Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Size: px
Start display at page:

Download "Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County."

Transcription

1 Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No

2 Table of Contents Introduction... 1 Forecast Methodology and Assumptions... 3 Development Assumptions... 3 Roadway Network Assumptions... 6 Roadway Network Alternatives... 8 Forecast Analysis Results... 1 Subarea Study Forecasts... 1 Comparison with Previously Published Forecasts... 1 Manning Avenue to/from TH 5 Travel Pattern Shifts Alternative 1 vs. No Build Alternative 2 vs. No Build Alternative 3 vs. No Build Alternative 4 vs. No Build Alternatives Evaluation... 2 Alternatives Evaluation Summary... 2 Criteria 1: Vehicle Miles and Vehicle Hours Traveled (VMT and VHT) Criteria 2: Safety Criteria 3: Arterial Roadway Capacity Criteria 4: Local Intersection Operations Criteria 5: System Plan Consistency Selection of Preferred Alternative Appendix Soceioeconmic Data (SE Data) for Traffic Forecasts H:\Projects\8141\TP\Sub Area Study\ CSAH 15 SubareaStudy.docx Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project i SRF Consulting Group, Inc.

3 Introduction The purpose of this Manning Avenue County State Aid Highway (CSAH) 15 Corridor Management and Safety Improvement Project Subarea Study is to identify, evaluate, and recommend roadway network improvements that best meet the goals and objectives defined by the project team. This is done by using the subarea study findings and results to assess the potential benefits or challenges from an overall system perspective. Manning Avenue is a north-south minor arterial roadway that serves as a primary connection for many resident and business patrons along the corridor and throughout Washington County. The subarea study area depicted in Figure 1 includes the general area bounded by Trunk Highway (TH) 36 to the north, I-694 to the west, I-94 to the south, and TH 95 to the east. The primary project goals and objectives identified for this subarea study include: Improve the safety and operation of the corridor by enhancing alignments, profiles, and geometrics while considering alternative intersection control types. Provide adequate near- and long-term capacity while maintaining the viability of commercial and residential growth along the Manning Avenue corridor. Provide system continuity by developing Manning Avenue as a north-south arterial in Washington County from I-94 to TH 36. Maintain consistency with local comprehensive plans. This subarea study forms the basis for the traffic operations analysis, environmental documentation, and the development of corridor concept layouts. This study documents the methodology, assumptions, network alternatives analysis, and results used for the selection of the preferred alternative. Based on the goals and objectives identified, the project team recommends the following roadway network alternatives: The expansion of Manning Avenue from two-lane undivided roadway to four-lane divided roadway between TH 5 and CSAH 1 in the study area. The realignment of TH 5 at Manning Avenue and CSAH 14. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 1 SRF Consulting Group, Inc.

4 Subarea Freeway Link & Interchange Volumes? ( 12 ( 11 GoWX ( 1 ( 17 Arterial Study %&h( Intersection Turning Movement Counts & Approach Volumes ( 9 ( 16 ( 15 ( 14?öA@ J:\Maps\8141\mxd\Figure1_SubareaStudyArea.mxd "b$ Hudson Blvd Intersection Turning Movement Counts (( 7 8 ( 6 ( ( 5 4 ( 13 3 ( 2 ( 1?öA@ Freeway Link & Interchange Volumes 1 2 Miles [ Subarea Study Area Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County, MN Figure 1

5 Forecast Methodology and Assumptions Year 23 daily traffic forecasts for this subarea study were developed using the Washington County Regional Travel Demand Model (Model). The previous base year 25 was updated to year 21 to include recently available data, which provides a more current basis for traffic forecast development. The model was refined in the study area to include additional transportation analysis zone (TAZ) and roadway network detail. Daily traffic volumes were validated based on the degree to which the model replicates known field counts. Future socioeconomic and roadway system data was incorporated to predict future conditions. Future year 23 volumes were adjusted consistent with the method described in NCHRP 255: Highway Traffic Data for Urbanized Area Project Planning and Design. Development Assumptions Year 21 population and household values used are 21 U.S. Census block-level data aggregated to study area TAZ. Year 21 employment estimates are based on city-level MnDEED data, Metropolitan Council employment datasets, past forecasts, and visual inspection of aerial maps. Year 23 population, household, and employment data was based on local comprehensive plans and the growth sub-allocation within the study area was based on future land use plans. The TAZ demographic forecast allocations are generally consistent with the published local comprehensive plans. In some cases year 21 U.S. Census information resulted in existing totals that exceed 23 values and zone-level adjustments were made where necessary to reallocate development to maintain growth in each TAZ. All municipal development forecasts were assumed consistent with the Metropolitan Council Year 23 Regional Development Framework as of January 212. Year 21 and year 23 development assumptions are included in Table 1 for the three study area communities (see Figures 2 and 3). Detailed socioeconomic data (SE Data) is provided as an Appendix. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 3 SRF Consulting Group, Inc.

