1 Transport Management Plan and Swept Path Analysis APPENDIX 9 Transport Management Plan and Swept Path Analysis Erection of Single Wind Turbine, Land at Sedgemoor Road, Eston, TS6 0UA Future Energy Partnership May 2015 By Entrust Planning Consultants Daresbury Innovation Centre, Keckwick Lane Daresbury WA4 4FS Tel:

2 Transport Management Plan and Swept Path Analysis Table of Contents 1. INTRODUCTION INTRODUCTION ASSESSMENT SCOPE AND APPROACH VEHICLES, LOADS and TRIPS PROPOSED DELIVERY ROUTE CONCLUSION POTENTIAL EVALUATION or MITIGATION REQUIREMENTS

3 Transport Management Plan and Swept Path Analysis 1. INTRODUCTION 1.1. INTRODUCTION This report has been commissioned by Entrust Professional Services Limited on behalf of the Future Energy Partnership to accompany a planning application for the erection of a single wind turbine, measuring 55m to hub and 77m to tip, on land south of Eston, Middlesbrough, Redcar and Cleveland. The purpose of this report is to assess the traffic and transport effects of the proposed Eston wind turbine as well as proposing a delivery route. The main transport effects will be associated with the movements of turbine delivery vehicles (TDVs) and heavy goods vehicles (HGVs) to and from the development site during the construction phase of the proposed development. It should be noted that this report uses Enercon's E44 Access Roads and Crane Platforms' guidelines and 'Packing List' document's as best practise standards, which the applicant proposes to adhere to for the delivery of the proposed turbine ASSESSMENT SCOPE AND APPROACH 1. The main transport impacts will be associated with the movement of HGVs to and from the development site during the construction phase of the development. Consideration has been given to the most suitable routing for the construction traffic to and from the development site. 2. Based on a desk study, on-site observations and advice received from Local Transport Projects (who carried out the swept path analysis contained in Appendix A) the proposed route for the delivery of construction materials, the turbine and associated equipment has been identified. The manufacturer of the machine will also be contacted upon the receipt of the grant of planning permission and prior to the construction process. 3. The Highways District Office were not consulted pre-planning as the delivery route is considered to be straight forward enough. Should a grant of planning permission be issued by the Local Planning Authority, the applicant is agreeable to a condition which requires the final transport management plan to be agreed in writing with the Highways District Office prior to the commencement of construction of the project. 3

4 Transport Management Plan and Swept Path Analysis 4. The site address is: Land at Eston, Sedgemoor Road, Middlesbrough, Cleveland, TS6 0UA 5. The proposed wind turbine site is located approximately 1.7km SSE of Eston, Cleveland. The location of the site is shown in Figure 1.1 below: Proposed Turbine Location Figure 1.1 4

5 Transport Management Plan and Swept Path Analysis 1.3. VEHICLES, LOADS and TRIPS The following information is what is typically required by Highways Agencies for medium sized wind turbine developments which are relatively straight forward in comparison to large scale wind farm developments. 1. The type of vehicles proposed for transporting the turbine components, construction plant and materials for the construction, maintenance and de-commissioning of the turbine. Please see Appendix B attached, which contains two documents; (1) Enercon's Access Roads and Crane Platforms ' guidelines and; (2) Enercon's 'Packing List'...both which contain details of the type of vehicles which will be used for transporting turbine components, construction plant and materials for the construction, maintenance and de-commissioning of the turbine. The documents contain dimensions of the vehicles and various components which will be used during construction, maintenance and de-commissioning. It should be noted that the turbine manufacturer Enercon were consulted directly for this information. 2. The weights of vehicles plus loads In order to obtain the relevant information Entrust consulted CLS Civil Engineering Ltd / CLS Demolition Ltd who have carried out the construction of numerous Wind Turbine projects to date. It is anticipated that during the first two weeks of the construction phase of the project there will be between 5 and 10 (20 tonne) loads of material a day delivered to site. The gross weight of the 8 wheeler tipper will be 30 tonnes. During the fifth week of the project for one day only there will be a delivery of approximately 23 (6m 3 ) loads of concrete to the proposed site. The gross weight of the concrete wagon will be 25 tonnes. 3. The number of trips The number of trips and frequency is outlined in point 2 above. 5

6 Transport Management Plan and Swept Path Analysis 4. The route to be used for transporting the turbine and construction plant and materials In order to obtain the relevant information for the proposed transport route Entrust consulted Local Transport Projects who are well renowned experts in the transportation of heavy goods such as the proposed wind turbine. Based on their initial desktop calculation the route outlined in Figure 1.2 below is proposed as the most viable route for transporting the turbine and construction plant and materials PROPOSED DELIVERY ROUTE 1. At the time of writing this report and should planning permission be granted the proposed turbine will be an Enercon E44 type turbine. This manufacturer is based in Continental Europe and therefore it is expected that the turbine will arrive by sea into the nearest port. 2. The following route has been identified as being the most appropriate for the transportation of the proposed wind turbine from the Port of Goole to the site: A66 to Normanby Road; Normanby Road to Flatts Lane; Flatts Lane to proposed site; It is anticipated that normal vehicular traffic associated with the construction of the wind turbine will access via the existing Flatts Lane Centre entrance from Flatts Lane. Once constructed, the wind turbine is designed to operate automatically, with only occasional maintenance required. The number of trips associated with the development of the wind turbine is likely to be negligible. The proposed route is quite straight forward with the majority of the route being on A and B roads which are consistently used by large numbers of HGVs. It is therefore that the construction traffic may only impact the last stretch of this route from Flatts Lane onto the site which is a relatively short stretch of the overall transport route. It is predicted that no significant damage will occur to the roads under the care of the Highways District Office during the various stages of the proposed development's life cycle. However, should any damage occur the Applicant is agreeable to paying any related costs for such repairs in order to return the road to its original condition. 6

