NCHRP ROADWAY CONSTRUCTION NOISE PREDICTION MODEL VERSION 2.0 DATA COLLECTION PROGRAM TARA MINNI SHARON PAUL CARPENTER

Size: px
Start display at page:

Download "NCHRP ROADWAY CONSTRUCTION NOISE PREDICTION MODEL VERSION 2.0 DATA COLLECTION PROGRAM TARA MINNI SHARON PAUL CARPENTER"

Transcription

1 TRB ADC40 SUMMER MEETING 8 NCHRP ROADWAY CONSTRUCTION NOISE PREDICTION MODEL VERSION 2.0 DATA COLLECTION PROGRAM TARA MINNI SHARON PAUL CARPENTER

2

3 DATA ACQUISITION PARAMETER SUMMARY METRIC TIME-WEIGHTING FREQUENCY WEIGHTING FREQUENCY RESOLUTION OVERALL L ASMAX SLOW A-WEIGHTING OVERALL /3 OB L ASMAX SLOW A-WEIGHTING /3 OCTAVE BAND OVERALL L AEQ UNWEIGHTED A-WEIGHTING OVERALL /3 OB L AEQ UNWEIGHTED A-WEIGHTING /3 OCTAVE BAND Note: Although Measurement from Highway-Related Noise indicates a fast time weighting, the data collected and the equations used for the original RCNM are based on a slow time weighting, therefore a slow time weighting will be used for comparison purposes.

4 EQUIPMENT SET-UP HIGH DEFINITION CAMERA OCTAVE-BAND SOUND LEVEL METER PERSONAL PROTECTIVE EQUIPMENT WEATHER METER FOR WIND SPEED, TEMPERATURE, AND HUMIDITY SHORT AND LONG DISTANCE MEASUREMENT DEVICES TABLET COMPUTER

5 DETERMINING CLEAN DATA 80 NOISE LEVELS (dba) dba 50 TIME (SECONDS)

6 DETERMINING CLEAN DATA 80 NOISE LEVELS (dba) dba 50 TIME (SECONDS)

7 ISSUES DURING DATA COLLECTION <6-0 Data not 6 to 0 dba over background on pass-by start and/or end Contractors communicating loudly Equipment working simultaneously! Unsafe environment or difficult to monitor IX XII VI III Equipment broken or not working properly Extended waiting period $ $ $ NJDOT construction shutdown due to gas tax refusal

8 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL

9 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL SIDE 2 SIDE 3 SIDE SIDE 4 CONTROL PANEL

10 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL

11 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

12 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL SIDE 6 SIDE 5

13 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL

14 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

15 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL SIDE SIDE 2 SIDE 4 SIDE 3

16 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL

17 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL INSTANTANEOUS STATIC IMPACT DYNAMIC 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

18 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL INSTANTANEOUS STATIC IMPACT DYNAMIC 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

19 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL INSTANTANEOUS STATIC IMPACT DYNAMIC 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

20 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL INSTANTANEOUS STATIC IMPACT DYNAMIC 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

21 CATEGORIES OF EQUIPMENT STEADY STATE PASS-BY CYCLICAL INSTANTANEOUS STATIC IMPACT DYNAMIC 00 EXAMPLE GRAPH NOISE LEVELS (dba) TIME (SECONDS)

22 STEADY STATE EQUIPMENT CATEGORIES IN MULTIPLE OF EQUIPMENT CATEGORIES PASS-BY CYCLICAL FRONT END LOADER DUMP TRUCK

23 TABLE : MONITORED CONSTRUCTION EQUIPMENT LIST EQUIPMENT TYPE AIR-OPERATED POST DRIVER DOZER PAVING POWER TOOLS (CONTINUED) ASPHALT DISTRIBUTOR TRUCK (ASPHALT SPRAYER) DRUM MIXER ASPHALT (W/ DUMP TRUCK) SANDER AUGER DRILL DUMP TRUCK (CYCLICAL) ASPHALT (W/ MTV & DUMP TRUCK) POWER UNIT (POWER PACK) BACKHOE DUMP TRUCK (PASSBY) CONCRETE (PLACER + SLIPFORM PAVER) PUMP BAR BENDER EXCAVATOR CONCRETE (TEXTURING/CURING MACHINE) ROCK DRILL BLASTING FLAT BED TRUCK CONCRETE (TRIPLE ROLLER TUBE PAVER) RUMBLE STRIP GRINDING ABRASIVE FRONT END LOADER (CYCLICAL) POWER TOOLS SCRAPER EXPLOSIVE FRONT END LOADER (PASSBY) AIR HOSE SHOT CRETE PUMP/SPRAY CHIP SPREADER GENERATOR CHAINSAW STREET SWEEPER COMPACTOR GRADER CHIPPING GUN TELESCOPIC HANDLER (FORKLIFT) PLATE HOE RAM (HYDRAULIC BREAKER) CIRCULAR SAW VACUUM EXCAVATOR (VAC-TRUCK) ROLLER HORIZONTAL BORE DRILL GRINDER VENTILATION FAN COMPRESSOR IMPACT PILE DRIVER HAMMER DRILL VIBRATORY CONCRETE CONSOLIDATOR CONCRETE BATCH PLANT JOINT SEALER IMPACT WRENCH (AIR GUN, RATCHET WRENCH) VIBRATORY PILE DRIVER CONCRETE MIXER TRUCK LIGHT TOWER JACKHAMMER WARNING HORN (AIR HORN) CONCRETE PUMP TRUCK MAN LIFT JIG SAW WATER SPRAY TRUCK CONCRETE SAW MOVEMENT ALARM NAIL GUN WELDING MACHINE CRANE MUD RECYCLER RECIPROCATING SAW DIRECTIONAL DRILL RIG PAVEMENT SCARIFIER (MILLINGMACHINE) RIVET BUSTER

24 MOVEMENT ALARMS BROADBAND MULTI-TONE PURE TONE

25 EQUIPMENT SIZE RANGES DEPENDENT ON CHASSIS EQUIPMENT TYPE CHASSIS CONCRETE DUMP VAC MIXER PUMP TRUCK TRUCK INTERNATIONAL FREIGHTLINER KENWORTH MACK PETERBILT GRANITE WORKSTAR 2 T270 M2 MIN CHASSIS HORSEPOWER MAX

