1 Request #: 1 Page #: 20 Section: Design The chassis frame rails shall be a minimum high-strength, low-alloy stainless steel (50,000 PSI yield) all chassis cross-members shall be fasted with Grade-8 equivalent high-strength steel fasteners understructure/chassis with stainless steel used in select places. New Flyer requests approval to provide a hybrid carbon steel/ferritic stainless steel structure along with Axalta Tufcote low VOC coating applied to the inside of structural tubing from the roof line down and Axlata Tufcote UC-1006 sacrificial barrier to be applied to the underbody. Please refer to Exhibits #1- Partial Stainless Steel Structure and Exhibit #2 - Corrosion Coating for additional information.

2 Request #: 2 Page #: 26 Section: Design and Construction Luggage rack to be made of 1 ¼ stainless steel tubing and stainless connectors. Rack is to be permanently fixed and located behind the driver, facing the aisle and is to have two (2) shelves covered in commercial grade carpet. Dimensions to be approximately thirty two (32) wide, twenty six (26) dep and seventy (70) high. Plexi glass on each side directly behind the driver and on side facing the first passenger row. Two smaller luggage racks, one located on each side may be an option. New Flyer requests approval to provide the luggage rack aft of the streetside wheelchair position to maximize the wheelchair turning envelope.

3 Request #: 3 Page #: 28 Section: Propulsion Control System (PCS) The drive motor shall be equipped with an electronically controlled management system, compatible with 12-volt power distribution. New Flyer requests approval to provide a propulsion controller compatible with 24V power distribution.

4 Request #: 4 Page #: 29 Section: Propulsion Control System (PCS) A control shall be available to the operator to allow a 30-second override, which, when depressed, will allow the operator to delay the drive system shutdown but not the activation and alarm system. The parallel architecture of the New Flyer high voltage propulsion batteries allows for shutdown of faulted batteries without the need to shutdown the entire high voltage power supply. As such, an automatic shutdown feature and corresponding override switch is not required in the New Flyer battery bus platform. New Flyer requests approval to waive this requirement.

5 Request #: 5 Page #: 30 Section: Battery Management System The BMS system must be capable of monitoring the voltage level of cells within each battery pack. The BMS must be able to read and store individual battery or block voltages at a frequency of 1 data point per block every 15 seconds. The system must also monitor battery pack temperatures using no fewer than 2 thermocouples placed in and around each battery pack sampled at the same 4 samples per minute frequency. The New Flyer BMS controllers used in our propulsion battery system are capable of providing all of the data-points listed at a sufficient sample rate but are not capable of long-term self-storage of said data beyond typical fault code storage requirements. That said, separate logging capability could be supported as all of the data can be broadcast on vehicle J1939 network. New Flyer requests approval for this deviation. Approved, provided proposed bus is equipped with necessary separate logging capability as listed above, and any necessary software.

6 Request #: 6 Page #: 31 Section: Battery Thermal Management The ESS battery packs shall be cooled via a recirculating air system. This air shall be reconditioned and cooled by a small radiator in each pack that uses a vehicle-based water/glycol cooling system. New Flyer requests approval to utilize liquid cooled batteries with a dedicated chiller to maintain the optimal temperature of the ESS battery packs. Liquid cooling is more efficient than air cooling, and utilizing a single chiller reduces the vehicle loads and hence improves range.

7 Request #: 7 Page #: 33 Section: Drive Train Cooling The drive train shall be cooled by a dedicated heat exchanger sized to maintain operating fluid within the drive train manufacturer s recommended parameters of flow, pressure and temperature. The drive train cooling system must be separate from the traction motor cooling system. The drive train cooling system shall be a standalone system designed to circulate oil through a small radiator next to the drive train. New flyer requests approval to cool both the traction motor and the motor inverters utilizing the same chiller. New Flyers design utilizes the same coolant loop to cool both the Motor and Inverters, the control strategy is focused on maintaining both components within the manufacture recommended operating limits. We have successfully operated buses with this configuration under a variety of operation conditions including at high temperatures in California, with no issues regarding staying within the manufacture recommended temperature range.

8 Request #: 8 Page #: 32 Section: Propulsion Cooling The radiator, shall be of durable corrosion-resistant construction with integral tanks, unless the EMP Mini-Hybrid System is installed. Please note that a conventional radiator is not included as part of New Flyer's Electric bus design. New Flyer requests deletion of this requirement.

9 Request #: 9 Page #: 35 Section: Oil and Hydraulic Lines Lines should be stainless steel in all location where stainless steel is compatible with the substance carried. New Flyer requests approval to provide Manuli Equator 2 and GH100 hoses where flexible line are required for connections. The proposed hoses meet or exceed the operating parameter requirements. Manuli hoses are rated for extended temperature range. Please refer to exhibit #5 for more information. Approved, provided that connections have fittings that don t corrode easily. Contractor to provide detailed information on type of fittings used and corrosive qualities.

10 Request #: 10 Page #: 40 Section: Steering Axle The front axle shall be of an independent suspension design, non-driving with a load rating sufficient for the bus loaded to GVWR and shall be equipped with grease type front wheel bearings and seals. New Flyer requests approval to provide the M.A.N. VOK-07F front axle. The front axle is a cast iron, dropped beam with hollow section; steered, non-driven type axle. The maximum axle load is 15,873 on the front axle. Please refer to attached Exhibit #4 - Front Axle and Suspension for additional information.

11 Request #: 11 Page #: 45 Section: Air Lines and Fittings Nylon tubing shall be in-stalled in accordance with the following color-coding standards: - Green: Indicates primary brakes and supply - Red: Indicates secondary brakes - Brown: Indicates parking brake - Yellow: Indicates compressor governor signal - Black: Indicates doors, hill hold, and accessories New Flyer requests approval to add a blue tubing to indicate suspension. New Flyer identifies suspension air lines separately to aid in service troubleshooting and preventative maintenance activities.

12 Request #: 12 Page #: 46 Section: Jump Start A jump-start connector, red for 24V and blue for 12V, shall be provided in the engine compartment, equipped with dust cap and adequately protected from moisture, dirt and debris. New Flyer requests approval to remove this requirement as an engine jump start is not applicable to an electric bus.

13 Request #: 13 Page #: 47 Section: Master Battery Switch Turning the master switch OFF, with the power plant operating, shall not damage any component of the electrical system. The master switch shall be capable of carrying and interrupting the total circuit load. New flyer would like to clarify that while steps are taken to minimize the impact of shutting off the vehicle using the master battery switch, it is impossible to guarantee that there would be no impact to vehicle if this were to be done on a regular basis. Proper procedure in normal operation is to apply an orderly shutdown through the standard ignition switches (i.e. the master run switch on the side console panel or equivalent). The master battery disconnect switch is meant for emergency and maintenance applications and should only be used in such instances.

