NEW YORK ENERGY HIGHWAY

Size: px
Start display at page:

Download "NEW YORK ENERGY HIGHWAY"

Transcription

1 RESPONSE TO REQUEST FOR INFORMATION NEW YORK ENERGY HIGHWAY May 30, 2012 West Point Partners, LLC c/o PowerBridge, LLC 501 Kings Highway, Suite 300 Fairfield, CT Phone Fax

2 RESPONSE TO REQUEST FOR INFORMATION New York Energy Highway Contents Section Title Page SUMMARY OF RESPONSE TO REQUEST FOR INFORMATION 1 I. RESPONDENT INFORMATION 2 A. Contact Information B. Respondent s Background and Experience II. PROJECT DESCRIPTION 4 III. PROJECT JUSTIFICATION 6 IV. FINANCIAL 9 A. Private-Public Partnership B. Financial Structure and Funding Options V. PERMIT/APPROVAL PROCESS 12 A. Federal, State, and Local Permits B. Permit and Approval Status C. Permitting Considerations VI. ADDITIONAL INFORMATION 13 A. Property B. Project In-Service Date and Project Schedule C. Interconnection D. Technical E. Construction F. Operational G. Socio-Economic H. Financial I. Environmental J. Project Contract/RFP Status K. Public Outreach and Stakeholder Engagement Appendices A. West Point Partners Key Personnel B. Technical Information, Siemens VSC-HVDC System C. Technical Information, Prysmian HVDC Cables

3 SUMMARY OF RESPONSE TO REQUEST FOR INFORMATION New York Energy Highway West Point Transmission ( West Point ) is conceived as an essential component of New York s proposed Energy Highway -- an underwater electric transmission cable capable of linking at least 1000 MW of less expensive and more environmentally sensitive generating resources from northern and western New York with electricity consumers in the New York City metropolitan area. As shown in red on the map below, West Point starts south of Albany and ends in Buchanan, New York. In combination with other important transmission system upgrades in the New York system, it will provide a new, broader pathway for cleaner and more diverse power into the downstate region, as well as multiple opportunities upstate for new jobs and economic development. PROJECT DESCRIPTION West Point Transmission will carry 1000 MW of electric capacity (expandable to 2000 MW). The transmission line will primarily be installed underneath the Hudson River, using established underwater installation techniques, taking care not to disturb sensitive river resources. The total route distance is approximately 80 miles. West Point will feature Voltage Sourced Converter-High Voltage Direct Current (VSC-HVDC) technology, characterized by controllability, compact design, and ease of interface with interconnecting systems. A converter station will be built at each end of the line, and interconnections to the NYISO system will be at the Leeds and Buchanan substations. West Point benefits and advantages for New York include: A new pathway for transmitting electricity from existing, repowered, and new generation sources in northern and western New York into the New York City electricity market. Broader access to renewable resources, including upstate wind and hydro power, boosting efforts to meet the state s Renewable Portfolio Standard and create a more diversified resource portfolio. New jobs in New York for project construction, as well as the potential for hundreds of additional jobs to build, repower and operate upstate generation needed to meet New York City electricity demand. Proven state-of-the art HVDC technology that enhances the stability of the transmission system in addition to increasing transmission capacity. Protection of natural resources along the Hudson River corridor. An experienced development team with a successful track record in building and operating similar facilities in New York: the Neptune and Hudson transmission projects. 1

4 I. RESPONDENT INFORMATION A. Contact Information Name: West Point Partners, LLC c/o PowerBridge, LLC Address: 501 Kings Highway East, Suite 300 Fairfield, CT (main telephone for all contacts) Primary Contact: Alternate Contact: Edward M. Stern, President and CEO Christopher Hocker, Vice President-Planning B. Respondent s Background and Experience West Point Partners, LLC ( WPP ) is a single-purpose entity formed by PowerBridge, LLC of Fairfield, CT and Anbaric, LLC of Wakefield, MA for purpose of developing, building, owning, and operating West Point Transmission, the proposed electric transmission cable project that is the subject of this RFI Response. PowerBridge, the Managing Partner of WPP, specializes in the development, permitting, financing, construction, ownership, and operation of energy and infrastructure projects ( Notable examples of PowerBridge projects include: Neptune Regional Transmission System: Neptune is a 660-MW, HVDC underground and underwater transmission cable that links PJM Interconnection with NYISO, serving the Long Island Power Authority ( LIPA ). It extends 65 miles between Sayreville, New Jersey and North Hempstead, Long Island, New York, and includes an HVDC converter station at both ends of the line. Neptune was completed in June 2007 after a two-year construction period, on budget and ahead of schedule, at a cost of approximately $650 million that was entirely financed in the private capital markets. For the past five years, it has provided approximately 20 percent of Long Island s electricity needs. ( Cable for the Neptune Regional Transmission System is installed from a barge in the Raritan River in New Jersey, September

5 Hudson Transmission: Hudson, like Neptune, is a 660-MW underground and underwater transmission connection between PJM and NYISO. It includes a back-to-back HVDC converter station in Ridgefield, New Jersey and a 345-kV AC transmission cable that runs approximately seven miles, including nearly four miles under the Hudson River, to the Con Edison W. 49 th Street substation. Construction began in May 2011, with underwater cables installed under the Hudson in December 2011, and the project be ready for its scheduled completion date of July Financing for the $850 million project was obtained from private investors, many of whom also participated in the Neptune project financing. ( Cable installation ship Giulio Verne bearing Hudson Transmission cable, in the Hudson River, December 2011 The core development team for WPP includes individuals who were and are directly involved in the development, permitting, financing, construction, and operation of the Neptune and Hudson projects. In addition, the West Point team includes Anbaric Transmission, a privately-held company specializing in the development of energy transmission and smart-grid projects, whose principal, Edward N. Krapels, is a founding partner of the Neptune and Hudson transmission projects; and equity investors, contractors, and consultants who participated in these projects. (See Appendix A for summary resumes of key personnel.) 3

6 II. PROJECT DESCRIPTION Type of Project: Size of Project: Location: Fuel Source: Transmission 1000 MW (can be increased to 2,000 MW) Leeds Substation (Athens, NY) to Buchanan Substation Not applicable Earliest Date of Operation: 2017 Project Technology: Voltage Source Conversion/High Voltage Direct Current The West Point Transmission facility ( West Point ) is conceived as an essential north-south element of New York s Energy Highway, capable of carrying 1000 MW of electric power for approximately 80 miles between the existing Leeds substation near Athens, New York, to the existing Buchanan substation adjacent to the Indian Point Energy Center. In combination with other transmission system upgrades to the north and west, West Point will be a major energy pathway that enables power to flow from a diverse array of generating resources throughout the state to load centers in the greater New York City area. West Point will include a high voltage (320-kV) cable buried underneath the Hudson River to the greatest extent practicable and will use Voltage Source Conversion-High Voltage Direct Current ( VSC- HVDC ) technology for controllability, voltage stability, and efficiency. A VSC-HVDC converter station will be constructed at each end of the line, close to each point of interconnection. For descriptive purposes, West Point is conceptually similar to the Trans Bay Cable Project, a 400-MW VSC-HVDC project that includes a 53-mile underwater cable between Pittsburg and San Francisco, California, completed in Principal contractors for Trans Bay Cable were Siemens and Prysmian, who also were the joint contractors for the Neptune and Hudson transmission projects in New York and Trans Bay Cable VSC-HVDC Converter Station in San Francisco, CA, completed in

7 are expected to be the contractors for West Point. Please see Appendices B and C for additional descriptive information on the proposed technology for West Point, as well as the website WPP understands that responsibility for enacting various components of the comprehensive Energy Highway both transmission and generation -- will be allocated among various parties and projects in a coordinated fashion. WPP will work with the Energy Highway Task Force to design and build a project that best meets the needs of New York State and therefore is prepared to make refinements to West Point Transmission as proposed here, to help achieve the State s goals. Based on our review of the New York State Transmission Assessment and Reliability Study ( STARS ) Phase II Study Report, we believe that, within the overall framework of the Energy Highway, a 1000-MW line between Leeds and Buchanan represents an appropriate size and location for a new transmission facility that can be sited, built, and operated to maximize economic benefit and minimize environmental impacts. For the purposes of this Response, we assume that important transmission upgrades between the New Scotland and Leeds substations, as identified in the STARS Report, will be done by others. However, it would be possible to expand West Point to as much as 2,000 MW of transmission capacity as well as to make the northern interconnection point at New Scotland, rather than Leeds. The 2,000 MW alternative would require two cables installed in the river, as well as either larger or a greater number of converter stations (depending on final configuration of the larger project). Linking to New Scotland would likely be best accomplished by using the existing New Scotland-Leeds transmission corridor, rather than an overland cable route between New Scotland and the River. WPP is prepared to explore this possibility further if desired. As explained in Section III, WPP currently holds two NYISO queue positions that would permit further study of a 1,000-MW, New Scotland-to-Buchanan alternative in addition to the 1,000-MW Leeds-to-Buchanan line described here. 5

8 III. PROJECT JUSTIFICATION West Point Transmission will address the State s objectives as follows: 1. Reduce constraints on the flow of electricity to, and within, the downstate area; and expand the diversity of power generation sources supplying downstate (RFI page 11) West Point is intended to be a backbone transmission corridor enabling electricity to flow from upstate New York to heavily populated areas in the southeastern part of the state. It is envisioned as a key component of a larger set of important transmission upgrades that will unbottle the State s congested transmission system and allow increased flow from the western and northern parts of the state. In conjunction with the West Point route from Leeds to Buchanan, it is assumed that transmission upgrades will occur between Leeds and the New Scotland substation, approximately 40 miles to the north, as well as other major improvements to the north and west of New Scotland. Providing a minimum of 1000 MW of new north-south transmission capacity will clearly promote the ability of more diverse, less costly upstate generation to reach customers in the greater New York City metropolitan area. 2. Assure that long-term reliability of the electric system is maintained in the face of major system uncertainties (RFI page 11). West Point helps assure reliability of the electric system both in the short run and in the long run. The line can be built without impacting existing north-south transmission infrastructure; no facilities need to be taken out of service in order to build West Point. In the long run, as noted above, West Point is envisioned as a permanent backbone of the state s transmission infrastructure using proven technology with a useful life of at least 40 years (and likely far greater). Moreover, the use of VSC-HVDC technology offers the advantages of controllability and voltage stability to the system as a whole while at the same time avoiding or minimizing certain impacts and disadvantages of a conventional AC system. 3. Encourage the development of utility-scale renewable resources throughout the state (RFI page 11). By providing a new major energy pathway, West Point will help create access for upstate renewables to downstate energy markets that are currently stranded by the constrained, aging, and inadequate transmission system. Relieving these constraints not only helps meet the State s 30 percent renewable target all with in-state resources -- but (as noted in the RFI) helps promote energy security, reduce overdependence on only one or two types of resources, and reduce greenhouse gas emissions and other pollutants. 4. Increase efficiency of power generation, particularly in densely populated urban areas (RFI page 12) While West Point, as a transmission facility, does not directly address the efficiency of generation units, it does contribute to improving the overall efficiency of the New York State energy system. Relieving north-south transmission constraints reduces the need to run older, dirtier, and less efficient power 6

