UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011

Size: px
Start display at page:

Download "UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011"

Transcription

1 UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011 The following is designed to give a side by side transition between the Union Pacific Air Brake and Train Handling Rules printed in April 2004 and the new book printed January Significant changes in application or instruction will be listed in red. If you have any questions contact your local Operating or Rules Manager. OLD # RULE TITLE NEW # RULE TITLE 30.0 TRAIN AIR BRAKE TESTS AND 30.0 TRAIN AIR BRAKE TESTS AND INSPECTIONS INSPECTIONS 30.1 Compliance with FRA Regulations 30.1 Compliance with FRA Regulations Added requirement to communicate status of all air brake inspections. If relieved prior to completion of any required inspection/test, this information must be communicated to the relieving crew verbally or by written notification left on the controlling locomotive Safety Inspection of Freight Cars Qualified Inspectors 30.2 Safety Inspection of Freight Cars Brake Inspection Requirements Added "Qualified Person" and "Qualified Mechanical Inspector" terms to glossary Coupling and Securing Air Hoses Coupling and Securing Air Hoses 30.4 Operative Brakes Operative Brakes 30.5 Person in Charge Air Brake Test Employee in Charge During Air Brake Test Simplified Rule and changed to apply to all crafts, not just employee at the controls of the locomotive Standard Brake Pipe Pressures Standard Brake Pipe Pressure Eliminated passenger and business car pressures. Changed standard pressure to 90 psi for all UPRR passenger and freight equipment Charging Air Brake System Charging Air Brake System 30.8 Air Brake Tests Using End of Train Telemetry Devices (EOT) Air Brake Tests Using Gauge or End of Train Device 30.9 Brake Pipe Leakage Test Brake Pipe Leakage Test Air Flow Method (AFM) Brake Pipe Leakage Test Brake Pipe Leakage Method Brake Pipe Leakage Test Initial Terminal and Road Air Brake Test (Class 1 Air Brake Test) 30.3 Initial Terminal Air Brake Test (Class I Air Brake Test) Requirement for Test Initial Terminal Air Brake Test (Class I) Requirements Clarified defective cars and repositioning cars for hazmat and train placement requirements. Combined interchange train with other train requirements and added requirement to test cars added to a train at a location from more than one previous train Procedure for Initial Terminal and Road Air Brake Test and Inspection Initial Terminal Air Brake Test (Class I) Procedure Procedure for Initial Terminal and Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements Class 1 Air Brake Test Notification Initial Terminal Air Brake Test (Class I) Notification Added bullet allowing information to be communicated to the crew that the test has been completed and then entered on Air Brake Test Form or on space provided on train documentation Cycle Trains Cycle Trains Cycle Trains Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements. 1

2 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Trains Designated as Extended Haul Trains Designated as Extended Haul Trains Designated as Extended Haul Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements Test Required after attaching locomotive to train previously Tested with Yard Test Plant or other locomotive Added overcharge prevention instructions Attaching Locomotive to Cars Previously Class I Tested Using Yard Air or Other Locomotive Transfer Train Movements Test 30.5 Transfer Train Movement Air Test Transfer Train Movements Test Transfer Train Movement Air Test Changed starting pressure to 75 psi. Added to Air Brake Test and Inspection Chart (30.10) Mile Inspection Tests (Class 1A Brake Test) ,000 Mile Inspection Tests (Class IA Brake Test) Mile Inspection Tests (Class 1A Brake Test) Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements Running Air Brake Test Light Engine Running Air Brake Test Requirements for Test Light Engine Running Air Brake Test Procedure for Running Air Brake Test Light Engine Running Air Brake Test Added Light Engine Running Air Brake Test Brakes Not Operating Properly 32.7 Air Brake Operation Brakes Not Operating Properly Air Brakes Not Operating Properly Test When Cutting Off and Recoupling Test When Cutting Off and Recoupling Test When Cutting Off and Recoupling Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements Application and Release Test (Class 3 Brake Test) 30.7 Application and Release Test (Class III Brake Test) Requirement for Test Application and Release Test (Class III Brake Test) Requirements Procedure for Conducting An Application and Release Test Air Brake Test Requirements Created table to incorporate all air brake procedures and requirements Air Brake Test When Adding Pretested Cars Initial Terminal Air Brake Test (Class I) Requirements Air Brake Test When Adding Pretested Trains Designated as Extended Haul Cars Inbound Train Inspection 30.8 Inbound Train Inspection Inbound Train Inspection Inbound Train Inspection Piston Travel Limits Air Brake Tests and Inspection Procedures Piston Travel Limits Brake Inspection Requirements Truck Mounted Brake Cylinders Brake Inspection Requirements Body Mounted Brake Cylinders Brake Inspection Requirements Dynamic Brakes 31.5 Dynamic Brake/Locomotive Warnings Dynamic Brakes Dynamic Brakes Dynamic Brake Requirements Dynamic Brakes 2

3 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Controlling Dynamic Brake from Lead Dynamic Brakes Locomotive Enroute Failure to Control Dynamic Brake, Dynamic Brakes Lead Locomotive Train Information 30.9 Train Information Train Information Train Information New Air Brake Test and Inspection Charts 31.0 LOCOMOTIVE AIR BRAKE TESTS AND 31.0 LOCOMOTIVE CONSIST REQUIREMENTS INSPECTIONS 31.1 General Requirements 31.1 Taking Charge of Locomotive Consist 31.2 Locomotive Daily Inspection 31.2 Locomotive Inspections Inspection Requirements Inspection Requirements Conducting a Locomotive Daily Inspection 31.8 Locomotive Inspections and Procedures Conducting a Locomotive Daily Inspection Conducting a Locomotive Daily Inspection Complete Required Daily Inspection Forms Complete Required Daily Inspection Forms Employee ID number must be used. Signature only allowed for non Union Pacific employees Locomotive With Non complying Condition Safe To Move Locomotive with Non complying Condition Safe to Move Locomotive With Non complying X DELETED Condition Not Safe To Move 31.3 Defects Other Than Non Complying Defects Other than Non complying Conditions Conditions 31.4 Non Complying Condition Found En route Locomotive with Non complying Condition Safe to Move 31.5 Major Internal Defects Found Enroute Major Internal Defects 31.6 Locomotive Air Brake Test 31.3 Locomotive Air Brake Tests Location of Test Locomotive Consist Air Brake Test Requirements New Exceptions Procedure for Conducting Locomotive Air Brake Test Leakage test is no longer required Procedure for Conducting Locomotive Consist Air Brake Test 31.7 Standard Air Pressures 31.4 Standard Air Pressure 31.7 Standard Air Pressures Standard Locomotive Air Pressures Eliminated passenger and business car pressures. Changed standard pressure to 90 psi for all UPRR passenger and freight equipment Reducing Locomotive Overcharge Reducing Pressure in Overcharged 31.9 Control Switches X DELETED Locomotive Safety Devices 31.1 Taking Charge of Locomotive Consist Operative Speed Indicator Speed Indicator Speed Indicator Test Speed Indicator Event Recorder Event Recorder/Track Image Recorder Moving Locomotive 31.6 Moving Locomotives Initial Movement of a Locomotive Consist Not Coupled to Other Equipment Light Engine Running Air Brake Test Added Light Engine Running Air Brake Test. 3

4 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Initial Movement of a Locomotive Consist X DELETED Coupled to Other Equipment Hostling Locomotive Hostling Locomotive Moving Locomotives Within Mechanical Department Limits Moving Locomotives within Mechanical Department Limits Moving Locomotives Within Turntable Moving Light Locomotive Consists Moving Light Locomotive Consists Locomotive Air Brake Equipment Locomotive Air Brake Equipment Separating Locomotives Separating Locomotives Moving Locomotives 31.7 Locomotive Placement Alignment Control Couplers Place Behind Locomotive Consist Non Alignment Control Couplers (UPRR Locomotives) Waybilled or Foreign Line Locomotives Not Equipped for Multiple Unit Operation Locomotive Alignment Control Locomotive Alignment Control Locomotive Alignment Control Locomotives Not Equipped for Multiple Locomotive Alignment Control Unit Operation Locomotives Equipped with Alignment Locomotive Alignment Control Control Couplers (Not Equipped for Multiple Unit Operation) UP Locomotives Not Equipped with Locomotive Alignment Control Alignment Control Couplers (Not Equipped for Multiple Unit Operation) Set up Procedure for Handling Locomotives Not Equipped for Multi Unit Operation Locomotive Alignment Control Created table to incorporate all procedures and requirements Changing Operating Ends Changing Operating Ends Procedure Cut Out Operating Controls Changing Operating Ends Procedure Restore Operating Controls Changing Operating Ends Procedure Leakage test is no longer required Changing to Opposite Controls in the Same Cab on Dual Control Locomotives X DELETED Controlling Brake Valve X DELETED New Controlling Brake Valve (Opposite X DELETED Side of Locomotive) Units Isolated Locomotive Fuel Conservation and TPA Compliance Consolidated rules from multiple locations into

