1 SERVICE SPECIFICATION DNVGL-SE-0122 Edition March 2017 Noble Denton marine services - certification for towing vessel approvability The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by anyone else but DNV GL and/or its licensees to offer and/or perform classification, certification and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL's prior written consent. DNV GL is not responsible for the consequences arising from any use of this document by others. The electronic pdf version of this document, available free of charge from is the officially binding version.

2 FOREWORD DNV GL service specifications contain procedural requirements for obtaining and retaining certificates and other conformity statements to the objects, personnel, organisations and/or operations in question. March 2017 Any comments may be sent by to This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

3 CURRENT CHANGES This document supersedes 0021/ND, December Changes in this document are highlighted in red colour. However, if the changes involve a whole chapter, section or sub-section, normally only the title will be in red colour. Main changes March 2017 General GL Noble Denton has been changed to DNV GL or Noble Denton marine services. Changes - current Sec.1 Introduction [1.3]: Extra background information has been added. Sec.2 Towing vessel categories Table 2-1: Tug category table has been added. Sec.3 Documentation required for entering the towing vessel approbability scheme [3.7]: New chapter has been added on certification and inspection in line with DNVGL-ST-N001, /1/. Note that the requirement in [3.7.7] for towline sockets to be renewed after 2.5 years has been changed from 2 years in DNVGL-ST-N001 [ ] ( edition). This will be updated in the next revision of DNVGL-ST-N001. App.B Bollard pull and towing equipment tests Bollard pull test information in the old appendix B has been replaced with reference to DNVGL-RU-SHIP Pt.5 Ch.10 in Table 1-1 Editorial corrections In addition to the above stated changes, editorial corrections may have been made. Service specification DNVGL-SE Edition March 2017 Page 3

4 CONTENTS Current changes... 3 Section 1 Introduction General Objective Scope of Noble Denton towing vessel approvability scheme Definitions Abbreviations and acronyms...10 Contents Section 2 Towing vessel categories Ocean-going salvage tug (ST) Unrestricted towages (U) Coastal towages (C) Restricted towages (R1) Benign area towages (R2) Restricted benign area towages (R3) Section 3 Documentation required for entering the towing vessel approvability scheme General specification General arrangement plans Towing/anchor-handling winches Towing equipment Certificates Salvage equipment Certification and inspection Section 4 Towing equipment requirements Ocean-going salvage tugs (ST) Unrestricted (U) or coastal (C) categories Restricted categories (R1) Benign area categories (R2) Restricted benign area categories (R3) All entered vessels Section 5 Towing wire protection and control requirements Protectors Tow bars, cargo protection rail, bulwarks, stern rail, tailgate and stern roller Service specification DNVGL-SE Edition March 2017 Page 4

5 5.3 Adjustable gogwire system Fixed gogwire system Towing pod Section 6 Other requirements Towing winch requirements Stability requirements Manning and accommodation requirements Seakeeping requirements Contents Section 7 Additional equipment required for salvage tugs (ST) General Lifting equipment Pumps Generators Air compressor Welding/cutting Damage control Spare parts Fenders Section 8 References References Appendix A Summary of technical requirements...34 Appendix B Bollard pull and towing equipment tests...36 B.1 Bollard pull tests B.2 Towing equipment B.3 Towing/anchor handling winches...36 B.4 Fixed gogwire system, towing pod, line stops and guide pins tests...37 Changes - historic...38 Service specification DNVGL-SE Edition March 2017 Page 5

6 SECTION 1 INTRODUCTION 1.1 General This service specification supersedes 0021/ND Rev 10 Guidelines for the Approval of Towing Vessels It describes the DNV GL Noble Denton marine services towing vessel approvability scheme (TVAS), how it is run and how vessels may enter it. 1.2 Objective This service specification describes the requirements for a vessel to be entered into the DNV GL Noble Denton marine services towing vessel approvability scheme (TVAS). It does not cover the towage of specific vessels or barges, specifications for which may be found in DNVGL-ST-N001, /1/. 1.3 Scope of Noble Denton towing vessel approvability scheme Purpose of scheme The TVAS provides a register of towing vessels that meet recognized international standards for marine warranty survey (MWS) approval by DNV GL for various towing vessel categories (as defined in Table 2-1) This document provides the standard against which a towing vessel will be assessed for the issue of a towing vessel approvability certificate and entry into the TVAS register The certification does not imply that approval by designers, regulatory bodies, harbour authorities and/or any other parties would be given. Nor does it imply approval of a vessel for any specific towage or operation for which further consideration of the suitability of the vessel for the towage or operation would be required. In particular, additional towline strength requirements for towing in ice are covered in DNVGL-ST- N001 [ ], /1/ Advantages to vessel owners, operators or charterers A vessel in the TVAS should not normally require a suitability survey before a towage or rig move for vessels in the appropriate category, though the attending marine warranty surveyor (MWS) will do spot checks before a certificate of approval (CoA) is issued for a towage or rig move The advantage of the TVAS to potential vessel charterers is that they are assured of contracting well-found and well-equipped vessels that have been independently surveyed and monitored to a consistent technical standard without the need for additional suitability surveys The advantage for vessel owners or operators is that they can easily show that their vessels continue to comply with the requirements of a leading MWS company. Service specification DNVGL-SE Edition March 2017 Page 6

7 1.3.3 Operation of scheme Owners or operators of vessels to be assessed for entry in the TVAS should contact DNV GL Noble Denton marine services through the TVAS manager via The TVAS manager then arranges a survey to be performed at a convenient time and place by a surveyor from the most suitable DNV GL Noble Denton marine services office. The survey will check that the vessel complies with the technical requirements in Sec.3 to Sec.8 (and summarised in App.A) as appropriate for the vessel category The survey report is sent to the TVAS manager who issues a towing vessel approvability certificate (TVAC), as appropriate, confirming the towing vessel category (in Sec.2 ) for which the vessel is approved and giving details of key surveyed items A list of vessels in the TVAS register is published monthly on the DNV GL website: Before each of the next 4 anniversaries of the certificate issue date the owner or operator is asked to confirm that all key items in the certificate remain at the same standard as when surveyed. After receipt of that confirmation the certificate is revalidated for another year by the TVAS manager After 5 years the vessel is re-surveyed and the cycle begins again Any changes of ownership, operator, name, registry or classification shall be notified to the TVAS manager who will decide if a further survey is required before a new TVAC can be issued. Service specification DNVGL-SE Edition March 2017 Page 7

8 1.4 Definitions Table 1-1 Definition of terms Term approved bollard pull Definition the continuous bollard pull which Noble Denton marine services is prepared to accept for towing service Explanation: Continuous (static) bollard pull is obtained by a test at 100% of the maximum continuous rating (MCR) of main engines, averaged over a period of 10 minutes. Where a certificate of continuous bollard pull, in conformity with the above, less than 10 years old can be produced, then this will normally be used as the approved bollard pull. Approved bollard pull for tugs less than 10 years old, without a bollard pull certificate, may be estimated as 1 tonne/100 (certified) BHP of the main engines. Ice-breaking tugs may be less than this and the TVAS manager should be consulted via Marine.Consulting- London@dnvgl.com. Approved bollard pull for non ice-breaking tugs over 10 years old, without a bollard pull certificate less than 10 years old, may be the greater of: the certified value reduced by 1% per year of age since the BP test, or 1 tonne/100 (certified) BHP reduced by 1% per year of age greater than 10. Bollard pull tests should be performed in accordance with DNVGL-RU SHIP Pt.5 Ch.10 Sec.11 ([1.4.2], /2/. Bollard pull test certificates issued by other recognized classification societies are acceptable. Certificates issued by other bodies recognized by DNV GL Noble Denton marine services may be accepted provided that acceptable procedures for the tests are produced. benign weather area brake horse power (BHP) continuous bollard pull (CBP) competent person minimum breaking load (MBL) maximum bollard pull (MBP) maximum continuous rating (MCR) see [2.5.1] and DNVGL-ST-N001 [3.6], /1/ the measure of horsepower at continuous engine output after the combustion stage continuous bollard pull is obtained by a test at 100% of the maximum continuous rating (MCR) of main engines, averaged over a period of 10 minutes person that has appropriate practical and theoretical knowledge and experience of the equipment and/or activity Explanation: Although the competent person may often be employed by another organisation, this is not necessary, provided they are sufficiently independent and impartial to ensure that in-house examinations are made without fear or favour. However, this should not be the same person who undertakes routine maintenance of the equipment as they would then be responsible for assessing their own maintenance work. Note: Where local or national regulations define a competent person with more onerous requirements, then the definition in these local or national regulations shall apply. in this document this refers to the minimum allowable value of breaking load for a particular sling, grommet, wire or chain etc. the bollard pull obtained by a test, typically at 110% of themaximum continuous rating (MCR) of main engines, over a period of 5 minutes 100% rating of the main engine as set by manufacturer Service specification DNVGL-SE Edition March 2017 Page 8