26 DATA RANGE SUMMARY STEADY STATE PASS-BY CYCLICAL EQUIPMENT SIZE RANGE (MONITORED) SIZE RANGE (COMMERCIALLY AVAILABLE) AIR-OPERATED POST DRIVER 00 PSI PSI BAR BENDER HP - 32 HP COMPRESSOR HP HP CONCRETE PUMP TRUCK HP HP CRANE HP HP DRUM MIXER.5 HP HP GENERATOR HP HP HORIZONTAL BORE DRILL 74 HP HP LIGHT TOWER HP HP MAN LIFT HP HP MOVEMENT ALARMS N/A N/A MUD RECYCLER 25 HP - 53 HP POWER UNIT (POWER PACK) HP HP PUMP 9-39 HP HP VACUUM EXCAVATOR (VAC-TRUCK) HP HP VENTILATION FAN 0.5 HP HP WELDING MACHINE HP HP AMP CFM FT-LBS HP LBS LPH PSI V AMPERAGE CUBIC FEET PER MINUTE FOOT POUNDS HORSEPOWER POUNDS LOADS PER HOUR POUNDS PER SQUARE INCH VOLTAGE

27 DATA RANGE SUMMARY STEADY STATE PASS-BY CYCLICAL EQUIPMENT SIZE RANGE (MONITORED) SIZE RANGE (COMMERCIALLY AVAILABLE) ASPHALT DISTRIBUTOR HP DEPENDS ON CHASSIS ENGINE CHIP SPREADER 275 HP HP COMPACTOR (PLATE) 6 HP HP COMPACTOR (ROLLER) HP HP DUMP TRUCK UNKNOWN DEPENDS ON CHASSIS ENGINE FLAT BED TRUCK UNKNOWN DEPENDS ON CHASSIS ENGINE FRONT END LOADER HP HP GRADER HP HP JOINT SEALER 33 HP HP PAVEMENT SCARIFIER (MILLING MACHINE) HP HP PAVING - ASPHALT (PAVER + DUMP TRUCK) HP HP (PAVER ONLY) PAVING - ASPHALT (PAVER + MATERIAL TRANSPORT VEHICLE + DUMP TRUCK) HP HP (PAVER + MATERIAL TRANSPORT VEHICLE ONLY) RUMBLE STRIP GRINDING 460 HP DEPENDS ON CHASSIS ENGINE SCRAPER 450 HP - 6 HP STREET SWEEPER HP HP TELESCOPIC HANDLER (FORKLIFT) 0 HP HP WATER SPRAY TRUCK HP DEPENDS ON CHASSIS ENGINE AMP CFM FT-LBS HP LBS LPH PSI V AMPERAGE CUBIC FEET PER MINUTE FOOT POUNDS HORSEPOWER POUNDS LOADS PER HOUR POUNDS PER SQUARE INCH VOLTAGE

28 DATA RANGE SUMMARY STEADY STATE PASS-BY CYCLICAL EQUIPMENT SIZE RANGE (MONITORED) SIZE RANGE (COMMERCIALLY AVAILABLE) AUGER DRILL HP HP BACKHOE HP HP BLASTING (ABRASIVE) SYSTEM SYSTEM BLASTING (EXPLOSIVE) 397 LBS DEPENDS ON NEED CONCRETE BATCH PLANT 35 LPH 8-35 LPH CONCRETE MIXER TRUCK UNKNOWN HP CONCRETE SAW HP HP DIRECTIONAL DRILL RIG 60 HP HP DOZER HP HP DUMP TRUCK (CYCLICAL) UNKNOWN DEPENDS ON CHASSIS ENGINE EXCAVATOR HP HP FRONT END LOADER (CYCLICAL) HP HP HOE RAM (HYDRAULIC BREAKER) HP HP IMPACT PILE DRIVER 28,87-8,300 FT-LBS 3, ,4 FT-LBS PAVING - CONCRETE (PLACER + SLIPFORM PAVER) 600 HP 54-4 HP PAVING - CONCRETE (TEXTURING/CURING MACHINE) 60 HP HP PAVING - CONCRETE (TRIPLE ROLLER TUBE PAVER) 40 HP HP POWER TOOLS - AIR HOSE 850 CFM BASED ON COMPRESSOR AMP CFM FT-LBS HP LBS LPH PSI V AMPERAGE CUBIC FEET PER MINUTE FOOT POUNDS HORSEPOWER POUNDS LOADS PER HOUR POUNDS PER SQUARE INCH VOLTAGE

29 DATA RANGE SUMMARY POWER TOOLS - CHAINSAW 3.2 HP HP POWER TOOLS - CHIPPING GUN LBS LBS POWER TOOLS - CIRCULAR SAW STEADY STATE PASS-BY CYCLICAL EQUIPMENT SIZE RANGE (MONITORED) SIZE RANGE (COMMERCIALLY AVAILABLE) 5 AMP HP POWER TOOLS - GRINDER 7 - AMPS 6-5 AMP POWER TOOLS - HAMMER DRILL 8 V 2-36 V POWER TOOLS - IMPACT WRENCH FT-LBS FT-LBS POWER TOOLS - JACKHAMMER LBS LBS POWER TOOLS - JIG SAW 5.5 AMP AMP POWER TOOLS - NAIL GUN - UNKNOWN PSI 60-3 PSI POWER TOOLS - RECIPROCATING SAW 2 AMP 9-8 AMP POWER TOOLS - RIVET BUSTER 30 LBS LBS POWER TOOLS - SANDER 7.8 AMPS 2-5 AMP ROCK DRILL HP HP SHOT CRETE PUMP/SPRAY 72 HP HP VIBRATORY CONCRETE CONSOLIDATOR UNKNOWN HP VIBRATORY PILE DRIVER HP HP WARNING HORN (AIR HORN) STANDARD STANDARD 5 AMP AMP CFM FT-LBS HP LBS LPH PSI V AMPERAGE CUBIC FEET PER MINUTE FOOT POUNDS HORSEPOWER POUNDS LOADS PER HOUR POUNDS PER SQUARE INCH VOLTAGE

