6,121 88, , ,637 21,860 3, , ,450 1, ,039 7, , ,188 33,898 79,727 12, , ,298 41,228 5,901 1, , a ,718 9,961 3, , a , ,494 2,303 2,182 13, , ,102 2,359 1, , a a 181 a a 0 0 a a a a 0 18, ,285 12, , , ,243 1, , a 5, , , ,236 2,229 1,356 10, a 5 5 a a 22 a , ,361 7, a , ,786 1, , ,730 14,517 62,429 11,909 1, , a , ,499 1,921 1,247 7, a a a a a 0 0 a a a 0 33,373 4, , a 0 40, a 1, a 0 a 0 0 a a 1965 a 0 0 a 0 0 1, , a 1,151 1,488 2, ,027 1,038 1, , a 1,978 11,659 16,524 31,344 54,495 23, ,680 2, , ,260 2,316 2, , a 159, ,583 94,808 21,354 7,311 1, a 514, , ,408 2, , ,260 2,336 2,177 1,631 10, a a 2, , ,628 18,072 22,023 9, , a a 4, , , ,151 20,161 6,116 1, , a a a a a a 0 0 4,463 54, ,944 43,873 9,157 1, , a 10 1,353 5,764 24,173 13,786 1, , ,092 50,814 8,482 1, , , , a , ,461 2,220 2,118 9, , ,598 33,233 75, ,685 67,046 36,224 7, , ,830 5,588 2, ,299 2,358 2,235 30, , , a ,752 8,929 3, , a a a a , , a a a 0 a 0 0 a a a 0 a 6, ,562 2,316 1, , , ,413 3,755 1, ,235 1,125 25, , ,865 78,260 34,178 7,866 1, ,928 AVG ,950 13,831 21,051 8,083 1, ,362 MEDIAN a a ,724 EIR_MonthlyFlows 4/23/2004

123 Alternative ID No.5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , a 1 42 a 0 0 a t a , ' a , ,342 10,540 1, , , a 1,970 1,897 5, ,834 0 a 0 a 226 a a 0 1,799 a 0 3, a a a 0 0 1, , , ,682 18,189 6, a , a a ,915 1,839 1, , ,826 a , ,018 a , a a 0 a a , ,161 3, a , , ,230 1, , a 1, ,205 1, , a 2, ,776 5, ,886 1, a 7,363 1, ,763 1, a ,627 35,109 21, , , , ,947 21, , , a 1,832 1,899 1,738 8, , a 1,862 1, , , , , ,111 23,833 4,130 1, ,330 2,520 1,174 4,697 7,954 1, , a 0 60,199 36,926 84,761 13,667 1, a 197, ,159 43,659 6,761 1, , a 5, , , a , a 2,002 1,986 1, ,821 2,202 1, a a a a a a 0 0 a 0 0 a a , ,673 12,974 1, , ,139 1, a 4, a , ,593 1, , a 0 0 a ,854 7,564 1, , a , , a ,103 74,097 13, , a , ,857 1, , a 0 a a a a a ,819 5, ,-~ a a a a ,242 1, , ,765 14,916 17,658 31,967 55,174 24,848 1, ,254 2, , ,882 2, , , , ,237 22,256 8,265 1, , , a 1,923 1, , a ,922 2,114 1,843 1,274 8, a 1, , ,497 26,490 23,246 10,630 1, , , , , ,410 23, , a 0 a 38, a 0 a ,410 67, ,562 48,921 10,507 1, , ,755 7,059 25,914 15,625 1, , , ,567 56, , a 173, a ,083 1, a , a 1,893 1,874 1,719 9, ,695 a 3,686 38,892 83, ,192 69,627 38,933 8,653 1, , ,187 6,155 2,652 1, ,951 2,082 1,889 31, , a , ,890 11,024 4, , a a a a 0 a a a , , ,158 a 15, ,780 5,861 2, , , a , ,126 86,070 38,181 8,874 1, ,795 AVG ,786 22,697 8,794 2, ,926 MEDIAN a EIR_MonthlyFlows 4/23/2004

124 Alternative ID No.5: SWRCB EIR Alt 1 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,383 25,670 8,222 2, , ,871 1, ,919 1, , , , , ,495 7,122 21,787 19,256 11,397 1, , , ,866 1,854 7, , , , , ,978 1, , , ,768 19,618 7,269 1, , , ,819 1,792 1,631 7, , , , , , ,046 1,232 15,371 4,884 1, , , ,155 1,957 1, , , ,134 1, , ,343 1,104 3,800 7, ,784 1,779 19, ,650 1,977 1, ,691 1, , ,863 39,702 22,913 2, , , , ,853 22,568 2, , ,054 2, ,764 1,856 1,684 10, ,545 1, ,781 1, , ,311 11, , , ,764 25,523 4,845 1, , ,727 4,199 2,085 6,523 9,082 1, , ,084 38,883 88,701 14,628 1, , ,297 46,188 7,402 2, , ,518 10,783 4, , , ,937 1,945 1,752 14, , ,773 2,176 1, , , , , ,370 13,268 1, , ,994 2, , , ,501 1, , ,971 14,723 2,319 1,008 1, , ,930 1, , ,385 28,022 82,557 14,712 2, , , ,770 1, , , ,439 9,581 1, , ,970 1, , , , ,886 3,364 5,547 2,385 1, , ,134 18,782 18,122 32,391 56,093 25,309 1, ,165 2, , ,804 2,024 1, , , , ,027 24,092 8,901 1, , , ,828 1, , ,844 2,073 1,790 1,219 8, , , , ,579 33,324 26,006 11,481 1, , , ,567 1, , , ,833 30,363 7,820 1, , , ,701 82, ,459 52,971 11,465 1, , ,825 9,190 28,587 16,609 1, , , ,210 60,807 10,308 2, , ,737 1, , , ,820 1,834 1,667 10, , ,051 47,509 93, ,147 74,847 40,857 9,509 1, , ,552 6,684 2,974 1, ,899 2,043 1,839 35, , , ,628 16,560 4, , , , , ,606 1,845 1, , ,292 7,017 3, , , , ,677 89,328 39,362 9,413 1, ,458 AVG ,050 6,621 18,057 24,720 9,602 2, ,732 MEDIAN , EIR_MonthlyFlows 4/23/2004

125 .-~ Alternative 10 No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM ,877 17,805 5, , ,346 2, , ,787 3,019 3,916 13, , ,108 4,833 2,277 12, , ,055 7,077 7, ,423 21, ,827 3,037 10, ,037 2, ,589 1,948 1,355 15, ,576 2, , ,685 2,716 2,496 9, , ,635 16,055 4, ,772 28, ,615 3,037 3,035 12, , ,295 3,002 3,023 2,573 17, ,407 2, , , , ,146 2, , ,358 2,995 2, , ,829 4,389 2,995 3,915 2,633 17, ,863 2,994 10, ,459 2,599 1,751 10, ,220 11,315 16,963 1, , , , , ,333 15,947 2, , ,179 3,037 2,889 12, , ,244 2,214 2,888 14, , , , ,502 18,398 3, , ,872 6, ,046 13, ,005 28,916 66,499 10, , ,297 36,009 4, , ,454 2, ,640 1,616 16, , ,993 3,038 3,035 16, , ,705 3,037 3,027 2,383 2,453 18, , , , , , , , , , ,760 13, ,145 4,049 1,680 30, ,323 2,557 2, , ,375 1,546 4,782 3,016 3,014 15, ,945 3, ,972 1, , ,098 2, , ,020 2,707 2, , ,184 33,847 9, ,344 48, ,556 2,075 3,763 12,365 -_._ , , , , , , ,889 2, , , , , , ,974 3, ~ ,068 2,293 4,944 3,003 13, , ,107 30,492 53,298 20, ,872 2, , , , ,673 _1c~ 11, , , ,328 78,232 17,940 5, ~ , ,140 3,037 2,294 12, ,623 1, ,751 3,037 3,036 2,475 16, , , ,266 2,493 14, , ,328 17,102 7, ,875 32, , ,441 1,431 9, ,162 4, , ,421 3, , , , , , ,559 35,263 7, , , ,138 21,171 11, , ,962 40,858 7, , , ,969 2,377 8, ,334 3,038 3,035 12, , ,126 57, ,322 56,413 29,414 5, , ,081 4,833 1, ,612 3,037 1,506 30, , ,669 2, , ,233 4, , , , , ,839 4,343 2,193 2, , , , , , ,185 3,980 3, , , ,566 4,860 2,058 11, , , ,825 65,378 28,726 6, ,797 AVG ,256 8,988 16,967 6,541 2,022 1,107 1,715 1,775 1,272 45,199 MEDIAN ,692 EIR_MonthlyFlows 4/23/2004

126 Alternative ID No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , , , ,535 7,572 7, ,947 2, ,325 1,755 1,216 13, ,262 1, , , ,453 2,516 2,343 9, , ,887 16,238 4, ,463 30, ,356 2,958 2,936 11, , ,048 2,926 2,746 2,411 16, ,168 2, , , , , ,881 2, , ,143 2,924 2, , ,565 4,240 2,933 3,639 2,491 16, ,567 2,915 10, , ,186 2,518 1,510 10, ,929 12,668 17,280 1, , , , , ,943 16,295 2, , ,931 2,954 2,789 11, , ,996 2,139 2,604 13, , ,274 63, , ,213 18,845 3, , , ,073 6, ,788 14, ,142 29,566 68,068 10, , ,352 36,765 4, , ,465 2, ,406 1,441 16, , ,802 2,961 2,938 15, , ,486 2,964 2,934 2,100 2,270 17, , , , , , , , , ,763 13, ,970 3,943 1,592 33, ,123 2,366 2, , ,175 1,399 4,638 2,953 2,932 14, ,856 3, ,596 1, , ,742 2, , , ,743 2,638 1, , ,939 2,895 36,422 9, ,159 53, ,300 2,005 3,464 11, , , , , , ,069 1, ,708 2, _13, , , , , ,614 3, , ,097 4,804 2,944 14, , ,666 7,289 30,588 53,551 20, ,705 2, , , ,393 2,117 10, , , ,545 79,729 18,452 5, , , ,898 2,958 2,049 12, , ,529 2,958 2,937 2,371 15, , , ,943 2,335 13, , ,525 3,279 17,598 7, ,646 35, , , ,162 1,297 9, ,159 12,311 5, , ,181 2, , , , , ,494 23, ,431 36,339 7, , , ,514 21,575 11, , ,011 42,110 7, , , , ,641 2,225 8, ,089 2,961 2,938 11, , ,714 59, ,849 57,897 30,206 5, , ,099 4,941 1, ,424 2,959 1,296 30, , ,394 2, , ,727 6,075 4, , , , ,564 4,229 2,141 2, , , , , , , ,984 3,700 3, , , ,353 4,685 2,001 12, , , ,161 66,726 29,322 6, ,953 AVG ,442 9,537 17,446 6,717 1,994 1,035 1,593 1,651 1,154 45,978 MEDIAN EIR_MonthlyFlows 4/23/2004

127 Alternative 10 No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a ,820 5, , a a a a 1, a a 2 a a 3, ,035 8, ,075 7 a a 609 3,531 1,146 6, ,382 2,062 7,698 9,382 8, a , a a ,263 2,517 6, ,471 2,224 1 a a a 3, , a a a a a a a 1, a a a a ,240 1,300 9, ,297 17,015 4, a 1,054 37, a ,114 2,488 2,400 8, ,378 a a ,871 2,468 1,339 1,375 10, a a a a a a a 2, a a a a 2 a a 138 a a a a a a 1, ,366 1, ,214 a 11, a a a ,056 2,460 2,341 a 8, a a a a 440 3, ,033 1,380 10, a a a ,286 2, a 3,164 2,448 10, a a a a 3, a 2,938 2, , a a a 243 8,452 17,480 18,181 1, , , , ,386 17,533 2, , a a ,843 2,504 2,284 8, , a a 2,904 1,736 1,280 8, ,254 76, , ,626 20,146 3, , ,977 1, ,438 6, , a ,867 31,536 74,227 11, , ,683 39,051 5, , a ,007 8,503 2, a , a a , ,893 2,547 2,450 12, , ,570 2, ,220 12, a a a a a a 408 a a a a 1, a a a a a 185 a 418 a a a a a a 1 a 74 1 a 1,116 a a a a 1, a a a a a a a 4 a a a a a a a 11, ,454 12, ,254 2, , a 308 1, a 4, a a a , , ,323 1,689 a a 1, a 6, a a 3,055 4, a 10, a a a a ,267 2, a 6, a a a 48 4,224 7,738 45,963 10, , a a a 32 1, ,106 1,602 1,944 8, a a 31 a a a 1, a 2 2 a a a a 245 a a a a a a ,341 2, a 23, a a a a a 1, a a a a a a a 307 a a a a a a a , ,722 1, a 5, a 790 _ , ,700 2,484 11, ,411 a 991 3,929 7,927 30,826 54,428 22, ,930 2, , a a 2,699 a 1,093 1,156 5, , ,612 86,432 20,091 6, , a , a 2,850 2, , a 2,669 2,570 2,450 1,868 11, , a 2,630 a a 1,387 1,309 8, a ,719 19,088 8, , a 3 2, , a , a a ,325 14,991 5, a 92 24, a a a a ,939 2,507 a a 5, a 452 a a a a a a a a 1, a a a 2,883 33, ,950 39,543 8, , ,339 22,467 12, , a a ,387 46,010 7,696 1, , a a a , a 1,173 1,230 6, a a , a 3,001 2,523 2,431 9, , ,722 66, ,528 63,112 33,329 6, , ,741 5,189 1, ,638 2, , a a a 362 1, , a a a 6 3,630 7,659 3, a , a a a 3 a 107 a a a a a a ,174 3,301 1,755 1,229 a 7, a a a a 2 a a 1,144 a a a a 1, a a a a a a a 52 a a a a a a a a a 3, ,750 1,920 2, , a a ,800 1, ,533 1,596 15, ,386 a 2 34, ,891 71,726 31,367 7, ,969 AVG ,012 11,285 19,046 7,280 1, ,005 1, ,788 MEDIAN a a a ,344 EIR_MonthlyFlows 4/23/2004

128 Alternative ID No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM c , ,410 21,680 6,511 1, , , , ,697 2,184 1,279 8, , , ,355 3,932 12,992 11,680 9,196 1, , , ,740 2,267 6, ,216 2, , , , , , , , ,071 17,560 5, , ,641 2,234 2,122 8, , ,469 2, , , ,972 1,001 9,318 2, , , ,651 2,249 2, , , ,764 2,247 1, , , ,277 4, ,619 2,186 14, ,988 1, ,479 1, , ,435 23,407 19,594 1, , , , ,897 19,158 2, , , ,457 2,281 2,035 9, ,492 1, , ,337 6,243 87, , ,640 21,847 3, , ,647 1, ,240 7, , ,591 34,032 79,706 12,346 1, , ,429 41,444 5,864 1, , ,056 8,929 3, , , ,518 2,329 2,201 13, , ,257 2,437 2, , , ,514 13, ,825 2, , ,545 1, , , ,068 2,202 2,103 10, , , , ,573 7,724 1, , ,737 1, , ,131 14,916 57,534 12,164 1, , , ,635 1,386 1,207 7, ,914 5, , , , , , ,263 1,700 3,003 1, ,111 2,218 13, , ,084 7,744 9,063 31,137 54,800 23, ,681 1, , , , , ,724 94,793 21,349 7,298 1, , , ,479 2, , ,342 2,390 2,216 1,626 10, , , , ,815 18,265 20,710 9, , , , , , ,401 19,423 6,116 1, , ,538 2, , ,755 47, ,664 44,179 9,199 1, , ,584 5,020 24,331 13,788 1, , ,026 92,108 51,108 8,439 1, , , , , ,583 2,287 2,167 10, , ,762 30,421 75, ,796 66,995 36,234 7, , ,398 5,581 2, ,321 2, , , ,090 10,707 4, , ,883 1, , , ,288 1,233 1, , ,439 3,825 1, ,018 1,388 24, , ,895 78,269 34,403 8,184 1, ,725 AVG ,930 13,579 20,931 8,058 1, ,241 MEDIAN ,761 EIR_MonthlyFlows 4/23/2004

