Utilizing GIS Models in Prioritizing and Selecting Transportation Projects
|
|
- Phillip McBride
- 5 years ago
- Views:
Transcription
1 Utilizing GIS Models in Prioritizing and Selecting Transportation Projects GIS-T Conference Raleigh, NC April 7, 2016 Tyler Meyer, AICP Tram Truong, GISP
2 Outline Case Studies: 1. MPO project selection for the Transportation Alternatives Program (TAP) 2. Sidewalk project prioritization
3 Case Study 1: Transportation Alternatives Program TAP program successor to Transportation Enhancements TAP program includes funding suballocated to 200,000+ UZA MPOs TAP requires a call for projects & competitive selection process Process subject to FHWA review & approval; requires public input FAST Act makes some changes
4 TAP Rules & Eligibility
5 MPO Narrowed Project Eligibility MPO determined to consider 3 project types: 1. Bicycle Infrastructure 2. Pedestrian Infrastructure 3. Intersection Improvement
6 91 Sidewalk Projects 10 Trail Projects 234 Intersections
7 GIS Model
8 1. Land Use Connectivity Residential Area Employment/ Retail Center School Park or Recreation Center
9 1. Land Use Connectivity 8 points Network Analyst Pedestrian projects: 8 points ½ mile: 2 points 1 mile: 1 point Bicycle projects: 1 mile: 2 points 1 ½ mile: 1 point Intersection projects: ½ mile: 2 points 1 mile: 1 point
10 2. Transportation System Connectivity 1. Connect to transit service (2 Points) 2. Connect to other transportation modes and/or facilities (3 Points) 3. Connect to existing facility and fill a gap (2 Points) 4. Is the project in an area underserved by bicycle & pedestrian infrastructure? (3 Points) 5. Extend key parts of the regional greenway system (Bicentennial, Piedmont, A&Y, Downtown Greenway, Mountains to Sea Trail) (4 Points)
11 2.1 Transportation System Connectivity Transit Connection 2 points Network Analyst Pedestrian projects: ¼ mile: 2 points 2 points ½ mile: 1 point Bicycle projects: ½ mile: 2 points 1 mile: 1 point Intersection projects: ¼ mile: 2 points ½ mile: 1 point
12 2.2 Transportation System Connectivity In an area underserved Bike/Ped facility 3 points % of existing sidewalk over total length of sidewalk <25%: 3 points 24.4% 3 points >= 25 & <50%: 2 points >=50% & <75%: 1 point >=75%: 0 point
13 2.3 Transportation System Connectivity Connect to other transportation modes/ facilities 2 points Connect to 1 of these facilities: Bus stop 2 points Bike facility Sidewalk
14 2.4 Transportation System Connectivity Fill a gap 3 points Connect to same facility 3 points
15 2.5 Transportation System Connectivity Extend key trails 4 points Bicentennial Piedmont A&Y Downtown Greenway Mountains to Sea Trail
16 3. Safety & Mobility 1. Safety problem (3 Points) 2. Barrier to mobility (2 Points) 3. Improve mobility for disadvantaged populations (2 Points)
17 3.1 Safety & Mobility Safety problem 3 points Bike/ pedestrian crash: 3 points Other safety issues (crossing, light, 3 points etc.): 2 points
18 3.2 Safety & Mobility- Barrier to Mobility 2 point Fill a gap: 1 point % worker with no vehicle to work (over total worker in a census tract) >2.88%: 1 point Fill a gap: 1 point 3.49%: 1 point Total: 2 points
19 3.3 Safety & Mobility- Household Poverty 2 points % of household poverty: >= 26.44%: 2 points 14.62% 26.44%: 1 point <14.62%: 0 point 18.38%% 1 point
20 4. Project Readiness & Viability Meet funds obligation requirements in the funding availability timeframe (4 points) Part of an adopted plan (2 points) Local government support (2 points) Community/ public support (2 points) Document source for the required 20% match (2 points) ROW acquisition status (2 points)
21 GIS Model
22 91 Sidewalk Projects 10 Trail Projects
23 234 intersections
24 Results
25 Project: Greensboro Pedestrian Signals Description: Install or upgrade the pedestrian signals Cost: $350,000 Total Score: 38 Current Funding: None Proposed Funding: TAP
26 Project 21: Phillips Ave Description: Where none exists between Summit Ave and Huffine Mill Rd Cost: $330,000 Total Score: 34 Land Use Connect 8 Percent of Existed Infrastructure 18.28% Disadvantaged Score 1 Match 2 Transit Connect Mode Type Connect Mode Connect Score Same Mode Connect Score 2 Infrastructure Score 3 Funds Obligation Score Sidewalk Trail Connect 0 Plan 2 2 Safety 3 3 Barrier 2 Government Support Community Support 4 2 ROW acquired Score Current Funding Proposed Funding 0 Length (ft) 0 CMAQ TAP 5,150.34
