Job Sheet 1 Installing the Net Watt-Hour Meter

Size: px
Start display at page:

Download "Job Sheet 1 Installing the Net Watt-Hour Meter"

Transcription

1 Job Sheet 1 Installing the Net Watt-Hour Meter Net kwh Meter The Grid-Tie Training System optional net meter is a V AC, single-phase, two-wire, bidirectional triple element watt-hour (Wh) meter (Figure 1-1). The meter has been tested by CSA to the UL standard. The net meter electronic circuitry is mounted in a safety enclosure and coupled to a set of digital counters. The counters log the total energy in Wh that passes in either forward or reverse directions (Figure 1-2). The net meter is non-standard the utility grid electrical connection. The detected signals are then converted by the meter s circuitry into the displayed Wh measurements. The unit requires a small amount of power (approximately 2 W) to drive the display and monitoring circuits. Figure 1-1. Net Watt-Hour Meter. Figure 1-2. Enclosed Meter with Counters. Festo Didactic Inc

2 OBJECTIVES In this job, you will complete the mounting of the net watt-hour meter onto the grid-tie current transformer to complete the installation. EQUIPMENT REQUIRED Refer to the Equipment Utilization Chart in Appendix A to obtain the list of equipment required for this job. SAFETY PROCEDURES You are wearing safety glasses. You are wearing safety shoes. You are not wearing anything that might get caught such as a tie, jewelry, or loose clothes. If your hair is long, tie it out of the way. Your sleeves are rolled up. WARNING:This job requires exposing and handling typically live receptacle connections. Unplug both sources of power entering the grid-tie trainer and the plug for the solar simulator or the grid-tie plug (green wire). Be sure both the AC disconnect and DC disconnect switches of the grid-tie trainer are in the Off position before starting this project. Instructor initials: Festo Didactic Inc

3 PROCEDURE Securing the Meter to the Trainer If the meter has already been secured to the grid-tie trainer, verify that it is properly mounted (Figure 1-3) and aligned at the top (Figure 1-11). Then, proceed to the section titled, Assembling the Conduit. If the meter has not been secured to the grid-tie trainer, proceed to Step 2. Using the supplied screws and channel spring nuts, loosely secure the meter to the side of the assembled grid-tie trainer (Figure 1-3). The meter must be secured to the end of the trainer near the main AC distribution panel. Evenly tighten the four mounting screws. Figure 1-3. Properly Mounted Watt-Hour Meter. Assembling the Conduit To create the conduit assembly, begin by opening the front cover of the net watt-hour meter enclosure by releasing the two side plastic latches (Figure 1-4). 4 Festo Didactic Inc

4 Side Plastic Latches Figure 1-4. Meter Enclosure Latches. Remove the single Phillips-head screw that secures the meter/counter fall. Remove the meter/counter assembly and screw, and place them in a safe location. Phillips-head Screw Figure 1-5. Meter with Cover Open. Remove the nut from one of the angled conduit connectors and insert it into the top of the enclosure with the output facing toward the main AC distribution panel (Figure 1-6). Replace the nut on the inside and handtighten. Festo Didactic Inc

5 Nut Figure 1-6. Inserting the Angle Connector. Remove the front AC distribution panel cover by removing the four Retaining screws Retaining screws Figure 1-7. Front Panel Retaining Screws. 6 Festo Didactic Inc

6 a screwdriver and possibly a light hammer, remove the 3 4 from the upper right corner of the main AC distribution panel ¾" Knock-out Figure 1-8. Main AC Distribution Panel with Knockout Removed. Remove the nut from the second of the angled conduit connectors and insert it into the top of the power panel with the output facing toward the inside and hand-tighten for now. Nut Figure 1-9. Main AC Distribution Panel with Angle Connector Installed. Festo Didactic Inc

7 bushing into each end of the supplied length of conduit (Figure 1-10). Figure Installing Anti-Short Bushings. Remove the cap of each angle conduit connector, and then align and conduit connector caps, but leave them loose for now. Figure Aligning Conduit. Once aligned, tighten the nut on each angle connector inserted in both the main AC distribution panel and enclosure. Leave the caps loose to prepare for wiring. Running the Wire lengths and strip the wire ends bare, leaving approximately 3 4 of an inch Select one wire of each color. Align the ends and loosely twist the wires into a twisted pair set (Figure 1-12). 8 Festo Didactic Inc

8 Figure Twisted Pair. Bend the white wire at each end of one twisted wire pair. This will help you identify the wire pair later (Figure 1-13). Figure Bent White Wire. Remove the two angle conduit connector caps and feed both twisted pair of wires through the conduit and connectors from the main power meter enclosure. Replace and tighten the angle connector end caps. Wiring the Net Watt-Hour Meter each counter, and strip and twist the conductors together. Route this paired connection to the left, passing through the opening to the front of the meter, and terminate at the screw labeled COMN (Figures 1-14 and Festo Didactic Inc

9 Route the remaining wire from the left counter to the left, passing through the opening to the front of the meter, and terminate at the screw Route the remaining wire from the right counter to the left, passing through the opening to the front of the meter, and terminate at the screw D-OUT COMN D-IN Figure Counter Wiring. two twisted pairs of wire to the front of the meter panel via the left side Twisted pairs of wire Figure Meter and Twisted Pairs. 10 Festo Didactic Inc