129 Alternative ID No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feetlyear SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , , , , ,960 1, , , , ,556 5,809 17,463 14,172 10,500 1, , , ,957 1,893 5, ,832 1, , , , , ,256 f , ,874 17,944 6, , ,975 1,860 1,703 6, , ,991 1, , , , , ,600 4, , , ,177 1,975 1, , , ,228 1, , , ,978 5, ,878 1,820 16, ,659 1, ,918 1, , ,105 29,155 21,473 2, , , , ,008 21,262 2, , , ,956 1,957 1,658 9, , ,975 1, , ,624 9,041 91, , ,114 23,820 4,116 1, , ,528 2,636 1,249 3,909 7,948 1, , ,602 37,096 84,754 13,672 1, , ,322 43,874 6,724 1, , ,018 9,180 4, , , ,029 2,013 1,825 12, , ,973 2,281 2, , , ,901 13,656 1, ,127 1, , ,653 2, , , ,365 1,820 1,672 8, , , ,066 7,975 1, , ,952 1, , ,498 21,654 69,290 14,082 1, , , ,977 1, , ,360 6,009 1, , ,372 ~,728 1, ,282 1,846 11, , ,021 11,253 10,292 31,729 55,464 25,057 1, ,265 1, , , , , , ,224 22,251 8,253 1, , , ,992 1, , ,008 2,169 1,883 1,272 8, , , , ,684 26,692 21,943 10,604 1, , , , , ,675 22,909 6,887 1, , ,959 1, , ,702 60, ,282 49,425 10,590 1, , ,982 6,362 26,078 15,629 1, , , ,582 56,961 9,525 2, , ,513 1, , , ,032 1,948 1,774 10, , ,855 36,131 83, ,300 69,576 38,943 8,635 1, , ,781?,151 2,649 1, ,974 2, , ,173 12,761 4, , ,223 1, , ,617 1, , , ,692 5,910 2, ,344 1,113 32, , ,153 86,079 38,406 9,191 1, ,094 AVG ,671 15,535 22,584 8,776 2, ,757 MEDIAN ,934 EIR_MonthlyFlows 4/23/2004

130 Alternative 10 No.6: SWRCB EIR Alt 2 and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,882 25,439 8,216 2, , ,187 1, ,869 1, , , , , m2t ,815 7,332 22,010 16,087 11,356 1, , , ,848 1,849 7, ,783 1, , , , ,590 1, , , ,960 19,372 7,269 1, , , ,882 1,815 1,647 8, , ,919 1, , , , ,243 1,372 15,810 5,289 1, , , ,102 1,938 1, , , ,151 1, , ,516 1,194 4,005 7, ,777 1,776 20, ,944 2,098 1, ,845 1, , ,347 33,748 22,763 2, , , , ,915 22,557 2,295 1, , ,135 2, ,888 1,914 1,605 10, ,670 1, ,893 1, , ,378 11, , , ,767 25,510 4,830 1, , ,926 4,315 2,159 5,735 9,075 1, , ,487 39,054 88,694 14,633 1, , ,461 46,403 7,365 2, , ,852 9,780 4, , ,035 5, ,964 1,971 1,773 13, , ,924 2,254 2, , , , , ,598 13,949 1, , , ,572 3, , , ,248 1,770 1,615 10, , , ,183 15,136 2,512 1,136 1, , ,842 1, , ,786 28,578 77,750 14,966 2, , , ,889 1, , ~ t----i ,980 9,751 1, , ,092 2, , , , ,069 3,687 6,037 2,679 1, ,169 1,801 21, , ,452 15,157 10,750 32,147 56,383 25,518 1, ,176 1, , , , , , ,014 24,087 8,889 2, , , ,894 1, , , ,929 2,128 1,830 1,217 9, , , , ,766 33,540 24,701 11,455 1, , , ,377 1, , , ,098 29,662 7,823 2, , ,893 1, , ,993 75, ,213 53,474 11,548 1, , ,056 8,499 28,750 16,613 2, , , ,229 61,143 10,272 2, , ,168 1, , , ,960 1,908 1,722 11, , ,220 44,750 93, ,255 74,795 40,867 9,492 1, , ,150 6,681 2,971 1, ,923 2, , ,909 18,293 4, , , ,138 1, , , , , ,204 7,297 3,128 1, ,244 1,077 39, , ,703 89,337 39,588 9,730 1, ,709 AVG ,084 6,614 17,807 24,612 9,585 2, ,563 MEDIAN EIR_MonthlyFlows 4/23/2004

131 Alternative ID No.7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,877 17,805 5, , ,273 1,296 1, ,146 1,148 2,099 13, ,322 2,152 3,279 12, , ,138 4,830 2,274 11, , ,048 1,670 7, ,607 16, ,300 1,307 1, ,606 3,037 13,986 f ,037 1, ,216 1,172 2,010 14, ,768 2, , ,752 2,461 9, , ,607 14,096 4, ,469 26, ,273 1,386 1, ,146 3,038 3,026 16, , ,962 3,002 2,460 2,522 17, , , , , , ,520 2, , ,251 2,995 2,993 2,806 15, , ,368 2,832 3,665 1,438 14, ,833 2,994 10, , , , ,220 13,668 16,965 1, ,978 3,037 42, ,273 27, ,332 15,948 2, , ,314 1,331 1, ,845 3,038 2,028 15, , ,137 2,752 2,615 13, , , , ,502 18,398 3, , ,098 6, ,753 12, ,434 28,916 66,499 10, , ,486 36,007 4, , ,653 2, ,227 2,395 16, , ,896 3,038 3,035 15, , ,484 3,037 3,028 3,017 2,813 20, , , , , , , , , , , , ,900 13, ,145 3, , , ,820 3,038 2,315 14, , , ,767 3,015 3,987 18, , ,974 1, , , , ,858 2,886 2, , ,184 32,974 9, , , ,198 2,213 3,129 14, , , , , , , , , , , , , , ,976 3, , ,813 4,897 2,995 12, ,994 2, ,482 53,301 20, ,813 3, , , , ,851 2,264 13, , , ,328 78,232 17,940 5, , , ,902 3,038 2,878 15, ,339 1, ,607 3,038 3,036 2,722 17, , ,413 3, ,441 2,463 15, , ,328 12,432 7, ,670 26, , ,122 1,794 10, ,284 8,614 4, , , ,761 2, , , , , ,559 35,263 7, , ,744 21,170 11, , ,291 40,858 7, , , ,090 2,370 10, , , ,000 3,038 3,035 15, ,819 57, ,324 56,412 29,415 5, , ,504 4,833 1, ,056 2,370 26, ,197 2, , ,928 4, ,119 1,086 17, , , , , ,257 2,995 2,993 2,992 17, , ,091 1, , , , ,184 3,981 3, , , ,853 3,037 11, , , ,824 65,379 28,726 6, ,487 AVG ,300 8,979 17,042 6,560 1,969 1,058 1,693 1,789 1,467 45,617 MEDIAN , ,660 EIR_MonthlyFlows 4/23/2004

132 Alternative ID No.7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM _ , ,211 18,287 5, , ,165 1,254 1, , ,916 12, ,099 2,083 2,993 12, , ,860 4,663 2,115 10, , , ,528 2,220 7, ,376 19, ,230 1,279 1, ,369 2,963 13, ,948 1, ,002 1,019 1,833 13, ,518 1, , , ,488 2,297 9, , ,860 14,287 4, ,193 28, ,166 1,494 1, ,948 2,963 2,931 15, , ,761 2,930 2,211 2,349 16, , , , , , , ,306 2, , ,033 2,922 2,898 2,701 14, ,130 2,758 3,367 1,316 13, ,550 2,917 10, , , , , ,926 15,003 17,297 1, ,805 2,969 45, ,167 29, ,920 16,309 2, , ,268 1,344 1, ,652 2,960 1,794 14, , ,916 2,674 2,351 12, , ,273 60, , ,213 18,845 3, , , ,321 6, ,530 13, ,616 29,566 68,068 10, , ,614 36,737 4, , ,714 2, ,029 2,184 16, , ,709 2,961 2,938 15, , ,305 2,969 2,938 2,908 2,697 19, , , , , , , , , , , ,830 13, ,970 3, , , ,600 2,969 2,236 14, , , ,548 2,942 3,703 17, , ,614 1, , ,748 2, , , ,605 2,818 2, , ,943 2,898 35,555 9, , , ,992 2,145 2,859 14, , , , , , , ,085 1, , ~~ , , , , ,649 3, , ,583 4,730 2,933 13, ,914 2, , ,443 53,606 20, ,655 2, , , , ,629 2,095 11, , , ,545 79,729 18,452 5, , , ,690 2,960 2,784 14, , ,413 2,962 2,940 2,427 16, , ,248 2, ,170 2,287 14, , ,524 3,278 12,947 7, ,449 29, , , ,874 1,645 10, ,848 9,838 5, , , ,536 2, , , , ,512 23, ,420 36,348 7, , ,124 21,561 11, , ,428 42,110 7, , , ,842 2,202 10, , , ,803 2,966 2,942 15, ,443 59, ,887 57,867 30,221 5, , ,541 4,938 1, ,148 25, , , ,761 8,776 4, , , , , , ,075 2,926 2,899 2,883 16, , , , , , , ,970 3,729 3, , , ,618 2,963 13, , , ,145 66,740 29,314 6, ,602 AVG ,482 9,529 17,517 6,739 1, ,575 1,662 1,344 46,396 MEDIAN , EIR_MonthlyFlows 4/23/2004

133 Alternative ID No.7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE ALISAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , , , , , , ,632 8, ,584 1,169 6, ,392 2,061 7,697 4,140 8, , , ,217 2,551 9, , , , , , ,178 1,282 9, ,294 15,100 4, , ,667 1, ,027 2,556 2,446 12, , ,864 2,540 1,041 1, , , ,481 1, , , ,969 2,462 2,342 2,123 10, ,007 2,310 1, , ,325 2, ,230 2,468 10, , , , ,217 1, ,948 2,607 54, , ,382 17,547 2, , , ,806 2, , ,945 2,264 1,146 8, ,260 73, , ,627 20,146 3, , ,038 1, , , ,495 31,624 74,269 11, , ,394 39,009 5, , ,204 7,009 2, ,116 14, , ,855 2,559 2,460 12, , ,575 2,645 2,518 2,392 2,146 15, , , , , , , , , ,510 12, ,432 2, , , ,400 2, , ,365 2,448 2,073 11, , , , ,113 4, , ,282 2, , ,281 7,825 45,130 10, , , , ,551 10, , , ,360 2, , , , , , , , ,548 2,492 11, ,432 2,430 1,114 4,133 2,051 30,641 54,589 22, ,916 2, , , , ,134 7, , ,418 20,091 6, , , ,557 2,317 11, ,644 2,593 2,467 1, ,611 2, ,259 9, ,464 9,711 14,489 8, , , , , , , , , , , , ,900 33, ,244 39,674 8, , ,017 22,486 12, , ,074 46,165 7,719 1, , ,222 8, ,887 1, ,939 2,575 2,472 12, ,482 20,579 66, ,622 63,033 33,366 6, , ,271 5,183 1, ,067 23, , ,982 10,533 4, , , , , ,148 2,532 2,396 2,328 12, , , ,768 2,208 2, , ,817 1, ,335 2,472 15, , , ,857 72,107 31,617 7, ,891 AVG ,012 11,281 19, , ,024 1, ,083 MEDIAN , ,979 EIR_MonthlyFlows 4/23/2004

134 Alternative ID No.7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER NEAR BUELLTON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , , , , ,657 1, ,932 12,991 6,517 9,082 1, , , , ,722 2,308 9, , , , , , , ,506 ~--~19~2~7r----4~2~8r-~1~,0~2~3r---._4~2~8r----4~9~1i.--~2~1~,0~66~~1~5S,6~65~ ~5,~57.68~ ~6~73~ ~1~39~ ~~29~ ~~0~ ~50~1~~4?6,~0~10~ ,905 1, ,618 2,322 2,185 11,218 r- ~19~2~9~~2~,1~4~4~----~0~----~0~----~0~---1~3~9r-~~3~1~4r---~2~27~ 223~--~2~,4~88~--.~2~,3~3~1~--~5239~--_~7256~1---~8~,9~60~ , ,855 1~ ,992 1,009 9,433 2, , , ,562 2,248 2,073 1,835 10, , ,557 2,077 1, , , ,294 4, ,672 2,203 14, ,528 1, ,414 r- ~19~3~7~ ~70~ ~70~--~70~ 758~3~~~176,~30~5~1--~2~5~,67.07~~~179,~6~22~--71,~60~8~~--~5~39~--~2=33~--~2,~5~69~--~2,~40~6~1-~6?9,~47~ , ,927 19,180 2, , ,110 1,541 2, ,461 2, , ,545 2, , ,338 6,253 84, , ,640 21,847 3, , ,711 1, ,574 7, , ,279 34,129 79,757 12,352 1, , ,180 41,424 5,892 1, , ,263 7,478 3, , , ,494 2,345 2,215 12, , ,270 2,487 2,331 2,156 1,886 13, , , ,417 1~ , ,593 13,644 1, ,996 1, , ,509 2, ,928 2,211 1,486 11,808 ~--1~9~5~4~--~3~6~----~0r-----~0~--~5~2~8r_--~9~2~9r-~1~,6~85~--~5~3~1 ~0~----c7~5r-.-~2~,~82~4,,_~2~,~16~7+---1~,2~4~8+-~10~,0~2~ , ,193 r- 1~9~576~----70r ~~5"-,,6:...:4:C11 -,-7.c::,8,-74:,-~--..:..1'c.:1:: ;4",87:-~-----=o807:3~~_ , ,754 2, , ,203 15,014 56,711 12,188 1, , , ,627 1, , , ,457 1% ::-6=-21- =-o1- =-o1-- =-o1-- --"'or--~3,934 5,350 1, , , c-:9~ r-~1-::,3:::-273r-~1-::,7cc4761--~3-::,0:c-4.:: ,-1, , =9.:...13=-!--..:..1L:,4706~----::-.:.: ::-.:C",0---~1Ql ,943 2,216 13,233 r---1c-:9~6::-7r--:::2-" 1--;:3::: :'-2,c; ~~_--;:2c,'::c2~3c:-3:-~-_-_-_77~,'=9~8c;:0~-:..----~~3~,'::3~41:--1--=--=---;:3~0c-:,~9~4~6~_-----"--;:5=4,~95~4~==--;:2~3",--=o5~0:-'~7~ ;;-;-1~,--;:0~0::-::;-1~ '~2i1~6~ =?2~,76"'6:'-'.::_9 ~ =?2-'-::,-7.4"'7=-'.::_0~--~1~o3:::3?~,76~0:-: , , , c-:9~679r-----=3~978~--~2':::6::-2~--~:CI1 161, ,823 94,784 21,350 7,299 1, :..::..:..'=3::-50+-=-=-c;-4::-76~~--c4,c:: ~..:.c:;-17::.:3+--.:.=2::-:7+--.:.c:::.-;-:16~~---::-2,461 -~-- 2, ,770 12, ,326 2,419 2, , , ,321 2, , ,791 18,246 16,155 9, , , , , , ,040 17,259 6,129 1, , , ,907 1~ ~ ~ ,804 47, ,966 44,313 9,431 1, ,085 ~--~19~7~9r---~1~ ~1~7r----:::6~1r-~1~,6"'20~--~4~,7~1~11r-~2~4~,3~55~~1~3,~8714~--~1,~2~02+--~5~46~--~2~02~---=~61~----~61~~4~6,~6~62~ ,215 90,933 51,281 8,469 1, , , , ,159 2, ,576 2,358 2,224 12, ,773 27,289 74, ,877 66,911 36,269 7,236 1, , ,938 5,577 2, , , ,471 13,552 4, , , , , ,727 2,314 2,132 2,036 11, , ,258 1,498 1, , ,429 3,820 1, ,807 2,220 24, , ,869 78,654 34,654 8,245 1, ,405 AVG ,913 13,564 21,001 8,079 2, ,421 MEDIAN o , ,183 EIR_MonthlyFlows 4/23/2004

135 Alternative 10 No, 7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM _ , ,245 23,877 7,709 1, , , , ,702 1, ,018 1, , , , ,554 5,804 17,459 9,031 10,378 1, , , , ,985 1,946 8, , , , , , , , ,861 16,054 6, , ,647 1, ,055 1,977 1,790 9, , ,048 2, , , , , ,716 4, , , ,090 1,971 1,684 1,411 9, , ,042 1, , , ,917 5, ,907 1,830 16, ,365 1, , ,792 31,298 21,496 2, ,043 2,117 84, , ,064 21,284 2,196 1, , ,020 1,711 3, ,012 2, , , ,005 1, , ,612 9,035 88, , ,114 23,819 4,116 1, , ,614 2,638 1,235 3,254 7,927 1, , ,290 37,186 84,802 13,678 1, , ,213 43,874 6,755 1, , ,311 7,803 4, , , ,030 2,036 1,844 11, , ,010 2,339 2,093 1,810 1,493 12, , ,980 13,795 1, ,361 1, , ,562 3, ,348 1,860 1,129 11, , ,120 1, , ,134 8,129 1, , ,996 1, , ,605 21,846 68,512 14,109 1, , , ,046 1, , , ,379 6,238 1, , ~ , ,480 3,827 1, ,074 1,824 11, ,718 1,752 3,262 11,581 4,691 31,524 55,612 25,023 1, ,274 2, , , , , , , ,216 22,253 8,254 1, , , ,021 2,051 1,730 12, ,019 2,207 1, , , ,079 2, , ,498 26,550 17,379 10,534 1, , , , , ,308 20,846 6,911 1, , , , ,751 60, ,751 49,634 10,849 1, , ,050 6,095 26,124 15,661 1, , , ,407 57,194 9,566 2, , ,311 1, , ,175 4, ,067 2,029 1,838 12, ,754 32,905 83, ,371 69,491 38,977 8,628 1, , ,349 6,151 2,651 1, , ,546 15,574 4, , , , , ,046 1,971 1,701 1,564 8, ,648 1, , , ,728 5,914 2, ,115 1,880 33, , ,096 86,463 38,657 9,252 1, ,617 AVG ,626 15,501 22,645 8,801 2, ,884 MEDIAN , EIR_MonthlyFlows 4/23/2004