14 Request #: 14 Page #: 52 Section: Data Communications General All faults shall be recorded, time stamped, odometer stamped and assigned a priority level based on the severity of the fault. A diagnostic tool shall also serve as a troubleshooting guide to aid in quick resolution of individual faults. New Flyer would like to clarify that not all of our key vehicle subsystems are capable of providing time stamps on fault code data, and none are currently capable of providing an odometer stamp. That said, separate logging capability could be supported as all of the data can be broadcast on vehicle J1939 network and remotely transmitted through the New Flyer connect system. New Flyer requests approval. Approved, provided proposed bus is equipped with necessary separate logging capability as listed above, and any necessary software.

15 Request #: 15 Page #: 54 Section: General Switches and controls shall be divided into basic groups and assigned to specific areas, in conformance with SAE Recommended Practice J680, Revised 1988, Location and Opera-tion of Instruments and Controls in Motor Truck Cabs, and be essentially within the hand reach envelope described in SAE Recommended Practice J287, Driver Hand Control Reach. New Flyer wishes to clarify that while we will definitely do everything possible to comply to the general intent and spirit of SAE J680, this standard was specifically written for transportation trucks that incorporate a left street-side driver door and a right curb-side control console, so there are limitations in our ability to fully comply with all recommended zone locations and orientations. NF response is acceptable.

16 Request #: 16 Page #: 58 Alarms Section: Transit Bus Instruments and Engine Shutdown Override Switch. The parallel architecture of the New Flyer high voltage propulsion batteries allows for shutdown of faulted batteries without the need to shutdown the entire high voltage power supply. As such, an automatic shutdown feature and corresponding override switch is not required in the New Flyer battery bus platform. New Flyer requests approval to waive this requirement. Waiver approved.

17 Request #: 17 Page #: 64 Section: Seat Structure and Materials Seats shall be Freedman Mid-Hi. New Flyer requests approval to use American Seating model 6466 seats per VTA's latest bus build with New Flyer.

18 Request #: 18 Page #: 67 Requirements Section: Capacity and Performance The air conditioning system shall meet these performance requirements using R134a. New Flyer requests approval to provide a Thermo King Intelligaire 3 air conditioning and heating system utilizing R-407C refrigerant. R-407C systems are more compact, have reduced power consumption and overall better efficiency with respect to batteries and range as compared to systems utilizing R-134.

19 Request #: 19 Page #: 67 Section: Mirrors Interior mirror shall be 6 x 30 with protected edges. There shall be a 10 convex mirror mounted inside to the upper right side of the rear en-trance door to enable the driver to see inside the step well from the driver seat through the above interior mirror. New Flyer requests approval to provide an 8"X15" driver's rear view mirror, a 6" spot mirror at the upper curbside corner of the windshield and a 12" convex mirror at the exit door. The proposed design of the mirrors are a standard feature in our Xcelsior fleet and has been proven in service.

20 Request #: 20 Page #: 68 Section: Electric Cabin Heater Bus will be equipped with an electric cabin heater capable of heating the interior cabin to 60 degrees Fahrenheit when outside temperatures are -20 degrees Fahrenheit. Operating the electric heater should not have a negative impact on specified range. Cabin temperature should be controllable by the driver. New Flyer would like to clarify that electric cabin heater will inherently have a negative impact on the range due to energy consumption. New Flyer requests clarification on the intent of this specification language. Please note the range requirements and calculations in section TS 23.4 are requested based on "Overall Average Consumption fuel efficiency recorded at Altoona". All test results at Altoona do not account for electric cabin heater energy losses. Ignore the language operating the electric heater should not have a negative impact on specified range.

21 Request #: 21 Page #: 64 Section: WINDOWS General Quarter top tilt in windows shall be provided throughout the entire bus except at the side destination sign mounting location. New Flyer requests approval to provide tip-in, bottom fixed windows manufactured by Arow Global.

22 Request #: 22 Page #: 64 Section: WINDOWS The main side windows shall be a minimum of 48 wide to offer maximum exterior view. New Flyer requests approval to provide windows with a 45.34" width aft of the entrance door on the curbside and for the first window aft of the driver's window on the streetside. This is inherent to the geometry of the Xcelsior model bus.

23 Request #: 23 Page #: 69 Section: Materials Window glazing shall be 5mm tempered safety glass. Windows shall meet the require-ments of ANSI Z Test Grouping 2 and the Recommended Practices defined in SAE J673. Windows shall be tinted 50% gray. Window glazing shall have 50% light transmittance as measured by ASTM D-1003 and 45% solar transmittance as measured by ASTM E-424. New Flyer requests approval to provide 6mm Laminated safety glass gray tint with 44% light transmittance as per VTA's most recent bus build with New Flyer.

24 Request #: 24 Page #: 70 Section: Capacity and Performance System capacity testing, including pull-down/warm-up, stabilization and profile, shall be conducted in accordance to the APTA s Recommended Instrumentation and Performance Testing for Transit Bus Air Conditioning System. The recommended locations of temperature probes are only guidelines and may require slight modifications to address actual bus design. Care must be taken to avoid placement of sensing devices in the immediate path of an air duct outlet. In general, the locations are intended to accurately represent the interior passenger area. New Flyer requests approval to provide test result showing compliance to the pull-down/warm-up requirements in lieu of performing the tests on VTA bus.

25 Request #: 25 Page #: 76 Section: Bumpers Manufacturer s standard bumper on front, painted black. New Flyer requests approval to provide bumpers that are color-impregnated black, not painted. Approved, spec calls for help bumpers on front and back. Page 75

26 Request #: 26 Page #: 77 Section: Bike Rack One option bid should be for bicycle rack installed to the front bumper that accommodates three (3) bikes. Preferred brand is SPORTWORKS APEX 3, with a pair of heavy duty springs to help raise and lower rack, with instrument panel indicator light to warn vehicle operators that the bike rack is in the lowered position. New Flyer requests approval to provide the bike rack, if selected, shipped loose due to Massachusetts law. Approved, cost to be included in proposed bus.

27 Request #: 27 Page #: 93 Section: Actuators Door actuators shall be Ventura Systems, or approved equal. Doors shall open or close completely in not more than 3.5 seconds from the time of control actuation and shall be subject to the closing force requirements. New Flyer requests approval to provide electric door actuators manufacturer by Vapor bus.

28 Request #: 28 Page #: 94 Section: Door Controller Doors shall be operated by push-button controls, conveniently located and operable within the driver s reach. The push buttons shall be labeled. There shall be a separate set of push button controls for the front and rear door(s), as needed. New Flyer requests approval to provide a 5 position Vapor door controller. Please see approval drawing Exhibit #3 - Door Controller for the control functions that we provide for the doors.