10 Replace the Phillips-head mounting screw to secure the meter. terminal labeled CT L1 Color and the white wire to the terminal labeled CT L1 WHITE (Figure 1-16). Straighten the bent white wire on the second twisted pair. Wire and tighten this twisted pair to the appropriate power input terminals: terminal labeled Neutral (Figure 1-16). Figure Meter with Wired Twisted Pairs. Straighten the wires and thread any excess length through the panel Preparing the Current Transformer NOTE: Festo Didactic Inc

11 Figure Current Transformer Wire. approximately 3 4 NOTE: To prevent coil damage, do not pull the wire at the base of the coil while stripping the wires. 3 4 inch Leaving approximately 4 inches (102 mm) extending from the coil, NOTE: If a dot is not present on the coil, the wires should exit the bottom of the coil. Figure Wire Wrapped Current Transformer. 12 Festo Didactic Inc

12 Installing the Current Transformer Figure Main AC Distribution Panel. Insert and tighten the AC load side of the current transformer (CT) coil source end of the coil wire to the 14-gauge hot wire you disconnected that connection with the larger supplied wire nut. Bend the AC load coil wire around the coil to complete a tenth turn, as shown in Figure NOTE: At this point in the procedure, there should be ten turns of #14 AWG wire wrapped around the current transformer in order to provide a measurement resolution of 1 Wh. AC Source AC Load Figure Current Transformer. Festo Didactic Inc

13 Figure Main Power Pane with CT Installed. NOTE: Your tie-wrap mount may appear slightly different in style and/or color than the one shown in Figure Figure Wire Wrap Mount. distribution panel, right behind the upper portion of the CT coil. Secure the coil to the mount using a tie wrap. Connecting the Current Transformer to the Net Watt-Hour Meter wires to the 22-gauge twisted pair coming from the net meter that does Secure the connections with the small wire nuts provided. 14 Festo Didactic Inc

14 resistance between CT coil connections CT L1 COLOR and CT L1 WHITE on the net watt-hour meter (Figure 1-23). You should get a value ohms) or a shorted value could indicate that the wrong twisted pair were wired and should be investigated. Figure CT Coil Connections. Connecting the Power Connections source side end of the current transformer s hand-wound wire (Figure 1-24). You will have to remove and then replace the larger wire nut to Large wire nut Figure Net Meter Power Connection. Festo Didactic Inc

15 Crimp the provided crimp pin connector onto the end of the bent 22-gauge white wire. Connect and secure the pin connector to the the wiring of the net watt-hour meter. Crimp pin Figure Net Meter Power Connection. Replace the main AC distribution panel cover and tighten the four securing screws. Close and latch the net watt-hour meter cover. You have completed the assembly and wiring of the net watt-hour meter. Do not disassemble your equipment. 16 Festo Didactic Inc

16 Procedure Questions 1. The net watt-hour meter provided with your trainer logs the total energy (in Wh) passed in the a. forward direction. b. reverse direction. c. Both A and B are correct. d. None of the above is correct. 2. True or false: The watt-hour meter requires 2 watts of power to drive the display and circuits. a. True b. False 3. twisted pair should be wired to the terminal labeled CT L1 COLOR and the white wire should be wired to the terminal labeled CT L1 WHITE. a. True b. False 4. Which of the following describes the appropriate wiring of the bent twisted pair? a. to the terminal labeled CT L1 WHITE. b. to the terminal labeled CT L1 COLOR. c. d. the terminal labeled Neutral. Festo Didactic Inc

17 True or false: There should be ten turns of #14 AWG wire wrapped around the current transformer in order to provide a measurement resolution of 1 Wh. a. True b. False Name: Date: Instructor approval: 18 Festo Didactic Inc

Job Sheet 6 Installing the Combiner Box

Job Sheet 6 Installing the Combiner Box Job Sheet 6 Installing the Combiner Box The Combiner Box The combiner box used in this course can combine photovoltaic (PV) solar sub-array strings that are up to 150 V DC each and up to 120 A total. Using

More information

Installing a Downstream Distribution Panelboard

Installing a Downstream Distribution Panelboard Job Sheet 5 Installing a Downstream Distribution Panelboard OBJECTIVE To install a downstream distribution panelboard (DDP) on the Mobile Workstation. To mechanically and electrically connect the DDP to

More information

Job Sheet 2 Aerodynamics Power Control

Job Sheet 2 Aerodynamics Power Control Job Sheet 2 Aerodynamics Power Control Power Control Power control is an important feature of a wind turbine. It regulates the speed of rotation of the rotor assembly when wind is present. For stand-alone

More information

Job Sheet 5 Hydraulic Unit Circuit

Job Sheet 5 Hydraulic Unit Circuit Job Sheet 5 Hydraulic Unit Circuit The key components involved in the cylinder piston rod actuation (solenoid valves SV1, SV2, SV3A, and SV3B) are within the core components of the hydraulic unit of the

More information

Midnite Kid Basic Solar Charging Kit

Midnite Kid Basic Solar Charging Kit What does my kit come with? 1pc MNKID-B 30-amp MPPT Charge Controller 1pc MNBIGBABY- 4 position breaker box 2 pcs MNEPV30- PV and battery breaker 1 pc GFP63 Ground Fault Protection Breaker 2pcs each Strain