136 Alternative ID No, 7: SWRCB EIR Alt 3A and Solvang River Well Pumping of 3,600 acre-feeuyear SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feeumonth) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,885 25,568 8,254 2, , , , , ,636 1, ,934 1, , , , , ,813 7,326 22,006 10,947 11,234 1, , , , ,885 1,903 10, , , , , ,779 1, , , ,944 17,483 7,253 1, , ,316 1, ,971 1,933 1,734 10, , ,979 2, , , ~ -~ ,263 1,381 15,925 5,421 1, , , ,018 1,934 1,632 1,352 10, , ,969 1, , ,278 1,116 3,932 7, ,805 1,787 20, ,665 2,304 1, , ,987 35,881 22,784 2, ,967 2,081 95, , ,971 22,578 2,297 1, , ,253 2,099 3,579 1, ,947 1, , ,594 1, ,919 1, , ,359 11, , , ,767 25,509 4,830 1, , ,015 4,318 2,146 5,081 9,054 1, , ,175 39,144 88,743 14,639 1, , ,356 46,403 7,396 2, , ,149 8,407 4, , ,125 4, ,965 1,995 1,792 13, , ,963 2,313 2,052 1,754 1,431 12, , , , ,677 14,088 1, , , ,472 4, ,244 1,812 1,079 14, , ,006 1, , ,251 15,287 2,583 1,178 1,717 1, , ,886 1, , ,893 28,772 76,972 14,992 2, , , ,960 1, , , , ,999 9,982 1, , ,165 2,145 1, , _ _ , , ,168 3,836 6,147 2,722 1, ,950 1,776 21, ,666 1,698 3,723 15,500 5,153 31,938 56,531 25,484 1, ,193 2, , , , , , , ,006 24,088 8,890 2, , , ,927 2,005 1,675 13, , ,945 2,167 1, , , ,996 2, , ,580 33,363 20,141 11,385 1, , , ,234 1, , , ,727 27,606 7,846 2, , , , ,042 75, ,672 53,684 11,807 2, , ,119 8,232 28,795 16,645 2, , , ,059 61,376 10,313 2,711 1, , ,967 1, , ,334 4, ,999 1,989 1,787 13, ,087 41,513 93, ,326 74,711 40,901 9,485 1,824 1, , ,721 6,680 2,973 1, , ,283 21,102 4, , , , , ,965 1,930 1,644 1,500 9, , , , ,240 7,315 3,133 1, ,014 1,835 40, , ,647 89,722 39,839 9,791 1, ,227 AVG ,087 6,565 17,769 24,672 9,610 2, ,691 MEDIAN ,048 1, ,846 EIR_MonthlyFlows 4/23/2004

137 Alternative ID No, 8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,927 17,774 5, , ,273 1,296 1, ,146 1,150 2,096 13, ,322 2,177 3,274 12, , ,137 4,830 2,274 11, , , , ,626 15, ,300 1,307 1, ,606 3,037 13, ,037 1, ,221 1,171 2,015 14,431 _, ,765 2, , ,752 2,461 9, , ,581 11,790 4, ,497 23, ,273 1,386 1, ,147 3,038 3,026 16, , ,963 3,002 2,461 2,522 17, , , , , , ,523 2, , ,222 2,995 2,993 2,865 15, , ,356 2,849 3,631 1,464 14, ,830 2,994 10, , , , ,220 7,760 16,931 1, ,994 3,037 36, ,273 27, ,383 15,925 2, , ,314 1,331 1, ,845 3,038 2,028 15, , ,137 2,762 2,613 13, , , , ,510 18,361 2, , , ,759 12, ,228 28,932 66,502 10, , ,289 35,995 4, , ,406 2, ,235 2,395 16, , ,904 3,038 3,035 15, , ,485 3,037 3,028 3,017 3,015 20, , , , , , , , , , , , ,587 8, ,143 3,558 2,870 23, , ,609 3,038 2,307 14, , , ,763 3,015 3,986 17, , ,974 1, , , , ,855 2,954 2, , ,176 27,284 9, ,069!----' , ,199 2,242 3,124 14, , , , , , , , , , , , , ,860 -' ,976 3, , ,745 4,897 2,995 12, ,994 2, ,768 53,315 20, ,819 3, , , , ,852 2,272 13, ,633.., , ,394 78,219 17,924 5, , , ,902 3,038 2,887 15, ,337 1, ,607 3,038 3,036 2,722 17, , ,413 3, ,448 2,455 15, , ,328 11,518 7, ,694 25, , ,142 1,827 9, ,284 8,360 4, , , ,761 2, , , , , ,625 35,260 7, , ,580 21,191 11, , ,987 40,857 6, , , ,090 2,370 10, , , ,000 3,038 3,035 15, ,156 57, ,391 56,422 29,378 5, , ,406 4,824 1, ,057 2,370 26, ,194 2, , ,329 3, ,134 1,102 16, , , , , ,261 2,995 2,993 2,992 17, ,826 1, , , , ,184 2,126 3,976 2,881 16, , ,913 2,471 11, , , ,878 65,395 28,689 6, ,645 AVG ,199 8,857 16,815 6,414 1,970 1,056 1,667 1,794 1,528 45,063 MEDIAN ,203 1,283 14,560 EIR_MonthlyFlows 4/23/2004

138 Alternative 10 No, 8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,261 18,256 5, , ,165 1,254 1, , ,914 12, ,099 2,108 2,989 12, , ,860 4,663 2,115 10, , , ,528 1,407 7, ,393 18, ,230 1,279 1, ,369 2,963 13, ,948 1, ,007 1,018 1,837 13, ,515 1, , , ,488 2,297 9, , ,834 11,991 4, ,219 26, ,166 1,494 1, ,948 2,963 2,931 15,669-2, ,762 2,930 2,211 2,349 16,266 ~30 1, , , , , , ,308 2, , ,005 2,922 2,898 2,759 14, ,118 2,775 3,334 1,341 13, ,548 2,917 10, , , , , ,926 9,137 17,218 1, ,821 2,969 39, ,168 28, ,969 16,287 2, , ,268 1,344 1, ,652 2,960 1,794 14, , ,916 2,685 2,350 12, , ,273 60, , ,221 18,808 3, , , ,087 6, ,535 13, ,411 29,583 68,071 10, , ,419 36,725 4, , ,470 2, ,037 2,184 15, , ,715 2,961 2,938 14, , ,306 2,969 2,938 2,908 2,896 19, , , , , , , , , , ,642 8, ,948 3,457 2,758 27, , ,394 2,968 2,223 14, , , ,528 2,940 3,698 16, , ,615 1, , ,748 2, , , ,602 2,885 2, , ,943 2,891 29,882 9, , , ,993 2,175 2,855 14, , , , , , , ,085 1, , , , , , , l\lq ,649 3, , ,518 4,728 2,933 13, ,914 2, , ,735 53,601 20, ,661 2,974 -~ , , ,629 2,104 11, , , ,612 79,716 18,437 5, , , ,690 2,960 2,793 14, , ,413 2,962 2,940 2,427 16, , ,248 2, ,176 2,279 14, ,524 3,277 12,037 7, ,472 28, , , ,892 1,677 9, ,848 9,586 5, , , ,536 2, , , , ,519 23, ,476 36,352 7, , ,965 21,577 11, , ,125 42,109 7, , , ,842 2,202 10, , , ,803 2,966 2,942 15, ,784 59, ,961 57,871 30,188 5, , ,444 4,929 1, ,148 25, , , ,761 8,182 4, , , , , , ,079 2,926 2,899 2,883 16, ,541 1, , , , , ,966 2,060 3,646 2,733 16, , ,663 2,401 12, , , ,147 66,802 29,253 6, ,752 AVG ,382 9,407 17,293 6,591 1, ,550 1,665 1,402 45,842 MEDIAN ,027 1, EIR_MonthlyFlows 4/23/2004

139 Alternative ID No.8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE ALISAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,824 19,918 5, , ,001 1, , , , ,100 1,732 1,629 8, ,584 1,169 6, ,392 2,061 7,697 3,352 8, , , ,217 2, , , , , , ,178 1,282 9, ,269 12,833 4, , ,667 1, ,027 2,556 2,446 12, , ,864 2,540 1,041 1,342 10, , , ,473 1, , , ,954 2,472 2,351 2,182 11, ,996 2,330 1, , ,328 2, ,229 2,469 10, , , , ,372 13,974 18,046 1, ,958 2,606 48, , ,428 17,526 2, , ,278 1, ,806 2, , ,945 2,274 1,145 8, ,260 73, , ,635 20,109 3, , ,072 1, ,535 6, , ,290 31,640 74,272 11, , ,201 38,993 5, , ,204 6,772 2, ,117 14, , ,856 2,558 2,459 12, , ,576 2,645 2,518 2,392 2,331 15, , , , , , , , , ,456 7, ,395 2,319 1,724 35, , ,223 2,467 1,711 11, ,330 2,469 2,126 10, , , , ,123 4, , ,280 2, , ,281 7,819 39,511 10, , , ,047 1,802 1,549 10, , , , ,360 2, , , , , ,753 2, , , ,550 2,496 11, ,435 2,433 1,119 4,139 1,939 26,969 54,544 22, ,919 2, , , , ,141 7, , ,768 86,405 20,075 6, , , ,799 2,557 2,325 11, ,644 2,593 2,467 1,143 11, ,612 2, ,254 9, ,461 9,709 13,590 8, , , , , ,990 12,536 5, , , , , , ,907 32, ,301 39,681 8, , ,869 22,491 12, , ,775 46,167 7,696 1, , , ,222 8, ,887 1, ,939 2,575 2,472 12, ,482 19,935 66, ,707 63,026 33,337 6, , ,176 5,173 1, ,067 23, , , ,982 9,955 4, , , , , ,152 2,532 2,396 2,328 12, , , , ,762 1,642 1,890 1,546 12, ,945 1, ,336 1,940 15, , , ,737 72,284 31,517 7, ,942 AVG ,915 11,159 18,911 7,160 1, ,015 1, ,527 MEDIAN EIR_MonthlyFlows 4/23/2004

140 Alternative 10 No.8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 64, ,455 21,775 6,509 1, , , , a 430 1, ,657 1, , a a a 328 2, , ,367 3,932 12,992 5,744 9,024 1, a , a 1, , ,722 2,308 9,fl?fl , a 2, , a 0 a , a a 1, , , , ,041 13,424 5, , a ,904 1, ,618 2,322 2,185 11, ,144 a 0 a ,488 2, , ,049 1 a , a 0 0 a 0 0 a 0 0 a 0 a ,992 1,009 9,426 2, a , a 0 0 1, a 2,548 2,258 2,082 1,890 10, a a 0 1, a 2,547 2,097 1, , , ,298 4, a 2,671 2,204 14, a 6,528 1, , ,305 19,923 19,445 1, ,575 2,403 63, , ,972 19,159 2, , ,109 1,541 2, ,461 2, , a a 2,545 2, , ,338 6,253 83, , ,648 21,810 3, , ,743 2, ,365 7, , ,075 34,144 79,760 12,328 1, , ,989 41,407 5,872 1, , a ,263 7,246 3, , , ,494 2,344 2,214 12, , ,271 2,487 2,331 2,156 2,062 14, a a 0 a a a 0 0 a 0 1,319 a , a a a 0 0 1, a a a 18, ,587 8, ,942 1,845 1,195 53, ,606 3, ,781 2,216 1,454 11, a , a 0 2,777 2,181 1,280 9, a a a , ~ ,653 7,884 1, a a 16, a ,752 2, , ,204 15,008 51,125 12,102 1, , a , ,627 1, , , , a a 0 0 a a 33,934 5,350 1, a 41, a a a 2, a a 0 0 a a 0 a a a a a ,774 a 918 1,449 9 a 4, ,326 1,748 3,042 1, ,943 2,220 13, ,141 2,150 2,237 7,985 3,233 27,303 54,903 23, ,672 2, , , , , , ,889 94,771 21,335 7,264 1, , , ,461 2,351 2,091 12, ,326 2,419 2, , , ,321 2,520 a , ,786 18,242 15,266 9, , a 0 0 4, , , , ,042 17,016 6,112 1, a 3 31, a a 0 1, , a 0 a 0 0 a a ,811 46, ,021 44,318 9,384 1, , ,619 4,567 24,359 13,782 1, , a 2 1,219 90,640 51,284 8,446 1, , a , , a ,159 2, ,576 2,358 2,224 12, ,773 26,652 74, ,961 66,903 36,240 7,195 1, , ,844 5,567 2, a , a a , a a ,471 12,982 4, a , a 0 a 0 1, a a 1, a a , ,731 2,314 2,132 2,036 11, a 0 0 a 0 a a a 0 0 a a a a a , ,248 1,427 1, , a ,622 3,873 1, ,803 1,708 24, , ,749 78,829 34,554 8,211 1, ,404 AVG ,817 13,444 20,788 7,931 1, ,862 MEDIAN 0 0 a , ,184 EIR_MonthlyFlows 4/23/2004

141 Alternative ID No, 8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,241 23,840 7,667 1, , , , ,702 1, ,018 1, , , , ,554 5,804 17,459 8,262 10,319 1, , , , : ,985 1,946 8, , , , , , , , ,836 13,824 6, , ,648 1, ,056 1,977 1,789 9, , ,048 2, , , , , ,709 4, , , ,078 1,982 1,693 1,460 9, , ,034 1, , , ,921 5, ,908 1,831 16, ,364 1, , ,792 25,650 21,303 2, ,046 2,114 78, , ,108 21,262 2,159 1, , ,020 1,711 3, ,012 2, , , ,005 1, , ,612 9,035 87, , ,122 23,783 4,074 1, , ,646 2,671 1,238 3,048 7,905 1, , ,086 37,202 84,805 13,654 1, , ,024 43,856 6,734 1, , ,311 7,574 4, , , ,029 2,034 1,843 11, , ,010 2,339 2,093 1,810 1,656 12, , ,974 9,303 1, ,259 1, , ,787 3, ,251 1,876 1,095 11, , ,058 1, , ,146 8,153 1, , ,995 1, , ,607 21,841 62,943 14,017 1, , , ,046 1, , , , ,379 6,239 1, , , , ,490 3,836 1, ,066 1,824 11, ,719 1,753 3,262 11,583 4,584 27,891 55,553 24,996 1, ,276 2, , , , , , , ,203 22,237 8,218 1, , , ,021 2,051 1,738 12, ,019 2,207 1, , , ,080 2, , ,488 26,541 16,493 10,490 1, , , , , ,315 20,609 6,894 1, , , , ,757 59, ,806 49,640 10,803 1, , ,049 5,955 26,126 15,629 1, , , ,114 57,211 9,545 2, , ,312 1, , ,176 4, ,067 2,029 1,838 12, ,754 32,275 83, ,454 69,484 38,949 8,588 1, , ,256 6,140 2,637 1, , ,547 15,013 4, , , , , ,050 1,971 1,701 1,564 8, ,662 1, ,430 1, , ,019 5,985 2, ,101 1,395 33, , ,932 86,638 38,557 9,218 1, ,555 AVG ,535 15,384 22,433 8,657 2, ,321 MEDIAN , ,128 EIR_MonthlyFlows 4/23/2004