9 plants located closer to the load, and helps provide far more optionality for the system to facilitate both economic and environmental dispatch of generation. 5. Other Benefits of West Point Transmission (RFI page 13) In addition to addressing the four major objectives above, West Point also provides benefits corresponding to those listed in the RFI. Create jobs and opportunities for New Yorkers. Removing transmission constraints within New York and encouraging the construction of renewable and other clean forms of generation upstate will clearly provide new job opportunities during construction itself, in increased activity at existing and new generation plants, and through the multiplier effect of stimulating products and services to meet the demands created by increased employment. As noted in the RFI, $1 billion worth of transmission investment has been found to be worth 13,000 FTE years of employment and $2.4 billion in total economic activity. (Note that the preliminary cost estimate for West Point is approximately $1 billion.) Contribute to an environmentally sustainable future for New York State. To the extent West Point helps open up access to more renewable and low-emission generation upstate, it will directly support a more environmentally sustainable future. In addition, the facility will not impact Environmental Justice areas, as the transmission cable itself will be buried or submerged, the converter stations will require small footprints of approximately five acres each and be located well outside of densely populated areas, and the facility will produce no emissions or discharges. Apply advanced technologies that benefit system performance and operations. The Siemens VSC-HVDC technology employed for West Point has the dual advantage of being both commercially available and representative of the future trend in HVDC transmission (see Section VI.D and Appendices B and C for additional information). A key feature of VSC-HVDC is the ability to provide voltage support for the system as a whole, thus contributing to stability and reliability. An added benefit, in comparison to AC solutions, is the absence of increased shortcircuit currents during system disturbances, thereby reducing electric system upgrade costs. Maximize New York State electric ratepayer value in the operation of the electric grid. The RFI notes that existing constraints in the electric system impose significant congestion costs on electric consumers and severely limit the ability to transmit lower-cost electricity to load. By creating long-term energy infrastructure, West Point will create a broader path for north-south electricity to flow and help relieve congestion and create markets for lower-cost power. In addition, opening up markets to renewables will help reduce costs imposed by pollution and other externalities. Adhere to market rules and procedures, and make recommendations for improvement as appropriate. The WPP team has demonstrated its understanding of NYISO s rules and procedures through the successful development of the Neptune and Hudson transmission projects, both of which involved complex interconnection engineering and construction work. (We have similarly gained extensive familiarity with the rules of other entities affecting energy markets and facility operation, including FERC, NERC, and the applicable regional reliability 7

10 organizations.) Through these experiences, we understand that there may be significant system costs associated with system interconnection and are prepared to pay these costs as part of the financing for West Point Transmission. We have initiated the NYISO interconnection process for West Point Transmission in the form of two separate requests that represent possible alternative configurations of the facility: Queue Position #357, 1000 MW, between New Scotland and Buchanan or Roseton; Queue Position #358, 1000 MW, between Leeds and Buchanan. 8

11 IV. FINANCIAL A. Private-Public Partnership WPP has conceived West Point Transmission to be a true private-public partnership, generally following the model created for the Neptune and Hudson transmission projects. For each of these projects, PowerBridge-managed project companies took on the tasks (and risks) associated with real estate acquisition, permitting, private financing, construction, interconnection, commissioning, and operation of the facilities for the benefit of New York State public entities the Long Island Power Authority for Neptune, and the New York Power Authority for Hudson. We believe we have the experience and knowledge to replicate this model with adjustments as necessary and appropriate to meet the current and long-term needs of New York State for West Point. For both Neptune and Hudson, the basis for financing was a long-term agreement between the public party and the private party that assured a revenue stream sufficient to support financing in the private capital markets. As discussed further below, while this approach is widely accepted and proven to be successful, it is not necessarily the only alternative for private sector financing. In actuality, we view the Energy Highway concept to be a multi-party partnership that ideally will involve the active participation of State agencies, private developers, regulated electric utilities, local governments, NYISO, and a wide variety of other stakeholders. The Energy Highway will not be built as one single project, but rather as a closely coordinated package of transmission and generation projects with each part of the package executed by different sponsors based on their ability to execute their assigned responsibilities. Thus, WPP seeks to be responsible for developing and building the backbone north-south transmission link between Leeds and Buchanan, while other parties, public or private, will be responsible for other important transmission upgrades as well as new and re-powered generation all under the umbrella and oversight of New York State. B. Financial Structure and Funding Options While the global capital markets have seen significant volatility over the last several years, capital for well structured infrastructure projects, such as transmission, remains readily available to developers with proven track records. In general, privately financed transmission projects have been structured around one of two revenue models: (a) a long term transmission capacity purchase agreement or (b) a cost-of-service, rate-based model. The Neptune and Hudson projects are examples of projects financed on the basis of a long term transmission purchase agreement. Those projects have 20 year contracts with LIPA and NYPA, respectively. The projects receive their revenue solely on the basis of an availability-driven tariff. If the transmission line is available for operation, then the project receives its monthly tariff payment, irrespective of the actual energy that flows through the line. The Customer is therefore free to optimize the use of the asset for its benefit and that of its own customers. The long term transmission capacity purchase agreement framework is similar to how most gas pipelines are financed. A major advantage of this type of structure for the Customer lies in the allocation of risk. The project entity (developer) takes on all development, permitting, design and construction risks and will not earn 9

12 revenues until the transmission line is built to pre-agreed specifications and successfully goes into service. In addition, all construction and operating cost risks are generally borne by the project owners. If there are cost overruns in constructing or operating the project, the tariff payments generally would not be increased. Examples of projects financed on the rate based model include the Competitive Renewable Energy Zone ( CREZ ) projects in Texas, which involve about 400 miles of 345-kV transmission to areas of the state with high-value renewable resources; and the Path 15 and Trans Bay projects in California. The rate based model is more similar to how investor-owned utilities recover their costs for constructing new transmission and distribution lines, or how Congestion Assessment and Resource Integration Study ( CARIS ) projects are proposed to recover costs through the NYISO tariff. The revenue requirements of the project company are determined each year on the basis of its prudent operating costs, cost of debt capital, agreed return on equity and applicable capital structure. Under this framework, greater amounts of risk are usually borne by the ratepayers than under the long term purchase agreement model. Increases in capital and/or operating costs, if deemed to be prudently incurred, are passed through to the ratepayers. In addition, unlike the long term purchase agreement model, the revenue requirement is usually not adjusted for poor operating performance such as reduced availability. WPP and its financial sponsors are very comfortable implementing a project under either of the two financing frameworks. To date, the West Point development team has raised over $1.5 billion in capital to finance the development, construction and operation of the 660 MW Neptune project and the 660 MW Hudson project. Each of those projects utilized 20 year Firm Transmission Capacity Purchase Agreements ( FTCPA ) as the cornerstone for establishing the credit to raise the financing. However, WPP s investors have also used other financial structures, including the rate based model. WPP would be willing to use a very similar contractual framework as that used for Neptune and Hudson -- in fact, the FTCPAs from Neptune and Hudson could be used as a starting point for a contract, since each has proven to be financeable in the capital markets. Not only would this provide a high degree of assurance of the ability to finance the project, but it would also be an efficient way to develop the contractual framework. Twenty (20) years should be viewed as a minimum term for the contract. A longer term contract of years would most likely lead to an overall lower annual tariff payment and still remains inside of the expected useful life of an HVDC transmission system. As with Neptune and Hudson, creditworthy counterparties such as NYPA or LIPA would be viewed favorably by the capital markets. In addition, one or more of the investor-owned utilities serving the ratepayers of New York who benefit from the project could also be the counterparties. The key for accessing the required capital in a cost effective manner would be for the contract counterparties to have an investment grade credit rating. The rate based framework would also be acceptable to WPP. There may be means to modify the rate based model structure somewhat in order to insulate ratepayers from certain risks. For instance, it may be possible to cap ratepayers exposure to cost overruns, and/or to make rate recovery contingent on the project achieving a minimum performance level, thereby mitigating the construction completion risk for ratepayers. Similarly, it may be possible to structure an adjustment mechanism to the annual revenue requirement on the basis of the actual availability of the transmission line. WPP is amenable to working through any number of different risk allocation structures, provided there is a balance between the risks and the rewards. 10

13 As noted above, we believe there will be plenty of capital available for a well structured transmission project. The development capital for West Point is currently being provided by three principal Equity Sponsors: Energy Investors Funds ( EIF ), which was founded in 1987 as the first private equity fund manager to invest exclusively in the power sector, and has raised more than $4 billion in equity capital in support of more than $15 billion worth of projects, including the Neptune and Hudson transmission projects. Starwood Energy Group, an affiliate of Starwood Capital Group Global, LLC, a privately held global investment management firm based in Greenwich, Connecticut that is also a principal investor in Neptune and Hudson. NRG Energy, a Fortune 250 wholesale power generation company with nearly 25,000 MW of generating assets in North America, including nearly 4,000 MW in New York. In return for providing this development capital, the Equity Sponsors retain an option to provide the permanent equity capital for the project, when it reaches the construction financing stage. On the debt side, we anticipate some combination of the commercial bank market and the institutional private placement market will be the financing source for West Point. Each of these markets has its pluses and minuses for financing the construction and operation of large, capital intensive, long-lived energy assets. Neptune and Hudson were predominantly financed in the institutional private placement market, with placements totaling more than $1 billion. The CREZ projects in Texas, on the other hand, were predominantly financed in the bank market. As of today, each of those markets would have sufficient capacity on its own to finance West Point, which is expected to have a capital cost on the order of $1 billion. Since access, competitive pressures, and relative pricing in each of these two markets can vary based on market conditions, we would not determine a final financing plan until much closer to the time of execution. However, the WPP development team has significant experience in raising capital in each of the markets and is highly confident of our ability to raise the necessary debt capital at the appropriate time. 11

14 A. Federal, State, and Local Permits V. PERMIT/APPROVAL PROCESS West Point Transmission will require two comprehensive permits: An Article VII Certificate of Environmental Compatibility and Public Need from the New York State Public Service Commission, and a Department of the Army Permit issued by the U.S. Army Corps of Engineers under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Approvals or consents from other agencies will also be required, including the office of Coastal Zone Management within the NY Department of State, the State Historic Preservation Office, the U.S. Fish & Wildlife Service, and National Marine Fisheries Service. The facility will also require a work permit and grant of easement from the New York State Office of General Services for the use of state underwater lands. Various other permits, approvals, or consents may be needed from local governments depending on the final siting of the facility. Finally, West Point must participate in the NYISO interconnection process and execute an Interconnection Agreement with the NYISO and interconnecting utilities. The West Point development team has extensive relevant experience obtaining this entire range of permits and approvals in connection and additionally, with relevant permits and approvals in New Jersey in connection with the Neptune and Hudson transmission projects. B. Permit and Approval Status WPP has initiated environmental and routing studies and in-water surveys of the river route for the preparation of applications for an Article VII Certificate and a U.S. Army Permit. These studies will be completed in 2012, and applications submitted in the first or second quarter of As noted previously, WPP has filed two Interconnection Requests with NYISO corresponding to potential configurations of the facility: A 1000-MW line between New Scotland and Roseton or Buchanan (Queue Position 357), and a 1000-MW line between Leeds and Buchanan (Queue Position 358). An Interconnection Feasibility Study Agreement between WPP and NYISO was executed in June 2011 for Queue Position 358, Leeds-to-Buchanan, and this study is expected to be completed by the late summer of C. Permitting Considerations The WPP development team has extensive experience with the Article VII and U.S. Army Permit process, having obtained these (and other) key permits for the Neptune and Hudson transmission projects. We believe we have a well-grounded understanding of the permitting process, and are not aware of any provision of federal or state laws or rules that present an inherent obstacle to the successful development of West Point. 12