6 Year Growth ? A@ %&h( GoWX ?öA@ Legend CSAH 15 Corridor Municipal Boundaries Household Growth J:\Maps\8141\mxd\Figure2_LandDevelopmentAssumptions.mxd "b$ ?öA@ [ 1 2 Miles Land Development Assumptions (Households) Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 2

7 Year Growth? A@ %&h( 2 GoWX?öA@ Legend CSAH 15 Corridor Municipal Boundaries Employment Growth J:\Maps\8141\mxd\Figure3_Land Development Assumptions.mxd 169 1,8 2,432 "b$ 1,665 4,312?öA@ ,312 [ 1 2 Miles Land Development Assumptions (Employment) Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 3

8 Table 1. Year 21 and Year 23 Development Assumptions Households Employment Study Area Community Year 21 Year 23 Percent Change Year 21 Year 23 Percent Change Lake Elmo 2,776 8, % 1,941 14, 621% Baytown Township % % West Lakeland Township 1,286 1,51 17% % The Metropolitan Council has released preliminary growth forecasts for the year 24 in conjunction with its Thrive MSP 24 planning process. The Council anticipates a slowing pace of growth in the region. Formal adoption of the Thrive 24 plan and its forecasts is expected later in 214. Roadway Network Assumptions Year 23 roadway network assumptions include transportation investments identified as funded in the Minnesota State Transportation Improvement Program, the Washington County Capital Improvement Plan, and the City of Lake Elmo Capital Improvement Plan. All study area programmed and non-programmed transportation improvements are identified in Figure 4; however, only the programmed projects identified in red were included in the year 23 network for the purposes of forecasting future traffic volumes. All development and roadway improvement assumptions were reviewed and approved by the project team prior to conducting the future year analysis. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 6 SRF Consulting Group, Inc.

9 Intersection of TH 36 & Hilton Trail converted to an interchange Intersection of TH 36 & Demontreville Trail converted from a full access to a 3/4 intersection with U-turn medians TH 36 South Frontage Road Study Existing river crossing closed to motor vehicle traffic TH 36 & Century Ave Intersection Improvements?ÇA@ Intersection improvements at TH 36 & Lake Elmo Ave and TH 36 & Manning Ave? A@ TH 36 signalized intersections at Osgood Ave, Greeley St, and Washington Ave remain at-grade. Minor intersection improvements were included to the frontage road system. Construct St. Croix river bridge TH 36 & Hadley Ave Intersection Improvements CSAH 17 Potential Safety and Capacity Improvements GnWX GuWX?öA@ J:\Maps\8141\mxd\Figure4_Roadway Network Assumptions.mxd Gateway Transitway Corridor %&h( GlWX "b$ Construct 5th Street from CSAH 13 to CSAH 15 GsWX GqWX GoWX?öA@ GiWX 3th Street Potential Roadway Enhancements Future Park-and-Ride Facility (55 spaces) Legend Programmed Improvements (Assumed in 23 No Build) Non-Programmed Improvements (Not assumed in 23 No Build) Manning Avenue (CSAH 15) Corridor Metropolitan Urban Service Area Miles [ Roadway Network Assumptions Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 4

10 Roadway Network Alternatives Based on the goals and objectives identified for this subarea study, four roadway improvement alternatives were identified for the subarea analysis and evaluation (see Figure 5). Additionally, the No Build was included as a point of comparison which includes the non-programmed improvements previously identified. Also, the remaining two-lane portion of TH 5 north of Manning Avenue near TH 36 was assumed to be a fourlane facility for comparison purposes between Alternatives 2 and 3. The four build alternatives are described in Table 2. Table 2. Roadway Network Alternatives Alternative Description 1 Realignment of TH 5 at Manning Avenue and CSAH 14 2 Expansion of Manning Avenue from two-lane undivided roadway to four-lane divided roadway between TH 5 and CSAH 1 in the study area 3 4 Realignment of TH 5 at Manning Avenue and CSAH 14 Expansion of Manning Avenue from two-lane undivided roadway to four-lane divided roadway between TH 5 and CSAH 1 in the study area Local improvements related to the I-94 development area and improvements southeast of Lake Elmo Old Village Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 8 SRF Consulting Group, Inc.

11 J:\Maps\8141\mxd\Figure 5_Roadway Alternatives.cdr Alternatives 2 and 3 Assume 4-lane Facility from CSAH 15 to TH 36 Approximate Locations Actual Locations to be Determined LEGEND - Realignment Improvements for Alternatives 1 and 3-4-Lane Facility Improvements for Alternatives 2 and 3 - Local Connections for Alternative 4 Roadway Network Alternatives Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 5

12 Forecast Analysis Results Subarea Study Forecasts Year 23 daily traffic forecasts were developed for the network alternatives and for the No Build (see Figures 6 through 1). The following reasonableness checks were applied to review the traffic forecasts. Comparison with Previously Published Forecasts Subarea study forecasts were reviewed for consistency with the following previously published forecasts: City of Lake Elmo Year 23 Comprehensive Plan Washington County Year 23 Comprehensive Plan TH 36/Lake Elmo Avenue Intersection Improvement Project No Build traffic forecasts on Manning Avenue range from 15, to 28, vehicles per day (vpd). This is consistent with No Build traffic forecasts published in the Lake Elmo and Washington County Comprehensive Plans. Manning Avenue forecasts for Alternative 3, which includes both the expansion of Manning Avenue and realignment of TH 5, are expected to increase to between 25, and 35, vpd. This is also consistent with traffic forecasts of 25, to 28, vpd published in the Lake Elmo Comprehensive Plan. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 1 SRF Consulting Group, Inc.