142 Alternative 10 No, 8: SWRCB EIR Alt 3C and Solvang River Well Pumping of 3,600 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a 54 79, ,880 25,531 8,213 2, , ,057 a 86 a 1,910 a a 4, ,636 1, ,934 1, , a a a , , , a a 11,813 7,326 22,006 10,178 11,175 1, a a 64, a a 2, , ,885 1,903 10, ,827 a ,901 a a 4, a a a a a a a a a a , ,779 1, , a 1, ,920 15,252 7,204 1, a a 62, a ,318 1, ,971 1,933 1,734 10, ,684 a ,979 2, , a a a a 27 1, a a a a 1, a a a a a a a a a a 5,263 1,381 15,919 5,414 1, a 30, a a a 2, ,007 1,944 1,640 1,400 10, a a a 2, ,961 1, a 8, a a a 3,284 1,118 3,936 7, ,805 1,787 20, a a a 50 10,662 2,304 1, a a a 14, a a a ,987 30,233 22,590 2, ,969 2,077 89, a a , ,015 22,557 2,260 1, , a a 154 1,253 2,099 3,579 1, ,947 1,998 a 12, a a a 221 1,594 1, ,919 1, , a a 2,359 11, , , ,775 25,473 4,789 1, , ,047 4,351 2,149 4,875 9,033 1, , ,971 39,160 88,745 14,615 1, , ,167 46,385 7,376 2, a 92, ,149 8,179 4, a a a 21, a a ,125 4, ,963 1,993 1,790 12, , ,963 2,313 2,052 1,754 1,592 12, a a a a a a a a a a a a a a a a 1,730 a a a a a a 1, a a a a a a a a a a a a a a a a a a a a a a a 1952 a a a 32, ,671 9,596 1, ,063 1, , ,728 4, ,150 1,828 1,043 15, a a a ,486 1,009 a 74 1,945 1, , a a a a 1, a a 12,263 15,317 2,590 1,182 1,720 1, a 1 34, a ,885 1,778 1 a 4, a a ,895 28,767 71,403 14,900 2, , , ,960 1, , a , a 2, a a a ,999 9,983 1, a 78, ,166 2,146 1, a 0 6, a a , a 2, ,178 3,849 6,157 2,721 1, ,942 1,776 21, ,666 1,699 3,724 15,503 5,045 28,306 56,471 25,457 1, ,195 2, , a , a 1,940 a 1 a 4, a a a 188, , ,993 24,073 8,855 2, , , a a 1,927 2,005 1,683 13, a 110 1, a 1,945 2,167 1, , a a 1, ,996 2,365 a a 8 6, a ,570 33,355 19,256 11,341 1, a 76, , ,014 1, , , ,735 27,369 7,829 2, , , a a 22 a 2, a a a a 29 a a a a a a a 9,049 74, ,727 53,689 11,761 2, , ,119 8,092 28,797 16,613 2, , , ,766 61,393 10,293 2,680 1, , ,967 1, , a ,334 4, ,999 1,989 1,787 13, a 61 4,087 40,883 93, ,409 74,704 40,872 9,444 1,824 1, , ,628 6,669 2,959 1, a a a 28, a a a a 28 a a a ,283 20,542 4, a a a 40, , a a a a 2, a a , ,968 1,930 1,645 1,500 9, a a a a a a a a a a a a a a a a a a a 1991 a a a a a 12, , a 16, a a ,530 7,303 3,152 1, ,998 1,354 39, a , ,482 89,897 39,739 9,757 1, a 336,159 AVG ,090 6,474 17,652 24,459 9,466 2, ,128 MEDIAN a a ,050 1, a 12,808 EIR_MonthlyFlows 4/23/2004

143 Alternative ID No.9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,856 17,819 5, , ,336 2,301 1, , ,706 2,383 3,803 12, , ,918 4,822 2,195 11, , ,139 7, ,505 25, ,169 4,808 3,037 9, ,037 2, ,731 2, , ,328 1, ,629 ~~ ,981 2,659 2,445 8, , ,331 16,217 4, ,841 33, ,719 3,036 3,034 11, , ,403 1,054 3,036 2,547 14, ,095 2, , , , ,336 2, , ,504 3,001 2,992 2,991 13, , ,436 2,070 3,719 1,710 13, ,904 2,993 8, , , , ,100 24,564 16,981 1, ,042 3,037 51, , ,315 15,955 2, , ,217 3,036 3,034 11, , ,292 3,027 2,715 13, , , , ,499 18,411 3, , ,820 6, ,100 13, ,962 28,910 66,497 10, , ,675 36,014 4, , ,970 2, ,585 1,388 16, , ,951 3,037 3,035 16, , ,737 3,035 2,702 2,278 2,434 17, , , , , , , , , ,014 13, ,135 1, , ,298 4,773 3, , ,808 4,754 3,020 3,999 14, , ,952 1, , , , ,026 2,993 1, , _ ,070 40,211 9, ,438 53, ,635 2,321 3,702 11, , , ,521 ~ , , , ,069 2, , , , , , ,935 3,977 1, , ,620 4,894 3,015 11, ,010 3, ,751 30,493 53,291 20, , , , , ,735 2,242 11, , , ,304 78,236 17,945 5, , , ,128 3,037 2,202 13, , ,766 3,037 3,035 2,850 16, , ,573 2, ,761 2,433 14, , ,209 18,126 7, ,063 32, , ,343 1,490 9, ,404 4, , ,056 2,340 1, , , , , ,537 35,263 7, , , ,322 21,164 11, ,051 39, ,411 40,858 7, , , ,099 2,349 6, ,404 3,037 3,034 11, , ,497 57, ,295 56,410 29,427 5, , ,698 4,836 1, ,570 3,037 3,035 32, ,200 1, ,667 2, , ,855 4, , , , , ,759 1,079 2,399 1, , , , , , ,177 2,993 2,720 3,964 16, , ,943 2,783 13, , , ,804 65,374 28,739 6, ,366 AVG ,252 9,256 17,222 6,553 1, ,554 1,648 1,312 44,970 MEDIAN , ,570 EIR_MonthlyFlows 4/23/2004

144 Alternative 10 No.9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 59, ,135 18,332 5, , a a 993 2,030 1, , ,417 2,307 3,492 11, , a a 1,492 4,593 2,018 10, , , ,416 11,604 7, ,235 28, ,553 2,962 8, ,947 2, a a a 4,275 1, , a a a a a a 50 a 2,601 1,070 a a 3, a a a a , ,582 2,416 2,283 8, , ,484 16,471 4, ,481 35, ,344 2,942 2,925 10, ,913 a a a a 3, ,787 2,391 13, a a a a 174 a ,026 a a 3, a a a a a a a a a a 1, a a , ,899 2, , a a a a 4,094 2,902 2,879 2,873 13, a a a a 4,011 1,979 3,353 1,576 12, a a a a 4,461 2,894 9, ,227 a a a 1, a 680 2,014 a 6, a a a 129 2,682 25,658 17,390 1, ,837 2,964 54, , ,924 16,303 2, , ,891 2,941 2,924 10, , a 3,960 2,931 2,422 12, , ,160 65, , ,210 18,858 3, , ,988 6, ,807 14, ,988 29,560 68,066 10, , ,579 36,791 4, , ,879 2, ,336 1,214 16, , ,749 2,959 2,937 16, , ,425 2,946 2,602 1,977 2,242 16, ,404 1 a a a a a 1, a a a 2, a a a a a 150 a 1, a a a 1, a a a a 65 a a 2, a a a 2, a a a a a a a 471 a a a a a a 3, ,650 12, ,831 1, , ,034 4,570 2, , a ,489 4,561 2,951 3,722 13, ,099 a a a 3,303 1, , a 1,602 2, ,166 a 7, a a ,541 2,894 1, , a 78 1,790 2,755 42,715 9, ,229 59, ,279 2,235 3,378 10, , a 1, a a 3, a a a a a a a 1, a a a 1, a ,602 1, ,832 1, , a a ,592 8 a 3, a a a a a a a 1, a a a 1965 ~ Q a a 46 a a 462 a 3,081 3,660 1, , a ,248 4,725 2,952 12, ,930 2, ,680 13,887 30,656 53,519 20, , , , , ,403 2,083 9, , , ,521 79,733 18,457 5, , , ,859 2,953 2,111 12, , ,477 2,946 2,928 2,531 15, , ,320 2,825 a 2,415 2,253 13, , a 1,390 3,141 18,590 7, ,772 35, , , ,041 1,346 9, ,026 13,499 5, , a a ,096 1, , a a a a a a 1, a a 2, a a a 1,220 31, ,427 36,325 7, , , ,646 21,570 11, , ,312 42,110 7, , , , ,686 2,187 7, a 4,067 2,947 2,929 10, , ,014 59, ,779 57,893 30,219 5, , ,682 4,948 1, ,364 2,955 2,935 31, ,104 1, a 1,287 2, , a a a 14 1,554 4,648 3, , , a 124 a a 2, a a a 5 a , ,227 1, , a a a a a a a 2, , a a a a a a a 770 a , a a a 1, ,861 2,894 2,626 3,479 15, , , ,617 2,701 14, , , ,141 66,721 29,334 6, ,557 AVG ,452 9,785 17,692 6,730 1, ,406 1,522 1,197 45,743 MEDIAN , ,757 EIR_MonthlyFlows 4/23/2004

145 Alternative ID No.9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,535 20,117 5, , , ,182 1,886 1,983 8, , ,478 1,088 6, ,348 2,012 7,677 13,488 8, , ,287 2,533 6, ,485 1, , , , , ,179 1,292 8, ,873 17,485 4, ,069 43, ,930 2,452 2,381 8, , , ,496 1,433 8, , , , , , ,734 2,401 2,302 2,274 10, ,802 1,583 1, , ,206 2, ,072 2,439 10, , , , ,951 30,223 18,560 1, ,924 2,597 64, , ,446 17,607 2, , ,738 2,490 2,414 8, , ,833 2,483 1,174 8, ,194 79, , ,763 20,154 3, , ,823 1, ,367 6, , ,530 31,645 74,420 11, , ,706 39,152 5, , ,764 9,779 2, , , ,882 2,562 2,464 13, , ,444 2,583 2, ,212 11, , ,286 12, , , ,430 1, , ,426 2,480 2,145 9, , , , ,901 4, , ,040 2, , ,039 7,721 52,423 10, , ,958 1,805 1,872 7, , ,806 2, , , ,283 1, , , ,559 2,521 10, ,456 2,456 1,064 4,200 14,746 31,411 54,604 22,353 1, , , , ,053 1,124 5, , ,714 86,552 20,137 6, , , ,801 2,527 1,676 10, , ,611 2,564 2,453 1,223 11, ,596 2, ,060 1,239 9, ,357 9,637 20,191 8, , , , , ,181 16,196 5, , , ,629 40, ,535 39,528 8, , ,374 22,625 12, , ,595 46,127 7,781 1, , , ,157 1,197 6, , ,891 2,503 2,421 9, , ,353 27,007 66, ,620 63,172 33,389 6, , ,281 5,246 1, ,625 2,587 2,492 30, , , , ,460 6,363 3, , , , , , ,676 2,367 2,184 1,604 13, , ,896 1, ,189 2,203 16, , , ,870 72,335 31,715 7, ,075 AVG ,101 11,596 19,356 7,380 1, ,326 MEDIAN ,936 EIR_MonthlyFlows 4/23/2004

146 Alternative 10 No.9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,186 21,982 6,588 1, , , ,694 1,649 1,246 7, , , ,348 3,894 12,982 15,750 9,361 1, , , ,760 2,282 6, ,229 1, a 0 2, , , , , ,595 18,038 5, , ,479 2,204 2,107 7, , , , , , ,982 2, , , ,341 2,189 2,035 1,982 10, , ,375 1,384 1, , , ,192 4, ,533 2,177 13, ,309 1, , ,894 36,031 19,979 1, ,543 2,395 79, , ,975 19,236 2, , , ,364 2,269 2,162 9, ,431 2, , ,277 6,190 89, , ,789 21,861 3, , ,499 1, ,149 7, , ,270 34,147 79,910 12, , ,448 41,553 5,933 1, , ,822 10,189 3, , , ,513 2,346 2,218 14, , ,141 2,426 1, , , ,344 13, , , ,317 1, , ~ , ,881 2,198 1,310 8, , ,432 7,705 1, , ,544 2, , ,964 14,912 63,969 12,300 1, , , ,504 1,582 1,154 7, ,379 5, O,iOo , , , ,161 1,497 2, ,952 2,244 12, ,161 1H3 2,189 8,051 15,797 31,757 55,014 23,659 1, , , , , , ,851 94,923 21,401 7,357 1, , , ,437 2,311 1,460 11, ,287 2,384 2, , , ,299 2, , ,711 18,194 21,812 9, , , , , ,270 20,622 6,221 1, , , ,506 54, ,276 44,177 9,441 1, , ,463 6,031 24,496 13,908 1, , ,282 51,226 8,526 1, , , , , ,485 2,270 2,159 9, , ,670 33,687 75, ,907 67,066 36,302 7, , ,931 5,639 2, ,311 2,394 2,265 31, , , ,961 9,447 4, , , , ,247 2,154 1, , ,659 3,834 1, ,679 1,963 25, , ,910 78,899 34,764 8,308 1, ,789 AVG ,024 13,896 21,247 8,164 1, ,866 MEDIAN EIR_MonthlyFlows 4/23/2004

147 ~.-- Alternative ID No.9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,034 24,051 7,748 1, , , ,931 1, , , , ,559 5,776 17,455 18,229 10,669 1, , , ,950 1,900 5, ,839 1, , , , , , , ,321 18,434 6, , ,822 1,827 1,685 6, , , , , , , ,238 3, , , ,866 1,906 1,641 1,543 9, , ,866 1, , , ,824 5, ,783 1,804 15, ,157 1, , ,355 41,649 21,875 2, ,002 2,101 94, , ,086 21,340 2, , , ,869 1,945 1,775 8, , ,907 1, , ,555 8,969 93, , ,263 23,833 4,161 1, , ,378 2,563 1,216 4,807 8,088 1, , ,281 37,202 84,954 13,729 1, , ,315 43,986 6,794 1, , ,788 10,413 4, , , ,020 2,028 1,839 13, , ,861 2,269 1, , , ,732 13,002 1, , ,246 1, , , , ,137 1, , ,925 7,848 1, , ,810 1, , ,331 21,624 75,695 14,224 1, , , ,851 1, , ,825 5, , ,090 3,370 1, ,073 1,847 10, ,738 1,774 3,219 11,647 17,004 32,409 55,706 25,184 1, , , , , , , ,355 22,304 8,312 1, , , ,953 1,996 1,138 11, ,956 2,163 1, , , ,033 2, , ,555 26,596 23,034 10,713 1, , , , , ,536 24,081 6,992 1, , ,453 67, ,894 49,264 10,798 1, , ,846 7,315 26,237 15,748 1, , , ,756 57,032 9,604 2, , ,249 1, , , ,935 1,928 1,763 10, , ,764 39,359 84, ,415 69,647 39,011 8,683 1, , ,289 6,207 2,699 1, ,963 2,117 1,918 32, , , ,088 11,536 4, , , ,479 1,792 1, , ,098 5,954 2, ,987 1,633 33, , ,201 86,709 38,768 9,316 1, ,100 AVG ,762 15,850 22,896 8,878 2, ,417 MEDIAN EIR_MonthlyFlows 4/23/2004

148 Alternative ID No, 9: SWRCB EIR Alt 1 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,673 25,743 8,294 2, , ,991 1, ,839 1, , , , , ,818 7,291 21,999 20,142 11,526 1, , , ,847 1,857 7, ,790 1, , , , ,018 1, , , ,403 19,862 7,366 1, , , ,731 1,781 1,629 7, , , , , , ,074 1,277 15,448 4,957 1, , , ,793 1,868 1,588 1,481 10, , ,794 1, , ,188 1,065 3,837 7, ,683 1,759 19, ,461 2,216 1, , ,549 46,225 23,163 2, ,922 2, , , ,992 22,635 2, , ,072 2, ,801 1,902 1,721 10, ,583 1, ,825 1, , ,307 11, , , ,916 25,523 4,876 1, , ,775 4,242 2,126 6,633 9,216 1, , ,166 39,160 88,895 14,690 1, , ,453 46,515 7,435 2, , ,622 11,012 4, , , ,956 1,986 1,787 14, , ,813 2,243 1, , , , , ,429 13,295 1, ,729 ~ ,106 2, , , , ,021 1, , ,042 15,006 2,458 1,103 1, , ,704 1, , ,619 28,549 84,154 15,108 2, , , ,764 1, , , ,444 9,644 1, , ,000 1, , , ,712 ~-6 1 2,911 3,397 5,674 2,505 1, ,952 1,799 19, ,686 1,721 3,682 15,567 17,458 32,830 56,626 25,646 1, , , , , , , ,145 24,140 8,948 1, , , ,858 1,950 1,090 12, , ,881 2,123 1, , , ,944 2, , ,637 33,421 25,794 11,564 1, , , ,610 1, , , ,957 30,833 7,928 2, , , ,744 82, ,782 53,314 11,756 1, , ,921 9,449 28,911 16,732 2, , , ,403 61,214 10,352 2, , ,904 1, , , ,863 1,887 1,712 11, , ,129 47,977 93, ,370 74,867 40,935 9,540 1, , ,654 6,737 3,022 1, ,911 2,078 1,868 35, , , ,824 17,071 4, , , , , ,179 1,567 1, , ,609 7,110 3, ,882 1,588 39, , ,752 89,968 39,949 9,855 1, ,714 AVG ,070 6,702 18,120 24,919 9,686 2, ,223 MEDIAN , ,457 EIR_MonthlyFlows 4/23/2004

