1 SMART METERING PROJECT PHASE 1 INFORMATION PAPER 3 7 th December 2009 CER/09/186

2 Table of Contents 1 Introduction Purpose of Information Paper What is Smart Metering? Background to Smart Metering Project Smart Metering Project Phase 1 Progress Update Electricity Customer Behaviour Trials (CBTs) Overview Benchmark Data Collection & Group Allocation Smart Metering Infrastructure for CBT Development of Smart Metering Energy Efficiency Initiatives Electricity CBT Timelines Gas Customer Behaviour Trials (CBTs) Overview Customer Recruitment Smart Metering Infrastructure for CBT Development of Smart Metering Energy Efficiency Initiatives Gas CBT Timeline Technology Trials Background Technologies being Used in the Trials Conclusion on Electricity Technology Trials Update Note on Gas Technology Trials Note on Water Smart Metering Prepayment Micro Generation Cost Benefit Analysis (CBA) Smart Metering Project Phase 1 Timelines Further Information Appendix 1: Gas CBT Recruitment Invite Letter Appendix 2: Gas CBT Recruitment FAQ Leaflet CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 1

3 1 Introduction 1.1 Purpose of Information Paper This Information Paper 3 on the Smart Metering Project Phase 1 has been prepared by the Commission for Energy Regulation (CER) with the purpose of providing public information on the project & its progress. This paper is a follow up to the information papers published by the CER on 6 th February 2009 (Information Paper 1 - CER/09/024) and 31 st July 2009 (Information Paper 2 - CER/09/118). The initial Information Paper 1 outlined the background to the project, project governance structure, project deliverables & gave an update on progress of the deliverables as at end of Information Paper 2 gave an update on progress of the project deliverables as at beginning of July This paper, Information Paper 3, gives an update on progress of the project deliverables as at end of November What is Smart Metering? Smart meters are the next generation of meters, which can replace existing electro-mechanical meters and offer a range of benefits for both the individual electricity & gas consumer and for the electricity & gas systems in general. The existing standard mechanical meter records the total amount of electricity/gas used over time. These meters are read manually and the information is sent to the network operator and then used to calculate customer bills. If a meter reader does not have access to the customer s meter, estimated consumption information (or a reading provided by the customer) is used to calculate the bill. If the estimated consumption is higher or lower than the actual meter read, this is corrected for when the meter is next read by the customer or the meter reader. A smart meter is much more sophisticated. It records customers actual use of electricity over short intervals (e.g. every 30 minutes). These meters are connected by a system to the network operator providing the operator with automated, up-to-date information on the amounts of electricity used by customers. Access to this information provides opportunities to reduce network operation costs, including reduced costs of technicians visiting customer CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 2

4 premises to manually read the meter and carrying out any necessary connections and disconnections. There are also savings due to reductions in technical losses and theft. The data collected from smart meters can be used by electricity & gas suppliers to deliver useful information to their customers regarding their electricity & gas consumption and costs. In particular, the installation of smart metering will allow electricity suppliers to create innovative pricing arrangements that can be offered to customers to support the efficient use of electricity, such as time-of-use electricity tariffs. This is where the price of electricity varies at different times of the day to reflect the changes in the costs of producing electricity. This will allow customers to manage their consumption of electricity in line with price movements and demand patterns. The customer behavior trials (CBTs) are being undertaken to understand how the use of smart meters can facilitate improving energy efficiency by helping consumers reduce any unnecessary electricity and/or gas usage & shift any discretionary electricity usage away from peak consumption times. 1.3 Background to Smart Metering Project The National Smart Metering Plan is a commitment in the Government's Energy Policy Framework and in the 2007 Programme for Government. It is a central component of the strategy to radically enhance management of energy demand and to deliver greater energy efficiency. The Commission established the Smart Metering Project Phase 1 in late 2007 with the objective of setting up & running Smart Metering Trials & assessing their costs and benefits, which will inform decisions relating to the full rollout of an optimally designed universal National Smart Metering Plan. In order to draw on the experience and expertise of the electricity and gas market a Steering Group and a Working Group was established by the Commission for the Smart Metering Project Phase 1. Both groups are chaired by the Commission and consist of representatives from the Department of Communications, Energy & Natural Resources (DCENR), Sustainable Energy Ireland (SEI), the Northern Ireland Authority for Utility Regulation (NIAUR) and Irish Gas & Electricity Industry Participants. The illustrations on the next page depict the Project Governance structure & all the Project participants. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 3

5 For further details on project background & governance please refer to the CER Smart Metering Information Paper published in February Smart Metering Project Phase 1 Governance Structure Smart Metering Steering Group CER Smart Metering Working Group CER Tariffs Work Stream Billing Data Work Stream Networks Work Stream Customer Behaviour Work Stream Smart Metering Project Phase 1 Participants 1 Smart Metering Project Phase 1 Information Paper (CER/09/024) 6th Feb CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 4

6 2 Smart Metering Project Phase 1 Progress Update The key deliverables of the Smart Metering Project are depicted below: High-Level Work Breakdown Structure (WBS) for Smart Metering Project Smart Metering Project Procure & Start-Up Technology Trials Customer Behaviour Trials Prepayment Market Model Micro Generation Analysis Cost Benefit Analysis Residential SMEs The progress made in achieving these deliverables is summarised in the table below & detailed in the sections that follow. Overall, progress continues to be very positive with all key milestones to date having been achieved. The main highlights since publication of Information Paper 2 have been the: Finalising of the Time of Use Tariffs to be trialled in the residential & SME electricity Customer Behaviour Trials (Section 2.1.4). Successful initiation of the Technology Trials (Section 2.3). Progress made in the Gas Customer Behaviour Trials (Section 2.2). Preparation work is also underway for the Prepayment Trial (Section 2.4). Summary Progress Update for Smart Metering Project Phase 1 CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 5

7 2.1 Electricity Customer Behaviour Trials (CBTs) Overview The overall objective of the Electricity CBTs is to ascertain the potential for smart metering enabled energy efficiency initiatives to effect measurable change in consumer behaviour in terms of reductions in peak electricity demand & overall energy use. The CBTs focus on Residential & SME (small-to-medium enterprise) electricity consumers. The CBTs have been designed to ensure that statistically robust findings will be produced that will give an accurate indication of what would be expected in a national smart metering roll-out scenario and the findings will thus inform the Smart Metering Cost Benefit Analysis. Consumers participating in the CBTs have been allocated to control groups & test groups. Various energy efficiency initiatives enabled by Smart Metering will be introduced to the test groups. These initiatives will take the form of: Price signals that will encourage consumers to transfer some of their electricity usage away from times of the day when demand for electricity is at its peak i.e. Time of Use (ToU) Tariffs. The Time of Use tariffs for the trial have been finalized & published. (Section ) Enhanced & more frequent information on electricity usage & costs for consumers via Billing, Web & Dynamic Display units so as to enable self regulation of electricity consumption. The systems required to deliver this functionality have been built & are currently being tested. (Sections ) A financial incentive that will encourage consumers to reduce their overall electricity usage by rewarding them for achieving a target for percentage reduction in their usage i.e. overall load reduction (OLR) incentive. The OLR methodology has been finalized and incorporated into the build of the smart billing system. (Section ) Benchmark Data Collection & Group Allocation The minimum benchmark data collection period began on 1 st July It was important that all required meters were installed by this date, which was achieved. This will mean that a minimum of 6 months normal electricity usage data is available for trial analysis purposes. The Benchmark data collection period serves the purpose of enabling an understanding of electricity usage behaviour & patterns of trial participants before the smart metering enabled energy efficiency initiatives are introduced. This data can then be compared with the electricity usage behaviour & patterns of the same trial participants during the Test Period i.e. after they are exposed to different energy efficiency initiatives facilitated by smart metering. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 6