7 Transport Management Plan and Swept Path Analysis Figure Swept Path Analysis Following discussions with Local Transport Projects we have identified three potential "pinch" points, which have been examined by way of Swept Path Analysis which is shown in Appendix A of this report. The Applicant will provide the final transport route and transport management plan once a decision has been issued on the planning application. The Applicant will agree the final transport route in writing with the Highways District Office prior to the commencement of construction of the proposed development. The Applicant is agreeable to having this secured through a condition on any forthcoming grant of planning permission. 7

8 Transport Management Plan and Swept Path Analysis 2. CONCLUSION 2.1. POTENTIAL EVALUATION or MITIGATION REQUIREMENTS 1. The installation of the proposed single wind turbine with a maximum tip height of 77m will require a small number of Turbine Delivery Vehicles and HGV movements during the construction and installation period. 2. The turbine will be transported using the motorways and major trunk roads apart from a short section towards the end of the delivery route, which leads onto the development site. 3. Due to the reasons outlined in this document, during the construction process, the associated traffic will not cause any adverse effect to either the existing road network or to occupants of nearby residential properties. The current state of roads is sufficient to withstand the amount of transport vehicles without causing any adverse impact on the amenity of local residents or on the infrastructure of the area. 4. As outlined above the Applicant is more than happy to have a condition attached to any forthcoming grant of planning permission stating that the final transport and delivery route is to be agreed in writing with the Highways District Office prior to the commencement of construction of the wind turbine project. 8

9 Transport Management Plan and Swept Path Analysis APPENDICES APPENDIX A APPENDIX B SWEPT PATH ANALYSIS (LOCAL TRANSPORT PROJECTS) ENERCON'S 'Access Roads and Crane Platforms ' guidelines and 'Packing List' 9

10 Transport Management Plan and Swept Path Analysis APPENDIX A Swept Path Analysis (Local Transport Projects) 1

11 10mm Local Transport Projects A3 Blades Transport Vehicle Profile Generator Transport Vehicle Profile Tower Transport Vehicle Profile 1. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 2. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 3. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. iii. iv. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Transport Vehicle Profiles traffic engineering and transport planning 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 100 Status WORKING DRAFT not for issue TK PRELIMINARY DRAWING subject to detailed design DRAFT FINAL DRAWING CONSULTATION DRAWING CONSTRUCTION DRAWING This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd Drawing number Project Job Drawing Sheet Revision LTP/ 2096 / T4 /

12 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - blades transport A66 Roundabout, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 500 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T1 /

13 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - generator transport A66 Roundabout, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 500 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T2 /

14 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - tower section transport A66 Roundabout, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 500 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T3 /

15 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - blades transport Junction of the A66 and Normanby Road, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T1 /

16 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - generator transport Junction of the A66 and Normanby Road, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T2 /

17 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - tower section transport Junction of the A66 and Normanby Road, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T3 /

18 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - blades transport Junction of Flatts Lane and the proposed site access, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T1 /

19 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - generator transport Junction of Flatts Lane and the proposed site access, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T2 /

20 10mm Local Transport Projects A3 Outer wheel tracks (see note 4) Vehicle swept path Load swept path Vehicle Centreline and direction 1. Simulated speed - not more than 5 mph 2. Trailer model based on specifications provided by Enercon (Access Roads and Crane Platforms / Provisional Packing List). 3. Actual vehicle dimensions and track may vary. Route should be assessed by the haulier with regard to vehicle combinations to be used prior to transport. 4. Line of outer wheel tracks does not account for rotation of rear wheels while being steered. Notes:- Key:- Disclaimers:- i. This drawing is copyright and must not be copied in part or in whole unless agreed in writing by Local Transport Projects Ltd ii. All dimensions are to be checked by the contractor prior to commencement of work. Any discrepancy shall be reported immediately to Local Transport Projects Ltd iii. iv. All work shall be carried out in accordance with local authority, statutory authority and health & safety requirements & regulations Based upon or reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationary Office. Licence Number Rev. Date By Chk Description Client Project Proposed Single Wind Turbine at: Land at Eston, Middlesbrough Title Swept path analysis - tower section transport Junction of Flatts Lane and the proposed site access, Middlesborough traffic engineering and transport planning Location of traffic islands (and street furniture) to be confirmed prior to transportation. Appropriate mitigation to accommodate the vehicle should be undertaken prior to transportation. 22, Trinity Lane, Beverley, info@local-transport-projects.co.uk East Riding of Yorkshire. HU17 0DY. Registered No Drawn Date RD 27th February 2015 Scale Approved 1 : 250 Status WORKING DRAFT not for issue DRAFT CONSULTATION DRAWING Drawing number TK PRELIMINARY DRAWING subject to detailed design FINAL DRAWING CONSTRUCTION DRAWING Project Job Drawing Sheet Revision LTP/ 2096 / T3 /