149 Alternative 10 No.1 0: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,877 17,805 5, , ,730 2, , ,553 2,146 2,551 11, , ,385 4,828 2,218 11, , ,055 8,024 7, ,541 23, ,822 3,036 10, ,036 2, ,397 1,487 2,196 15, ,413 2,137 1, , ,708 2,426 8, , ,925 16,211 4, ,177 29, ,440 3,037 3,035 12, , ,064 3,002 2,561 2,513 16, , , , , , , , ,073 2,994 2,993 2,992 14, , ,152 2,994 3,161 1,796 14, ,737 2,994 9, , , , ,220 16,191 16,966 1, ,983 3,037 43, , ,333 15,947 2, , ,043 3,037 2,872 12, , ,091 2,095 2,605 13, , , , ,502 18,398 3, , ,872 6, ,851 13, ,194 28,916 66,499 10, , ,522 36,009 4, , ,480 2, ,317 1,987 16, , ,858 3,038 3,035 16, , ,501 3,037 3,027 2,502 3,291 19, , , , , , , , , , ,772 13, ,118 2,712 2,314 28, , ,312 2,597 3,032 13, ,741 3,015 2,053 11, ,983 1, ,552 1, , , , ,690 2,352 2, , ,184 35,306 9, ,098 49, ,388 1,856 2,572 10, , , , , , , ,320 1, , , , , , ,974 3, , ,156 4,894 3,003 11, ,994 2, ,219 30,492 53,298 20, ,814 2, , , ,291 2,236 10, , , ,328 78,232 17,940 5, , , ,985 3,037 1,987 12, , ,582 3,037 3,036 2,218 15, , , ,752 2,433 14, , ,335 18,937 7, ,614 33, , ,973 1,690 9, ,369 4, , ,193 3, , , , , , ,559 35,263 7, , , ,488 21,171 11, , ,002 40,858 7, , , ,518 2,338 7, ,143 3,038 3,035 12, , ,383 57, ,322 56,413 29,414 5, , ,081 4,833 1, ,356 3,036 30, , , , ,574 4, , , , , ,598 4,283 3,003 2,973 1,179 14, ,972 1, , , , ,183 3,982 3, , , ,686 3,036 10, , , ,825 65,378 28,726 6, ,677 AVG ,284 9,005 17,076 6,560 1, ,578 1,766 1,366 45,194 MEDIAN , ,197 EIR_MonthlyFlows 4/23/2004

150 Alternative 10 No,10: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,211 18,287 5, , ,442 2, , ,294 1,948 2,380 10, , ,134 4,627 2,050 10, , , ,538 8,516 7, ,301 26, ,527 2,957 9, ,943 2, ,137 1,309 2,018 14, ,162 1, , , ,420 2,257 8, , ,154 16,418 4, ,913 31, ,183 2,957 2,935 11, , ,822 2,924 2,297 2,340 15, , , , , , , , , ,839 2,918 2,895 2,880 14, ,903 2,915 2,872 1,654 13, ,442 2,914 10, , , , , ,916 17,501 17,314 1, ,796 2,967 46, , ,943 16,295 2, , ,799 2,953 2,772 11, , ,846 2,020 2,329 12, , ,277 64, , ,213 18,845 3, , , ,073 6, ,603 14, ,324 29,566 68,068 10, , ,570 36,769 4, , ,491 2, ,101 1,786 16, , ,669 2,961 2,938 15, , ,286 2,962 2,933 2,397 2,938 18, , , , , , , , ,775 13, ,962 2,608 2,200 32, , ,070 2,524 2,761 13, ,465 2,934 1,968 11, ,647 1, ,188 1, , ,743 2, , , ,419 2,284 2, , ,941 2,897 37,879 9, , ,135 1,667 2,398 10, , , , , , ,069 1, ,077 1, , , , , , ,614 3, , ,691 2,935 12, ,911 2, ,710 7,408 30,593 53,549 20, ,648 2, , , ,022 2,073 9, , , ,545 79,729 18,452 5, , , ,746 2,957 1,752 11, , ,363 2,957 2,936 2,117 14, , , ,454 2,263 12, , ,533 3,285 19,426 7, ,397 36, , , ,714 1,534 9, ,159 12,517 5, , ,958 2, , , , , ,495 23, ,430 36,339 7, , ,840 21,568 11, , ,049 42,110 7, , , , ,208 2,173 7, ,903 2,960 2,938 12, , ,969 59, ,847 57,897 30,206 5, , ,099 4,941 1, ,100 2,956 29, , , , ,729 6,414 4, , , , ,379 4,137 2,940 2,722 1,059 13, ,711 1, , , , , ,943 3,737 3, , , ,414 2,957 12, , , ,161 66,726 29,322 6, ,807 AVG ,470 9,554 17,555 6,736 1, ,460 1,626 1,247 45,972 MEDIAN , ,174 EIR_MonthlyFlows 4/23/2004

151 Alternative ID No.1 0: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 62, ,774 19,990 5, , a a 1 a 3,183 1, , a 3 a , ,408 7, a a 311 3,554 1,135 6, ,484 2,136 7,816 10,442 8, a , a a ,235 2,523 6, ,479 2, a 3, ,061 9, a a a a a a 1, a a a a , ,170 1,285 9, ,697 17,380 4, , a ,140 2,536 2,441 9,143 _~929 2,411 a ,876 2,529 1,113 1,351 10, a a a a a 1, a 2, a a a a 2 a a 142 a a a a a a 1, ,414 1, , , a a a a 2,903 2,522 2,399 2,325 11, a a a 2,952 2,516 1, , a a a 1, ,402 2, a 3,202 2,486 11, a a a 3, a a 1,204 a 7, a a a 213 8,411 22,320 18,383 1, ,944 2,610 56, , ,478 17,599 2, , a a ,858 2,543 2,300 9, , a 2,917 1,663 1,141 8, ,319 78, , ,765 20,141 3, , ,023 1, ,531 6, , a ,171 31,663 74,427 11, , ,124 39,132 5, , a ,109 8,705 2, a , a a , ,876 2,579 2,477 13, , ,580 2,658 2,533 1,935 1,485 13, a a a a a a a a a 1, a a a a a a a a a 1 a 74 1 a 1,116 0 a a a 1, a a a a a a a 4 a a a a a a a 11, ,466 12, ,701 1,576 1,216 40, a 3,005 2,106 1,419 9, a a a a 5 3,327 2,490 1,524 8, , a a 1, a 5, a a 3,190 5, ,174 a 11, a a a ,199 1,893 1,098 a 6, a a a 72 4,400 8,011 47,719 10, , a a a 43 1, , ,436 6, , a 1,011 a a 2, a 3 3 a a a a 247 a a a a a a ,341 2, a 24, a a a ,059 a a 2, a a a a a a a 337 a a a a a a a , ,722 2, a 5, a 833 1,001 1, ,589 2,530 10, , ,178 4,273 8,439 31,258 54,656 22,321 1, ,916 2, , a ,683 a 896 1,139 5, , ,801 86,547 20,131 6, , a , ,846 2, , ,677 2,615 2,491 1,666 11, , , ,173 1,289 7, a 3,566 9,843 21,056 8, , a 4 2, , a , a a ,429 15,404 5, a 83 25, a a a a ,968 2,565 a a 5, a 660 a a a a a a a a 1, a a a 2,883 33, ,293 39,757 8, , ,708 22,657 12, , a a ,607 46,178 7,780 1, , a a a , a 970 1,214 6, a a , a 2,994 2,569 2,469 10, , ,527 24,163 66, ,700 63,147 33,388 6, , ,832 5,238 1, a 3,060 2,567 28, a 282 1, , a a a 8 3,806 8,200 4, a , a a a 4 a 166 a a a a a a a ,225 2,548 1, , a a a a 3 a a a a 1, a a 0 a a a a 53 a a a a a a a a a 3, ,697 2,271 2, , a a ,848 1, ,185 2,515 15, , , ,143 72,384 31,708 7, ,495 AVG ,073 11,371 19,244 7,367 1, , ,338 MEDIAN a a EIR_MonthlyFlows 4/23/2004

152 Alternative 10 No.1 0: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM " , ,422 21,856 6,579 1, , , , , , , , , ,491 4,017 13,123 12,741 9,323 1, , , ,711 2,273 6, ,223 2, , , , , , , ,462 17,931 5, , ,684 2,288 2,168 8, , ,492 2, , , , ,008 1,017 9,392 2, , , ,513 2,312 2,133 2,025 11, , ,528 2, , , ,385 4, ,661 2,226 14, ,576 1, , ,361 28,197 19,799 1, ,566 2,410 72, , ,007 19,228 2, , , ,482 2,322 2,054 9, ,518 1, , ,368 6,313 88, , ,792 21,848 3, , ,694 2,020 1,008 3,335 7,356 1, , ,915 34,165 79,917 12,395 1, , ,872 41,533 5,931 1, , ,160 9,137 3, , , ,516 2,366 2,233 13, , ,274 2,500 2,346 1, , , ,590 13,697 1, ,341 1, , ,693 1, ,584 1, , , ,764 2,198 1,249 9, , , , ,765 8,001 1, , ,697 1, , ,356 15,230 59,305 12,261 1, , , , , , "--" ,966 5,306 1, , , , , , ,321 1,757 3,082 1, ,967 2,248 13, ,162 2,180 2,291 8,119 9,582 31,590 55,053 23,620 1, ,672 2, , , , , ,925 94,918 21,395 7,344 1, , , ,491 2, , ,357 2,441 2,263 1,439 10, , , , ,913 18,398 22,670 9, , , , , , ,521 19,847 6,221 1, , ,583 2, , ,809 47, ,029 44,404 9,492 1, , ,598 5,384 24,529 13,903 1, , ,080 92,365 51,285 8,528 1, , ,939 1, , , ,599 2,340 2,212 10, , ,841 30,882 75, ,987 67,041 36,301 7, , ,492 5,633 2, ,616 2,339 29, , ,299 11,255 4, , ,813 2, , , ,175 1,578 1, , ,484 3,862 1, ,660 2,259 24, , ,174 78,945 34,755 8,293 1, ,157 AVG ,995 13,671 21,134 8,147 2, ,801 MEDIAN ,883 EIR_MonthlyFlows 4/23/2004

153 Alternative 10 No.1 0: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM ,924 7,739 1, , , , , , , , , ,765 5,923 17,617 15,239 10,632 1, , , ,922 1,895 6, ,836 1, , , , , , , ,233 18,313 6,708 1, , ,008 1,910 1,745 6, , ,017 2, , , , , ,688 4, , , ,037 2,030 1,738 1,574 9, , ,023 1, , , ,023 5, ,905 1,854 16, ,402 1,818 1, , ,933 33,893 21,684 2, ,030 2,117 86, , ,114 21,333 2, , , ,980 1,997 1,677 9, ,301 1, ,000 1, , ,631 9,087 92, , ,266 23,820 4,146 1, , ,575 2,679 1,291 4,005 8,086 1, , ,926 37,210 84,958 13,721 1, , ,757 43,965 6,791 1, , ,125 9,389 4, , , ,039 2,052 1,858 12, , ,995 2,345 2,101 1, , , ,977 13,685 1, , ,902 2, ,068 1, , , ,041 1, , ,258 8,321 1, , , ,969 1, , ,860 22,114 71,125 14,186 1, , , , , ,412 6,194 1, , , , ,483 3,861 1, ,034 1,835 12, ,725 1,770 3,293 11,699 10,841 32,209 55,730 25,141 1, ,261 1, , , , , , ,350 22,298 8,299 1, , , ,011 2, , ,023 2,218 1,928 1,101 8, , , , ,755 26,809 23,893 10,712 1, , , , , ,801 23,341 6,995 1, , ,008 2, , ,756 60, ,647 49,723 10,908 1, , ,030 6,748 26,307 15,753 1, , , ,839 57,149 9,616 2, , ,675 1, , , ,054 2,001 1,818 10, , ,936 36,599 84, ,493 69,622 39,010 8,667 1, , ,877 6,204 2,697 1, ,959 1,998 30, ,435 13,331 4, , ,082 1, , ,686 1, , , ,789 5,956 2, ,968 1,911 33, , ,442 86,754 38,759 9,300 1, ,464 AVG ,736 15,629 22,790 8,868 2, ,296 MEDIAN ,663 EIR_MonthlyFlows 4/23/2004

154 Alternative 10 No.1 0: SWRCB EIR Alt 2 and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,895 25,615 8,284 2, , , , ,377 1, , , , , , ,024 7,440 22,162 17,153 11,488 1, , , ,815 1,851 7, ,787 1, , , , ,902 1, , , ,316 19,742 7,353 1, , ,368 1, ,913 1,864 1,688 8, , ,946 1, , , , ,279 1,395 15,898 5,444 1, , , ,964 1,991 1,685 1,511 11, , ,951 1, , ,361 1,156 4,033 7,383 1, ,802 1,810 20, ,688 2,339 1, , ,136 38,487 22,974 2, ,951 2,080 98, , ,021 22,627 2,323 1, , ,154 2, ,912 1,954 1,624 11, ,706 1, ,918 1, , ,375 11, , , ,919 25,510 4,861 1, , ,973 4,358 2,202 5,831 9,213 1, , ,811 39,168 88,898 14,682 1, , ,896 46,494 7,432 2, , ,958 9,990 4, , ,107 5, ,974 2,010 1,806 14, , ,946 2,319 2,060 1, , , , , ,674 13,978 1, , ,836 3, ,968 1, , , ,926 1, , ,375 15,479 2,650 1,233 1,789 1, , ,864 1, , ,148 29,038 79,585 15,070 2, , , , , , ,031 9,937 1, , ,151 2,159 1, ~ , , ,~61 3,835 6,180 2,787 1, ,911 1,786 21, ,673 1,717 3,754 15,619 11,298 32,627 56,649 25,602 1, ,172 1, , , , , , ,140 24,134 8,936 2, , , ,914 1, , , ,943 2,177 1,874 1,049 9, , , , ,837 33,631 26,653 11,564 1, , , ,444 1, , , ,224 30,094 7,931 2, , ,941 1, , ,047 75, ,579 53,773 11,866 2, , ,098 8,883 28,979 16,737 2, , , ,487 61,331 10,363 2, , ,331 1, , ,068 4, ,983 1,961 1,766 11, , ,301 45,219 93, ,447 74,842 40,934 9,524 1, , ,245 6,733 3,019 1, ,855 1,952 33, , ,171 18,863 4, , , ,987 1, , , , , ,301 7,339 3,210 1, ,868 1,864 40, , ,993 90,013 39,940 9,839 1, ,079 AVG ,104 6,677 17,899 24,818 9,676 2, ,102 MEDIAN ,031 EIR_MonthlyFlows 4/23/2004

155 Alternative 10 No. 11: SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,273 1,296 1, , ,441 13, ,156 1,343 2,582 11, , ,115 4,831 2,215 11, , ,048 3,231 7, ,326 18, ,300 1,307 1, ,462 3,037 14, ,037 2, ,966 2,203 13, ,172 1, , ,625 2,418 8, , ,635 15,464 4, ,192 27, ,273 1,386 1, ,010 3,038 3,026 16, , ,769 3,002 2,993 3,356 18, , ,200 1, , , , ,033 1,351 8, ,880 2,995 2, , ,334 2,994 2,254 3,973 15, , ,625 2,994 11, , , , ,220 14,041 16,965 1, ,914 3,037 42, ,273 28, ,332 15,948 2, , ,314 1,331 1, ,730 3,037 1,793 14, , ,995 3,019 2,293 13, , , , ,502 18,398 3, , ,098 6, ,535 12, ,682 28,916 66,499 10, , ,527 36,007 4, , ,687 2, ,396 16, , ,775 3,038 3,035 15, , ,430 3,037 3,028 3,017 2,087 19, , , , , , , , , , , , ,881 13, ,156 2,411 2,116 27, , ,141 3,038 2,815 15, , , ,393 3,015 3,661 17, , ,257 2, , , , ,561 2,414 2, , ,184 34,305 9, , , ,068 1,210 2,602 13, , , ,261 1, , , , , ,617 1, , , , , , ,976 3, , ,935 3,002 11, ,994 2, ,115 30,487 53,299 20, ,765 3, , , ,429 2,170 1,259 2,276 13, , , ,328 78,232 17,940 5, , , ,784 3,037 1,649 13, , ,445 3,038 3,036 2,434 16, , ,413 3, ,045 2,457 15, , ,328 14,728 7, ,027 30, , ,558 2,234 9, ,284 8,640 4, , , ,124 2, , , , , ,559 35,263 7, , ,810 21,171 11, , ,389 40,858 7, , , ,775 2,373 10, , , ,869 3,038 3,035 15, ,380 57, ,324 56,412 29,414 5, , ,504 4,833 1, ,373 25, ,037 1,686 8, ,784 4, ,678 17, , , , ,022 2,995 2,993 2,992 17, ,979 1,171 1, , , , ,182 2,305 3,978 2,066 16, , ,526 2,586 10, , , ,824 65,379 28,726 6, ,021 AVG ,313 9,033 17,106 6,582 1,955 1,016 1,463 1,809 1,486 45,545 MEDIAN ,301 1,339 13,675 EIR_MonthlyFlows 4/23/2004