8 The benchmark data also serves another important purpose in that it assists the Project Statisticians in the task of allocating Trial participants across different sample groups so as to ensure that each sample grouping has appropriate & consistent representivity i.e. the correct spread of electricity consumers in terms of their electricity usage amounts & patterns, as well as other socio-economic & demographic factors as derived from surveys of trial participants conducted throughout August & September This assists in ensuring that results derived from the trial can be extrapolated up to apply to the national electricity consumer base. (Note Information Paper 2 outlined details about the representivity of Trial participants). The diagram over page gives an overview of the Trial Design matrix for the Residential CBT & depicts the different sample groups into which Trial consumers have been allocated. These are made up of a number of different test groups & a control group. Each test group is exposed to a different type of smart metering enabled energy efficiency initiative during the Test Period (1 st Jan 31 st Dec 2010). The control group do not receive any smart metering enabled energy efficiency initiative during the Test Period. Instead they continue to receive the standard electricity offering. The control group serves a very important function in that their usage behaviour & patterns during the Test Period can then be compared with that of the Test Groups in order to account for the impact of any variables unrelated to smart metering that may have impacted electricity usage during the Test Period e.g. temperature. Consumer communications have been developed which will be mailed to trial participants in December 2009 informing them of which sample group they have been allocated to. The Test Period will then begin on 1 st January 2010, when the various smart metering energy efficiency initiatives come into effect, & end on 31 st December CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 7

9 Trial Design Matrix for Residential CBT Smart Metering Infrastructure for CBT ESB Networks is using smart meters from Elster that have GPRS communications built in. In addition an IT system from Energy ICT was installed by ESB Networks. This system remotely manages the meters and collects and manages their data. Smart meter installations began in December 2008 & were successfully completed by end-june 2009 in time for the beginning of the Benchmark Period. Data collection system continues to perform well and the secure channels that provide data from this system to electricity suppliers & trial statisticians CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 8

10 (anonymised format) are also functioning well. Half hourly profile data is being collected by this system every day for each consumer. Data protection is always a key consideration in the design of any systems that will have consumer information. The operation of the system complies with all legal data protection requirements. In addition the systems are designed in accordance with best international IT security practices to prevent unauthorised access from third parties Development of Smart Metering Energy Efficiency Initiatives The smart metering enabled energy efficiency initiatives that will be tested as part of the trial are currently in the final stages of development & are on target for being ready for the Test Period start on 1st January Time of Use Tariffs Smart metering facilitates new types of electricity pricing that will encourage consumers to transfer some of their electricity usage away from times of the day when demand for electricity is at its peak i.e. Time of Use Tariffs. Instead of one price per unit (which most consumers pay at the moment), there will be three different prices, depending on the time of day you use electricity. For the purposes of the CBT these time bands have been defined as follows: Price Time Peak Rate 5pm to 7pm (Monday to Friday, excluding Public Holidays) Night Rate 11pm to 8am every night Day Rate All other times The Peak Rate will be the highest and the Night Rate will be the cheapest. Peak Rate is when electricity demand is at its highest, resulting in more expensive generation sources being used to meet demand, this in turn generates higher carbon emissions and electricity is therefore more expensive during these times. If consumers cut down or move some of their electricity usage outside of these peak hours, they could save money and reduce their carbon emissions. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 9

11 On the previous page is a sample graphic illustrating the Time of Use bands. This graphic will be included in communication materials to trial participants, including a fridge magnet & appliance stickers. The actual prices to be used in the CBT have been calculated based on the prevailing standard residential tariff as at 1 st October The CER worked with the electricity industry via the Smart Metering forums to develop a methodology & principles to be used in calculating the Time of Use Tariff prices. Feedback on the ToU tariffs emanating from a series of consumer focus groups has also been factored into the final agreed prices. The finalised ToU prices for ESB Customer Supply participating customers are summarised in the tables below - refer to the following published document on for the detail of these ToU tariffs: Smart Metering CBTs Electricity Time of Use (TOU) Tariffs published 2 nd October Over the period participants trialling these ToU tariffs will not pay any more for their electricity than they would if they had remained on their normal electricity prices. They will receive a credit on their December 2009 bill. Once their participation in the Trial ends in December 2010 they will receive a further credit in January If it is calculated at the end of the trial that, even after taking these credits into account, some customers have still paid more than they would have on their normal electricity price, then they will be given a final credit for this amount. Please note that these credits are in addition to the two 25 credits available to trial participants for completing the trial surveys. Bord Gáis Energy & ESBIE will calculate the SME trial ToU tariffs for their participating customers based on the agreed methodology. Residential Trial Time of Use Tariffs (cents per kwh, excluding VAT) Tariff Night Day Peak T T T T T5 (W end)* *Night rate applies all day Saturday & Sunday for T5 SME Trial Time of Use Tariffs (cents per kwh, excluding VAT) Tariff Night Day Peak T T CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 10

12 These ToU tariffs will apply for trial participants from 1 st January 2010 to 31 st December Rates may be subject to change in line with ESB Customer Supply tariff changes. Over page is a copy of the fridge magnet that will be given to consumers on ToU Tariff T1. Fridge Magnet for Time of Use Tariff T Smart Billing The electricity CBT will test the effectiveness of enhanced & more frequent information on electricity usage & costs for consumers via billing so as to better enable self regulation of electricity consumption. Information Paper 2 gave an overview of the market research that was conducted with Residential & SME CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 11

13 electricity consumers in order to assist in the development of the more detailed electricity billing that smart metering can facilitate. Various Smart Billing options were designed on the basis of the findings derived from market research. These Smart Billing options were put into focus group research with consumers & the final versions for residential & SME trials were agreed. These bills contain the following information: Financial invoice including line item breakdown of electricity usage costs by time of use. Table displaying typical costs of running the main household appliances over a full year at the different time of use rates see the table below (note costs displayed are for illustration purposes only): Graphical displays of electricity usage & cost by ToU band for the billing period. Below is a sample mock-up of a residential bill graph which depicts a consumer s cumulative time of use costs by day of the week for the billing period. Use by day of week: Jan/Feb Night (11pm 8am) CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 12

14 Over page is a sample mock-up of SME bill graphs which also depicts a consumer s cumulative time of use costs by day of the week for the billing period, as well as a weekly breakdown of electricity usage costs by time of use. Also included is tabular information on historic usage costs by time of use for previous billing periods. Information panels giving smart energy efficiency tips that highlight to consumers the opportunities for shifting and/or reducing their electricity usage & the costs savings that would result. Individualised motivational messages based on historic usage & peer comparisons will also be included. ESB Customer Supply is currently finalising the systems to produce Smart Billing for the Residential Electricity CBT & is on target to have these ready for issuing bills during the Test Period. ESB Customer Supply & Bord Gáis Energy Supply are currently developing the systems to produce Smart Billing for the SME Electricity CBT & are on target to have these ready for issuing bills during the Test Period. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 13