15 VI. ADDITIONAL INFORMATION A. Property The Neptune and Hudson projects, the WPP development team has gained extensive experience in obtaining all necessary rights for the use of real estate for the purpose of building and owning transmission facilities that are comparable to West Point. Such rights were obtained without eminent domain authority, and range from fee ownership to long-term licenses or easements, obtained from both private sellers and public entities. It should be noted that obtaining all such rights, along with government approvals to use the property for the intended purpose, is a necessary precondition to obtaining financing for such a project. While securing the real estate for linear projects like a transmission line can be a challenge, real estate acquisition needs for West Point are not particularly extensive. Most of the transmission line itself will be buried beneath the Hudson River, requiring a New York State Office of General Services (OGS) license and easement. For the converter stations, West Point will benefit from the fact that VSC-HVDC technology allows construction using a relatively small footprint of approximately five acres for each station. Near the proposed northern terminus near Athens, New York, there are extensive areas of suitable unoccupied land, as well as an existing, short corridor leading to the Hudson River for the landbased transmission line. Near the southern terminus in Buchanan, WPP is in preliminary discussions with the owner of property in close proximity to the Buchanan substation. WPP does not expect to require or seek eminent domain authority for its real estate needs. B. Projected In-Service Date and Schedule WPP has begun environmental studies and in-water surveys that will enable us to submit an application for a New York State Article VII Certificate, and a U.S. Army Corps of Engineers permit, in the first or second quarter of Beyond this, the schedule to complete the facility is dependent on the length of time required to obtain the major permits, as well as work window restrictions for in-water cable installation that might be imposed in the permits. Our experience with the Neptune and Hudson projects suggests that a period of approximately 30 to 36 months for construction and commissioning is likely to be appropriate. This period includes engineering and design, and procurement under an Engineering-Procurement-Construction ( EPC ) contract such as that used for the Neptune and Hudson projects. Thus, assuming approximately one year for review and issuance of the principal permits, we envision the commercial operation date for West Point to be during Calendar Year C. Interconnection Information As discussed previously, our currently preferred route extends from the National Grid Leeds substation near Athens, New York to the Consolidated Edison Buchanan substation. We favor this route primarily due to cost and environmental considerations, as the Leeds substation is approximately two miles from the Hudson River and there is an existing utility corridor to the River that might be utilized. By contrast, the New Scotland substation is approximately 10 miles from the River with a much more complicated overland route. Nonetheless, we are aware that upgrading the existing transmission capabilities between New Scotland and Leeds, using the existing corridor, will be essential to realization of the Energy Highway objectives and providing meaningful access to points north and west of New Scotland. We currently assume that the New Scotland-Leeds upgrade will be done by others as part of the 13

16 comprehensive Energy Highway implementation. However, we are entirely open to incorporating this upgrade into the West Point project if doing so best meets the needs of New York State. Selecting the Buchanan substation as the southern terminus for West Point has several clear advantages, including available physical space for interconnection at the substation, close proximity to the River, and the capability of using existing transmission facilities that run to New York City. D. Technical Information WPP intends to use the same principal contractors that successfully built the Neptune project and are currently building the Hudson Transmission project: Siemens Energy is a global technology company that specializes in HVDC installations worldwide, and has rapidly advanced its VSC-HVDC capabilities in the form of what it calls HVDC-Plus. The latest U.S. example of HVDC-Plus is the Trans-Bay Cable Project from Pittsburg to San Francisco, California, which Siemens completed in 2010 in conjunction with Prysmian Cables & Systems. Globally, Siemens is responsible for 46 HVDC installations, including those currently in construction. These include both classic HVDC such as in the Neptune and Hudson projects, and, more recently, HVDC-Plus (see Appendix B). Siemens is currently in the process of building five HVDC-Plus facilities in Europe with capacities up to 2000 MW. Four of these link offshore wind developments to the mainland grid. A landbased HVDC-Plus facility, called INELFE, is a 2000-MW link between France and Spain, scheduled for completion in Detailed information regarding Siemens HVDC- Plus technology is included in Appendix B. Prysmian Cables & Systems is also a global company specializing in the manufacture and installation of power cables, especially for submarine installations. Prysmian was responsible for design, manufacturing, and installation of the 65-mile-long Neptune HVDC land and sea cable system as well as the 8-mile AC cable for the Hudson Transmission project, in addition to the recently completed Trans Bay Cable project and many other cable installations around the world. Prysmian s experience with HVDC cables includes 23 installations wordwide. Additional detailed information about Prysmian experience and cable technology is included in Appendix C. 14

17 Useful Life of Project Components. The expected lifespan of an HVDC system such as West Point is generally considered to be at least 40 years, and may be reasonably expected to extend beyond that with proper maintenance. Siemens portfolio of operating HVDC installations extends back to the mid- 1970s. Prysmian s portfolio of HVDC cable installations extends back to the early 1960s. Equipment Warranties: Generally, established equipment providers such as Siemens and Prysmian expect to provide reasonable and satisfactory warranty terms. This was true of Neptune and Hudson and can be expected to be true of West Point. Typically, warranty terms are the subject of negotiations between the Owner and the Contractor, and may have an impact on pricing of the equipment. WPP believes that the warranty terms between the Owner and the Contractor will correspond to the warranties reasonably required by the Customer. E. Construction As described previously, WPP will negotiate a comprehensive EPC Contract with its principal contractors, Siemens and Prysmian, as a consortium. Both companies have extensive experience working in New York State. Under the EPC arrangement, the contractors are responsible for facility design and engineering, manufacturing and/or procuring all equipment and materials, all construction and installation work, and final commissioning and testing. While much of the converter station equipment requires specialized manufacturing, we would expect that many of the basic materials and components for civil and structural work on the converter station would be provided by local suppliers. Likewise, construction labor is likely to be local. Both Siemens and Prysmian are accustomed to working under Project Labor Agreements. Project Decommissioning: For Neptune and Hudson, cable decommissioning is addressed by the major permits, which typically call for a detailed decommissioning plan tailored to the specifics of the project. In the case of an underwater cable, abandoning in place rather than removal is usually considered preferable in order to avoid environmental disturbance. Operating converter stations do not require more than minimal amounts of regulated substances and will not present an environmental liability upon decommissioning. F. OPERATIONS Performance: The performance of a transmission system such as West Point is typically measured on the basis of its availability: the percentage of time in a given calendar period in which the system is capable of performing as required, allowing for scheduled maintenance outages. Availability targets are set contractually between Owner and Contractor, and Owner and Customer, and are often subject to negotiation within a relatively narrow band. The Neptune transmission project has averaged over 97 percent availability during its five years of operation, consistent with benchmarks for similar HVDC systems. Safety Considerations: Safety considerations for a VSC-HVDC converter station are comparable to those observed in a typical major electrical substation. Since the line itself will be buried underground or beneath the Hudson River bed, hazards associated with contacting the line are extremely remote. 15

18 G. SOCIO-ECONOMIC Local Economic and Employment Impacts: As discussed previously and already noted in RFI, major transmission investments have been shown to produce a significant positive impact, directly and indirectly, on job creation and economic activity. An important goal of the Energy Highway is to improve transmission infrastructure that will encourage future opportunities for new generation in upstate New York. As a critical component of these transmission improvements, West Point will play an important role in stimulating these opportunities. In local communities hosting the West Point converter stations, we would expect to negotiate development agreements with the affected municipalities that would provide them with significant long-term sources of additional revenue. The WPP team has negotiated such agreements in connection with the Neptune and Hudson transmission projects, and can provide references in North Hempstead, New York, and in Sayreville and Ridgefield, New Jersey. Neighborhood Impacts; Public Safety. The West Point cable will be buried underground or under the Hudson River, and therefore will produce no visual or other neighborhood impacts, or public safety hazards. The underground portions of the cable route are expected to be very short and not routed through neighborhoods or densely populated areas. The converter stations will require approximately five acres each. As noted above, they will be sited close to their interconnection points away from densely populated areas, and designed and located so as to minimize visual impacts. Appropriate security measures, such as those taken at an electrical substation, will be used to protect public safety. WPP is familiar with the typical Article VII Certificate requirements regarding safety, aesthetics, and other public impacts, and is fully prepared to comply with these. In addition, the WPP development team has extensive experience working cooperatively with local officials and other stakeholders to assure that local public concerns are suitably addressed. H. FINANCIAL Please see the discussion in Section V.B, above. I. ENVIRONMENTAL Environmental impacts of West Point will primarily occur during construction, since the cable will be buried beneath the Hudson River for a distance of approximately 75 miles between Athens and Buchanan. WPP is well aware that this portion of the River includes environmentally sensitive areas, including habitat for a variety of valuable species. We have performed preliminary routing studies showing that many of the especially sensitive areas in the River can be avoided altogether. For those areas that cannot be avoided, impacts can be avoided or minimized by restricting construction to seasonal windows that permit in-water activity only during times of the year when sensitive species are not present. WPP is very familiar with NYSDEC and USACOE expectations and requirements regarding submarine cable installation, as well as Coastal Zone Management Act consistency considerations. 16

19 Each of the West Point converter stations will occupy approximately five acres, requiring clearing of unoccupied land. Potential impacts to affected land, and appropriate mitigation, will be the subject of studies conducted in preparation of permit applications. Based on WPP s experience and current knowledge of the cable route and likely converter station sites, we expect to be able to develop an environmentally acceptable construction plan in consultation with jurisdictional agencies, after performing the necessary land and river-based studies now under way during During operation, environmental impacts of West Point will be negligible, as the transmission cable will not be visible, and the converter stations produce no emissions or discharges into the environment. To the extent environmental impacts of construction cannot be avoided, WPP will take necessary measures to minimize the impacts and to provide mitigation through restoration and enhancement, either directly or by funding mechanisms as appropriate. In addition, we will work closely with stakeholder groups such as Riverkeeper, Scenic Hudson, and the Natural Resources Defense Council ( NRDC ) to assure that their concerns are satisfactorily addressed. The environmental impacts of a high-voltage cable installation in the Hudson River compare favorably to the impacts of installing high-voltage overhead transmission lines. Underwater cable installation techniques are designed to minimize such impacts as turbidity, and disturbance to habitat can be minimized or avoided by careful routing and observance of seasonal installation windows. In operation, there are no visual impacts or issues related to electro-magnetic fields ( EMF ) extending to abutting properties. By contrast, installation of high-voltage overhead lines, even in an existing corridor, may require larger structures or widening of the corridor, creating the potential for increased visual impacts or other effects on abutting properties. J. CONTRACT/RFP STATUS WPP has not sought any contracts for the project or made any submissions to any state agency or authority in response to any Request For Proposal. K. PUBLIC OUTREACH AND STAKEHOLDER ENGAGEMENT WPP expects a wide range of potential stakeholders, in addition to jurisdictional agencies, to be interested in West Point as plans for the project are developed, such as: River interests such as Riverkeeper and Scenic Hudson; Environmental groups such as NRDC, Sierra Club and other organizations with interests in promoting sustainable energy alternatives; Organizations promoting economic development; Labor unions; Counties and municipalities along the river route; Municipalities in which the converter stations will be sited; Other county and municipal governments in northern and western New York where there is high potential for windpower development; Interconnecting utilities. 17