5 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE 32.0 TRAIN OPERATIONS 32.0 SECUREMENT/TRAIN OPERATIONS 32.1 Securing Equipment Against Undesired Movement 32.1 Securing Equipment Against Undesired Movement 32.1 Securing Equipment Against Undesired Movement 32.1 Securing Equipment Against Undesired Movement Additional requirements for single car securement Securing and Unattended Train or Portion of Train with Locomotive Attached Added Primary and Secondary Securement Procedures Securing Equipment Securement Procedures Single Car Securement Securing Specialized Equipment Securing an Unattended Train or Portion of Train with Locomotive Attached Securing an Unattended Train Before Detaching Locomotives Securing an Unattended Train Before Detaching Locomotives Securing an Unattended Train Before Detaching Locomotives Coupling to Opposite End of Cars Locomotive handbrakes will count towards required brakes Unattended Locomotive(s) 32.2 Securing Locomotives Unattended Locomotive(s) Unattended Locomotive(s) Train Break in Two 32.3 Train Line Train Break in Two Undesired Emergency Resulting in Train Separation A Brake Application Undesired Emergency Resulting in Train Separation 32.2 Releasing Hand Brakes Releasing Hand Brakes 32.3 Transferring Control of Train Brakes Transferring Control of Train Brakes 32.4 Brakes not Operating Properly Air Brakes Not Operating Properly 32.5 Sticking Brakes Sticking Brakes Minimizing Sticking Brakes Sticking Brakes 32.6 Reducing Pressure in Overcharged Train 32.5 Overcharge Brake Systems 32.6 Reducing Pressure in Overcharged Train Brake Systems Reducing Pressure in Overcharged Train Brake Systems 32.7 Cutting Out Air Brake Equipment Procedure to Cut Out Control Valve and/or Bleeding Off Car Procedure to Cut Out Control Valve or Procedure to Cut Out Control Valve Automatic Vent Valve Placement of Cars with Cut Out Air Brake Equipment Placement of Cars with Cut Out Air Brake Equipment Rear Car Brakes Placement of Cars with Cut Out Air Bleed Off Cars Procedure to Cut Out Control Valve 32.8 Reporting Flat Spots Reporting Flat Spots 32.9 Setting Out Defective Cars 32.8 Setting Out Cars 32.9 Setting Out Defective Cars Setting Out Defective Cars Coupling Brake Pipe Connections Coupling Brake Pipe Connections 5

6 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Powered Axle Limitation Item 5B System Train Make Up Requirements Helpers 33.0 DISTRIBUTED POWER AND MANNED HELPER REQUIREMENTS Helpers 33.6 Manned Helper Requirements Manned Helper Entrained or Coupled at Rear of Train Adding Manned Helper Mid train or Rear of Train Removing an Entrained Helper Removing Mid train Helper Manned Helper Added to Head End of Train Manned Helper Added to Head End of Non DP Train Manned Helper Removed From Head End of Train Manned Helper Removed from Head End of Train Operating Responsibilities with Manned Operating Responsibilities with Manned Helper Helper Distributed Power 33.0 Distributed Power and Manned Helper Requirements Distributed Power 33.1 Distributed Power Requirements A Employee Familiarization Employee Familiarization B Preparing Locomotives for Distributed Power Service 33.7 Process for Set up and Linking Locomotives for Distributed Power Service C Brake Pipe Continuity Test Following Brake Pipe Communication Test (BP Test) Radio Link D Radio Communication Interruption DP Radio Communication Interruption E Conditions Which Require Actions to 33.2 Remote Consist Unlinked/Shutdown Protect a Single Remote Locomotive E Conditions Which Require Actions to Protect a Single Remote Locomotive Setting Out Remote Locomotive F Changing from Independent Mode to Synchronous Mode 33.3 Changing from Independent to Synchronous Mode F Changing from Independent Mode to Operating DP Consist in Independent Mode Synchronous Mode G Rear Remote Limitation 33.4 Rear Remote Limitation G Rear Remote Limitation Maximum Locomotives G Rear Remote Limitation Conventional Set up G Rear Remote Limitation Display Screen and Remote Set up G New 33.8 Procedures for Distributed Power Operation G Rear Remote Limitation Distributed Power Brake Communication Test (BP Test) G Rear Remote Limitation Distributed Power Automated Leakage Test G Rear Remote Limitation Set out Function End of Train Telemetry System 32.9 Telemetry Installation Installation Arming HEU/EOT Arming HEU/EOT Testing HEU/EOT Testing HEU/EOT Disarming HEU/EOT Disarming HEU/EOT Emergency Switch 32.9 Telemetry Emergency Switch Emergency Switch 6

7 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Emergency Application Capability from Rear of Train Emergency Application Capability from Rear of Train Loss of Emergency Application Capability from Rear of Train Loss of Emergency Application Capability from Rear of Train Required Air Brake Test During Inclement 32.4 Inclement Weather Weather Required Air Brake Test During Inclement Weather Wheel Slip Warning Light Wheel Slip Warning Light Dynamic Brake Warning Light Dynamic Brake Warning Light Unusual Conditions Unusual Conditions Required Air Brake Test During Inclement Weather Unusual Changes in Brake Pipe Pressure Unusual Air Brake Conditions Increased Air Brake System Leakage Unusual Air Brake Conditions Enroute Reporting Unusual Air Brake Conditions Unusual Air Brake Conditions Train Separation Report X DELETED Engine Shutdown Locomotive Fuel Conservation and TPA Compliance Consolidated rules from multiple locations into Weak Batteries Weak Batteries Shutdown Procedure Shutdown Procedure Starting Procedure Starting Procedure Prevent Engine Cooling System from Prevent Engine Cooling System from Freezing Freezing 33.0 TRAIN HANDLING 34.0 TRAIN HANDLING 33.0 Train Handling 34.1 Train Handling Responsibilities 33.1 Train Status Information X DELETED 33.2 Dynamic Braking Dynamic Braking Dynamic Brake Limitations Dynamic Braking 33.3 Use of Automatic Brake 34.5 Car Air Brakes 33.3 Use of Automatic Brake Applying or Reapplying Automatic Brakes Applying or Reapplying Automatic Brakes Applying or Reapplying Automatic Brakes Changed actuating requirements. Changed requirements when reapplying air brakes Delayed Departure Train Check Delayed Departure 34.4 Delayed Departure Releasing Brakes Releasing Brakes Use of Automatic Brakes During Cold Weather Conditions Use of Automatic Brakes During Cold Weather Conditions 33.4 Throttle and Reverser Positions Throttle and Reverser Positions Short Time Ratings Short Time Rating/Minimum Continuous Speed Minimum Continuous Speed Short Time Rating/Minimum 33.5 Independent Brake (Locomotive Brake) 34.6 Locomotive Operation 33.5 Independent Brake (Locomotive Brake) Independent Brake (Locomotive Brake) 33.6 Train Handling Scenarios 34.2 Train Handling Guidelines Starting Train Starting/Accelerating Train Cresting a Grade Cresting Grade 7

8 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Slowing or Controlling Speed Slowing or Controlling Speed Preferred methods for slowing or controlling train speed changed A B C D E Slowing/Controlling Speed, Level or Descending Grade, with Dynamic Brakes, Slack Bunched Slowing/Controlling Speed, Level or Descending Grade, without Dynamic Brakes, Slack Bunched Slowing/Controlling, Ascending Grade, Slack Stretched, Throttle Reduction Slowing/Controlling While Cresting Grade, Throttle Reduction Method Slowing or Controlling Speed, Undulating Grade or Sag, Throttle Modulation Method Slowing/Controlling Speed on Level or Descending Grade, with Dynamic Brakes, Slack Bunched X DELETED Ascending Grade Cresting Grade Undulating Grade F Stretch Braking Stretch Braking Throttle position allows higher position while stretch braking Stopping Stopping Unplanned Stop Non Emergency Unplanned Stops Shoving Movements Shoving Equipment C Starting Reverse/Shoving, Descending X DELETED Grade, Slack Bunched or Unknown Moving Over Railroad Crossing at Grade X DELETED 33.7 Grade Operation 34.3 Grade Operations Stopping on a Grade Stopping Recharging on a Grade Recharging on a Grade Changed requirement when using consist with multiple DC locomotives on grade Cresting a Mountain Grade Cresting Grade Balance Braking on Grade Balance Braking When practical use combination of air and dynamic brake to control speed on descending grade exceeding 1.75% Distributed Power, Descending Grade 33.5 Descending Grade Exceeding 1.8 Percent Distributed Power, Descending Grade Exceeding 1.8 Percent Changed from 100K to Throttle 4 position to allow for multiple DP consists Distributed Power, Descending Grade Exceeding 1.8% Regulating Valve Braking Regulating Valve Braking Retaining Valves Retaining Valves 33.8 Emergency Brake Applications Emergency Brake Applications Emergency Brake Application by Crew Emergency Brake Applications Member Undesired Emergency Brake Application Emergency Brake Applications Unintentional Brake Release Unintentional Brake Release 33.9 Penalty Brake Application Penalty Brake Application Slow Train Penalty Brake Application Slow Train Overspeed Control 8

9 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE Recover Overspeed Control Switching Movements Switching Movements Temporary Speed Restrictions Disturbed Track/Temporary Speed Restrictions/Heat Restrictions Disturbed Track Disturbed Track/Temporary Speed Restrictions/Heat Restrictions Heat Restrictions Disturbed Track/Temporary Speed Restrictions/Heat Restrictions Thermal Misalignment Thermal Misalignment 34.0 FREIGHT CARS AND LOCOMOTIVE COMPONENTS 39.0 FREIGHT CAR AND LOCOMOTIVE COMPONENTS 34.0 FREIGHT CARS AND LOCOMOTIVE 39.1 Freight Car Components COMPONENTS 34.1 Freight Car End and Platform Freight Car End and Platform Identification Identification 34.2 Wheel and Journal Identification on Cars Wheel and Journal Identification on Cars 34.3 Coupler Assemblies High Strength Couplers High Strength Couplers High Strength Couplers 34.4 Freight Car A 1 Reduction Relay Valve Freight Car A 1 Reduction Relay Valve 34.5 Freight Car Automatic Vent Valve Freight Car Automatic Vent Valve 34.6 Retaining Valves Retaining Valves Three Position Retaining Valve Retaining Valves Four Position Retaining Valve Retaining Valves 34.7 Locomotive Brake Equipment 39.2 Locomotive Components Automatic Brake Valves Automatic Brake Valves Automatic Brake Valve Cutout Valve Automatic Brake Valve Cutout Valve Independent Brake Valves Independent Brake Valves MU 2A/Double Ported Cutout Cock MU 2A/Double Ported Cutout Cock 34.8 Electropneumatic Automatic and Electro Pneumatic Automatic and Independent Independent Brake Valves 34.9 Locomotive Electric Air Brake Computer Resets Resetting CCB Faults Air Flow Meter Air Flow Meter Air Flow Meter Readings Air Flow Meter Engineer Responsibilities Air Flow Meter Charging Time Chart Charging Time Chart Electronic Alertness Device X DELETED Deactivate Device Temporarily X DELETED Overspeed Control Overspeed Control Brake Valves Locomotive Electronic Air Brake Computer Resets Resetting CCB Faults Slowing Train due to Overspeed Overspeed Control Application Recover Overspeed Control 36 New 36 RESERVED FOR PTC OPERATIONS 37 New 37 RESERVED FOR FUTURE USE 9