15 Smart Web The Smart Web Access application will provide online access for a subset of Residential & SME consumers on the trial to view their detailed consumption & costs in various graphical & tabular formats. The screenshot below illustrates an example of what a Smart Web view might look like. Account Overview View Bill View Statement Cost & Consumption Peer Comparison Select View: Daily Weekly Monthly 6 Year to Date Cost (Euro) Cost & Consumption Summary Cost & Consumption Summary Detailed table Euro 2.50 The Web has been identified as a key channel through which to communicate smart metering enabled detailed electricity usage & cost information to SME multi-site consumers in particular. Many SME multi-site businesses have specific staff with energy cost management responsibilities who can analyse such information & act on it to implement energy efficiencies & make cost savings for their businesses. Thus a group of SME multi-site customers of ESB Independent Energy (ESBIE), who are broadly representative of the different business sectors, have been engaged to participate in case study trials which will test the effectiveness of such a Smart Web offering for SME multi-sites. ESBIE are currently finalising the system that will be used to provide Smart Web access to their customers who are participating in the trial, which is on target to be ready for the start of the Test Period on 1 st January CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 14

16 Dynamic Display Unit ESB Networks have been working with Elster to ensure a best of breed dynamic display unit (also referred to as an electricity monitor or In-Home Display or IHD) to meet the requirements of consumers will be delivered. Testing of this device has been successfully completed & manufacturing is in progress. The dynamic display units will be installed by ESB Networks in relevant trial participant s homes at the beginning of the Test Period. The dynamic display unit will be trialed with a subset of Residential & SME Trial consumers, & will give them real-time & historical information on their electricity usage & costs. The home screen for the dynamic display unit is the key screen that the customer will always see when the device is plugged in and switched on. Refer to the illustration below for a picture of the dynamic display unit showing the home screen (tariffs & costs featured are for illustrative purposes only). The consumer will be able to view additional information on their electricity usage & cost by navigating through additional screens behind the home screen. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 15

17 Overall Load Reduction (OLR) Incentive As part of the trial a subset of consumers will take part in a test of the effectiveness of an overall load reduction (OLR) incentive. This is a financial incentive that will encourage consumers to reduce their overall electricity usage by rewarding them for achieving targets for percentage reduction in their usage i.e. overall load reduction (OLR) incentive. Personalised targets for demand reduction will form the basis of the OLR incentive with financial rewards for consumers who achieve & surpass their targets. In effect, there are two rewards available to motivate consumers to change their electricity consumption a lower bill as a result of reduced usage plus a reward for achieving the target. Consumers testing this initiative will be communicated to with their demand reduction target at the beginning of the trial & receive feedback on progress towards their target via information on their Smart Bills. The OLR period will run from May to December The OLR panel on the Smart Bill will compare the overall usage during this period with the overall usage from May to December 2009 (benchmark period). The baseline is set at 10% reduction on benchmark consumption. Consumers will be advised by letter in May 2010 of their OLR target. All consumers on the OLR stimulus will be bi-monthly billed. The first bills with the OLR target will issue in July for the May/June period. Each bill will show the actual cumulative usage per consumer and will provide an indication of whether they are above or below the end of year target. This cumulative usage will be derived from the bi-monthly usage and added to usage since 1st May The calculations showing cumulative usage to date will be consumer specific and will be provided through the billing system. Over page is a mock-up illustration of what the OLR incentive panel on a Smart Bill might look like (Note all figures used are for illustrative purposes only). ESB Customer Supply is currently finalising the systems to deliver smart billing including the OLR initiative information. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 16

18 Example of OLR Panel on Smart Bill Reduce your Electricity Usage 2010 Electricity Reduction Target Your Target : Use less than 3,000 Units by Dec 31 st Your Usage : You have used 599 Units since May 1 st Reduce your usage goals At the end of This Billing Period: Your goal was to have used less than By the end of the Next Billing Period: Your goal is to have used less than 545 1,147 Units Units You are within your Goal Congratulations. Your bi-monthly goals help you meet your annual target. If you keep below these goals at the end of the year, you will earn 20 AS WELL AS any savings you make on your bill Electricity CBT Timelines Jul-Dec 2009: 6mth minimum Benchmark Data Collection Period began 1 st July collect current electricity usage data for trial consumers before the Smart Metering enabled energy efficiency initiatives are introduced. Jan-Dec 2010: 12mth Test Period will begin on 1 st January measure electricity usage after the introduction of the Smart Metering enabled energy efficiency initiatives. Feb 2011: Findings Report - understand effect of the Smart Metering enabled energy efficiency initiatives on consumer usage via quantitative analysis of the electricity usage data by Statisticians & results of qualitative analysis by Market Researchers (e.g. surveys of trial consumers). CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 17

19 2.2 Gas Customer Behaviour Trials (CBTs) Overview The overall objective of the Gas Customer Behaviour Trials (CBTs) is to ascertain the potential for smart metering enabled energy efficiency initiatives to effect measurable change in consumer behaviour in terms of reductions in overall energy use. The CBTs, which focus on Residential & SME (small-to-medium enterprise) gas consumers, have been designed to ensure that statistically robust findings will be produced that will give an accurate indication of what would be expected in a national smart metering roll-out scenario and the findings will thus inform the Smart Metering Cost Benefit Analysis. Consumers participating in the CBTs will be allocated to control groups & test groups. Up to 2,000 smart meters will be installed for the gas trials: The majority of these (1,925) will be used for an experimental trial with Residential consumers. A small subset of the meters (50) will be used for Gas SME case studies to supplement results from other international SME trials, particularly in Britain Customer Recruitment Customer recruitment for the residential CBT began in early August 2009 & was successfully completed by early September A random selection invite process was undertaken, similar to the Electricity CBT, to ensure that a representative sample of consumers participate in the Gas CBTs. Response rates to the invitation letters sent were very positive with an approx. 25% acceptance rate. Copies of the recruitment materials (letter & FAQ leaflet) are included in Appendix 1 & 2. Recruitment for the SME trial will begin in early Smart Metering Infrastructure for CBT After an extensive tendering process, Bord Gáis Networks selected technology vendors for the CBT during August Each CBT home is equipped with a smart gas meter (which replaces the existing gas meter) and an in-home communications hub. The smart gas meter features solid state ultrasonic measurement technology. Meter read data is transmitted to the in-home hub via low-power radio. The in-home hub then relays the meter read data on a daily basis to the IT management systems via SMS technology. Selected consumers CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 18