156 Alternative ID No. 11 : SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,211 18,287 5, , ,164 1,253 1, , ,205 12, ,936 1,180 2,389 10, , ,625 2,045 10, , , ,531 3,761 7, ,111 21, ,233 1,281 1, ,227 2,963 13, ,947 2, ,626 2,040 12, ,913 1, , , ,338 2,246 8, , ,887 15,650 4, ,927 29, ,164 1,493 1, ,813 2,963 2,930 15, , ,572 2,929 2,896 3,035 17, , , , , , , ,727 1,219 9, ,672 2,921 2, , ,084 2,917 2,162 3,613 14, , ,351 2,916 11, , , , , ,928 15,376 17,299 1, ,742 2,969 45, ,164 29, ,925 16,306 2, , ,267 1,344 1, ,538 2,959 1,568 14, , ,777 2,938 2,042 12, , ,272 61, , ,213 18,845 3, , , ,321 6, ,320 13, ,857 29,566 68,068 10, , ,654 36,738 4, , ,747 2, ,133 15, , ,591 2,961 2,938 15, , ,252 2,969 2,938 2,908 1,982 18, , , , , , , , , , , ,812 13, ,022 2,296 1,997 30, , ,934 2,965 2,724 14, , , ,165 2,938 3,377 16, , ,921 2, , ,750 2, , , ,314 2,348 2, , ,945 2,899 36,884 9, , , ,862 1,057 2,413 12, , , , , , , ,085 1, ,417 1, , , , , , ,649 3, , ,673 2,928 12, ,905 2, ,669 3,348 30,524 53,575 20, ,608 2, , , ,253 2,104 1,058 2,083 12, , , ,545 79,729 18,452 5, , , ,571 2,959 1,433 12, , ,254 2,961 2,939 2,150 15, , ,247 2, ,790 2,269 14, , ,528 3,281 15,235 7, , , , ,338 2,055 9, ,848 9,865 5, , , , , , , ,512 24, ,426 36,343 7, , ,188 21,561 11, , ,520 42,110 7, , , ,539 2,193 10, , , ,674 2,965 2,941 15, ,000 59, ,881 57,873 30,218 5, , ,541 4,938 1, ,097 25, ,698 1,539 7, ,767 8,640 4, ,444 18, , , , ,843 2,925 2,898 2,882 16, ,728 1,039 1, , , , , ,938 2,238 3,673 1,936 15, , ,282 2,513 12, , , ,153 66,733 29,318 6, ,124 AVG ,495 9,582 17,582 6,760 1, ,357 1,672 1,353 46,324 MEDIAN ,119 1,165 13,224 EIR_MonthlyFlows 4/23/2004

157 Alternative ID No, 11: SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feeuyear SANTA YNEZ RIVER ABOVE ALiSAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,907 20,048 5, , ,057 1, , ,146 7, , , ,401 7, ,566 1,142 6, ,489 2,132 7,812 5,747 8, , ,166 1, ,199 2,578 10, ,521 1, ,232 1,105 7, , , ,121 1,279 9, ,464 16,595 4, , ,737 1, ,014 2,588 2,473 12, , ,849 2,583 2,438 1,639 12, , , ,672 1, , , ,890 2,559 2, , ,013 2,494 1,690 1,924 10, , ,510 2, ,207 2,506 12, , , , ,569 20,302 18,351 1, ,941 2,621 55, , ,499 17,611 2, , ,048 1,339 1, ,796 2, , ,938 2, , ,319 74, , ,766 20,141 3, , ,080 1, ,830 6, , ,914 31,690 74,440 11, , ,630 39,138 5, , ,287 7,184 2, ,017 14, , ,840 2,588 2,484 12, , ,677 2,698 2,563 2,433 1,519 15, , , , , , , , , ,491 12, ,036 1,290 1,027 39, , ,027 2,561 2,248 12, ,109 1, ,246 2,536 2,015 11, , ,618 1, , ,262 5, , , ,257 1,981 1, , ,470 8,057 46,768 10, , , , ,424 8, , , , ,361 2, ,729 f----_ , , ,828 2, , ,062 1, ,473 2,508 11, ,446 2,457 1,173 4,233 4,495 31,081 54,696 22,300 1, ,906 2, , , ,658 1, ,101 8, , ,865 86,539 20,131 6, , , ,785 2, , ,642 2,635 2, , ,750 2, ,266 10, ,588 9,862 16,912 8, , , , ,110 7, ,105 12,977 5, , , , , , , ,901 33, ,611 39,860 8, , ,166 22,688 12, , ,372 46,266 7,794 1, , , ,234 9, ,998 1, ,919 2,605 2,498 12, ,541 21,281 66, ,775 63,084 33,418 6, , ,357 5,232 1, , , , ,172 10,619 4, , , , , ,101 2,576 2,437 2,359 12, , , ,785 1,819 2, , ,995 2, ,197 2,126 16, , ,155 72,392 31,703 7, ,720 AVG ,064 11,407 19,284 7,400 1, , ,596 MEDIAN , ,342 EIR_MonthlyFlows 4/23/2004

158 Alternative ID No. 11 : SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a ,562 21,916 6,597 1, , ,002 1, , , a a 7 a 474 1, , , a a 21 2, , ,496 4,014 13,120 8,108 9,251 1, a 59 43, a 1, , ,728 2,342 10, ,277 1,717 a a a , a a a a a a 1, a a a a 1, , a , , ,241 17,152 5, a , a a a 501 1,982 1, ,623 2,361 2,217 11, ,171 a a a ,495 2,381 2, , a a a a 1, a a 410 a a 1, a a a a a a a 34 a a a a a a 3,044 1,034 9,657 2, a , a a a 1, a 2,518 2,355 2,167 a 9, a a a 1, a a 2,563 2,256 1,431 1,107 9, a a 2, ,514 4, a 2,682 2,250 15, a a a 6,621 1, a a 734 a 9, a a a ,522 26,199 19,766 1, ,571 2,423 70, , ,063 19,251 2, , ,159 1,603 2, ,462 2, , a a ,557 2, , ,366 6,318 85, , ,793 21,848 3, , ,754 2, ,656 7, , a ,716 34,202 79,939 12,399 1, , ,423 41,564 5,952 1, , a ,349 7,658 3, , a a , ,494 2,379 2,244 12, , ,376 2,544 2,382 2,202 1,294 13, a a a a a a a a a a a a a a 1,336 a 232 a a a a 1, a a a a 886 a a 736 a a a a 1, a a a a a a a a a a a a a 1952 a a a 18, ,643 13,673 1, , ,609 3, a 2,623 2,318 1,973 12, a a 668 1,122 1, ,756 2,268 1,235 10, a a a 55 a a 2, a a 5,845 8,058 1, a a 570 a 17, a a a a ,761 1, a 5, a a a 143 8,439 15,286 58,364 12,255 1, , a a a 168 3, , , , a a 2, a a a a a a a 47 a a a a a a a a 34,110 5,565 1, a 41, a a a... a 1, a a 3, a a a a a a a 81 a a a a a a a a a a 1,823 a 1,018 1,652 3 a 4, a 1,364 1,823 3,176 1, a 2,850 2,224 13, ,145 2,169 2,282 8,076 5,717 31,400 55,079 23,592 1, ,664 2, , , ,354 1, , , ,995 94,913 21,396 7,345 1, , , ,458 2, , ,334 2,468 2, , , ,462 2,574 a , a 5,948 18,423 18,569 9,459 1, , a a 11 4, , , a a 1, ,180 17,469 6,232 1, a 1 32, a a a a 1, a 3, a a a a a a a a a a a a a 4,868 47, ,361 44,512 9,565 1, , ,670 4,862 24,567 13,915 1, , a a 3 1,258 91,264 51,392 8,549 1, , a a ,660 1, , a a ,273 2, ,574 2,394 2,254 13, a 29 2,840 28,007 75, ,050 66,973 36,328 7,269 1, , ,028 5,629 2, , a a a , a a a 94 7,710 13,660 4, , a a a 12 a 1, a 2, a a a 9 a 1, ,710 2,368 2,181 2,073 11, a a a a a a a a a a a a a a a a a a a a a a 1991 a a a a a 6,520 1, ,235 1,587 1, , a a a ,683 3,992 1, ,692 1,892 25, , ,192 78,956 34,753 8,294 1, ,264 AVG ,969 13,700 21,165 8,171 2, ,933 MEDIAN a a a , ,337 EIR_MonthlyFlows 4/23/2004

159 Alternative 10 No. 11: SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,394 23,983 7,757 1, , , , ,827 1, , , , , ,761 5,916 17,612 10,623 10,554 1, , , , ,001 1,981 9, ,904 1, , , , , , ,021 17,533 6,699 1, , ,707 1, ,069 2,017 1,823 9, , ,068 2,108 1, , , , , ,940 4, , , ,066 2,080 1, , , ,005 1,934 1, , , ,197 5, ,938 1,881 17, ,361 1,811 1, , ,108 31,913 21,647 2, ,048 2,135 85, , ,199 21,354 2,225 1, , ,070 1,775 3, ,020 2, , , ,019 1, , ,618 9,078 89, , ,266 23,820 4,146 1, , ,659 2,679 1,277 3,337 8,070 1, , ,727 37,235 84,976 13,724 1, , ,470 44,019 6,816 1, , ,410 7,989 4, , , ,040 2,072 1,874 12, , ,123 2,399 2,146 1, , , ,031 13,900 1, , ,723 3, ,099 1,968 1,567 12, , ,084 1, , ,338 8,463 1, , , ,033 1, , ,024 22,210 70,205 14,180 1, , , , , , , ,556 6,454 1, , , ' , _.._._- 1,599 4,005 1, ,972 1,823 12, ,718 1,767 3,297 11,668 7,027 31,996 55,746 25,111 1, ,270 2, , , ,028 1, , , , ,348 22,300 8,300 1, , , ,026 2, , ,022 2,253 1, , , ,219 2, , ,769 26,820 19,805 10,676 1, , , , , , ,482 21,081 7,020 1, , , , ,814 60, ,223 49,833 10,984 1, , ,104 6,251 26,345 15,765 1, , , ,738 57,317 9,647 2, , ,437 1, , ,292 4, ,077 2,067 1,871 12, ,826 33,630 83, ,546 69,554 39,037 8,662 1, , ,440 6,203 2,699 1, , ,918 15,749 4, , , , , ,065 2,033 1,756 1,603 9, ,732 1, ,340 1, , ,973 6,084 2, ,002 1,567 33, , ,433 86,765 38,756 9,301 1, ,423 AVG ,683 15,641 22,815 8,893 2, ,375 MEDIAN , EIR_MonthlyFlows 4/23/2004

160 Alternative 10 No, 11: SWRCB EIR Alt 3A and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month).. Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,033 25,675 8,303 2, , , , , ,769 1, , , , , , ,020 7,432 22,156 12,538 11,410 1, , ,338 1,046 1,508 1, ,902 1,939 10, ,856 1, , , ,142 1, , , ,103 18,961 7,345 1, , ,372 2, ,985 1,972 1,768 10, , ,001 2,072 1, , , , ,315 1,406 16,149 5,500 1, , , ,997 2,042 1, , , ,928 1,894 1, , ,670 1,301 4,224 7,523 1, ,836 1,837 21, ,642 2,331 1, , ,320 36,506 22,937 2, ,971 2,098 97, , ,106 22,649 2,326 1, , ,302 2,164 3,666 1, ,956 2, , ,630 1, ,935 1, , ,346 11, , , ,919 25,510 4,861 1,756 1, , ,060 4,359 2,187 5,164 9,197 1, , ,612 39,193 88,916 14,685 1,902 1, , ,614 46,548 7,457 2, , ,249 8,593 4, , ,177 4, ,976 2,031 1,822 13, , ,077 2,374 2,105 1, , , , , ,728 14,193 1, , ,623 4, ,001 1,919 1,507 15, ,193 3,755 1, ,973 1, , ,455 15,621 2,682 1,251 1,805 1, , ,927 1, , ,312 29,161 78,661 15,065 2, , , !,Qi 91 1, , , , ,175 10,196 1, , ,278 2,290 1, , _ '---..-J , , ,248 3,973 6,330 2,860 1, ,847 1,774 22, ,665 1,712 3,758 15,587 7,486 32,411 56,665 25,572 1, ,190 2, , , ,960 1, , , , ,138 24,136 8,937 2, , , ,934 2, , , ,946 2,212 1, , , ,138 2, , ,851 33,616 22,570 11,528 1, , , ,817 1, , , ,906 27,842 7,955 2, , , , ,106 75, ,153 53,883 11,941 2, , ,174 8,388 29,016 16,749 2, , , ,391 61,499 10,395 2,749 1, , ,092 2, , ,448 4, ,009 2,027 1,819 13, ,159 42,239 93, ,501 74,773 40,961 9,519 1,836 1, , ,813 6,732 3,020 1, , , ,655 21,278 5, , , , , ,986 1,991 1,699 1,538 9, ,551 1, ,040 1, , ,485 7,394 3,274 1, ,901 1,524 40, , ,984 90,024 39,937 9,840 1, ,028 AVG ,102 6,621 17,908 24,841 9,702 2, ,181 MEDIAN ,247 2,011 1, ,581 EIR_MonthlyFlows 4/23/2004

161 Alternative 10 No. 12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER BELOW HILTON CREEK (acre-feet/month) - Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM ,927 17,774 5, , ,273 1,296 1, , ,440 13, ,156 1,343 2,582 11, , ,115 4,831 2,215 11, , ,048 2,421 7, ,339 17, ,300 1,307 1, ,460 3,037 14, ,037 2, ,633 2,194 13, ,508 2, , ,555 2,414 8, , ,581 12,725 4, ,220 24, ,273 1,386 1, ,010 3,038 3,026 16, , ,769 3,002 2,993 3,356 18, , ,199 1, , , , ,035 1,368 8, ,856 2,995 2, , ,327 2,994 2,055 3,973 15, , ,624 2,994 11, , , , ,220 8,433 16,931 1, ,927 3,037 36, ,273 27, ,383 15,924 2, , ,314 1,331 1, ,730 3,037 1,793 14, , ,995 3,019 2,293 13,~~ , , , ,510 18,361 2, , , ,539 12, ,478 28,932 66,502 10, , ,330 35,996 4, , ,440 2, ,395 15, , ,781 3,038 3,035 15, , ,430 3,037 3,028 3,026 2,473 20, , , , , , , , , , , , ,588 8, ,277 2,415 4,652 22, , , ,056 2,499 2,887 15, , , ,255 2,655 3,460 16, , ,260 2, , , , ,558 2,121 2, ~ ,184 29,360 9, , , ,070 1,215 2,602 13, , , ,222 1, ,270 ~ , , , ,612 1, , , , , , ,976 3, , ,918 3,002 11, ,994 2, ,212 53,316 20, ,774 3, , , ,429 2,661 1,203 2,278 14, , , ,394 78,219 17,924 5, , , ,784 3,037 1,649 13, , ,445 3,038 3,036 2,094 16, , ,413 2, ,969 2,460 15, , ,328 13,516 7, ,034 28, , ,584 2,262 9, ,284 8,387 4, , , ,124 2, , , , , ,626 35,260 7, , ,647 21,191 11, , ,053 40,857 6, , , ,775 2,373 10, , , ,869 3,038 3,035 15, ,708 57, ,391 56,422 29,377 5, , ,406 4,824 1, ,373 25, ,035 1,689 8, ,184 3, ,692 16, , , , ,026 2,995 2,993 2,992 17, ,979 1,171 1, , , , ,182 2,375 3,978 2,052 16, , ,526 2,602 10, , , ,879 65,394 28,690 6, ,468 AVG ,220 8,878 16,907 6,445 1,944 1,003 1,477 1,796 1,521 45,015 MEDIAN ,279 1,354 13,677 EIR_MonthlyFlows 4/23/2004