27 Project 65: Aycock / Walker Intersection Description: Intersection improvement at Aycock Street and Walker Avenue Cost: $173, Total Score: 33 Land Use Connect 8 Percent of Existed Infrastructure 71.00% Disadvantaged Score 2 Match 2 Transit Connect Mode Type Connect Mode Connect Score Same Mode Connect Score 2 Infrastructure Score 1 Funds Obligation Score Sidewalk Trail Connect 0 Plan 2 2 Safety 3 3 Barrier 2 Government Support Community Support 0 2 ROW acquired Score Current Funding Proposed Funding 2 Length (ft) 2 None TAP
28 Aycock Corridor & Intersection Project scope expanded following USDOT Safety Assessment Current Cost Estimate: $850,000
29 Case Study 1 Conclusions Automated GIS evaluation was useful Our attention to detail and testing during evaluation specification phase paid off GIS model produced valid results Top scoring projects realistically reflect top needs
30 Case Study 2: Prioritizing Sidewalk Sidewalk construction is an important local priority Currently miles of sidewalk in Greensboro miles of sidewalk added since miles of those miles built by road projects & 45 miles by independent sidewalk projects miles currently under design or construction
31 Manual Prioritization Methodology Staff developed a manual prioritization method based on Literature review Field experience City council guidance Data Roadway type, volume, speed Land use multifamily, commercial, school, park and recreation center Demand transit stop, path worn Connectivity filling gap Distribution across city
32 Manual Method Sidewalk Projects
33 Context for the GIS Model Input Data Input Criteria Scoring Prioritized Recommendation Land Use Connection Score Stakeholder Input Land Use Mixed Land Use Index Score Planners and managers review Selecting road segments with sidewalk needs Transit User Connectivity Socioeconomic Safety Top 50 Bus Stops by Ridership Score Transit Connection Score Trail Connection Score Sidewalk Gap Score Worker With No Vehicle Score Household Poverty Score Pedestrian Crash Score Total Score Prioritizing road segments with sidewalk needs using geographic equity into Tiers. Tier 1 has the highest score range and Tier 4 has the lowest score range. Tier 1: Short Term Tier 2: Middle Term Tier 3: Long Term Tier 4: Long Term (After Tier 3) Field data collection to collect current sidewalk presence and condition Street Classification Street Classification Score
34 Introduction Introduce 2-step sidewalk prioritization: Step 1: Address the needs Step 2: Geographic equity adjustment Validation: Compare results of Step 1 & Step 2 with: Test 1: Ratio of max and min of % sidewalk mileage by district Test 2: Manual planned sidewalk projects
35 Input Data Input Criteria Scoring Prioritized Recommendation Land Use Connection Score Stakeholder Input Land Use Mixed Land Use Index Score Planners and managers review Transit User Top 50 Bus Stops by Ridership Score Transit Connection Score Prioritizing road segments with sidewalk needs using geographic equity into Tiers. Connectivity Trail Connection Score Sidewalk Gap Score Total Score Tier 1 has the highest score range and Tier 4 has the lowest score range. Selecting road segments with sidewalk needs Socioeconomic Safety Worker With No Vehicle Score Household Poverty Score Pedestrian Crash Score Tier 1: Short Term Tier 2: Middle Term Tier 3: Long Term Tier 4: Long Term (After Tier 3) Field data collection to collect current sidewalk presence and condition Street Classification Street Classification Score
36 Methodology Step 1: Needs-based criteriacriteria Scoring Prioritized Step Scoring 2: Geographic Recommendation equity adjustment Land Use Connection Score Land Use Mixed Land Use Index Score Transit User Top 50 Bus Stops by Ridership Score Transit Connection Score Prioritizing road segments with sidewalk needs using geographic equity into Tiers. Connectivity Socioeconomic Trail Connection Score Sidewalk Gap Score Worker With No Vehicle Score Household Poverty Score Total Score Total Score Tier 1 has the highest score range and Tier 4 has the lowest score range. Tier 1: Short Term Tier 2: Middle Term Safety Pedestrian Crash Score Tier 3: Long Term Tier 4: Long Term (After Tier 3) Street Classification Street Classification Score