21 Transport Management Plan and Swept Path Analysis APPENDIX B ENERCON'S 'Access Roads and Crane Platforms ' guidelines and 'Packing List' 1

22 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 1 of 12 Access Roads and Crane Platforms E-44 44m steel tower Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

23 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 2 of 12 CONTENTS Page 1. Assembling the tower and wind energy converter 3 2. Crane technology 2.1. Details of crane technology Supporting base and working radius Installing the telescopic crane Assembling the jib 4 3. Access roads 3.1. Minimum requirements of access roads Example of access road construction Transport structure clearance Access road bearing capacity Basic principles of access road construction 6 4. Radii of curves 4.1. Minimum requirements of intersections and curves Radius of curve < 90 degrees Road performance of vehicles in curves 8 5. Transport and logistics 5.1. Basic principles of transport Overview of transport vehicles 9 6. Crane platforms 6.1. Minimum requirements of crane platforms Standard crane platform 12 Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

24 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 3 of Assembling the tower and wind energy converter The tower and wind energy converter are installed in two stages (work steps): Step 1 Bolting the tower flanges to assemble the supplied tower sections. The 44m steel tower consists of two tower sections. Step 2 Preassembly of the supplied converter components and subsequent assembly of the wind energy converter. 2. Crane technology 2.1. Details of crane technology The following crane technology is required for the work steps described above: Crane type Length/basic unit Width/basic unit Track width Supporting base Working radius 44m steel tower 300t telescopic crane 16 m 3 m 3 m 10 m x 10 m 12 m - 17 m 2.2. Supporting base and working radius The supporting base describes the distance between the four support cylinders arranged in a square (in metres). The working radius is the minimum distance between the crane hook and the crane s live ring. Example: With a working radius of 17 m, the distance from the live ring to the centre of the foundation would be at least 17 m (see 6.2.). Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

25 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 4 of Installing the telescopic crane The following work steps need to be performed: - Drive crane into position - Align the crane with the centre of the WEC (taking into account the working radius) - Use approx. 5 trucks to transport the crane accessories to the telescopic crane with luffing jib - Support the crane on the crane platform using load distribution plates and - Assemble jib 2.4. Assembling the jib The jib of the telescopic crane should be extended with a fixed boom extension by approx. 20m. Afterwards the jib has to be extended to achieve the required installation height. 3. Access roads Any roadways, bridges or access roads have to be able to withstand the transportation of heavy loads up to a maximum axle load of 12t and a maximum overall weight of 120t. Access has to be kept clear at all times. The responsible ENERCON Project Manager has to be informed of any failure to meet these requirements Minimum requirements of access roads Useful width of carriageway Clearance width Clearance height Radius of curve, external 4 m 5 m 4.6 m 28 m Incline with loose surface 7% Incline with fixed surface (paved) 12% Ground clearance of transport vehicles 0.15 m Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

26 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 5 of Example of access road construction 5 Gravel 2,5 % Recycling material 4,00 (Useful width) Fibrous material 5,00 (Clearance width) Caution: The structure illustrated above is merely an example of average bearing soil. If the subsoil is soft (boggy soil, etc.), it may be necessary to use more backfill, install a geogrid and make use of gravel. ENERCON has always to be consulted prior to any construction work Transport structure clearance 5,00 4,50 3,30 Tower section 4,60 Generator Vehicle 2,60 Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

27 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 6 of Access road bearing capacity In the case of cohesive soils, the use of a geotextile or geogrid is recommended, as this makes for better distribution of the load across the access road s subgrade. It will also increase the access road s service life and durability. During construction, plate load bearing tests should be carried out to ensure that the necessary bearing capacity is achieved. Data for soil experts: Subsoil Base course Maximum axle load of transport vehicles Maximum axle load of crane Maximum vehicle weight E v2 45 MN/m² E v2 100 MN/m² 10t 12t 120t 3.5. Basic principles of access road construction - Useful carriageway width of 4 m - Able to withstand an axle load of up to 12t - Able to withstand an overall weight of up to 120t - Carriageway width of 5.5 m on curves - No obstacles on inside/outside of curves - Clearance width of 5 m - Clearance height of 4.6 m - Checking of bridge bearing capacity - Checking of outlets and pipework - Checking of distances from graves, hollows and watercourses - Checking of distances from high voltage/electrical/telephone cables and - Inspection of inclines Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

28 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 7 of Radii of curves 4.1. Minimum requirements of intersections and curves In contrast to intersections, areas involving curves do not require the same degree of reinforcement, as the squinch does not need to be constructed. 2,00 4,00 INTERSECTION AREA 2,00 4,00 CURVE AREA 8,00 8,00 10,00 28,00 15,50 8,00 R 28,00 14,00 16,00 4,00 5,50 24,00 20,00 4,00 8,00 4,00 Intersections The construction method for intersection areas as illustrated above should be used for existing intersections. The stippled area must be stable, or it will need to be reinforced. The hatched areas have to be free of obstacles, as the load that is being transported may protrude into these areas (for example, rotor blades may protrude from the rear of the vehicle by 7 m during transport). Curves The construction method for curve areas as illustrated above should be used for new access roads within the context of any curves. The hatched areas have to be free of obstacles, as the load that is being transported may protrude into these areas. Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