30 DATA PROCESSING DATA ANALYSIS TOOL 2 DATA REVIEW SCATTER PLOT 3 NOISE SOURCE DATABASE

31 DATA PROCESSING DATA ANALYSIS TOOL DATA IMPORT GENERATE LAeq set( LeqDataSheet.Range(LeqDataSheet.Cells(, Workbooks.OpenText verbose currentcolumn Do Dim Until newwpsheet, findleqcurrentrow, figure( = currentcolumn true; 2 = ), wpsheetwrite 5 'WindowStyle', Filename:=RNDPath, = currentcolumn, 73 As Worksheet 'Docked' currentleqcolumn Origin:=xlMSDOS, ), LeqDataSheet.Cells(leqDataLastRow, StartRow:= As Long _ for 36)).HorizontalAlignment ink Do Dim While =, timecount DataType:=xlDelimited, : Set currentcolumn length( formatcells As Long method = xlcenter < = ); 73wpSheetWrite.Cells(findLeqCurrentRow, TextQualifier:=xlDoubleQuote, Space:=False, Comma:=True method currentcolumn) LeqDataSheet.Range(LeqDataSheet.Cells(firstRowDataBegins, Set = wpsheetwrite.range(wpsheetwrite.cells(22, { 'EPD_Chessell' _ = Sheets.Add(after:=Sheets(ActiveWorkbook.Sheets.count)) }; currentcolumn), ), LeqDataSheet.Cells(leqDataLastRow, strcolor wpsheetwrite.cells(22, presstotalbyp0 timecount, = FieldInfo:=Array(Array(, 'brgmck'; With = 0formatCells = zeros( currentcolumn length( )).NumberFormat xlgeneralformat), + )).Merge f ) ); = "hh:mm:ss" Array(2, xlgeneralformat), Array(3, LeqDataSheet.Range(LeqDataSheet.Cells(firstRowDataBegins, pressdirectbyp0 wpsheetwrite.name findleqcurrentrow currentcolumn xlgeneralformat),.borders.linestyle = zeros( = "WCPB" currentcolumn 25 Array(4,, & length( = xlgeneralformat), xlcontinuous + 2f ) ); Array(5, 2), xlgeneralformat), LeqDataSheet.Cells(leqDataLastRow, Array(6, CLng(ThisWorkbook.Sheets("Hidden").Range("J2").Value) f = pressreflectbyp0 Loop logspace( Do Until xlgeneralformat), timecount 2,.Borders.Color 4, 000 = zeros( > DateDiff("s", ); Array(7,, = vbblack length( 36)).NumberFormat xlgeneralformat), wpsheetwrite.range("q0").value, f ) ); = Array(8, "0.0 xlgeneralformat), Array(9, sigmaeff wpsheetwrite.range("t0").value) pressgroundbyp0 wpsheetwrite.cells(22, xlgeneralformat), = 300;.Borders.Weight = zeros( Array(0, 5).Formula, = length( xlthin xlgeneralformat), = f "=MAX(" ) ); & wpsheetwrite.cells(25, Array(, LmaxDataSheet.Range(LmaxDataSheet.Cells(, xlgeneralformat), wpsheetwrite.range("af5:an5").merge 3).Address(0, rho for =.2; lead currentcolumn = 0).Value :& Array(2, length( ":" = = & 5LeqDataSheet.Cells(findLmaxTimeRow, wpsheetwrite.cells(wpsheetlastrow, f xlgeneralformat), ) ), Array(3, xlgeneralformat), 4).Address(0, 0) & LmaxDataSheet.Cells(leqDataLastRow, Array(4, ")" currentleqcolumn).value temp wpsheetwrite.range("af5:an5").value = ; [ presstotalbyp0( xlgeneralformat), = lead 2Array(5, ), pressdirectbyp0( 36)).HorizontalAlignment xlgeneralformat), = "Wind Direction" lead ), Array(6, pressreflectbyp0( = xlcenter lead xlgeneralformat), c = pressgroundbyp0( LmaxDataSheet.Range(LmaxDataSheet.Cells(firstRowDataBegins, wpsheetwrite.range("af6:an6").merge wpsheetwrite.cells(22, NumberFormat * Array(7, temp; lead ) ] 3).Formula xlgeneralformat), = =... "0.0" = "=INDEX(" Array(8, & wpsheetwrite.cells(25, xlgeneralformat), ), LmaxDataSheet.Cells(leqDataLastRow, Array(9, ).Address(0, If WP_SettingsConfirm.MetWD_OptionNW.Value xlgeneralformat), combinedirectreflected( formatcells End 0) With & ":" & = wpsheetwrite.cells(wpsheetlastrow, Array(, )).NumberFormat f( xlgeneralformat), lead sigmaeff, = True = Then "hh:mm:ss" Array(2, geometry, ).Address(0, method{ 0) ink & } ); xlgeneralformat), strtemplate wpsheetwrite.range(wpsheetwrite.cells(findleqcurrentrow, ",MATCH(" LmaxDataSheet.Range(LmaxDataSheet.Cells(firstRowDataBegins, wpsheetwrite.range("af6:an6").value & = wpsheetwrite.cells(22, 'JASAV74N4_FIG2'; Array(22, xlgeneralformat), 5).Address(0, = Array(23, "NW" 0) & "," xlgeneralformat), ), & 2), LmaxDataSheet.Cells(leqDataLastRow, Array(24, [ wpsheetwrite.cells(findleqcurrentrow, wpsheetwrite.cells(25, sx, end ElseIf sy, xlgeneralformat), rx, WP_SettingsConfirm.MetWD_OptionW.Value ry formatcells ] = gettemplate( 3).Address(0, = Array(25, wpsheetwrite.cells(findleqcurrentrow, strtemplate, 36)).NumberFormat 0) 2)) xlgeneralformat), & ":" & true = True ); = "0.0" Array(26, Then currentcolumn xlgeneralformat), wpsheetwrite.cells(wpsheetlastrow, + geometry.x ) With = wpsheetwrite.range("af6:an6").value formatcells [ sx rx Array(27, ]; xlgeneralformat), 3).Address(0, Array(28, = 0) "W"& ",0))" xlgeneralformat), Array(29, geometry.y semilogx( ThisWorkbook.Sheets("Hidden").Range("H7").Value ElseIf wpsheetwrite.cells(22, xlgeneralformat), = WP_SettingsConfirm.MetWD_OptionSW.Value.Merge With [ f, sy formatcells ry *]; log0( 3).NumberFormat Array(30, abs( presstotalbyp0 xlgeneralformat), = "hh:mm:ss ) =./ = True abs( Array(3, Then pressdirectbyp0 ) ), strcolor( LeqDataSheet.Cells(firstRowDataBegins, xlgeneralformat), ink wpsheetwrite.range("af6:an6").value ) ).Borders.LineStyle Array(32, xlgeneralformat), = = xlcontinuous ).ValueArray(33, = "SW" xlgeneralformat), Array(34, [ findlmaxlastrow geometry hold ElseIfonxlGeneralFormat), WP_SettingsConfirm.MetWD_OptionN.Value ] = computepathlengths(.borders.color = LmaxDataSheet.Cells(LmaxDataSheet.Rows.count, = Array(35, vbblack = vbblack geometry xlgeneralformat)) ); = True Then "A").End(xlUp).Row Call Columns.EntireColumn.AutoFit AddRNDDataToGraph(LeqDataSheet, wpsheetwrite.range("af6:an6").value.borders.weight = xlthin = xlthin "LeqChart", = "N""Leq", firstrowdatabegins, end leqdatalastrow, outputintermediateresults( ElseIf WP_SettingsConfirm.MetWD_OptionNA.Value.Value If 35) InStr(wpSheetWrite.Cells(findLeqCurrentRow, = LeqDataSheet.Cells(findLmaxTimeRow, sigmaeff, strtemplate, verbose = True ).Value Then Set currentcolumn).value, Call rawsheet findlmaxtimerow AddRNDDataToGraph(LmaxDataSheet,.NumberFormat wpsheetwrite.range("af6:an6").value = ThisWorkbook.ActiveSheet = "-.-") = "hh:mm:ss" > 0 Then "LmaxChart", = "NA" "Lmax", grid firstrowdatabegins, dx = Do ElseIf on geometry.x( While End WP_SettingsConfirm.MetWD_OptionS.Value With findlmaxtimerow 'If end lmaxdatalastrow, wpsheetwrite.cells(findleqcurrentrow, ) - geometry.x( < findleqlastrow 35) ); = True Then currentcolumn).value = xlabel( dy " = -.-" rawlastrow geometry.y( 'Frequency, Then If LmaxDataSheet.Cells(findLmaxTimeRow, wpsheetwrite.range("af6:an6").value = rawsheet.cells(rawsheet.rows.count, end Hz' ) -) geometry.y( ); ).Value = "S""A").End(xlUp).Row = ylabel( wpsheetwrite.range("c22").value finaladdress ElseIf 'Level Set WP_SettingsConfirm.MetWD_OptionNE.Value formatcells re = Source rawsheet.cells(rawlastrow.value = Level, = "" db' Then) - 4, 2).Value = True Then title( geometry.r wpsheetwrite.range(wpsheetwrite.cells(findleqcurrentrow, targetrow sprintf( = Exit wpsheetwrite.range("af6:an6").value = sqrt( firstrowdatabegins 'EFR Do '.NumberFormat dx^2 = %.0f + dy^2 cgs); Rayls', = "0.0" sigmaeff = )"NE" ) 3), axis( wpsheetwrite.cells(findleqcurrentrow, End If[ Else0000 Else -50 ] ) 4)) legend( wpsheetlastrow method, findlmaxtimerow = 'Location', wpsheetwrite.cells(wpsheetwrite.rows.count,.formula = findlmaxtimerow 'EastOutside', = "=0^(" & wpsheetwrite.cells(findleqcurrentrow, + 'Interpreter', 'none' "A").End(xlUp).Row ) dx currentcolumn).address(0, = geometry.x( End If end ) - geometry.x( 0) & "/0)" ); dy = Loop geometry.y( End end If) + geometry.y( ); End With WORK CYCLE GENERATE LASmax NORMALIZATION

