Electric Vehicle Infrastructure Location Tool and Visualization Map

Size: px
Start display at page:

Download "Electric Vehicle Infrastructure Location Tool and Visualization Map"

Transcription

1 Electric Vehicle Infrastructure Location Tool and Visualization Map NASEO Northeast Regional Meeting April 12, 2018

2 Agenda Electric Vehicle Fast Charging Infrastructure Planning Tools Overview & Analysis Goals Methodology & Possible Users Demonstration 2

3 Analysis Objective Support states and other stakeholders in assessing fast charging along corridors and priority locations for charging stations 3

4 Key Analysis Parameters MJB&A utilized a GIS platform to collect and organize data on over 4,000 miles of freeway in the 11-state Transportation & Climate Initiative region Assessed DC Fast Charging (DCFC) opportunities along all the designated federal corridors plus additional state priority corridors For the existing network, included public, non-proprietary DCFC infrastructure within 5 miles of freeway corridors Focused on interstate exits as sites for corridor fast charging Worked with TCI state participants to refine dataset, parameters, and metrics 4

5 Inputs: Key Metrics Proximity to Existing Charging Commercial Activity Population Traffic Density Distance to nearest DCFC station and density of existing stations Number of restaurants, bars, and gas stations within 1 mile of each exit Population density of surrounding county Average annual traffic volume of freeway segment 5

6 Methodology: Overview Each exit is compared to all other selected exits within each metric Each exit is scored between 1 and 10 for each metric: an exit could be a 1 for population density (i.e., very low population) but a 10 for proximity (i.e., there are no existing DCFC nearby) Metrics are then combined through a range of ranking methods to assign each exit one cumulative score; all scores are then ranked Tools allow a user to adjust the weighting of metrics and design a ranking method that reflects personalized priorities Proximity (Nearest) Proximity (Density) Traffic Volume Pop. Density Comm. Activity Nearest existing infrastructure very close Nearest existing infrastructure very far 1 10 Many charging ports nearby No charging ports nearby 1 10 Low traffic volume on freeway near exit Very high traffic volume on freeway near exit 1 10 Low population density near exit Very high population density near exit 1 10 No points of interest within 1 mile of exit Many points of interest within 1 mile of exit

7 Resource: Infrastructure Location Identification Tool Identification Tool Options Region: Full TCI or individual state Exit Group: All in region, Gap Exits, or specific corridor Weighting method: one of six preloaded or custom 7

8 Infrastructure Location Identification Tool: Ranking Methods 1. Through Traffic 2. Gap Proximity Metrics Nearest DCFC Density of DCFC 3. High Traffic Gap 4. Traveler Use + User Defined Demand Metrics Traffic Density Population Density? Convenience Metrics Commercial Activity 5. Resident Use 6. Even 8

9 Resource: Visualization Map The Visualization Map allows the user to see all metric data (e.g., population density and traffic volume) as well as the outputs from the Identification Tool in order to compare possible locations for DCFC infrastructure deployment Through Traffic Method Fill Gaps Method Low Suitability High Suitability 9

10 Ongoing & Potential Tool Uses Scoping analysis for state infrastructure development initiatives Support for Public Utilities Commission electric vehicle proceedings Utility or private developer review / comparison of potential development locations 10

11 Tool Availability Tools are available for free from either M.J. Bradley & Associates or Georgetown Climate Center websites

12 Questions?? Grace Van Horn M.J. Bradley & Associates 12

13 M.J. Bradley & Associates, LLC Concord, MA Headquarters 47 Junction Square Drive Concord, MA USA T: F: Washington, DC 1225 Eye Street, NW, Suite 200 Washington, DC USA T: For more information, visit 13

Electric Vehicle Infrastructure Location Tool and Visualization Map

Electric Vehicle Infrastructure Location Tool and Visualization Map Electric Vehicle Infrastructure Location Tool and Visualization Map Analysis and Methodology Overview February 2018 Agenda Electric Vehicle Fast Charging Infrastructure Planning Tools Overview & Analysis

More information

Electric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018

Electric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018 Electric Vehicle Infrastructure Location Tool and Visualization Map Version 2.0 Analysis Summary July 17, 2018 Contents Electric Vehicle Fast Charging Infrastructure Planning Tools Overview & Analysis

More information

Transportation & Climate Initiative Regional EV Corridors

Transportation & Climate Initiative Regional EV Corridors Transportation & Climate Initiative Regional EV Corridors NEDC Partners Meeting September 25, 2017 Matthew Goetz Georgetown Climate Center Georgetown Climate Center: A Resource for State and Federal Climate

More information

Clean Car Roll-back. Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed.