20 We will pro-actively engage such stakeholders, seek to understand their concerns, and address these concerns to the greatest extent possible, both prior to filing permit applications and through the Public Service Law Article VII process, which requires the establishment of an intervener fund. Studies undertaken in connection with major permit applications will be used to demonstrate the extent of impacts and how these will be avoided, minimized, or mitigated. WPP will consider providing financial support for appropriate mitigation, restoration, or enhancement measures in response to stakeholder concerns. WPP believes that public outreach efforts should proceed in parallel with project development, beginning with conceptual-level information provided on a one-to-one basis for the purposes of receiving feedback before progressing to more detailed discussions of specific concerns and means of addressing them in broader public forums. We have begun the process of describing and explaining West Point Transmission to stakeholders on a selective basis and expect these efforts to increase as specific information about both the project and the Energy Highway continues to evolve. 18

21 APPENDIX A WEST POINT PARTNERS KEY PERSONNEL

22 Edward M. Stern, President and CEO Ed Stern, President and CEO of PowerBridge, LLC, has more than 25 years of experience leading the successful development, financing, and operation of major energy and infrastructure projects. Under his guidance, Neptune Regional Transmission System, LLC, a PowerBridge company, developed, constructed, and since 2007 has operated the Neptune Project a 660 MW, 65-mile-long HVDC undersea and underground electric transmission system that interconnects the PJM market at Sayreville, New Jersey with Long Island, New York. Through PowerBridge, Ed is leading the development of other major energy infrastructure projects, including the Hudson Transmission Project, linking the PJM grid to New York City, the Green Line Project, which will link renewable energy resources in northern New England with the Boston market and West Point, linking upstate New York resources with the New York metro area. From 1991 through 2003, Ed was employed by Enel North America, Inc. (a subsidiary of Enel SpA, an Italian electric utility company) and its predecessor, CHI Energy, Inc., an energy company which owned or operated nearly one hundred power plants in seven countries, specializing in renewable energy technologies including hydroelectric projects and wind farms. While at Enel North America, Inc. and CHI Energy, Inc., Ed served as General Counsel and, commencing in 1999, as President, Director and Chief Executive Officer. Prior to joining CHI, Ed was a Vice President with BayBanks, Inc., a Boston-based $10 billion financial services organization, where for six years he specialized in energy project finance, real estate restructurings and asset management. Ed currently serves on the Boards of Directors of Rentech, Inc. (AMEX: RTK), a global leader in the development of ultra-clean fuels and chemicals, and Capital Access Network, Inc., a small business lender; is on the Board of Managers of Deepwater Wind Holdings, LLC, an offshore wind energy developer; and serves on the Advisory Board of Starwood Energy Group Global, LLC, a private equity firm specializing in energy and infrastructure investments. Ed received B.A., J.D. and M.B.A. degrees from Boston University and is a member of the Massachusetts Bar and the Federal Energy Bar.

23 Ernest B. Griggs, Senior Vice President and Project Manager Ernie Griggs joined PowerBridge as the Project Manager for Neptune in He currently oversees Neptune operations, and the construction of the Hudson Transmission Project, and also is involved in the technical and construction aspects of developing the West Point Project. Ernie brings over 30 years of large scale project management, HVDC, and electric power industry experience in bulk power generation, transmission and operations, primarily in the northeastern United States. Ernie was previously employed by New England Power Co., where his responsibilities included project management of Phase I and II of the 2,250 MW HVDC Interconnection between New England and Hydro-Quebec, oversight of a 1,200 MW hydroelectric system, and project management of the Bear Swamp hydroelectric pumped storage project. Ernie graduated from Vermont Technical College with a degree in Electromechanical Engineering and from Lesley University with a degree in Management. Jeffrey T. Wood, Senior Vice President Jeff Wood is primarily responsible for leading the financing effort for PowerBridge projects such as Hudson Transmission and West Point Transmission. Jeff is a former managing director at the investment bank Société Générale, where he was responsible for serving as financial advisor and for arranging $600 million in non-recourse project financing for the Neptune transmission project, a 660-MW, 51-mile undersea transmission cable completed in June of After joining PowerBridge, he had primary responsibility for raising approximately $850 million in non-recourse project financing for Hudson Transmission. Jeff has nearly 20 years of experience in project finance with involvement in raising more than $7 billion in debt and equity. Prior to joining PowerBridge, he was a Senior Vice President with Noble Environmental Power of Essex, Connecticut, where he was responsible for raising more than $700 million of non-recourse debt and $200 million of tax equity for a portfolio totaling 330 MW of wind power in New York State. His finance experience also includes positions with J.P. Morgan Chase and Wachovia Securities, where he has been active in the financing of major energy projects both in the U.S. and internationally. Jeff graduated from the University of Tennessee with a B.S.degree, magna cum laude; he also holds an MBA from the Fuqua School of Business at Duke University. Thomas G. Beaumonte, Chief Financial Officer and Treasurer Tom Beaumonte has more than 20 years experience as a senior financial executive in planning, operations, strategic planning, budgeting, cost reduction and financial reporting for both domestic and international companies. For PowerBridge, he is responsible for financial accounting, budgeting, reporting, and investor relations for the Neptune, Hudson, and other project companies managed by PowerBridge. Prior to joining PowerBridge at its inception, Tom served as Vice President, Comptroller and Treasurer of Enel North America, Inc. and its predecessor company, CHI Energy, Inc.

24 Previously, Tom served as Director of UBS Warburg, Inc. of New York, Treasurer and Assistant Controller of Republic New York Securities Corporation of New York, Vice President of Lehman Brothers Holdings of New York, and Supervisory Senior at Ernst & Young of New York. Tom is a graduate of Lehigh University (B.S.), a Certified Public Accountant and is licensed by the National Association of Securities Dealers (Series 7). J. Christopher Hocker, Vice President, Planning Chris Hocker joined PowerBridge as Vice President of Planning with 20 years of electric power industry experience that encompasses project planning, licensing and permitting, government and community relations, business development, and corporate communications. Chris was responsible for compliance with all major permits during construction of the Neptune facility and led the successful permitting effort for the Hudson Transmission Project. He is responsible for assuring permit compliance during the construction of the Hudson Transmission Project and will spearhead permit applications and compliance on the West Point project as well. Prior to joining PowerBridge, Chris was employed by Enel North America, Inc., and its predecessor company, CHI Energy, Inc. from 1990 to While with CHI, he initially focused on licensing, planning, and government and community relations for a proposed 1500-MW power project, was responsible for preparing a successful siting application for the project generating facility as well as a separate siting application for a related 345-kW transmission line. He later served as Senior Vice President, Corporate Affairs, for CHI and Enel North America, part of the senior management team responsible for corporate development. He served on the board of directors of the National Hydropower Association, a Washington, D.C.-based trade association of utility and independent hydropower owners, for nine years, including one year as president of the association in Previously, Chris was a communications consultant for companies involved in the engineering, energy, and environmental fields and a contributing editor of Independent Energy magazine for several years, writing numerous articles on various business aspects of the independent power industry. He holds a B.A. degree from Stanford University. Charles J. Micciche, Vice President, Construction Charlie Micciche has over 20 years experience in managing the operation, maintenance and construction of power generation and transmission facilities. Involved in the development of the Neptune project from its earliest stage through completion of construction, Charlie is currently responsible for overseeing the installation of the Hudson Transmission Project cable between Ridgefield, New Jersey and Manhattan s W. 49 th Street and the construction of the back-to-back converter station in Ridgefield, New Jersey. Prior to joining PowerBridge, Charlie managed the construction of a 500 MW combined cycled gas fired plant in Westbrook, Maine followed by a similar facility in Johnston, Rhode Island. As project manager for both projects he had overall responsibility for achieving safety, productivity, quality, schedule and financial goals.

25 Charlie previously served as Manager of Construction for Public Service Electric and Gas in New Jersey. In this capacity he managed a $1.5 billion, five-year repowering program. He also was a plant manager and served in a variety of department head roles involving maintenance, controls and operations at conventional and nuclear facilities. Charlie graduated from the Stevens Institute of Technology with a Bachelor of Engineering and has attended the Rutgers Senior Management Program and the Texas A&M Construction Executive Program. James P. Nash, Vice President, Engineering Jim Nash provided engineering and consulting services during the development and construction phases of the Neptune Transmission Project. He officially joined the PowerBridge team in 2007 and continues to maintain an ongoing involvement in the operation of Neptune, while principally responsible for overseeing all aspects of engineering during the construction of the Hudson project and the development and of West Point project. Jim has more than 24 years experience in the fields of electric power engineering and project development for various generation, transmission, and distribution projects. Jim s professional career includes multiple assignments while with the New England Electric System (NEES, now National Grid US) including its Global Transmission group. He was Project Director for the Cross Sound Cable Project, later purchased and developed by TransEnergie US, which Mr. Nash joined in He was NEES Project Manager for the first 26-mile Nantucket Submarine Cable Project and Project Engineer for the 800-ampere Lisbon Ground Electrode serving the New England Hydro Quebec HVDC Intertie. While with EBASCO (now Washington Group) from 1987 to 1993, Jim worked on several substation projects including the NYPA to Long Island Y-49, 345 kv Submarine Cable and the 345 kv cable interconnection for Consolidated Edison s Goethals Substation to the Linden Cogeneration Facility in New Jersey. Jim received a B. S. degree in Electrical Engineering from Clarkson University in 1982, is a Registered Professional Engineer in the Commonwealth of Massachusetts, and a Senior Member of the IEEE Power Engineering Society. James T. Sullivan, Vice President, Operations Jim Sullivan joined PowerBridge in June of 2011 and is primarily responsible for O&M and reliability compliance for Neptune and for development of O&M procedures for the Hudson Transmission Project. Jim has more than 30 years of experience in the engineering, operations, maintenance, and management of electric systems, primarily for High Voltage Direct Current (HVDC) transmission systems, with more than 20 years developing operating procedures and compliance with reliability requirements for HVDC systems. Previous work experience includes 10-plus years as a supervisor for a 2000-MW HVDC converter terminal in New England; and seven years with National Grid as Supervisor and Director of HVDC Operations and Maintenance for the New England/Hydro Quebec HVDC Interconnection.

26 Most recently Jim served as a consultant specializing in developing O&M and reliability compliance procedures for several major clients, including the Neptune Regional Transmission System. Jim has extensive education and training in the fields of electrical and electronic design, including specialized training in HVDC controls and protection and in business management. Edward Krapels, Chief Executive Officer, Anbaric Transmission, LLC Ed Krapels is a developer of energy transmission projects in the United States and a leading authority on energy issues, markets, and policy. He is the Founder of Anbaric Holding, LLC, an organization involved in the development of various energy projects including Neptune Regional Transmission System, and the Hudson Transmission Project. He is Chairman of both Atlantic Energy Partners, the initial developer of Neptune and New England Independent Transmission Company, which is developing the Green Line in New England. In 2008, he joined several partners in the development of Viridity LLC, a company dedicated to developing projects that couple intermittent energy sources with demand response programs. Through controlled demand and distributed generation, Viridity uses smart grid technology to optimize power consumption of large campus-like institutions, such as universities or industrial complexes, in order to control both energy resources and demand simultaneously at multiple locations. A former energy consultant and advisor, Ed has provided valuation and due diligence services to prominent investors in the energy arena, assisted major utilities, end users, and government agencies in the risk management sector of the energy industry and advised clients on the importance of the location energy asset location.. Ed holds a B.A. from the University of North Carolina, Chapel Hill, a M.A. from the University of Chicago, and a Ph.D. from the Johns Hopkins University.