10 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE 38.0 PASSENGER TRAIN AIR BRAKE RULES (COMMUTER OPERATIONS) 38.0 COMMUTER/BUSINESS TRAIN AIR BRAKE RULES 38.0 Passenger Train Air Brake Rules 38.1 Passenger Equipment Inspections 38.0 Passenger Train Air Brake Rules (Commuter Operations) 38.2 Commuter Operation Air Brake Tests and Inspections 38.1 Inspections and Air Brake Test Inspections and Brake Tests 38.2 Class I Brake Test Class I Brake Test 38.2 Class I Brake Test Air Brake Test Requirements 38.2B Procedure for a Class I Test Air Brake Test Requirements 38.3 Class IA Class IA Brake Test 38.3 Class IA Air Brake Test Requirements 38.4 Class II Class II Brake Test 38.4 Class II Air Brake Test Requirements 38.4B Procedure for a Class II Brake Test Air Brake Test Requirements Created table to incorporate all procedures and requirements Running Brake Tests Procedure for a Running Brake Test New Changing Operating Ends on Trains Equipped with Cab Cars 38.5A When to Perform Test Running Brake Tests 38.5B Procedure for a Running Brake Test Air Brake Test Requirements 38.6 Parking Brake and Hand Brakes Parking Brake and Hand Brakes 38.7 Using Blended Braking Using Blended Braking 38.8 Defective Train Brakes 38.3 Operative Brakes 38.8 Defective Train Brakes Defective Train Brakes Calculating the Percentage of Operable Operable Brakes Brakes Calculating the Percentage of Operable Defective Brake Chart Operative Brake Conditions Operative Brake Conditions 39.0 Charts and Diagrams 39.3 Charts and Diagrams 39A Single Capacity Freight Air Brake Car Chart Components Equipment 39B B Car Chart Figure Car Chart Components 39C C Car Chart Figure Car Chart Components 39D D Car Chart Figure Car Chart Components 39E E Car Chart Figure Car Chart Components 39F F Car Chart Components Car Chart Components 39G G Freight Car Axle, Journal and Wheel Car Chart Components Identification Diagram 39H H Articulated Car Identification Diagram Terminology for Articulated Car Identification Diagram 39I I Terminology for Articulated Car Identification Diagram Terminology for Articulated Car Identification Diagram 39J J Coupler Diagram Coupler Diagram 39K K Locomotive Axle, Journal and Wheel Diagram Locomotive Axle, Journal, and Wheel Identification Diagram 10

11 Table of Contents (Old to New) OLD # RULE TITLE NEW # RULE TITLE 11 The following rules were created or modified from locations other than the previous ABTH book: Item 2F Maximum Speeds Fuel Conservation Locomotive Fuel Conservation and TPA Compliance Item 5C Corridor and Subdivision Train Make Up and Helper Placement Requirements Locomotive Fuel Conservation and TPA Compliance Consolidated rules from multiple locations into Item 4B Locomotive Instructions Locomotive Consist Limits Item 4B Locomotive Instructions Light Engine Set Up Created table to incorporate all procedures and requirements. Item 10B Remote Control Operations Instructions 35 REMOTE CONTROL OPERATIONS Item 10B Remote Control Operations Instructions 35.1 Reference Materials Item 10B Remote Control Operations Instructions 35.2 Remote Control Area Item 10B Remote Control Operations Instructions 35.3 Equipment Item 10B Remote Control Operations Instructions Operator Equipment Item 10B Remote Control Operations Instructions Remote Control Mode Item 10B Remote Control Operations Instructions Setup and Testing Item 10B Remote Control Operations Instructions RCL Strobe Lights Item 10B Remote Control Operations Instructions 35.4 Operation Item 10B Remote Control Operations Instructions Man down Transmission Item 10B Remote Control Operations Instructions Remote Control Transmitter Attachment Item 10B Remote Control Operations Instructions "Pitch and Catch" Operations Item 10B Remote Control Operations Instructions Operating the Equipment Item 10B Remote Control Operations Instructions RCL Fails to Respond to Stop Command Item 10B Remote Control Operations Instructions 35.5 Securement Item 10B Remote Control Operations Instructions Securing Remote Control Equipment Item 10B Remote Control Operations Instructions 35.6 RCL Zone Item 10B Remote Control Operations Instructions Positive Stop Protection (PSP) Item 10B Remote Control Operations Instructions Overriding PSP Item 10B Remote Control Operations Instructions Disabling PSP Item 10B Remote Control Operations Instructions RCL Zones with Road Crossing Equipped with Cameras Item 10B Remote Control Operations Instructions 35.7 Main Track Item 10B Remote Control Operations Instructions Remote Control Main Track Operation

12 Table of Contents (Old to New) 12 GLOSSARY TERMS The following glossary terms have been created or modified: Air Flow Indicator or Air Flow Measurement Jackknife (AFM) Buff Forces Journal Cab Car MU Calendar day Power Holding Feature Compensated Grade Qualified maintenance Person (Passenger Car Inspector) Controlled Tractive Effort (CTE) Restricted Car Limits Conventional Car Restricted Car Placement Coupler Limit Solid Block (of cars) Draft Forces String Lining Dynamic Brake Surprise Stop Equalization Tons per Equivalent Powered Axle (TPA) Engine / Locomotive Tread Build up Full Tractive Effort Unattended Head End Power (Passenger) Unit Train Intermodal Equipment Yard Test Plant

13 UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (New to Old) 12/8/2011 The following is designed to give a side by side transition between the Union Pacific Air Brake and Train Handling Rules printed in April 2004 and the new book printed January Significant changes in application or instruction will be listed in red. If you have any questions contact your local Operating or Rules Manager. NEW # RULE TITLE OLD # RULE TITLE 30.0 TRAIN AIR BRAKE TESTS AND INSPECTIONS 30.0 TRAIN AIR BRAKE TESTS AND INSPECTIONS 30.1 Compliance with FRA Regulations 30.1 Compliance with FRA Regulations Added requirement to communicate status of all air brake inspections. Added: If relieved prior to completion of any required inspection/test, this information must be communicated to the relieving crew verbally or by written notification left on the controlling locomotive Qualified Inspectors 30.2 Safety Inspection of Freight Cars Added "Qualified Person" and "Qualified Mechanical Inspector" terms to glossary General Requirements 30.2 New Coupling and Securing Air Hoses 30.3 Coupling and Securing Air Hoses Operative Brakes 30.4 Operative Brakes Employee in Charge During Air Brake Test 30.5 Person in Charge Air Brake Test Simplified Rule and changed to apply to all crafts, not just employee at the controls of the locomotive Standard Brake Pipe Pressure 30.6 Standard Brake Pipe Pressures 31.7 Standard Air Pressures Eliminated passenger and business car pressures. Changed standard pressure to 90 psi for all UPRR passenger and freight equipment Charging Air Brake System 30.7 Charging Air Brake System Air Brake Tests Using Gauge or End of Train Device 30.8 Air Brake Tests Using End of Train Telemetry Devices (EOT) 30.3 Initial Terminal Air Brake Test (Class I Air Brake Test) Initial Terminal and Road Air Brake Test (Class 1 Air Brake Test) Initial Terminal Air Brake Test (Class I) Requirement for Test Requirements Initial Terminal Air Brake Test (Class I) Air Brake Test When Adding Pretested Cars Requirements Clarified defective cars and repositioning cars for hazmat and train placement requirements. Combined interchange train with other train requirements and added requirement to test cars added to a train at a location from more than one previous train Initial Terminal Air Brake Test (Class I) Procedure Procedure for Initial Terminal and Road Air Brake Test and Inspection Initial Terminal Air Brake Test (Class I) Notification Class 1 Air Brake Test Notification Added bullet allowing information to be communicated to the crew that the test has been completed and then entered on Air Brake Test Form or on space provided on train documentation Cycle Trains Cycle Trains Trains Designated as Extended Haul Trains Designated as Extended Haul Trains Designated as Extended Haul Air Brake Test When Adding Pretested Cars 13