29 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 8 of Radius of curve < 90 degrees If the angle of the curve under construction is < 90 degrees, the curve moves outwards and the area associated with the necessary carriageway width of 5.5 m has to be enlarged accordingly (see marking). The load again protrudes into the inside and outside areas of the curve (see 4.1) >4 4 R28 R28 R28 5, Road performance of vehicles in curves The figure bellow illustrates the movement of blades as they are transported round a curve. Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

30 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 9 of Transport and logistics 5.1. Basic principles of transport It is a basic principle that transport vehicles should not exceed the maximum axle load of 10t. Thus, a transport vehicle with an actual overall weight of 100t has to have at least 10 axles. The following vehicles are used on ENERCON construction sites: - Lowloader trailers - Drop base vehicles - Semi trailers and - Adapter vehicles The vehicles vary to some extent in terms of length and width and can be shortened (pushed in) by several metres once they have been unloaded Overview of transport vehicles Semi trailer, steel section Telescopic semi, machine house components Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

31 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 10 of 12 Flatbed trailer, hub 8-axled semi, generator Semi trailer, rotor blade Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

32 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 11 of Crane platforms 6.1. Minimum requirements of crane platforms The crane platform is the key to ensuring that everything runs smoothly and safely during the construction phase. It should take the form of a coarse, level surface with a top surface made from recycled materials or mixed minerals with a grain size of 0 32 mm. The crane platform should be located above ground level to ensure that surface water is properly dispersed. During construction, plate load bearing tests should be carried out to ensure that the necessary bearing capacity is achieved. Any cranes used have a maximum support pressure of 200t and are supported on the crane platform by means of load distribution plates. Pressures of up to 18.5t/m² may act on the platform as a result of this and the maximum surface pressure is therefore 185 kn/m 2. The dimensions of the crane platform should be calculated so that all the work necessary for installing the wind energy converter (including tower) can be carried out in the optimum manner. The example given in 6.2 provides a basic standard. This can be adapted to local conditions in consultation with the competent ENERCON Project Manager. The soft, levelled assembly area can be located either to the left or to the right of the crane platform. To ensure that any components inside the tower can subsequently be replaced and to protect the wind energy converter against ingress of dirt, a 5 m wide and stable access road has to be constructed between the crane platform and the tower once the foundation has been backfilled. During foundation construction, the crane platform also serves as a storage area for material (e.g. reinforced steel) and machinery. Any excess earth excavated during the construction phase should always be stored behind the foundation (see 6.2). Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

33 Specification Access Roads and Crane Platforms E-44 / 44m steel tower Page 12 of Standard crane platform 20,00 15,00 9,00 5,00 6,00 Excavated earth 1,00 WEA Soft, levelled assembly area 9,50 Holding rope min. 75,00m R 17,00 30,00 Crane platform Holding rope min. 75,00m Delivery of steel section 4,00 Document information: Author/date: Department: Approved/date: Heiko Krey/ Project Management Gunda Hinderlich/ Translator/date: Revisor/date: Reference: S.Kinne/ G. Hinderlich/ PM-CW-SP038-E44-44mSRT Zuwegung und Kranstellfläche-Rev002ger-eng.DOC

34 ENERCON GmbH Dreekamp 5 D Aurich Project: E-44/S/54/3K/01 Emden- PROVISIONAL PACKING LIST - ESTIMATED PACKING DETAILS - FINAL PACKING LIST TO FOLLOW! Revision date: Pos. Quantity Description Stackable Deck option Max. length m Max. width m Max. height m Single gross weight ton Storage m² Volumn m³ Total gross weight ton CONVERTER 1 1 nacelle on wooden supports; net length 4,10m; - on direct transport together with Pos.4 on one platform-trailer without 20's.o.FR no no 4,10 4,40 3,25 6,00 18,04 58,63 6, generator on wooden supports no no 5,08 4,95 3,10 24,30 25,15 77,95 24, rotorblades E-44 1 set blade frames 40' with overlength both ends yes yes 21,44 2,44 2,72 8,40 52,31 142,29 8, spinner, lower part MH, concrete, stairs (20' s.o. FR seatransport only) yes yes 6,10 2,44 2,60 7,00 14,88 38,70 7, electrical accessories (20' s.o. FR seatransport only) yes no 6,10 2,44 2,60 9,00 14,88 38,70 9,00 5 TOTAL SHIPMENT (Converter): 125,27 356,27 54,70 TOWER max. transport dimensions incl. lashing eyes & transport saddles 1 1 steel tower E-44 section 1 (length 19,92m flange diameter 1,49m/1,81m) unpacked on saddles incl. Lashing eyes no yes 20,07 1,81 1,96 13,58 36,33 71,20 13, steel tower E-44 section 2 (length 17,00m flange diameter 1,81m/2,41m) unpacked on saddles incl. Lashing eyes no yes 17,14 2,41 2,56 17,96 41,31 105,75 17, steel tower E-44 section 3 (length 17,03m flange diameter 2,41m/3,58m) unpacked on saddles incl. Lashing eyes no yes 17,18 3,58 3,73 32,24 61,50 229,41 32, pre delivery foundation basket 6 weeks before 20 Bx yes yes 6,10 2,44 2,60 6,00 14,88 38,70 6,00 4 TOTAL SHIPMENT (Tower): 154,02 445,06 69,78 TOTAL GROSS WEIGHT (Converter + Tower) 124,48 erstellt am: :56

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for.