27 APPENDIX B TECHNICAL INFORMATION SIEMENS VSC-HVDC SYSTEM 1. Siemens HVDC Project Listing 2. Siemens HVDC-Plus Presentation

28 HVDC Classic transmission projects executed by Siemens Customer & Project Name Location of Installation Rated Power DC Voltage Commercial Operation National Grid / Scottish Power Western HVDC Link SNC AltaLink Western Alberta Transmission Link (WATL) ATCO East DC Link Project Fingrid, FIN / Elering, EST EastLink 2 China Northern Power Grid Nuozhadu Guangdong Hudson Transmission Project Hudson (Back-to-back) Energotrans Ltd. Black Sea Transmission Network Project Power Grid Company of Bangladesh Ltd. BtB Bangladesh CSG Xiloudu Guangdong Transpower New Zealand Ltd. Inter Island Connector Pole 3 Red Eléctrica de España COMETA Adani Power Ltd. Mundra Haryana BritNed Development Limited Brit-Ned SGCC Xiangjiaba Shanghai Energinet.dk Storebælt Power Grid Cooperation of India Ballia Bhiwadi Interconnector SGCC Ningdong - Shandong Hunterston Kelsterton, UK 2250 MW 600 kv 2015 Sunnybrook Crossings Canada 1000 MW 500 kv 2014 Heathfield New Canada 1000 MW 500 kv 2014 Anttila, Finnland Püssi, Estonia 670 MW 540 kv 2014 Pu`er Jiangmen 5000 MW 800 kv 2013 New York 600 MW 170 kv 2013 Akhaltsikhe, Georgia 2 x 350 MW 96 kv 2013 Bheramara 500 MW 158 kv 2013 Zhaotong Coghua 2 x 3200 MW 500 kv 2013 Haywards (North Island) to Benmore (South Island) Valencia Mallorca Spain Gujarat province to Haryana province Isle of Grain, UK - Maasvlakte, Netherlands 2 x 350 MW 350 kv x 200 MW 250 kv MW 500 kv x 500 MW 450 kv 2011 Xiangjiaba Shanghai 6400 MW 800 kv 2010 The islands Funen (Fyn) and Zealand (Sælland) in Denmark Uttar Pradesh province to Rajasthan province 600 MW 400 kv MW 500 kv 2010 Ningdong Shandong 4000 MW 660 kv 2010 China Southern Power Grid Guizhou-Guangdong II Neptune RTS Neptune RTS Xingren / Guizhou Shenzhen / Guangdong USA / New Jersey New York 3000 MW 500 kv MW 500 kv E T PS S 1 Page 1 of 3

29 Customer & Project Name Location of Installation Rated Power DC Voltage Commercial Operation Power Grid Cooperation of India Ltd. East South Interconnector II National Grid Australia Basslink Interconnector Xcel Energy Lamar China Southern Power Grid Guizhou Guangdong II Line ± 500 kv DC Transmission Project Sate Power South Company (SPSC) Orissa province Karnataka province Loy Yang / Victoria to George Town / Tasmania 2000 MW 500 kv 2003 / MW 400 kv 2006 Lamar / Colorado / USA 210 MW 63.6 kv 2005 Xingren / Guizhou Shenzhen / Guangdong 3000 MW 500 kv 2005 Guizhou Guangdong 3000 MW 500 kv 2004 Gui Guang Manitoba Hydro, Winnipeg, Canada Nelson River Bipole 1, Pole 2 Valve Replacement Bonneville Power Administration (BPA) Celilo Mercury Arc Replacement Project Moyle Interconnector Ltd. (MIL), Northern Ireland Moyle Interconnector Electricity Generating Authority of Thailand (EGAT) Tenega National Berhad (TNB) Thailand Malaysia China Southern Power Grid Tian Guang HBC, Lisbon, Portugal ESCOM, Johannesburg, South Africa Radisson Converter Station on Nelson River Dorsey Converter Station near Winnipeg both in Manitoba, Canada 1000 MW 500 kv 2004 The Dalles, Oregon, USA 3100 MW 400 kv 1997 / 2004 Northern Ireland, Scotland 2 x 250 MW 2 x 250 kv 2001 Khlong Ngae Gurun 300 MW 300 kv 2001 Tianshengqiao Guangzhou 1800 MW 500 kv 2000 Songo, Mazambique Apollo, South Africa 1920 MW 533 kv 1975 / 1998 Cohora Bassa Los Angeles Department of Water and Power, California, USA (LADWP) Sylmar Converter Station East, Los Angeles 550 (825) MW 500 kv 1995 Sylmar East Valve Reconstruction American Electric Power, Ohio, USA (AEP) Texas, Titus Country near Mount Pleasant 600 MW 180 kv 1995 Welsh HVDC Converter Station (Back-to-back) E.ON Munich, Germany Etzenricht (Back-to-back) Österreichische Elektrizitätswirtschafts Aktiengesellschaft (Verbundgesellschaft, VG) Etzenricht, near Weiden / Oberpfalz 600 MW 160 kv 1993 Southeast of Vienna, Austria 600 MW 145 kv E T PS S 1 Page 2 of 3

30 Customer & Project Name Location of Installation Rated Power GK-Wien-Südost (GK-SO) (Back-to-back) China National Technical Import & Export Corporation Ge-Nan Western Area Power Administration (WAPA) DC Voltage Rectifier station in Gezhouba (Central China), Inverter station in NAn Qiao (about 40 km from shanghai) 1200 MW 500 kv 1989 Sidney, Nebraska, USA 200 MW 50 kv 1987 Commercial Operation Virginia Smith Converter Station (Back-to-back) Hydro Quebec Montreal, Canada Poste Châteauguay (Back-to-back) Österreichische Elektrizitätswirtschafts Aktiengesellschaft (Verbundgesellschaft, VG) Beauharnois, Quebec, Canada Dürnrohr, near Zwentendorf, Austria 2 x 500 MW 145 kv MW 145 kv 1983 Dürnrohr (Back-to-back) A.N.D.E. Acaray (Back-to-back) Manitoba Hydro (Winnipeg) Nelson River, Bipole 2 Paraguay 55 MW 25 kv 1981 Henday Converter Station near Nelson River Dorsey Converter Station near Winnipeg both in Maitoba, Canada 2000 MW 500 kv E T PS S 1 Page 3 of 3

31 VSC transmission projects executed by Siemens Customer & Project Name Location of Installation Rated Power DC Voltage Commercial Operation Rte and REE INELFE Baixas, France Santa Llogaia, Spain 2 x 1000 MW ± 320 kv DC 2014 Tennet SylWin1 Transpower Offshore GmbH BorWin2 Transpower Offshore GmbH HelWin1. Trans Bay Cable LLC Trans Bay Cable Project Tennet HelWin2 Büttel, Germany 864 MW ± 320 kv DC Diele, Germany 800 MW ± 300 kv DC Büttel, Germany 576 MW ± 250 kv DC Pittsburg - San Francisco 400 MW ± 200 kv DC 2010 Ca USA Büttel, Germany 690 MW ± 320 kv DC E T PS S 1 Page 1 of 1

32 HVDC PLUS Siemens AG April 2012 E T PS S 1 Energy Sector / Power Transmission Energy Solutions Sector

33 HVDC PLUS General Features of VSC Technology Additional Features and Benefits of HVDC PLUS Grid Access of weak AC Networks Independent Control of Active and Reactive power Supply of passive Networks and Black Start Capability High dynamic Performance Low Space Requirements Siemens AG April 2012 Energy Sector / Power Transmission Solutions 1

34 HVDC PLUS Features and Benefits of MMC Topology High Modularity in Hardware and Software No Generation of Harmonics Low Switching Frequency of Semiconductors Use of well-proven Standard Components Sinus shaped AC Voltage Waveforms Easy Scalability Reduced Number of Primary Components Low Rate of Rise of Currents even during Faults High Flexibility, economical from low to high Power Ratings No Filters required Low Converter Losses High Availability of State-ofthe-Art Components Use of standard AC Transformers Low Engineering Efforts, Power Range up to 1000 MW High Reliability, low Maintenance Requirements Robust System Siemens AG April 2012 Energy Sector / Power Transmission Solutions

35 HVDC PLUS From Model... Transformer Insertion Resistor Star Point Reactor AC Switchyard Converter Reactor Power Modules Siemens AG 20 4 April 2012 Energy Sector / Power Transmission Solutions

36 HVDC PLUS... to Reality Siemens AG 20 5 April 2012 Energy Sector / Power Transmission Solutions

37 Key Components of HVDC PLUS Symmetrical Configuration AC System A DC AC System B Controls, Protection, Monitoring To/ from other terminal 1. AC Switchyard 2. Transformers 3. Star Point Reactor 4. Insertion Resistor 5. Power Modules Converter Reactor Siemens AG April 2012 Energy Sector / Power Transmission Solutions

38 AC Switchyard (1) AC Switchyard: Connect the terminal to the AC system Siemens AG April 2012 Energy Sector / Power Transmission Solutions

39 Transformers (2) Conventional Transformers Converter Transformer: Obtain the AC voltage needed for the required DC voltage Optional 3rd winding for auxiliary system In feed Siemens AG April 2012 Energy Sector / Power Transmission Solutions

40 Star Point Reactor (3) Star Point Reactor: Symmetry of DC voltage Siemens AG April 2012 Energy Sector / Power Transmission Solutions

41 Insertion Resistor (4) Insertion Resistor: Charging of DC circuit decoupled from converter deblocking 10 April 2012 Energy Sector / Power Transmission Solutions

42 Power Module (5) Converter Hall - Example Power Modules: Modular Multilevel Conversion Siemens AG April 2012 Energy Sector / Power Transmission Solutions 1

43 Power Module (5) HVDC PLUS One Step ahead Compact Design Modular Design Lower Space Requirements Advanced VSC Technology Maintenance friendly Siemens AG April 2012 Energy Sector / Power Transmission Solutions

44 Power Module (5) Options for Converter Modules and Building Arrangements A highly flexible Design Siemens AG April 2012 Energy Sector / Power Transmission Solutions

45 Converter Reactors (6) ~ = = ~ = = ~ = = Parallel connection of three voltage sources 1 2 n 1 2 n Phase Unit Converter Reactor: Damp balancing currents between different phases Limit current gradients during severe faults Siemens AG April 2012 Energy Sector / Power Transmission Solutions

46 APPENDIX C TECHNICAL INFORMATION PRYSMIAN HVDC CABLES 1. Prysmian HVDC Cable Project Listing 2. Extruded Cables for HVDC Power Transmission