13 38,5 3,5 (9,1) 18,6 (24,) 36, (61,) 2,9 (33,) 3, (48,) #,### - 21 AADT (#,###) - 23 No Build AADT Manning Avenue (CSAH 15) Study Corridor J:\Maps\8141\mxd\Figure6_ForecastNoBuild.mxd 67, (86,) 71, (9,) %h GlWX 7,1 (16,7) b 11,7 (21,) 89, (119,)? A@ GsWX 9,6 (34,) GqWX 69 (2,3) 4,45 (11,2) 1,5 4,1 73 (17,5) (11,8) (2,8) 86 (3,) 1,7 (17,) 3,6 (11,) 1,15 (1,9) GqWX 68 (4,1) 16,8 (25,) 3,7 (6,2) 11,5 1,45 (18,3) (15,5) 1,7 4,1 (16,6) (11,7) 4,3 (6,1) 5,2 11,87 (1,) (2,) 3,45 (5,8) 13,6 (27,5) (5,9) 78 (7,5) 13,3 (34,)?öA@ GoWX 1,6 (2,) GnWX 4,8 (9,6) (3,8) 2,8 (8,1) 1,95 (5,7) GiWX GuWX 2,85 (5,9) Under Capacity Approaching Capacity Over Capacity?öA@ [ 1 2 Miles Copyright: 213 Esri, DeLorme, NAVTEQ Existing and Year 23 No Build Daily Traffic Forecasts Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 6

14 (24,) (53,) (61,) [+3] [+4] [+4] (33,) (9,1) [] (48,) [-5] (#,###) - 23 No Build AADT [###] - Delta Manning Avenue (CSAH 15) Study Corridor J:\Maps\8141\mxd\Figure7_ForecastScenario1.mxd (86,) [+5] (9,) [-3] %h GlWX (16,7) [] b (21,) [-8] (119,) [+3]? A@ GsWX (34,) [] GqWX (11,8) [-16] GqWX (2,3) [] (1,9) [] (11,7) [-5] (5,9) [-4] (11,2) [-15] (2,8) [+5] (3,) [+5] (11,) [-5] (6,1) [+4] (5,8) [] (7,5) [] (34,) []?öa@ (4,1) [+3] (25,) [-17] (18,3) (6,2) [-31] [+5] (15,5) [+22] (17,5) [+17] (17,) [+8] GoWX (1,) [] (2,) [+1] (27,5) [+9] (2,) [] (16,6) [+8] GnWX (9,6) [] (3,8) [] (8,1) [] (5,7) [] GiWX GuWX?öA@ (5,9) [] Under Capacity Approaching Capacity Over Capacity New Roadway [ 1 2 Miles Copyright: 213 Esri, DeLorme, NAVTEQ Year 23 Alternative 1 Daily Traffic Forecasts Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 7

15 (53,) (9,1) [] (61,) [] (24,) [+14] (33,) [+27] (48,) [] (#,###) - 23 No Build AADT [###] - Delta Manning Avenue (CSAH 15) Study Corridor J:\Maps\8141\mxd\Figure8_ForecastAlternative2.mxd (86,) [-7] (9,) [-12] %h GlWX (16,7) [-7] b (21,) [-5] (119,) [+9]? A@ GsWX (34,) [] (5,9) [-3] GqWX (11,8) [-17] (11,) [-24] GqWX (11,2) [-22] (3,) [] (1,9) [+3] (11,7) [-19] (4,1) [-6] (25,) [+59] (18,3) (2,3) [-16] [+3] (2,8) [] (6,1) [+8] (5,8) [] (7,5) [-3] (17,5) [+93] (17,) [+12] (34,) []?öa@ (6,2) [+13] (15,5) [+93] GoWX (2,) [+49] (27,5) [+47] (2,) [] (16,6) [+13] (1,) [-21] GnWX (9,6) [-18] (3,8) [-4] (8,1) [-18] (5,7) [-15] GiWX GuWX?öA@ Under Capacity Approaching Capacity Over Capacity (5,9) [-11] [ 1 2 Miles Copyright: 213 Esri, DeLorme, NAVTEQ Year 23 Alternative 2 Daily Traffic Forecasts Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 8

16 (53,) (9,1) [] (61,) [] (24,) [+12] (33,) [+24] (48,) [] (#,###) - 23 No Build AADT [###] - Delta Manning Avenue (CSAH 15) Study Corridor J:\Maps\8141\mxd\Figure9_ForecastAlternative3.mxd (86,) [] (9,) [-19] %h GlWX (16,7) [-9] b (21,) [-15] (119,) [+15]? A@ GsWX (34,) [] GqWX (11,2) [-34] (11,8) (2,8) [-3] [+4] (3,) [+4] (11,) [-32] GqWX (11,7) [-26] (5,9) [-4] (1,9) [+4] (6,1) [+15] (7,5) [-5] (5,8) [] (34,) [+3] (4,1) [-5] (25,) [+48] (18,3) (6,2) (2,3) [-45] [+18] [+4] (15,5) [+12] (17,5) [+116] (17,) [+121]?öA@ GoWX (2,) [] (16,6) [+121] (1,) [-2] (2,) [+61] (27,5) [+59] (3,8) [-6] GnWX (9,6) [-17] (8,1) [-15] (5,7) [-14] GiWX (5,9) [-1] GuWX?öA@ Under Capacity Approaching Capacity Over Capacity New Roadway [ 1 2 Miles Copyright: 213 Esri, DeLorme, NAVTEQ Year 23 Alternative 3 Daily Traffic Forecasts Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 9