14 Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE Attaching Locomotive to Cars Previously Class I Tested Using Yard Air or Other Locomotive Added overcharge prevention instructions ,000 Mile Inspection Tests (Class IA Brake Test) ,000 Mile Inspection Tests (Class IA Brake Test) Test Required after attaching locomotive to train previously Tested with Yard Test Plant or other locomotive New Mile Inspection Tests (Class 1A Brake Test) 30.5 Transfer Train Movement Air Test Transfer Train Movements Test Transfer Train Movement Air Test Transfer Train Movements Test Changed starting pressure to 75 psi. Added to Air Brake Test and Inspection Chart (30.10) Test When Cutting Off and Recoupling New Test When Cutting Off and Recoupling Test When Cutting Off and Recoupling 30.7 Application and Release Test (Class III Brake Test) Application and Release Test (Class 3 Brake Test) Application and Release Test (Class III Brake Requirement for Test Test) Requirements 30.8 Inbound Train Inspection New Inbound Train Inspection Inbound Train Inspection 30.9 Train Information New Train Information Train Information Air Brake Test and Inspection Charts New Air Brake Test Requirements Procedure for Initial Terminal and Road Air Brake Test and Inspection Air Brake Test Requirements Cycle Trains Air Brake Test Requirements Trains Designated as Extended Haul Transfer Train Movements Test Air Brake Test Requirements Mile Inspection Tests (Class 1A Brake Test) Air Brake Test Requirements Test When Cutting Off and Recoupling Air Brake Test Requirements Procedure for Conducting An Application and Release Test Created table to incorporate all procedures and requirements. Starting pressure for all air tests now 75 psi Air Brake Tests and Inspection Procedures New Brake Inspection Requirements Piston Travel Limits Brake Inspection Requirements 30.2 Safety Inspection of Freight Cars Brake Inspection Requirements Truck Mounted Brake Cylinders Brake Inspection Requirements Body Mounted Brake Cylinders Brake Pipe Leakage Test 30.9 Brake Pipe Leakage Test Brake Pipe Leakage Test Air Flow Method (AFM) Brake Pipe Leakage Test Brake Pipe Leakage Method 14

15 Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE 31.0 LOCOMOTIVE CONSIST REQUIREMENTS 31.0 LOCOMOTIVE AIR BRAKE TESTS AND INSPECTIONS 31.1 Taking Charge of Locomotive Consist 31.1 General Requirements 31.1 Taking Charge of Locomotive Consist Locomotive Safety Devices 31.2 Locomotive Inspections 31.2 Locomotive Daily Inspection Inspection Requirements Inspection Requirements Complete Required Daily Inspection Forms Complete Required Daily Inspection Forms Employee ID number must be used. Signature only allowed for non Union Pacific employees Event Recorder/Track Image Recorder Event Recorder Speed Indicator Operative Speed Indicator Speed Indicator Speed Indicator Test Locomotive with Non complying Condition Safe to Move Locomotive With Non complying Condition Safe To Move Locomotive with Non complying Condition 31.4 Non Complying Condition Found En route Defects Other than Non complying 31.3 Defects Other Than Non Complying Conditions Conditions Major Internal Defects 31.5 Major Internal Defects Found Enroute 31.3 Locomotive Air Brake Tests 31.6 Locomotive Air Brake Test Locomotive Consist Air Brake Test Location of Test Requirements 31.4 Standard Air Pressure 31.7 New Standard Locomotive Air Pressures 31.7 Standard Air Pressures 31.5 Dynamic Brake/Locomotive Warnings New Dynamic Brakes Dynamic Brakes Dynamic Brakes Dynamic Brake Requirements Dynamic Brakes Controlling Dynamic Brake from Lead Locomotive Dynamic Brakes Enroute Failure to Control Dynamic Brake, Lead Locomotive Dynamic Brake Warning Light Dynamic Brake Warning Light Wheel Slip Warning Light Wheel Slip Warning Light 31.6 Moving Locomotives Moving Locomotive Moving Light Locomotive Consists Moving Light Locomotive Consists New Exceptions Locomotive Consist Limits Item 4B Locomotive Instructions Hostling Locomotive Hostling Locomotive Moving Locomotives within Mechanical Department Limits Moving Locomotives Within Mechanical Department Limits Turntable Moving Locomotives Within Mechanical Department Limits 31.7 Locomotive Placement Moving Locomotives 15

16 16 Air Brake and Train Handling Transition Guide Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE Locomotive Alignment Control Alignment Control Couplers Place.Behind Locomotive Consist Locomotive Alignment Control Non Alignment Control Couplers (UPRR Locomotives) Locomotive Alignment Control Waybilled or Foreign Line Locomotives Not Equipped for Multiple Unit Operation Locomotive Alignment Control Locomotives Not Equipped for Multiple Unit Operation Locomotive Alignment Control Locomotives Equipped with Alignment Control Couplers (Not Equipped for Multiple Unit Operation) Locomotive Alignment Control UP Locomotives Not Equipped with Alignment Control Couplers (Not Equipped for Multiple Unit Operation) Locomotive Alignment Control Set up Procedure for Handling Locomotives Not Equipped for Multi Unit Operation Created table to incorporate all procedures and requirements Locomotive Inspections and Procedures New Conducting a Locomotive Daily Inspection Conducting a Locomotive Daily Inspection Changing Operating Ends Procedure Locomotive Air Brake Equipment Changing Operating Ends Procedure Changing Operating Ends Changing Operating Ends Procedure Cut Out Operating Controls Changing Operating Ends Procedure Restore Operating Controls Leakage test is no longer required Light Engine Set Up Item 4B Locomotive Instructions Created table to incorporate all procedures and requirements Procedure for Conducting Locomotive Consist Air Brake Test Leakage test is no longer required Procedure for Conducting Locomotive Air Brake Test Light Engine Running Air Brake Test Running Air Brake Test Light Engine Running Air Brake Test Requirements for Test Light Engine Running Air Brake Test Procedure for Running Air Brake Test Light Engine Running Air Brake Test Initial Movement of a Locomotive Consist Not Coupled to Other Equipment Added Light Engine Running Air Brake Test Starting Procedure Starting Procedure Weak Batteries Weak Batteries

17 Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE Locomotive Fuel Conservation and TPA Units Isolated Compliance Locomotive Fuel Conservation and TPA Engine Shutdown Compliance Locomotive Fuel Conservation and TPA Item 2F Maximum Speeds Fuel Conservation Compliance Locomotive Fuel Conservation and TPA Compliance Consolidated rules from multiple locations. Item 5C Corridor and Subdivision Train Make Up and Helper Placement Requirements Shutdown Procedure Shutdown Procedure Prevent Engine Cooling System from Freezing Prevent Engine Cooling System from Freezing 32.0 SECUREMENT/TRAIN OPERATIONS 32.0 TRAIN OPERATIONS 32.1 Securing Equipment 32.1 Securing Equipment Against Undesired Movement Securement Procedures 32.1 Securing Equipment Against Undesired Movement Securing an Unattended Train or Portion of Train with Locomotive Attached Added Primary and Secondary Securement Procedures Securing and Unattended Train or Portion of Train with Locomotive Attached Securing an Unattended Train Before Detaching Locomotives Securing an Unattended Train Before Detaching Locomotives Locomotive handbrakes will count towards required brakes Single Car Securement 32.1 Securing Equipment Against Undesired Movement Additional requirements for single car securement Securing Specialized Equipment 32.1 Securing Equipment Against Undesired Movement Releasing Hand Brakes 32.2 Releasing Hand Brakes 32.2 Securing Locomotives New Unattended Locomotive(s) Unattended Locomotive(s) Separating Locomotives Separating Locomotives 32.3 Train Line New Undesired Emergency Resulting in Train Train Break in Two Separation Undesired Emergency Resulting in A Brake Application Coupling Brake Pipe Connections Coupling Brake Pipe Connections Coupling to Opposite End of Cars Unattended Locomotive(s) Coupling to Opposite End of Cars Securing an Unattended Train Before Detaching Locomotives 32.4 Inclement Weather New Required Air Brake Test During Inclement Weather Required Air Brake Test During Inclement Weather 32.5 Overcharge 32.6 New Reducing Pressure in Overcharged Train Brake Systems 32.6 Reducing Pressure in Overcharged Train Brake Systems Reducing Pressure in Overcharged 31.8 Reducing Locomotive Overcharge 17

18 18 Air Brake and Train Handling Transition Guide Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE 32.6 Flat Spots 32.8 New Reporting Flat Spots 32.8 Reporting Flat Spots 32.7 Air Brake Operation New Air Brakes Not Operating Properly Brakes Not Operating Properly Air Brakes Not Operating Properly 32.4 Brakes not Operating Properly Sticking Brakes 32.5 Sticking Brakes Sticking Brakes Minimizing Sticking Brakes Procedure to Cut Out Control Valve and/or 32.7 Cutting Out Air Brake Equipment Bleeding Off Car Procedure to Cut Out Control Valve Procedure to Cut Out Control Valve or Automatic Vent Valve Procedure to Cut Out Control Valve Bleed Off Cars Placement of Cars with Cut Out Air Brake Equipment Placement of Cars with Cut Out Air Brake Equipment Placement of Cars with Cut Out Air Rear Car Brakes 32.8 Setting Out Cars 32.9 New Setting Out Defective Cars 32.9 Setting Out Defective Cars 32.9 Telemetry End of Train Telemetry System 32.9 Telemetry Emergency Switch Emergency Application Capability from Rear of Train Emergency Application Capability from Rear of Train Installation Installation Arming HEU/EOT Arming HEU/EOT Testing HEU/EOT Testing HEU/EOT Emergency Switch Emergency Switch Loss of Emergency Application Capability from Rear of Train Loss of Emergency Application Capability from Rear of Train Disarming HEU/EOT Disarming HEU/EOT Unusual Conditions Unusual Conditions Unusual Air Brake Conditions Unusual Changes in Brake Pipe Pressure Unusual Air Brake Conditions Reporting Unusual Air Brake Conditions Unusual Air Brake Conditions Increased Air Brake System Leakage Enroute 33.0 DISTRIBUTED POWER AND MANNED HELPER Helpers REQUIREMENTS 33.0 Distributed Power and Manned Distributed Power 33.1 Distributed Power Requirements Distributed Power Employee Familiarization A Employee Familiarization Brake Pipe Communication Test (BP Test) C Brake Pipe Continuity Test Following Radio Link DP Radio Communication Interruption D Radio Communication Interruption 33.2 Remote Consist Unlinked/Shutdown E New Setting Out Remote Locomotive E Conditions Which Require Actions to Protect a Single Remote Locomotive 33.3 Changing from Independent to Synchronous Mode F New Operating DP Consist in Independent Mode F Changing from Independent Mode to Synchronous Mode