47 HVDC CABLE REFERENCE LIST Power Export and Domestic Markets Year Area Place of installation Customer 1962 Europe 1965 Europe France - U.K.(part of La Manche Channel crossing cable lenght) Italy & France (Italian mainland - Corsica - Sardinia islands link) Total length (km) N of cables Type of cable Working voltage (kv) Conductor size (mm²) EDF - France Paper insulated (solid) ±200 d.c. 1 x 340 ENEL - Rome Paper insulated (solid) 200 d.c. 1x Europe Spain (Mallorca - Minorca Islands link) GESA - Barcelona Self contain. oil filled 132 ac ± dc 1 x 500 Al 1974 North America Canada (Vancouver Island - Mainland - 2nd link through Strait of Georgia and Trincomali channel) B.C.H. & P.A. - Vancouver Self contain. oil filled ±300 d.c. 1 x Europe Crossing of English Channel CEGB - Guildford Paper insulated (solid) ±270 d.c. 1 x North America 1993 Far East 1996 Far East Deep Water Hawaiian Electric Co. 1.8 Self contain. oil filled ±300 d.c. 1 x 1600 Al Korea (Connection between Mainland and Cheju Island) Korea (Connection between Mainland and Cheju Island) KEPCO - Korea Paper insulated (solid) ± x 800 KEPCO - Korea Paper insulated (solid) ± x Europe Italy - Greece Enel Paper insulated (solid) 400 d.c. 1 x Europe Viking Prototype Statnett - - Paper insulated (solid) 500 d.c. 1x Oceania Australia - Tasmania (Basslink) N.G.C Paper insulated (solid) ±400 1 x North America New Jersey - Long Isand USA Neptune Regional Transmission System LLC Paper insulated (solid) x Europe Sardinia-Peninsula Italy (Pole 1) TERNA and EdF Paper insulated (solid) x 1150 Current Europe Sardinia-Peninsula Italy (Pole 2) TERNA and EdF Paper insulated (solid) x 1150 Current Europe Spain - Mallorca (COMETA) Red Electrica de Espagna (REE) Paper insulated (solid) ±250 1 x 750 Page 1 of 2 March 2011 rev 01

48 HVDC CABLE REFERENCE LIST Power Export and Domestic Markets Year Area Place of installation Customer 2009 North America Current Europe North Sea - BorWin2 (Submarine Cable) Current Europe North Sea - BorWin2 (Land Cable) Current Europe North Sea - HelWin1 (Submarine Cable) Current Europe North Sea - HelWin1 (Land Cable) Total length (km) N of cables Type of cable Working voltage (kv) Conductor size (mm²) San Francisco Trans Bay Cable LLC XLPE insulated DC ±200 1 x 1100 Transpower Offshore GmbH (now TenneT Offshore GmbH) Transpower Offshore GmbH (now TenneT Offshore GmbH) Transpower Offshore GmbH (now TenneT Offshore GmbH) Transpower Offshore GmbH (now TenneT Offshore GmbH) XLPE insulated DC ± XLPE insulated DC ± XLPE insulated DC ± XLPE insulated DC ±250 Current Europe North Sea - SylWin1 (Submarine Cable) TenneT Offshore GmbH XLPE insulated DC ±320 Current Europe North Sea - SylWin1 (Land Cable) TenneT Offshore GmbH XLPE insulated DC ±320 Current Europe France (Baixas) - Spain (Santa Llogaia) - Land Cable INELFE (INterconnection ELectrique France Espagne) Equivalent to 800MW Equivalent to 800MW Equivalent to 576MW Equivalent to 576MW Equivalent to 864MW Equivalent to 864MW XLPE insulated DC ±320 1 x 2500 Page 2 of 2 March 2011 rev 01

49 Extruded Cables for HVDC Power Transmission

50 HIGH VOLTAGE AND SUBMARINE System Solutions and Innovation HV land and submarine cable systems are the backbone of all power transmission networks. The greater and ever-increasing demand for power, the need for larger bulks of power and for the transmission of such bulks over longer and longer distances, the localization of the sufficient or even exceeding existing power generation capacity far from the requiring use and consumption centers are the main reasons for the realization of interconnections among power networks of various and different types. In addition, the involvement of new players other than the traditional operators and asset owners (e.g. Merchant Lines) in the electricity market requires an increasingly stricter control of the power flows. HVDC cable systems offer a technologically advanced and reliable instrument to address these issues. Power transmission cable systems AC transmission is used on short distances because it is more cost effective as it does not require converter stations. DC transmission is used for long lengths. For bulk power transmission, mass impregnated cables still prove to be the most suitable solution because of their capacity to work up to 600 kv DC. Recent developments on converters technology have lead to the adoption of extruded insulation cables for DC transmission systems up to 300 kv.

51 YOUR ENERGY... OUR SYSTEMS... ANYWHERE MONOPOLE CABLE i MONOPOLE (with metallic return) CABLE i + P i SEA RETURN + + P M.V. RETURN CABLE Cathode Anode Laid separated or bundled P/2 + - P/2 BIPOLE (with emergency electrodes) + HV 2. v - HV P/2 P/2 BIPOLE (with metallic return) + HV v 2. v v - HV P/2 P/2 BIPOLE (without metallic return) + HV - HV Typical HVDC transmission configurations > A new generation of cables for a new generation of converters In recent years HVDC power transmission systems have gone through a remarkable development because of the increasing need for the transmission of larger and larger bulks of power over longer and longer distances with the purpose of optimising the energy resources available worldwide. The new generation of converters (VSC Voltage Source Converters) use IGBT (Insulated Gate Bipolar Transistors) which allow the power to be transmitted as it is in both directions without requiring polarity reversal. This has allowed re-introducing the use of extruded cables in DC power transmission as, with the polarity reversal being no longer required, the problem of space charges that can arise with an extruded insulation and create excessive dielectric stress within the cable in the case of sudden polarity reversal does not exist any longer. Peculiarities of power transmission Transmission Solution Advantages Drawbacks/Limitations AC AC AC Simple No maintenance High Availability Heavy cable Length ( km) Rigid connection/power control Require compensation reactance AC DC Conventional AC Less cables (n.), lighter No limits in length Low cable and conversion losses Power flow control Very high transmission power Strong AC networks needed Cannot feed isolated loads Polarity reversal required Large space occupied Special equipment required (transformer, filters) AC DC New AC Can feed isolated loads (oil platforms, wind parks, small islands, etc.), medium power Modularity, short delivery time Small space and environmental impact No polarity reversal Standard equipment Higher conversion losses Reduced experience Limited power

52 HIGH VOLTAGE AND SUBMARINE About us Global Solutions Provider Prysmian is a world leader in the energy and telecommunication cables industry with a strong market position in higher added value market segments. It is organised in two business sectors: Energy Cables and Systems (submarine and underground cable systems for power transmission and distribution, cabling solutions for residential and infrastructure buildings and cabling systems for signalling, control and power feeding for a wide range of industrial applications) and Telecom Cables and Systems (optical fibres, optical cables and copper cables for voice, video and data transmission). The Prysmian Group has a global presence in 34 countries with 54 plants, 7 international R&D Centers and more than 12,000 employees. Specialising in the development of bespoke products and systems, Prysmian s main competitive strengths include: focus on research and development, ability to innovate in terms of both products and processes, and the use of advanced proprietary technologies. The energy market has been changing dramatically in recent years, as a result of deregulation and privatisation. To face the challenge of competition, energy transmission and distribution operators are driven towards an optimum use of their existing resources and new investments. To support its customers, Prysmian has evolved over the years from the traditional role of cable manufacturer to that of a Global Solutions Provider. Prysmian focuses on a total system approach, to give its customers the lowest cost of ownership of their new and installed cable networks. This Total System approach is, at all voltages, the ultimate solution to provide power utilities with real advantages in terms of asset optimisation. Besides an increasing activity on product innovation to lower investment costs, Prysmian is developing additional pre and post sales services for its customers - e.g. network services, enhanced logistics, engineering studies - to optimise asset management and give the best possible exploitation of transmission and distribution networks.

53 Product Range So far, Mass Impregnated cables (high-density paper tapes impregnated with a high-viscosity compound) have proven suitabl allowing these cables to be installed in HVDC links in very long lengths, up to several hundreds of kilometers. However, where remarkable advantages and makes for lighter and easier-to-handle cables, which can operate at high temperatures and at hig Thanks to recent technology improvement, extruded cables are presently adopted for voltages up to 300 kv DC. Recent studies have demonstrated that the extruded technology proves suitable for HVDC links, in particular when associated Impregnating fluids and/or pressure feeding reduced cable weight and dimensions and relative ease of jointing are the key fea in terms of total system costs. Power Transmission Capacity Performances of cables are very much related to environmental conditions. The graphs show typical rating curves in specified conditions. 200 kv HVDC 300 kv HVDC Submarine installation: Soil Thermal Resistivity 1.0 K.m/W - Soil Temperature 15 C - Burial Depth 1.2 m - Cables in contact (installation in bundle) Land installation: Soil Thermal Resistivity 1.2 K.m/W - Soil Temperature 20 C - Burial Depth 1.4 m - Axial distance between cables 300 mm

54 e for voltages of up 600 kv DC without requiring fluid pressure feeding, thus system requirements permit, the use of an extruded insulation offers several h electrical stresses. with VSC (Voltage Source Converter) technology. tures of this technological innovation, which offers also considerable benefits HDVC submarine cable design Prequalification of Extruded HVDC Cables Sea Trial for Submarine Cables Two electrical prequalification programmes were successfully carried out in accordance to the CIGRE TB 219 document "Recommendations for testing DC extruded cable systems for power transmission". The first for a rated voltage of 250 kv, the second for a rated voltage of 300 kv. Testing circuits included the cable and all relevant accessories. CIGRE Electra n. 171 recommends carrying out this test when laying conditions and/or cable designs differ considerably from previously established practice. The test is carried out on a sample of cable sufficiently long to reproduce the laying conditions and includes both a factory joint and a repair joint. The cable sample is laid at the maximum sea depth the cable will reach in real laying conditions and then recovered and subject to electrical tests and visual examination. The mechanical prequalification procedure according to CIGRE Electra n. 171 consists of: > Tensile bending test on a real cable sample (at least 30 m) containing at least one flexible joint, with three bending cycles at the same calculated load as during the installation around a drum with the same diameter (or smaller) of the laying ship pay-off wheel. The test is then followed and concluded by the electrical test and the visual inspection. > External water pressure withstand test carried out on a cable sample (visual examination).