32 DATA PROCESSING DATA ANALYSIS TOOL TYPE: COMPRESSOR MANUFACTURER: INGERSOLL RAND MODEL: XP375 SIZE: 39 HP

33 DATA PROCESSING DATA ANALYSIS TOOL LENGTH (FT): 4 WIDTH (FT): 5 HEIGHT (FT): 6 SOURCE HEIGHT (FT): 4

34 DATA PROCESSING DATA ANALYSIS TOOL TEMPERATURE ( F): 8 RELATIVE HUMIDITY (%): 74 WIND SPEED (MPH): 0 WIND DIRECTION: N/A

35 DATA PROCESSING DATA ANALYSIS TOOL

36 DATA PROCESSING DATA ANALYSIS TOOL

37 DATA PROCESSING DATA ANALYSIS TOOL

38 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 MANUFACTURER MODEL SIZE (MAIN) WORK CYCLE DATA SHEET SIZE (MAIN) UNIT SIZE (SUB) 60 SIZE (SUB) UNIT SPEED TYPE ATTACHMENT ACTIVITY INGERSOLL RAND XP HP 0 AUX. HP 0 COMPRESSOR NONE COMPRESSING AIR/GENERATING POWER LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION NA PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE DIRT ROAD NO 36 SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 0 WORK CYCLE :43:45 0:48:4 00:04: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 8:36: :36: UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 8:36: :36: TIME L MAX MAIN K K K K K K K K K K K K K K 0:43: :43: :43: :48: :48: :48:

39 DATA PROCESSING DATA ANALYSIS TOOL

40 DATA PROCESSING DATA ANALYSIS TOOL

41 DATA PROCESSING DATA ANALYSIS TOOL

42 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 MANUFACTURER MODEL SIZE (MAIN) WORK CYCLE DATA SHEET SIZE (MAIN) UNIT SIZE (SUB) SIZE (SUB) UNIT SPEED TYPE ATTACHMENT ACTIVITY ALLIANZ JOHNSTON VT650 0 HP 99 AUX. HP N/A STREET SWEEPER NONE SWEEPING STREETS LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION NA PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE PAVEMENT NO N/A SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 05 PASSBY :45:26 0:46:09 00:00: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 0:45: :45: UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 0:45: :45: TIME L MAX MAIN :45: :45: :45: :46: :46: :46: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

43 DATA PROCESSING DATA ANALYSIS TOOL

44 DATA PROCESSING DATA ANALYSIS TOOL

45 DATA PROCESSING DATA ANALYSIS TOOL

46 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 WORK CYCLE DATA SHEET MANUFACTURER MODEL SIZE (MAIN) SIZE (MAIN) SIZE (SUB) SIZE (SUB) UNIT UNIT SPEED TYPE ATTACHMENT ACTIVITY N/A N/A 397 LBS 540 SQ FT 0 BLASTING (EXPLOSIVE) NONE EXPLODING GRANITE LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) N/A N/A N/A TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION NA PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE DIRT ROAD NO N/A SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 0 WORK CYCLE :59:22 0:59:32 00:00: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 0:59: :59: UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 0:59: :59: TIME L MAX MAIN :59: :59: :59: :59: :59: :59: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