19 Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE 33.4 Rear Remote Limitation G New Maximum Locomotives G Rear Remote Limitation 33.5 Descending Grade New Distributed Power, Descending Grade Exceeding 1.8% Distributed Power, Descending Grade Exceeding 1.8 Percent Changed from 100K to Throttle 4 position to allow for multiple DP consists Manned Helper Requirements Helpers Operating Responsibilities with Manned Operating Responsibilities with Manned Helper Helper Adding Manned Helper Mid train or Rear of Locomotive Air Brake Equipment Train Adding Manned Helper Mid train or Manned Helper Entrained or Coupled at Rear of Train Removing Mid train Helper Removing an Entrained Helper Manned Helper Added to Head End of Non DP Train Manned Helper Added to Head End of Train Manned Helper Removed from Head End of Train Manned Helper Removed From Head End of Train Transferring Control of Train Brakes 32.3 Transferring Control of Train Brakes 33.7 Process for Set up and Linking Locomotives for Distributed Power Service B Preparing Locomotives for Distributed Power Service Conventional Set up G Rear Remote Limitation Display Screen and Remote Set up G Rear Remote Limitation Set Up Distributed Power Lead New 33.8 Procedures for Distributed Power Operation G New Distributed Power Brake Communication Test G Rear Remote Limitation (BP Test) Distributed Power Automated Leakage Test G Rear Remote Limitation Set out Function G Rear Remote Limitation Train Check Delayed Departure 34.0 TRAIN HANDLING 33.0 TRAIN HANDLING 34.1 Train Handling Responsibilities 33.0 Train Handling 34.2 Train Handling Guidelines 33.6 Train Handling Scenarios Starting/Accelerating Train Starting Train Slowing or Controlling Speed Slowing or Controlling Speed Preferred methods for slowing or controlling train speed changed Slowing/Controlling Speed on Level or Descending Grade, with Dynamic Brakes, Slack Bunched A Stretch Braking F Stretch Braking Throttle position allows higher position while stretch braking. Slowing/Controlling Speed, Level or Descending Grade, with Dynamic Brakes, Slack Bunched Ascending Grade C Slowing/Controlling, Ascending Grade, Slack Stretched, Throttle Reduction 19

20 Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE Cresting Grade Cresting a Grade Cresting Grade Cresting a Mountain Grade Undulating Grade E Slowing or Controlling Speed, Undulating Grade or Sag, Throttle Modulation Method Stopping Stopping Stopping Stopping on a Grade Unplanned Stops Unplanned Stop Non Emergency Emergency Brake Applications 33.8 Emergency Brake Applications Emergency Brake Applications Emergency Brake Application by Crew Member Emergency Brake Applications Undesired Emergency Brake Application Shoving Equipment Shoving Movements Switching Movements Switching Movements Disturbed Track/Temporary Speed Temporary Speed Restrictions Restrictions/Heat Restrictions Disturbed Track/Temporary Disturbed Track Disturbed Track/Temporary Heat Restrictions Thermal Misalignment Thermal Misalignment 34.3 Grade Operations 33.7 Grade Operation Balance Braking Balance Braking on Grade When practical use combination of air and dynamic brake to control speed on descending grade exceeding 1.75% Recharging on a Grade Recharging on a Grade Changed requirement when using consist with multiple DC locomotives on grade Delayed Departure Delayed Departure 34.5 Car Air Brakes 33.3 New Applying or Reapplying Automatic Brakes 33.3 Use of Automatic Brake Applying or Reapplying Automatic Brakes Applying or Reapplying Automatic Brakes Changed actuating requirements. Changed requirements when reapplying air brakes Releasing Brakes Releasing Brakes Unintentional Brake Release Unintentional Brake Release Regulating Valve Braking Regulating Valve Braking Retaining Valves Retaining Valves Use of Automatic Brakes During Cold Weather Conditions Use of Automatic Brakes During Cold Weather Conditions 34.6 Locomotive Operation 33.5 New Independent Brake (Locomotive Brake) 33.5 Independent Brake (Locomotive Brake) Throttle and Reverser Positions 33.4 Throttle and Reverser Positions Dynamic Braking 33.2 Dynamic Braking Dynamic Braking Dynamic Brake Limitations Short Time Rating/Minimum Continuous Short Time Ratings Speed Short Time Rating/Minimum Minimum Continuous Speed Penalty Brake Application 33.9 Penalty Brake Application Penalty Brake Application Slow Train 20

21 21 Air Brake and Train Handling Transition Guide Table of Contents (New to Old) NEW # RULE TITLE OLD # RULE TITLE 35 REMOTE CONTROL OPERATIONS Item 10B New (Title) 35.1 Reference Materials Item 10B Remote Control Operations Instructions 35.2 Remote Control Area Item 10B Remote Control Operations Instructions 35.3 Equipment Item 10B New (Title) Operator Equipment Item 10B Remote Control Operations Instructions Remote Control Mode Item 10B Remote Control Operations Instructions Setup and Testing Item 10B Remote Control Operations Instructions RCL Strobe Lights Item 10B Remote Control Operations Instructions 35.4 Operation Item 10B New (Title) Man down Transmission Item 10B Remote Control Operations Instructions Remote Control Transmitter Attachment Item 10B Remote Control Operations Instructions "Pitch and Catch" Operations Item 10B Remote Control Operations Instructions Operating the Equipment Item 10B Remote Control Operations Instructions RCL Fails to Respond to Stop Command Item 10B Remote Control Operations Instructions 35.5 Securement Item 10B New (Title) Securing Remote Control Equipment Item 10B Remote Control Operations Instructions 35.6 RCL Zone Item 10B New (Title) Positive Stop Protection (PSP) Item 10B Remote Control Operations Instructions Overriding PSP Item 10B Remote Control Operations Instructions Disabling PSP Item 10B Remote Control Operations Instructions RCL Zones with Road Crossing Equipped with Item 10B Remote Control Operations Instructions Cameras 35.7 Main Track Item 10B New (Title) Remote Control Main Track Operation Item 10B Remote Control Operations Instructions 36 RESERVED FOR PTC OPERATIONS 36 New 37 RESERVED FOR FUTURE USE 37 New 38.0 COMMUTER/BUSINESS TRAIN AIR BRAKE RULES 38.0 PASSENGER TRAIN AIR BRAKE RULES (COMMUTER OPERATIONS) 38.1 Passenger Equipment Inspections 38.0 Passenger Train Air Brake Rules (Commuter Operations) Inspections and Brake Tests 38.1 Inspections and Air Brake Test Class I Brake Test 38.2 Class I Brake Test Class IA Brake Test 38.3 Class IA Class II Brake Test 38.4 Class II Running Brake Tests 38.5A When to Perform Test 38.2 Commuter Operation Air Brake Tests and 38.0 New Inspections Air Brake Test Requirements 38.2 Class I Brake Test Air Brake Test Requirements 38.3 Class IA Air Brake Test Requirements 38.4 Class II Air Brake Test Requirements 38.4B Procedure for a Class II Brake Test Air Brake Test Requirements 38.5B Procedure for a Running Brake Test Created table to incorporate all procedures and requirements.

Air Brake and Train Handling Rules

Air Brake and Train Handling Rules BNSF Railway Safety Vision We believe every accident or injury is preventable. Our vision is that BNSF Railway will operate free of accidents and injuries. BNSF Railway will achieve this vision through:

More information

RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1

RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1 RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1 EFFECTIVE: OCTOBER 1, 2007 NS-1 RULES THIS BOOK IS THE PROPERTY OF NORFOLK SOUTHERN AND ITS RAILROAD SUBSIDIARIES ISSUED TO NAME EMPLOYED AS who must return

More information

RULES FOR EQUIPMENT OPERATION AND HANDLING

RULES FOR EQUIPMENT OPERATION AND HANDLING RULES FOR EQUIPMENT OPERATION AND HANDLING Effective January 1, 2015 NORFOLK SOUTHERN CORPORATION Further instructions may be issued by proper authority. MARK D. MANION Executive Vice President and Chief

More information

Air Brake Tests and Procedures TABLE OF CONTENTS

Air Brake Tests and Procedures TABLE OF CONTENTS General Operating Instructions (GOI) Section Air Brake Tests and Procedures TABLE OF CONTENTS 1.0 General...160 2.0 Locomotive Brake Test...161 3.0 RSC (Safety Control System)...162 4.0 Locomotive and

More information

INSTRUCTOR EMPLOYEE: ID NUMBER: DATE: INSTRUCTOR: SCORE:

INSTRUCTOR EMPLOYEE: ID NUMBER: DATE: INSTRUCTOR: SCORE: TRAIN HANDLING PHYSICAL CHARACTERISTICS LOCOMOTIVE ENGINEERS NEBRASKA CENTRAL RAILROAD COMPANY EMPLOYEE: INSTRUCTOR ID NUMBER: DATE: INSTRUCTOR: SCORE: 1 CIRCLE THE CORRECT RESPONSE TO EACH QUESTION DIRECTLY

More information

Operating Practices Manual OP-1

Operating Practices Manual OP-1 Operating Practices Manual OP-1 Effective 0001 January 1, 2017 General Notice: The Operating Practices Section (OP-1) of the Belt Railway of Chicago Operating Manual is intended for all employees whose

More information

RCLS Operation -CANAC

RCLS Operation -CANAC Canadian Pacific Railway Job Aids/Special Instructions CANAC REMOTE CONTROL LOCOMOTIVE SYSTEM RCLS Operation -CANAC Special Instructions for the use of Canac Remote Control Locomotive System (RCLS) 1.0

More information

CANADA CATTRON RCLS Special Instructions

CANADA CATTRON RCLS Special Instructions RCL Operation CANADA CATTRON RCLS Special Instructions In the application of the Rule Book for Train & Engine Employees Item 2.2(c)(iv) and /or CROR General Rule A (ii), employees connected with the operation

More information

THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation

THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation General Order No. 2 Effective 12:01 AM, June 1, 1006 May 31, 2006 TO ALL CONCERNED: Purpose of revision: RCL Rules revisions

More information

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials Course Catalogue 2009 Table of Contents Air Brake Tests 1 Basic Conductor/Certification Course 2 Basic Conductor/Mechanical (Combination Package) 3 Basic Hazardous Materials 4 Basic Locomotive Braking

More information

AMT-3 STUDY GUIDE. What is the maximum allowable brake pipe leakage on a Locomotive?