55 YOUR ENERGY... OUR SYSTEMS... ANYWHERE Total Quality Commitment Standards and Recommendations The Prysmian brand has always been a guarantee for the supply of products and services based on worldwide common quality standards. Prysmian has a built-in multi-step quality assurance program, which covers the entire production process from cable design and raw material purchasing, to final inspection and testing documentation. Prysmian business locations and manufacturing sites as well as operation units are certified according to ISO 9001 and ISO Quality Management System standards for their specific activities and products, and environmental quality standards. Reference Project High Voltage and Submarine cable constructions are not fully covered by national or international standards; Prysmian products are designed to meet the projected service duty and to comply with the applicable specifications. Type approval references are given against each product type available. Most cable systems are custom designed to suit the specific environmental parameters and operating requirements of a particular route and loading conditions, taking into account the thermal, thermo-mechanical and electrical performance necessary to ensure reliable system operation throughout service life, which naturally will vary considerably between different applications and locations. Besides, international scientific bodies - like IEC and CIGRE - develop relevant standards, technical recommendations and guidelines within their activities in the field of High Voltage land and submarine cable systems. Prysmian relies on a long-standing tradition of participation and on a strong presence within such bodies, acquired thanks to its undisputed expertise developed over scores of projects accomplished anywhere in the world. Trans Bay Cable San Francisco, USA Route length: 85 km Transmitted power: 400 MW Voltage: ± 200 kv

56 ARGENTINA Prysmian Energía Cables y Sistemas de Argentina S.A. Fábrica La Rosa, Av.da Argentina Capital Federal tel fax AUSTRALIA Prysmian Power Cables & Systems Australia PTY LTD 1 Heathcote Road, Locked Bag 7042, Liverpool Business Centre 1871, NSW tel fax AUSTRIA Prysmian OEKW GmbH Lembockgasse 47A, 1230 Wien tel fax BRAZIL Prysmian Energia Cabos e Sistemas do Brasil S.A. Av. Alexandre de Gusmao 145, Santo André SP tel fax CHINA Prysmian Cables & Systems , Tower A, City Center of Shanghai No. 100 ZunYi Road, Shanghai tel fax EGYPT Prysmian Cables & Systems 8 Abd El Azim Aoudallah st. Hegaz sq. Heliopolis - Cairo tel fax FINLAND Prysmian Cables & Systems Oy P.O. Box 13, FIN Kirkkonummi tel fax FRANCE Prysmian Energie Cables et Systèmes France S.A. Zone Industrielle du PORT AU VIN, GRON, SENS tel fax GERMANY Prysmian Kabel und Systeme GmbH Alt-Moabit 91 D Berlin tel fax HONG KONG Prysmian Cable Systems Pte. Ltd. Unit A, 18/F, China Overseas Building, 139 Hennessy Road, Wanchai, Hong Kong tel: fax HUNGARY Prysmian MKM Magyar Hungarian Cable Works Co. Ltd. Baràzda u. 38, H-1116 Budapest tel fax INDONESIA PT. Prysmiani Cables Indonesia Gedung BRI II, Suite 1502 Jln. Jend Sudirman No Jakarta tel fax ITALY Prysmian Cavi e Sistemi Energia Italia Srl Viale Sarca, Milano tel fax KUWAIT Prysmian Cables & Systems Kuwait Office Villa No 4 (next to Hyatt Regency Hotel) Bidda - KUWAIT tel fax MALAYSIA Prysmian Cable Systems Pte. Ltd. Lot 2, Jalan Kawat 15/18, Shah Alam, Selangor Darul Ehsan, tel fax NETHERLANDS Prysmian Cables & Systems N.V. Schieweg 9, 2627 AN Delft P.O. Box 495, 2600 AL Delft The Netherlands tel fax NORTH AMERICA Prysmian Cables & Systems North America 700 Industrial Drive Lexington, SC USA tel fax ROMANIA Prysmian Cabluri si Sisteme SA Soseaua Draganesti, Km Slatina tel RUSSIA Prysmian Cables and Systems 6th street 8 Marta, 64, Bldg 1 Moscow tel fax SINGAPORE Prysmian Cables & Systems Pte. Ltd. No 4 Tuas Avenue 12. 3rd Storey Singapore tel fax SLOVAKIA Prysmian Kablo s.r.o. Trnavska cesta Bratislava tel fax SPAIN Prysmian Cables y Sistemas S.L. Carretera C-15, Km Vilanova i la Geltrú (Barcelona), tel fax SWEDEN Prysmian Kablar och System AB Turebergs Allé 2 SE Sollentuna tel fax THAILAND Prysmian Cables & Systems Pte. Ltd. 555 Rasa Tower, 11th floor Phaholyoyhin Road, Lardyao Chatuchak, Bangkok tel fax TURKEY Turk Prysmian Kablo ve Sistemleri A.S. Buyukdere Caddesi No Gayrettepe, Istanbul tel fax U.A.E. (Dubai) Prysmian Cables and Systems Middle East P.O. Box 72125, Dubai tel fax UK Prysmian Cables & Systems Ltd. Chickenhall Lane Eastleigh Hampshire, SO50 6YU tel fax Prysmian Powerlink Srl Viale Sarca 222, Milano, Italy - tel , fax

The Green Line Project

The Green Line Project The Green Line Project Presentation to the ISO-NE Planning Advisory Committee New England Independent Transmission Company, LLC December 18, 2007 1 500 kv DC transmission system with transfer capability

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA Submission of Indicated New York Transmission Owners For Authority to Construct and Operate Electric Transmission Facilities in Multiple Counties in New York Case 13-M-0457 Edic to New Scotland 345 kv

More information

Robert L. Mitchell CEO and Co-Founder Atlantic Wind Connection

Robert L. Mitchell CEO and Co-Founder Atlantic Wind Connection Robert L. Mitchell CEO and Co-Founder Atlantic Wind Connection New Jersey Energy Link Electric superhighway connecting northern, central and southern New Jersey Delivers 3,000 megawatts of electricity

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

Meeting Policy Objectives Transmission: A Path to Compliance

Meeting Policy Objectives Transmission: A Path to Compliance Meeting Policy Objectives Transmission: A Path to Compliance Rich Dewey Executive Vice President New York Independent System Operator NYISO Environmental Advisory Council Troy, NY November 20, 2015 Performance

More information

Overview of ISO New England and the New England Wholesale Power Markets

Overview of ISO New England and the New England Wholesale Power Markets Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England

More information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Emergency preamble. Whereas, acts

More information

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT 2 What s the Problem? Constrained grid is an issue that impacts many new renewables developments. A quick look at the distribution heat maps published by

More information

Effects of Smart Grid Technology on the Bulk Power System

Effects of Smart Grid Technology on the Bulk Power System Effects of Smart Grid Technology on the Bulk Power System Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Union College 2013 Environmental Science, Policy & Engineering

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: The Trustees are being requested to approve a resolution adopting modifications to the Long Island Power Authority

More information

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD SCHEDULED ITEM TO: FROM: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD GEORGE F. MORROW, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2013 SUBJECT: APPROVAL OF POWER SALES AGREEMENT ( PSA ) WITH

More information

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation 1 Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources Power Sector Transformation Notice of Inquiry into the Electric Utility Business Model and Request for Stakeholder

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

Looking Towards the Future: Advantages of 765-kV Transmission Technology

Looking Towards the Future: Advantages of 765-kV Transmission Technology Looking Towards the Future: Advantages of 765-kV Transmission Technology In the electric transmission business, design plays a key role in the efficiency and productivity of the nation s energy delivery

More information

When Grids Get Smart - ABB s Vision for the Power System of the Future

When Grids Get Smart - ABB s Vision for the Power System of the Future When Grids Get Smart - ABB s Vision for the Power System of the Future When Grids Get Smart ABB s Vision for the Power System of the Future There is a convergence occurring between the business realities

More information

EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets

EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets Education Session January 22, 2014 1 Overview and agenda

More information

Donna Painter, Executive Consultant February 27, 2013

Donna Painter, Executive Consultant February 27, 2013 Donna Painter, Executive Consultant February 27, 2013 Transmission What is it and How has it Evolved Legislation and Regulatory Impacts What is Next for AMEA and Others Transmission System High voltage

More information

LS Power Southwest Renewable Energy Conference: Financing Transmission Joseph Esteves Chief Financial Officer September 2009 Bringing Energy Forward

LS Power Southwest Renewable Energy Conference: Financing Transmission Joseph Esteves Chief Financial Officer September 2009 Bringing Energy Forward LS Power Southwest Renewable Energy Conference: Financing Transmission Joseph Esteves Chief Financial Officer September 2009 Table of Contents 1. Overview of LS Power Group 2. Description of LS Power transmission

More information

Good afternoon Chairman Maziarz and Members of the Senate. Standing Committee on Energy and Telecommunications. We welcome this

Good afternoon Chairman Maziarz and Members of the Senate. Standing Committee on Energy and Telecommunications. We welcome this Welcome and Introductions Good afternoon Chairman Maziarz and Members of the Senate Standing Committee on Energy and Telecommunications. We welcome this opportunity to address the impact that closing the

More information

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission

More information

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012 DECEMBER 12, 2012 ISO on Background Energy-efficiency forecast Anne George VICE PRESIDENT, EXTERNAL AFFAIRS &CORPORATE COMMUNICATIONS Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING Agenda 11:00-11:05

More information

Final Report. LED Streetlights Market Assessment Study

Final Report. LED Streetlights Market Assessment Study Final Report LED Streetlights Market Assessment Study October 16, 2015 Final Report LED Streetlights Market Assessment Study October 16, 2015 Funded By: Prepared By: Research Into Action, Inc. www.researchintoaction.com

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Yukon Resource Gateway Project

Yukon Resource Gateway Project Yukon Resource Gateway Project Summary Application for National Infrastructure Component Funding January 2016 Introduction The Government of Yukon is seeking endorsement of the Yukon Resource Gateway

More information

Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure

Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure Robert J. Thomas Cornell University Energy Council s 2003 Federal Energy and Environmental Matters Conference March

More information

JCP&L Verbatim Response to Middletown Township s Questions

JCP&L Verbatim Response to Middletown Township s Questions JCP&L Verbatim Response to Middletown Township s Questions Township officials sent 13 questions about the proposed Monmouth County Reliability Project to JCP&L on June 10 th. JCP&L provided direct responses

More information

The Gambia National Forum on

The Gambia National Forum on The Gambia National Forum on Renewable Energy Regulation Kairaba Hotel, The Gambia January 31 February 1, 2012 Tariff and Price Regulation of Renewables Deborah Erwin Public Service Commission of Wisconsin

More information

The Smart Way. HVDC PLUS One Step Ahead. Answers for energy.

The Smart Way. HVDC PLUS One Step Ahead. Answers for energy. The Smart Way HVDC PLUS One Step Ahead Answers for energy. 2 HVDC PLUS Maximum power in the smallest space The customized solution for evolving energy markets Keeping the power flowing is part of our life

More information

Genbright LLC. AEE Technical Round Table 11/15/2017

Genbright LLC. AEE Technical Round Table 11/15/2017 Genbright LLC AEE Technical Round Table 11/15/2017 About Genbright Founded in 2013, Genbright was created to develop and monetize distributed energy technologies across the power industry including distributed

More information

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic 1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be

More information

Electricity Transmission Infrastructure Development in New England

Electricity Transmission Infrastructure Development in New England Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly

More information

best to you all Gail Carbiener Page 1 of 5

best to you all Gail Carbiener Page 1 of 5 Please accept this attachment as my up dated response to the B2H DEIS. If this is not acceptable, please let me know. Nice meeting last Monday in Boardman. 300316 best to you all Gail Carbiener 2 Page

More information

Michigan Renewable Energy Case Study

Michigan Renewable Energy Case Study Michigan Renewable Energy Case Study NARUC ENERGY REGULATORY PARTNERSHIP WITH GEORGIAN NATIONAL ENERGY AND WATER SUPPLY REGULATORY COMMISSION TBILISI, GEORGIA JANUARY 27-31, 2014 GREG R. WHITE, COMMISSIONER

More information

Brownfields to Brightfields

Brownfields to Brightfields Lori Ribeiro, Brockton Brightfields Consultant LRibeiro@bluewavestrategies.com (781) 648-2605 Brownfields to Brightfields Revitalizing Brockton by Converting a Former Manufactured Gas Plant to a Solar

More information

Western Alberta Transmission Line (WATL) HVDC Project

Western Alberta Transmission Line (WATL) HVDC Project Submission for the ACEC Canada Canadian Consulting Engineering Awards 2016 Western Alberta Transmission Line (WATL) HVDC Project Submitted by Teshmont Consultants LP as a Consultant to AltaLink Attachment

More information

MMP Investigation of Arthur Kill 2 and 3

MMP Investigation of Arthur Kill 2 and 3 MMP Investigation of Arthur Kill 2 and 3 Requestor Consolidated Edison Company of New York, Inc. Facility Name Arthur Kill 2 and 3 Date of Request January 27, 2003 Type of Facility NG Generator Topic of

More information

2013 CARIS Phase 1 Report

2013 CARIS Phase 1 Report 2013 CARIS Phase 1 Report Timothy Duffy Manager, Economic Planning New York Independent System Operator Business Issues Committee September 18, 2013 KCC 2013 New York Independent System Operator, Inc.