20 in the trial will be provided with an In-Home Display unit allowing them to monitor their gas consumption on a daily basis. The technical architecture is as shown in the diagram below: Gas CBT Technical Architecture IHD (Mains Powered) Low Power Radio HUB (Mains Powered) SMS GSM Network GSM Network SMS Data Management Service Low Power Radio Smart Gas Meter (Battery Powered) After agreeing technology integration schedules with the selected vendors and successful evaluation/demonstration of the selected technologies, smart meter installations commenced in late-sept Bord Gáis Networks have successfully installed all the required 1,925 residential meters by end-november This enables the start of the minimum benchmark data collection period on 1st December The data management system supervises the daily collection of data from the meters over the GSM network and makes this data available for billing and for analysis. End-to-end testing from the meters through to the data management system went well and final integration with Bord Gáis Networks existing IT systems has been completed Development of Smart Metering Energy Efficiency Initiatives Various energy efficiency initiatives enabled by Smart Metering will be introduced to the test groups. These initiatives will take the form of: Enhanced & more frequent information on gas usage & costs for consumers via Billing, Web & Dynamic Display units (also known as In-home Displays or IHDs) so as to enable self regulation of gas consumption. New tariffs or incentives that may encourage more energy efficient usage of gas. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 19

21 Development of the energy efficiency initiatives is being progressed by the Smart Metering industry work streams. Consumer focus groups have been held to better understand residential consumer attitudes to gas usage & the factors influence their usage behaviour. This information is being used in designing of the Smart Bills which is currently underway. The primary focus for the SME trial will be developing a Web based stimulus that will be able to give businesses access to a rich stream of information on their gas usage & costs, which can be in turn used to help them become more energy efficient & reduce their gas costs as a result. Preliminary work on the design of this SME Web stimulus for the trial is currently underway Gas CBT Timeline Residential CBT: o End- Nov 2009: Meter installations have been successfully completed. o Dec 2009 May 2010: 6mth Benchmark data collection period occurs from 1 st Dec 2009 to 31 st May o Jun 2010 May 2011: Smart Metering enabled energy efficiency initiatives will be introduced from the 1 st June 2010 with the 12mth test period due to conclude on 31 st May SME Trial: o Oct 2009 Jan 2010: Procurement activities o Feb 2010: Complete customer recruitment o End-May 2010: Complete meter installations o June 2010 May 2011: Smart Metering enabled energy efficiency initiatives will be introduced from the 1 st June 2010 with the 12mth test period due to conclude on 31 st May Cost Benefit Analysis (CBA): o Q1 2011: A checkpoint will be taken in early 2011 to integrate preliminary results from the Gas CBT into the Smart Metering Cost Benefit Analysis to be completed at end of Q o Q3 2011: It is envisaged that the full results of the gas trials could be included in an addendum to the CBA in Q CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 20

22 2.3 Technology Trials Background Smart metering is a new and immature technology with evolving functionality. Initial implementations were focussed on one way communication with the meter to automatically read it. In recent times the requirements for smart metering implementations have been evolving to include areas such as: Interval and time of use (ToU) Register Data kw and kvar import and export Events/Tamper Alarms Firmware Upgrades Outage Recording on Meter Basic Power Quality Monitoring Load Limiting, Variable settings Remote operation of switch embedded in meter. Smart metering is a hybrid technology consisting of three high level layers: Physical meters and associated devices Communications layer covering data transport and communications network management IT systems which manage the data, applications and services The communications layer is the area where a considerable number of challenges currently are, and as a result this is a key focus of the technology trials. In 2008 ESB Networks selected a number of solutions for the trials that were representative of the currently available communication technologies. As the functional requirements for smart metering in Ireland are likely to be leading edge a technology trial is seen as a key learning and risk mitigation project. Researching and trialling different communications technologies is also necessary because the unique nature of Ireland from both the perspective of population density and electricity network design means that substantial number of meters will be using wireless (Radio Frequency) communications. This will be one of the first major deployments of this type of technology in Europe. It is necessary because almost half of Irish electricity consumers live in rural areas where power-line carrier (PLC) would not be viable (analogous to the rural broadband problem). As the technology trials are different than the customer behaviour trials, consumers who have their meters replaced in this trial by smart meters will continue to be billed by their electricity supplier as normal and will not be put on CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 21

23 new smart energy efficiency initiatives, such as time of use tariffs, like those consumers participating in the electricity CBTs. The design of the technology trials is to allow for three elements of study: Bench / Lab Sandbox Field Further to this technical study of features and functionality not readily available in the trial technologies will be carried out by means of technical studies. Field test locations are chosen with the intention of studying the performance of AMI (advanced metering infrastructure) communication technologies in typical situations and also more difficult environments. In addition the technology trials will also facilitate an understanding of: The level of technical issues faced in replacing meters in problematic installations e.g. meter boxes needing repairs, unsuitable locations for meters, other remedial work required at the meter. Deployment and logistical issues. Risks and issues for full roll out Technologies being Used in the Trials The meters being installed for the trials will incorporate the various communications technologies including GPRS, Power Line Carrier (PLC) and RF (wireless) Meters with GPRS GPRS allows high-speed data services over existing GSM radio networks (which operates in the same way as a mobile phone). This is the technology being installed in the meters for the customer behaviour trials. ESB Networks can study the performance of this technology by using the infrastructure that is being used for the customer behaviour trials. The meters for this trial are all now in place: CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 22

24 GPRS over Vodafone Mobile network EI Server Meter Management, Data Management Data Storage Elster AS230 Smart meter with GPRS Module Meters with Wireless LAN module These meters will have a RF (Radio Frequency) wireless Local Area Network (LAN) module. There are a number of different potential technologies in this area. In North America, smart metering tends to be deployed using multi-hop RF Mesh. The meter collector receives and transmits signals to meters which, in turn, pass these signals on to other meters and eventually via a collector back centrally. The wireless signals will operate in the unlicenced spectrum area. Unlicenced wireless is mainly used in North America. Most of these solutions there are not compatible with available unlicenced spectrum in Ireland. ESB Networks are looking at the wireless in the two key areas of currently available unlicenced spectrum 2.4GHz and 868MHz. They are mainly deploying meters with wireless communications in the 2.4GHz similar to what is being deployed in almost 1,000,000 smart meters in Ontario, Canada. The technology ESB Networks are using is shown over page: CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 23

25 2.4ghz radio Trilliant Meshgate SerViewCom Meter Management, GPRS Data Storage repeater The systems to support this trial have been commissioned by ESB Networks. Currently these meters are being rolled out to about 2,500 consumers in the Cork City urban and Bandon rural areas. The meters come from Iskraemeco with the communications and IT systems coming from Trilliant. ESB Networks is also doing an evaluation with Elster on whether the unlicenced 868 MHz spectrum would also be suitable Meters with Power Line Carrier (PLC) Based LAN Power line carrier (PLC) technology uses signals sent over the low voltage (LV) electricity network downstream of the distribution transformers as the communications medium between meters and data concentrators. The data concentrator is generally connected to the LV busbar at the distribution transformers, i.e. one concentrator per transformer. These also then pass back and forth data via GPRS to the central IT system. The systems to support this CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 24

26 trial have been commissioned by ESB Networks. This trial is now underway with meters and equipment installed in the Limerick and Ennis Areas. The schematic below shows the power line carrier technology from Sagem which is being trialled: Ionos Meter Management, Data Storage Signal over DLC GPRS over Vodafone Mobile operators network ESB Networks are also doing a study with Aclara on how low frequency narrow band PLC might be used to meet requirements Conclusion on Electricity Technology Trials Update The technology trials are now well underway with ESB Networks targeting to report back on these trials by mid The total number of meters actually deployed in the electricity technology trials is now likely to be in the order of 4,000-5,000, in addition to the approx 6,500 meters in the CBT. However, as smart metering is a technology which continues to develop and as smart metering requirements also emerge ESB Networks will also be reviewing other available options. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 25