37 Land Use Transit User Land Use Connection Score Mixed Land Use Index Score Top 50 Bus Stops by Ridership Score Step 1: Needs-based criteria Transit Connection Score Connectivity Socioeconomic Trail Connection Score Sidewalk Gap Score Worker With No Vehicle Score Household Poverty Score Total Score Tier 1: points Tier 2: points Tier 3: points Tier 4: 9 16 points Safety Pedestrian Crash Score Street Classification Street Classification Score
38
39 Test 1: Percentage of Sidewalk mileage overall Roadway mileage by Tier by District District Score District 1 District 2 District 3 District 4 District 5 Max/ Min Tier Tier Tier Tier Unrated
40
41 Test 2: Number of short term planned sidewalk construction projects by tier by district District District 1 District 2 District 3 District 4 District 5 Total % Tier % Tier % Tier % Tier % Unrated %
42 Methodology Step 2: Geographic Equity Adjustment Adjusted priorities based on geographic equity Identify most needed project by city council districts Ensure that projects are sufficiently distributed throughout the city Avoid funding conflicts Avoid spotty and unconnected sidewalk development
43
44 Validation Test 1 Percentage of Sidewalk mileage overall Roadway mileage by Tier by District Tier 1 Tier 2 Tier 3 Tier 4 Unrated District District District District District Max/ Mean Min
45
46 Validation Test 2 Number of short term planned sidewalk construction projects by tier by district Tier 1 Tier 2 Tier 3 Tier 4 Unrated District District District District District Total %
47 Case Study 2 Conclusion Introduce 2-step prioritization method Identify most needed projects in all five districts, minimize funding conflicts between the districts, and reduce spotty and unconnected sidewalk development throughout the city Meet an acceptable validation target: 85% of planned sidewalk projects are in tier 1
48 Publication Plan: 2015 Bicycle, Pedestrian, Trails & Greenway Plan Update - Greensboro MPO Paper: TRB Accounting for Geographic Equity in Prioritizing Sidewalks
49 Big Picture Conclusions GIS automation helps a lot to systematically implement conceptual evaluation schemes GIS models can identify high need locations that are reasonably consistent with manual methods Thinking through criteria and weights is the most important part validation is important GIS models can eliminate a good bit of the work required for manual methods for sidewalk prioritization Even so, some manual interpretations & field work will always be needed on the back end
50 THANK YOU! Contact: Tyler Meyer, AICP Tram Truong, GISP
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015 Overview Transportation Alternatives Program (TAP) overview MPO TAP Scoring
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationThe Georgia CMAQ Program. Practice Makes Perfect
The Georgia CMAQ Program Practice Makes Perfect Outline Georgia s Air Quality Georgia s CMAQ Process Prioritized Projects Project Mix Georgia and Air Quality Out of the 6 pollutants measured by EPA, Georgia
More information2030 Multimodal Transportation Study
2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study
More informationresidents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by
2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there
More informationPlanning for Future Mobility In a Performance-Based World Steven Gayle, PTP
Planning for Future Mobility In a Performance-Based World Steven Gayle, PTP September 26, 2018 MPOs at the Intersection 2 Performance-Based Planning New planning paradigm introduced in MAP-21 MPOs and
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationUS 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More information2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016
2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)
More informationCity of Pacific Grove
Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal
More informationNeeds and Community Characteristics
Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by
More informationMetro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner
Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning
More informationRevised Evaluation Scores. System Preservation
Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program
More informationCommunity Advisory Committee. October 5, 2015
Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical
More informationDixie Transportation Planning Office
A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation
More informationTo Infill or Not to Infill?