More information

MNBRATKIT MidNite Brat Solar Charging Kit

MNBRATKIT MidNite Brat Solar Charging Kit 1 pc MNBRAT 20/30-amp PWM Charge Controller 1 pc MNBIGBABY Breaker Box 3 pcs 1-10A 1-20A 1-30A MNEPV- PV, Battery and Load Breakers 2 pcs 2 pcs 9-161-1 Strain Relief 9-162-1 Lock Nut 2-4 Hole Strain Reliefs

More information

Lakela nd H2 Low Speed Stator Coil Installation

Lakela nd H2 Low Speed Stator Coil Installation Lakela nd H2 Low Speed Stator Coil Installation Step 1: Place the stator assembly on a padded surface to protect the plastic signal generators, and orient it as shown in figure 1. The low speed coil is

More information

Connecting to DC Power

Connecting to DC Power APPENDIXC This appendix describes how to make DC power connections to the Catalyst 3750G-12S-SD switch. See the Installing the Switch section on page 2-11 for instructions on installing the switch. To

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS MANUAL TRANSFER SWITCHES FROM 0 Residential Wattage Requirements Appliance Running Watts Add watts for starting Furnace blower, gas or fuel 1/8 hp 300 500 1/8 hp

More information

Job Sheet 1 Electrical Panel Familiarization

Job Sheet 1 Electrical Panel Familiarization Job Sheet 1 Electrical Panel Familiarization The Wind Turbine Training System: Electrical Pitch Hub hardware has an electrical enclosure that houses an electrical panel. As shown in Figure 1-1, this panel

More information

Ex. 1-1 Nacelle Familiarization and Safety Discussion

Ex. 1-1 Nacelle Familiarization and Safety Discussion Exercise 1-1 Nacelle Familiarization and Safety EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with key components and safety aspects of the nacelle trainer. You will be

More information

Installation Instructions for LED Timing Light

Installation Instructions for LED Timing Light Daytona Sensors LLC Engine Controls and Instrumentation Systems Installation Instructions for CAUTION: CAREFULLY READ INSTRUCTIONS BEFORE PROCEEDING OVERVIEW The P/N 120001 includes a versatile controller

More information

1718 W. Fullerton Ave Chicago, IL Tel: Fax:

1718 W. Fullerton Ave Chicago, IL Tel: Fax: 07 Edge Lighting. All Rights Reserved. Installation Instructions for Pix Stick Tie Stix Suspension -Light, -Light, -Light and -Light with Power IMPORTANT INFORMATION - This product is suitable for indoor

More information

Installation and Construction Notes for EVSE4

Installation and Construction Notes for EVSE4 Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process

More information

SB-C-CTS/10TW3 SKU# & Up Cadillac CTS/CTS-V

SB-C-CTS/10TW3 SKU# & Up Cadillac CTS/CTS-V INSTALLATION GUIDE for the SB-C-CTS/10TW3 SKU# 94552 2008 & Up Cadillac CTS/CTS-V If you choose to perform the installation yourself, it is absolutely vital that the Stealthbox be properly mounted to the

More information

1718 W. Fullerton Ave Chicago, IL Tel: Fax:

1718 W. Fullerton Ave Chicago, IL Tel: Fax: 206 Edge Lighting. All Rights Reserved. Installation Instructions for Nova Power Suspension Up/Down - Center Feed Glide Up/Down - Center Feed IMPORTANT INFORMATION - This product is suitable for indoor

More information

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly Kit Contents B00009035-3 Motor Drive Assembly (Return original to CMI) B00007698-8 GFCI Module

More information

WARNING. Important Notice

WARNING. Important Notice CAL (Color AquaLuminator ) Light and Return Water Flow for Above Ground Pools Owners Manual IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS Table of Contents SECTION

More information

Industrial Maintenance. Gear Drives 1. Courseware Sample F0

Industrial Maintenance. Gear Drives 1. Courseware Sample F0 Industrial Maintenance Gear Drives 1 Courseware Sample 36893-F0 Order no.: 36893-70 First Edition Revision level: 08/2015 By the staff of Festo Didactic Festo Didactic Ltée/Ltd, Quebec, Canada 2005 Internet:

More information

THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER

THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER Table of Contents Page Tools Needed (A) 3 Replacement

More information

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit Exercise 3-1 Basic Hydraulic Circuit EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic schematic and components of the nacelle trainer. You will identify

More information

Installing Power Components

Installing Power Components This chapter provides instructions on how to install and reinstall power components in the Cisco NCS 4016 chassis. It also covers connecting and disconnecting power and powering on the chassis. The Cisco

More information

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH STANDBY POWER FURNACE SWITCH Easy/Tran TF Congratulations on your purchase of the Reliance Controls Easy/Tran TF furnace transfer switch. Reliance has been manufacturing transfer switches and equipment

More information

Owner's/Installation Manual

Owner's/Installation Manual Owner's/Installation Manual Power Management Module (PMM) and Starter Kit NOTE: The starter kit must be purchased and installed prior to individual PMM usage. Model Numbers: 00686-0 PMM 00699-0 PMM WITH

More information

MEDIA LED. Pendant Standard Mount Installation ou de montage WARNING:

MEDIA LED. Pendant Standard Mount Installation ou de montage WARNING: MEDIA LED Pendant Standard Mount WARNING: Disconnect main power at the source prior to installation! Thread gripper base onto 1 /4 20 stud, or with #8 screw. Depress gripper nozzle to insert aircraft cable.