AMT-3 STUDY GUIDE. What is the maximum allowable brake pipe leakage on a Locomotive? 1. When coupling a diesel locomoitve to another diesel locomotive in a multiple unit consist which will be used for Over-The-Road movement, which hose connections must be made? A: Only the hoses on the

More information

ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER, and ALLRAILER)

ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER, and ALLRAILER) ROADRAILER 60 MPH Loaded and 55 MPH Empty UNDER AIR BRAKE AND TRAIN HANDLING RULES - No.2 - Page No. 42 and 42a revised October 10, 1999 RULE 103.9 ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER,

More information

Rail Handbook for Air Brake and Train Handling Rules

Rail Handbook for Air Brake and Train Handling Rules Rail Handbook for Air Brake and Train Handling Rules MARCH 2008 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. HEADQUARTERS DEPARTMENT OF THE ARMY This publication is

More information

LOCOTROL AIR SIGNALS AIR BRAKES OPERATION AND MAINTENANCE GOVERNING RULES AND INSTRUCTIONS AND PACIRC RAILROAD COMPANY. CfflCAGO, MILWAUKEE. ST.

LOCOTROL AIR SIGNALS AIR BRAKES OPERATION AND MAINTENANCE GOVERNING RULES AND INSTRUCTIONS AND PACIRC RAILROAD COMPANY. CfflCAGO, MILWAUKEE. ST. Form 2697 H«Ti»»d CfflCAGO, MILWAUKEE. ST. PAUL AND PACIRC RAILROAD COMPANY RULES AND INSTRUCTIONS GOVERNING OPERATION AND MAINTENANCE OF AIR BRAKES AIR SIGNALS LOCOTROL September 1. 1974 Cascade Rail

More information

SAFETY FIRST Quick Reference Guide prepared by:

SAFETY FIRST Quick Reference Guide prepared by: SAFETY FIRST Quick Reference Guide prepared by: T. J. Donnigan, BLE General Chairman WR D. W. Hannah, BLE General Chairman WL C. R. Rightnowar, BLE General Chairman CR M. A. Young, BLE General Chairman

More information

LOCOTROL OPERATION...

LOCOTROL OPERATION... General Operating Instructions Section 17 Distributed Power TABLE OF CONTENTS Distributed Power Operations... 234 1.0 Introduction... 234 General Instructions... 236 2.0 Locotrol - Restrictions... 236

More information

System General Orders In effect December 10, 2018

System General Orders In effect December 10, 2018 In effect December 10, 2018 For business purposes only. Unauthorized access, use, distribution, or modification of Union Pacific computer systems or their content is prohibited by law. Order Category listed

More information

(1) The location where the train is originally assembled ( initial terminal ); (2) A location where the train consist is changed other than by:

(1) The location where the train is originally assembled ( initial terminal ); (2) A location where the train consist is changed other than by: 232.205 Class I brake test-initial terminal inspection. (a) Each train and each car in the train shall receive a Class I brake test as described in paragraph (c) of this section by a qualified person,

More information

49 CFR Part 229. Locomotive Safety Standards THE REGULATION

49 CFR Part 229. Locomotive Safety Standards THE REGULATION 49 CFR Part 229 Locomotive Safety Standards THE REGULATION 1 Subpart B Sec. 229.21 Daily Locomotive Inspection Except for MU locomotives, each locomotive in use shall be inspected at least once during

More information

AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS

AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS Table of Content Divided into five sections Updated Mechanical Standards and Tables & Forms Definitions Added Electronically Controlled Pneumatic Brake

More information

NATIONAL RAILROAD PASSENGER CORPORATION- AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS

NATIONAL RAILROAD PASSENGER CORPORATION- AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS NATIONAL RAILROAD PASSENGER CORPORATION- AMT - 3 AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS These instructions govern the testing and operation of air brake and other equipment on Amtrak trains

More information

AAR Manual of Standards and Recommended Practices Brakes and Brake Equipment CODE OF AIR BRAKE SYSTEM TESTS FOR FREIGHT EQUIPMENT SINGLE CAR TEST

AAR Manual of Standards and Recommended Practices Brakes and Brake Equipment CODE OF AIR BRAKE SYSTEM TESTS FOR FREIGHT EQUIPMENT SINGLE CAR TEST S-486 AAR Manual of Standards and Recommended Practices CODE OF AIR BRAKE SYSTEM TESTS FOR FREIGHT EQUIPMENT SINGLE CAR TEST Standard S-486 Adopted: 1991; Last Revised: 2018 TABLE OF CONTENTS Paragraph

More information

NATIONAL RAILROAD PASSENGER CORPORATION- AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS

NATIONAL RAILROAD PASSENGER CORPORATION- AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS NATIONAL RAILROAD PASSENGER CORPORATION- AMT - 3 AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS These instructions govern the testing and operation of air brake and other equipment on Amtrak trains

More information

Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways

Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways Part I: General 1. SHORT TITLE 1.1 For ease of reference, these rules may be referred to as the "Train

More information

ENGINEDRIVER 1ST-GRADE AIR BRAKE EXAMINATION TYPICAL QUESTIONS & ANSWERS

ENGINEDRIVER 1ST-GRADE AIR BRAKE EXAMINATION TYPICAL QUESTIONS & ANSWERS ENGINEDRIVER 1ST-GRADE AIR BRAKE EXAMINATION TYPICAL QUESTIONS & ANSWERS 1. What are the two most important new features of the 26C 1 Automatic brake valve? i. Self-lapping: whereby the Regulating portion

More information

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES TC O 0-95 Approved July 10, 2008 Effective October 1, 2008 Contents PART I GENERAL 3 1 Short Title 3 2 Scope 3 3 Definitions 3 4 Certification

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Hand Brakes Leaving Equipment TABLE OF CONTENTS

Hand Brakes Leaving Equipment TABLE OF CONTENTS General Operating Instructions (GOI) Section Hand rakes Leaving quipment TL O ONTNTS 1.0 Hand rake Policy...174 2.0 Leaving a Portion of a Train Standing with mergency ir rakes pplied...176 3.0 Leaving

More information

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES November 17, 2017 Contents PART I GENERAL 3 1 Short Title 3 2 Scope 3 3 Definitions 3 4 Certification of Car Inspectors 6 5 Qualified

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: It is a railway s responsibility to ensure the safe operation of locomotives in service with their railway and ensure locomotives do not suffer catastrophic failures or undesired events resulting in death,

More information

SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section)

SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section) SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section) TIMETABLE NO. 105 EFFECTIVE 0001 PACIFIC STANDARD TIME FRIDAY, July 01, 2005 325 Mill Road Lewiston, Idaho 83501 208-743-2559 Ray Leiterman

More information

Freight Train Make-up and Handling: Conditions that Cause Derailments. Dr. Elton Toma, Ph.D., P.Eng. August 26, 2015

Freight Train Make-up and Handling: Conditions that Cause Derailments. Dr. Elton Toma, Ph.D., P.Eng. August 26, 2015 Freight Train Make-up and Handling: Conditions that Cause Derailments Dr. Elton Toma, Ph.D., P.Eng. August 26, 2015 Freight Train Make-up and Handling Summarize work from several projects completed by

More information

1003 Orientation B&SVRR 1003 Orientation Page 1 10/23/2009

1003 Orientation B&SVRR 1003 Orientation Page 1 10/23/2009 1003 Orientation B&SVRR 1003 Orientation Page 1 B&SVRR 1003 Orientation Page 2 CONTROLS AT ENGINEMAN'S POSITION 1. Air Gauges 8. Reverse Lever 2. Load Current Indicating Meter 9. Heater Switch 3. Indicating

More information

TOC Waiver. ARTC website

TOC Waiver. ARTC website TOC Waiver Reference Number 12475 Distributed To: ARTC website Distribution Date: 05/06/2014 Requested By: Subject: Effective Period: ARTC RAS Manual Stage 1 implementation for the ARTC in New South Wales

More information

PART 238--PASSENGER EQUIPMENT SAFETY STANDARDS

PART 238--PASSENGER EQUIPMENT SAFETY STANDARDS PART 238--PASSENGER EQUIPMENT SAFETY STANDARDS Subpart A--General Sec. 238.1 Purpose and scope. 238.3 Applicability. 238.5 Definitions. 238.7 Waivers. 238.9 Responsibility for compliance. 238.11 Civil

More information

Spoornet Technical: Evaluation, Acquisition and Review

Spoornet Technical: Evaluation, Acquisition and Review Document no: RSE\TE\TMO 0016 Rev no: 6 Page 2 of 36 5.5 EXITING BP EMULATION...15 6. ITC NETWORK COMMUNICATIONS REQUIREMENTS...16 6.1 GENERAL MESSAGING REQUIREMENTS...16 6.2 ECP SPOORNET-SPECIFIC EXTENSION

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

RAILWAY INVESTIGATION REPORT R12E0004

RAILWAY INVESTIGATION REPORT R12E0004 RAILWAY INVESTIGATION REPORT R12E0004 MAIN-TRACK COLLISION CANADIAN NATIONAL RUNAWAY ROLLING STOCK AND TRAIN A45951-16 MILE 44.5, GRANDE CACHE SUBDIVISION HANLON, ALBERTA 18 JANUARY 2012 The Transportation

More information

THE BELT RAILWAY COMPANY OF CHICAGO

THE BELT RAILWAY COMPANY OF CHICAGO THE BELT RAILWAY COMPANY OF CHICAGO CORA Update 2017-003 Effective 0001, June 19, 2017: Summary of Changes: Replacement section for entire BRC Section of CORA Operating Guide Designation of Lines with

More information

NZQA registered unit standard version 4 Page 1 of 5

NZQA registered unit standard version 4 Page 1 of 5 Page 1 of 5 Title Drive and manoeuvre a steam driven rail vehicle Level 4 Credits 10 Purpose This unit standard covers the knowledge and skills required to drive and manoeuvre steam driven rail vehicles,

More information

WARNING. 4. The wearing of safety glasses, footwear and personal safety clothing is compulsory.