17 (53,) (9,1) [] (24,) (61,) [] [] (33,) [] (48,) [] (#,###) - 23 No Build AADT [###] - Delta Manning Avenue (CSAH 15) Study Corridor Under Capacity J:\Maps\8141\mxd\Figure1_ForecastAlternative4.mxd (86,) [] (9,) [] %h GlWX (16,7) [] b (21,) [] (119,) []? A@ GsWX (34,) [] (5,9) [-5] GqWX (11,2) [-2] (11,8) [-2] GqWX (11,7) [] (4,1) [] (25,) [] (6,2) (2,3) [] [] (18,3) [+1] [+54] (2,8) [+2] (3,) [+2] (11,) [] (1,9) [] (6,1) [-5] (2,) (5,8) [+5] [+26] (7,5) [-21] (17,) [] (17,5) [-2] (16,6) [] (1,) [] (34,) []?öa@ (15,5) [-2] GoWX (27,5) [+12] (2,) [] GnWX (9,6) [] (3,8) [] (8,1) [] (5,7) [] GiWX GuWX?öA@ (5,9) [] Approaching Capacity Over Capacity New Roadway [ 1 2 Miles Copyright: 213 Esri, DeLorme, NAVTEQ Year 23 Alternative 4 Daily Traffic Forecasts Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County Figure 1

18 Manning Avenue to/from TH 5 Travel Pattern Shifts Understanding probable travel pattern shifts for the Manning Avenue to/from TH 5 movement provided a better understanding of the travel markets changes caused by each network alternative. Additionally, the travel pattern shifts were used to inform the development of peak hour volumes for a traffic operations analysis. The following summarizes the key travel pattern shifts for each alternative. Alternative 1 vs. No Build The realignment of TH 5 at Manning Avenue and CSAH 14 results in an additional 4,4 daily trips making the Manning Avenue to/from TH 5 movement compared to the No Build (see Figure 11). These are typically longer distance trips and without the realignment, most of these trips would use Lake Elmo Avenue with some on TH 5 and the north/south roadways east of Manning Avenue. A portion of these trips would then be backfilled by shorter distance trips currently using other routes. The realignment provides improved north/south continuity by creating a more direct route for north/south oriented trips; however, Manning Avenue capacity is not adequate to meet the forecast traffic demand with this alternative. Figure 11. Manning Avenue to/from TH 5 Travel Pattern Shifts - Alternative 1 vs. No Build Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 16 SRF Consulting Group, Inc.

19 Alternative 2 vs. No Build The expansion of Manning Avenue from a two-lane undivided roadway to a four-lane divided roadway between TH 5 and CSAH 1 in the study area results in an additional 7,6 daily trips making the Manning Avenue to/from TH 5 movement compared to the No Build (see Figure 12). These are typically longer distance trips and without the Manning Avenue expansion, most of these trips would use Lake Elmo Avenue with some on TH 5 and the north/south roadways east of Manning Avenue. A portion of these trips would then be backfilled by shorter distance trips currently using other routes. The additional capacity on Manning Avenue is better able to meet the forecast traffic demand with this alternative; however, Manning Avenue lacks north/south continuity since it terminates into TH 5. Figure 12. Manning Avenue to/from TH 5 Travel Pattern Shifts - Alternative 2 vs. No Build Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 17 SRF Consulting Group, Inc.

20 Alternative 3 vs. No Build The realignment of TH 5 and the expansion of Manning Avenue to a four-lane divided roadway between TH 5 and CSAH 1 in the study area results in an additional 12, daily trips making the Manning Avenue to/from TH 5 movement compared to the No Build (see Figure 13). These are typically longer distance trips and without the improvements, most of these trips would use Lake Elmo Avenue with some on TH 5 and the north/south roadways east of Manning Avenue. A portion of these trips would then be backfilled by shorter distance trips currently using other routes. The additional capacity on Manning Avenue is better able to meet the forecast traffic demand and the realignment of TH 5 provides improved north/south continuity with this alternative. Figure 13. Manning Avenue to/from TH 5 Travel Pattern Shifts - Alternative 3 vs. No Build Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 18 SRF Consulting Group, Inc.

21 Alternative 4 vs. No Build The addition of an east/west collector between CSAH 13 and Manning Avenue and the local connection between 3th Street North and TH 5 would result in local traffic pattern shifts that would not have significant changes in regional traffic patterns compared to the No Build (see Figure 14). The east/west collector is forecasted to serve 2,6 vpd. These trips would shift from Hudson Road and CSAH 1. The local connection between 3th Street North and TH 5 is forecasted to serve 5,4 vpd. These trips would shift from Manning Avenue and Lake Elmo Avenue. Figure 14. Manning Avenue to/from TH 5 Travel Pattern Shifts - Alternative 4 vs. No Build Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 19 SRF Consulting Group, Inc.