29 Request #: 29 Page #: 95 Section: Two-Way Power Flow Buses should be equipped for two-way power flow. Vehicles should be capable of exporting power to an AC load, vehicle to grid, or vehicle to vehicle. Power flow should be 3-phase, AC 480 volt and with less than 5% harmonic distortion. Equipment should be UL certified. Contractor should provide example and contact information for transit property that has exported power from vehicle. New Flyer seeks approval to waive this requirement. Our current charging inverter configuration does have the functional capability of passing controlled power to the grid from the vehicle. At present time there is still much uncertainty surrounding standardization and mass adoption of V2G. The current standards for utility and off board electrical equipment can vary significantly in different regions of the country, and right now there is a lot of debate about how the vehicle side should be certified. For now, there is no clear agreement or resolution as of yet, so final development work is still far from full completion. Denied.

30 Request #: 30 Page #: 95 Section: Wheelchair Accommodations Stanchion and grab bars installed shall be of stainless steel, a minimum of 1-1/4 in diame-ter. A modesty panel and plexi-glass panel will be installed behind the driver s seat. Hand-rails will be installed on both sides of the passenger entrance. New Flyer requests approval to provide a communications box, Secure Diagnostic Station (SDS) box, located on the wheelhouse where the forward wall of the box acts as the upper portion of the barrier and the wheelhouse as the lower portion separating the operator from the street-side front passenger seat there by precluding the need for a separate barrier. The SDS box is made of fiberglass and painted black to minimize the glare and reflections that may impact the driver s sightline(s). Please refer to the Exhibit #6 for more information.

31 Request #: 31 Page #: 96 Section: Destination Signs The front should be sized 69 by 11 by 4 ; side should be 47 by 8 by 4 and rear should be 14 by 13. Interior panel behind the destina-tion sign should be attached using latches (not screws). New Flyer requests approval to provide a front destination sign from Luminator measuring 65" x 10" x 1.5" Approved, as long as all signs are LED, full color.

32 Request #: 32 Page #: 97 Section: Charging Infrastructure The battery charger shall be configured to automatically restart after unintended interruption of a charging episode due to interruption or temporary degradation of electrical service. The battery chargers shall be configured to interface with on-board battery management and interlock systems. For safety considerations, New Flyer strongly recommends against implementing an automatic restart of the charger after interruption to minimize the risk of harm to maintenance personnel and electrical equipment. This would also be in conflict with many of the already existing charging standards and protocols that are already available within the industry. New Flyer requests the deletion of this requirement. Clarification. The VTA holds safety as primary importance and default to the vehicle manufacturers regarding safety for workers and vehicle systems. That said, several of the Authorities facilities are often unoccupied during nighttime charging hours. Our desire for EVSE to reconnect during voltage sags or loss in electrical power is so that buses are charged and ready for deployment in the morning. If the manufacturer does not recommend automatically re-connecting with the charging system, please specify the procedures or recommendations for ensuring that buses are fully charged and ready for scheduled service, regardless of power interruptions (either of short duration or longer), voltage sag, or other common electrical system disturbance.

33 Request #: 33 Page #: 97 Section: Charging Infrastructure Conductive cabling connecting depot and convenience chargers to the bus shall be of fifteen-foot (max) length and shall connect to a receptacle at the front of the bus, curb side. The connectors shall be industry standard and of simple design and heavy-duty construction and shall not be energized except when mated with the bus mounted receptacle. A single bus mounted receptacle shall serve both the depot charging station. The bus mounted receptacle shall be of simple and ergonomic design, of not more than 25 pounds (plug and cord), not more than two plugs, and heavy-duty construction, and shall not be ener-gized except when mated with the charger connectors. New Flyer requests approval to provide our base design offering which involves locating the charge receptacle at the rear curbside of vehicle. Denied, VTA is requiring two charging receptacles. One curb side front and one curb side rear. We will be issuing an addendum to reflect this change.

34 Request #: 34 Page #: 105 Section: Training The Contractor shall provide an optional cost for a comprehensive hands-on training pro-gram for the operations and maintenance staff. The program shall be included in the pro-curement at the discretion of the Authorities. The training offered by the Contractor and Original Equipment Manufacturers (OEM) shall be for major components provided on the buses. The Training Program schedule will be discussed with Contractor after contract award to establish a training schedule that is properly coordinated with the delivery and acceptance of the buses. New Flyer requests that the training be priced separately from the bus price. This will ensure proper costing regardless of the number of buses in the base order, and each subsequent delivery. New Flyer also requests approval to provide a training proposal showing pricing for individual courses along with the length of each training course. This will allow VTA the opportunity to allocate the total number of training hours to the specific courses they want along with the required quantities based on their training requirements.

REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ)

REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ) REQUEST FOR TRANSIT VEHICLE PRICE QUOTE (RFQ) This is (check one): Initial Request for Quote (from Requesting Agency to Vendors) Due Date: January 12, 2019 Response to RFQ (from Responding Vendor back

More information

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric North America, and is the only bus manufacturer to offer all three types of zero

More information

Questions and Answers

Questions and Answers ADDENDUM # 1 IFB NO.V-1711 Paratransit Cutaway Bus May 24, 2017 Dear Prospective Bidders: The purpose of this addendum is to answer questions for and make revisions in the above referenced Invitation for

More information

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in North America, and is the only bus manufacturer to offer

More information

All vendors are to accept the information contained herein as the official response of IPTC.

All vendors are to accept the information contained herein as the official response of IPTC. Page 1 of 5 February 26, 2018 To: All Vendors of Record Re: Addendum # 4 All vendors are to accept the information contained herein as the official response of IPTC. TO ALL BIDDERS OF RECORD AND TO WHOM

More information

GALLATIN PUBLIC UTILITIES

GALLATIN PUBLIC UTILITIES GALLATIN PUBLIC UTILITIES Bid Proposal Item: Single Axle Dump Truck Bid Date: Company Address: Phone Number: Manufacturer: Bid Information (1) Prices F.O.B., 249 Hancock Street, Gallatin, Tennessee 37066.

