Utilisation of High CO2- Content Flare Gas for Steam and Electricity Generation. Santiago Pástor Technical Manager PETROBRAS Ecuador December 2008

Size: px
Start display at page:

Download "Utilisation of High CO2- Content Flare Gas for Steam and Electricity Generation. Santiago Pástor Technical Manager PETROBRAS Ecuador December 2008"

Transcription

1 Utilisation of High CO2- Content Flare Gas for Steam and Electricity Generation Santiago Pástor Technical Manager PETROBRAS Ecuador December 2008

2 Index 1. Palo Azul Power Plant Project 2. B18 Field - CDM PROJECT: Incorporate Additional Gas Supply -2-

3 1.- Palo Azul Power Plant Project -3-

4 Topics 1. Location 2. Background 3. Technology and Operation 4. Environmental Issues 5. Location 6. Economic Issues 7. Video 8. Conclusions -4-

5 1. Location -5-

6 Location Petrobras operates the Pata and Palo Azul fields in Block 18, located 300 Km. from Quito, the capital of Ecuador. Concession area: approximately 110,000 hectares. Location: Northeast section of the Ecuadorian Amazon Region, in the Province of Orellana. -6-

7 Location COLOMBIA EC UADOR VENEZUELA GUYANAS PERU BOLIVIA CHILE PARAGUAY URUGUAY BRASIL ARGENTINA Panoramic View of the Palo Azul CPF -7-

8 2. Background -8-

9 Background In 2006, the Central Processing Facilities (CPF) were built with a capacity to process 40,000 BOPD (28 API), 75,000 BWPD and 12 MMSCF with 77% CO2. A power generation demand of 12 MW, with a MW installed capacity, powered by provisional, portable diesel-fuelled reciprocal engines at a high fuel cost. Ecuador imports its diesel. -9-

10 Background GOR wells = 400; 12 MMSCFD/ (77% CO2) Technological alternatives were analyzed for the use and disposal of the gas from flares for generating electricity and optimizing operating costs. -10-

11 Background Analyzed alternatives : Combustible gas in Internal Combustion Engines. Gas in Gas Turbines. Flare Gas and/or crude oil in electricity generation with steam cycle. -11-

12 Background Technical-economic analyses determined that the combined steam cycle system is the best option for achieving: Reduction of environmental emissions and noise pollution Better use of flare gases Minimum gas treatment Substantial reduction of operating costs -12-

13 Background Alternative of a dual combustion engine implied: Limited operating window when gas quality decreases With full Load: 100% Maximum gas utilization: 30% Requires other fuel (diesel o crude oil): 70% More environmental emissions, particularly CO2-13-

14 Background Poor gas operational window: Dual combustion engine Diesel share % 0 Gas share % NOT APPICABLE OPERATING AREA P = 68% Fuel share 40% CRO 60%, GAS 40% No estimate on heat rate Fuel Sharing APPICABLE OPERATING AREA Transfer window Engine load% -14- P = 100% Fuel share 27% CRO 73%, GAS 27% No estimate on heat rate P = 100% CRO mode CRO 100%, GAS 0% Guaranteed heat rate 8539 kj/kwhr at 35 C

15 Background The project was developed using SGPMP-PRODEP (PETROBRAS) methodology PLANNING CONTROL PROJECT APROVAL PHASE 1 IDENTIFICATION AND EVALUATION PHASE 2 ALTERNATIVE SELECTION CONCEPTUAL PROJECT PHASE 3 DETAIL OF SELECTED ALTERNATIVE BASIC PROJECT PHASE 4 EXECUTION PHASE 5 OPERATION (1st year) Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 DSP 1 DSP 2 DSP 3 VP 1 VP 2 FRONT END LOADING (FEL) Requirements for project definition DSP DECISION SUPPORT PACKAGE VP VERIFICATION PACKAGE -15-

16 Background APPLIED LAWS AND REGULATIONS: Ecuadorian Hydrocarbons Law, articles 11 and 24. Substitute Regulation of the Hydrocarbons Operations Regulation, articles: 11 and 13. Ecuadorian Water Act, article 82. General Rules for Applying the Water Act, articles: 13, 14 y

