1 Attachment 1 BSCP31 Trading Unit Application for West Burton A&B Power Stations Full description of nominated BM Unit(s) (in conjunction with form BSCP31/4.5) West Burton A Power Station comprises: Plant 4 x 500MW coal fired steam generating units, each with an associated 50MVA 22/11kV unit transformer connected to 11kV unit boards within the station and a 600MVA 22/400kV generator transformer connected to transmission at NGET s West Burton 400kV substation busbars. 2 x 20MW gas turbine generators, one connected within the station to the 11kV unit boards for main generating unit 1, the other connected within the station to the 11kV unit board for main generating unit 4. 2 x 50MVA station transformers connected to the 132kV busbars at NGET s 132kV West Burton substation, which is fed via 400/132kV Grid Supply Transformers from the adjacent 400kV substation (see Attachment 2 map and Attachment 3 NGET line diagram). BMUs The net flow to the transmission system for each main generator/unit transformer pair (T_WBUPS 1, T_WBUPS 2, T_WBUPS 3, T_WBUPS 4) and for each gas turbine generator (T_WBUGT 1, WBUGT 4) is represented as a transmission connected BM Unit. The main generator/unit transformer pairs have transmission Connection Entry Capacity (CEC) 503 MW each. The GT generators 1 and 4 have CEC 20 MW each, and share connection with main generators 1 and 4 respectively (see Attachment 4 Extract from West Burton A Connection Agreement). The aggregated metered station demand from the 132kV substation busbars is represented as a single embedded station demand BM Unit (E_WBUPS STX), since it is connected at 132kV. The 7 BMUs at West Burton A are included in existing Class 1 Trading Unit West Burton Power Station V2. This would be de registered if (and only if) the proposed combined West Burton Power Stations A&B Trading Unit becomes effective. Settlement Active Energy Metering & BMU Meter Aggregations The active energy metering equipment is compliant with Code of Practice E in effect at the time of installation (allowing metering on the low voltage side of grid transformers, with compensation to the high Page 1 of 6

2 voltage transmission boundary). Lifetime meter dispensation D/472 allows use of protection rated current transformers for reactive measurements for generator unit 3, rather than measurement rated current transformers. Settlement active energy meters for each main generator and for its associated unit transformer are located on the low voltage 22kV side of each generator transformer. The auxiliary Gas Turbine connections to the Unit Boards are metered at 11kV. Settlement metering for the gas turbine generator 1 connected to unit board 1 is used to determine its BM Unit metered volume, and is subtracted in aggregation rules from the boundary flow for main generator and unit transformer 1 to give the main generator/unit 1 BM Unit volume. Similarly, settlement metering for the gas turbine generator 4 connected to unit board 4 is subtracted from the boundary flow for the BM Unit representing main generator 4 and unit transformer 4. Ie. T_WBUPS 1 (coal/unit) = Unit 1 transmission boundary flow auxiliary gas turbine 1 flow. T_WBUPS 4 (coal/unit) = Unit 4 transmission boundary flow auxiliary gas turbine 4 flow. Settlement active energy metering for the station load is located on the Low Voltage 11kV side of the station transformers, with compensation to the 132kV high voltage side. West Burton B Power Station comprises: Plant 3 x CCGT Units, each comprising a 388 MVA gas turbine generator with 390 MVA 400/17kV power transformer and a 200 MVA steam turbine generator with 200 MVA 400/15 kv power transformer. The CCGT Units operate at less than the maximum theoretical capacity. All 6 power transformers are connected to EDF Energy s 400kV banking compound busbars within the West Burton power station site, from which two 400kV cables run to NGET s 400kV busbars at NGET s 400kV substation situated at the West Burton site. Units 1 and 3 each have a 22/6.6kV unit transformer connected to respective 6.6kV unit boards within the station. Unit 1 is normally used to provide power to the unit boards for main Unit 2, which does not have its own unit transformer. There are no separate station transformers, and no other connections to the transmission or distribution total system. A +/ 50 MW battery system comprising 10 x 5 MW sub modules is situated within the West Burton B site. Part of the system is connected to the main CCGT unit 1 6.6kV boards, and the remainder to the main CCGT unit 3 6.6kV unit boards within the station. Two of the battery sub modules can switch between the unit 1 and unit 3 boards, with normal configuration giving +/ 20 MW capability through unit 1 and remaining +/ 30 MW capability through unit 3. Page 2 of 6