More information

ADDENDUM 3 - APPENDIX A - TECHNICAL SPECIFICATIONS ONE (1) 3 TON 4X2 CARGO REEL CAB/CHASSIS

ADDENDUM 3 - APPENDIX A - TECHNICAL SPECIFICATIONS ONE (1) 3 TON 4X2 CARGO REEL CAB/CHASSIS 1. SCOPE It is the intent of the JEA to purchase ONE (1) 3T 4X2 CARGO REEL REGULAR CAB/CHASSIS (Chassis Only). Truck Chassis must be tested and delivered to JEA Fleet Facility (5717 New Kings Road Jacksonville,

More information

VEHICLE SPECIFICATIONS 12 PASSENGER OFF CENTER AISLE VAN REV 02/19

VEHICLE SPECIFICATIONS 12 PASSENGER OFF CENTER AISLE VAN REV 02/19 NOTE: Accepting options to purchase 12 Passenger Off Center Aisle Vehicle with seating arrangements for 12 Ambulatory Passengers. DESCRIPTION: These specifications describe a new 12 Passenger Off Center

More information

Advancing Electric Solutions

Advancing Electric Solutions Advancing Electric Solutions Choose your level of electrification: from electric accessories to zero-emission propulsion www.hybridrive.com Transportation trends toward electric The trend toward more electric

More information

Incomplete Vehicle Document 2014 Model Year NOTE:

Incomplete Vehicle Document 2014 Model Year NOTE: NOTE: YOU CAN PRODUCE YOUR OWN LEGITIMATE INCOMPLETE VEHICLE DOCUMENT BY PRINTING THIS DOCUMENT AND THEN TAKING A PHOTO OF THE CERT. LABEL ON THE DRIVERS DOOR OPENING. 55351115AZ CHRYSLER GROUP LLC 800

More information

STATE OF MINNESOTA EQUIPMENT SPECIFICATION. SPECIFICATION: September 2012 Page 1 SINGLE AXLE CAB & CHASSIS

STATE OF MINNESOTA EQUIPMENT SPECIFICATION. SPECIFICATION: September 2012 Page 1 SINGLE AXLE CAB & CHASSIS STATE OF MINNESOTA EQUIPMENT SPECIFICATION SPECIFICATION: 330-912 September 2012 Page 1 1.0 SCOPE SINGLE AXLE CAB & CHASSIS This unit shall be a currently advertised production model as modified per specifications

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status:

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status: 0 1. Scope The following prescription apply to safety requirements with respect to the electric power train of road vehicles of categories M and N, with a maximum design speed exceeding 25 km/h and vehicles

More information

APPENDIX A TECHNICAL SPECIFICATIONS Purchase of all New 2018 Model Year, Two (2) Vacuum Jet Trucks UPDATED November 20, 2017

APPENDIX A TECHNICAL SPECIFICATIONS Purchase of all New 2018 Model Year, Two (2) Vacuum Jet Trucks UPDATED November 20, 2017 1. SCOPE The purpose of this Invitation to Negotiate (the "ITN") is to solicit pricing and select a vendor for the purchase of two (2) vacuum jet trucks, all new 2018 model year. All new 2018 model year,

More information

ADDENDUM NO.1 IFB NO.V-1821 CUTAWAY BUS. July 3, 2018

ADDENDUM NO.1 IFB NO.V-1821 CUTAWAY BUS. July 3, 2018 ADDENDUM NO.1 IFB NO.V-1821 CUTAWAY BUS July 3, 2018 Dear Prospective Bidders: The purpose of this addendum is to answer questions for and revise the above referenced Invitation for Bids (IFB). The following

More information

Issue 23 draft for Nuvve

Issue 23 draft for Nuvve Issue 23 draft for Nuvve Contents Introduction... 1 Issue Framing:... 2 Key Questions / Considerations... 2 Key Questions... 2 Key Considerations for IOUs:... 3 Background Knowledge... 4 Additional Details:...

More information

VEHICLE SPECIFICATIONS Mid-Sized 4 X 4 Sport Utility Vehicle REV 05/16

VEHICLE SPECIFICATIONS Mid-Sized 4 X 4 Sport Utility Vehicle REV 05/16 NOTE: Accepting options to purchase Mid-Size 4 X 4 Sport Utility Vehicle (SUV) with seating arrangements for 7 Ambulatory Passengers. DESCRIPTION: These specifications describe a new Mid-Sized 4 X 4 Sport

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

:43 1/13 Victron & BYD B-Box

:43 1/13 Victron & BYD B-Box 2018-11-04 15:43 1/13 Victron & BYD B-Box Victron & BYD B-Box The combination of Victron products with BYD B-Box lithium batteries (2.5, 5.0, 7.5, 10.0 and 12.8 models) has been tested and certified by

More information

ADDENDUM NO. ONE (1) ACQUIRE SNOW REMOVAL EQUIPMENT NORFOLK INTERNATIONAL AIRPORT, VIRGINIA. May 18, 2016

ADDENDUM NO. ONE (1) ACQUIRE SNOW REMOVAL EQUIPMENT NORFOLK INTERNATIONAL AIRPORT, VIRGINIA. May 18, 2016 From: The Norfolk Airport Authority ADDENDUM NO. ONE (1) NORFOLK INTERNATIONAL AIRPORT, VIRGINIA May 18, 2016 To: All Bidders of Record This Addendum is hereby made a part of the contract documents and

More information

QUOTE For a 2017 Fire Department Conventional Truck Chassis-Water Tender With PTO Pump

QUOTE For a 2017 Fire Department Conventional Truck Chassis-Water Tender With PTO Pump Town of Wascott PO Box 159,Wascott, WI 54890 Phone: 715/466-4252 Email: wascott@centurytel.net QUOTE For a 2017 Fire Department Conventional Truck Chassis-Water Tender With PTO Pump Note: Bidders must

More information

This list applies to buses (other than motor coaches), minibuses and any trailer towed by a bus, minibus or motor coach.

This list applies to buses (other than motor coaches), minibuses and any trailer towed by a bus, minibus or motor coach. List 2 Bus This list applies to buses (other than motor coaches), minibuses and any trailer towed by a bus, minibus or motor coach. 1. Coupling devices The defects provided for in points 1.C and 1.F apply

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES TSEWG TP-11: UFC 3-500-10N BEST PRACTICES UFC 3-500-10N was developed by NAVFAC and was used as the starting point for the tri-services development of UFC 3-500-10, Design: Electrical Engineering. UFC

More information

Town of South Windsor, Connecticut. Police Department

Town of South Windsor, Connecticut. Police Department Town of South Windsor, Connecticut Police Department May 2018 Bid Documents for Automobile Lease Unmarked Police Vehicles Up to Nine (9) - Four (4) Door, Mid-Size, All Wheel Drive SUV type vehicles TOWN

More information

145 HP, FRONT WHEEL ASSIST TRACTOR 3/17/15 Page 1. Mountrail County Road and Bridge SPECIFICATIONS FOR

145 HP, FRONT WHEEL ASSIST TRACTOR 3/17/15 Page 1. Mountrail County Road and Bridge SPECIFICATIONS FOR Page 1 Mountrail County Road and Bridge S FOR Bidder's Instructions: Indicate compliance to the specifications on the YES/NO line by each specification. Indicate any deviations from the specifications