More information

THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL. WELLS ENGINE UNIT 230 VOLT Product No. U905, U906, U907, U908

THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL. WELLS ENGINE UNIT 230 VOLT Product No. U905, U906, U907, U908 DENTAL, INC. TECHNICAL BULLETIN U807-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427 SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS

More information

LED Flat Panel Installation Instructions For 1 x4, 2 x2, and 2 x4 LED Flat Panels (FP Series)

LED Flat Panel Installation Instructions For 1 x4, 2 x2, and 2 x4 LED Flat Panels (FP Series) LED Flat Panel Installation Instructions For 1 x4, 2 x2, and 2 x4 LED Flat Panels (FP Series) PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION SAFETY

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Hydraulic Brakes EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic circuits of the yaw and the rotor brakes. You will control brakes by changing

More information

Installation Instructions: Read these instructions in its entirety before performing any installation work.

Installation Instructions: Read these instructions in its entirety before performing any installation work. WIR-TRAN Rated for use on 110/120VAC 60Hz applications Installation Instructions: Read these instructions in its entirety before performing any installation work. FOR USE WITH POOL AND SPA PRODUCTS ETL

More information

Installation Instructions Table of Contents

Installation Instructions Table of Contents Installation Instructions Table of Contents Pre- Installation of Garage Storage Lift 2 Layout the Garage Storage Lift 3 Installing the strut Channels 3 Install the Drive Assembly 5 Install the Drive Shaft

More information

Application note. The APM-AMP meter can be connected in three different configurations:

Application note. The APM-AMP meter can be connected in three different configurations: Application note Title: Current sensing with an APM-AMP meter Date: 5 th September 2014 Revision: 1.0 Introduction: The APM-AMP meter can measure both AC and DC currents. The APM-AMP meter performs automatic

More information

INSTALLATION GUIDE. For Carrier/Bryant Residential Power Systems

INSTALLATION GUIDE. For Carrier/Bryant Residential Power Systems INSTALLATION GUIDE For Carrier/Bryant Residential Power Systems For 100 Amp Automatic Transfer Switch/Load Center Model: KGATX0116100 16 circuit installed with 16kW generators. This Automatic Transfer

More information

Safe-T-element Installation Instructions

Safe-T-element Installation Instructions Safe-T-element Installation Instructions For: PTI STEZA (2x2 Burner Configuration) & PTI STEZB (3x1 Burner Configuration) Revision K (May. 3 2012) TABLE OF CONTENTS 1. PREPARATION... 3 1.1 General Safety

More information

Models beginning with MO, MK, 7B, 6S, 6F or 5B. Product Description. Technical Specifications. Installation Instructions.

Models beginning with MO, MK, 7B, 6S, 6F or 5B. Product Description. Technical Specifications. Installation Instructions. Models beginning with MO, MK, 7B, 6S, 6F or 5B The Mini Meter Product Description Technical Specifications Installation Instructions February 28 th, 2013 1. Product Description...2 1.1 General Description...2

More information

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual Combiner Box Installation & Operations Manual SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual TABLE OF CONTENTS Notices and Safety Precautions Pages 1-2 Combiner

More information

MODEL ELC-12/40-CVM-D BATTERY CHARGER

MODEL ELC-12/40-CVM-D BATTERY CHARGER NATIONAL RAILWAY SUPPLY MODEL ELC-12/40-CVM-D BATTERY CHARGER Installing, Operating and Service Instructions for the ELC-12/40-CVM-D Solid State Charger PLEASE SAVE THESE IMPORTANT SAFETY AND OPERATING

More information

MX Cable Connector Kit Manual Manual for Trimming the Cable and Connecting the Connector to an MX8031 Extension Cable

MX Cable Connector Kit Manual Manual for Trimming the Cable and Connecting the Connector to an MX8031 Extension Cable MX8020-001 Cable Connector Kit Manual Manual for Trimming the Cable and Connecting the Connector to an MX8031 Extension Cable The Metrix MX8020-001 Cable Trimming and Connector Kit provides an easy way

More information

Model Numbers SAVI-NOTE75, SAVI-NOTE150

Model Numbers SAVI-NOTE75, SAVI-NOTE150 Installation INSTRUCTIONS & OWNERS Manual SAVI NOTE UNDERWATER LED LIGHT Model Numbers SAVI-NOTE75, SAVI-NOTE150 Safety Precautions...2 SAVI Note Install Instructions...3-4 1 READ AND FOLLOW ALL INSTRUCTIONS

More information

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly Checking and Replacing the AC Motor To remove and replace the AC Motor you will need the following tools: #2 Phillips screwdriver (magnetic tip preferred) Removing the AC Motor 1. Ready the machine by

More information

Hunter Automatics HA-8. Installation Manual

Hunter Automatics HA-8. Installation Manual Hunter Automatics HA-8 Installation Manual WARNING TO REDUCE RISK OF INJURY 1. READ AND FOLLOW ALL INSTALLATION INSTRUCTIONS CAREFULLY. FAILURE TO DO SO MAY RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE

More information

PVM 220 Installation Guide

PVM 220 Installation Guide R CONFIG SELECT AUDIO AUX INPUT VOICELIFT PAGING SENSOR SENSITIVITY PVM 0 Installation Guide The Extron PVM 0 is an enclosure for the safe mounting of PoleVault system devices in the plenum area of a suspended

More information

MAx-305 & MAx-318 Series MAx-405 Through MAx-419 Series Two-Position Actuators

MAx-305 & MAx-318 Series MAx-405 Through MAx-419 Series Two-Position Actuators MAx-305 & MAx-38 Series MAx-405 Through MAx-49 Series Two-Position Actuators General Instructions Application For two-position operation of dampers, valves, and other equipment which require the return

More information

PROVEX Installation Guide. Version 1.0

PROVEX Installation Guide. Version 1.0 Version 1.0 INTRODUCTION The scale must not be loaded beyond its capacity. Do not select a site where overweight load would have to maneuver to avoid crossing the platform. Avoid areas where the scale

More information

SERVICE MANUAL Model: SF-INS30-BK - Instructions -

SERVICE MANUAL Model: SF-INS30-BK - Instructions - SERVICE MANUAL Model: SF-INS30-BK - Instructions - NOTICE! DO NOT discard any hardware while servicing. It must be reused. This manual will assist a qualified service technician in the replacement of parts.

More information

Self-Testing Industrial Series

Self-Testing Industrial Series Series: AS-I (Maint.-Free) Self-Testing Industrial Series Emergency Lighting Equipment Instructions for INSTALLATION OPERATION SERVICE SPECIFICATIONS 1300650 1300654 1300666 1300754 1300823 1300886 Hubbell

More information

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit

Exercise 3-1. Basic Hydraulic Circuit EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Complete hydraulic circuit Exercise 3-1 Basic Hydraulic Circuit EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic schematic and components of the nacelle trainer. You will identify

More information

Industrial Maintenance. Belt Drives 2. Job Sheets - Courseware Sample F0

Industrial Maintenance. Belt Drives 2. Job Sheets - Courseware Sample F0 Industrial Maintenance Belt Drives 2 Job Sheets - Courseware Sample 36963-F0 Order no.: 36963-30 First Edition Revision level: 05/2015 By the staff of Festo Didactic Festo Didactic Ltée/Ltd, Quebec, Canada

More information

Dry Contact Closure Interface

Dry Contact Closure Interface Dry Contact Closure Interface Overview LuXout Shades Dry Contact Closure Contact closure interfaces allows integration of the Automation systems throughout the house. The contact closure interface communicates

More information

MODEL ELC-12/60-D BATTERY CHARGER

MODEL ELC-12/60-D BATTERY CHARGER *32198* NATIONAL RAILWAY SUPPLY Installing, Operating and Service Instructions for the 12/60 Solid State Charger MODEL ELC-12/60-D BATTERY CHARGER PLEASE SAVE THESE IMPORTANT SAFETY AND OPERATING INSTRUCTIONS

More information

INSTALLATION INSTRUCTION W Track Recessed 120V Flangeless

INSTALLATION INSTRUCTION W Track Recessed 120V Flangeless W Track Recessed 120V Flangeless WT4-RTL, WT8-RTL, WT12-RTL SAFETY INSTRUCTION Read all of these instructions before installing the track system. Turn off power at main switch before installing or modifying

More information

SE-B2, B3 & BXL Sound Enclosures

SE-B2, B3 & BXL Sound Enclosures SE-B2, B3 & BXL Sound Enclosures Installation Manual READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION 03/08 1 SE-B2, B3 & BXL Series Sound Enclosures Thanks for purchasing a Display Devices product.

More information

Mizer Single Pump and Starter Box

Mizer Single Pump and Starter Box Mizer Single Pump and Starter Box Table of Contents Line Diagram... 2 Overview... 3 Booster Pump Specifications... 3 Water... 3 Electrical... 3 Models... 3 Mounting... 4 Electrical... 6 Motor Rotation...

More information

RZ3-5K Polaris RZR XP 1000 & 900 Kicker 5 Speaker Audio Kit

RZ3-5K Polaris RZR XP 1000 & 900 Kicker 5 Speaker Audio Kit PO H PWER PO 5 O KIT I E D U A S A TS S I R LA R Z R R O SP pg 2 pg 9 pg 13 pg 25 pg 29 Disassembly, Wire and Amplifier Plate Installation Glovebox Subwoofer Installation Kick Panel Speakers Installation

More information

DYNACO STEREO 120 C7 REPLACEMENT MANUAL

DYNACO STEREO 120 C7 REPLACEMENT MANUAL DYNACO STEREO 120 C7 REPLACEMENT MANUAL 2013 AkitikA, LLC All rights reserved Revision 1p03 April 29, 2013 Page 1 of 15 Table of Contents Section 1: About This Manual... 3 Who Should Attempt this Project?...