9 Term recognized classification society register survey surveyor safe working load (SWL) tonnes towing vessel approvability certificate (TVAC) towing vessel approvability scheme (the scheme) towing vessel report TVAS manager ultimate load capacity (ULC) working load limit (WLL) Definition member of IACS with recognized and relevant competence and experience in specialised vessels or structures, and with established rules and procedures for classification/certification of such vessels/structures under consideration the list published monthly of all towing vessels entered into the towing vessel approvability scheme a systematic and independent assessment in order to verify compliance with this service specification In this document this refers to attendance and inspection by a DNV GL Noble Denton marine services representative. personnel authorized to carry out surveys and to conclude whether or not compliance has been met SWL is a derated value of the working load limit (WLL), following an assessment by a competent person of the maximum static load the item can sustain under the conditions in which the item is being used metric tonnes of 1,000 kg (approximately 2,204.6 lbs) are used throughout this document The necessary conversions shall be made for equipment rated in long tons (2,240 lbs, approximately 1,016 kg) or short tons (2,000 lbs, approximately 907 kg). the document issued by DNV GL Noble Denton marine services stating that a vessel complied with these specification at the time of survey, or was reportedly unchanged at the time of revalidation, in terms of design, construction, equipment and condition, and is considered suitable for use in towing service within the limitations of its category, bollard pull and any geographical limitations which may be imposed It is valid for 5 years, subject to the owner or operator confirming to the TVAS manager every 12 months that no significant changes have taken place. the scheme whereby owners of vessels may apply to have their vessels surveyed and entered into the scheme and the register the surveyor's report on which the issue of a towing vessel approvability certificate (TVAC) is based the person administering the TVAS scheme on behalf of Noble Denton marine services, contactable via Marine.Consulting-London@dnvgl.com the certified minimum breaking load of wire rope, chain, shakle or similar The load factors allow for good quality splices in wire rope. Ultimate load capacity of a padeye, clench plate, delta plate or similar structure, is defined as the load, which will cause general failure of the structure or its connection into the barge or other structure. the maximum force which a product is authorized to sustain in general service when the rigging and connection arrangements are in accordance with the design See safe working load (SWL). Table 1-2 Definitions of verbal forms Term shall Definitions verbal form used to indicate requirements strictly to be followed in order to conform to the document Service specification DNVGL-SE Edition March 2017 Page 9

10 Term should may Definitions verbal form used to indicate that among several possibilities one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required verbal form used to indicate a course of action permissible within the limits of the document 1.5 Abbreviations and acronyms Table 1-3 Acronyms and abbreviations Short form BHP POB CBP CoA IACS MBL MCR MWS NDT SWL TVAC TVAS ULC UT WLL In full brake horse power person on board continuous bollard pull certificate of approval international association of classification societies minimum breaking load maximum continuous rating marine warranty survey or marine warranty surveyor non-destructive testing safe working load towing vessel approvability certificate towing vessel approvability scheme ultimate load capacity ultrasonic testing working load limit Service specification DNVGL-SE Edition March 2017 Page 10

11 SECTION 2 TOWING VESSEL CATEGORIES Vessels that are entered into the scheme or proposed for towing duties will be designated one of the six (6) categories as summarised in Table 2-1. The requirements for each category are stated below, and summarised in App.A. Table 2-1 Tug category summary Ref. Category Used for 1 ST Salvage tug 2 U Unrestricted Single tug towage in benign or non-benign weather areas. They shall have very good seakeeping qualities including good propeller immersion in bad weather to protect their towlines. 3 C Coastal Towage in benign weather areas or staged tow 4 R1 Restricted Assisting in multi-tug towage 5 R2 Restricted Benign weather area towage 6 R3 Restricted Assisting in multi-tug towage in benign weather areas 2.1 Ocean-going salvage tug (ST) Vessels within this category are approvable for all towages within the limits of their bollard pull in all geographical areas subject to the vessel s ice classification Vessels shall be equipped with two (2) main towing wires and a spare towing wire, all of which shall comply with the strength and length requirements of [4.1] Vessels shall be adequately manned for towing operations in all geographical areas. Each vessel shall have a minimum complement of officers and crew as required in the safe manning certificates and also have the capability of accommodating increased manning levels where it is deemed necessary for a specific towage. See [6.3] and App.A Vessels shall be of such a design that they are capable of undertaking towages in all geographical areas subject to their ice classification and Sec.7. They shall have very good seakeeping qualities including good propeller immersion in bad weather. These qualities are unlikely to be satisfied with a length over all (LOA) less than 40 metres and a displacement of less than 1,000 tonnes Vessels shall have a minimum bunker capacity of at least 35 days consumption at 80% MCR. Service specification DNVGL-SE Edition March 2017 Page 11

12 2.1.6 Vessels shall be equipped with a workboat designed for open sea operation (e.g. a rigid inflatable) with sufficient power and capacity to carry four (4) persons plus material/equipment to the casualty/tow Vessels shall be equipped with the additional equipment listed in Sec Unrestricted towages (U) Vessels within this category are approvable for all towages within the limits of their bollard pull in all geographical areas subject to the vessels ice classification Vessels shall be equipped with a main towing wire and a spare towing wire, both of which shall comply with the strength and length requirements of [4.2] Vessels shall be adequately manned for towing operations in all geographical areas. Each vessel shall have a minimum complement of officers and crew as required in the safe manning certificates and also have the capability of accommodating increased manning levels where it is deemed necessary for a specific towage. See [6.3] and App.A Vessels shall be of such a design that they are capable of undertaking towages in all geographical areas subject to their ice classification and Sec.7. They shall have very good seakeeping qualities including good propeller immersion in bad weather. These qualities are unlikely to be satisfied with a length over all (LOA) less than 40 metres and a displacement of less than 1,000 tonnes Vessels shall be equipped with a workboat designed for open sea operation (e.g. a rigid inflatable) with sufficient power and capacity to carry four (4) persons plus material/equipment to the tow. A suitable man overboard boat may be considered as a workboat provided there is sufficient space to carry out a workboat function and the appropriate flag state is in agreement that it is permitted to be deployed for tasks other than man overboard duties. 2.3 Coastal towages (C) Vessels within this category are approvable for all coastal towages within the limits of their bollard pull in all geographical areas subject to the vessels ice classification. Coastal towages are defined as routes for which a tow is able to safely reach a place of safety within the period of a reliable weather forecast, or are in benign weather areas. Service specification DNVGL-SE Edition March 2017 Page 12

13 2.3.2 Vessels shall be equipped with a main towing wire and a spare towing wire, both of which shall comply with the strength and length requirements of [4.2] Vessels shall be adequately manned for towing operations in all relevant geographical areas. Each vessel shall have a minimum complement of officers and crew as required in the safe manning certificates and also have the capability of accommodating increased manning levels where it is deemed necessary for a specific towage. See [6.3] and App.A Vessels shall be of such a design that they are capable of undertaking towages in all relevant geographical areas subject to their ice classification and Sec Vessels shall be equipped with a workboat with sufficient power and capacity to carry four (4) persons plus material/equipment to the tow. The man overboard boat may be considered as a workboat provided there is sufficient space to carry out a workboat function and the appropriate flag state is in agreement that it can be deployed for tasks other than man overboard duties. 2.4 Restricted towages (R1) Vessels within this category are approvable for assisting with towages within the limits of their bollard pull in all geographical areas subject to the vessels ice classification Vessels shall be equipped with a minimum of one main towing wire which shall comply with the strength and length requirements of [4.3] Vessels in this category shall comply with the requirements for manning and seakeeping as outlined in [2.2.3], [2.2.4], [6.3] and Sec If proposed as the lead or only tug for a particular towage, as may be allowed in [4.3.4] vessels shall be equipped with a workboat with sufficient power and capacity to carry four (4) persons plus material/ equipment to the tow. The man overboard boat may be considered as a workboat provided there is sufficient space to carry out a workboat function and the appropriate flag state is in agreement that it is permitted to be deployed for tasks other than man overboard duties. Service specification DNVGL-SE Edition March 2017 Page 13

14 2.5 Benign area towages (R2) Vessels within this category are approvable for towages within the limits of their bollard pull and the defined geographical limits of benign areas in DNVGL-ST-N001 [3.6], /1/. Service specification DNVGL-SE Edition March 2017 Page 14