More information

APPENDIX A TECHNCIAL SPECIFICATIONS

APPENDIX A TECHNCIAL SPECIFICATIONS 1. SCOPE The purpose of this Invitation to Negotiate (the "ITN") is to solicit pricing and select a vendor for the purchase of four (4) five ton 6X4, 14 to 16 cubic yard dump trucks, all new current model

More information

SPECIFICATIONS MEDIUM DUTY TRANSIT BUS WITH ADA ACCESSIBILITY OPTIONS

SPECIFICATIONS MEDIUM DUTY TRANSIT BUS WITH ADA ACCESSIBILITY OPTIONS Page 1 SPECIFICATIONS MEDIUM DUTY TRANSIT BUS WITH ADA ACCESSIBILITY OPTIONS *** Note: All specifications will be considered minimum unless stated otherwise.*** PURPOSE This item shall be a vehicle suitable

More information

Electric buses Solutions portfolio

Electric buses Solutions portfolio Electric buses Solutions portfolio new.abb.com/ev-charging new.abb.com/grid/technology/tosa Copyright 2017 ABB. All rights reserved. Specifications subject to change without notice. 9AKK107045A5045 / Rev.

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS GENERAL PURPOSE: The purpose of these specifications is to describe for purchase, a 2018 or newer 10-14 passenger airport shuttle bus with rear mounted handicap lift. This bus

More information

SCHEDULE E: TRAINING AIDS

SCHEDULE E: TRAINING AIDS 1.0 CONTRACT FOR X# Buses, BASE ONLY Total Price No. Qty. Description of Item Unit Price U.S. Dollars 1 X# "Type X" Buses, Base Buy (From Schedule A, column H line 161) 2 X# Optional X# year/x# mile PPA

More information

APPENDIX A TECHNICAL SPECIFICATIONS Purchase of all New 2018 Model Year, Nineteen (19) Half Ton Standard Cab 4x2 Pickup Trucks

APPENDIX A TECHNICAL SPECIFICATIONS Purchase of all New 2018 Model Year, Nineteen (19) Half Ton Standard Cab 4x2 Pickup Trucks 1. SCOPE The purpose of this Invitation to Negotiate (the "ITN") is to solicit pricing and select a vendor for the purchase of nineteen (19) half ton standard cab 4x2 pickup trucks, all new 2018 model

More information

1. SCOPE 2. MODEL: 3.1 Base Curb Weight: not to exceed 7800 lbs. PAGE 1 OF 6

1. SCOPE 2. MODEL: 3.1 Base Curb Weight: not to exceed 7800 lbs. PAGE 1 OF 6 1. SCOPE It is the intent of the JEA to purchase FOUR (4) 3/4 Ton LWB Pickup / Utility Trucks with various up-fits and options (two (2) Fleet Side Pickup Bodies and two (2) Utility Bodies). All units must

More information

IVTM Installation Manual

IVTM Installation Manual Integrated Vehicle Tire Pressure Monitoring IVTM Installation Manual 2nd edition Copyright WABCO 2006 Vehicle Control Systems An American Standard Company The right of amendment is reserved Version 002/06.06(us)

More information

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition) Pt. 665 PART 665 BUS TESTING Subpart A General Sec. 665.1 Purpose. 665.3 Scope. 665.5 Definitions. 665.7 Grantee certification of compliance. Subpart B Bus Testing Procedures 665.11 Testing requirements.

More information

BID FOR A ONE (1) ONE-TON AND A HALF (5500 SERIES) CREWCAB TRUCK WITH DUMP BED. BID OPENING February 15, 2017 AT 10:00 A.M.

BID FOR A ONE (1) ONE-TON AND A HALF (5500 SERIES) CREWCAB TRUCK WITH DUMP BED. BID OPENING February 15, 2017 AT 10:00 A.M. P. O. B o x 1 5 4 0 T h o m a s v i l l e, G A 3 1 7 9 9 2 2 9-2 2 7-7 0 0 0 F A X 2 2 9-2 2 7-3 2 4 3 w w w. t h o m a s v i l l e. o r g BID FOR A ONE (1) ONE-TON AND A HALF (5500 SERIES) CREWCAB TRUCK

More information

REVISIONS. App Thom. App Sud. App PC DD 2014/11/25

REVISIONS. App Thom. App Sud. App PC DD 2014/11/25 1/11 REVISIONS Rev Description Rev n by Sud PC Thom VB LH Clyd r Act Issue Date YYYY/MM/DD 0 Initial Document Release RR 2012/03/06 1 2 Revision of various details See list at end Added Specification identification

More information

Program IV: ProStar TM. Performance A/C International. Series. Study Guide Performance A/C Program IV: International ProStar Series TMT

Program IV: ProStar TM. Performance A/C International. Series. Study Guide Performance A/C Program IV: International ProStar Series TMT Performance A/C International A N AV I S TA R C O M PA N Y Program IV: ProStar TM Study Guide TMT-160701 Series Study Guide Performance A/C Program IV: International ProStar Series TMT-160701 2007 International

More information

PART A TENDER SUBMISSION

PART A TENDER SUBMISSION PART A TENDER SUBMISSION Page 1 of 24 FORM A: TENDER (SEE B7) 1. Project Title SUPPLY AND DELIVERY OF REGULAR CAB CHASSIS TRUCKS 2. Bidder Name of Bidder Street City Province Postal Code (Mailing address

More information

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 Overview The following requirements outline the guidelines for designers and project delivery teams in the planning, design and infrastructure requirements

More information

Everything You Need! Phone , Ext. 229

Everything You Need! Phone , Ext. 229 Public Works Operations Manager 401 E Third St Kewanee, IL 61443 Everything You Need! Phone 309-852-2611, Ext. 229 Fax 309-856-6001 November 13, 2017 The City of Kewanee is requesting proposals in conformance

More information

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION 2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION L o s A n g e l e s S e p t e m b e r 1 0 th & 11 th 1 General Considerations of Staff Proposal Achieve zero emission

More information

PACER II. Parking Shuttle. Assisted Living. Shown with optional graphics, lighting and ADA packages. Church

PACER II. Parking Shuttle. Assisted Living. Shown with optional graphics, lighting and ADA packages. Church PACER II Parking Shuttle Assisted Living Shown with optional graphics, lighting and ADA packages. Church Up to 14 passenger Flexible ADA packages Excellent turning radius & maneuverability Fully welded