Clean Car Roll-back. Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed. Clean Car Roll-back Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed June 15, 2018 U.S. Climate Pollution and Fuel Economy Standards Save Families

More information

Straight to Recording for All: The Alternative Fuels Corridor Program

Straight to Recording for All: The Alternative Fuels Corridor Program TRANSPORTATION RESEARCH BOARD Straight to Recording for All: The Alternative Fuels Corridor Program The Alternative Fuels Corridor Program Diane Turchetta Matthew Goetz Tim Sexton Kevin Black (moderator)

More information

Alternative Fuels Corridor Implementation. MARAMA Workshop Mark Hand, Pennsylvania Department of Environmental Protection March 20, 2019

Alternative Fuels Corridor Implementation. MARAMA Workshop Mark Hand, Pennsylvania Department of Environmental Protection March 20, 2019 Alternative Fuels Corridor Implementation Tom Wolf, Governor MARAMA Workshop Mark Hand, Pennsylvania Department of Environmental Protection March 20, 2019 Patrick McDonnell, Secretary 1 Energy Programs

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in eight US states Quick Take M.J. Bradley & Associates (MJB&A) evaluated the costs and States Evaluated benefits of

More information

Clean Car Roll-back. Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed.

Clean Car Roll-back. Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed. Clean Car Roll-back Estimated costs for American families if U.S. climate pollution and fuel economy standards are relaxed July 2, 208 U.S. Climate Pollution and Fuel Economy Standards Save Families Money

More information

US DOE Community Partner Projects: U.S. Fuels Across America's Highways -- Michigan to Montana (M2M)

US DOE Community Partner Projects: U.S. Fuels Across America's Highways -- Michigan to Montana (M2M) US DOE Community Partner Projects: U.S. Fuels Across America's Highways -- Michigan to Montana (M2M) Ted Barnes, P.E. Gas Technology Institute April 2018 Company Overview Independent, not-for-profit established

More information

Plug-In North Carolina: Developing A Location Analysis Mapping System with Web App Builder

Plug-In North Carolina: Developing A Location Analysis Mapping System with Web App Builder Plug-In North Carolina: Developing A Location Analysis Mapping System with Web App Builder Marcy Bauer, NCSU Clean Energy Technology Center (Formerly) Todd Wilson, NCSU Masters in GIS Graduate (2014) Presentation

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas Welcome! Thank you for joining us. Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas A brief presentation will begin at 6pm. Table activities

More information

Bus Stop Optimization Study

Bus Stop Optimization Study Bus Stop Optimization Study Executive Summary February 2015 Prepared by: Passero Associates 242 West Main Street, Suite 100 Rochester, NY 14614 Office: 585 325 1000 Fax: 585 325 1691 In association with:

More information

Transportation Electrification Public Input Workshop. August 3, 2016

Transportation Electrification Public Input Workshop. August 3, 2016 Transportation Electrification Public Input Workshop August 3, 2016 1 Agenda Welcome and Introductions Company Overview Existing Transportation Electrification Initiatives Accelerating Transportation Electrification

More information

Minnesota Mileage-Based User Fee Test Results. Ray Starr Office of Traffic, Safety and Technology Minnesota Department of Transportation

Minnesota Mileage-Based User Fee Test Results. Ray Starr Office of Traffic, Safety and Technology Minnesota Department of Transportation Minnesota Mileage-Based User Fee Test Results Ray Starr Office of Traffic, Safety and Technology Minnesota Department of Transportation Statutory Direction 2 2-Part MBUF Research Effort 1. Technology Demonstration

More information

Grant Opportunities for Vehicle-based Projects in the Bay Area

Grant Opportunities for Vehicle-based Projects in the Bay Area Grant Opportunities for Vehicle-based Projects in the Bay Area East Bay Clean the Cities Coalition Grants Workshop Tuesday, November 2, 2010 Karen M. Schkolnick Grant Programs Manager Bay Area Air Quality

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

King County Metro. Sustainably and equitably achieving a zero-emission fleet

King County Metro. Sustainably and equitably achieving a zero-emission fleet King County Metro Sustainably and equitably achieving a zero-emission fleet Agenda Background Purpose Service area Fleet size Climate goals Process Stakeholder engagement Analyses Service Equity Final