3 BM Units The 3 CCGT Modules are each represented as a BM Unit. Each has a transmission Connection Entry Capacity 470 MW (Attachment 5). The battery is operated as a single controllable entity, but an approved non standard BM Unit arrangement (ISG198/02) is in effect until 31 December 2021 to represent it as two BM Units, as requested by NGET due to its connection to transmission via two separate circuits. Its combined transmission CEC is 50 MW. Its two separate settlement metered connections within the station are each represented as a BM Unit (T_WBURB 41 and T_WBURB 43). EDF Energy will consider how best to address the ongoing battery BM Unit configuration before the current permission for a non standard configuration expires (31Dec2021). The Trading Unit composition will be revisited at that time if appropriate, for example if the current battery BM Units were to be consolidated or sub divided. The 3 CCGT Module BMUs at West Burton B are included in existing Class 1 Trading Unit West Burton B CCGT. This would be de registered if (and only if) the proposed combined West Burton Power Stations A&B Trading Unit becomes effective. Settlement Metering & BMU Meter Aggregations CoP1 settlement meters are situated on the high voltage side of the six generator transformers connected to EDF Energy s 400kV banking compound busbars, in accordance with CoP1 at the time of construction. The 400kV banking compound busbars are connected by two 400kV cable circuits to NGET s 400kV substation busbars. CoP1 meters are located on the two 6.6kV circuits within the site connecting the two sides of the battery system to the main CCGT unit 1 and unit 3 boards. Lifetime meter dispensation D/478 permits battery meters at lower voltage within the site, with compensation to the HV side of the 400kV transformers. CCGT module 1 and 3 BM Unit (T_WBURB 1 and T_WBURB 3) aggregation rules subtract the relevant battery BM Unit meter readings from the boundary metering to represent the relevant CCGT module. CCGT module 2 BM Unit (T_WBURB 2) is not connected to the low voltage system within the site, and is aggregated from its 400kV boundary meters alone. Ie. T_WBURB 1 (CCGT) = unit 1 boundary flow battery unit 41 flow T_WBURB 3 (CCGT) = unit 3 boundary flow battery unit 43 flow Confirmation from each Lead Party of their intention to be associated with a single Trading Unit The applicant, EDF Energy (Thermal Generation) Ltd, is the registrant for all the BM Units. Confirmation of its agreement for the Trading Unit is attached (attachment 6). Page 3 of 6

4 Full description of Metering Systems See the description of metering given within Full description of nominated BM Unit(s) above. BSCP20 registration forms have not been included, but can be provided on request. Full description of points of measurement of electrical flow See the description of metering given earlier within Full description of nominated BM Unit(s). Line diagrams showing electrical connections and energy flows at nominated BM Unit(s) Attachment 7 is a simple line diagram showing the plant, electrical connections, BM Units, settlement metering locations and typical flow directions at the West Burton Power Stations. The actual flows vary according to which items of plant are operating. Line diagrams showing location of Metering Systems Attachment 7 is a simple line diagram showing the plant, electrical connections, BM Units, settlement metering locations and typical flow directions at the West Burton Power Stations. Evidence that assets & equipment are capable of transmitting or distributing the quantity of Electricity to be transmitted or distributed at the nominated BM Unit(s) See extracts from NGET Bilateral Connection Agreements, attachments 4 (WBA) and 5 (WBB). Confirmation from the Transmission Company that the metering arrangements are compatible To be confirmed. Supporting evidence from associated BSC Parties (as appropriate) All the BM Units are registered to EDF Energy (Thermal Generation) Ltd. The only other directly associated BSC Parties are National Grid, and Western Power Distribution (WPD) who have separate distribution feeds from the 132kV substation. WPD take power from the 132kV busbar at the National Grid substation, from which West Burton A station demand is also taken (and may be used as part of a difference metering arrangement for the East Midlands _B GSP Group). This is not directly relevant to the Trading Unit status of the West Burton BM Units. Class 2 only Evidence of Dedicated Assets Not applicable. Page 4 of 6