27 2.3.4 Note on Gas Technology Trials The CER s initial analysis indicates that gas smart meters are most economic when leveraging off an electricity smart metering infrastructure. The CER is working with Bord Gáis Networks & ESB Networks to ensure any overlapping gas smart metering technical trial requirements are included in the scope of the technology trials outlined above. Bord Gáis Networks will also conduct separate specific gas smart metering technology trials up to 500 gas smart meters will be installed for this. Details are currently being finalised Note on Water Smart Metering The CER have held preliminary discussions with the Department of Environment, Heritage & Local Government to examine if a smart metering infrastructure put in place for electricity could have synergies with any possible future requirements for water smart metering. The CER will continue to keep in touch with the Department to monitor any developments in this area. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 26

28 2.4 Prepayment The increased ability for consumers to monitor and adjust their consumption utilising the Smart Meter will also mean that energy supply companies will be able to combine daily consumption with updated payment information to facilitate similar services to the Pay-As-You-Go (PAYG) type pre-payment service as is currently available in the mobile telecommunications area. These opportunities are being analysed with the objective of agreeing an appropriate Smart Metering Prepayment Market Model. A small scale pilot will be carried out in 2010 to determine the feasibility of the provision of a service such as this. An outline of the trial is as follows: Smart Meter (Standard) Payment Channels Payments -Over-the-counter -IVR -EFT -Web Payments A/C Balance Threshold Balance SMS/AVT Meter Readings De/Reenergisation Daily Reads Networks D/E Requests Meter Data Management System The trial will be comprised of a small number of ESB Customer Supply customers following their agreement to participate. Account Balance will be calculated daily for these customers, inclusive of up to date consumption, received payments, and any debt repayment commitments. For the purposes of the trial participating customers will be able to determine their daily balance by SMS or by phone If outstanding credit runs low, warnings will be issued to the customer to top-up their account. The top-up process will consist of making a payment via any of ESB Customer Supply s existing payment channels CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 27

29 Payments are processed overnight and will be reflected in the following day s balance (other than laser payments over the phone/web which are immediate and cheque postal which can take longer). As with PAYG mobile phones, failure to maintain credit above agreed level will result in disconnection, following warnings. This will be carried out remotely at a pre-notified time. If a customer is disconnected, supply will be reconnected remotely once top-up payment is made and confirmed to ESB Customer Supply. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 28

30 2.5 Micro Generation Smart Metering offers new opportunities for expanding Micro Generation of electricity. A micro generation scheme was launched in February 2009 through which up to 4,000 interval meters are being made available for micro-generators (further details below). This removes need for a smart meter specific pilot but the Smart Metering Project will ensure required import/export data from this scheme is captured for analysis & input into the Smart Metering Cost Benefit Analysis (CBA). Details of the suite of micro generation measures announced by Minister Eamon Ryan on 26 Feb 2009, the learning s from which will then inform the development of a long-term micro generation programme, are outlined in the CER s Smart Metering Information Paper 2. CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 29

31 2.6 Cost Benefit Analysis (CBA) Using information gathered via the different Trials conducted as part of the Smart Metering Project Phase 1 & from other sources a Cost Benefit Analysis (CBA) will be developed to ascertain the costs & benefits that would be entailed in a full national roll-out of Smart Metering in Ireland. The CER have engaged the ESRI (Economic & Social Research Institute) to develop the Smart Metering CBA with the CER. Highlevel timelines have agreed with the ESRI for delivery of an interim CBA in September 2010 & a final CBA in March The objective of the CBA is to estimate the payoff to society of each roll-out option, compared to no action baseline. Options compared in the CBA will be derived from electricity & gas trials findings & other sources. All data from suppliers being analysed will be coded so as to protect consumer identification in line with Data Protection requirements. Preliminary preparation work for the Interim CBA was kicked-off by the CER in October 2009 & is currently ongoing. Further information on the types of costs & benefits attributable to smart metering is available in the following CER paper: Demand Side Management and Smart Metering Consultation Paper (CER/07/038) - March CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 30

32 3 Smart Metering Project Phase 1 Timelines High-Level timelines for the Smart Metering Project Phase 1 are depicted below: CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 31

33 4 Further Information Other CER publications on relating to Smart Metering which may be of interest are: Smart Metering CBTs Electricity Time of Use (TOU) Tariffs published 2nd October 2009 Smart Metering Project Phase 1 Information Paper 2 (CER/09/118) 31 st July 2009 Smart Metering Project Phase 1 Information Paper 1 (CER/09/024) 6 th Feb 2009 Arrangements for Micro Generation Decision and Response to Comments Received (CER/07/208) 20 th Nov 2007 Smart Metering - The Next Step in Implementation (CER/07/198) 5 th Nov 2007 Demand Side Management and Smart Metering Consultation Paper (CER/07/038) - March 2007 For further information on the Smart Metering Project you can contact Gary Martin at the Commission for Energy Regulation ( gmartin@cer.ie or tel.: ). CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 32

34 Appendix 1: Gas CBT Recruitment Invite Letter CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 33

35 Appendix 2: Gas CBT Recruitment FAQ Leaflet CER Information Paper 3: Smart Metering Project Phase 1 (CER/09/186) Page 34

National Smart Metering Programme. Consultation CER/11/191 Information Session 23 rd November 2011

National Smart Metering Programme. Consultation CER/11/191 Information Session 23 rd November 2011 National Smart Metering Programme Consultation CER/11/191 Information Session 23 rd November 2011 Welcome Cathy Mannion Director Electricity Networks & Retail CER Objective CER/11/191: Consultation on

More information

Smart Grid Demonstration Projects Update

Smart Grid Demonstration Projects Update Smart Grid Demonstration Projects Update Neil McGuinness Manager, Smart Metering, ESB Networks June 2010 Republic of Ireland Electricity Industry Structure Commission for Energy Regulation Independent

More information

The Smart Meter rollout programme

The Smart Meter rollout programme The Smart Meter rollout programme Cambridge Cleantech 3 rd July 2013 Ash Pocock Head of Industry, Regulatory and External Affairs EDF Energy July 2013 1 2013 Smart Metering - Key Questions Policy will

More information

Power Off & Save Pilot Programme

Power Off & Save Pilot Programme Power Off & Save Pilot Programme Frequent Asked Questions September 2016 1 P a g e Electric Ireland in association with EirGrid have a new and exciting opportunity for our Smarter Living Trial members

More information

Cost Reflective Tariffs

Cost Reflective Tariffs Cost Reflective Tariffs for Large Government,Commercial and Industrial Customers Customer Guide Introduction On September 2016, the Council of Ministers had approved the introduction Cost of Reflective

More information

Smart Grids from the perspective of consumers IEA DSM Workshop

Smart Grids from the perspective of consumers IEA DSM Workshop Smart Grids from the perspective of consumers IEA DSM Workshop 14 th November 2012 Linda Hull EA Technology Overview What is a smart grid? What do customers know about Smart Grids What do they know about

More information

Presented by Eric Englert Puget Sound Energy September 11, 2002

Presented by Eric Englert Puget Sound Energy September 11, 2002 Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable

More information

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012 A Guide to the medium General Service Conservation Rate BC Hydro Last Updated: February 24, 2012 Executive summary The way Medium General Service (MGS) accounts pay for electricity is changing. MGS is

More information

Abstract. Background and Study Description

Abstract. Background and Study Description OG&E Smart Study TOGETHER: Technology-Enabled Dynamic Pricing Impact Evaluation Craig Williamson, Global Energy Partners, an EnerNOC Company, Denver, CO Katie Chiccarelli, OG&E, Oklahoma City, OK Abstract

More information

Electricity Demand Reduction Pilot BSRIA. Charlie Lewis, DECC 25 March 2014

Electricity Demand Reduction Pilot BSRIA. Charlie Lewis, DECC 25 March 2014 Electricity Demand Reduction Pilot BSRIA Charlie Lewis, DECC 25 March 2014 Efficiency at the heart of a low carbon economy Energy Efficiency belongs at the heart of a lowcarbon economy. By reducing energy

More information

Application Guide for Aran Islands Electric Vehicle Programme

Application Guide for Aran Islands Electric Vehicle Programme Introduction to Aran Islands Electric Vehicle Programme SEI is supporting a project together with the Dept of Community, Rural and Gaeltacht Affairs to demonstrate how wind and ocean energy may be used

More information

Manager of Market Strategy and Planning September 22, 2008

Manager of Market Strategy and Planning September 22, 2008 One Utility s Perspective on Investment in Clean Energy Frederick Lynk Manager of Market Strategy and Planning September 22, 2008 6,400 employees N W 2.1M electric customers S 1.7M gas customers 24/7 operation

More information

EPRI DOE, and International Smart Grid Project Reviews Ireland Case

EPRI DOE, and International Smart Grid Project Reviews Ireland Case EPRI DOE, and International Smart Grid Project Reviews Ireland Case Mark O Malley Electricity Research Centre www.ucd.ie/erc 4th International Conference on Integration and Distributed Energy Resources,

More information

Evaluation and modelling of demand and generation at distribution level for Smart grid implementation

Evaluation and modelling of demand and generation at distribution level for Smart grid implementation Evaluation and modelling of demand and generation at distribution level for Smart grid implementation Dr.Haile-Selassie Rajamani Senior Lecturer Energy and Smart Grid Research Group University of Bradford,

More information

Green Drive Nov 2020

Green Drive Nov 2020 Green Drive Nov 2020 Tariff terms and conditions About your tariff Green Drive Nov 2020 prices are fixed until 30 November 2020. You ll pay a daily standing charge and unit rate for each fuel. We ll also

More information

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources A9 Data Monitoring and Analysis Report January 2016 Content 1. Executive Summary 2. Overview 3. Purpose 4. Baseline Data Sources 5. Casualty Analysis 6. Vehicle Speed Data 7. Incident Frequency & Impact

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES January 10, 2011 Presentation to Arvada City Council CONSULTANT TEAM LBA Associates MSW Consultants Denver based recycling and waste management consultant

More information

BGE Smart Energy Pricing: Customers are making it work

BGE Smart Energy Pricing: Customers are making it work BGE Smart Energy Pricing: Customers are making it work Institute for Regulatory Policy Studies Conference April 29,2010 Neel Gulhar Program Manager, Smart Grid Smart Energy Pricing Agenda BGE Smart Grid

More information

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities By: Nasser Kutkut, PhD, DBA Advanced Charging Technologies

More information

EC Forum on Model Approaches to Distribution Pricing. June 2009

EC Forum on Model Approaches to Distribution Pricing. June 2009 EC Forum on Model Approaches to Distribution Pricing June 2009 Session Explain Aurora UoS Pricing and fit with the Retail Model Approach Discuss how we transitioned a Demand tariff structure to Aurora

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

Smart Grid Progress and Plans

Smart Grid Progress and Plans Washington Council Of Governments November 17, 2011 Smart Grid Progress and Plans Robert Stewart Manager, Advanced Technology and New Business Pepco Holdings, Inc. 3 states and Washington DC in mid-atlantic

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 5842 Available on www.roymorgan.com Roy Morgan Unemployment Profile Thursday, 2 October 2014 Unemployment climbs to 9.9% in September as full-time work lowest since October 2011; 2.2 million

More information

Case study: Sweden. E.on Sverige's residential electricity bill. Context

Case study: Sweden. E.on Sverige's residential electricity bill. Context Case study: Sweden E.on Sverige's residential electricity bill Context Sweden was one of the first countries in Europe to complete the deployment of smart electricity meters to household consumers. In

More information

Consumers, Vehicles and Energy Integration (CVEI) project

Consumers, Vehicles and Energy Integration (CVEI) project Consumers, Vehicles and Energy Integration (CVEI) project Dr Stephen Skippon, Chief Technologist September 2016 Project aims To address the challenges involved in transitioning to a secure and sustainable

More information

Andrew Tang Smart Energy Web Pacific Gas and Electric Company September 18, 2009

Andrew Tang Smart Energy Web Pacific Gas and Electric Company September 18, 2009 Andrew Tang Smart Energy Web Pacific Gas and Electric Company September 18, 2009 Balancing Competing Priorities Environmental Sustainability Reliable Service Reasonable Cost Smart Grid 2 Challenges for

More information

Sacramento Municipal Utility District s EV Innovators Pilot

Sacramento Municipal Utility District s EV Innovators Pilot Sacramento Municipal Utility District s EV Innovators Pilot Lupe Jimenez November 20, 2013 Powering forward. Together. Agenda SMUD Snapshot Pilot Plan v Background v At-a-Glance v Pilot Schedule Treatment

More information

THE REAL-WORLD SMART CHARGING TRIAL WHAT WE VE LEARNT SO FAR

THE REAL-WORLD SMART CHARGING TRIAL WHAT WE VE LEARNT SO FAR THE REAL-WORLD SMART CHARGING TRIAL WHAT WE VE LEARNT SO FAR ELECTRIC NATION INTRODUCTION TO ELECTRIC NATION The growth of electric vehicles (EVs) presents a new challenge for the UK s electricity transmission

More information

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. 7-1 AVAILABLE In all territory served by the Company. APPLICABLE To Residential

More information

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies Explanatory Note accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies 1. Context A Consultation Forum was held on 18 April 2013 which

More information

Direct Energy Regulated Services

Direct Energy Regulated Services Decision 23986-D01-2018 Application for True-Up of the 2017 and 2018 Interim Rates for the Default Rate Tariff and the Regulated Rate Tariff December 4, 2018 Alberta Utilities Commission Decision 23986-D01-2018

More information

Electricity and Gas Retail Markets Report Q Information Paper

Electricity and Gas Retail Markets Report Q Information Paper Electricity and Gas Retail Markets Report Q1 2017 Information Paper Reference: CER/17247 Date Published: 22/01/2018 Public/ Customer Impact Statement The purpose of this report is to provide industry,

More information

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport Office of the Minister of Energy and Resources PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

More information

Energy Performance Information Request Timeline

Energy Performance Information Request Timeline Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when