More information

Performance Measure Summary - Washington DC-VA-MD. Performance Measures and Definition of Terms

Performance Measure Summary - Washington DC-VA-MD. Performance Measures and Definition of Terms Performance Measure Summary - Washington DC-VA-MD There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

Business Models that Capture the Indirect Value of EV Charging Services

Business Models that Capture the Indirect Value of EV Charging Services February 2, 2015 Business Models that Capture the Indirect Value of EV Charging Services Nick Nigro 2015 Energy Policy Outlook Conference About Center for Climate and Energy Solutions Independent, nonpartisan,

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in five Northeast & Mid-Atlantic states Quick Take With growing interest in the electrification of transportation in

More information

Planning for Sustainability: Electric Vehicles

Planning for Sustainability: Electric Vehicles Planning for Sustainability: Electric Vehicles NYSMPO Conference June 23, 2015 Jennifer Ceponis Sr Transportation Planner Clean Communities Coordinator Clean Cities Mission To advance the energy, economic,

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRINTER'S NO. 11 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 01 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE, NEILSON,

More information

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms Performance Measure Summary - Louisville-Jefferson County KY-IN There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There

More information

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms Performance Measure Summary - Boston MA-NH-RI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Regional EV Infrastructure & the West Coast Electric Highway

Regional EV Infrastructure & the West Coast Electric Highway Regional EV Infrastructure & the West Coast Electric Highway EV Summit Ashley Horvat Coca Beach, FL ashley@plugshare.com October 22, 2015 (503) 360-2500 @ashleyinoregon App Overview 2 #1 Ranked EV charging

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION

More information

The European Commission s science and knowledge service

The European Commission s science and knowledge service The European Commission s science and knowledge service Joint Research Centre Optimal allocation of electric vehicle charging infrastructure in cities and regions Andreea Maria Julea, Harald Scholz, Christian

More information

Washington State Road Usage Charge Assessment

Washington State Road Usage Charge Assessment Washington State Road Usage Charge Assessment Jeff Doyle Director of Public/Private Partnerships; and State Project Director Road User Charge Assessment August 15, 2013 Tallahassee, Florida Similarities

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRIOR PRINTER'S NO. PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE,

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

U.S. System Summary: ARIZONA/SOUTHWEST

U.S. System Summary: ARIZONA/SOUTHWEST U.S. System Summary: ARIZONA/SOUTHWEST Arizona/Southwest High-Speed Rail System (Source: Texas A&M Transportation Institute) The Arizona/Southwest high-speed rail system described in this summary groups

More information

Request for Qualification for Comprehensive Plan Services RFQ#

Request for Qualification for Comprehensive Plan Services RFQ# Request for Qualification for Comprehensive Plan Services RFQ#16-2001-05 City of Texarkana, Texas Planning and Community Development 220 Texas Boulevard Texarkana, TX 75501 Page 2 of 10 RFQ COMPREHENSIVE

More information

Workplace Transportation Improvements. April Hopps BUSB-433. Geographic Information Systems - Business Analyst Online - Course Project

Workplace Transportation Improvements. April Hopps BUSB-433. Geographic Information Systems - Business Analyst Online - Course Project Running head: WORKPLACE TRANSPORTATION 1 Workplace Transportation Improvements April Hopps BUSB-433 Geographic Information Systems - Business Analyst Online - Course Project 18 June 2013 Workplace Transportation

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

Background and Considerations for Planning Corridor Charging Marcy Rood, Argonne National Laboratory

Background and Considerations for Planning Corridor Charging Marcy Rood, Argonne National Laboratory Background and Considerations for Planning Corridor Charging Marcy Rood, Argonne National Laboratory This document summarizes background of electric vehicle charging technologies, as well as key information

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Large Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Medium Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423

ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 This proposal represents recommended highway segments for alternative fuel corridors for the State of Arizona. Included in this document are the

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

Application of Autonomous Driving Technology to Transit

Application of Autonomous Driving Technology to Transit Application of Autonomous Driving Technology to Transit 2013 ITS New Jersey Annual Conference MetLife Stadium December 16, 2013 Jerome M. Lutin, Ph.D., P.E. Senior Director, Statewide & Regional Planning

More information

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms Performance Measure Summary - Austin TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms Performance Measure Summary - Pittsburgh PA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - New Orleans LA. Performance Measures and Definition of Terms