More information

RZ3-5A Polaris RZR XP 1000 & 900 SSV Works 5 Speaker Audio Kit

RZ3-5A Polaris RZR XP 1000 & 900 SSV Works 5 Speaker Audio Kit RZ3-5A Polaris RZR XP 1000 & 900 SSV Works 5 Speaker Audio Kit pg 2 Disassembly, Wire and Amplifier Plate Installation pg 9 Glovebox Subwoofer Installation pg 13 Kick Panel Speakers Installation pg 25

More information

Company Switch Installation Instructions and User Manual

Company Switch Installation Instructions and User Manual Lex Products Corporation 15 Progress Drive Shelton, CT 06484 203.363.3738 203.363.3742 Fax Lex West 11847 Sheldon Street Sun Valley, CA 91352 818.768.4474 818.768.4040 Fax www.lexproducts.com info@lexproducts.com

More information

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS AQUALUMINATOR & AQL LIGHT AND RETURN WATER FLOW FOR ABOVE GROUND SWIMMING POOLS INSTALLATION AND USER'S GUIDE Contents SECTION I. IMPORTANT SAFETY INSTRUCTIONS... 2 SECTION II. LAMP HOUSING INSTALLATION...

More information

Installing Ignition Coil relay

Installing Ignition Coil relay Installing Ignition Coil relay Above is a schematic diagram of the coil relay modification. All it really does is, it uses the existing 12 Volt positive that normally powers the coils, to power a relay,

More information

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES FOR MICRO COAXIAL CONTACTS AND MODULES TABLE OF CONTENTS SECTION 1 RECEIVER CONTACT ASSEMBLY INSTRUCTIONS SECTION 2 ITA CONTACT ASSEMBLY INSTRUCTIONS

More information

DARMAN. ENDURA II Cloth Towel Cabinet Product Guide. Manufacturing Company, Inc Lincoln Ave., Utica, NY 13502

DARMAN. ENDURA II Cloth Towel Cabinet Product Guide. Manufacturing Company, Inc Lincoln Ave., Utica, NY 13502 ENDURA II Cloth Towel Cabinet Product Guide Page 2, 3 4, 5 6, 7 8, 9 10 11 12 Parts Covered Hood Assembly Mechanism Back Assembly Bin and Towel Guide Service Bulletin - Roller Warranty and Maintenance

More information

Spectron Industrial Series

Spectron Industrial Series 1300650 1300654 1300666 1300754 1300823 1300886 Table B Constant Value per Voltage System Wire Size (Maximum Voltage Drop 5%) System 6 Volt 12 Volt 24 Volt Wire Size #12 #10 #8 #6 #12 #10 #8 #6 #10 #12

More information

w w w. h d o n l i n e s h o p. d e LAYBACK LICENSE PLATE AND TURN SIGNAL RELOCATION KIT INSTALLATION GENERAL -J03892 REV Kit Number

w w w. h d o n l i n e s h o p. d e LAYBACK LICENSE PLATE AND TURN SIGNAL RELOCATION KIT INSTALLATION GENERAL -J03892 REV Kit Number -J0 REV. 00-0-0 LAYBACK LICENSE PLATE AND TURN SIGNAL RELOCATION KIT GENERAL Kit Number 0-0 Models For model fitment information, please see the P&A Retail Catalog or the Parts and Accessories section

More information

Installation Manual. CS9300 Professional Series Landscape Lighting System

Installation Manual. CS9300 Professional Series Landscape Lighting System Installation Manual CS9300 Professional Series Landscape Lighting System CS9300 Professional Series Landscape Lighting System pg. 1 READ THESE INSTRUCTIONS ENTIRELY BEFORE BEGINNING INSTALLATION! Congratulations

More information

NEOPOST TA50B. Dual ModeTabber. Operating Manual 8/

NEOPOST TA50B. Dual ModeTabber. Operating Manual 8/ NEOPOST TA50B Dual ModeTabber 8/09 25-0056-15 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 Organization of this...1 1.2 TA50B Description...1 1.3 Items Included...3 1.4 Safety Terms...4 1.5 Safety Precautions...5

More information

AquaLumin III - Nicheless Light Installation Guide IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

AquaLumin III - Nicheless Light Installation Guide IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS 16 1 AquaLumin III - Nicheless Light Installation Guide IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS Section Contents 1. Installing a mounting bracket and light

More information

Raritan PX. Power Cord Installation Guide. Safety Guidelines. Safety Instructions

Raritan PX. Power Cord Installation Guide. Safety Guidelines. Safety Instructions QS Rule Raritan PX Power Cord Installation Guide This installation guide explains how to install power cords on Raritan PX products that do not come with a factory installed power cord. This type of product,

More information

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH IS NOT FOR "DO-IT-YOURSELF" INSTALLATION. It must be installed by

More information

Tooling Assistance Center

Tooling Assistance Center Safeguards are designed into this application equipment to protect operators and maintenance personnel from most hazards during equipment operation. However, certain safety precautions must be taken by

More information

MONORAIL KITS INSTALLATION INSTRUCTIONS PENDANTS

MONORAIL KITS INSTALLATION INSTRUCTIONS PENDANTS MONORAIL KITS PENDANTS JESCO Lighting Group is a UL and ETL listed company Copyright 2011 JESCO Lighting Group. All rights reserved. IMPORTANT SAFETY INSTRUCTIONS Be sure to read and unsderstand the following