5 Class 3 only Evidence of Contiguous Assets Not applicable. Class 6 only Other evidence having regard to the criteria set out in BSC The arrangement is equivalent to a Class 1(B) Trading Unit as in the BSCP31 line diagram (pasted below) in all respects except that there are two power stations and the auxiliary generating units at West Burton A and the battery BM Units at West Burton B are connected to the respective unit/station boards. This is a normal configuration at many existing large power station Trading Units. We think the arrangement should be a Class 1 Trading Unit, but it could be a Class 6 Trading Unit if the line diagram arrangement (attachment 7) is considered materially different from that in the BSCP31 line diagram (pasted below). Page 5 of 6

6 Attachments 1 This document, supporting evidence for BSCP31 Trading Unit Application for West Burton A&B Power Stations 2 Map of West Burton site showing National Grid assets. 3 NGET West Burton Substation Assets Diagram (from West Burton B Connection Agreement) 4 Extract from West Burton A NGET Connection Agreements showing entry capacities. 5 Extract from West Burton B NGET Connection Agreement showing entry capacities. 6 EDF Energy (Thermal Generation) Ltd director s confirmation of Trading Unit application. 7 Simple Line diagram showing the plant, electrical connections, BM Units, settlement metering locations and typical flow directions at the West Burton Power Stations. Page 6 of 6

UK Power Networks Use of System Charging Methodology

UK Power Networks Use of System Charging Methodology UK Power Networks Use of System Charging Methodology Effective From: 1 July 2018 Published: 15 June 2018 Contents General Introduction... 3 Who we are 3 Licence Obligations 3 Price Control 3 Connection

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS Effective from 1 st April 2013 The methodology set out in this statement was approved

More information

Elia Ancillary Services: Black-Start

Elia Ancillary Services: Black-Start Elia Ancillary Services: Black-Start 2018-2020 Bidding instructions and awarding criteria Table of contents 1 General information... 2 1.1 Minimal need of ELIA... 2 1.2 «Black-Start» Electrical zones...

More information

Energy from Waste Grid Connections

Energy from Waste Grid Connections Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection

More information

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM Effective from 1 st April 2013 The methodology set out in this statement was approved

More information

Clarification of Definitions. Jonathan Sprooten Power System Planning, Elia 24/01/2017

Clarification of Definitions. Jonathan Sprooten Power System Planning, Elia 24/01/2017 Clarification of Definitions Jonathan Sprooten Power System Planning, Elia 24/01/2017 Clarification of Generating units and storage systems Extract from the NC RfG This Regulation shall not apply to: Therefore,

More information

Generation Connections

Generation Connections Generation Connections An essential guide for generation developers applying to connect to the GB Transmission Network Preparing your application A guide to costs and timescales Your connection offer About

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

33kV Connection up to 90MVA

33kV Connection up to 90MVA Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords

More information

Net Consumption (GWh)

Net Consumption (GWh) GEORGIAN ENERGY MARKET Over the last 20 years Georgia s power market has evolved from a vertically integrated single buyer utility, to a competitive regional power market model. The Georgian wholesale

More information

Introduction to Charging: Which Parties Pay Which Charges?

Introduction to Charging: Which Parties Pay Which Charges? Introduction to Charging: Which Parties Pay Which Charges? Information I National Grid Last Updated December 2015 Connection Charging - The cost of sole use assets required to connect to the transmission

More information

Generating unit functional document submission form

Generating unit functional document submission form Generating unit functional document submission form The below form must be completed and returned to generator.reports@aeso.ca. Supporting information to assist generating unit owners to complete this

More information

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Version 1 August 2018 www.energynetworks.org 2 Introduction Connection of Power Generating Modules to DNO

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS NATIONAL GRID ELECTRICITY TRANSMISSION plc INTRODUCTION THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS SECTION 1 - APPLICABILITY OF SECTIONS AND RELATED AGREEMENTS STRUCTURE 1.1 Introduction 1.2