22 Alternatives Evaluation To assist with this subarea analysis, evaluation criteria were developed to compare the roadway network alternatives. The No Build represents the existing and programmed conditions. Factors such as environmental impacts, mitigation options, and right-of-way impacts were not directly included in this analysis. These will be considered as a part of the environmental documentation and development of corridor concept layouts. The following identifies the criteria developed: 1. Vehicle Miles and Vehicle Hours Traveled (VMT and VHT) 2. Safety 3. Arterial Roadway Capacity 4. Local Intersection Operations 5. System Plan Consistency Information used for this analysis was developed based on the travel demand model. Alternatives Evaluation Summary Table 3 summarizes the alternatives evaluation. As shown in Table 3, the alternatives were given a rating of good, fair, or poor based on how they compared to the No Build with respect to the evaluation criteria. A rating of good identifies a high improvement, comparatively between alternatives, over the No Build. A rating of fair indicates medium improvement over the No Build. A rating of poor indicates no improvement or a decline in service over the No Build. More details of the evaluation process are provided following Table 3. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 2 SRF Consulting Group, Inc.

23 Table 3. Alternatives Evaluation Summary Alternative Criteria 1 (VMT and VHT) Criteria 2 (Safety) Criteria 3 (Arterial Roadway Capacity) Criteria 4 (Local Intersection Operations) Criteria 5 (System Plan Consistency) 1 Poor-Fair Poor-Fair Poor Good Poor-Fair Realignment of TH 5-95 VMT (<.1%) -1 VHT (<.1%) Expected Rate = 1.3/MEV No Build = 1.31/MEV Does not provide adequate capacity on Manning Ave Improves peak hour volume imbalance at TH 5 and Manning Avenue Realignment is consistent but no Manning Ave expansion or local connections are included 2 Fair Good Fair Poor Fair Expansion of Manning Avenue to four-lane divided +1,8 VMT (.3%) -1,16 VHT (1.2%) Expected Rate =.86/MEV No Build = 1.31/MEV Provides adequate capacity on Manning Ave but minimal local roadway congestion relief Does not improve peak hour volume imbalance at TH 5 and Manning Avenue Manning Ave expansion is consistent but no realignment or local connections are included 3 Fair Good Good Good Good Realignment of TH 5 and Expansion of Manning Avenue +11,65 VMT (.4%) -1,19 VHT (1.2%) Expected Rate =.86/MEV No Build = 1.31/MEV Provides adequate capacity on Manning Ave and local roadway congestion relief Improves peak hour volume imbalance at TH 5 and Manning Avenue Realignment and Manning Ave expansion are consistent but no local connections are included 4 Poor Poor Poor Poor Poor Local Improvements Negligible change in VMT and VHT Expected Rate = 1.31/MEV No Build = 1.31/MEV Does not provide adequate capacity on Manning Ave Does not improve peak hour volume imbalance at TH 5 and Manning Avenue Realignment and Manning Ave expansion are not consistent; only local connections are included

24 Criteria 1: Vehicle Miles and Vehicle Hours Traveled (VMT and VHT) Goal: Measure: Promotes system efficiency by minimizing VMT and VHT VMT and VHT Changes in annual vehicle operations were analyzed to assess the change in overall system efficiency as measured by VMT and VHT (see Table 4). VMT and VHT estimates for the subarea were developed using the travel demand model and the alternatives were compared to the No Build and rated based on their ability to reduce VMT and VHT (see Table 5). Table 4. Criteria 1 Summary Alternative Rating 1 Realignment of TH 5 Poor-Fair 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue Fair Fair 4 Local Improvements Poor Alternative 1 shows a minor reduction of 95 VMT and 1 VHT over the No Build. This reduction results from improved north\south continuity of Manning Avenue. Vehicles previously required to turn from TH 5 to Manning Avenue are now provided with a continuous turn-free trip between TH 36 and I-94 resulting in shorter trip length and slightly reduced trip travel times. Alternative 2 shows an increase of 1,8 VMT and a decrease of 1,16 VHT over the No build. This VMT increase results from trips shifting to the expanded Manning Avenue mainly from the two-lane facilities of Lake Elmo Avenue and TH 5. This VHT decrease also results from trips shifting to the expanded Manning Avenue. Trips shifting to Manning Avenue experience a longer trip length but achieve reductions in trip travel time. Overall, VMT increases of less than a half percent are expected on the four-lane divided facilities such as Manning Avenue with reductions expected on the existing two-lane facilities. Similar to Alternative 2, Alternative 3 shows an increase of 11,65 VMT and a decrease of 1,19 VHT over the No Build. Alternative 3 VMT and VHT increases exceed the sum of VMT in Alternatives 1 and 2 due to system synergies resulting from implementation of both the expansion and realignment improvements. Alternative 4 shows no significant change in VMT or VHT since the local roadway improvements only provide localized travel patterns shifts. Table 5. VMT and VHT Analysis Alternative VMT (Change from No Build) VHT (Change from No Build) 1 Realignment of TH 5 3,175,15 (-95) 95,85 (-1) 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue 3,186,9 (+1,8) 94,7 (-1,16) 3,187,75 (+11,65) 94,67 (-1,19)