WARNING. 4. The wearing of safety glasses, footwear and personal safety clothing is compulsory. SECTION 18-500.00 18-500.00/ 1 WARNING 1. All Federal, State, Provincial, Municipal and company, (including Transit Authority), laws and regulations regarding vehicles must be complied with. Also, any

More information

How to Operate like a Pro. Introduction

How to Operate like a Pro. Introduction How to Operate like a Pro Introduction The role of the professional locomotive engineer requires tremendous responsibility. As such, the training period to receive Certification lasts many months and mastering

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

SC-1 1 Empty/Load Equipment

SC-1 1 Empty/Load Equipment SC-1 1 Empty/Load Equipment Operation, Adjustment & Testing November 2002 Copyright 2002 by Wabtec Corporation Operation of the SC-1 The SC-1 empty/load equipment includes the use of an: S-1 Sensor Valve

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

. OPERATING INSTRUCTION MANUAL NO. 548-A

. OPERATING INSTRUCTION MANUAL NO. 548-A WABCO ~. OPERATING INSTRUCTION MANUAL NO. 548-A SATELLITE LOCOMOTIVE REMOTE CONTROL SYSTEM. I,t UNION SWITCH & SIGNAL DIVISION Westinghouse Air Brake Company PITTSBURGH.PA. 15218 SepteITiber, 1963 Al.63-250-848.2

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures s Rule Number: 3025 Version 1.0, 31 March 2016 Temporary Speed Restrictions Rule Number: 3025 Document Control Identification Document title Number Version Date

More information

Operator s Manual Reppo Virtual Rail Vehicles Baldwin DR

Operator s Manual Reppo Virtual Rail Vehicles Baldwin DR 2 Rolling Stock PRR CENTIPEDE UNIT A-1 5823-A1-5834-A1 PRR CENTIPEDE UNIT A-2 5823-A2-5834-A2 PRR B60b BAGGAGE CAR 9200-9399 3 PRR D78d DINING CAR 4470-4474-4475-4478-4486-4490-4491-4492-4494-4497 4 OPERATION

More information

and Revocation of Certification

and Revocation of Certification > Denial and Revocation of Certification Denial of certification. Criteria for revoking certification. Periods of revocation. Process for revoking certification. Conductor Certification- Feb. 2012 50 Conductor

More information

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001 Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic

More information

Route Access Condition Notice

Route Access Condition Notice Route Access Condition Notice 13-00039 Distributed To: ARTC Website Distribution Date: 04/04/14 Requested By: Subject: Effective Period: Amendment Type: ARTC General Review by Rules Team Until Published

More information

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems DRAFT CHAPTER 11 SECTIONS 3.5.11.8, 3.5.11.9 Part 3 Track and Roadway Considerations SECTION 3.5 TRACK AND ROADWAY CONSIDERATIONS 3.5.11.8 Turnouts and Crossovers (2012) Turnouts and crossovers are used

More information

Freight Car Maintenance Inspection

Freight Car Maintenance Inspection ASSOCIATION OF AMERICAN RAILROADS Mechanical Inspection Department Page 1 of 8 A. Outbound Inspection (Completed Cars) Reporting Reason Bad Ordered Marks Exception Noted Maj Mod Min Load or Empty Status/Comments

More information

SECTION 5 STANDARD TRAIN EXAMINATION PROCEDURES

SECTION 5 STANDARD TRAIN EXAMINATION PROCEDURES SECTION 5 STANDARD TRAIN EXAMINATION PROCEDURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 5 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED TABLE OF CONTENTS Section Description Page No. 5.1

More information

Dynamic Adjustment Procedure for 700-series Digital Controls. Application Note (Revision A,8/1998) Original Instructions

Dynamic Adjustment Procedure for 700-series Digital Controls. Application Note (Revision A,8/1998) Original Instructions Application Note 01304 (Revision A,8/1998) Original Instructions Dynamic Adjustment Procedure for 700-series Digital Controls (700, 701, 701A, 702, 705, 721, 723, 723PLUS, 828) General Precautions Read

More information

ALP-46 New Jersey Transit

ALP-46 New Jersey Transit ALP-46 New Jersey Transit 1 BACKGROUND... 3 1.1 Loco... 3 1.2 Design & Specification... 3 1.3 Multi-Level Cab car... 4 1.4 Design & Specification... 4 2 ROLLING STOCK... 5 2.1 NJT ALP-46... 5 2.2 Comet

More information

APPENDIX C Train Accident Cause Codes

APPENDIX C Train Accident Cause Codes TRACK, ROADBED AND STRUCTURES Roadbed APPENDIX C Train Accident Cause Codes T001 T002 T099 Roadbed settled or soft Washout/rain/slide/flood/snow/ice damage to track Other roadbed defects (Provide detailed

More information

Operational Controls for High-Hazard Flammable Trains

Operational Controls for High-Hazard Flammable Trains F E D E R A L R A I L R O A D A D M I N I S T R A T I O N Operational Controls for High-Hazard Flammable Trains New Regulatory Requirements Addressed in HM-251 Final Rule Published May 8, 2015 Ken Holgard

More information

Commander 15i Container and Pallet Loader. Property of American Airlines

Commander 15i Container and Pallet Loader. Property of American Airlines Commander 15i Container and Pallet Loader Section 2. Operation BEFORE ATTEMPTING TO OPERATE OR MAINTAIN THE VEHICLE, COMPLETELY READ AND UNDERSTAND THE OPERATION AND MAINTENANCE MANUAL, INCLUDING ALL DANGER,,

More information

Mantis Rerailer General Specifications

Mantis Rerailer General Specifications 2008 General Specifications 1. Typical Operating Parameters 2. General 1.1 Operating temperatures will typically be between 20 F (7 C) to 110 F (43 C). 1.2 Relative humidity ranges between 20% and 100%.

More information

RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT

RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT CANADIAN NATIONAL FREIGHT TRAIN NO. E20531-15 MILE 154.4, REDDITT SUBDIVISION WHITE, ONTARIO 16 MAY 2000 The Transportation Safety Board of Canada

More information

Cat Electronic Technician 2017A v1.0 Product Status Report 7/10/2017 9:49 AM

Cat Electronic Technician 2017A v1.0 Product Status Report 7/10/2017 9:49 AM Cat Electronic Technician 2017A v1.0 Product Status Report 7/10/2017 9:49 AM Product Status Report Product ID Comments ELIAS MARIN C18 772 (TXH00900) Engine Serial Number TXH00900 ECM Part Number 2622879-01

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

6540 Orientation B&SVRR 6540 Orientation Page 1 8/11/2009

6540 Orientation B&SVRR 6540 Orientation Page 1 8/11/2009 6540 Orientation B&SVRR 6540 Orientation Page 1 CONTROLS AT ENGINEMAN'S POSITION 4. Operating Switches 6. Throttle 7. Reverse Lever 5. Headlight Dimming 18. Alerter Reset Button B&SVRR 6540 Orientation

More information

3000VA 120/208/230VAC

3000VA 120/208/230VAC User s Manual English Smart-UPS 2200VA 120/230VAC 3000VA 120/208/230VAC 2U Rack Mount Uninterruptible Power Supply 990-1352 12/02 Introduction The APC Uninterruptible Power Supply (UPS) is designed to

More information

Two Channel Remote Shutdown Device

Two Channel Remote Shutdown Device Installation & Operation Standard Features: Two Channel Remote Shutdown Device I. Introduction Latched shutdown for increased safety Powerful transmitter with 300 feet range Waterproof sealed transmitter

More information

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Prepared by: TÜV Rheinland Mobility Rail Sciences Division March 25, 2014 1 Who We are TUV Rheinland

More information

IVTM Installation Manual

IVTM Installation Manual Integrated Vehicle Tire Pressure Monitoring IVTM Installation Manual 2nd edition Copyright WABCO 2006 Vehicle Control Systems An American Standard Company The right of amendment is reserved Version 002/06.06(us)

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Canadian Pacific Railway: Addressing Climate Change. UN Conference on Climate Change (COP 11) December 3, 2005

Canadian Pacific Railway: Addressing Climate Change. UN Conference on Climate Change (COP 11) December 3, 2005 Canadian Pacific Railway: Addressing Climate Change UN Conference on Climate Change (COP 11) December 3, 2005 CPR Network Canadian Pacific Railway Limited operates a transcontinental railway in Canada

More information

FEDERAL RAILROAD ADMINISTRATION OFFICE OF RAILROAD SAFETY

FEDERAL RAILROAD ADMINISTRATION OFFICE OF RAILROAD SAFETY FEDERAL RAILROAD ADMINISTRATION OFFICE OF RAILROAD SAFETY Hours of Service Compliance Manual Freight Operations December 2013 Hours of Service Compliance Manual Freight Operations Table of Contents INTRODUCTION

More information

STEERING HYDRAULICS The steering system is a flow amplified, load sensing, hydraulics arrangement.