15 Guidance note: The following chart is extracted from DNVGL-ST-N001 [3.6], /1/. Figure 2-1 Benign weather areas ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification DNVGL-SE Edition March 2017 Page 15

16 2.5.2 Vessels shall be equipped with a main towing wire and a spare towing wire, both of which shall comply with the strength and length requirements of [4.4] Vessels shall be adequately manned for towage operations within the geographical limits of benign areas. These vessels shall have the capability of accommodating increased manning levels where it is deemed necessary for a specific towage. See [6.3] Vessels shall be of such a design that they are capable of undertaking towages within the geographical limits of benign areas. See Sec If proposed as the lead or only tug for a particular towage, vessels shall be equipped with a workboat with sufficient power and capacity to carry three (3) persons plus material/equipment to the tow. The man overboard boat may be considered as a workboat provided there is sufficient space to carry out a workboat function and the appropriate flag state is in agreement that it is permitted to be deployed for tasks other than man overboard duties. 2.6 Restricted benign area towages (R3) Vessels within this category are approvable for assisting with towages within the limits of their bollard pull and the defined geographical limits of benign areas Vessels shall be equipped with a minimum of one main towing wire which shall comply with the strength and length requirements of [4.5] Vessels shall comply with the requirements for manning and seakeeping as outlined in [2.5.3], [2.5.4], [6.3] and Sec.7. Service specification DNVGL-SE Edition March 2017 Page 16

17 SECTION 3 DOCUMENTATION REQUIRED FOR ENTERING THE TOWING VESSEL APPROVABILITY SCHEME Prior to a survey of the vessel being carried out for entry into the scheme, and in order to assess the likelihood of successful entry, copies of the following documents should be submitted to the TVAS manager via Marine.Consulting-London@dnvgl.com. 3.1 General specification General specification should include, but is not limited to, general details of: overall dimensions and tonnages classification propulsion equipment speed, consumption and bunker capacity towing and anchor-handling equipment anchoring system accommodation capacity and layout. 3.2 General arrangement plans General arrangement plans should show the overall arrangement of the vessel, and should be sufficiently detailed to show the deck area including the towing, anchor handling and mooring equipment. 3.3 Towing/anchor-handling winches Specifications of the towing/anchor-handling winch and its foundation. 3.4 Towing equipment Specifications of all towing equipment carried including bridles, chains, towing wires, pennant wires, stretchers, towing shackles and connecting links. 3.5 Certificates Copies of the following valid documents (unless not legally required, typically for some vessels less than 500 gt) shall be submitted to the TVAS manager or made available to the surveyor at time of survey: certificate of registry international load line certificate certificates of class for hull and machinery cargo ship safety equipment certificate cargo ship safety radio certificate safety construction certificate certificate of safe manning international oil pollution prevention certificate safety management certificate international ship security certificate ballast water exchange certificate (if required) certificates for all required bridles, chains, tow wires, pennants, stretchers, and shackles and connecting links. Service specification DNVGL-SE Edition March 2017 Page 17

18 These certificates shall be issued or endorsed by bodies approved by an IACS member or other recognized certification body accepted by DNV GL: bollard pull certificate (by a recognized authority or body) approved stability booklet. 3.6 Salvage equipment For the entry of ocean-going salvage tugs (ST), details of the salvage equipment should be submitted. A list of the minimum requirements appears in Sec Certification and inspection Valid certificates (less than 5 years old) shall be submitted for all towing gear hardware (e.g. chains, wires and shackles) from the towing winch to the towing connections. Certificates shall be issued or endorsed by bodies approved by a recognized classification society or other body accepted by DNV GL. For delta plates, less than 5 years old, calculations agreed with DNV GL in advance can be acceptable instead of certification Apart from towing bridles or pennants connected to underwater connections (such as on semi-submersible pontoons) all towing gear hardware shall be subjected to a documented inspection by a competent person not more than 12 months before use and shall be thoroughly visually inspected before each use. Items with any significant wear or damage shall be repaired and thoroughly inspected again, or replaced, before use Additionally all delta plates, master links and shackles shall be inspected less than 2.5 years before each use with MPI and UT to confirm there are no defects For any towing gear that cannot be inspected annually, an inspection regime shall be agreed in advance with the vessel operator. Higher safety factors shall be agreed to allow for corrosion, fatigue and longer times between inspections. The maximum age for such equipment shall be 5 years from new and typically the safety factors should be increased by an extra 20% per year after the first Towlines shall not be in use for longer than 100,000 nautical miles, of which no more than 50,000 miles shall have been in adverse weather conditions (nominally > Beaufort force 6). Within 5 years from new or from any previous similar test about 10 m to 12 m of towline shall be cut out and break tested or proof loaded to 1.5 x BP without yielding. Max. towline life shall be 5 years if not adequately documented in a towline log. Tow wires shall be terminated with hard eye thimbles or closed sockets Anchor handling work wires should generally not be used for towing due to the high probability of damage. The only exception is when the wire log shows only very light use and after a rigorous inspection of the whole wire by an independent competent person appropriately certified to do such inspections. Service specification DNVGL-SE Edition March 2017 Page 18

19 3.7.7 Where a closed socket (normally spelter type) is used to form the towline termination it shall be renewed at intervals not exceeding 2.5 years (excluding time before fitting when new on the tug), irrespective of the condition of the socket and its wire. Except when re-socketed at sea for (temporary) contingency reasons socketing shall only be done by a certified specialist, approved by a recognized classification society. Renewed means the wire cropped back to steel that shows no sign of deterioration and the use of either a new socket or one which has undergone rigorous NDT Aluminium or alloy ferrules shall not be used on any pennant or towline If testing of towing gear is required, then the requirements of App.B shall be followed Table 3-1 summarises the required expiry times for the above certificates and inspections shown above. Table 3-1 Certificate and inspection document requirements Item Certificate valid for Time since documented inspection by a competent person (unless new) Bollard pull < 10 years Not applicable. See approved bollard pull in Table 1-1 Delta plates, master links and shackles < 5 years < 12 months and MPI and UT < 2.5 years Pennants, bridles and towlines < 5 years < 12 months Lashing equipment < 4 years < 12 months Spelter sockets < 2.5 years < 12 months Service specification DNVGL-SE Edition March 2017 Page 19

20 SECTION 4 TOWING EQUIPMENT REQUIREMENTS 4.1 Ocean-going salvage tugs (ST) Vessels shall be equipped with two (2) main towing wires on separate winch drums, and one spare towing wire, each of adequate strength to satisfy the requirements of minimum breaking load (MBL) as follows: Table 4-1 Towline minimum breaking loads for salvage tugs Continuous bollard pull (BP) BP 40 tonnes Minimum breaking load (MBL) 3.0 x BP 40 < BP 100 tonnes (220 BP) x BP/60 BP > 100 tonnes 2.0 x BP For towing vessels with very large bollard pulls (typically over 280 tonnes) it may be difficult to satisfy the requirements of Table 4-1 above due to problems in safely handling the large towlines required. In these cases the effective towing bollard pull for selecting the towline MBL may be reduced to not less than 280 tonnes provided that 1) the vessel is fitted with towline tension monitoring, 2) the tug Master is in agreement 3) the reduction is documented in the towing procedures and Certificate of Approval, 4) the tug master shall take extra care in bad weather to protect the towline and if practicable: 5) the winch should be adjusted to pay out at 80% of the towline MBL, and 6) the tug engines should be mechanically or electronically limited to produce a maximum static bollard pull (i.e. the effective bollard pull) of not more than 50% of the towline MBL The minimum deployable length (L), as explained in [4.6.1] of both main wires and the spare towing wire shall be determined from the formula: L = (BP/MBL) x 2,000 [m] except that in no case shall the deployable length be less than 800 metres (see also [4.6.5]) A towing log indicating service history, maintenance and inspections shall be kept for each tow wire and each synthetic stretcher held on board the vessel. Service specification DNVGL-SE Edition March 2017 Page 20