More information

MONTVILLE PUBLIC SCHOOLS MONTVILLE CONNECTICUT FEBRUARY 20, 2015 BID # BUS

MONTVILLE PUBLIC SCHOOLS MONTVILLE CONNECTICUT FEBRUARY 20, 2015 BID # BUS MONTVILLE PUBLIC SCHOOLS MONTVILLE CONNECTICUT INVITATION TO BID FOR PURCHASE OF SCHOOL BUSES 71, 77 AND 47 PASSENGER SCHOOL BUSES FEBRUARY 20, 2015 BID #14-15-1-BUS LEGAL NOTICE MONTVILLE PUBLIC SCHOOLS

More information

ALLEGAN COUNTY ROAD COMMISSION PROPOSAL FOR WESTERN STAR TANDEM REAR AXLE DUMP TRUCKS (CAB & CHASSIS) MINIMUM 64000# GVWR

ALLEGAN COUNTY ROAD COMMISSION PROPOSAL FOR WESTERN STAR TANDEM REAR AXLE DUMP TRUCKS (CAB & CHASSIS) MINIMUM 64000# GVWR ALLEGAN COUNTY ROAD COMMISSION PROPOSAL FOR WESTERN STAR TANDEM REAR AXLE DUMP TRUCKS (CAB & CHASSIS) MINIMUM 64000# GVWR Board of County Road Commissioners of the County of Allegan 1308 Lincoln Road Allegan,

More information

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification Hydrogen Station Equipment Performance Device (HyStEP Device) Specification Overview Policies and technology solutions need to be developed and implemented to help reduce the time from when a new hydrogen

More information

Barrow County Board of Education 179 W. Athens Street Winder, Georgia 30680

Barrow County Board of Education 179 W. Athens Street Winder, Georgia 30680 Barrow County Board of Education 179 W. Athens Street Winder, Georgia 30680 Judy Roberts Telephone: 770-867-4527 x100214 Business Services Fax: 770-867-4540 E-Mail: jroberts@barrow.k12.ga.us Barrow County

More information

Metrocity Specification

Metrocity Specification Metrocity Specification Body length options MC 10130 MC 10820 MC 11520 Overall length (mm) 10130 10820 11520 Overall width (mm) 2470 Overall height (mm) 2850 Wheelbase (mm) 5130 5820 6520 Front overhang

More information

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet Worcester Public Schools 2020-2022 Student Transportation Contract Proposed Bid Specification Change Summary Sheet 1 for a five-year period beginning the First Day of Summer School 2015 and ending on the

More information

APPENDIX A GROUP 2 SPECIFICATION, JEA CLASS 116: HALF TON 4X2 SWB (6 6 Bed) PICKUP TRUCK Standard Cab Units UPDATED JUNE 12, 2018

APPENDIX A GROUP 2 SPECIFICATION, JEA CLASS 116: HALF TON 4X2 SWB (6 6 Bed) PICKUP TRUCK Standard Cab Units UPDATED JUNE 12, 2018 1. SCOPE It is the intent of the JEA to purchase FIFTEEN (15) HALF-TON 4X2 Standard Cab SWB (6 6 Bed / ALL UNITS) Pickup Trucks with Various Configurations, Up-Fits and Options. [15 Standard Cab]. All

More information

OPERATION & MAINTENANCE

OPERATION & MAINTENANCE OPERATION & MAINTENANCE VaxiCool Mobile Refrigerator/Freezer An Advanced Technology Vaccine Storage & Transport System Model VXC-2 2900 Dryden Road Dayton, Ohio 45439 U.S.A. Telephone: (937) 312-0114 Fax:

More information

Air Handling Unit Construction Checklist

Air Handling Unit Construction Checklist Air Handling Unit Construction Checklist Project: Date: AHU Tag: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

BID FOR ONE (1) 1 TON CREW CAB TRUCK WITH SERVICE BODY OPENING APRIL 11, 2019 AT 10:00 A.M.

BID FOR ONE (1) 1 TON CREW CAB TRUCK WITH SERVICE BODY OPENING APRIL 11, 2019 AT 10:00 A.M. P. O. B o x 1 5 4 0 T h o m a s v i l l e, G A 3 1 7 9 9 2 2 9-2 2 7-7 0 0 0 F A X 2 2 9-2 2 7-3 2 4 3 w w w. t h o m a s v i l l e. o r g BID FOR ONE (1) 1 TON CREW CAB TRUCK WITH SERVICE BODY OPENING

More information

1. Additional Information. Yes Yes Yes. Yes Yes Yes. Yes Yes Yes

1. Additional Information. Yes Yes Yes. Yes Yes Yes. Yes Yes Yes Bus Unit Price Type A2 Over 6350kg GVW Chassis. All units and components must meet Federal and Provincial regulations and $63,445.00 $65,317.00 $62,785.00 requirements and current D250 Type A2 Under 6350kg

More information

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 INVITATION FOR BIDS (IFB) #17-5036-33 BI-FUEL SHUTTLE BUSES FOR PARATRANSIT SERVICES Issue Date:

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

City of Storm Lake Fire Department Heavy Rescue Specifications

City of Storm Lake Fire Department Heavy Rescue Specifications INTENT OF SPECIFICATIONS City of Storm Lake Fire Department Heavy Rescue Specifications It shall be the intent of these specifications to provide a complete apparatus equipped as hereinafter specified.

More information

PURCHASING MEMORANDUM

PURCHASING MEMORANDUM 21513p12.doc/T05san New York State Office of General Services http://www.ogs.ny.gov AWARD NUMBER: 21513 DATE: January 4, 2012 REVISED April 6, 2009 January 14, 2012 sandra.nolan@ogs.ny.gov Arcola Sales

More information

(electronic Access & Security Keyless-entry)

(electronic Access & Security Keyless-entry) e-ask Systems (electronic Access & Security Keyless-entry) Entrance doors, compartment doors or baggage doors, RF transmitter FOB, keypad or both...now you can have it all. Keyless convenience and security

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

City of Jeffersontown PROJECT SCOPE & DESCRIPTION

City of Jeffersontown PROJECT SCOPE & DESCRIPTION City of Jeffersontown PROJECT SCOPE & DESCRIPTION Project is to purchase a 2018 StarTrans Senator II with a 2018 Ford E350 DRW. Twelve (12) passengers with 2 w/c positions and Driver. Proposal Procedures

More information

NELSON COUNTY FISCAL COURT

NELSON COUNTY FISCAL COURT NELSON COUNTY FISCAL COURT Specifications/Bid Forms FOR 25 CUBIC YARD REAR PACKER,REAR EJECTION, GARBAGE TRUCK DATE: 08/2017 ADVERTISEMENT FOR BIDS The Nelson County Fiscal Court will accept sealed bids