47 DATA PROCESSING DATA ANALYSIS TOOL

48 DATA PROCESSING DATA ANALYSIS TOOL

49 DATA PROCESSING DATA ANALYSIS TOOL

50 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 MANUFACTURER MODEL SIZE (MAIN) WORK CYCLE DATA SHEET SIZE (MAIN) UNIT SIZE (SUB) 60 SIZE (SUB) UNIT SPEED TYPE ATTACHMENT ACTIVITY JUNTTAN HHK 5AL 2887 FT-LBS 0 AUX. HP N/A PILING RIG HYDRAULIC IMPACT PILE DRIVER DRIVING STEEL PILES LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION NA PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE PAVEMENT NO 36 SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 0 WORK CYCLE :4:38 3:5:54 00:0: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 3:4: :4: UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 3:4: :4: TIME L MAX MAIN :4: :4: :4: :5: :5: :5: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

51 DATA PROCESSING DATA ANALYSIS TOOL

52 DATA PROCESSING DATA ANALYSIS TOOL

53 DATA PROCESSING DATA ANALYSIS TOOL

54 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 MANUFACTURER MODEL SIZE (MAIN) WORK CYCLE DATA SHEET SIZE (MAIN) UNIT SIZE (SUB) 60 SIZE (SUB) UNIT SPEED TYPE ATTACHMENT ACTIVITY KLEMM BOHRTECHNIK KR HP 0 AUX. HP N/A ROCK DRILL NONE DRILLING IN ROCK LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION W PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE DIRT ROAD NO 36 SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 02 WORK CYCLE :34:29 3:35:52 00:0: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 3:34: :34: UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 3:34: :34: TIME L MAX MAIN :34: :34: :34: :35: :35: :35: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

55 DATA PROCESSING DATA ANALYSIS TOOL

56 DATA PROCESSING DATA ANALYSIS TOOL DISTANCE FROM MICROPHONE TO EQUIPMENT BODY: 55 FT THIS DISTANCE IS USED FOR L AEQ NORMALIZATION -MINUTE L AEQ GRAPH

57 DATA PROCESSING DATA ANALYSIS TOOL

58 DATA PROCESSING DATA ANALYSIS TOOL DISTANCE FROM MICROPHONE TO AUGER DRILL: 50 FT THIS DISTANCE IS USED FOR L ASMAX NORMALIZATION -MINUTE L ASMAX GRAPH

59 DATA PROCESSING DATA ANALYSIS TOOL L AEQ L ASMAX

60 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN WORK CYCLE DATA SHEET (L AEQ ) MANUFACTURER MODEL SIZE (MAIN) SIZE (MAIN) SIZE (SUB) SIZE (SUB) UNIT UNIT SPEED TYPE ATTACHMENT ACTIVITY Bauer BG 24 H 350 hp 0 N/A NA Piling Rig Auger Drill Deep Foundation Drilling LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION N PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE Gravel No NA SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 03 Work Cycle :35:36 09:38:37 00:03: OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) 09:38: SEC L ASMAX 09:38: (TIME) UNCORRECTED DATA FREQUENCY MAIN OVERALL L AEQ K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 09:38: :38: TIME L MAX MAIN :35: :35: :35: :38: :38: :38: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

61 WORK CYCLE DATA SHEET (L (L ASMAX AEQ )) SIZE (MAIN) SIZE (SUB) CONSTRUCTION MANUFACTURER MODEL SIZE (MAIN) SIZE (SUB) SPEED TYPE ATTACHMENT ACTIVITY UNIT UNIT EQUIPMENT INFORMATION Bauer BG 24 H 350 hp 0 N/A NA Piling Rig Auger Drill Deep Foundation Drilling CONSTRUCTION LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) EQUIPMENT DIMENSIONS METEOROLOGICAL DATA TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION N ENVIRONMENT PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE Gravel No NA WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM MEASUREMENT SIDE # DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) CORRECTED DISTANCE (FT) PASSBY PASSBY # SOURCE (FT) INFORMATION 03 Work Cycle :35:36 09:38:37 00:03: CORRECTED DATA FREQUENCY MAIN K K K K K K K K K K K K K K OVERALL L AEQ SEC L AEQ (TIME) -SEC L ASMAX (TIME) 09:38: :38: UNCORRECTED DATA FREQUENCY MAIN K K K K K K K K K K K K K K OVERALL L AEQ SEC L AEQ (TIME) 09:38: SEC L ASMAX (TIME) 09:38: TIME L MAX MAIN K K K K K K K K K K K K K K 09:35: :35: :35: :38: :38: :38:

62 CONSTRUCTION EQUIPMENT INFORMATION CONSTRUCTION EQUIPMENT DIMENSIONS METEOROLOGICAL DATA ENVIRONMENT MEASUREMENT INFORMATION CORRECTED DATA FREQUENCY MAIN 2.5 UNCORRECTED DATA FREQUENCY MAIN WORK CYCLE DATA SHEET (L ASMAX ) MANUFACTURER MODEL SIZE (MAIN) SIZE (MAIN) SIZE (SUB) SIZE (SUB) UNIT UNIT SPEED TYPE ATTACHMENT ACTIVITY Bauer BG 24 H 350 hp 0 N/A NA Piling Rig Auger Drill Deep Foundation Drilling LENGTH (FT) WIDTH (FT) HEIGHT (FT) SOURCE HEIGHT (FT) TEMPERATURE ( F) RELATIVE HUMIDITY (%) WIND SPEED (MPH) WIND DIRECTION N PREDOMINANT GROUND TYPE BETWEEN SOURCE AND RECEIVER UNDER STRUCTURE? DISTANCE FROM NEAREST REFLECTIVE SURFACE Gravel No NA SIDE # WORK CYCLE OR WORK CYCLE OR MICROPHONE DISTANCE FROM DATE START TIME END TIME DURATION MICROPHONE HEIGHT (FT) PASSBY PASSBY # SOURCE (FT) CORRECTED DISTANCE (FT) 03 Work Cycle :35:36 09:38:37 00:03: OVERALL L AEQ SEC L AEQ (TIME) -SEC L ASMAX (TIME) 09:38: :38: OVERALL L AEQ K K.25 K.25 K.6 K.6 K 2 K 2 K 2.5 K 2.5 K 3.5 K 3.5 K 4 K 4 K 5 K 5 K 6.3 K 6.3 K 8 K 8 K 0 K 0 K 2.5 K 2.5 K 6 K 6 K K K -SEC L AEQ (TIME) -SEC L ASMAX (TIME) 09:38: :38: TIME L MAX MAIN :35: :35: :35: :38: :38: :38: K.25 K.6 K 2 K 2.5 K 3.5 K 4 K 5 K 6.3 K 8 K 0 K 2.5 K 6 K K