21 4.1.5 If a surge chain is supplied then the MBL shall not be less than that of the main towing wire. The surge chain shall be a continuous length of welded studlink chain with an enlarged open link at each end Vessels shall be equipped with at least four (4) towing pennants of not less than the required MBL of the towing wire, and of the same lay, 2 of which can be used to make up an emergency bridle Vessels shall be provided with the components for one towing bridle, which may be either all chain, or a combination of chain and wire. The ultimate load capacity (ULC), in tonnes, of each bridle leg shall be not less than: ULC = 1.25 x MBL (for MBL 160 tonnes) or ULC = MBL + 40 (for MBL 160 tonnes) with a maximum of ULC of 400 tonnes (considered to be the maximum able to be handled at sea without a crane) Vessels shall be equipped with at least twelve (12) towing shackles in accordance with the requirements of [4.6.12] to [4.6.14]. 4.2 Unrestricted (U) or coastal (C) categories Vessels shall be equipped with both a main and a spare towing wire, each of adequate strength to satisfy the requirements of minimum breaking load (MBL) as follows: Table 4-2 Towline minimum breaking loads for unrestricted towages Bollard pull (BP) Less than 40 tonnes Minimum breaking load (MBL) 3.0 x BP 40 to 100 tonnes (220 BP) x BP/60 Over 100 tonnes 2.0 x BP For towing vessels with very large bollard pulls (typically over 280 tonnes) it may be difficult to satisfy the requirements of Table 4-2 above due to problems in safely handling the large towlines required. In these cases the effective towing bollard pull for selecting the towline MBL may be reduced to not less than 280 tonnes provided that 1) the vessel is fitted with towline tension monitoring, 2) the tug master is in agreement Service specification DNVGL-SE Edition March 2017 Page 21

22 3) the reduction is documented in the towing procedures and certificate of approval, 4) the tug master shall take extra care in bad weather to protect the towline and if practicable: 5) the winch should be adjusted to pay out at 80% of the towline MBL, and 6) the tug engines should be mechanically or electronically limited to produce a maximum static bollard pull (i.e. the effective bollard pull) of not more than 50% of the towline MBL The minimum deployable length (L), as explained in [4.6.1] of both main wires and the spare towing wire shall be determined from the formula: L = (BP/MBL) x 1,800 [m] except that in no case shall the length be less than 650 metres for Unrestricted categories or 500 metres for coastal (see also [4.6.5]) A towing log indicating service history, maintenance and inspections shall be kept for each tow wire and each synthetic stretcher held on board the vessel. 4.3 Restricted categories (R1) Vessels shall be equipped with one main towing wire of adequate strength to satisfy the requirements of minimum MBL as follows. Table 4-3 Towline minimum breaking loads for restricted towages Bollard pull (BP) Less than 40 tonnes Minimum breaking load (MBL) 3.0 x BP 40 to 100 tonnes (220 BP) x BP/60 Over 100 tonnes 2.0 x BP The minimum deployable length (L), as explained in [4.6.1] of the towing wire shall be determined from the formula: L = (BP/MBL) x 1,800 [m] except that in no case shall the deployable length be less than 650 metres (see also [4.6.5]) A towing log indicating service history, maintenance and inspections shall be kept for each tow wire and each synthetic stretcher held on board the vessel. Service specification DNVGL-SE Edition March 2017 Page 22

23 4.3.4 DNV GL will not in normal circumstances approve single tug towages where the tug is equipped with only one tow wire. However, vessels in category R1 may in certain circumstances be approved for single tug towages where the towage is in sheltered waters or within the limits of a reliable weather forecast. Approval of a vessel for this type of towage will be subject to a specific assessment. 4.4 Benign area categories (R2) Vessels shall be equipped with both a main and spare towing wire each of adequate strength to satisfy the requirements of minimum BL as follows: MBL = 2.0 x BP The minimum deployable length (L), as explained in [4.6.1] of both main wires and the spare towing wire shall be determined from the formula: L = (BP/MBL) x 1,200 [m] except that in no case shall the deployable length be less than 500 metres (see also [4.6.5]). 4.5 Restricted benign area categories (R3) Vessels shall be equipped with a towing wire of adequate strength to satisfy the requirements of MBL as follows: MBL = 2.0 x BP The minimum length (L) of the towing wire shall be determined from the formula: L = (BP/MBL) x 1,200 [m] except that in no case shall the length be less than 500 metres (see also [4.6.5]). 4.6 All entered vessels The towline deployable length shall not include the minimum remaining turns on the winch drum, and the distance from the drum to the stern rail or roller. One full strength wire rope pennant which is permanently included in the towing configuration may be considered when determining the deployable length All towing wires shall have hard eyes formed by a heavy-duty gusseted thimble, pee-wee or a closed spelter socket fitted at the outer end. Service specification DNVGL-SE Edition March 2017 Page 23

24 4.6.3 The main towing wire(s) should be spooled onto the towing winch drum(s) using adequate tension. The end of the wire shall be adequately secured to the winch drum Where a spare towing wire is carried, it shall be stowed on a winch drum, or reverse stowed on a reel. Where the spare wire is stowed on a reel, it shall be accessible even in heavy weather, and be in such a position as to ensure that transfer to the main towing drum can be achieved safely and efficiently Where a reduced towline length demands a higher minimum breaking load (MBL) in order to satisfy the towline length formula, then this increased MBL shall be the required MBL when determining the strength of the other components in the towing arrangement If the vessel ever uses a towing pennant, it shall carry two on board. ST vessels shall be equipped with at least 4 pennants as described in [4.1.6] to [4.1.7] Towing pennants, if carried, shall: be of the same lay as the towing wire, and have a breaking load not less than the required breaking load of the main towing wire, and have a length appropriate to their intended service; typically these will be in the range of 10 to 50 metres long, and have hard eyes formed by a heavy-duty gusseted thimble, pee-wee or a spelter socket at each end If a soft-eyed pennant is carried (e.g. for putting over a bollard or for anchor handling), then such pennant shall be additional to the other requirements of this section If synthetic stretchers are used, at least 2 shall be carried. For benign areas, one (1) synthetic stretcher may be acceptable If synthetic stretchers are used, they should be in a sound condition and their minimum breaking load should be at least: as recommended by the manufacturer and 1.5 times the required towline minimum break load (MBL). When determining the required towline MBL the considerations in [4.6.5] shall be taken into account. Service specification DNVGL-SE Edition March 2017 Page 24

25 The synthetic stretchers shall have a heavy-duty gusseted thimble at each end and be adequately protected against chafe. They should also be stored in line with the manufacturer s recommendations and protected from solvents and sunlight Vessels shall be equipped with at least 6 (12 for category ST) towing shackles or approved connecting links The documented minimum breaking load of shackles forming part of the towline (including any shackle between the towline and the bridle apex) shall be at least 130% of the required breaking load of the towline to be used If the SWL or WLL of a shackle is documented but the minimum breaking load is not, the towing vessel owner should obtain a document (which could be a company brochure) from the shackle manufacturer stating the minimum safety factor defined as minimum break load/swl (or WLL as appropriate). This is because there is a large range in shackle safety factors. Service specification DNVGL-SE Edition March 2017 Page 25

26 SECTION 5 TOWING WIRE PROTECTION AND CONTROL REQUIREMENTS 5.1 Protectors Sufficient towing wire protectors shall be provided to prevent the towing wire from being damaged by abrasion and chafe against tow bars, cargo protection rails, bulwarks, stern rail, tail gate or stern roller If a fixed gogwire system or towing pod is used, then whenever possible, towing wire protectors should also be provided for the towing wire at the gogwire shackle or towing pod. 5.2 Tow bars, cargo protection rail, bulwarks, stern rail, tailgate and stern roller The top of the tow bars, cargo protection rail, bulwarks, stern rail, tail gate and stern roller shall be free of sharp edges, corners or obstructions which could damage the towing wire or prevent it from free lateral movement Where, during normal towing conditions, the towing wire bears on tow bars, cargo protection rail, bulwarks, stern rail or tailgate, the radius of bend shall be at least ten (10) times the diameter of the towing wire. 5.3 Adjustable gogwire system Preference shall be given to the use of an adjustable gogwire system The winch or capstan used to adjust the gogwire system shall be controlled from a safe location. 5.4 Fixed gogwire system If a single wire or single chain gogwire system is used, then the connection point on the aft deck shall be on the centreline of the vessel. Service specification DNVGL-SE Edition March 2017 Page 26

27 5.4.2 The length of the single wire or single chain of the gogwire system shall not exceed half the distance between the cargo protection rails or bulwarks, whichever is less Either a wide body sling shackle, having an enlarged bearing surface at the bow, or a purpose-designed sheave, shall be used to connect the gogwire system to the towing wire. 5.5 Towing pod The centre line of the towing pod shall be in line with the centre line of the towing wire winch drum The towing pod shall be well faired and have a bend radius of at least ten (10) times the diameter of the towing wire. Service specification DNVGL-SE Edition March 2017 Page 27