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for. FEASIBILITY from covering LAND TRANSPORTATION Of WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE for VENTUS ENERGY September 2018 TABLE OF CONTENTS 1. PURPOSE AND SCOPE... 1 1.1. Purpose...

More information

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed

More information

Residential Development Bearna Engineering Services Report

Residential Development Bearna Engineering Services Report Residential Development Bearna Engineering Services Report APPENDIX D Job No: B861G TRAFFIC REPORT TRAFFIC IMPACT ASSESSMENT RESIDENTIAL DEVELOPMENT, BEARNA, CO. GALWAY Burkeway Homes Project No. B861

More information

Established in The experts in heavy transportation and logistics. Products & Services.

Established in The experts in heavy transportation and logistics. Products & Services. Established in 1998 The experts in heavy transportation and logistics. Products & Services www.fte.com.sa The experts in heavy transportation and logistics. Contents About us 2 Heavy haulage 3 Heavy lift

More information

Dropped Crossing Service

Dropped Crossing Service Dropped Crossing Service Ringway Infrastructure Services offer a full service to install Vehicle Dropped Crossings. Our easy to follow guide will allow you to assess whether you need planning permission

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

PROPOSED BROILER FARMS

PROPOSED BROILER FARMS PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment Prepared for PAVILION PARTNERS MARCH, 2014 OUR REFERENCE: 16853R9457 PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment

More information

1. Highway Traffic Act Weight & Dimension Limitations

1. Highway Traffic Act Weight & Dimension Limitations GUIDELINES FOR OVERSIZE/OVERWEIGHT VEHICLES May 2012 1. Highway Traffic Act Weight & Dimension Limitations An oversize/overweight permit is required when the dimensions or weight of a vehicle(s) exceeds

More information

Please Read Carefully

Please Read Carefully Please Read Carefully Name Address Address Address ANNE BRERETON DIRECTOR FOR PLACES Central Depot, Moat Lane Solihull West Midlands B91 2LW Tel: 0121 704 6103 Fax:0121 704 8162 Email: jwilkins@solihull.gov.uk

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

Title: Lifting Operations Involving Crane or Gantry Offshore

Title: Lifting Operations Involving Crane or Gantry Offshore PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

Cuadrilla. Roseacre Wood. Transport Consultation Report

Cuadrilla. Roseacre Wood. Transport Consultation Report Cuadrilla Roseacre Wood Transport Consultation Report November 2017 1 Contents 1 INTRODUCTION... 1 2 PROPOSED HGV ROUTES... 2 3 HGV MANAGEMENT... 4 HGV Daily Cap... 4 Mobilisation/Demobilisation... 4 HGV

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Position Paper. Telehandler Use: Lifting Suspended Loads

Position Paper. Telehandler Use: Lifting Suspended Loads Position Paper Telehandler Use: Lifting Suspended Loads The following paper reflects the considered opinion on the Crane Association of New Zealand (Inc.) This document has been prepared by the Technical

More information

Control, Safe Use and Operation of Road-Rail Plant

Control, Safe Use and Operation of Road-Rail Plant Control, Safe Use and Operation of Page 1 of 13 Part A Synopsis A Standard detailing the requirements for the control, safe use and operation of road-rail plant in the railway environment. Approval and

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES 0 13-Sep-05 Issued for Implementation GD DM PJ Rev # Date Revision Description By Checked Checked App d File

More information

Clyde Waste Transfer Facility Quarterly Truck Noise Measurements April 2009

Clyde Waste Transfer Facility Quarterly Truck Noise Measurements April 2009 REPORT 10-6815-R3 Quarterly Truck Noise Measurements April 2009 PREPARED FOR Cnr Unwin & Shirley Street ROSEHILL NSW 2142 30 APRIL 2009 HEGGIES PTY LTD ABN 29 001 584 612 Quarterly Truck Noise Measurements

More information

A Assembly instructions Mini Rope End Swinger Art. Nr

A Assembly instructions Mini Rope End Swinger Art. Nr A Assembly instructions Mini Rope End Swinger Art. Nr. 4585-45 Operator: Location: Attention! The distance between the center of the poles is 3.00 x 1.00m. In case of an eventual add-on of any other rope-parcours

More information

PRELIMINARY METHOD OF STATEMENT

PRELIMINARY METHOD OF STATEMENT PRELIMINARY METHOD OF STATEMENT LID Energy 30 MW Wind Turbine Erection Project Belen / TURKEY Table of Contents 1. Cranes...... page 3 2. Tackle Check List....... page 3 3. Turbine Details.... page 3 4.

More information

Code of Practice. For works on, near or adjacent to the Luas Tramway

Code of Practice. For works on, near or adjacent to the Luas Tramway Code of Practice For works on, near or adjacent to the Luas Tramway Overhead power cables and any support cables should be treated as "live" at all times. Before attempting to carry out works close to

More information

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135 Condition Assessment and Contributions Study 270 June 2015 Our Ref: SY140135 Copyright Barker Ryan Stewart Pty Ltd 2015 All Rights Reserved Project No. SY140135 Author DH Checked PM Approved GB Rev No.