More information

FC/FCA 12, 24, 32 & 48 VOLT, 6 & 10 AMP BATTERY CHARGER OPERATION & MAINTENANCE GUIDE

FC/FCA 12, 24, 32 & 48 VOLT, 6 & 10 AMP BATTERY CHARGER OPERATION & MAINTENANCE GUIDE FC/FCA 12, 24, 32 & 48 VOLT, 6 & 10 AMP BATTERY CHARGER OPERATION & MAINTENANCE GUIDE SENS part number: 101037 Document revision: A Engineering change number: 105073 Date: 1/13/2006 1840 Industrial Circle

More information

Installation Instructions

Installation Instructions Quick-Mount Visual Instructions for Mechanical Installation Quick-Mount Visual Instructions 1. Rotate the damper to its failsafe position. If the shaft rotates counterclockwise, mount the CCW side of the

More information

Handyman Motor Capacitor Meter PART NO

Handyman Motor Capacitor Meter PART NO Handyman Motor Capacitor Meter PART NO. 2225174 To test a motor-run capacitor in the field with no capacitance meter at hand, you had to hook up the capacitor through an extension cable to a 120V wall

More information

Familiarization with voltage and current measurements. 1. Disconnect your training system from the wall outlet.

Familiarization with voltage and current measurements. 1. Disconnect your training system from the wall outlet. Job Sheet 6 Geothermal Heat Pumps OBJECTIVE In this job sheet, you will determine the coefficient of performance (COP) and the energy efficiency ratio (EER) using measured temperature, humidity, voltage,

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

PN CHEVY TRI-FIVE. Kit Contents: Four panel Sequential LED Taillight kit installation guide

PN CHEVY TRI-FIVE. Kit Contents: Four panel Sequential LED Taillight kit installation guide Four panel Sequential LED Taillight kit installation guide Kit Contents: 2 tail light LED panels 2 tail light turn signal LED panels 1 rubber boot/sleeve kit 1 power wire with t-tap 1 driver side LED harness,

More information

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES FOR THERMOCOUPLE CONTACTS AND MODULES Table of Contents SECTION 1 RECEIVER CONTACT ASSEMBLY INSTRUCTIONS SECTION 2 ITA CONTACT ASSEMBLY INSTRUCTIONS

More information

Series 110 MK III, Series 187 MK II and MK III, Series 250 MK II, MK III, and RAST 5 & 7

Series 110 MK III, Series 187 MK II and MK III, Series 250 MK II, MK III, and RAST 5 & 7 Series 110 MK III, Series 187 MK II and MK III, Series 250 MK II, MK III, and RAST 5 & 7 Application Specification 114-2074 13 JAN 17 Rev L All numerical values are in metric units [with U.S. customary

More information

Electric Actuator Instructions

Electric Actuator Instructions BAC IOM Electric Actuator Instructions E024, E025, E026, E029 & E030 TABLE OF CONTENTS Electric Actuator Specifications...2 Overview...3 Actuator Wiring Diagrams...4 VMS-35 Specifications and Wiring Diagram...5

More information

SPACESAVER EC-300 A ELECTRICS

SPACESAVER EC-300 A ELECTRICS INSTALLATION INSTRUCTIONS SPACESAVER EC-300 A ELECTRICS SECTION I TOP MOUNTED ELECTRICS SECTION II FACE PANEL MOUNTED ELECTRICS SECTION III ZFS INSTALLATION INSTRUCTIONS This symbol indicates a connection

More information

RZ3-3A Polaris RZR XP 1000 & 900 SSV Works 3 Speaker Audio Kit

RZ3-3A Polaris RZR XP 1000 & 900 SSV Works 3 Speaker Audio Kit RZ3-3A Polaris RZR XP 1000 & 900 SSV Works 3 Speaker Audio Kit pg 2 Disassembly, Wire and Amplifier Plate Installation pg 9 Glovebox Subwoofer Installation pg 13 Kick Panel Speakers Installation pg 25

More information

I n s t a l l a t i o n M a n u a l. f o r T E D

I n s t a l l a t i o n M a n u a l. f o r T E D I n s t a l l a t i o n M a n u a l f o r T E D 5 0 0 0 Page 2 N O T I C E - I M P O R T A N T T E D O P E R AT I O N A L L I M I TAT I O N S TED is only suitable for use on 120/240V single-phase 60Hz

More information

SEALER-15-1/2 ELECTRICAL IMPULSE

SEALER-15-1/2 ELECTRICAL IMPULSE SEALER-5-/ ELECTRICAL IMPULSE OPERATING INSTRUCTIONS 39 Mission Oaks Blvd., Camarillo, CA 930 Visit our Web site at http://www.harborfreight.com Copyright 000 by Harbor Freight Tools. All rights reserved.

More information

Sun Tie Inverter. Installation and Operator s Manual. ST1000, ST1500, ST2000 and ST Trace Engineering. P/N Rev.

Sun Tie Inverter. Installation and Operator s Manual. ST1000, ST1500, ST2000 and ST Trace Engineering. P/N Rev. Sun Tie Inverter ST1000, ST1500, ST2000 and ST2500 Installation and Operator s Manual P/N 975-0003-01-01 Rev. B 06/00 Sun Tie Inverter ST1000, ST1500, ST2000 and ST2500 Table of Contents Section Description

More information

The customer s solar generation metering shall have the same characteristics (voltage and phasing) as the Company s electric delivery service.