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

Standards, Procedures and Policies for Grid Connection

Standards, Procedures and Policies for Grid Connection Standards, Procedures and Policies for Grid Connection CONTENTS 1 INTRODUCTION 1 2 EMBEDDED GENERATION 1 2.1.1 OUTLINE OF EMBEDDED GENERATION 1 2.1.2 CHANGES IN EMBEDDED GENERATION 1 2.1.3 ASPECTS OF EMBEDDED

More information

GC0096 Storage Grid Code Workgroup. Monday 30 th January 2017

GC0096 Storage Grid Code Workgroup. Monday 30 th January 2017 GC0096 Storage Grid Code Workgroup Monday 30 th January 2017 Contents Background to GC0096 Review/Approve Terms of Reference In/out of scope items Defining our Storage user How should technical requirements

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

The Power Potential Project A guide to participating

The Power Potential Project A guide to participating The Power Potential Project 0 A guide to participating A technical guide to the services for synchronous and non-synchronous DER participants Page 1 of 17 Table of Contents Our vision... 3 1. Introduction...

More information

SUBSTATION INTERLOCKING SCHEMES

SUBSTATION INTERLOCKING SCHEMES SUBSTATION INTERLOCKING SCHEMES This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses

More information

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES 1 PRESENTATION OUTLINE Generation System Demand Outlook Existing Generation Resources Transmission System National Interconnected

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Export limits for Embedded Generators up to 200 kva connected at Low Voltage Export limits for Embedded Generators up to 200 kva connected at Low Voltage Standard Operating Procedure Document number: SOP 33-06 Issue number: 5 Status: FINAL Approver: J Bridge Date of approval: 3

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 77/15 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

3.7 Areas where increasing levels of DER potentially affects operation of the system under Emergency Conditions

3.7 Areas where increasing levels of DER potentially affects operation of the system under Emergency Conditions 3.7 Areas where increasing levels of DER potentially affects operation of the system under Conditions Whole system issues list As the electricity system changes, moving to more active operation across

More information

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015 Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF a motion by the Ontario Energy Board to

More information

Distribution Charging Update

Distribution Charging Update Distribution Charging Update 1 1 Agenda Charging Methodologies and governance Tariff Setting HV/LV Connected Customers EHV Customers 19/20 Charges Recent Changes Future Changes Treatment of storage Charging

More information

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA Submission of Indicated New York Transmission Owners For Authority to Construct and Operate Electric Transmission Facilities in Multiple Counties in New York Case 13-M-0457 Edic to New Scotland 345 kv

More information

Power Potential Guide to Participating : A technical 0 guide to the services for synchronous and non-synchronous DER participants 04/10/2017

Power Potential Guide to Participating : A technical 0 guide to the services for synchronous and non-synchronous DER participants 04/10/2017 Power Potential Guide to Participating : A technical 0 guide to the services for synchronous and non-synchronous DER participants 04/10/2017 Our Vision of the Future National Grid (NG) and UK Power Networks

More information

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. No Date of Exemption To whom Exemption was granted Clause to which Exemption has been granted Concise

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

APRIL 2011 FINAL RATES

APRIL 2011 FINAL RATES STATEMENT OF CHARGES FOR USE OF INDEPENDENT POWER NETWORKS LIMITED S ELECTRICITY DISTRIBUTION NETWORK APRIL 2011 FINAL RATES This statement is effective from 1st April 2011 Independent Power Networks Limited,

More information

Age-dependent & multi-load reliability analysis in transmission systems

Age-dependent & multi-load reliability analysis in transmission systems CIGRE US National Committee 2013 Grid of the Future Symposium October 20-22, 2013 Boston, USA Age-dependent & multi-load reliability analysis in transmission systems Marco Fleckenstein, Prof. Dr. -Ing.