25 Criteria 2: Safety Goal: Measure: Improve the overall safety of the corridor Expected Crash Rate Changes in expected crash rates with respect to crash reductions by facility type were analyzed to assess the change in the overall safety of the corridor (see Table 6). Future expected crash rates assuming no improvements to the corridor were determined for the existing two-lane and four-lane segments of the corridor. Future expected crash rates were also determined assuming the alternative improvements. The expected crash reductions were obtained from the FHWA Desktop Reference for Crash Reduction Factors assuming the installation of a median and the installation of an additional lane (see Table 7). The alternatives were rated based on their expected crash rates following the improvements. Table 6. Criteria 2 Summary Alternative Rating 1 Realignment of TH 5 Poor-Fair 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue Good Good 4 Local Improvements Poor Alternatives 1 and 4 are not expected to have a significant reduction in the expected crash rate compared to the No Build given no improvements are assumed along Manning Avenue and minimal traffic volumes shifts are expected with these alternatives. Alternatives 2 and 3 are expected to have a reduction in the expected crash rates compared to the No Build due to the improvements associated with these alternatives. Although these alternatives are expected to attract higher volumes to Manning Avenue, the crash rates are expected to be the lowest compared to the other alternatives. Improved safety of the corridor will also be achieved by enhancing alignments, profiles, and geometrics while considering alternative intersection control types.

26 Table 7. Segment Crash Analysis Existing Two-lane Section Data No Build Alternative 1 Alternative 2 Alternative 3 Alternative 4 Average AADT 16,65 18,25 26,425 28,6 15,65 Segment Length (mi) VMT (5-year) 14,528,7 113,16,95 165,896,15 179,55,8 98,25,7 Existing Crash Rate Future Expected Crashes (existing rate) Crash Reduction Percentage (addition of lane and median) % % 55% 55% % Future Expected Crashes (new rate) Existing Four-lane Section Average AADT 23,75 24,7 28,55 29,75 24,6 Segment Length (mi) VMT (5-year) 36,842,188 38,315,875 44,288,188 46,149,688 38,16,75 Existing Crash Rate Future Expected Crashes (existing rate) Future Expected Crashes (new rate) Entire Corridor Total Future Expected Crashes Total VMT (5-year) 141,37, ,476,825 21,184, ,7, ,411,45 Total Future Expected Crash Rate

27 Criteria 3: Arterial Roadway Capacity Goal: Measure: Improve arterial roadway capacity Daily Volumes and Volume-to-Capacity Ratio (V/C) Changes in daily volumes were analyzed to assess the change in overall system efficiency (see Table 8) as measured by volume shifts by facility type (see Table 9) and the volume-to-capacity of the facility (see Figure 15). Green depicts roadways expected to be under capacity in year 23; yellow depicts roadways expected to be approaching capacity; and, red depicts roadways that are expected to be over capacity. Daily volume forecasts for the subarea were developed using the travel demand model and the alternatives were compared to the No Build and rated based on their ability to balance volumes in the network without overloading roadways in Lake Elmo, Baytown Township, and West Lakeland Township. Table 8. Criteria 3 Summary Alternative Rating 1 Realignment of TH 5 Poor 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue Fair Good 4 Local Improvements Poor Alternative 1 is expected to have a net increase in daily volume ranging from 8 to 2,2 vpd along Manning Avenue in the study area compared to the No Build; however, Manning Avenue capacity is not adequate to meet the forecast traffic demand with this alternative. Alternative 2 is expected to have a net increase in daily volume ranging from 4,7 to 1,3 vpd along Manning Avenue in the study area compared to the No Build and the additional capacity on Manning Avenue is better able to meet the forecast traffic demand; however, Manning Avenue lacks north/south continuity since it terminates into TH 5. Alternative 3 is expected to have a net increase in daily volume ranging from 5,9 to 12,1 vpd along Manning Avenue in the study area compared to the No Build. The additional capacity on Manning Avenue is better able to meet the forecast traffic demand and the realignment of TH 5 provides improved north/south continuity. Also, Alternative 3 is also expected to provide the most congestion relief to the local roadway system compared to the other alternatives. The addition of an east/west collector between CSAH 13 and Manning Avenue and the local connection between 3th Street North and TH 5 would result in local traffic pattern shifts only for Alternative 4. Theses shifts would not have a significant impact on regional traffic patterns compared to the No Build. The east/west collector is forecasted to serve 2,6 vpd. These trips would shift from Hudson Road and CSAH 1. The local connection between 3th Street North and TH 5 is forecasted to serve 5,4 vpd. These trips would shift from Manning Avenue and Lake Elmo Avenue. As a result, Alternative 4 is expected to only provide localized congestion relief.