More information

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types: SECTION 262913 600 VOLT ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification

More information

Appendix A Group 3 SPECIFICATION, JEA CLASS 133: Truck / 3T CARGO REEL FLAT BED

Appendix A Group 3 SPECIFICATION, JEA CLASS 133: Truck / 3T CARGO REEL FLAT BED 1. SCOPE It is the intent of the JEA to purchase THREE (3) 3T 4X2 CARGO REEL FLATBED UNITS. All units must be tested and delivered to JEA Fleet Facility (5717 New Kings Road Jacksonville, Florida 32209)

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Requesting authorization for the SFMTA, through the Director of Transportation,

More information

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications PART 1 GENERAL 1.1 SUMMARY A. The Defender Mini CLI specification describes a single phase, online, solid state Lighting

More information

JAPANESE COMMENTS ON US PROPOSAL OF INF.DOC.NO.6( 45 TH GRRF)

JAPANESE COMMENTS ON US PROPOSAL OF INF.DOC.NO.6( 45 TH GRRF) 1 Informal document No. 11 (48 th GRRF,11-13,Sept.2000 Agenda item 1.5) Informal document No. (46 th GRRF,13-15,Sept.1999 Agenda item 1.2) JAPANESE COMMENTS ON US PROPOSAL OF INF.DOC.NO.6( 45 TH GRRF)

More information

GTWY515, GTWY516* Fast Idle, Shift Interlock, I/O Ford Transit Introduction

GTWY515, GTWY516* Fast Idle, Shift Interlock, I/O Ford Transit Introduction An ISO 9001:2015 Registered Company GTWY515, GTWY516* Fast Idle, Shift Interlock, I/O 2015-2019 Ford Transit Introduction The Gateway 515 and 516 are wheelchair lift safety interlocks which allows lift

More information

SX-6. Soil Stabilizer/Reclaimer. SX-6e/ex

SX-6. Soil Stabilizer/Reclaimer. SX-6e/ex Soil Stabilizer/reclaimer SX-6e/ex Soil Stabilizer/Reclaimer SX-6 ENGINE SX-6e: Tier 4i; Cummins QSX15 620 hp (447 kw) Diesel @ 1,850 rpm SX-6ex: Tier 3; Cummins QSX-15 620 hp (447 kw) @ 1,850 rpm* * ex

More information

SUBSTATION EQUIPMENT - Page 1 of 8

SUBSTATION EQUIPMENT - Page 1 of 8 BATTERY BANKS 1. GENERAL: JEA utilizes a 125 volt DC system for the control and operation of its transmission and distribution substations. JEA has standardized on lead acid type battery banks to supply

More information

CITY OF MINNEAPOLIS GREEN FLEET POLICY

CITY OF MINNEAPOLIS GREEN FLEET POLICY CITY OF MINNEAPOLIS GREEN FLEET POLICY TABLE OF CONTENTS I. Introduction Purpose & Objectives Oversight: The Green Fleet Team II. Establishing a Baseline for Inventory III. Implementation Strategies Optimize

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM Page 1 of 19 Table of Contents 1.0 SCOPE...4 2.0 PURPOSE...4 3.0 LIMITATIONS...5 4.0 GENERAL INTERCONNECTION

More information

TECHNICAL WHITE PAPER

TECHNICAL WHITE PAPER TECHNICAL WHITE PAPER Chargers Integral to PHEV Success 1. ABSTRACT... 2 2. PLUG-IN HYBRIDS DEFINED... 2 3. PLUG-IN HYBRIDS GAIN MOMENTUM... 2 4. EARLY DELTA-Q SUPPORT FOR PHEV DEVELOPMENT... 2 5. PLUG-IN

More information

AMENDMENTS TO THE CITY S MOBILE FOOD TRUCK REGULATIONS

AMENDMENTS TO THE CITY S MOBILE FOOD TRUCK REGULATIONS AMENDMENTS TO THE CITY S MOBILE FOOD TRUCK REGULATIONS Approve/not approve Ordinance 2017-38 Approval of the amendments (6-0) An amendment is being proposed that would make several changes to the City

More information

Multi-Service Vehicle Engine Specifications

Multi-Service Vehicle Engine Specifications This specification describes a high performance, articulated side walk tractor that shall support a variety of attachments. The versatility is required to allow operation in all four seasons of the year.

More information

OICA Draft Proposal for the ELSA Meeting July in Bonn

OICA Draft Proposal for the ELSA Meeting July in Bonn OICA Draft Proposal for the ELSA Meeting July 22-24 in Bonn ELECTRICAL SAFETY PROVISIONS FOR VEHICLES IN USE 1. Scope General This module shall apply to the drive train of electric vehicles, hybrid vehicles

More information

3. CHASSIS (FORD TRANSIT 350HD / DIESEL / HIGH TOP / EXTENDED LWB / 4X4 / DUAL REAR WHEEL VAN)

3. CHASSIS (FORD TRANSIT 350HD / DIESEL / HIGH TOP / EXTENDED LWB / 4X4 / DUAL REAR WHEEL VAN) 1. SCOPE It is the intent of the JEA to purchase (2) Two one (1) Ton Heavy Duty / Diesel / High Top / Extended LWB / Quigley 4X4 Conversion / Dual Rear Wheel Transit Vans with various up-fits and options.

More information

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 * SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 * PRODUCT: Heavy Duty Stock Car Steel Wheels 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards

More information

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES P a ge 1 FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES *Effecitive dates for Bid 15-11-0116 are: February 1, 2015 through March 31, 2016. SPECIFICATION

More information

COORDINATED GRANT COMPETITION: PROJECT SPONSOR FOLLOW-UP QUESTIONS

COORDINATED GRANT COMPETITION: PROJECT SPONSOR FOLLOW-UP QUESTIONS 2016-2017 COORDINATED GRANT COMPETITION: PROJECT SPONSOR FOLLOW-UP QUESTIONS AGENCY: Senior Services of Snohomish County PROJECT: TAP Capital Vehicle Purchase Question #1: The same package of funding letters

More information

E/ECE/324/Rev.1/Add.57/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.57/Rev.2/Amend.4

E/ECE/324/Rev.1/Add.57/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.57/Rev.2/Amend.4 11 July 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions for

More information

CITY OF ALHAMBRA NOTICE INVITING BIDS NO. N2M16-144

CITY OF ALHAMBRA NOTICE INVITING BIDS NO. N2M16-144 CITY OF ALHAMBRA NOTICE INVITING BIDS NO. N2M16-144 PUBLIC NOTICE IS HEREBY GIVEN that the City of Alhambra will receive sealed bids on or before the hour of 10:30 AM on Thursday, October 27 2016, at the

More information

ELECTRICAL POWER, DIRECT CURRENT, SPACE VEHICLE DESIGN REQUIREMENTS

ELECTRICAL POWER, DIRECT CURRENT, SPACE VEHICLE DESIGN REQUIREMENTS MIL-STD-1539 (USAF) 1 AUGUST 1973 MILITARY STANDARD ELECTRICAL POWER, DIRECT CURRENT, SPACE VEHICLE DESIGN REQUIREMENTS FSC 1810 Electrical Power, Direct Current, Space Vehicle Design Requirements MIL-STD-1539

More information

2 Way Security and Keyless Entry Installation Guide ca 1553

2 Way Security and Keyless Entry Installation Guide ca 1553 PROFESSIONAL SERIES 2 Way Security and Keyless Entry Installation Guide ca 1553 2012 Audiovox Electronics Corporation. All rights reserved. 1 Table of Contents Before You Begin... 3 Wire Connection Guide...