More information

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid. Grid Code Review Panel Issue Assessment Proforma Operational Metering for Embedded Small Power Stations PP 11/35 1 A Panel Paper by John Lucas (ELEXON) & Steve Curtis (NGET) Summary Currently it is unclear

More information

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 1 Reactive Power Compensation for Solar Power Plants Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 2 Objectives Refresh the basics of reactive power from a generator s perspective Regulatory

More information

Net Metering & Compensation Seminar

Net Metering & Compensation Seminar Net Metering & Compensation Seminar November 2, 2017 Eversource Energy Hadley, MA Changes Are Here Market Net Metering Credit was introduced: 60% Market equal to 60% of distribution, transition, transmission

More information

Small DER Aggregation Example

Small DER Aggregation Example Special MIC Meeting DER Small DER Aggregation Example April 10 th, 2017 Presented by: Drew Adams A.F.Mensah, Inc. Outline Example Overview System Design Operations Backup Power Mode Description EDC ship

More information

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011 Network ENMAX Power Corporation Network Planning & Design November 4, 2011 ENMAX Fast Facts Service area of 1,044 square kilometers 1,738MVA Peak load (2009) Transmission System 266 km overhead 15km underground

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99 Version 2, January 2019 www.energynetworks.org 2 Introduction Connection of Power Generating Modules to DNO

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Wind Turbine. Commissioning Utilizing Mini-Grid Power. Scottish Renewables Onshore Wind Conference & Exhibition Aggreko

Wind Turbine. Commissioning Utilizing Mini-Grid Power. Scottish Renewables Onshore Wind Conference & Exhibition Aggreko Wind Turbine Commissioning Utilizing Mini-Grid Power Scottish Renewables Onshore Wind Conference & Exhibition Agenda 41 Aggreko: 10 years in North America wind industry Wind Farm Mini-Grid Projects Why

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016 JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016 BALANCING ELECTRICITY TRADE GUARANTEED CAPACITY TRADE ELECTRICITY IMPORT AND EXPORT SUPPORT OF CONSTRUCTION OF NEW HYDRO POWER PLANTS

More information

Standard Battery Energy Storage System (BESS) Connection Arrangements

Standard Battery Energy Storage System (BESS) Connection Arrangements Standard Battery Energy Storage System (BESS) Connection Arrangements Introduction A battery energy storage system (BESS) can be operated in a number of different ways to provide benefit to a customer.

More information

ABB Wind Power Solution

ABB Wind Power Solution Feng Li, Wind ISI, CNABB, November, 2016 ABB Wind Power Solution November 13, 2016 Slide 1 ABB deliveries from A to Z into the wind industry Wind power generation, transmission and integration, control

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 8/18 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

OVERVIEW OF UNIFORM TRANSMISSION RATES

OVERVIEW OF UNIFORM TRANSMISSION RATES Exhibit H1 Tab 1 Schedule 1 Page 1 of 2 1 OVERVIEW OF UNIFORM TRANSMISSION RATES 2 3 4 5 6 7 8 9 Transmission rates in Ontario have been established on a uniform basis for all transmitters in Ontario since

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction... 2 2 Charging Methodology Objectives... 4 3 Connection Charging Methodology... 5 4 Connection

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012.

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012. POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT PREPARED BY: System Performance & Commercial DATE: 1 March 2013 FINAL Disclaimer Purpose This report has been prepared by the Australian

More information

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Selling PFIFFNER in the UK. Paul Haines

Selling PFIFFNER in the UK. Paul Haines Selling PFIFFNER in the UK. Paul Haines Contents Introduction, Country & Market Overview UK. Accessing the Market Critical Success Factors. Developing the Business Together. Proposed Pfiffner Support.