Performance Measure Summary - New Orleans LA. Performance Measures and Definition of Terms Performance Measure Summary - New Orleans LA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms

Performance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms Performance Measure Summary - Portland OR-WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms Performance Measure Summary - Oklahoma City OK There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Buffalo NY. Performance Measures and Definition of Terms

Performance Measure Summary - Buffalo NY. Performance Measures and Definition of Terms Performance Measure Summary - Buffalo NY There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms Performance Measure Summary - Seattle WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Fresno CA. Performance Measures and Definition of Terms

Performance Measure Summary - Fresno CA. Performance Measures and Definition of Terms Performance Measure Summary - Fresno CA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Hartford CT. Performance Measures and Definition of Terms

Performance Measure Summary - Hartford CT. Performance Measures and Definition of Terms Performance Measure Summary - Hartford CT There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Boise ID. Performance Measures and Definition of Terms

Performance Measure Summary - Boise ID. Performance Measures and Definition of Terms Performance Measure Summary - Boise ID There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Tucson AZ. Performance Measures and Definition of Terms

Performance Measure Summary - Tucson AZ. Performance Measures and Definition of Terms Performance Measure Summary - Tucson AZ There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Wichita KS. Performance Measures and Definition of Terms

Performance Measure Summary - Wichita KS. Performance Measures and Definition of Terms Performance Measure Summary - Wichita KS There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Spokane WA. Performance Measures and Definition of Terms

Performance Measure Summary - Spokane WA. Performance Measures and Definition of Terms Performance Measure Summary - Spokane WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measures and Definition of Terms

Performance Measures and Definition of Terms Performance Measure Summary - All 471 Areas Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Sophisticated Mapping for Increasing Railway Capacity

Sophisticated Mapping for Increasing Railway Capacity Sophisticated Mapping for Increasing Railway Capacity April 17, 2012 Engineering Architecture Design-Build Surveying GeoSpatial Solutions Workshop Agenda Introductions Corporate Overview Market Drivers

More information

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms Performance Measure Summary - Grand Rapids MI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Overcoming Charging Challenges to Maximize Air Quality Benefits The City and County of Denver has set aggressive goals

More information

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms Performance Measure Summary - Charlotte NC-SC There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Toledo OH-MI. Performance Measures and Definition of Terms

Performance Measure Summary - Toledo OH-MI. Performance Measures and Definition of Terms Performance Measure Summary - Toledo OH-MI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Pensacola FL-AL. Performance Measures and Definition of Terms

Performance Measure Summary - Pensacola FL-AL. Performance Measures and Definition of Terms Performance Measure Summary - Pensacola FL-AL There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

SANDAG Roadmap Program: Overview

SANDAG Roadmap Program: Overview SANDAG Roadmap Program Update Joint Regional Planning Technical Working Group and Regional Energy Working Group SANDAG Roadmap Program: Overview Began in 2010 Energy Efficiency Local Government Partnership

More information

Performance Measure Summary - Omaha NE-IA. Performance Measures and Definition of Terms

Performance Measure Summary - Omaha NE-IA. Performance Measures and Definition of Terms Performance Measure Summary - Omaha NE-IA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Refuel: San Diego Regional Alternative Fuel Coordinating Council. Kick-off Meeting October 16, 2014

Refuel: San Diego Regional Alternative Fuel Coordinating Council. Kick-off Meeting October 16, 2014 Refuel: San Diego Regional Alternative Fuel Coordinating Council Kick-off Meeting October 16, 2014 Item 3 California Energy Commission Grant Requirements Why are we here? Energy Commission Grant 2 year

More information

Performance Measure Summary - Allentown PA-NJ. Performance Measures and Definition of Terms

Performance Measure Summary - Allentown PA-NJ. Performance Measures and Definition of Terms Performance Measure Summary - Allentown PA-NJ There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Nashville-Davidson TN. Performance Measures and Definition of Terms

Performance Measure Summary - Nashville-Davidson TN. Performance Measures and Definition of Terms Performance Measure Summary - Nashville-Davidson TN There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms Performance Measure Summary - Corpus Christi TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Role of Public Transportation and School Buses in the Resiliency of Rural Coastal Communities

Role of Public Transportation and School Buses in the Resiliency of Rural Coastal Communities Role of Public Transportation and School Buses in the Resiliency of Rural Coastal Communities Jaydeep Chaudhari Janelle Booth Zhirui Ye David Kack Western Transportation Institute, Bozeman, MT & Ben Posadas