More information

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION Medium Voltage Standby non-paralleling Control 1. GENERAL GUIDE FORM SPECIFICATION A. The requirements of the contract, Division 1, and part 16 apply to work in this section. 1.01 SECTIONS INCLUDE A. Medium

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Load Side PV Connections

Load Side PV Connections Perspectives on PV Load Side PV Connections 705.12(D) in the 2014 NEC by John Wiles Through the exceptional efforts of the members of NFPA NEC Code-Making Panel 4 working with the proposals and comments

More information

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 * SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 * PRODUCT: Replacement Flywheels and Clutch Assemblies 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum

More information

Cobra 3 Stand-By Emergency Central Lighting Inverter (CLI) Technical Specifications

Cobra 3 Stand-By Emergency Central Lighting Inverter (CLI) Technical Specifications Cobra 3 Stand-By Emergency Central Lighting Inverter (CLI) Technical Specifications PART 1 GENERAL 1.1 SUMMARY A. This specification describes a stand-by, three-phase, solid state Lighting Inverter System

More information

Forward-Looking Statements

Forward-Looking Statements Forward-Looking Statements This presentation contains statements that constitute forward-looking statements within the meaning of Section 27A of the Securities Act and Section 21E of the Securities Exchange

More information

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 *

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 * SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 * PRODUCT: Crankshaft Hub Harmonic Dampers 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for

More information

Fortress 1 Outdoor Emergency Central Lighting Inverter (CLI) Technical Specifications

Fortress 1 Outdoor Emergency Central Lighting Inverter (CLI) Technical Specifications Fortress 1 Outdoor Emergency Central Lighting Inverter (CLI) Technical Specifications PART 1 GENERAL 1.1 SUMMARY A. This specification describes a single phase, on-line, double conversion, solid state

More information

INSTALLATION & OWNER S MANUAL

INSTALLATION & OWNER S MANUAL 1 of 18 INSTALLATION & OWNER S MANUAL (*Not including cab & other accessories) A/C Alternator Kit: Yamaha Drive & Drive2 P/N: 1ACYDR2DRK Recommended it be installed with Curtis Cab: Sandstone (p/n 1GCYD1-A,

More information

SECTION ELECTRIC MOTOR ACTUATORS FOR VALVES

SECTION ELECTRIC MOTOR ACTUATORS FOR VALVES SECTION 40 92 10 - ELECTRIC MOTOR ACTUATORS FOR VALVES PART 1 - GENERAL A. Description This section includes materials and installation of electric motor actuators for valves. B. Submittals 1. Submit shop

More information

COLLEGE COMMUNITY SCHOOL DISTRICT BID SHEET. THREE (3) 78 PASSENGER TRANSIT STYLE SCHOOL BUSES and ONE (1) 65 PASSENGER LIFT BUS

COLLEGE COMMUNITY SCHOOL DISTRICT BID SHEET. THREE (3) 78 PASSENGER TRANSIT STYLE SCHOOL BUSES and ONE (1) 65 PASSENGER LIFT BUS COLLEGE COMMUNITY SCHOOL DISTRICT BID SHEET THREE (3) 78 PASSENGER TRANSIT STYLE SCHOOL BUSES and ONE (1) 65 PASSENGER LIFT BUS Bid #1 Three (3) 2010 (78) Passenger Transit Style School Buses and One (1)

More information

Orion BMS Purchasing Guide Rev. 1.2

Orion BMS Purchasing Guide Rev. 1.2 www.orionbms.com Orion BMS Purchasing Guide Rev. 1.2 Main Components... 2 Orion BMS Unit... 2 Current Sensor... 4 Thermistors... 5 CANdapter... 6 Wiring Harnesses... 7 Cell voltage tap wiring harnesses...

More information

SPECIFICATION, JEA CLASS 117: HALF TON 4X4 SWB (6 6 Bed) PICKUP TRUCK Crew Cab & Standard Cab Units UPDATED JULY 27, 2018

SPECIFICATION, JEA CLASS 117: HALF TON 4X4 SWB (6 6 Bed) PICKUP TRUCK Crew Cab & Standard Cab Units UPDATED JULY 27, 2018 1. SCOPE It is the intent of the JEA to purchase TWENTY SEVEN (27) HALF Ton 4X4 SWB (6 6 Bed / ALL UNITS) Pickup Trucks with Various Configurations, Up-Fits and Options. [19 Crew Cab and 9 Standard Cab].

More information

9,000 lb. Forklift w/tire Changing Attachment (Propane) Req. 18-GA Georgia Ports Authority. Section 3 - Performance Specs Page 1 of 7

9,000 lb. Forklift w/tire Changing Attachment (Propane) Req. 18-GA Georgia Ports Authority. Section 3 - Performance Specs Page 1 of 7 In this Request For Sealed Bid, the "Required" column means that the bidder must comply with the specifications as indicated, or will be considered non-responsive. The specifications in the "Desired" column

More information

DESCRIPTION AND OPERATION

DESCRIPTION AND OPERATION Page 1 of 10 DESCRIPTION AND OPERATION AIR DELIVERY DESCRIPTION AND OPERATION The air delivery description and operation is divided into five areas: HVAC Control Components Air Speed Air Delivery Recirculation

More information

METRO,...,. AMENDMENT- INVITATION FOR BID (IFB) Project No. Date Amendment Issued. Issued By

METRO,...,. AMENDMENT- INVITATION FOR BID (IFB) Project No. Date Amendment Issued. Issued By Rev. 10-3-17 METRO,...,. AMENDMENT- INVITATION FOR BID (IFB) Amendment No. 1 IFB No. 4018000101 Project No. Date Amendment Issued COMPANY NAME AND ADDRESS (To be completed by Bidder) The hour and date

More information