63 DATA PROCESSING 2 DATA ANALYSIS TOOL DATA REVIEW SCATTER PLOT WORK CYCLES

64 DATA PROCESSING DATA ANALYSIS TOOL 2 DATA REVIEW SCATTER PLOT 3 NOISE SOURCE DATABASE

65 DATA PROCESSING 2 3 DATA REVIEW SCATTER PLOT NOISE SOURCE DATABASE SCATTER PLOT FILES

66 DATA PROCESSING DATA ANALYSIS TOOL 2 DATA REVIEW SCATTER PLOT 3 NOISE SOURCE DATABASE

67 QUESTIONS?

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

Appendix C Noise and Vibration Worksheets

Appendix C Noise and Vibration Worksheets PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level

More information

FEMA's Schedule of Equipment Rates

FEMA's Schedule of Equipment Rates DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY DISASTER ASSISTANCE DIRECTORATE PUBLIC ASSISTANCE DIVISION WASHINGTON, D.C. 20472 www.fema.gov/government/grant/pa/eqrates.shtm (May

More information

Construction Noise Worksheets

Construction Noise Worksheets Appendix F Construction Noise Worksheets Al Larson Boat Shop Improvement Project Draft EIR January 2012 ADP# 080627-072 SCH# 2010091041 This page left intentionally blank ADP# 080627-072 SCH# 2010091041

More information

Definitions of Acoustical Terms

Definitions of Acoustical Terms Appendix E Noise Definitions of Acoustical Terms Sound Measurements Decibel (db) A Weighted Decibel (dba) Maximum Sound Level (Lmax) Minimum Sound Level (Lmin) Equivalent Sound Level (Leq) Percentile

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52

More information

Schedule of Equipment Rates

Schedule of Equipment Rates SCHEDULE OF EQUIPMENT RATES FEDERAL EMERGENCY MANAGEMENT AGENCY RESPONSE AND RECOVERY DIRECTORATE INFRASTRUCTURE DIVISION WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment s are for equipment

More information

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250

More information

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Engine Oil with Filter

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Engine Oil with Filter Specifications Bobcat S770 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 92 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP 3.4L Bobcat

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

APPENDIX H-2 CONSTRUCTION NOISE ANALYSES

APPENDIX H-2 CONSTRUCTION NOISE ANALYSES APPENDIX H-2 CONSTRUCTION NOISE ANALYSES H-2 Construction Noise Analyses APPENDIX H2: CONSTRUCTION NOISE ANALYSES This appendix provides a database of construction equipment noise generation estimates

More information

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Specifications Bobcat S740 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 74 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP Net HP 3.4L

More information

FEMA's Schedule of Equipment Rates

FEMA's Schedule of Equipment Rates DEPARTMENT OF HOMELAND SECURITY EMERGENCY PREPAREDNESS AND RESPONSE DIRECTORATE RECOVERY DIVISION PUBLIC ASSISTANCE BRANCH WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment Rates are for applicant-owned

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-C CONSTRUCTION NOISE ASSESSMENT 20-C CONSTRUCTION NOISE ASSESSMENT 20-C.1 CONSTRUCTION NOISE ASSESSMENT The

More information

T.A.T Minimum Wage Scale

T.A.T Minimum Wage Scale T.A.T Minimum Wage Scale General Construction: Construction projects that are funded by the Three Affiliated Tribes or an Enrolled member of the Fort Berthold Reservation. Rates Fringes Electrician $29.24

More information

Why? Faster To reduce the duration of the process

Why? Faster To reduce the duration of the process BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual

More information

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017 OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017 A Frame $48.98 B Asphalt Curbing Machine $47.07 C Asphalt Plant Engineer $47.07 C Asphalt Spreader

More information

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL 303378 HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, 303379 HOUR BACKHOE,Z54,W OP OTHER CONTROLLED EQUIPMENT, BACKHOE, WITH OPERATOR, 303381 HOUR BROOM,ROTARY,UNDER,SELF-PROPELLED,F52 303383 HOUR

More information

Kansas Department of Transportation

Kansas Department of Transportation Kansas Department of Transportation STANDARD JOB CLASSIFICATIONS AND DESCRIPTIONS ASPHALT PAVER SCREED OPERATOR (Power Equipment Operator) Makes sure paver is in proper position before moving off the joint.

More information

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) 1. Personal Info: Ensure your legal company name is on the form. 2. Equipment Info: Ensure you complete all

More information

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014 OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014 A Frame $43.48 B Asphalt Curbing Machine $41.57 C Asphalt Plant Engineer $41.57 C Asphalt Spreader

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Oct 24, 2017 - Index Summary All times listed are approximate. Day 1 - Tuesday October 24 2017 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction

More information

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT FOREWARD This edition of the Nova Scotia Road Builders Association Suggested Schedule of Rental Rates for Construction Equipment is presented for the information

More information

EL653. Low-noise Construction Machinery [EL /2/ ]

EL653. Low-noise Construction Machinery [EL /2/ ] EL653. Low-noise Construction Machinery [EL653-2002/2/2005-68] 1. Scope The scope shall apply to the machine provided for construction work (hereinafter referred to as construction machine ). 2. Definition

More information

FarmSmart January 20,2018

FarmSmart January 20,2018 FarmSmart 2018 January 20,2018 NEW HTA subsection 1(1) definition: road-building machine means a self-propelled vehicle of a design commonly used in the construction or maintenance of highways that, (a)

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY Equipment Use Improve Access Roads (per mile) Bulldozer Grade access roads 1 4 10 Road Grader Grade access roads 1 4 10 Loader Load haul trucks, transport materials