STEERING HYDRAULICS The steering system is a flow amplified, load sensing, hydraulics arrangement. STEERING HYDRAULICS 116821 The steering system is a flow amplified, load sensing, hydraulics arrangement. When the steering wheel is turned, the Steering Metering Pump meters an oil volume proportional

More information

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013 Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 December 03 E1 Authorised Vehicles E3 December 03 E2 E3 E4 E5 Movement of Defective Vehicles Special Movement Conditions Vehicles

More information

Script. Visual. Narrative. Module 6C Carrier Requirements (Rail)

Script. Visual. Narrative. Module 6C Carrier Requirements (Rail) Script Visual Narrative 1 Module 6C Carrier Requirements (Rail) 2 Hazardous materials shipments by rail must comply with the requirements of Part 174 as well as those contained in Parts 171, 172, 173 and

More information

Rules Respecting Key Trains and Key Routes

Rules Respecting Key Trains and Key Routes Rules Respecting Key Trains and Key Routes February 12, 2016 version CONTENTS 1. SHORT TITLE 2. APPLICATION 3. DEFINITIONS 4. KEY TRAINS 5. KEY ROUTES 6. KEY ROUTE RISK ASSESSMENTS 7. CONSULTATIONS WITH

More information

Owner s Guide CARS & CA4B5

Owner s Guide CARS & CA4B5 PROFESSIONAL SERIES Owner s Guide For Model: CARS & CA4B5 Deluxe Vehicle Remote Start and Keyless Entry System IMPORTANT NOTE: The operation of the Security and Convenience System as described in this

More information

RAC Work/Rest Rules Interpretation Document. Effective June 29, 2005

RAC Work/Rest Rules Interpretation Document. Effective June 29, 2005 RAC Work/Rest Rules Interpretation Document Effective June 29, 2005 The following document does not form part of the Work/Rest Rules for Railway Operating Employees. Its purpose is to provide consistent

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

United States Army Warfighting Center Fort Rucker, Alabama NOVEMBER 2006

United States Army Warfighting Center Fort Rucker, Alabama NOVEMBER 2006 United States Army Warfighting Center Fort Rucker, Alabama NOVEMBER 2006 STUDENT HANDOUT TITLE: CH-47D ENGINE CONTROL SYSTEM FILE NUMBER: 011-2109-3 PROPONENT FOR THIS STUDENT HANDOUT IS: 110 th Aviation

More information

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook Train Examination (Braking System) Addendum Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates

More information

F40 Locomotive Operating Manual

F40 Locomotive Operating Manual F40 Locomotive Operating Manual 1. Introduction The HP-Trainz team developed very detailed 3D-model of the American diesel-electric locomotive F40 for the use in the railway simulator Trainz. Beside the

More information

LOCOMOTIVE ENGINEER TRAINING HANDBOOK

LOCOMOTIVE ENGINEER TRAINING HANDBOOK LOCOMOTIVE ENGINEER TRAINING HANDBOOK February, 2006 Locomotive Control Stand Orientation An important part of your Locomotive Engineer training will be operating locomotive simulators, and your first

More information

Standardized Technical Specification. Bi-Level Passenger Rail Cars for Intercity Corridor Service. Chapter 5. Trucks. Revision H

Standardized Technical Specification. Bi-Level Passenger Rail Cars for Intercity Corridor Service. Chapter 5. Trucks. Revision H Standardized Technical Specification Bi-Level Passenger Rail Cars for Intercity Corridor Service Chapter 5 Trucks Revision H Table of Contents 5-1 Table of Contents 5.0 Trucks... 5-3 5.1 Overview... 5-3

More information

Troubleshooting Guide

Troubleshooting Guide Troubleshooting Guide diesel - gasoline - LPG diesel - gasoline - LPG diesel - gasoline - LPG P/N 0191681 May, 1999 An ISO 9001 Registered Company P.O. Box 1160 St. Joseph, MO 64502-1160 1-800-255-0317

More information

SD Bendix MV-3 Dash Control Module DESCRIPTION. Bottom View

SD Bendix MV-3 Dash Control Module DESCRIPTION. Bottom View SD-03-3415 Bendix MV-3 Dash Control Module MOUNTING PLATE MOUNTING HOLES (4) Dual Circuit SUPPLY Check VALVE AUXILIARY PORT (Optional) delivery DESCRIPTION secondary supply Trailer delivery FIGURE 1 -

More information

Steam Locomotive. v.2

Steam Locomotive. v.2 Steam Locomotive O p e r a t o r s M a n u a l N E OPERATE IN SILENCE NO MORE. 1 MO v.2 Before running your engine: Prior to operation, be sure to perform a reset procedure on your engine as outlined in

More information

HI/LO CYLINDER (Y SERIES) INSTALLATION, OPERATING & MAINTENANCE MANUAL

HI/LO CYLINDER (Y SERIES) INSTALLATION, OPERATING & MAINTENANCE MANUAL HI/LO CYLINDER (Y SERIES) INSTALLATION, OPERATING & MAINTENANCE MANUAL 545 Hupp Avenue Jackson, Michigan 49204 Ph: 517-787-9444 Fx: 517-787-7585 www.airhydraulics.com info@airhydraulics.com Serial No.

More information

E2O: Engineered to Outperform LEADER THE TRAIN HANDLING AND ENERGY MANAGEMENT SYSTEM

E2O: Engineered to Outperform LEADER THE TRAIN HANDLING AND ENERGY MANAGEMENT SYSTEM E2O: Engineered to Outperform LEADER THE TRAIN HANDLING AND ENERGY MANAGEMENT SYSTEM LEADER Train Handling and Energy Management System The business case is straightforward. Fuel costs money and LEADER

More information

UNION PACIFIC RAILROAD 1 Safety Book Transition Guide July 2, 2013

UNION PACIFIC RAILROAD 1 Safety Book Transition Guide July 2, 2013 UNION PACIFIC RAILROAD 1 The following is designed to give a side by side transition between the Union Pacific Safety Rules effective July 30, 2007 and the new rules effective July 2, 2013. Many rules

More information

Public Works Idling Policy Example

Public Works Idling Policy Example Public Works Idling Policy Example DEPARTMENT OF PUBLIC WORKS MEMORANDUM TO: FROM: Public Works Employees Director of Public Works DATE: SUBJECT: Durations Public Works Vehicle Idling Policy and Guidelines

More information

SLIMZONE CLASSIC /

SLIMZONE CLASSIC / SLIMZONE CLASSIC 2701-001 / 2701-006 ZONE CONTROL SYSTEM INSTALLATION AND OPERATION MANUAL TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 IMPORTANT NOTE...1 1.2 FEATURES...1 1.3 SAFETY INSTRUCTIONS...1 2. APPLICATION

More information

NEW YORK AIR BRAKE CORPORATION

NEW YORK AIR BRAKE CORPORATION NEW YORK AIR BRAKE CORPORATION A KNORR BRAKE COMPANY 748 Starbuck Avenue, Watertown, New York 13601 C.W. 307 COMPONENT WRITE-UP OF CCB-26 LOCOMOTIVE BRAKE SYSTEM ISSUE NO. 1 C.W. 307 GENERAL The CCB-26

More information

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES INTO-PLANE AUDIT CHECKLIST Audit Date: Allocation #: Station Code: City: Vendor Name: Address: Primary Contact: Title: Phone: Fax: E-mail: Auditor: Acceptable: Conditionally Acceptable Not Acceptable Register:

More information

LADDER SAFETY PROGRAM

LADDER SAFETY PROGRAM All ladders at Craven Community College must be constructed and used in accordance with OSHA regulations and ANSI standards. All commercially manufactured ladders must have a label indicating it meets

More information

Operating Procedures Working of Trains - Procedures 1 to 23

Operating Procedures Working of Trains - Procedures 1 to 23 Operating Procedures Working of Trains - Procedures 1 to 23 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 Australian

More information

CA 6550 Owner s Guide

CA 6550 Owner s Guide PROFESSIONAL SERIES CA 6550 Owner s Guide 2 Way LCD Vehicle Security and Remote Start System IMPORTANT NOTE: The operation of the Security and Convenience System as described in this manual is applicable

More information

MiniBMS V3 User Manual

MiniBMS V3 User Manual MiniBMS V3 User Manual CleanPowerAuto LLC MiniBMS is a battery management system designed for LiFePo4 cells, used in Electric Vehicles. MiniBMS is designed to be reliable and cost effective solution; it

More information

Tomorrow and beyond in Equipment Evolution Innovations & Trends

Tomorrow and beyond in Equipment Evolution Innovations & Trends Tomorrow and beyond in Equipment Evolution Innovations & Trends Presented by Robert E. Pickel Senior Vice President, Marketing and Sales National Steel Car N.A. Inc. June 18, 2013 1 Today s Railcars Provide

More information

SECTION 11 POWERED INDUSTRIAL TRUCKS

SECTION 11 POWERED INDUSTRIAL TRUCKS SECTION 11 POWERED INDUSTRIAL TRUCKS 11.1 Powered Industrial Truck Procedure 11.2 Forklift Inspection 11.3 Operator Performance Evaluation Checklist Revised: May 2009 Updated: November 2017 Reviewed: October

More information

F40PH-2CAT New Jersey Transit

F40PH-2CAT New Jersey Transit F40PH-2CAT New Jersey Transit 1 BACKGROUND... 3 1.1 Loco... 3 1.2 Design & Specification... 3 2 ROLLING STOCK... 4 2.1 F40PH-2CAT... 4 2.2 Comet IV... 4 2.3 Comet V Cab Car... 5 3 DRIVING THE F40PH-2CAT...

More information