28 SECTION 6 OTHER REQUIREMENTS 6.1 Towing winch requirements Vessels in all categories shall be provided with at least one towing winch, (two towing winch drums for category ST) The towing winch and its connection to the vessel shall be strong enough to withstand a force equal to the breaking load of the tow wire acting at its maximum height above deck, without over-stressing either the winch or the deck connections If the power for the towing winch is supplied via a main engine shaft generator during normal operating conditions, then another generator shall be available to provide power for the towing winch in case of main engine or generator failure If a multi-drum winch is used, then each winch drum shall be capable of independent operation The towing winch drum(s) shall have sufficient capacity to stow the required minimum length of the tow wire(s) A spooling device shall be provided such that the tow wire(s) is effectively spooled on to the winch drum(s) The towing winch brake shall be capable of preventing the towing wire from paying out when the vessel is towing at its maximum continuous static bollard pull and shall not release automatically in case of a power failure The winch shall be fitted with a mechanism for emergency release of the tow wire There shall be an adequate means of communication between the winch control station(s) and the engine control station(s) and the bridge. Service specification DNVGL-SE Edition March 2017 Page 28

29 If there is only one towing winch then the crew must be able to demonstrate that a spare tow wire can be safely run onto the towing winch within 6 hours of a towline break in bad weather. 6.2 Stability requirements The stability of the vessel shall never be less than that required by the Guidelines for the Design and Construction of Offshore Supply Vessels (Resolution A.469 [XII] adopted by the International Maritime Organisation 1981) and the Merchant Shipping (Load Line) rules 1966, S.I In addition, if the vessel has IACS class notation "Tug" or Towing Vessel, the stability booklet shall contain an example loading condition that fulfils the classification society's notation. The vessel s master shall show the attending surveyor how the example loading condition relates to the voyage(s), including whether any roll reduction tanks are in use If the example loading condition varies, the master shall document adequate stability, including for the arrival fuel loads. The relevant print out(s) from the onboard calculations (e.g. loadmaster) shall be given to the surveyor If the vessel cannot show that it satisfies IACS class notation Tug" or Towing Vessel as described above, then the heeling lever (defined below) shall not exceed 0.5 times the maximum GZ for the most critical loading condition. Heeling Lever = [0.6 x max. bollard pull x vertical distance between Hawser and centre of the propeller(s)]/ displacement The height of the hawser shall be measured at: the fixed gog, or the side rails if higher, if a fixed gog is always used, or the top of the winch drum (with no towline deployed), or the side rails if higher, if a fixed gog is not always used If the maximum GZ occurs at an angle greater than 30 degrees of heel then the GZ value for 30 degrees of heel shall be used instead of the angle of maximum GZ. Service specification DNVGL-SE Edition March 2017 Page 29

30 6.3 Manning and accommodation requirements Vessels in all categories shall be manned to meet the minimum requirements laid down by statutory regulations Manning levels for vessels in all categories will be subject to the requirements of a specific towage Where vessels are required to undertake long duration towages, difficult towages or where the tow is unmanned, they shall have adequate certified accommodation to enable manning levels to be increased. Any increase in manning levels will be subject to the limitations of the regulations relating to life-saving appliances Table 6-1 shows the minimum required certified accommodation and life-saving for each category. Table 6-1 Minimum accommodation and LSA requirements Category ST when engaged in towing operations U, C and R1 when engaged in towing operations R2 and R3 when engaged in towing operations Certified accommodation and life-saving appliances for a minimum POB of 12 including a minimum of 5 certificated officers. These would normally be the master, 2 deck officers and 2 engineer officers. 8 including a minimum of 4 certificated officers. These would normally be the master, 1 deck officer and 2 engineer officers. Not specified, but to include a minimum of 3 certificated officers. These would normally be the master, 1 deck officer and 1 engineer officer. 6.4 Seakeeping requirements Vessels in all categories shall be of such a design to allow them to operate safely and effectively in their designated areas Vessels in all categories shall be purpose-built for towing operations or be of a multi-purpose design having towing capability Vessels shall be assigned an appropriate classification by a recognized classification society. Service specification DNVGL-SE Edition March 2017 Page 30

31 6.4.4 The length and normal operating draught of the vessel shall be adequate to maintain propeller effectiveness and reduce slamming in heavy weather conditions Vessels in category ST, U, C and R1 shall have a raised forecastle with a height of at least 2 metres above the freeboard deck. The forecastle shall be of such a design to ensure minimum water retention. Service specification DNVGL-SE Edition March 2017 Page 31

32 SECTION 7 ADDITIONAL EQUIPMENT REQUIRED FOR SALVAGE TUGS (ST) 7.1 General All vessels in category ST shall carry the equipment as listed in the sections below. 7.2 Lifting equipment A deck crane or derrick with a minimum capacity of two (2) tonnes for transferring equipment. 7.3 Pumps At least 2 portable salvage pumps (at least 2 inch (5 cm) suction diameter) with an ample supply of suitable hoses. 7.4 Generators 2 portable generators and cabling to allow power to be distributed to the casualty/tow. If the portable pumps are electric then one generator shall be able to power any 2 pumps and the other generator power at least one pump. 7.5 Air compressor Portable air compressor suitable for salvage purposes with ample supply of hoses or facility to allow compressed air to be distributed to the casualty/tow. If the portable pumps are pneumatic then one compressor shall be able to power any 2 pumps and one additional compressor power at least one pump. 7.6 Welding/cutting Portable welding and cutting equipment with ample supply of extension cables, hoses and consumables. 7.7 Damage control Assorted steel plate, timber, canvas, cement, sand, tools, etc. for damage control purposes. 7.8 Spare parts An adequate inventory of spare parts shall be carried, for the vessel to allow repairs to be carried out during long voyages. 7.9 Fenders Sufficient fenders to allow the tug to safely come alongside a casualty or tow. Service specification DNVGL-SE Edition March 2017 Page 32

GUIDELINES FOR THE APPROVAL OF TOWING VESSELS

GUIDELINES FOR THE APPROVAL OF TOWING VESSELS GUIDELINES FOR THE APPROVAL OF TOWING VESSELS NO: 0021/NDI 04.10.06 6 PJD TPB 01.04.02 5 JMRL TPB 01.12.01 4 JMRL TPB 01.04. 01 3 JMRL /JR For use in TVAS 02.04.96 2 JMRL For use in TVAS 28.12.89 1 PAC

More information

Y-fl'. MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION

Y-fl'. MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION No-363/421, Corner of Merchant & Theinbyu Road, Botataung Township, Yangon, Myanmar E-mail : d gdma.mm@ gmail.com; dma.myan@smail.com

More information

RULES FOR CLASSIFICATION Yachts. Part 4 Systems and components Chapter 6 Piping systems. Edition December 2015 DNV GL AS

RULES FOR CLASSIFICATION Yachts. Part 4 Systems and components Chapter 6 Piping systems. Edition December 2015 DNV GL AS RULES FOR CLASSIFICATION Yachts Edition December 2015 Part 4 Systems and components Chapter 6 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL").

More information

O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W :

O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W : O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W : In order that the survey can be conducted with the least inconvenience to the parties concerned, we list the below details that

More information

M A R I T I M E E N G I N E E R S P T Y L TD A Member of James Fisher and Sons plc

M A R I T I M E E N G I N E E R S P T Y L TD A Member of James Fisher and Sons plc O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W : P A R T 1 : T O W E D V E S S E L R E Q U I R E M E N T S DOCUMENTATION REQUIRED (FROM BARGE/TOWED VESSEL OWNERS) Certificate

More information

DNVGL-CG-0194 Edition July 2017

DNVGL-CG-0194 Edition July 2017 CLASS GUIDELINE DNVGL-CG-0194 Edition July 2017 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by anyone

More information

GUIDELINES FOR TOWAGE AT SEA

GUIDELINES FOR TOWAGE AT SEA GUIDANCE NOTES GD 02-2012 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR TOWAGE AT SEA Effective from January 01 2012 Beijing CONTENTS CHAPTER 1 GENERAL PROVISIONS...1 Section 1 Purpose and Requirements...1

More information

IMO. 21 December 1998 GUIDELINES FOR SAFE OCEAN TOWING

IMO. 21 December 1998 GUIDELINES FOR SAFE OCEAN TOWING INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR E Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G IMO Ref. T1/3.02 MSC/Circ.884 21 December 1998 GUIDELINES FOR

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N GEN 018 REQUIREMENTS FOR ST. VINCENT AND THE GRENADINES TOWED VESSELS TO: APPLICABLE TO: RECOGNIZED ORGANIZATIONS (RO), FLAG STATE INSPECTORS,