More information

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO. Direct Testimony and Schedules Grant Stevenson STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION FOR A ROUTE PERMIT FOR THE PLEASANT

More information

Solar-Wind Specific Request for Proposals

Solar-Wind Specific Request for Proposals Program Description Solar-Wind Specific Request for Proposals Power Production from Green Resources in North Carolina 04/19/2006 NC GreenPower (NCGP) is a statewide program designed to improve the quality

More information

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options Effective 8-10-09, Public Act 096-0159 modified the Illinois Power Agency Act to include the Renewable

More information

NYISO Market Initiatives

NYISO Market Initiatives NYISO Market Initiatives Robb Pike Director Market Design New York Independent System Operator Ventyx Market Leadership Council Santa Clara, CA April 23, 2012 Topics Roles of the NYISO Smart Grid Integrating

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in eight US states Quick Take M.J. Bradley & Associates (MJB&A) evaluated the costs and States Evaluated benefits of

More information

80+ Power Supply Program for Computers

80+ Power Supply Program for Computers 80+ Power Supply for Computers An immediate opportunity to secure energy and peak savings for less than 3 cents per lifetime kwh New Design Assures Major Reduction in Computer Energy Use Most past efforts

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Montgomery Township Community Energy Aggregation

Montgomery Township Community Energy Aggregation Montgomery Township Community Energy Aggregation MCEA Round 2 Program Announcement! The Township of Montgomery is excited to announce another Montgomery Community Energy Aggregation program (MCEA Round

More information

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15

More information

THE COUNCIL OF STATE GOVERNMENTS RESOLUTION SUPPORTING ELECTRIC POWER GRID MODERNIZATION TO ACHIEVE ENERGY EFFICIENCY AND DEMAND REDUCTION BENEFITS

THE COUNCIL OF STATE GOVERNMENTS RESOLUTION SUPPORTING ELECTRIC POWER GRID MODERNIZATION TO ACHIEVE ENERGY EFFICIENCY AND DEMAND REDUCTION BENEFITS THE COUNCIL OF STATE GOVERNMENTS RESOLUTION SUPPORTING ELECTRIC POWER GRID MODERNIZATION TO ACHIEVE ENERGY EFFICIENCY AND DEMAND REDUCTION BENEFITS Resolution Summary The resolution offers numerous findings,

More information

Transportation Electrification Public Input Workshop. August 3, 2016

Transportation Electrification Public Input Workshop. August 3, 2016 Transportation Electrification Public Input Workshop August 3, 2016 1 Agenda Welcome and Introductions Company Overview Existing Transportation Electrification Initiatives Accelerating Transportation Electrification

More information

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost. Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity

More information

Competitive Power Procurement

Competitive Power Procurement Competitive Power Procurement Energy Regulatory Partnership Program Abuja, Nigeria September 20-24, 2010 Kirk Megginson Financial Specialist - Regulated Energy Division Michigan Public Service Commission

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con

More information

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

SOLAR POWER SOLUTIONS

SOLAR POWER SOLUTIONS METKA EGN SOLAR POWER SOLUTIONS BUILDING A WORLD OF OPPORTUNITIES IN SOLAR ENERGY RENEWABLE EPC SOLUTIONS CONTENTS ABOUT METKA EGN...04 WHAT WE DO...06 OUR COMPETITIVE ADVANTAGES...08 TOTAL SOLUTIONS...10

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy

Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask Gerald Deaver Manager Regional Transmission Policy Some Xcel Energy Statistics Transmission Business 19,000

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRIOR PRINTER'S NO. PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE,

More information

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014 Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014 The Clean Coalition recommends that state regulators and utilities account for potential

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM REQUEST FOR INTEREST ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM ( Electric Car Discount Program ) SUBMITTAL DUE DATE

More information

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council: Corporate NO: R279 Report COUNCIL DATE: DECEMBER 18, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: December 15, 2006 FROM: General Manager, Engineering FILE: 8710-20 (Heritage) SUBJECT: Update on Community

More information

The Development of Competitive Renewable Energy Zones in Texas

The Development of Competitive Renewable Energy Zones in Texas The Development of Competitive Renewable Energy Zones in Texas Warren Lasher Manager, System Assessment 4/23/2008 North American Electric Grids The ERCOT Region is one of 3 NERC grid interconnections.

More information

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Overcoming Charging Challenges to Maximize Air Quality Benefits The City and County of Denver has set aggressive goals

More information

Purple Line Light Rail P3 Project

Purple Line Light Rail P3 Project Purple Line Light Rail P3 Project TPB Meeting May 18, 2016 1 Topics General Project Overview The P3 Contract Details on The Successful Proposal 2 Recap of Purple Line P3 Events In November 2013 MTA initiated

More information

Energy Northwest launches public power-focused Demand Response Pilot Project

Energy Northwest launches public power-focused Demand Response Pilot Project Energy Northwest launches public power-focused Demand Response Pilot Project Energy Northwest, the Bonneville Power Administration and regional public power partners activated the Northwest s first-of-a-kind

More information

Model Legislation for Autonomous Vehicles (2018)

Model Legislation for Autonomous Vehicles (2018) Model Legislation for Autonomous Vehicles (2018) What is the Self-Driving Coalition for Safer Streets? The Self-Driving Coalition for Safer Streets was formed by Ford, Lyft, Volvo Cars, Uber, and Waymo

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section 7-207.1 and 7-207.2 APPLICABILITY The Public Service Commission of Maryland ( Commission

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST MEGAN O REILLY COALITION FOR CLEAN AFFORDABLE ENERGY EPE IRP STAKEHOLDER

More information

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor

More information

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018 Introduction: Taxis and Accessible Services Division Medallion Reform Background May 1, 2018 SFMTA s Taxis and Accessible Services Division is responsible for the regulation of the private businesses that

More information

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis Terry Blackwell Page 1 of 5 Education 1977 North Carolina State University BS, Electrical Engineering Power Systems emphasis Professional Qualifications 1977 PE-Professional Engineer Business Experience

More information

Guideline on Energy Storage

Guideline on Energy Storage Purpose Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs DEPARTMENT OF ENERGY RESOURCES SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE Guideline

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

Thank you, Chairman Taylor, Chairman Keller, Representative Quinn and members of

Thank you, Chairman Taylor, Chairman Keller, Representative Quinn and members of Testimony of Andrew Daga President and CEO, Momentum Dynamics Corporation Pennsylvania House of Representatives Committee on Transportation November 13, 2017 Thank you, Chairman Taylor, Chairman Keller,

More information

HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE

HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE HONOLULU RAIL TRANSIT PROJECT RENEWABLE ENERGY AND ENERGY EFFICIENCY TECHNOLOGIES

More information

-Mobility Solutions. Electric Taxis

-Mobility Solutions. Electric Taxis -Mobility Solutions Electric Taxis This paper was prepared by: SOLUTIONS project This project was funded by the Seventh Framework Programme (FP7) of the European Commission Solutions project www.uemi.net

More information

Washington State Road Usage Charge Assessment

Washington State Road Usage Charge Assessment Washington State Road Usage Charge Assessment Jeff Doyle Director of Public/Private Partnerships; and State Project Director Road User Charge Assessment August 15, 2013 Tallahassee, Florida Similarities

More information

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

The Preferred Alternative: a Vision for Growth on the Northeast Corridor A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement

More information

State Zero-Emission Vehicle Programs Memorandum of Understanding

State Zero-Emission Vehicle Programs Memorandum of Understanding State Zero-Emission Vehicle Programs Memorandum of Understanding WHEREAS, the Signatory States have adopted regulations requiring increasing sales of zeroemission vehicles (ZEVs), or are considering doing

More information

Submission to the Transport and Public Works Committee s inquiry into the operations of toll roads in Queensland

Submission to the Transport and Public Works Committee s inquiry into the operations of toll roads in Queensland 9 August 2018 Mr Shane King MP Chair Transport and Public Works Committee Parliament House BRISBANE QLD 4000 Via email: tollroads@parliament.qld.gov.au Dear Mr King, RE: Submission to the Transport and

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

AES Corporation A CLEAN Program Brief

AES Corporation A CLEAN Program Brief AES Corporation A CLEAN Program Brief The unleashing of wholesale distributed generation in key market segments Overview The AES Corporation is a Fortune 200 global energy company with operations in 17

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any Draft Version 1 Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation,

More information

Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van

Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van 5/1/2018 First of its kind to operate in a standard commercial on-road environment LATHAM, N.Y.,

More information

Toronto Parking Authority Fleet Vehicle Replacement

Toronto Parking Authority Fleet Vehicle Replacement PA12.5 REPORT FOR ACTION Toronto Parking Authority Fleet Vehicle Replacement - 2018 Date: June 8, 2018 To: Board of Directors, Toronto Parking Authority From: Acting President, Toronto Parking Authority

More information

THE TRES AMIGAS PROJECT

THE TRES AMIGAS PROJECT UNITING THE NATION S ELECTRIC POWER GRID THE TRES AMIGAS PROJECT Project Development, Business Case, and Benefits -ERCOT Presentation Jan 22, 2010 Agenda Project Overview Project Objective Project Description,

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017 Solar Project Development in Regulated Markets Smart and Sustainable Campuses Conference 2017 Session Outline Overview of renewable energy procurement options Market structure and policy impacts on solar

More information

Net Metering in Missouri

Net Metering in Missouri Net Metering in Missouri Make A Good Policy Great (AGAIN) Executive Summary More and more Americans every year are able to produce their own electricity. As the cost of solar continues to plummet, homeowners

More information

Senate Standing Committees on Economics 27 June 2014 PO Box 6100 Parliament House CANBERRA ACT 2600 By

Senate Standing Committees on Economics 27 June 2014 PO Box 6100 Parliament House CANBERRA ACT 2600 By Senate Standing Committees on Economics 27 June 2014 PO Box 6100 Parliament House CANBERRA ACT 2600 By email: economics.sen@aph.gov.au Submission: Inquiry into Fuel Indexation (Road Funding) Bill 2014

More information