The customer s solar generation metering shall have the same characteristics (voltage and phasing) as the Company s electric delivery service. SOLAR PURCHASE PROGRAM Electrical Guide Please share this document with your electrician to ensure wiring is done correctly. Should you or your electrician have any questions, please let us know. Included

More information

PVM 220 Installation Guide

PVM 220 Installation Guide R CONFIG SELECT AUDIO 1 3 5 2 4 AUX INPUT VOICELIFT PAGING SENSOR SENSITIVITY PVM 220 Installation Guide The Extron PVM 220 is an enclosure for the safe mounting of PoleVault system devices in the plenum

More information

Environmental Distribution Center (EDC-06P-NH)

Environmental Distribution Center (EDC-06P-NH) Corning Cable Systems Standard Recommended Procedure (SRP) 003-545 Issue 4, July 2004 Page 1 of 13 Environmental Distribution Center (EDC-06P-NH) 1.2 To purchase any accessories that are sold separately,

More information

Fisher 657 Diaphragm Actuator Sizes and 87

Fisher 657 Diaphragm Actuator Sizes and 87 Instruction Manual 657 Actuator (30-70 and 87) Fisher 657 Diaphragm Actuator Sizes 30 70 and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Installation... 3 Mounting

More information

Wind Energy Technologies

Wind Energy Technologies Wind Energy Technologies Wind Energy Technician This Green Collar Zone workstation will teach you the basic principles of wind power, as you acquire skills by performing hands-on activities. No prior knowledge

More information

ELECTRICAL INSTALLATION PROCEDURES For Custom Grid Assemblies & Power Generators

ELECTRICAL INSTALLATION PROCEDURES For Custom Grid Assemblies & Power Generators ELECTRICAL INSTALLATION PROCEDURES For Custom Grid Assemblies & Power Generators BECAUSE CLEAN AIR MATTERS Note: Factory trained or suitably qualified personnel must perform this installation. General:

More information

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS HVAC/BAC ELECTRIC IOM ELECTRIC ACTUATOR E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS Electric Actuator Specifications... 2 Overview... 3 Actuator

More information

INSTALLATION MANUAL. Medlux MRI-Safe Color Changing Troffer System

INSTALLATION MANUAL. Medlux MRI-Safe Color Changing Troffer System Medlux MRI-Safe Color Changing Troffer System INSTALLATION MANUAL TO AVOID DOING IRREPARABLE DAMAGE TO DRIVE CIRCUITRY NEVER APPLY AC POWER DIRECTLY TO LED LIGHTING MODULES! 4949 South 110 th Street Greenfield,

More information

Installation Instructions

Installation Instructions SLP GM/Chevrolet LS3 COIL COVER KIT 2010+ Camaro 5.3L/6.2L 2007+ GMT900 5.3L/6.2L PN: 620038 Installation Instructions Important Notes: Before installing your SLP Coil Cover Kit, please read the installation

More information

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V) FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V) 21T, Rev.4 6-13 IMPORTANT: Before proceeding, retrieve the GLASS SHADE INSTALLATION GUIDE, which is included with the pendant cord set

More information

E.S.P. Embedded Sensing Probes for Motor Brushes

E.S.P. Embedded Sensing Probes for Motor Brushes E.S.P. Embedded Sensing Probes for Motor Brushes 2/13 Installation & Operating Manual MN609 Any trademarks used in this manual are the property of their respective owners. Important: Be sure to check www.baldor.com

More information

Installation Instructions

Installation Instructions Quick-Mount Visual Instructions for Quick-Mount Visual Instructions 1. Rotate the damper to its failsafe position. If the shaft rotates counterclockwise, mount the CCW side of the actuator out. If it rotates

More information

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid OFF-GRID Design Dr. Gay E. Canough, Master trainer 1 Understand the Customer s load 2 Load sizing Gay E. Canough AC Appliance watts amps how many of these? number of hours it is used per day equals watt-hr/

More information

ETF-600 Sensor Operated Lavatory Faucet

ETF-600 Sensor Operated Lavatory Faucet INSTALLATION INSTRUCTIONS OPTIMA SYSTEMS SENSOR OPERATED LAVATORY FAUCET ETF-600 I.I. Code No. 0816318 ETF-600 Sensor Operated Lavatory Faucet Includes Instructions for Installation of Optional Back Checks

More information

MARCH TECH TIP Common Repairs for the ZW Transformer Part 1 By Jim Weatherford

MARCH TECH TIP Common Repairs for the ZW Transformer Part 1 By Jim Weatherford MARCH TECH TIP Common Repairs for the ZW Transformer Part 1 By Jim Weatherford The most popular transformer built by Lionel, by far, is the 275 watt ZW. It provides a combination of power, flexibility,

More information

PONTIAC FIREBIRD

PONTIAC FIREBIRD 1974-78 PONTIAC FIREBIRD Two Panel Sequential LED Tail Light Kit Installation Guide Kit Contents: 2 LED panels 2 LED panel mount kits 6 rubber grommets 1 power wire 1 pigtail harness Kit 1 crimp terminal

More information

Excel 15 W7760A BUILDING MANAGER

Excel 15 W7760A BUILDING MANAGER Excel W0A BUILNG INSTALLATION INSTRUCTIONS PRODUCT DESCRIPTION The Excel W0A Building Manager is a freely configurable controller that can be used to monitor and control H equipment and other miscellaneous

More information