More information

casualty information Dear Captain General Requirements Encl.: 7 pages

casualty information Dear Captain General Requirements Encl.: 7 pages casualty information no. 88 MARCH 2012 Norwegian Hull Club wishes to contribute to increased safety on board, focusing on Lives, Health, Environment and Assets and to distribute Useful Experience. In this

More information

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships (Jan 2004) (Corr.1 Feb 2004) Rev.1 July 2004) (Rev.2 Sept 2006) (Rev.3 July 2007) (Corr.1 Sept 2014) (Rev.4 Oct 2016) (Corr.1 Dec 2016) (Corr.2 Mar 2017) Shipboard fittings and supporting hull structures

More information

DNVGL-CP-0110 Edition March 2016

DNVGL-CP-0110 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0110 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships (Jan 2004) (Corr.1 Feb 2004) Rev.1 July 2004) (Rev.2 Sept 2006) (Rev.3 July 2007) (Corr.1 Sept 2014) (Rev.4 Oct 2016) Shipboard fittings and supporting hull structures associated with towing and mooring

More information

IMO fuel oil consumption data collection system

IMO fuel oil consumption data collection system No. Subject: IMO fuel oil consumption data collection system IMO fuel oil consumption data collection system A similar scheme to EU MRV has also been adopted by IMO; according to Regulation 22A of MARPOL

More information

Title: Lifting Operations Involving Crane or Gantry Offshore

Title: Lifting Operations Involving Crane or Gantry Offshore PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev

More information

USER INFORMATION, CURRENT RULE CHAPTERS AND INDEX

USER INFORMATION, CURRENT RULE CHAPTERS AND INDEX RULES FOR CLASSIFICATION OF Ships MAIN CHANGES JANUARY 2013 General A complete list of current rule chapters including revision dates is presented in Pt.0 Ch.1 Sec.2. The listing below contains only chapters

More information

Systems and Arrangement for Meeting Regulations in Emission Control Areas (ECA)

Systems and Arrangement for Meeting Regulations in Emission Control Areas (ECA) RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 25 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Systems and Arrangement for Meeting Regulations in Emission Control Areas (ECA) JANUARY 2010

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N AFS 001 Rev.1 International Convention on the Control of Harmful Anti-fouling Systems on Ship Issuance of Statement of Compliance TO: APPLICABLE

More information

ANNEX 8 RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS

ANNEX 8 RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 022 FUEL OIL CONSUMPTION DATA COLLECTION SYSTEM Amendments to MARPOL Annex VI, MEPC.278(70) TO: APPLICABLE TO: EFFECTIVE AS FROM: SHIPOWNERS,

More information

Emergency Towing Booklet (ETB) According to SOLAS II-1, Reg. 3-4 and MSC.1/Circ. 1255

Emergency Towing Booklet (ETB) According to SOLAS II-1, Reg. 3-4 and MSC.1/Circ. 1255 Emergency Towing Booklet (ETB) According to SOLAS II-1, Reg. 3-4 and MSC.1/Circ. 1255 Table of Contents 1 GENERAL DESCRIPTION.. 3 1.1 GENERAL... 3 1.1.1 Flag or Class Aproval......3 1.2 LIMITATION DURING

More information

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements... 4 Sec. 2 System

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 012 AMENDMENTS OF THE SUPPLEMENT (FORM A AND B) OF THE IOPP CERTIFICATE TO: SHIPOWNERS, SHIPS OPERATORS AND MANAGERS, MASTERS, RECOGNIZED

More information

MANDATORY EMERGENCY TOWING SYSTEMS ON SHIPS OTHER THAN TANKERS OF NOT LESS THAN 20,000 DWT. Report of the correspondence group

MANDATORY EMERGENCY TOWING SYSTEMS ON SHIPS OTHER THAN TANKERS OF NOT LESS THAN 20,000 DWT. Report of the correspondence group INTERNATIONAL MARITIME ORGANIZATION E SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 49th session Agenda item 7 IMO DE 49/7 18 November 2005 Original: ENGLISH MANDATORY EMERGENCY TOWING SYSTEMS ON SHIPS OTHER

More information

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) Annex 3, page 1 ANNEX 3 RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS,

More information

RESOLUTION MSC.35(63) (adopted on 20 May 1994) ADOPTION OF GUIDELINES FOR EMERGENCY TOWING ARRANGEMENTS ON TANKERS

RESOLUTION MSC.35(63) (adopted on 20 May 1994) ADOPTION OF GUIDELINES FOR EMERGENCY TOWING ARRANGEMENTS ON TANKERS MSC 63/23/Add.1 RESOLUTION MSC.35(63) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING

More information

GUIDANCE ON SHIPBOARD TOWING AND MOORING EQUIPMENT

GUIDANCE ON SHIPBOARD TOWING AND MOORING EQUIPMENT INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 IMO E Ref. T4/3.01 MSC/Circ.1175 24 May 2005 GUIDANCE ON SHIPBOARD TOWING AND MOORING

More information

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 2003 This booklet includes the relevant amendments and corrections

More information

INFORMATION BULLETIN No. 165

INFORMATION BULLETIN No. 165 Bulletin No. 165 Revision No. 03 Issue Date 05 Sep 2017 Effective Date 05 Sep 2017 INFORMATION BULLETIN No. 165 International Convention for the Control and Management of Ships Ballast Water and Sediments,

More information

Guideline No.: E-03(201806) E-03 MOTORS. Issued date: June 7, China Classification Society

Guideline No.: E-03(201806) E-03 MOTORS. Issued date: June 7, China Classification Society Guideline No.: E-03(201806) E-03 MOTORS Issued date: June 7, 2018 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical requirements, inspection and testing

More information

BPQ5 USA Offshore Tug Date updated date 2 Tug Name text 3 Identification. 5 Build 1 Date delivered (built) 2 Builder (where rebuilt)

BPQ5 USA Offshore Tug Date updated date 2 Tug Name text 3 Identification. 5 Build 1 Date delivered (built) 2 Builder (where rebuilt) Chapter General Information Section General Information Date upd Tug Name 3 Identification IMO VIN 4 Vessel's previous name(s) Grid column Grid column Grid row Grid row Grid row 3 Grid row 4 5 Build Name

More information

AIR LUBRICATION SYSTEM INSTALLATION

AIR LUBRICATION SYSTEM INSTALLATION Guide for Air Lubrication System Installation GUIDE FOR AIR LUBRICATION SYSTEM INSTALLATION OCTOBER 2018 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2018

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

Ships in Operation Survey Requirements

Ships in Operation Survey Requirements Rules for Classification of Ships, July 2006 Pt.7 Ships in Operation Survey Requirements Issued 1. July 2006 This report contains DNV s overall interpretation of the consequences of the many new DNV rules

More information

INFORMATION BULLETIN No. 165

INFORMATION BULLETIN No. 165 Bulletin No. 165 Revision No. 00 Issue Date 09 Jun 2017 Effective Date 09 Jun 2017 INFORMATION BULLETIN No. 165 International Convention for the Control and Management of Ships Ballast Water and Sediments,

More information

ANNEX 9. RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

ANNEX 9. RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) Annex 9, page 1 ANNEX 9 RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention

More information

Technical Publication. Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) /

Technical Publication. Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) / Technical Publication Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) / March 2018 Technical Publication content / Introduction Amendments to MARPOL Annex VI The timeline

More information

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973, AS MODIFIED

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 07 Date: 23/06/15 Reference: Health, Safety and Welfare at Work (General Application)

More information

Ballast Water Management Surveyor checklist

Ballast Water Management Surveyor checklist Ballast Water Management Surveyor checklist Last updated: July 2017 This document is uncontrolled if printed, please refer to the Maritime New Zealand website for the latest version. Use this checklist

More information

Shipping Guidance Notice 069. EU Monitoring, Reporting and Verification (MRV) regulations and IMO Data Collection Data Collection System (DCS)

Shipping Guidance Notice 069. EU Monitoring, Reporting and Verification (MRV) regulations and IMO Data Collection Data Collection System (DCS) Watergate House Tel (+350)200 46862 / 200 47771 /200 50424 2/8 Casemates Square Fax (+350) 200 47770 Gibraltar e-mail: maritime.survey@gibraltar.gov.gi maritime.registry@gibraltar.gov.gi Shipping Guidance

More information

MSN 047 June 2014 MANX SHIPPING NOTICE DEPARTMENT OF ECONOMIC DEVELOPMENT

MSN 047 June 2014 MANX SHIPPING NOTICE DEPARTMENT OF ECONOMIC DEVELOPMENT MANX SHIPPING NOTICE MSN 047 June 2014 DEPARTMENT OF ECONOMIC DEVELOPMENT Anti-fouling Systems Convention The International Convention on the Control of Harmful Anti-fouling Systems on Ships (AFS Convention)

More information

Information Notice (rev3) DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Ballast Water Management

Information Notice (rev3) DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Ballast Water Management Information Notice 2016-003 (rev3) DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Ballast Water Management 1. Introduction This Information Notice is to draw attention to all involved parties

More information

1.2 For the purpose of this UR, the following definitions apply: Low-Speed Engines means diesel engines having a rated speed of less than 300 rpm.