More information

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Specifications Bobcat S850 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 92 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP Net HP V3800-CR-TE4CB-BC-2

More information

Appendix D Noise Data

Appendix D Noise Data Appendix D Noise Data Construction Noise Summary Lmax (dba) at Various Leq (dba) at Various Construction Phase 50 100 200 400 800 1,600 3,200 6,400 50 100 200 400 800 1,600 3,200 6,400 Phase 1 Decommissioning

More information

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway 1of 5 General Decision Number: MN100015 02/04/2011 MN15 State: Minnesota Construction Type: Highway Counties: Dodge, Fillmore, Freeborn, Goodhue, Houston, Mower, Olmsted, Rice, Steele, Wabasha and Winona

More information

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 *Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 SCHEDULE A CLASSIFICATIONS AND WAGE SCALES On all work covered by this Agreement, and in all instances

More information

Construction Equipment

Construction Equipment Construction ment Chapter 32 Introduction to Construction ment... 32-3 Construction ment... 32-4 G3 ICARUS Corporation, 1998. 32-2 ICARUS Reference ICARUS Corporation, 1998. G3 Chapter 32: Construction

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

CONSTRUCTION and OFF ROAD EQUIPMENT

CONSTRUCTION and OFF ROAD EQUIPMENT CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle

More information

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017 Defense Logistics Agency Troop Support Construction and Equipment Heavy Equipment Procurement Program HEPP Customer Handbook March 2017 HEPP Table of Contents 1. Introduction... 3 2. HEPP Program... 3

More information

APPENDIX C AIR QUALITY

APPENDIX C AIR QUALITY C.1 CONSTRUCTION APPENDIX C AIR QUALITY Construction activities associated with the Proposed Action are set to begin July 2020 and be completed by May 2023. Potential sources of construction emissions

More information

This appendix describes various types of equipment that can

This appendix describes various types of equipment that can Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com Self Priming Pumps TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective September 1, 2016 RENTAL SALES MUNICIPAL OIL & GAS SERVICE Self Priming Pumps ABOUT

More information

EL PASO, TEXAS CATALOG (45) Date: 06/16/2012 Location : Address: City State :

EL PASO, TEXAS CATALOG (45) Date: 06/16/2012 Location : Address: City State : 101 NEW 4-PACK 10,000LB RATCHET STRAPS NEW SUPPORT Page 1 of 8 111 NEW 3PC 14IN. PREMIUM DIAMOND BLADES NEW 102 NEW 4-PACK 10,000LB RATCHET STRAPS NEW SUPPORT 112 NEW 6 PACK OF 14IN. ABRASIVE BLADES (3

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

RENTAL RATES SALES SERVICE PARTS RENTAL OIL & GAS MUNICIPAL CONCRETE ASPHALT ENVIRONMENTAL SOLID WASTE TOUGH JOBS TOUGH MACHINES

RENTAL RATES SALES SERVICE PARTS RENTAL OIL & GAS MUNICIPAL CONCRETE ASPHALT ENVIRONMENTAL SOLID WASTE TOUGH JOBS TOUGH MACHINES TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE 2015 RENTAL RATES RENTAL SALES MUNICIPAL OIL & GAS SERVICE Effective November 1, 2014 ABOUT FARIS After 60 years, we at Faris

More information

Where Quality makes the Difference...

Where Quality makes the Difference... Concept/Design/Photography : Intelligent E-Business Solutions Where Quality makes the Difference... P.O. Box: 5723-Manama - Kingdom of Bahrain, Tel.: 17 62 0551, Fax: 17 62 0833 Instagram: @ALHAIDARIYA,

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

Update of noise database for prediction of noise on construction and open sites

Update of noise database for prediction of noise on construction and open sites Update of noise database for prediction of noise on construction and open sites Phase 3: Noise measurement data for construction plant used on quarries July 2006 www.defra.gov.uk Department for Environment,

More information

Heavy Equipment Operator

Heavy Equipment Operator Heavy Equipment Operator This section contains a list of equipment used by the Equipment Operator Specialist classification. This classification is in the Maintenance and Operations pay schedule at the

More information

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway Page 1 of 5 > General Decision Number: MN120010 06/15/2012 MN10 Superseded General Decision Number: MN20100020 State: Minnesota Construction Type: Highway Counties: Anoka, Carver, Chisago, Dakota, Hennepin,

More information

Equipment Rental Costs

Equipment Rental Costs Estimating Tips This section contains the average costs to rent and operate hundreds of pieces of construction equipment. This is useful information when estimating the time and material requirements of

More information

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018 LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE B Building Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 BUILDING CONSTRUCTION DIVISION

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

2015 FEMA Schedule of Equipment Rates

2015 FEMA Schedule of Equipment Rates 2015 FEMA Schedule of Equipment Rates Cost Code Equipment Specifications Capacity or Size HP Notes Unit 2015 Rates 8010 Air Compressor Air Delivery 41 CFM to 10 Hoses included. hour $1.25 8011 Air Compressor

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

GREASE TIME RATE SINGULARLY OPERATED MACHINES

GREASE TIME RATE SINGULARLY OPERATED MACHINES LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE A Heavy & Highway Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 HEAVY & HIGHWAY CONSTRUCTION

More information

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective February 1, 2019 RENTAL SALES MUNICIPAL OIL & GAS SERVICE ABOUT FARIS After 60 years, we at Faris Machinery

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER BULLETIN Associated General Contractors of New Jersey Raritan Center Raritan Plaza II Fieldcrest Avenue Edison, NJ 08837 TELEPHONE: 732-738-9454 / FAX: 732-738-8722 L A B O R U P D A T E DATE: JUNE 11,

More information

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective February 1, 2018 RENTAL SALES MUNICIPAL OIL & GAS SERVICE ABOUT FARIS After 60 years, we at Faris Machinery

More information

St. Cloud State University St. Cloud, MN

St. Cloud State University St. Cloud, MN ADDENDUM # 1 REQUEST FOR PROPOSAL: Elevator Maintenance Services RFP St. Cloud State University St. Cloud, MN 56301-4498 ORIGINAL PUBLICATION : June 23 2014 ADDENDUM # 1 ISSUE : July 8, 2014 REVISED 1.