More information

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide. Discipline: Engineering (Track & Civil) Category: Code Practice Clearances Section 7 Applicability ARTC Network wide Primary Source Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

Transport solutions for HEAVY HAULAGE. Low loaders KAPITEL 1

Transport solutions for HEAVY HAULAGE. Low loaders KAPITEL 1 Transport solutions for HEAVY HAULAGE Low loaders KAPITEL 1 OVERVIEW SERIES LOW LOADERS THE ALL-ROUNDER INDUSTRIES PLATFORM SEMI-TRAILERS SEMI LOW LOADERS LOAD PLATFORM Heavy construction machinery and

More information

Maritime New Zealand Guidelines

Maritime New Zealand Guidelines Maritime New Zealand Guidelines MARINE GUIDANCE NOTICE ISSUE 02-2007 VEHICLE REQUIREMENTS FOR SHIPMENT BY RO-RO This guidance is for: Any person who offers vehicles for carriage by a ro-ro ship Ro-ro ship

More information

Chapter 11 Route Window NE10 Gidea Park station. Transport for London

Chapter 11 Route Window NE10 Gidea Park station. Transport for London Chapter 11 Route Window NE10 Gidea Park station Transport GIDEA PARK STATION 11 Route Window NE10 Gidea Park station Transport Introduction 11.1 The construction activities in this route window are associated

More information

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies

More information

PS 127 Abnormal / Indivisible Loads Policy

PS 127 Abnormal / Indivisible Loads Policy PS 127 Abnormal / Indivisible Loads Policy June 2017 Version 1.5 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

Lake County Building Department

Lake County Building Department Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking

More information

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Tel: 01342 893806 Fax: 01342 893158 www.blockadeservices.co.uk Steve Burrows started as a sole trader

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

GUIDELINES FOR PERMITTING PRIVATELY OWNED CIRCUITS COACHING / PRACTICE & OTHER NON-COMPETITION EVENTS

GUIDELINES FOR PERMITTING PRIVATELY OWNED CIRCUITS COACHING / PRACTICE & OTHER NON-COMPETITION EVENTS GUIDELINES FOR PERMITTING PRIVATELY OWNED CIRCUITS for COACHING / PRACTICE & OTHER NON-COMPETITION EVENTS Table of Contents Item 1.0 Background 2.0 Key Steps Step 1: Application For A Track Licence Step

More information

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Gisborne District Traffic and Parking Bylaw DOCS_n144966 Gisborne District Traffic and Parking Bylaw 2011 DOCS_n144966 Contents 1. TITLE 1 2. COMMENCEMENT AND REPEALS 1 3. APPLICATION 1 4. INTERPRETATION 1 5. GENERAL 3 6. PARKING 7. PARKING OF HEAVY MOTOR VEHICLES

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014 K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014 K2 Wind Background The K2 Wind Power Project is a 270 megawatt (MW) wind project being developed in the Township of Ashfield-Colborne-Wawanosh

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Australian Standard. Cranes, hoists and winches Safe use. Part 10: Mobile elevating work platforms AS AS

Australian Standard. Cranes, hoists and winches Safe use. Part 10: Mobile elevating work platforms AS AS AS 2550.10 2006 AS 2550.10 2006 Australian Standard Cranes, hoists and winches Safe use Part 10: Mobile elevating work platforms This Australian Standard was prepared by Committee ME-005, Cranes. It was

More information

Field Testing to Validate Standardized Bridge Approach Curve Design Recommendations

Field Testing to Validate Standardized Bridge Approach Curve Design Recommendations Field Testing to Validate Standardized Bridge Approach Curve Design Recommendations Date: December, 2016 By: Alex Forrester, PEng, RPF fpinnovations.ca is a not-for-profit worldleading R&D institute that

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

LOAD CHART & RIGGING LEARNING GUIDE

LOAD CHART & RIGGING LEARNING GUIDE LOAD CHART & RIGGING LEARNING GUIDE MOBILE HYDRAULIC CRANE 80 Tonnes & Under Grove RT870 CraneSafe Certification Mobile Hydraulic 80 Tonnes & Under LEARNING GUIDE LCR.MH80.GVRT870.LG1.Q4(290109) 28 June

More information

CraneSafe. Certification. CraneSafe Certification. CraneSafe. Certification

CraneSafe. Certification. CraneSafe Certification. CraneSafe. Certification LOAD CHART & RIGGING PRACTICE EXERCISES TOWER CRANE Pecco SK 170 Tower Crane PRACTICE EXERCISES LCR.TC.PCSK170.P1 1 December 2010 + Fulford Harbour Group Tel: 604.952.6033 www.fulford.ca Introduction These

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Load Chart Exercise Workbook

Load Chart Exercise Workbook Load Chart Exercise Workbook (508) 212-4735 Copy Right 2017 For Exam Use Only BRODERSON IC-80-2D RATED LIFTING CAPACITIES IN POUNDS LOAD RADIUS IN FEET 5 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 ON RUBBER

More information

TRAFFIC REGULATION APPROVAL PROCESS

TRAFFIC REGULATION APPROVAL PROCESS Approved: Effective: August 22, 2017 Review: June 21, 2017 Office: Traffic Engineering and Operations Topic No.: 750-010-011-e Department of Transportation PURPOSE TRAFFIC REGULATION APPROVAL PROCESS To