1.2 For the purpose of this UR, the following definitions apply: Low-Speed Engines means diesel engines having a rated speed of less than 300 rpm. (Feb 2015) (Corr.1 June 2016) Type Testing of I.C. Engines 1. General 1.1 Type approval of I.C. engine types consists of drawing approval, specification approval, conformity of production, approval of

More information

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS REPUBLIC OF Marine Notice THE MARSHALL ISLANDS No. 7-051-2 OFFICE OF THE MARITIME ADMINISTRATOR Rev. 5/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

Optimising overall functionality of your ships integrated anchor handling, towing, mooring and subsea load handling solutions

Optimising overall functionality of your ships integrated anchor handling, towing, mooring and subsea load handling solutions Optimising overall functionality of your ships integrated anchor handling, towing, mooring and subsea load handling solutions Winches Operational profitability through pioneering technology, reliability

More information

To: Owners, Technical Managers, Deputy Registrars, Fleet Managers, Surveyors, Recognised Organisations

To: Owners, Technical Managers, Deputy Registrars, Fleet Managers, Surveyors, Recognised Organisations Circular 169/ 2018 To: Owners, Technical Managers, Deputy Registrars, Fleet Managers, Surveyors, Recognised Organisations Subject: MARPOL Annex VI Fuel Oil Consumption Data Collection Date: 12th April

More information

Form of IOPP Certificate and Supplements * INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE

Form of IOPP Certificate and Supplements * INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE Appendix II Appendices to Annex I Form of IOPP Certificate and Supplements * Annex I INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE (Note: This Certificate shall be supplemented by a Record of Construction

More information

Guideline No.: E-03(201610) E-03 MOTORS. Issued date: October 28,2016. China Classification Society

Guideline No.: E-03(201610) E-03 MOTORS. Issued date: October 28,2016. China Classification Society Guideline No.: E-03(201610) E-03 MOTORS Issued date: October 28,2016 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical requirements, inspection and

More information

DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION OF MARPOL ANNEX VI

DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION OF MARPOL ANNEX VI E INTERSESSIONAL MEETING ON CONSISTENT IMPLEMENTATION OF REGULATION 14.1.3 OF MARPOL ANNEX VI Agenda item 2 25 May 2018 ENGLISH ONLY DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION

More information

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) REGULATORY AMENDMENTS ENTERING INTO FORCE DURING JANUARY 2017

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) REGULATORY AMENDMENTS ENTERING INTO FORCE DURING JANUARY 2017 Information Notice 2016-006 DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) REGULATORY AMENDMENTS ENTERING INTO FORCE DURING JANUARY 2017 Information regarding the most significant regulatory

More information

RESOLUTION MEPC.181(59) Adopted on 17 July GUIDELINES FOR PORT STATE CONTROL UNDER THE REVISED MARPOL ANNEX VI

RESOLUTION MEPC.181(59) Adopted on 17 July GUIDELINES FOR PORT STATE CONTROL UNDER THE REVISED MARPOL ANNEX VI MEPC 59/24/Add.1 RESOLUTION MEPC.181(59) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization concerning the functions of the

More information

Lifting / Spreader Beams

Lifting / Spreader Beams Lifting / Spreader Beams Contents 1 CERTEX NORWAY AS company information 2 2 Definitions 3 3 DNV GL Type Approved Lifting Beams 4 3.1 Multi Section Beams 5 3.2 Single Section Beams 6 3.3 Shackles 7 3.4

More information

Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management

Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management Ballast water management surveyor guidance Page 1 of 9 Ballast

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

This is to certify: Application : Certificate No: TAS000011V. That the Lifting set for Offshore containers and Portable Offshore Units

This is to certify: Application : Certificate No: TAS000011V. That the Lifting set for Offshore containers and Portable Offshore Units Certificate No: TAS000011V This is to certify: That the Lifting set for Offshore containers and Portable Offshore Units with type designation(s) Green Pin Standard and Green Pin Polar shackles Issued to

More information

Guideline No.: E-04(201610) E-04 GENERATORS. Issued date: October 28,2016. China Classification Society

Guideline No.: E-04(201610) E-04 GENERATORS. Issued date: October 28,2016. China Classification Society Guideline No.: E-04(201610) E-04 GENERATORS Issued date: October 28,2016 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical requirements, inspection

More information

FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES.

FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES. FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES. EXTRACTS FROM MALAYSIA MARINE DEPARTMENT TERMS & CONDITIONS FOR STS OPERATIONS CONDITIONS

More information

M-24 OUTBORD ENGINES

M-24 OUTBORD ENGINES Guideline No.: M-24(201510) M-24 OUTBORD ENGINES Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

INFORMATION BULLETIN No. 84

INFORMATION BULLETIN No. 84 Bulletin No. 84 Revision No. 05 Issue Date 23 Oct 2017 Effective Date 01 Nov 2017 INFORMATION BULLETIN No. 84 Oil Record Books Guidance and Instructions for Bahamas Recognised Organisations, Bahamas Approved

More information

EMERGENCY TOWING ARRANGEMENTS HERMES" "HERACLES" & ZEUS INSTALLATION & MAINTENANCE

EMERGENCY TOWING ARRANGEMENTS HERMES HERACLES & ZEUS INSTALLATION & MAINTENANCE EMERGENCY TOWING ARRANGEMENTS HERMES" "HERACLES" & ZEUS 1) FOREWORD INSTALLATION & MAINTENANCE Emergency Towing Arrangements (ETA) "HERMES" & "HERACLES" are designed and produced by POSIDONIA SRL, Genoa

More information

Regulatory update on implementation of the 0.50% sulphur limit for international shipping

Regulatory update on implementation of the 0.50% sulphur limit for international shipping Regulatory update on implementation of the 0.50% sulphur limit for international shipping Marshall Islands Quality Council (MIQC), 19 April 2018 Trinity House, London Dr Edmund Hughes Marine Environment

More information

RESOLUTION MEPC.251(66) Adopted on 4 April 2014

RESOLUTION MEPC.251(66) Adopted on 4 April 2014 RESOLUTION MEPC.251(66) Adopted on 4 April 2014 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973, AS MODIFIED BY THE

More information

Regional Workshop on MARPOL Annex VI: Ship Energy Efficiency and Technology Transfer NOTE

Regional Workshop on MARPOL Annex VI: Ship Energy Efficiency and Technology Transfer NOTE Regional Workshop on MARPOL Annex VI: Ship Energy Efficiency and Technology Transfer Pre-Workshop Assignment Multiple Choice Questions NOTE Those who are going to take part in the workshop should read

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE. Level 3 Assessment Chief and Second Engineer <3000kW

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE. Level 3 Assessment Chief and Second Engineer <3000kW Page 1 of 7 Compiled by Chief Examiner Approved by Executive Head: Centre of Seafarers OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE and Second Engineer Page 2 of 7 Content STCW 78 CHIEF AND SECOND ENGINEER

More information

RESOLUTION MEPC.95(46) Adopted on 27 April 2001 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1978 RELATING TO THE INTERNATIONAL CONVENTION FOR THE

RESOLUTION MEPC.95(46) Adopted on 27 April 2001 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1978 RELATING TO THE INTERNATIONAL CONVENTION FOR THE RESOLUTION MEPC.95(46) OF POLLUTION FROM SHIPS, 1973 (Amendments to regulation 13G of Annex I to MARPOL 73/78 and to the Supplement to the IOPP Certificate) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Report No.: Name of Ship: Plans referred during Initial Survey:

Report No.: Name of Ship: Plans referred during Initial Survey: Report on the Surveys Concerning International Oil Pollution Prevention Certificate Part 7 Survey of installation for discharges from cargo spaces Initial/ Annual/ Intermediate/ Renewal/ Change of Flag

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Lloyd s Register Type Approval System Test Specification Number GT04

Lloyd s Register Type Approval System Test Specification Number GT04 Lloyd s Register Type Approval System Test Specification Number GT04 Gas Turbines Performance and test specifications for Gas Turbines to be used in Marine, Offshore and Industrial Applications 2004 Lloyd's