More information

Emerald Reactive Support Alternative Solution Expressions of interest

Emerald Reactive Support Alternative Solution Expressions of interest Emerald Reactive Support Alternative Solution Expressions of interest Publishing Date 21/02/2017 Closing Date 21/03/2017 1. Executive Summary Ergon Energy Corporation Limited (EECL) is seeking expressions

More information

Clean Energy Transmission Summit. Stephen Beuning Director Market Operations 1/9/13

Clean Energy Transmission Summit. Stephen Beuning Director Market Operations 1/9/13 Clean Energy Transmission Summit Stephen Beuning Director Market Operations 1/9/13 1 Who We Are Xcel Energy is dedicated to being an environmental leader NSP-Minnesota NSP-Wisconsin 26,000+ MWs of generation

More information

Co-location Informal Guidance Note. March 2018 Version 1.1

Co-location Informal Guidance Note. March 2018 Version 1.1 Co-location Informal Guidance Note March 2018 Version 1.1 Contents 1. Foreword...3 2. Purpose......4 3. Terminology.5 4. Co-location Guidance 6 5. Summary and Conclusion 9 Appendix 1 FAQs...10 1. Foreword

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 35490-E Cancelling Revised Cal. P.U.C. Sheet No. 33652-E ELECTRIC SAMPLE FORM 79-1153 Sheet 1 NEM LOAD AGGREGATION

More information

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

PHILIPPINE DISTRIBUTION CODE 2017 EDITION PHILIPPINE DISTRIBUTION CODE 2017 EDITION PDC 2017- Background Revised the PDC 2001 Starts of revision in 2010 April 18 and 24, 2012 conducted a series of expository presentation for Visayas and Mindanao

More information

NOVA SCOTIA UTILITY AND REVIEW BOARD

NOVA SCOTIA UTILITY AND REVIEW BOARD ORDER 2015 NSUARB 267 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF THE REQUEST BY NOVA SCOTIA POWER INCORPORATED FOR APPROVAL OF THE LOAD

More information

Balancing and Settlement Code. Code Subsidiary Document. Loss of Load Probability Calculation Statement. Version 1.0. Effective Date: 5 November 2015

Balancing and Settlement Code. Code Subsidiary Document. Loss of Load Probability Calculation Statement. Version 1.0. Effective Date: 5 November 2015 Balancing and Settlement Code Code Subsidiary Document Loss of Load Probability Calculation Statement Version 1.0 Effective Date: 5 November 2015 Balancing and Settlement Code Page 1 of 22 5 November 2015

More information

Static frequency converter couples US paper mill s 25-Hz and 60-Hz electricity grids

Static frequency converter couples US paper mill s 25-Hz and 60-Hz electricity grids Static frequency converter couples US paper mill s 2-Hz and 0-Hz electricity grids Before 0 Hz was adopted as the standard frequency for electricity distribution in the USA, power companies across the

More information

Exemptions currently in force

Exemptions currently in force exemptions by Western Power s currently in force Neerabup Units G11 & G12 3.3.3.1 (a) 16 Jan 2008 Ongoing Modified performance criteria: 0.8 Lagging 101.3 MVAr 0.9 Leading 68.5 MVAr Financial contribution

More information

Potential Transmission Charging Arrangements at Exporting Grid Supply Points (GSPs)

Potential Transmission Charging Arrangements at Exporting Grid Supply Points (GSPs) Informal Consultation Paper Potential Transmission Charging Arrangements at Exporting Grid Supply Points (GSPs) GSPs provide the interface between the transmission system and distribution networks. Traditionally

More information

GRID CONSTRAINTS IN THE SOUTH WEST: OPTIONS FOR CONNECTION

GRID CONSTRAINTS IN THE SOUTH WEST: OPTIONS FOR CONNECTION GRID CONSTRAINTS IN THE SOUTH WEST: OPTIONS FOR CONNECTION REGEN SW March 2016 Disclaimer: Information and data contained within this guide are correct as of time of print 04 March 2016 Page 1 1 INTRODUCTION

More information

GC0023 Protection Fault Clearance Time & Back-Up Protection

GC0023 Protection Fault Clearance Time & Back-Up Protection Stage 03: Report to Grid Code GC0023 Protection Fault Clearance Time & Back-Up Protection What stage is this document at? 01 02 03 Workgroup Report Industry Consultation Report to the This proposal seeks

More information

New Power Flow Controller for Congestion Management and Reliability Improvement in Transmission and Distribution Systems

New Power Flow Controller for Congestion Management and Reliability Improvement in Transmission and Distribution Systems New Power Flow Controller for Congestion Management and Reliability Improvement in Transmission and Distribution Systems Alberto Del Rosso EPRI CIGRE US National Committee 204 Grid of the Future Symposium