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:

More information

EP4-Platform: E-126 EP4 / E-141 EP4. Arno Hildebrand, Programm Manager EP4 ENERCON Research & Development

EP4-Platform: E-126 EP4 / E-141 EP4. Arno Hildebrand, Programm Manager EP4 ENERCON Research & Development EP4-Platform: E-126 EP4 / E-141 EP4 Arno Hildebrand, Programm Manager EP4 ENERCON Research & Development 1 THE NEW ENERCON 4 MW PLATFORM E-126 EP4 INTELLIGENT ADVANCEMENT OF PROVEN TECHNOLOGY SMART. EFFICIENT.

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

LIEBHERR LTM Ton HYDRAULIC CRANE

LIEBHERR LTM Ton HYDRAULIC CRANE www.baycrane.com LIEBHERR LTM 1250-6.1 300 Ton HYDRAULIC CRANE New York City 11-02 43rd Avenue Long Island City, NY 11101 Tel: 718 392 0800 Fax: 718 349 6681 info@baycrane.com Long Island 389 New South

More information

View thousands of Crane Specifications on FreeCraneSpecs.com HMK. Higher Performance and Faster Handling Mobile Harbour Crane HMK 300 E

View thousands of Crane Specifications on FreeCraneSpecs.com HMK. Higher Performance and Faster Handling Mobile Harbour Crane HMK 300 E HMK Higher Performance and Faster Handling Mobile Harbour Crane HMK 300 E Mobile Harbour Crane HMK 300 E In a Class of its Own Worldwide cargo traffic is continuously growing accordingly, professional

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

The Highways Agency is working to improve the M3 between junctions 2 to 4a. Welcome The Highways Agency is working to improve the M3 between junctions 2 to 4a. The M3 Junctions 2 to 4a is part of a major strategic road network connecting people, communities and businesses, carrying

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

GRAF EcoBloc Stormwater Management System

GRAF EcoBloc Stormwater Management System GRAF EcoBloc Stormwater Management System Scan for more information Technical Guide D9.4 High performance system for managing rain water infiltration, stormwater attenuation and rain water harvesting.

More information

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 PART 10 OF THE KAPITI COAST DISTRICT COUNCIL CONSOLIDATED BYLAWS KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 1 Title, Commencement and Application... 2 2 Bylaw Validation... 2 3 Objective and Scope...

More information

80 Tonnes & Under. Restriction: 20 Tonnes & Under. CraneSafe Certification

80 Tonnes & Under. Restriction: 20 Tonnes & Under. CraneSafe Certification Load Chart LEARNING GUIDE mobile hydraulic CRANE 80 Tonnes & Under Restriction: 20 Tonnes & Under Lorain LCD-150 Mobile Hydraulic 80 Tonnes & Under (Res 20 Tonnes) LEARNING GUIDE LC.M80R20.LRLCD150.PEX1.LG1

More information

CraneSafe. Certification. CraneSafe. Certification CraneSafe Certification

CraneSafe. Certification. CraneSafe. Certification CraneSafe Certification LOAD CHART & RIGGING PRACTICE EXERCISE FOLDING BOOM TRUCK CRANE 11 Tonnes & Under Hiab XS 335K Hiab 175 Effer 145.00 5S Folding Boom PRACTICE EXERCISE LCR.FB11.HBXS335K.HB175.EF145005S.PEX1 26 March 2010

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8 FINAL REPORT FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT Project Number: #W08-5107A August 28, 2008 SUBMITTED TO: Tara Erwin itrans Consulting Inc 100 York Boulevard Richmond Hill,

More information

Evaluation Report 643

Evaluation Report 643 Alberta Farm Machinery Research Centre Printed: April 1991 Tested at: Lethbridge ISSN 0383-3445 Group 10 (c) Evaluation Report 643 Kello-Bilt Series 5000 Subsoiler A Co-operative Program Between ALBERTA

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

CITY OF VALLEJO. DEPARTMENT OF PUBLIC WORKS Engineering Division

CITY OF VALLEJO. DEPARTMENT OF PUBLIC WORKS Engineering Division CITY OF VALLEJO DEPARTMENT OF PUBLIC WORKS Engineering Division 555 SANTA CLARA STREET P.O. BOX 3068 VALLEJO CALIFORNIA 94590-5934 707-648-4315 Web Site: www.ci.vallejo.ca.us/ FAX 707-648-4691 NOTICE DATE:

More information

Evaluation Report 48

Evaluation Report 48 Evaluation Report No. E0377A Printed: March, 1978 Tested at: Portage la Prairie ISSN 0383-3445 Evaluation Report 48 Doepker 8.25 m Grain Drill and Windrower Transporter A Co-operative Program Between ALBERTA

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

A Assembly Instructions Trampoline Piccolo Art with Special Installation Frame

A Assembly Instructions Trampoline Piccolo Art with Special Installation Frame A Assembly Instructions Trampoline Piccolo Art. 20.02.116 with Special Installation Frame Operator: Location: T:\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\20_02_116-01-en-000.doc

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Synopsis This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. [This document contains one or more pages which contain colour] Copyright