More information

Province of Prince Edward Island 2017

Province of Prince Edward Island 2017 Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and

More information

NOW 5 DAYS! APRIL 24 28!

NOW 5 DAYS! APRIL 24 28! NOW 5 DAYS! APRIL 24 28! Late Additions Edmonton, AB April 24 28, 2018 (Tue Sat) Unreserved public auction 1 of 2 2017 John Deere 290G LC 2 of 3 2014 Peterbilt 367 & 2 of 3 2014 Capital 26 Ft 2012 Western

More information

Eligibility Criteria to Undertake an Advanced Technical Test

Eligibility Criteria to Undertake an Advanced Technical Test Eligibility Criteria to Undertake an Advanced Technical Test 1. The Scheme is supported by a cache of trained, experienced and qualified testers. It is essential that testers working within the Scheme

More information

REVISED: OCTOBER 18,

REVISED: OCTOBER 18, CONSTRUCTION EQUIPMENT DIVISION RENTAL RATES 1-800-633-0027 1 RENTAL RATES CASE BACKHOE/LOADER 580SM 300 900 2450 580SM w/hammer 635 2135 5950 580/590 BH Bucket 45 115 350 EXCAVATORS Model Pounds Day Week

More information

TEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS EQUIPMENT FUEL USAGE

TEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS EQUIPMENT FUEL USAGE TABLE 1 FUEL IA TEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS AUTOMOBILES & STATION WAGONS Gasoline Waived 53,298 1,703 1,304,498 23.7 98 Electric/Hybrid 7,631 330,138 43.3 29 LPG/Gasoline

More information

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06 2018 SPOKANE TRIBAL WAGE RATES FOR CONTRACTORS All rates are based on 100% of Washington State prevailing wage rates for Stevens County All wage rates are subject to annual adjustments by the TERO Commission

More information

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010 Fleet Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010 Each year the City of Milwaukee Fleet Services Section submits at least three replacement equipment budget scenarios, which provide

More information

Mining Construction Demolition Waste Paving Agriculture Power Generation.

Mining Construction Demolition Waste Paving Agriculture Power Generation. Mining Construction Demolition Waste Paving Agriculture Power Generation www.rhinoeq.com Rhino Equipment is the result of the collaboration of various private equity business groups with more than 25 years

More information

APPENDIX A AIR QUALITY CALCULATIONS

APPENDIX A AIR QUALITY CALCULATIONS City of El Segundo January 2008 APPENDIX A AIR QUALITY CALCULATIONS Plaza El Segundo Development Addendum to the Certified EIR SCH No. 2003121037 Page 27 Summary of Plaza el Segundo Results By Phase Total

More information

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03) EQUIPMENT HIRE INTRODUCTION CONTENTS Millers are a long established plant hire company with a solid foundation in Victoria. We have become established from over 2 generations and 40 years in the industry.

More information

TABLE OF CONTENTS RADIAL TYRES BIAS TYRES

TABLE OF CONTENTS RADIAL TYRES BIAS TYRES TABLE OF CONTENTS T.R.A. CLASSIFICATION OF OFF-THE-ROAD TYRES 1 TYPE OF TREAD 1 T.R.A. (Tyre and Rim Association) CODE 2 TREAD THICKNESS 2 YOKOHAMA TYRE SPECIFICATION CODE 2 CONVERSION CHART 2 RADIAL TYRES

More information

REMU MSU2-300US GRINDER KOEHRING EXCAVATOR MODEL

REMU MSU2-300US GRINDER KOEHRING EXCAVATOR MODEL MAJOR CONTRACTOR AUCTION JULY 20, 2007 LOT YEAR MAKE MODEL HRS/MILE VIN 1. DAVEY AIR COMPRESSOR 2. ROLLER 3. BARBER GREENE PAVER 2853 SA41X151 100. INGERSOL RAND BLAW KNOX PAVER PF5510 551030-25 101. 1982

More information

EM, MPT & Industrial Tyres TECHNICAL DATABOOK 12 TH EDITION

EM, MPT & Industrial Tyres TECHNICAL DATABOOK 12 TH EDITION EM, MPT & Industrial s TECHNICAL DATABOOK 12 TH EDITION INTRODUCTION AND CONTENTS Introduction The extensive technical data and other information relating to tyres and accessories on the following pages

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

EQUIPMENT LINE CARD RENT-CAT

EQUIPMENT LINE CARD RENT-CAT EQUIPMENT LINE CARD 1-800-RENT-CAT WE RENT MORE THAN JUST CAT You work hard to run your business. Let us work hard to help you. Our machines have the productivity, durability and safety you need to get

More information

SSMP ELEMENT 4 O & M Program APPENDIX 4.3. Sewer Pipe Cleaning Standard Operating Procedures (SOPs)

SSMP ELEMENT 4 O & M Program APPENDIX 4.3. Sewer Pipe Cleaning Standard Operating Procedures (SOPs) SSMP ELEMENT 4 O & M Program APPENDIX 4.3 Sewer Pipe Cleaning Standard Operating Procedures (SOPs) City of San Mateo CODE OF SAFE PRACTICES Table of Contents A B C D E F G Air Compressor and Pressure Vessel

More information

CONSTRUCTION EQUIPMENT

CONSTRUCTION EQUIPMENT Your Preferred One Stop Shop for over 43 Years CONSTRUCTION EQUIPMENT CONCRETE POWER & AIR MATERIAL HANDLING QUARRYING WASTE MANAGEMENT SERVICE & PARTS DUBAI ABU DHABI AL-AIN BASRA - IRAQ cmcgulf.com CONSTRUCTION

More information

Highway and Heavy Master Job Classifications OLD versus NEW

Highway and Heavy Master Job Classifications OLD versus NEW Highway and Heavy Master Job Classifications OLD versus NEW Position Title Old Number New Number Laborer, common (general labor work) 101 101 Laborer, skilled (assisting skilled craft journeyman) 102 102

More information

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park Contact Us: T: +27 (0)86 196 1177 E: training@fezamax.co.za FTTA Building C5, Denel North, Atlas Rd, Kempton Park www.buildmax.co.za Training Academy Fezamax is a wholly owned subsidiary of Buildmax Limited

More information

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Side Cutter Kit (Left and Right - fits all 68, 72, 80 Buckets) 48 Pallet Fork Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) These Bolt On Side Cutters (BOSC) greatly extend bucket service life and improve penetration power into hard packed soil or stock piled

More information