More information

Electric Networks/Ina Lehto Updated Original 12/2011

Electric Networks/Ina Lehto Updated Original 12/2011 1 TECHNICAL APPENDIX 2 TO THE GUIDELINES CONNECTING AN ELECTRICITY GENERATION INSTALLATION TO THE DISTRIBUTION NETWORK CONNECTING AN INSTALLATION WITH A NOMINAL RATED CAPACITY OF OVER 100 These instructions

More information

Non-BM Balancing Services Volumes and Expenditure

Non-BM Balancing Services Volumes and Expenditure Non-BM Balancing Services Volumes and Expenditure Contents 1 Introduction... 2 1.1 What are Balancing Services or Ancillary Services?... 2 1.2 What are Balancing Mechanism (BM) and Non-Balancing Mechanism

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Overview of State Distributed Generation Interconnection Rules

Overview of State Distributed Generation Interconnection Rules Overview of State Distributed Generation Interconnection Rules Presentation to EPA CHP Webinar Series June 26, 2008 Wayne Shirley Director The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier,

More information

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS... TITLE SPECIFICATION FOR PORTABLE DATE: JULY 2006 PAGE: 1 OF 25 TABLE OF CONTENTS Page FOREWORD...3 INTRODUCTION...4 1 SCOPE...4 2 NORMATIVE S...4 3 DEFINITIONS AND ABBIATIONS...4 4 REQUIREMENTS...5 4.1

More information

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements Company Directive STANDARD TECHNIQUE: SD4O/1 Standard HV Connection Arrangements Policy Summary This document specifies the standard arrangements for HV metered connections. NOTE: The current version of

More information

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT 14 TH MARCH 2008 TABLE OF CONTENTS Page 1 Introduction...1 2 Charging Methodology Objectives...3 3 Connection Charging Methodology...4 4

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Interconnection Customer Contact Information Name Alternative Contact Information (if different

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM ATTACHMENT 2 Utility: Duke Energy Progress Designated Utility Contact: Attention: Customer Owned Generation Mail Code ST13A E-Mail Address: Customerownedgeneration@duke-energy.com

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw Major Customer Connections Preliminary Enquiry Form Embedded Generation > 30 kw MARCH 2018 Privacy Notice Ergon Energy is collecting information (including personal information) on this form for the purposes

More information

Draft for an Appendix G Electrical System

Draft for an Appendix G Electrical System CSPBankability Project Report Draft for an Appendix G Electrical System to the SolarPACES Guideline for Bankable STE Yield Assessment Document prepared by the project CSPBankability funded by the German

More information

Electricity Transmission network charging

Electricity Transmission network charging Electricity Transmission network charging An introductory guide January 2018 All users of the GB electricity transmission system pay network charges in some way. Generators pay to use the network to transport

More information

REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS. International Competitive Bidding (ICB)

REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS. International Competitive Bidding (ICB) REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS International Competitive Bidding (ICB) Polonnaruwa Solar PV Power Project (10 MWp) Tender No: CEB/EPT/SP/RFP1

More information

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study Cromby Units 1 and 2 and Eddystone Units 1 and 2 Deactivation Study Original Posting Date: March 2, 2010 Updated May 10, 2010 Updated June 7, 2010 Updated September 7, 2010 General PJM received notice

More information

Building Collaboration Between East African Nations via Transmission Interconnectors

Building Collaboration Between East African Nations via Transmission Interconnectors Building Collaboration Between East African Nations via Transmission Interconnectors Eng. Christian M.A. Msyani Ag. DEPUTY MANAGING DIRECTOR TRANSMISSION - TANESCO CONTENTS 1. TANESCO - Existing Power

More information

Sub Regional RTEP Committee South

Sub Regional RTEP Committee South Sub Regional RTEP Committee South December 18, 2017 Baseline Reliability and Supplemental Projects Second Review 2 Date Project Last Presented: 10/30/2017 SRRTEP Problem Statement: DOM End of Life Criteria

More information

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer (a) Purpose - This report

More information