More information

A428 Western Corridor Guided Bus Route Options

A428 Western Corridor Guided Bus Route Options Guided Bus Route Options for Cambridgeshire County Council Guided Bus Route Options Document Status Document status Revision Date Status or comment Prepared by Checked by Authorised by 10/08/2017 First

More information

In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment:

In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment: 06 July 2012 P0961 Natural Gas Storage Facility Letter Ver2.doc CB&I Level 13, 197 St Georges Terrace Perth, Western Australia, 6000 Attention: Jim Rutherford Dear Jim, Re: Natural Gas Storage Facility

More information

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA Assessment of Helicopter Noise A report Prepared on behalf of: JamCo Constructions Pty Ltd PO Box 631 Yarraville Victoria 3013 Ref: 11573-3jg March 2015

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

Great things come in small packages MK 140 mobile construction crane

Great things come in small packages MK 140 mobile construction crane Great things come in small packages MK 140 mobile construction crane Technical data VarioJib Trolley mode Luffing mode Max. lifting capacity 8,000 kg Max. radius 58.5 m 65.0 m Max. lifting capacity at

More information

DUNMORE QUARRY. Transport Management Plan. Boral Resources (NSW) Pty Ltd 4/04/2016. Prepared for:

DUNMORE QUARRY. Transport Management Plan. Boral Resources (NSW) Pty Ltd 4/04/2016. Prepared for: DUNMORE QUARRY Transport Management Plan Prepared for: Boral Resources (NSW) Pty Ltd 4/04/2016 The Transport Planning Partnership Pty Ltd ACN: 607 079 005 1609_Dunmore TMP Final DUNMORE QUARRY Transport

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Guidelines for Granting of Exemption Permits for the Conveyance of Abnormal Loads

Guidelines for Granting of Exemption Permits for the Conveyance of Abnormal Loads Guidelines for Granting of Exemption Permits for the Conveyance of Abnormal Loads Definitions www.concargo.com Keyword Abnormal Load Abnormal Vehicle Articulated motor vehicle (from NRTA) Route Survey

More information

Application for a New / Augmented Connection

Application for a New / Augmented Connection Application for a New / Augmented Connection For up to 4 domestic connections or a single small commercial connection up to 69 On receipt of your application and all relevant information, we will provide

More information

JUNE Livestock Transport

JUNE Livestock Transport JUNE 2007 Livestock Transport INFORMATION Bulletin Introduction This information bulletin provides information that is relevant to operators and drivers involved in the transport of livestock. It details

More information

Completing this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project.

Completing this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project. APPLICATION FOR AN ECTRICITY CONNECTION FOR WORKS OVER 70 Completing this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project.

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

A Assembly Instructions Space Capsule, Art-No

A Assembly Instructions Space Capsule, Art-No A Assembly Instructions Space Capsule, Art-No. 20.01.020 T:\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\20_01_020-01-en-003.doc - 1 - Revision history Revision 0 2004-06-22

More information

CPM Technical Guide / Load Configuration. Load configuration for customers. Concrete Safety for Life

CPM Technical Guide / Load Configuration. Load configuration for customers. Concrete Safety for Life CPM Technical Guide / Load Configuration Load configuration for customers Concrete Safety for Life Technical Summary In order to assist our customers in their preparation for off-loading our products from

More information

GRAF EcoBloc Stormwater Management System

GRAF EcoBloc Stormwater Management System GRAF EcoBloc Stormwater Management System Scan for more information Technical Guide EVS 21 High performance system for managing rain water infiltration, stormwater attenuation and rain water harvesting.

More information

MULTIMAX The Allrounder

MULTIMAX The Allrounder EN MULTIMAX The Allrounder Version 03.2016 www.faymonville.com 2 BÜLLINGEN (BE) - since 1988 30.000 m² With an experience of over 50 years, Faymonville is one of the biggest manufacturers of semi-trailers

More information

TRASH RACK CLEANING MACHINE

TRASH RACK CLEANING MACHINE TRASH RACK CLEANING MACHINE 1 SCOPE The work includes the design, manufacturing, supply, transportation, handling, storage, installation (including 1 st and 2 nd Stage embedded parts and any other necessary

More information

Study Report. McCredie-Overton Transmission Line Right-of-Way Analysis. City of Columbia, Missouri. prepared for the (S49)

Study Report. McCredie-Overton Transmission Line Right-of-Way Analysis. City of Columbia, Missouri. prepared for the (S49) Study Report McCredie-Overton Transmission Line Right-of-Way Analysis prepared for the City of Columbia, Missouri (S49) May, 2017 S49 McCredie-Overton Transmission Line Right-of-Way Study Report Table

More information

PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD

PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD Reason for Proposal: Bedford Borough Council has received a request to introduce a dedicated

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER 2006-052 BEING A BY-LAW TO REGULATE AND CONTROL PARKING WITHIN THE TOWNSHIP OF MIDDLESEX CENTRE WHEREAS the Municipal Act authorizes local

More information

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY

More information

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose

More information

Compatibility Between Electric Trains and Electrification Systems

Compatibility Between Electric Trains and Electrification Systems Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures

More information

ELMORE COUNTY HIGHWAY DEPARTMENT

ELMORE COUNTY HIGHWAY DEPARTMENT Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore

More information