More information

Meter Insights for Downtown Store

Meter Insights for Downtown Store Meter Insights for Downtown Store Commodity: Analysis Period: Prepared for: Report Date: Electricity 1 December 2013-31 December 2014 Arlington Mills 12 February 2015 Electricity use over the analysis

More information

July 16, Dear Mr. Randolph:

July 16, Dear Mr. Randolph: July 16, 2012 Edward F. Randolph Director of Energy Division California Public Utilities Commission 505 Van Ness Ave., Room 4004 San Francisco, CA 94102 Re: Southern California Edison Company Report on

More information

Enabling Smart grids for the future Frits Bruggink Senior Vice President and General Manager Echelon Corporation USA

Enabling Smart grids for the future Frits Bruggink Senior Vice President and General Manager Echelon Corporation USA Enabling Smart grids for the future Frits Bruggink Senior Vice President and General Manager Echelon Corporation USA Metering Is At a Generational Turning Point From electro-mechanical to digital From

More information

Smarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng

Smarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng Smarter Network Storage UK first multi-purpose application of grid scale storage Dr. Panos Papadopoulos, PhD, CEng UK Power Networks GENERATION TRANSMISSION DISTRIBUTION SUPPLY INDUSTRIAL COMMERCIAL RESIDENTIAL

More information

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation 1 Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources Power Sector Transformation Notice of Inquiry into the Electric Utility Business Model and Request for Stakeholder

More information

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions 1 What did Black Hills Energy file? We submitted a Phase 2 Rate Review proposal to the Colorado Public Utilities Commission (PUC) to complete the two-step process of updating electric rates, which were

More information

Electric School Bus Pilot Program - Webinar

Electric School Bus Pilot Program - Webinar Electric School Bus Pilot Program - Webinar A Climate Change Action Plan Initiative August 28, 2017 Outline Pilot Overview Climate Change Action Plan (CCAP) Minister s Mandate Letter Objectives Current

More information

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014 Solar and Smart Meter Update 1 April 2014 to 30 June 2014 Released July 2014 2 CONTENTS 1. Solar and Smart Meter Cases... 3 2. SMART METER UPDATE... 4 2.1. EWOV Smart Meter Cases Increase by 36%... 4 2.2.

More information

Group 3: Pricing from 1 April 2018 and load management

Group 3: Pricing from 1 April 2018 and load management Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa Signing of First SSEG Contract 23 September 2014 Black River Offices

More information

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division Central London Congestion Charging Scheme 17 March 2005 Impacts - 9 th Annual Conference Michele Dix Director Congestion Charging Division Contents 1. The Scheme 2. Impacts 3. Next Steps The Scheme Where

More information

Evolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design

Evolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design Edison SmartConnect Evolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design Southern California Edison An Edison International Company Southern

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: Staff proposes to modify its Tariff for Electric Service to increase the Daily Service Charge or Monthly Charge

More information

Residential Load Profiles

Residential Load Profiles Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

A9 Data Monitoring and Analysis Report. March Content. 1. Executive Summary and Key Findings. 2. Overview. 3. Purpose

A9 Data Monitoring and Analysis Report. March Content. 1. Executive Summary and Key Findings. 2. Overview. 3. Purpose A9 Data Monitoring and Analysis Report March 2018 Content 1. Executive Summary and Key Findings 2. Overview 3. Purpose 4. Baseline Data Sources and Methodology 5. Casualty Analysis 6. Vehicle Speed Data

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7761 Available on www.roymorgan.com Roy Morgan Unemployment Profile Monday, 8 October 2018 Unemployment down to 9.4% in September off two-year high Australian employment has grown solidly over

More information

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources A9 Data Monitoring and Analysis Report January 2018 Content 1. Executive Summary 2. Overview 3. Purpose 4. Baseline Data Sources 5. Casualty Analysis 6. Vehicle Speed Data 7. Incident Frequency & Impact

More information

Zero Emission Bus Impact on Infrastructure

Zero Emission Bus Impact on Infrastructure Zero Emission Bus Impact on Infrastructure California Transit Association (CTA) Fall Conference Nov 17, 2016 Russ Garwacki Director, Pricing Design & Research 626.302.6673 Russell.Garwacki@sce.com Barbara

More information

EUCL AMI Project Experience Share

EUCL AMI Project Experience Share EUCL AMI Project Experience Share James Musoni--Project Manager of Revenue Protection Program(RPP) EUCL COMPANY S STRUCTURE 2 General power system planning Energy infrastructure projects development Electricity

More information

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016 Boston Scientific Energy Storage Project Final Report (PUBLIC) November 2016 Executive Summary Kingspan ESB Limited applied for Energy RD&D funding for the Boston Scientific Solar PV Energy Storage Project

More information

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach 1 GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach Report was prepared by Working Group Smart Grids of GEODE GEODE Spring Seminar, Brussels, 13th of May 2014 Hans Taus, Wiener Netze

More information

DG system integration in distribution networks. The transition from passive to active grids

DG system integration in distribution networks. The transition from passive to active grids DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution

More information

11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe. MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole

11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe. MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole 11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole Graz, February 2010 Table of Contents Page 1 European perspective 1 2 Cost-benefit

More information

Consumers Energy/NRDC Collaboration on a Pilot Project to Defer Investment in a Michigan Substation

Consumers Energy/NRDC Collaboration on a Pilot Project to Defer Investment in a Michigan Substation Consumers Energy/NRDC Collaboration on a Pilot Project to Defer Investment in a Michigan Substation ACEEE Efficiency as a Resource Conference Little Rock, Arkansas September 21, 2015 Chris Neme, Energy

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016 Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number #545.3 Final Report October 1, 2016 Prepared for: Waste Diversion Ontario Continuous Improvement Fund Office Barrie, Ontario

More information

11. Electrical energy tariff rating

11. Electrical energy tariff rating 799 11. Electrical energy tariff rating 800 11. ELECTRICAL ENERGY TARIFF RATING There is no universal system for billing electrical energy. Each country generally adopts its own method, taking into account

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

Comhairle Cathrach Chorcaí Cork City Council

Comhairle Cathrach Chorcaí Cork City Council Transportation Division City Hall Cork Response to the Consultation Paper on the ESBN Electric Vehicle Pilot & Associated Assets Reference CER/16/286 Introduction welcomes the opportunity to respond to

More information

Decision on ESB Networks Electric Vehicle Pilot

Decision on ESB Networks Electric Vehicle Pilot DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/14/057 05 March 2014 Deirdre Bell (dbell@cer.ie) The Commission for Energy Regulation, The Exchange, Belgard Square North, Tallaght,

More information

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers

More information

A Transformational Approach to Energy Supply. September 2016 Gail Scholes, Jo Gilbert

A Transformational Approach to Energy Supply. September 2016 Gail Scholes, Jo Gilbert A Transformational Approach to Energy Supply September 2016 Gail Scholes, Jo Gilbert About Robin Hood Energy The UK s first Local Authority-owned fully licensed gas and electricity supplier. Bourne from

More information

New Rate Structure Encouraging greater efficiency

New Rate Structure Encouraging greater efficiency New Rate Structure Encouraging greater efficiency Presentation for CHENACT Project Stephen Worme Chief Marketing Officer March 31, 2010 Agenda Tariffs for Hotels Secondary Voltage Power (SVP) Large Power