162 Alternative ID No,12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT 154 BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,261 18,256 5, , ,164 1,253 1, , ,205 12, ,936 1,180 2,389 10, , ,625 2,045 10, , , ,531 2,961 7, ,123 20, ,234 1,281 1, ,226 2,963 13, ,947 2, ,330 2,026 12, ,199 1, , , ,271 2,240 8, , ,834 12,921 4, ,953 26, ,164 1,493 1, ,814 2,963 2,931 15, , ,572 2,929 2,896 3,035 17, , , , , , , ,729 1,235 9, ,649 2,921 2, , ,077 2,917 1,966 3,610 14, , ,351 2,916 11, , , , , ,928 9,807 17,225 1, ,755 2,969 39, ,165 29, ,974 16,284 2, , ,267 1,344 1, ,539 2,959 1,568 14, , ,777 2,938 2,042 12, , ,272 60, , ,221 18,808 3, , , ,087 6, ,324 13, ,654 29,583 68,071 10, , ,459 36,725 4, , ,503 2, ,133 15, , ,596 2,960 2,938 14, , ,252 2,969 2,938 2,917 2,361 19, , , , , , , , , , , ,665 8, ,124 2,298 4,540 26, , , ,851 2,431 2,627 14, , , ,031 2,581 3,178 15, , ,923 2, , ,751 2, , , ,311 2,058 2, , ,945 2,900 31,954 9, , , ,864 1,061 2,413 12, , , , , , , ,085 1, ,413 1, , , , , , ,649 3, , ,657 2,927 11, ,905 2, , ,168 53,617 20, ,616 2, , , ,253 2,591 1,008 2,084 13, , , ,612 79,716 18,437 5, , , ,571 2,959 1,433 12, , ,254 2,961 2,939 1,996 15, , ,247 2, ,725 2,271 14, , ,528 3,281 14,028 7, , , , ,363 2,083 9, ,849 9,613 5, , , , , , , ,519 23, ,483 36,347 7, , ,029 21,577 11, , ,186 42,109 7, , , ,539 2,193 10, , , ,674 2,965 2,941 15, ,333 59, ,955 57,877 30,184 5, , ,444 4,929 1, ,097 25, ,695 1,541 7, ,767 8,045 4, ,457 18, , , , ,847 2,925 2,898 2,882 16, ,727 1,039 1, , , , , ,938 2,307 3,673 1,923 15, , ,282 2,529 12, , , ,168 66,783 29,263 6, ,570 AVG ,403 9,428 17,386 6,623 1, ,370 1,659 1,388 45,794 MEDIAN ,121 1,179 13,227 EIR_MonthlyFlows 4/23/2004

163 Alternative 10 No. 12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feetfyear SANTA YNEZ RIVER ABOVE ALI SAL BRIDGE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , ,957 20,017 5, , ,057 1, , ,146 7, , , ,401 7, ,566 1,142 6, ,489 2,132 7,812 4,960 8, , ,167 1, ,198 2,578 10, ,521 2, ,099 1,108 7, , , ,073 1,270 9, ,412 13,889 4, , ,737 1, ,014 2,588 2,473 12, , ,849 2,583 2,438 1,639 12, , , ,665 1, , , ,885 2,564 2, , ,011 2,496 1,511 1,916 9, , ,512 2, ,207 2,506 12, , , , ,569 14,823 18,209 1, ,949 2,620 49, , ,546 17,590 2, , ,048 1,339 1, ,797 2, , ,938 2, , ,320 74, , ,774 20,104 3, , ,114 1, ,611 6, , ,710 31,706 74,443 11, , ,435 39,125 5, , ,287 6,946 2, ,017 14, , ,841 2,587 2,484 12, , ,677 2,698 2,563 2,441 1,868 15, , , , , , , , , ,481 7, ,128 1,303 3,569 35, , ,985 2,063 1,402 11, ,183 1, ,151 2,203 1,851 11, , ,616 1, , ,272 5, , , ,255 1,708 1, , ,471 8,058 41,871 10, , , , ,425 8, , , , ,361 2, , , , ,897 2, , ,081 1, ,468 2,511 11, ,448 2,459-1,175 4,236 2,063 29,620 54,740 22, ,913 2, , , ,658 2, ,101 8, , ,932 86,527 20,115 6, , , ,785 2, , ,642 2,635 2,505 1,563 12, , ,737 1, ,276 9, ,590 9,864 15,716 8, , , , ,136 7, ,107 12,731 5, , , , , , , ,907 33, ,666 39,865 8, , ,016 22,695 12, , ,047 46,265 7,769 1, , , ,234 9, ,998 1, ,919 2,605 2,498 12, ,548 20,628 66, ,860 63,078 33,389 6, , ,262 5,221 1, , , , ,172 10,035 4, , , , , ,105 2,576 2,437 2,359 12, , , ,785 1,883 2, , ,995 2, ,197 2,141 16, , ,117 72,461 31,640 7, ,168 AVG ,974 11,256 19,093 7,263 1, , ,061 MEDIAN ,363 EIR_MonthlyFlows 4/23/2004

164 Alternative ID No.12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER NEAR BUELL TON (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 64, ,603 21,882 6,557 1, , ,002 1, , , a a 7 a 474 1, , , a a 21 2, , ,496 4,014 13,120 7,334 9,207 1, a 62 42, a 1, , ,728 2,342 10, ,277 1,862 a a , a a a a a a a 1, a a a a 1, , a , , ,189 14,474 5, a , a a a 501 1,982 1, ,623 2,360 2,217 11, ,171 a a a ,495 2,381 2, , a a a a 1, a a 410 a a 1, a a a a a a a 34 a a a a a a 3,044 1,034 9,649 2, a , a a a 1, a 2,516 2,360 2,172 a 9, a a a 1, a a 2,562 2,258 1,262 1,099 9, a a 2, ,515 4, a 2,682 2,250 15, a a a 6,621 1, a a 734 a 9, a a a ,522 20,773 19,618 1, ,576 2,421 64, , ,109 19,229 2, , ,159 1,603 2, ,462 2, , a a ,557 2, , ,372 6,319 84, , ,800 21,811 3, , ,788 2, ,444 7, , a ,514 34,217 79,942 12,375 1, , ,230 41,550 5,931 1, , a ,349 7,424 3, , a a , ,494 2,378 2,243 12, , ,376 2,543 2,382 2,210 1,626 14, a a a a a a a 140 a a a a a a a a 1,367 a 244 a a a a 1, a a a a 888 a a 742 a a a a 1, a a a a a a a a a a a a a 1952 a a a 18, ,679 8,968 1, ,046 53, ,704 3, ,595 1, , a a 783 1,232 1, ,696 1,959 1,119 10, a a a 55 a a 2, a a 5,863 8,070 1, a a 557 a 17, a a a a ,760 1, a ;c~ 1958 a a a 143 8,441 15,287 53,493 12,184 1, , a a a 167 3, , , , a a 2, a a a a a a a 47 a a a a a a a a 34,111 5,565 1, a 41, a a a a 1, a a 3, a a a a a a a 204 a a a a a a a 1 a a 1,835 a 1,084 1,683 a a 4, a 1,385 1,843 3,195 1, a 2,846 2,226 13, ,148 2,171 2,285 8,080 3,354 29,939 55,111 23, ,669 2, , , ,353 2, , , ,061 94,900 21,381 7,310 1, , , ,458 2, , ,334 2,468 2,285 1,347 10, , ,447 1,872 a , a 5,950 18,424 17,386 9,418 1, , a a 11 4, , , a a 1, ,183 17,225 6,215 1, a 1 32, a a a a 1, a 3, a a a a a a a a a a a a a 4,873 47, ,414 44,517 9,518 1, , ,670 4,716 24,573 13,884 1, , a a 3 1,263 90,947 51,392 8,525 1, , a a ,660 1, , a a ,273 2, ,574 2,394 2,254 13, a 29 2,847 27,361 75, ,133 66,967 36,299 7,228 1, , ,934 5,618 2, , a a a , a a a 94 7,710 13,084 4, , a a a 12 a 1, a 2, a a a 9 a 1, ,714 2,368 2,181 2,073 11, a a a a a a a a a a a a a a a a a a a a a a 1991 a a a a a 6,520 1, ,235 1,649 1, , a a a ,682 3,992 1, ,692 1,907 25, , ,141 79,018 34,686 8,253 1, ,738 AVG ,880 13,551 20,976 8,036 2, ,394 MEDIAN a a a , ,322 EIR_MonthlyFlows 4/23/2004

165 _.- Alternative ID No. 12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER ABOVE SALSIPUEDES CREEK CONFLUENCE (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM 1918 a a a a 73, , ,715 1, a 242, a a a a 2,030 a 43 4, a a a a 418 1, a 2,038 a 83 5, a a a a a 2, , a a 8,761 5,916 17,612 9,852 10,509 1, a a 54, a a 1, , a 2,002 1,981 9, ,904 1,555 a a a a a a , a a a a a a 414 a a 33 a a a a a a 1, , a , a 1, ,971 14,867 6,651 1, a a 53, a a a 146 1,708 1, a 2,070 2,017 1,823 9, ,768 a a a ,068 2,108 1, , a a a a a 1,468 a a a 2 a a 1, a a a a a a a a a a a a a 1932 a a 3, ,933 4, a a 126 a 20, a a a 2, a 2,068 2,086 1,783 a 8, a a a 1, a a 2,005 1, , a a a 2, ,199 5, a 1,938 1,882 17, a a a a 8,362 1,811 1, a a 84 a 11, a a a ,108 26,519 21,485 2, ,050 2,132 79, a a a , ,244 21,332 2,188 1, a 296, a a 8 1,070 1,775 3, ,020 2,075 a 10, a a a 125 1, a 2,019 1, , a a 1,624 9,081 88, , ,274 23,783 4,105 1, , ,691 2,713 1,279 3,127 8,051 1, a a 21, a a a 59,525 37,251 84,979 13,700 1, a 198, a a ,279 44,004 6,795 1, a 84, a ,410 7,759 4, a a 16 19, a a , ,039 2,071 1,873 12, , ,122 2,399 2,146 1,865 1,257 12, a a a a a a a a a a a a a a a a 674 a a a a a a a a a a 136 a a a a a a a a a a a a a a a a a a a a 1952 a a a 26, ,067 9,416 1, ,292 67, a 4 1,888 3, a 2,098 1, , a a a 622 1,119 2,552 1,044 a a 2,083 1, , a a a a a a 16 a a a a 6,356 8,513 1, , a a 50 a 19, a a a a a 66 a a 2,033 1, a 3, a a a 10 11,026 22,211 65,348 14,105 1, a 114, a a a 49 4, ,061 a 90 7, a a a 1,160 a 76 a a a a a 1, a a a a a a a a a a a a a 1962 a a a a 46,557 6,454 1, a a a a 54, a a a a a a a a 1, a a a a a a a a a a a a a 1965 a a a a a a 984 a a a 1, a 649 1,637 4,043 1, a 1,973 1,827 12, ,722 1,770 3,302 11,674 4,702 30,520 55,767 25,045 1, ,274 2, , a a a , a 2,028 1,903 a 32 6, a a a 179, , ,335 22,285 8,265 1, , a a a , a 2,026 2,086 a 10, a a 2,022 2,253 1,955 1,022 8, a 1, ,212 1,767 a a 67 5, a a a 6,768 26,820 18,626 10,633 1, a a 64, a a a 6, , a a 22 11, a a 1, ,487 20,842 7,003 1, a a a 38, a a a a 1, a a a 148 a 1, a a a a a a a 2 a a a a a a a 4,820 60, ,276 49,838 10,937 1, a 328, a a a 2,104 6,109 26,348 15,733 1, a a 52, a a a 1, ,421 57,337 9,627 2, a a 173, a a a ,437 1, a a 40 14, a a a a a 2,292 4, a 2,077 2,067 1,871 12, a a 3,833 32,991 83, ,628 69,547 39,008 8,621 1, , ,348 6,192 2,685 1, a a 10 25, a a 15 a a a a 114 a a a a a 9,919 15,181 4, a a a 30, a a a a a 1,288 a a a a a a 1, a a a a a 1, a 2,069 2,033 1,756 1,603 9, a a a a a a a a a a a a a 1990 a a a a a a a a a a a a a 1991 a a a a a 8,732 1, ,340 1, a 13, a a a 68 19,971 6,084 2, a 2,002 1,581 33, a a 39, ,320 86,827 38,689 9,260 1, a 321,904 AVG ,597 15,494 22,627 8,763 2, ,831 MEDIAN a a a , a EIR_MonthlyFlows 4/23/2004

166 Alternative ID No. 12: SWRCB EIR Alt 3C and Solvang River Well Pumping of 2,400 acre-feet/year SANTA YNEZ RIVER AT LOMPOC NARROWS (acre-feet/month) Water Year OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SUM , , , , , , ,769 1, , , , , , ~.._ ,020 7,432 22,156 11,768 11,365 1, , ,344 1,050 1,512 1, ,902 1,939 10, ,856 1, , , ,238 1, , , ,053 16,296 7,296 1, , ,373 2, ,986 1,972 1,768 10, , ,001 2,072 1, , , , ,315 1,406 16,143 5,492 1, , , ,998 2,048 1, , , ,928 1, , ,669 1,302 4,226 7,524 1, ,836 1,838 21, ,643 2,332 1, , ,320 31,112 22,775 2, ,974 2,095 91, , ,150 22,627 2,288 1, , ,302 2,163 3,666 1, ,956 2, , ,630 1, ,935 1, , ,352 11, , , ,927 25,473 4,820 1,755 1, , ,092 4,393 2,190 4,954 9,178 1, , ,410 39,209 88,919 14,661 1,902 1, , ,423 46,533 7,436 2, , ,248 8,363 4, , ,178 4, ,974 2,029 1,821 13, , ,076 2,373 2,105 1,809 1,199 12, , , , ,764 9,709 1, ,150 83, ,826 4, ,001 1, , ,383 3,933 1, ,974 1, , ,473 15,671 2,699 1,259 1,813 1, , ,927 1, ,892._------_._-_ ,314 29,163 73,804 14,989 2, , ::$ , , , , , ,177 10,197 'UliJ , ,278 2,290 1, ~ _ 6, , , ,282 4,017 6,370 2,873 1, ,849 1,778 22, ,669 1,715 3,762 15,593 5,164 30,934 56,686 25,506 1, ,194 2, , , ,960 1, , , , ,125 24,120 8,901 2, , , ,934 2, , , ,946 2,212 1, , , ,140 1, , ,850 33,618 21,391 11,485 1, , , ,700 1, , , ,911 27,603 7,938 2, , , , ,111 75, ,206 53,888 11,894 2, , ,173 8,246 29,020 16,717 2, , , ,074 61,519 10,375 2,718 1, , ,093 2, , ,448 4, ,009 2,027 1,819 13, ,165 41,600 93, ,583 74,767 40,932 9,478 1,835 1, , ,720 6,721 3,006 1, , , ,656 20,710 5, , , , , ,990 1,992 1,699 1,538 9, ,551 1, ,040 1, , ,483 7,395 3,274 1, ,901 1,538 40, , ,870 90,086 39,870 9,799 1, ,509 AVG ,106 6,535 17,762 24,654 9,571 2, ,637 MEDIAN ,342 2,012 1, ,731 EIR_MonthlyFlows 4/23/2004

Technical Memorandum #4 Additional Alternative Analyses

Technical Memorandum #4 Additional Alternative Analyses Technical Memorandum #4 Additional Alternative Analyses DR A FT TECHNICAL M E M 0 RAN DUM NO.4 STETSON ENG IN EERS INC. 2171 E. Francisco Blvd., Suite K San Rafael, California. 94901 TEL: (4 15) 457-0701

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

Total Production by Month (Acre Feet)

Total Production by Month (Acre Feet) Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16

More information

Missouri River Mainstem Reservoirs Runoff Volumes for Annual Operating Plan Studies RCC Technical Report Jy-08

Missouri River Mainstem Reservoirs Runoff Volumes for Annual Operating Plan Studies RCC Technical Report Jy-08 Missouri River Region Since 1953 US Army Corps of Engineers Reservoir Control Center Missouri River Region Northwestern Division Reservoir Control Center July 2008 Missouri River Basin Fort Peck Montana

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Santa Lucia Preserve Monterey County, California Publication No. WI-2009-01

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Santa Lucia Preserve Monterey County, California Publication No. WI-2008-01

More information

Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report

Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha,

More information

April 10, Dear Customer:

April 10, Dear Customer: Dear Customer: April 10, Attached is the monthly water supply outlook and projected operations for Yellowtail Dam and Powerplant. If you have any questions or concerns, please feel free to call me at 406-247-7334

More information

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN September 2001 This document provides a progress report on air quality trends in the Mono Basin federal PM-10 1 nonattainment

More information

All Annual Operating Plan Recipients

All Annual Operating Plan Recipients To: All Annual Operating Plan Recipients From: Lower Colorado Region Boulder Canyon Operations Office River Operations Group Daniel Bunk P.O. Box 647 Boulder City, NV 896-47 Phone: 72-293-83 The operation

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775

More information

Appendix E Hydrology, Erosion and Sediment Transport Studies

Appendix E Hydrology, Erosion and Sediment Transport Studies Appendix E Hydrology, Erosion and Sediment Transport Studies Hatch 2012/10 Appendix E1 EA Hydrology Memorandum February 2011 (Hatch. 2011a) Hatch 2012/10 Project Memo February 23, 2011 TO: Larry King FROM:

More information

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed

More information

Memorandum October 5, 2017

Memorandum October 5, 2017 614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and

More information

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # );

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # ); Districts Response to NMFS-4, Element 1 through 6 Effects of Don Pedro Project and Related Facilities on Hydrology for Anadromous Fish: Magnitude, Timing, Duration, and Rate of Change 1.0 Background On

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Residential Load Profiles

Residential Load Profiles Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...