To Infill or Not to Infill? Mark Fuhrmann Program Director, Rail New Starts Metropolitan Council/Metro Transit MarySue Abel Deputy Project Director, METRO Blue Line Extension Metropolitan Council/Metro
More information6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION
June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationChapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle
Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationFresno County. Sustainable Communities Strategy (SCS) Public Workshop
Fresno County Sustainable Communities Strategy (SCS) Public Workshop Project Background Senate Bill 375 Regional Transportation Plan (RTP) Greenhouse gas emission reduction through integrated transportation
More informationUTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018
UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms
More informationHennepin County Transit Oriented Development Program. The Ellipse, St. Louis Park, 2009
Hennepin County Transit Oriented Development Program The Ellipse, St. Louis Park, 2009 What is Transit Oriented Development (TOD)? Development within walking distance of transit Typically ¼ to ½ mile 10
More informationSUPPORTING TOD IN METRO CHICAGO
www.rtachicago.org SUPPORTING TOD IN METRO CHICAGO Tuesdays at APA November 18, 2014 OVERVIEW OF RTA 2 11/18/2014 Tuesdays at APA: Supporting TOD in Metro Chicago RTA Region 8.5 million people 3,700 square
More informationGreen Line Long-Term Investments
Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect
More informationTRAFFIC CALMING PROGRAM
TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic
More informationKing County Metro. Sustainably and equitably achieving a zero-emission fleet
King County Metro Sustainably and equitably achieving a zero-emission fleet Agenda Background Purpose Service area Fleet size Climate goals Process Stakeholder engagement Analyses Service Equity Final
More informationSales and Use Transportation Tax Implementation Plan
Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,
More informationCITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan
Date: Wednesday, June 18, 2014 Location: Ann Arbor District Library Attendees: 14 citizen attendees Ann Arbor Station Environmental Review Citizen Working Group Meeting Notes Meeting #3 The third meeting
More informationTempe Streetcar. March 2, 2016
Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use
More informationTRAVEL DEMAND FORECASTS
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components
More informationHarrisburg Station Location Study. Allan Paul Deputy Director NCDOT Rail Division 9 th February 2015
Harrisburg Station Location Study Allan Paul Deputy Director NCDOT Rail Division 9 th February 2015 NCDOT Rail Division Who We Are Six state-supported passenger trains Carolinian: Charlotte - Raleigh -
More informationSubarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.
Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay
More information2030 Comprehensive Plan Goals, Objectives, and Policies Mobility Working Document
TRANSPORTATION ELEMENT 2030 Comprehensive Plan Goals, Objectives, and Policies Mobility Working Document GOAL 1 The City shall utilize Quality/Level of Service standards which meet the Florida Department
More informationTEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035)
TEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035) Helping shape the future of rural Texas Texas Rural Transportation Plan 2035 Texas Rural Transportation Plan 2035 What is it? Component of the Statewide
More informationCITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan
Date: Wednesday, June 24, 2014 Location: Ann Arbor District Library Attendees: 40 citizen attendees Ann Arbor Station Environmental Review Public Meeting Meeting Notes Meeting #2 The second public meeting
More informationSFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000
SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST
More informationParking Management Element
Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking
More informationWest Broadway Reconstruction/LRT Design. March 19, 2015
West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian
More informationSan Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors
Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &
More informationExecutive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1
Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line
More informationMidtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014
Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results
More informationWilliamson County Projects
Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin
More informationTHE CITY OF CHATTANOOGA SMART TRANSPORTATION SYSTEMS
THE CITY OF CHATTANOOGA SMART TRANSPORTATION SYSTEMS SMART TRANSPORTATION SYSTEMS What comes to mind when we mention the term Smart Transportation? or its more generic term ITS. (Intelligent Transportation
More informationMetra Milwaukee District West Line Transit-Friendly Development Plan
Metra Milwaukee District West Line Transit-Friendly Development Plan Community Input Workshop April 6, 2011 Overview of Presentation Workshop Goals Study Context Existing Conditions Market Overview Employment
More informationAn Introduction to Automated Vehicles
An Introduction to Automated Vehicles Grant Zammit Operations Team Manager Office of Technical Services - Resource Center Federal Highway Administration at the Purdue Road School - Purdue University West
More informationGeneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan
Geneva, 67th SC.2 Session 23 25 October 2013 High Speed Trains Master Plan Work Package I Work Package II Work Package III Project Management Review of related Work Socio economic framework of the ECE
More informationSpeaker Information Tweet about this presentation #TransitGIS
Making the Case for Transit: the Transit Competitiveness Index Title William E. Walter, GISP Speaker Information Tweet about this presentation #TransitGIS Understanding Conditions in Each Travel Market
More informationLetter EL652 City of Mercer Island. Page 1. No comments n/a
Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists
More informationElectric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018
Electric Vehicle Infrastructure Location Tool and Visualization Map Version 2.0 Analysis Summary July 17, 2018 Contents Electric Vehicle Fast Charging Infrastructure Planning Tools Overview & Analysis
More informationMPO Staff Report Technical Advisory Committee: July 12, 2017
MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationLEED v4 Building Design and Construction Quiz #3 LT
LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance
More informationGreen Line LRT: Beltline Segment Update April 19, 2017
Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street
More informationReston Transportation Strategy July 9, 2018
Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset
More informationHighway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM
Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious
More informationArt Griffith, Capital Projects Manager, ,
Part 1 Base Information 1. Project Title Broadway & Highlands Ranch Pkwy. Intersection Capacity and Safety Improvement Project 2. Project Start/End points or Geographic Area Provide a map with submittal,
More informationTier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis
LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST
More informationDEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY
APPENDIX 1 DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY INTRODUCTION: This Appendix presents a general description of the analysis method used in forecasting
More informationDRAFT Evaluation Scores. Transit
DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per
More informationMarch 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming
COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What
More informationThe City of Toronto s Transportation Strategy July 2007
The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects
More informationWAKE TRANSIT PLAN Summer 2018
WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationCity of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County
Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE
More informationAgenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan
Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.
More informationAppendix C. Parking Strategies
Appendix C. Parking Strategies Bremerton Parking Study Introduction & Project Scope Community concerns regarding parking impacts in Downtown Bremerton and the surrounding residential areas have existed
More informationArterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014
Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationOverview of Transit Funding and Planning in the PACTS Region
Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities
More informationMajor Widening/New Roadway
Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information
More informationBrainstormed Solutions - Passenger
1-1a Air / Exand: Expand capacity (runway lengths) at BG airport (LOW) find solution! 1-1b Air / fuel: Improve fuel availabilty and reduce cost (LOW) Sound Walls X X X Reduce scatter lighting - more focused
More informationCTA Blue Line Study Area
CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING
More informationMOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project
MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation
More informationExhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup
Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting
More informationTransportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1
Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network
More informationThe Screening and Selection of Regionally Significant Projects
The Screening and Selection of Regionally Significant Projects UTC 2018 Seminar Series March 15, 2018 Claire Bozic Martin Menninger ON TO 2050 CMAP is the Region s MPO, seven county region Land use and
More informationAttachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.
Attachment 5 High Speed Transit Planning Study Prepared by: City of Edmonton Transportation Planning Branch Stantec Consulting Ltd. Transportation Management & Design, Inc. with Lea Consulting Ltd. [135-35130]
More informationCity of Salem. Transportation Systems Development Charge Update
Final Report City of Salem Transportation Systems Development Charge Update June 2, 2008 Public Works Department Transportation Services Division Transportation System Development Charge Update Project
More informationTRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT
MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION
More informationWelcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,
Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present
More informationDFW HSR Station Plans People Movers Hyperloop
DFW HSR Station Plans People Movers Hyperloop Transit-Oriented Development Task Force Meeting May 1, 2018 Automated Transportation Systems (People Movers) Traditional People Movers Fixed, Closed Guideways
More informationUS 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017
US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master
More information2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018
Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)
More informationJanuary Final. Phase 2 Initial Screening Memorandum
January 2018 Final Phase 2 Initial Screening Memorandum This page intentionally left blank Table of Contents 1. Introduction... 1 1.1 Project Area, Context, and Description... 1 1.2 Study Evaluation Process
More informationCOMMISSION WORKSHOP Tuesday, May 12, :00 a.m. 12:00 p.m.
COMMISSION WORKSHOP Tuesday, 9:00 a.m. 12:00 p.m. AGENDA 1. Approval of the April 30, 2009 Workshop Minutes 2. Community Redevelopment Agency a. CRA Master Plan Update b. Downtown Parking Study 3. Economic
More informationCall for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee
Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee July 18, 2018 Formula Coordination DRCOG under review, considering FHWA toolkit RAQC Argonne
More information2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN
2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated
More informationTroost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More information