More information

Performance Measure Summary - El Paso TX-NM. Performance Measures and Definition of Terms

Performance Measure Summary - El Paso TX-NM. Performance Measures and Definition of Terms Performance Measure Summary - El Paso TX-NM There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Minneapolis-St. Paul MN-WI. Performance Measures and Definition of Terms

Performance Measure Summary - Minneapolis-St. Paul MN-WI. Performance Measures and Definition of Terms Performance Measure Summary - Minneapolis-St. Paul MN-WI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Performance Measure Summary - New York-Newark NY-NJ-CT. Performance Measures and Definition of Terms

Performance Measure Summary - New York-Newark NY-NJ-CT. Performance Measures and Definition of Terms Performance Measure Summary - New York-Newark NY-NJ-CT There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

National strategy for alternative fuels infrastructure

National strategy for alternative fuels infrastructure National strategy for alternative fuels infrastructure Konrad Pütz Transnova Regional Power for Clean Transport, October 30 th 2013 About Transnova Transnova is a Norwegian governmental tool for climate-efficient

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Emergency preamble. Whereas, acts

More information

M.J. Bradley & Associates LLC How Much will New Technologies Contribute to Better Air Quality?

M.J. Bradley & Associates LLC How Much will New Technologies Contribute to Better Air Quality? M.J. Bradley & Associates LLC How Much will New Technologies Contribute to Better Air Quality? 15 th IUAPPA World Clean Air Congress Greener Transport in a Post recession World Vancouver, British Columbia

More information

Overview of Plug-In Electric Vehicle Readiness. Coachella Valley Association of Governments

Overview of Plug-In Electric Vehicle Readiness. Coachella Valley Association of Governments Overview of Plug-In Electric Vehicle Readiness Coachella Valley Association of Governments Philip Sheehy and Mike Shoberg February 21, 2013 Electric Drive Community Readiness Workshop 2006 ICF International.

More information

State Tolling Authority adopts all state Highway and bridge tolls sets fares for Washington State Ferries

State Tolling Authority adopts all state Highway and bridge tolls sets fares for Washington State Ferries 6/11/2015 State Tolling Authority adopts all state Highway and bridge tolls sets fares for Washington State Ferries Proposes transportation policy and finance recommendations, such as road usage charge

More information

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on

More information

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

The Preferred Alternative: a Vision for Growth on the Northeast Corridor A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement

More information

2012 Air Emissions Inventory

2012 Air Emissions Inventory SECTION 6 HEAVY-DUTY VEHICLES This section presents emissions estimates for the heavy-duty vehicles (HDV) source category, including source description (6.1), geographical delineation (6.2), data and information

More information

Fleet Safety Initiative Status Summary

Fleet Safety Initiative Status Summary Fleet Safety Initiative Status Summary Deborah Majeski DTE Energy Company October 7, 2008 DTE Energy s Primary Subsidiaries are Gas and Electric Utilities 2 Non-Utility Energy Related Businesses 3 Impact

More information

NASEO 2015 Central Regional Meeting. Vision Fleet June 12, 2015

NASEO 2015 Central Regional Meeting. Vision Fleet June 12, 2015 NASEO 2015 Central Regional Meeting Vision Fleet June 12, 2015 Agenda Vision Fleet Overview Indy Project Overview Analytics to Improve Performance 1 Vision Fleet at a Glance Our Mission & Value: Enable

More information

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust May 24, 2018 Oklahoma Department of Environmental Quality Air Quality Division P.O. Box 1677 Oklahoma City, OK 73101-1677 RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

ASTM International 1

ASTM International 1 1 ASTM International ASTM INTERNATIONAL Organized in 1898 Independent, private sector, not-for-profit Provides a global forum for the development of voluntary, consensus standards and promotion of related

More information

Petroleum Brownfields Management Tools: A Site Inventory Case Study

Petroleum Brownfields Management Tools: A Site Inventory Case Study Petroleum Brownfields Management Tools: A Site Inventory Case Study J. Ryan Kellogg, M.A., R.E.H.S. Tacoma-Pierce County Health Department 17 th Annual UST/LUST National Conference March 15, 2005 2 Pierce

More information

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017 West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million

More information

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology 4 FUTURE CHANGES IN THE CORRIDOR Over the next 30 years, Santa Clara County will grow by roughly 637,000 residents and 303,500 jobs increases of 31 percent and 43 percent, respectively. 1 Changes in land

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information