28 Table 9. Arterial Roadway Daily Volumes Location Existing No Build Alternative 1 Alternative 2 Alternative 3 Alternative 4 TH 5 (east of Manning Avenue) 16,8 25, 23,3 3,9 29,8 25, TH 5 (west of Manning Avenue) 11,5 18,3 15,2 16,7 13,8 19,3 Manning Avenue (south of CSAH 14) 1,45 15,5 17,7 24,8 27,5 13,5 Manning Avenue (south of CSAH 1) 11,87 2, 21, 24,9 26,1 2,5 CSAH 14 (east of Manning Avenue) 3,7 6,2 6,7 7,5 8, 6,2 CSAH 17 (north of CSAH 1) 4,1 11,8 1,2 1,1 8,8 9,8 CSAH 17 (south of CSAH 1) 3,45 5,9 5,5 5,6 5,5 5,4 CSAH 1 (west of Manning Avenue) 4,3 6,1 6,5 6,9 7,6 5,6 CSAH 1 (east of Manning Avenue) 5,2 1, 1, 7,9 8, 1, CSAH 65 (east of Manning Avenue) 2,8 8,1 8,1 6,3 6,6 8,1 CSAH 21 (east of Manning Avenue) 2,85 5,9 5,9 4,8 4,9 5,9 Figure 15. Volume-to-Capacity Summary Alternative 1 Alternative 2 Alternative 3 Alternative 4

29 Criteria 4: Local Intersection Operations Goal: Improve local road system continuity and connectivity Measure: Turning movement balance at Manning Avenue and TH 5 Traffic pattern changes expected with respect to turning movement volumes (see Figure 16) were analyzed to assess the change in overall intersection balance (see Table 1). Peak hour turning movement volume forecasts were developed based on existing turning movement volumes and the daily volume forecasts. The alternatives were rated based on their ability to balance volumes at the Manning Avenue and TH 5 intersection to provide an intersection that would meet driver expectations. Table 1. Criteria 4 Summary Alternative Rating 1 Realignment of TH 5 Good 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue Poor Good 4 Local Improvements Poor Alternatives 1 and 3, which include the realignment of TH 5 at Manning Avenue and CSAH 14, would improve the peak hour turn imbalance at Manning Avenue and TH 5 by converting the TH 5 to Manning Avenue left-turn movement to a thru movement and the Manning Avenue to TH 5 right-turn movement to a thru movement. Alternatives 2 and 4, which do not include the realignment, would not improve volume imbalance. Figure 16 graphically summarizes the daily and peak hour forecasted volumes for both Alternatives 2 and 3. These volumes represent how the traffic volumes would be redistributed with Alternative 3. Figure 16. Year 23 Daily and Peak Hour Forecast Volumes Alternative 2 Alternative 3 Legend: X,XXX XX (XX) Daily Volumes A.M. Peak Hour P.M. Peak Hour

30 Criteria 5: System Plan Consistency Goal: Measure: Provide consistency with local transportation plans Consistent or Not Consistent A general comparison was made with respect to how the alternatives maintain consistency with the local transportation plans (see Table 11). This includes plans for Washington County, Lake Elmo, Baytown Township, and West Lakeland Township. The alternatives were rated based on their ability to provide consistency with the plans. Table 11. Criteria 5 Summary Alternative Rating 1 Realignment of TH 5 Poor-Fair 2 Expansion of Manning Avenue to four-lane divided 3 Realignment of TH 5 and Expansion of Manning Avenue Fair Good 4 Local Improvements Poor The following current edition plans were reviewed: Washington County Year 23 Comprehensive Plan City of Lake Elmo Year 23 Comprehensive Transportation Plan City of Lake Elmo Draft Village Area Comprehensive Plan Amendment Baytown Township Year 23 Comprehensive Plan Update Comprehensive Plan for West Lakeland Township Alternative 1, which includes only the realignment of TH 5 at Manning Avenue and CSAH 14, is consistent with local transportation plans; however, this alternative does not include the Manning Avenue capacity expansion. Also, Alternative 1 does not include any additional local roadway connections. Alternative 2, which includes only the expansion of Manning Avenue to a four-lane roadway, is consistent with local transportation plans; however, this alternative does not include the realignment of TH 5 at Manning Avenue and CSAH 14. Also, Alternative 2 does not include any additional local roadway connections. Alternative 3, which includes both the realignment of TH 5 and the expansion of Manning Avenue to a four-lane roadway, is consistent with local transportation plans. Additionally, Alternative 3 does not include any additional local roadway connections. Alternative 4 includes additional local roadway connections but does not include the realignment of TH 5 and the expansion of Manning Avenue to a four-lane roadway.