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment

More information

Smart Grid OG&E

Smart Grid OG&E Smart Grid Program @ OG&E Carl Johnson Sr. Customer Programs Planner 1 OG&E s s Demand Response Program: Making the Customer Seamless through effective Communications & Customer Programs System Statistics

More information

Electricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version

Electricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version Electricity Network pricing schedule Module 15 Effective April 1, 2011 for Electricity line charges Version 2011.1 Contents Section 1: Pricing Schedules...3 1.1 Wellington electricity Network line charges...3

More information

PowerCom Pre-Payment. November Next Generation Smart Grid Solutions. For Further Information Please Contact:

PowerCom Pre-Payment. November Next Generation Smart Grid Solutions. For Further Information Please Contact: PowerCom Pre-Payment Next Generation Smart Grid Solutions November 2012 For Further Information Please Contact: joseph.wittman@powercom.co.il 1 +972 54 6888 341 Overview Powercom prepayment system is an

More information

Electric Vehicle Program

Electric Vehicle Program Cause No. 43960 INDIANAPOLIS POWER & LIGHT COMPANY Electric Vehicle Program Year 3 2013 Report May 2, 2014 Contents Background... 2 Project Objectives... 3 Current Status... 3 Significant Milestones...

More information

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E Amy G. Rabinowitz Counsel April 3, 2003 By Hand Mary L. Cottrell, Secretary Department of Telecommunications and Energy One South Station, 2 nd Floor Boston, MA 02110 Re: Massachusetts Electric Company

More information

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) indicated in the 2016-2018 Energy Efficiency

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

About Landis + Gyr manage energy better

About Landis + Gyr manage energy better About Landis + Gyr manage energy better One-Stop Solution Provider for Smart Community linking best-of-breed from Landis+Gyr and Toshiba Smart Grid applications: Building Management Distribution Automation

More information

New Hampshire Electric Cooperative s Smart Grid Project Frequently Asked Questions (FAQ)

New Hampshire Electric Cooperative s Smart Grid Project Frequently Asked Questions (FAQ) New Hampshire Electric Cooperative s Smart Grid Project Frequently Asked Questions (FAQ) What is the project overview? Between now and March 2013, NHEC will be replacing all of its existing electric meters

More information

Residential Smart-Grid Distributed Resources

Residential Smart-Grid Distributed Resources Residential Smart-Grid Distributed Resources Sharp Overview for EPRI Smart Grid Advisory Meeting Carl Mansfield (cmansfield@sharplabs.com) Sharp Laboratories of America, Inc. October 12, 2009 Sharp s Role

More information

Basic tariff guiding principles

Basic tariff guiding principles Basic tariff guiding principles Small-scale Embedded Generation (SSEG) tariffs This brief outlines the basic guiding principles in tariff design for municipalities, to support and adapt to a changing electricity

More information

Electricity and Gas Retail Markets Report Q2 2017

Electricity and Gas Retail Markets Report Q2 2017 An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Electricity and Gas Retail Markets Report Q2 2017 Information Paper Reference: CRU 17290 Date Published: 06/10/2017 An Coimisiún um

More information

Case study: Australia - Victoria

Case study: Australia - Victoria Case study: Australia - Victoria Origin Energy s residential electricity bill Context Victoria is the second largest electricity market in Australia with 2.3 million residential electricity customers.

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7433 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 12 January 2018 2.6m Australians unemployed or under-employed in December The latest data for the Roy Morgan employment

More information

Strategy for Promoting Centers of Excellence (CoE) Activities

Strategy for Promoting Centers of Excellence (CoE) Activities Strategy for Promoting Centers of Excellence (CoE) Activities 1. The Background of the ITU Centers of Excellence (CoEs) Network: The Centres of Excellence project was established pursuant to resolutions

More information

Economics and Barriers to Solar Photovoltaic Applications in Barbados

Economics and Barriers to Solar Photovoltaic Applications in Barbados Economics and Barriers to Solar Photovoltaic Applications in Barbados Roland R Clarke PhD Clarke Energy Associates www.clarkeenergy@aol.com clarkeenergy@aol.com Presented to Alternative Energy: Pathways

More information

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 4 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia ABSTRACT Two speed surveys were conducted on nineteen

More information

Rural Energy Access: Promoting Solar Home Systems In Rural Areas In Zambia A Case Study. O.S. Kalumiana

Rural Energy Access: Promoting Solar Home Systems In Rural Areas In Zambia A Case Study. O.S. Kalumiana Rural Energy Access: Promoting Solar Home Systems In Rural Areas In Zambia A Case Study O.S. Kalumiana Department of Energy, Ministry of Energy & Water Development, P.O. Box 51254, Lusaka ZAMBIA; Tel:

More information

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities November 2018 Customer Switching Report for the Electricity and Gas Retail Markets Information Paper Reference: CRU18266 Date Published:

More information

Manitoba Hydro Customer Consultation. Industrial Rates Workshop

Manitoba Hydro Customer Consultation. Industrial Rates Workshop Manitoba Hydro Customer Consultation Industrial Rates Workshop Industrial Rates Workshop Engage g Customers in Rate Development Increase understanding of rate-setting process Solicit feedback and input

More information

Tendering Public Charging Infrastructure for Electric Vehicles

Tendering Public Charging Infrastructure for Electric Vehicles European Best Practices: Tendering Public Charging Infrastructure for Electric Vehicles Best Value Procurement in the city of Arnhem Authors: Peter Swart, Arnhem City Roos van der Ploeg, MA legal & EV

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011 Smart Grid Update 2011 Supplier Conference Kevin Dasso Senior Director Technology & Information Strategy October 27, 2011 Agenda PG&E Smart Grid overview Implementation Approach Smart Grid Baseline Upcoming

More information

Energy Forum: Demand Side Management & May 6, 2010

Energy Forum: Demand Side Management & May 6, 2010 Energy Forum: Demand Side Management & DSE2 Avoidance May 6, 2010 Ohio Legislation S.B. 221 responds to concerns about rising electricity prices seen in states with expiring price caps S.B. 221 became

More information

System Status Briefing

System Status Briefing System Status Briefing Phakamani Hadebe Interim Group Chief Executive 3 May 2018 Contents 1 Performance summary 2 Operational highlights 3 Generation performance 4 Distribution overview 5 Transmission

More information

End-Customer Owned Decentralized Storage as a Part of the Smart Grid Volker Wachenfeld, SMA Solar Technology AG

End-Customer Owned Decentralized Storage as a Part of the Smart Grid Volker Wachenfeld, SMA Solar Technology AG End-Customer Owned Decentralized Storage as a Part of the Smart Grid Volker Wachenfeld, European Utility Week Amsterdam 04.-06.11.2014 Introduction: Photovoltaic in Germany Key Success Factors of PV >

More information

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview Who is TasNetworks? Delivering your power TasNetworks provides both distribution network services (via the poles and wires)

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

Unlocking the value of consumer flexibility. Creating sustainable value from connecting homes PassivSystems Limited

Unlocking the value of consumer flexibility. Creating sustainable value from connecting homes PassivSystems Limited Unlocking the value of consumer flexibility Creating sustainable value from connecting homes How do consumers access energy system benefits without active engagement?" New technologies = New opportunities

More information