More information

Sylvania Volspruit Mine. Water Balance Simulation Results Summary

Sylvania Volspruit Mine. Water Balance Simulation Results Summary Sylvania Volspruit e Water Balance Simulation Results Summary 13 January 214 Prepared for: Sylvania Compiled by: WJ Gouws (SimX Consulting CC) Dr FS Botha (Water Hunters) 1. BACKROUND This results summary

More information

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case Overview A consensus forecast is used to estimate the prime rate charged by commercial banks. As the prime rate is subject to competitive pressures faced by individual lenders and is set on an individual

More information

Flows Atlas. Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake

Flows Atlas. Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake April 2010 FLOWS ATLAS Compilation of instream flow & estuary inflow statistics for the Sabine

More information

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1. Your Northwest renewables utility

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1. Your Northwest renewables utility SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1 Your Northwest renewables utility May 17, 2013 VIA ELECTRONIC FILING Kimberly D. Bose, Secretary Federal Energy Regulatory Commission (FERC) 888 First Street

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7433 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 12 January 2018 2.6m Australians unemployed or under-employed in December The latest data for the Roy Morgan employment

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7761 Available on www.roymorgan.com Roy Morgan Unemployment Profile Monday, 8 October 2018 Unemployment down to 9.4% in September off two-year high Australian employment has grown solidly over

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT Final

LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT Final LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT 2013 LICENSE ARTICLES 405 & 408 Final LAKE CHELAN HYDROELECTRIC PROJECT FERC Project No. 637 April 30, 2014 Public Utility District No. 1 of Chelan

More information

CLIMATOLOGICAL SUMMARY

CLIMATOLOGICAL SUMMARY DEPARTMENT OF REGISTRATION AND EDUCATION CTATP OF ILLINOIS ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-19 Archive ISWS Illinois State Water Survey )CAL CLIMATOLOGICAL DATA MP-19 LOCAL

More information

Missouri River Incremental Flows Below Gavins Point Technical Report

Missouri River Incremental Flows Below Gavins Point Technical Report Missouri River Incremental Flows Below Gavins Point Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska July 214 Missouri

More information

2016 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton

2016 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton 0 2016 Meteorological Summary for the Galeta Marine Island Laboratory Prepared by: Steven Paton 1 Introduction This is the fourth in a series of yearly reports summarising the past year s Smithsonian Tropical

More information

2017 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton

2017 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton 0 2017 Meteorological Summary for the Galeta Marine Island Laboratory Prepared by: Steven Paton 1 Introduction This is the 5 th in a series of yearly reports summarising the past year s Smithsonian Tropical

More information

CVRP: Market Projections and Funding Needs

CVRP: Market Projections and Funding Needs CVRP: Market Projections and Funding Needs Public Workshop: Update to the 3-Year Plan for LDV & Transportation Equity Investments (4 Dec. 2018, El Monte CA) Brett Williams, PhD Senior Principal Advisor,

More information

TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER

TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER Prepared for: PUBLIC SERVICE CO. OF COLORADO Durango, Colorado Prepared by: DEVINE TARBELL & ASSOCIATES,

More information

LOCAL CLIMATOLOGICAL DATA

LOCAL CLIMATOLOGICAL DATA ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-21 Archive SWS0964 Illinois State Water Survey LOCAL CLIMATOLOGICAL DATA FDR HILLSBORO, IL. 1901-1962 LOCAL CLIMATOLOGICAL DATA 1901-1962 HILLSBORO

More information

Arctic Freshwater Flux and Change

Arctic Freshwater Flux and Change Arctic Freshwater Flux and Change Daqing Yang, Doug Kane, Sveta Berezovskaya Water and Environment Research Center, Univ. of Alaska Fairbanks Main Topics Large Arctic River Streamflow Regime and Change

More information

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT In order to understand the vehicle classes and groupings, the MnDOT Vehicle Classification Scheme and the Vehicle Classification

More information

Presented by Eric Englert Puget Sound Energy September 11, 2002

Presented by Eric Englert Puget Sound Energy September 11, 2002 Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable

More information

BEFORE THE CANTERBURY REGIONAL COUNCIL. Act 1991 AND. of Plan Change 3 to the Waitaki Catchment Water Allocation Regional Plan

BEFORE THE CANTERBURY REGIONAL COUNCIL. Act 1991 AND. of Plan Change 3 to the Waitaki Catchment Water Allocation Regional Plan BEFORE THE CANTERBURY REGIONAL COUNCIL IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of Change 3 to the Waitaki Catchment Water Allocation Regional STATEMENT OF EVIDENCE OF DAVID

More information

Sprinkler System Waiver Application Packet

Sprinkler System Waiver Application Packet Sprinkler System Waiver Application Packet According to the City s municipal code, use of sprinklers is conditional upon use of a water budget and the City continues to discourage customers from irrigating

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment

More information

Exhibit 1. Background. Authorizing Legislation

Exhibit 1. Background. Authorizing Legislation Background Authorizing Legislation The Boulder Canyon Project Act (43 U.S.C. 617, et seq.), enacted by the U.S. Congress in 1928 (The 1928 Act), authorized the Secretary of the Interior to spend up to

More information

ALBENI FALLS DAM AND LAKE PEND OREILLE

ALBENI FALLS DAM AND LAKE PEND OREILLE ALBENI FALLS DAM AND LAKE PEND OREILLE Fall Public Meeting 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Aug. 7, 2017 255 255 255 239 65 53 80 119 27 252 174.59 83 36 118 110 135 120

More information

CHINO DESALTER PHASE 3

CHINO DESALTER PHASE 3 CHINO DESALTER PHASE 3 Comprehensive Predesign Report Prepared for Jurupa Community Services District, City of Ontario, and Western Municipal Water District REVISED FINAL December 2010 Jurupa Community

More information

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016 2016/2 ELECTRICITY GENERATION & DISTRIBUTION STATS BRIEF, FIRST QUARTER 2016 Copyrights Statistics Botswana 2016 Statistics Botswana. Private Bag 0024 Botswana Tel: (267) 367 1300. Fax: (267) 395 2201.

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the second of a series of yearly reports summarising the past year

More information

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

WIM #29 was operational for the entire month of October Volume was computed using all monthly data. OCTOBER 2015 WIM Site Location WIM #29 is located on US 53 near Cotton in St Louis county. System Operation WIM #29 was operational for the entire month of October 2015. Volume was computed using all monthly

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Consent Workshop [ ]

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Consent Workshop [ ] - _j POSTPONED FROM THE JANUARY 14 BCC MEETING Agenda Item #5,::.. I BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: February 4, 2014 [ ] [ ] Department: Submitted By: Engineering & Public

More information

Lake Mead Intake No. 3

Lake Mead Intake No. 3 Lake Mead Intake No. 3 1 Lake Mead Intake No. 3 Total Project Scope INTAKE STRUCTURE PUMPING STATION ACCESS SHAFTS WATER TREATMENT FACILITY CONNECTOR TUNNEL INTAKE 1 INTAKE 2 C-2 Lake Mead Intake No. 3

More information

Annual Fish Passage Report 2012 Columbia and Snake River Projects

Annual Fish Passage Report 2012 Columbia and Snake River Projects US Army Corps of Engineers Portland District Walla Walla District Annual Fish Passage Report 2012 Columbia and Snake River Projects 2012 ANNUAL FISH PASSAGE REPORT COLUMBIA AND SNAKE RIVERS for SALMON,

More information

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015 PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 5842 Available on www.roymorgan.com Roy Morgan Unemployment Profile Thursday, 2 October 2014 Unemployment climbs to 9.9% in September as full-time work lowest since October 2011; 2.2 million

More information

Drought Contingency Planning Process Workshop III

Drought Contingency Planning Process Workshop III Photo courtesy of Bryan Flores floresfotography.com Drought Contingency Planning Process Workshop III November 14, 2018 Colorado River Drought Monitor and Snowpack Conditions 2018 2017 2 11-6-18 http://droughtmonitor.unl.edu/currentmap/statedroughtmonitor.aspx?west

More information

NEU Electric and Natural Gas Price Update

NEU Electric and Natural Gas Price Update Exelon s $24 Billion Energy Bill Senate Bill 2814 Short-Term Energy Price Outlook On November 15, 2016, Exelon, through its legislative supporters, introduced Senate Bill 2814, a massive 446 page document

More information

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings

More information

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES January 10, 2011 Presentation to Arvada City Council CONSULTANT TEAM LBA Associates MSW Consultants Denver based recycling and waste management consultant

More information

NJ Solar Market Update

NJ Solar Market Update NJ Solar Market Update April 16, 20 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 3/31/ is approximately

More information

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2, Contact Statistician: Otsile Chelenyane Industry Statistics Unit Email: ochelenyane@statsbots.org.bw Tel: (+267) 367 1300; Ext. 333 ELECTRICITY GENERATION AND DISTRIBUTION Stats Brief, Quarter 2, 2018

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

Final Technical. Memorandum

Final Technical. Memorandum Federal Emergency Management Agency Task Or rder #34 Final Technical Memorandum HYDROLOGIC REVIEW FOR THE VENTURA RIVER WATERSHED AND SEVERAL TRIBUTARY STREAMS FLOOD INSURANCE STUDY Ventu ra County, CA

More information

M onthly arket. Jan Table of Contents. Monthly Highlights

M onthly arket.   Jan Table of Contents. Monthly Highlights Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family

More information

Sound Transit Operations July 2016 Service Performance Report. Ridership

Sound Transit Operations July 2016 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link

More information

NPCC Natural Gas Disruption Risk Assessment Background. Summer 2017

NPCC Natural Gas Disruption Risk Assessment Background. Summer 2017 Background Reliance on natural gas to produce electricity in Northeast Power Coordinating Council (NPCC) Region has been increasing since 2000. The disruption of natural gas pipeline transportation capability

More information

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the forth of a series of yearly reports summarising the past year

More information

Henry M. Jackson Hydroelectric Project (FERC No. 2157)

Henry M. Jackson Hydroelectric Project (FERC No. 2157) Henry M. Jackson Hydroelectric Project (FERC No. 2157) License Article 401: Water Quality Monitoring Plan 2013 Annual Report Everett, WA Final This document has been prepared for the District. It has been

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Used Vehicle Supply: Future Outlook and the Impact on Used Vehicle Prices

Used Vehicle Supply: Future Outlook and the Impact on Used Vehicle Prices Used Vehicle Supply: Future Outlook and the Impact on Used Vehicle Prices AT A GLANCE When to expect an increase in used supply Recent trends in new vehicle sales Changes in used supply by vehicle segment

More information

AOP. Final Missouri River Mainstem System Annual Operating Plan

AOP. Final Missouri River Mainstem System Annual Operating Plan US Army Corps of Engineers Northwestern Division Missouri River Basin Water Management Division Final AOP 2009-2010 Missouri River Mainstem System 2009-2010 Annual Operating Plan Fort Peck Garrison Oahe

More information

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of

More information

WIM #48 is located on CSAH 5 near Storden in Cottonwood county.

WIM #48 is located on CSAH 5 near Storden in Cottonwood county. WIM Site Location WIM #48 is located on CSAH 5 near Storden in Cottonwood county. System Operation WIM #48 was operational for the entire month of August 2017. Volume was computed using all monthly data.

More information

Missouri River Mainstem System Annual Operating Plan. Garrison. Oahe

Missouri River Mainstem System Annual Operating Plan. Garrison. Oahe Missouri River Basin Water Management Division Final AOP 2012-2013 Missouri River Mainstem System 2012-2013 Annual Operating Plan Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Annual Operating

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013

More information

D G A G R I D A S H B O A R D : A P P L E S

D G A G R I D A S H B O A R D : A P P L E S 75 79 60 56 49 74 65 59 54 42 76 63 58 53 78 55 42 43 79 44 81 63 47 83 64 59 53 48 Sources: Eurostat, MSs notifications, DG Agri, Comext, Comtrade, GTA, ITC, AMI, Expert groups, Freshfel, Wapa. 89 68

More information

Appendix H TM 10.7 Well Interference

Appendix H TM 10.7 Well Interference Appendix H TM 10.7 Well Interference Regional Groundwater Storage and Recovery Project Draft EIR Appendix-H April 2013 Case No. 2008.1396E FUGRO CONSULTANTS, INC. April 26, 2012 Project No. 0103.128 1000

More information

STAFF REPORT. Consideration of Request Submitted by Athens Services for Rate Adjustment SUMMARY

STAFF REPORT. Consideration of Request Submitted by Athens Services for Rate Adjustment SUMMARY City of San Gabriel STAFF REPORT Date: To: From: Subject: June 16, 2015 Steven A. Preston, City Manager /\. Thomas C. Marston, Finance Directo~ Consideration of Request Submitted by Athens Services for

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

NEU Electric and Natural Gas Price Update

NEU Electric and Natural Gas Price Update $ / MWH Jan-11 May-11 Sep-11 Sep-12 Jan-13 Electric: Short-Term Outlook The NYMEX Northern Illinois Hub 12-month forward price at the end of August 2016 for the September 2016 to August 2017 period was

More information

WIM #40 is located on US 52 near South St. Paul in Dakota county.

WIM #40 is located on US 52 near South St. Paul in Dakota county. WIM Site Location WIM #40 is located on US 52 near South St. Paul in Dakota county. System Operation WIM #40 was operational for the entire month of November 2017. Volume was computed using all monthly

More information

MARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky

MARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky MARKET RATES UPDATE I N T R O D U C T I O N BY: Paula Gold-Williams President & Chief Executive Officer (CEO) P R E S E N T E D BY: Cory Kuchinsky Interim Vice President, Financial Services September 24,

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7137 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 8 February 2017 Over 12 million Australians have jobs for the first time including over 8 million full-time jobs,

More information

NJ Solar Market Update As of 10/31/15

NJ Solar Market Update As of 10/31/15 NJ Solar Market Update As of 10/31/15 Prepared by Charlie Garrison Renewable Energy Committee Meeting November 10, 2015 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 10/31/15

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7353 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 11 October 2017 2.498 million Australians (18.9%) now unemployed or under-employed In September 1.202 million

More information

*iiiii. May 31, 2017 VIA ELECTRONIC FILING

*iiiii. May 31, 2017 VIA ELECTRONIC FILING *iiiii. PUBLIC UTILITY DISTRICT NO. I of CHELAN COUNTY P.O. Box 1231, Wenatchee, WA 98807-1231 327 N. Wenatchee Ave., Wenatchee, WA 98801 (509) 663-8121 Toll free 1-888-663-8121 www.chelanpud.org May 31,

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E Amy G. Rabinowitz Counsel April 3, 2003 By Hand Mary L. Cottrell, Secretary Department of Telecommunications and Energy One South Station, 2 nd Floor Boston, MA 02110 Re: Massachusetts Electric Company

More information

2005 City of Santa Paula Potable Water System Master Plan Amendment

2005 City of Santa Paula Potable Water System Master Plan Amendment 2005 City of Santa Paula Potable Water System Master Plan Amendment City of Santa Paula Project Engineer Randy Toedter, PE Brian Yanez June, 2012 970 Ventura Street Santa Paula, CA 93060 PURPOSE OF THE

More information

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia.

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia. State: Georgia Grant Number: 08-953 Study Number: 6 LONG RANGE PERFORMANCE REPORT Grant Title: State Funded Wildlife Survey Period Covered: July 1, 2010 - June 30, 2011 Study Title: Wild Turkey Production

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division

Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division Climate and the Colorado and Columbia River Basins Presented at The Aspen Global Change Institute June

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Decision-Support Model. DSM Summary PA-23 Committee Briefing January 26, 2017

Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Decision-Support Model. DSM Summary PA-23 Committee Briefing January 26, 2017 Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Decision-Support Model DSM Summary PA-23 Committee Briefing January 26, 2017 Santa Ana River Conservation and Conjunctive Use Program

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

Regulation Update. Operating Committee September 12, PJM 2017

Regulation Update. Operating Committee September 12, PJM 2017 Regulation Update Operating Committee September 12, 2017 Regulation Market Clearing Price *Data up to Aug 22 2 Mileage Ratio Mileage Ratio has increased since the new signal implementation Larger Utilization

More information

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Régis Gosselin, B ès Arts, M.B.A., C.G.A., Chair Larry Soldier, Member Marilyn Kapitany, B.Sc. (Hons.), M.Sc., Member Neil Duboff, B.A. (Hons.),

More information

Meteorology of Monteverde, Costa Rica 2005

Meteorology of Monteverde, Costa Rica 2005 Meteorology of Monteverde, Costa Rica 2005 Technical Report submitted to the Monteverde Institute Andrew J. Guswa, Asst Professor, Picker Engineering Program Amy L. Rhodes, Asst Professor, Department of

More information

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS May 19, 2005 Department of Operations 100 95 90 85 80 75 70 65 A B C D RAIL PERFORMANCE INDEX FY

More information