More information

RULES PUBLICATION NO. 98/P

RULES PUBLICATION NO. 98/P RULES PUBLICATION NO. 98/P GUIDELINES REGARDING THE REQUIREMENTS FOR MARINE DIESEL ENGINES FITTED WITH NO X SELECTIVE CATALYTIC REDUCTION (SCR) SYSTEMS 2018 January Publications P (Additional Rule Requirements)

More information

Part 4 Systems and components Chapter 1 Machinery systems, general

Part 4 Systems and components Chapter 1 Machinery systems, general RULES FOR CLASSIFICATION Ships Edition July 2016 Part 4 Systems and components Chapter 1 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The

More information

Maritime New Zealand Guidelines

Maritime New Zealand Guidelines Maritime New Zealand Guidelines MARINE GUIDANCE NOTICE ISSUE 02-2007 VEHICLE REQUIREMENTS FOR SHIPMENT BY RO-RO This guidance is for: Any person who offers vehicles for carriage by a ro-ro ship Ro-ro ship

More information

United States Coast Guard. USCG Formal Investigation

United States Coast Guard. USCG Formal Investigation United States Coast Guard USCG Formal Investigation .that the inadequate assessment and management of risks by the parties involved was the most significant causal factor of the mishap. Vessel and the

More information

M-22 DUAL FUEL ENGINE

M-22 DUAL FUEL ENGINE Guideline No.: M-22(201510) M-22 DUAL FUEL ENGINE Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

GUIDELINES FOR PORT STATE CONTROL UNDER MARPOL ANNEX VI

GUIDELINES FOR PORT STATE CONTROL UNDER MARPOL ANNEX VI INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 IMO E Ref. T5/1.08 MEPC/Circ.472 29 July 2005 GUIDELINES FOR PORT STATE CONTROL UNDER

More information

ALP introduces its next generation long distance ocean towing anchor handling fleet

ALP introduces its next generation long distance ocean towing anchor handling fleet ALP introduces its next generation long distance ocean towing anchor handling fleet 2015 ocean towage anchor handling offshore supply positioning and mooring salvage alpspecs The ALP Fleet of long distance

More information

Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0) Website:

Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0) Website: Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0)1534 447788 Email: jerseyharbours@ports.je Website: www.ports.je Vessel bunkering operations and the transfer of waste liquids

More information

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society Guideline No.: E-07(201712) E-07 TRANSFORMERS Issued date: December 26, 2017 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Ballast Water Convention

Ballast Water Convention Ballast Water Convention January 2017 L-C&R / SCD Foreword - Invasive aquatic species / Ballast Water Invasive aquatic species are one of the greatest threats to the world s oceans, and can cause extremely

More information

N-03 STEERING GEAR CONTROL SYSTEMS

N-03 STEERING GEAR CONTROL SYSTEMS Guideline No.: N-03(201510) N-03 STEERING GEAR CONTROL SYSTEMS Issued date: October 20,2015 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical requirements,

More information

RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION July

RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION July RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION 2017 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules

More information

PS 127 Abnormal / Indivisible Loads Policy

PS 127 Abnormal / Indivisible Loads Policy PS 127 Abnormal / Indivisible Loads Policy June 2017 Version 1.5 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains RENTAL DIVISION PRODUCT LINES In a continuing effort to give the customer the opportunity to get an assortment of equipment, services and products from one supplier, our rental division was established

More information

FEUBO Catalogue 2016

FEUBO Catalogue 2016 FEUBO Catalogue 2016 Contents C-Links: C-Type Connector 4 Marc 5 Pear Link 6 Chasing Equipment: Grapnel 7 J-Chaser 8 Labyrinth Wire Rope Grapnel 9 Permanent Chaser 10 Roller Chaser 11 Hooks: KS Hook 12

More information

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1 28 October 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

REPUBLIC OF THE MARSHALL ISLANDS

REPUBLIC OF THE MARSHALL ISLANDS REPUBLIC OF THE MARSHALL ISLANDS MARITIME ADMINISTRATOR 11495 COMMERCE PARK DRIVE RESTON, VIRGINIA 20191-1506 TEL: +1-703-620-4880 FAX: +1-703-476-8522 Email: technical@register-iri.com TECHNICAL CIRCULAR

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

CHAIN BLOCK AND WIRE SLINGS REGISTER

CHAIN BLOCK AND WIRE SLINGS REGISTER CHAIN BLOCK AND WIRE SLINGS REGISTER M/T Port of Registry International Call Sign Flag IMO Number THIS PLAN WILL NEED TO BE MADE AVAILABLE FOR INSPECTION ON OCCASIONS. Record of Revisions Revision / Date

More information

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping IBIA/BMS United A glimpse into the future of shipping 30 May 2018, Athens, Greece

More information

MINIBUS AND TRANSPORT POLICY

MINIBUS AND TRANSPORT POLICY MINIBUS AND TRANSPORT POLICY Date last reviewed: 06/12/17 Review date: Autumn 2018 Responsible Committee : FGB Person Responsible: Transport Manager The policy applies to: All minibuses with up to 16 passenger

More information

This is to certify: Application : Certificate No: TAS000011V Revision No: 1. That the Lifting set for Offshore containers and Portable Offshore Units

This is to certify: Application : Certificate No: TAS000011V Revision No: 1. That the Lifting set for Offshore containers and Portable Offshore Units Certificate No: TAS000011V Revision No: 1 This is to certify: That the Lifting set for Offshore containers and Portable Offshore Units with type designation(s) Green Pin Standard and Green Pin Polar shackles

More information

2nd EDITION STEVPRIS FLIPPER DELTA DANFORTH AC-14 SWIVEL SHACKLE DETACHABLE PEARLINK HINGE LINK LINK

2nd EDITION STEVPRIS FLIPPER DELTA DANFORTH AC-14 SWIVEL SHACKLE DETACHABLE PEARLINK HINGE LINK LINK STEVPRIS FLIPPER DELTA DANFORTH AC-14 SWIVEL SHACKLE DETACHABLE PEARLINK HINGE LINK LINK SHACKLE GOLDNOSE CLOSED/OPEN SOCKET GRAPNEL J CHASER 2nd EDITION JS OFFSHORE SUPPLY PTE LTD 7500A Beach Road #13-304

More information

ABS Guide for Certification of Lifting Appliances 2016: Focus on machinery

ABS Guide for Certification of Lifting Appliances 2016: Focus on machinery ABS Guide for Certification of Lifting Appliances 2016: Focus on machinery Cernusco sul Naviglio, Italy 19 May 2016 Marine & Offshore Meeting 2016 Guide for Certification of Lifting Appliances Lifting

More information

POLLUTION PREVENTION AND RESPONSE (MATTERS EMANATING FROM THE FIFTH SESSION OF THE SUB-COMMITTEE)

POLLUTION PREVENTION AND RESPONSE (MATTERS EMANATING FROM THE FIFTH SESSION OF THE SUB-COMMITTEE) E MARITIME SAFETY COMMITTEE 100th session Agenda item 8 MSC 100/8/1 XX October 2018 Original: ENGLISH POLLUTION PREVENTION AND RESPONSE (MATTERS EMANATING FROM THE FIFTH SESSION OF THE SUB-COMMITTEE) Effective

More information

SHOCK TESTING OF EQUIPMENT AND SYSTEMS NAVAL APPLICATIONS

SHOCK TESTING OF EQUIPMENT AND SYSTEMS NAVAL APPLICATIONS CLASSIFICATION NOTES No. 57.1 SHOCK TESTING OF EQUIPMENT AND SYSTEMS NAVAL APPLICATIONS JANUARY 2002 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous

More information

GUIDANCE NOTE ON THE USE OF RED DIESEL FOR PROPELLING PRIVATE PLEASURE CRAFT. Legal Background

GUIDANCE NOTE ON THE USE OF RED DIESEL FOR PROPELLING PRIVATE PLEASURE CRAFT. Legal Background GUIDANCE NOTE ON THE USE OF RED DIESEL FOR PROPELLING PRIVATE PLEASURE CRAFT Legal Background Pursuant to the EU Energy Products Directive 2003/96, EU member states are free to impose their own rate of

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants Page 1 of 8 Compiled by Approved by Chief Examiner Syllabus Committee: 26 February 2013 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Deck: Page 2 of 8 KNOWLEDGE, UNDERSTANDING

More information

Decree of the Ministry of Transport and Communications

Decree of the Ministry of Transport and Communications 579/2000 Decree of the Ministry of Transport and Communications on transportable pressure equipment and tanks discharged or filled by pressure and used for the transport of dangerous goods Adopted in Helsinki,

More information