31 Selection of Preferred Alternative Based on the Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Subarea Study findings and results, the project team recommends Alternative 3 as the preferred roadway network alternative. Alternative 3 includes both the realignment of TH 5 at Manning Avenue and CSAH 14 and the expansion of Manning Avenue to a four-lane divided roadway between TH 5 and CSAH 1 in the study area. This recommendation is based on the following: The realignment and capacity expansion is expected to provide the highest reduction in vehicle hours traveled network-wide thereby improving the efficiency of the subarea. The realignment and capacity expansion is expected to have the highest reduction in crash rates compared to the No Build due to the improvements associated with these alternatives. Although these alternatives are expected to attract higher volumes to Manning Avenue, the crash rates are expected to be the lowest compared to the other alternatives. Manning Avenue cannot function with future growth under near- and long-term conditions without upgrading Manning Avenue to a four-lane roadway. Volumes shift from the local roadways to Manning Avenue because of the realignment and capacity expansion. The shift in volumes is expected to provide the most congestion relief to the local roadway system compared to the other alternatives. The realignment improves north/south continuity thereby developing Manning Avenue as a north-south arterial in Washington County from I-94 to TH 36. The realignment also would improve the volume imbalance at Manning Avenue and TH 5 by converting the TH 5 to Manning Avenue left-turn movement to a thru movement and the Manning Avenue to TH 5 right-turn movement to a thru movement. The realignment of TH 5 and the expansion of Manning Avenue to a four-lane roadway are consistent with local transportation plans. Downtown Lake Elmo will experience increased traffic volumes over existing conditions regardless of the alternative; however, as previously noted the realignment of TH 5 and the expansion of Manning Avenue to a four-lane roadway is expected to provide the most congestion relief to the local roadway system compared to the other build alternatives. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project 29 SRF Consulting Group, Inc.

32 Appendix Socioeconomic Data (SE Data) for Traffic Forecasts

33 Baytown Twp Lake Elmo West Lakeland Twp Q:\Projects\8141\GIS\TAZ\TAZ_61113.mxd Legend Municipal Boundary Manning Avenue Subarea TAZ Washington County TAZ CSAH 15 Subarea TAZ Boundaries Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Washington County

34 Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Socioeconomic Data Lake Elmo to 23 Growth 23 Manning Metropolitan Avenue Washington Retail Non-retail Council Households Subarea County TAZ Employment Employment Households Retail Non-retail Employment Employment Households Retail Employment TAZ TAZ Non-retail Employment , , , , ,5-4 1, , ,23 13 (1) Lake Elmo City Total (1) Only includes part of TAZ within city limits 2, ,631 5,951 1,69 1,369 8,727 2, 12,

35 Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Socioeconomic Data Baytown Township to 23 Growth 23 Manning Metropolitan Avenue Washington Retail Non-retail Council Households Subarea County TAZ Employment Employment Households Retail Non-retail Employment Employment Households Retail Employment TAZ TAZ Non-retail Employment (1) Baytown Township Total (1) Only includes part of TAZ within city limits

36 Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Socioeconomic Data West Lakeland Township to 23 Growth 23 Manning Metropolitan Avenue Washington Retail Non-retail Council Households Subarea County TAZ Employment Employment Households Retail Non-retail Employment Employment Households Retail Employment TAZ TAZ Non-retail Employment West Lakeland Township Total 1, ,

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer SRF No. 10482 To: From: Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer Date: May 16, 2018 Subject: City of Brooklyn Park Year 2040 Forecasts

More information

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

MPO Staff Report Technical Advisory Committee: July 12, 2017

MPO Staff Report Technical Advisory Committee: July 12, 2017 MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

SRF No MEMORANDUM. Project Steering Committee. Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc.

SRF No MEMORANDUM. Project Steering Committee. Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc. APPENDIX G SRF No. 009 6658 MEMORANDUM TO: Project Steering Committee FROM: Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc. DATE: August 17, 2009 SUBJECT: ROCHESTER INTERNATIONAL

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT

TRAFFIC AND TRANSPORTATION TECHNICAL REPORT TRAFFIC AND TRANSPORTATION TECHNICAL REPORT for ENVIRONMENTAL ASSESSMENT Route 29 Bypass State Project No.: 0029-002-844, P101; UPC 102419 Federal Project Number: TBD From: Route 250 Bypass To: U.S. Route

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Mountain Area Transportation Study Model Methodology and Assumptions Final

Mountain Area Transportation Study Model Methodology and Assumptions Final Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY APPENDIX 1 DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY INTRODUCTION: This Appendix presents a general description of the analysis method used in forecasting

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Appendix F Model Development Report

Appendix F Model Development Report Appendix F Model Development Report This page intentionally left blank. Westside Mobility Plan Model Development Report December 2015 WESTSIDE MOBILITY PLAN MODEL DEVELOPMENT REPORT December 2015 Originally

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS This document reviews the methodologies and tools used to calculate the projected ridership and parking space needs from the proposed Texas City Park & Ride to

More information

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter F:\PROJ\55211014\dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/2002 03:22:17 PM, saamhu, Acrobat PDFWriter MERRIFIELD RIVER CROSSING METHOD OF CHANGE FROM ID# ISSUES MEASUREMENT UNITS VALUE BASE CONDITIONS

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

Public Meeting. March 21, 2013 Mimosa Elementary School

Public Meeting. March 21, 2013 Mimosa Elementary School Public Meeting March 21, 2013 Mimosa Elementary School Today s Meeting Purpose 2 Where We Are The Process What We ve Heard and Findings Transit Technologies Station Types Break-out Session Where We Are

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Toll Impact Study Tier 1 Environmental Impact Statement

Toll Impact Study Tier 1 Environmental Impact Statement PPMS: 67587 PROJECT NO: 0081-961-111 PPMS: 67588 PROJECT NO: 0081-962-116 PPMS: 67589 PROJECT NO: 0081-968-123 Tier 1 Environmental Impact Statement This technical report was prepared to support the Tier

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

Interchange Justification Report

Interchange Justification Report Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information