17 Background APPLIED LAWS AND REGULATIONS: Environmental Management Law, articles: 19 and 20. Environmental Regulation for the Electricity Industry, article 10. Electrical Sector Regime Law, articles : 2, 3, 30 and 40. Regulation of Concessions, Permits and Licenses for the Provision of Electrical Power Services, articles: 5, 11, 12, 54, 55 and

18 Background GOVERNMENTAL APPROVALS: Authorization to use gas: DNH (National Hydrocarbons Office) resolution #683 of Nov,17th Authorization to use crude oil: DNH resolution #74 of 8/Feb/

19 Background GOVERNMENTAL APPROVALS: Authorization to use water: CNRH (National Council of Water Resources) resolution dated 29/Nov/2005. Environmental License: CONELEC (National Electricity Council) resolution #DE of 6/Nov/2006. Authorization Contract for construction, installation and operation: executed with CONELEC on 9/Nov/

20 3. Technology and Operation -20-

21 Technology and Operation System : 2 steam 6 MW turbogenerators and MW motor generator. 12 MW net generation with gas, MW installed capacity. Back up motor generator fuelled by crude oil or diesel for start up and auxiliary system. Hybrid System using all high CO2- content gas with no prior treatment, depending on required demand. -21-

22 Technology and Operation Boilers with cutting-edge gas-crude oil dual burners. All available gas calorific energy is used. (470 BTU/CF) Additional contaminant of gas emissions (CO2, among others) are avoided by not burning fossil fuels, such as crude oil, diesel or bunker. -22-

23 Technology and Operation Power Generation Plant Layout BOILERS STEAM TURBINES COOLING TOWER GAS FWKO + SRU 6 MW c/u TO BOILERS CRUDE OIL TO MOTOR CRUDE OIL TREATMENT MW MOTO-GENERATOR

24 Technology and Operation Water-Steam Cycle (Rankine Cycle) -24-

25 Steam Circuit Layout COOLING TOWER STEAM 200 PSIG STEAM 600 PSIG 750 F TURBINE Generator FLOW PUMPS CONDENSER BOILER DEAERATOR 25 PSIG FEEDWATER PUMPS WATER REPLACEMENT PUMPS -25- CONDENSER PUMPS DEMINERALISED WATER TANK OSMOSIS PURGE WATER TANK FILTERS WATER TREATMENT CLARITY WATER DRAIN PIT TO CPF

26 3-D View of Plant -26-

27 Panoramic View of Boilers Area -27-

28 Boiler Unit -28-

29 Crude Oil Generator Unit -29-

30 4. Environmental Issues -30-

31 Environmental Issues EMISSIONS OF THE BOILERS vs REQUIREMENTS DINAPAª 10,000 DINAPA: GOVERNMENT ENVIRONMENTAL OFFICE UNITS [mg/nm3] 1, NOx CO PM SOx CO2 11% O2 11% O2 DINAPA LIMIT GAS@11% O2 DINAPA LIMIT OIL@11% O2-31-

32 5. Economic Issues -32-

33 Economic Issues Project allows the use of 100% of flare gas for the steam cycle as thermal energy. The achieved results consist of a 90% reduction in equivalent energy expenses, 37% savings (OPEX). -33-

34 Economic Issues Year 2007: Power Generation with Diesel # USD / Kw-hr 0.15 Kw-hr Gall / day January February March April May June July August September October November December Energy Kw-hr Diesel Gall/day Unit Cost YEAR

35 Economic Issues Year 2008: Power Generation with Flare Gas Kw-hr Gall /day and BOPD USD / Kw-hr January February March April May June July August September October November December YEAR Energy Kw-hr Diesel and Oil Units Costs

36 6. VIDEO -36-

37 Video Existing Plant Video -37-

38 7. Conclusions -38-

39 Conclusions Flexible system, poor gas options, poor and rich gas or crude oil blends. Use of flare gas, no prior treatment required, only removal of liquids. Reduction of 60 MTCDE/year. Possibility to use 100% of available gas (12 MMSCFD). Current use is 50%. Flexibility for adapting to future field requirements, depending on oil and formation water production. -39-

40 Conclusions Reduction of emissions compared to those of previous plant SO2 NOx CO MP EQUIP. (mg/m3) (mg/m3) (mg/m3) (mg/m3) Diesel Gen , Gas Boiler < 5 17 < 5 < 5 Reduction of noise from 115 to 88dB in turbines area. Immediate effects consisting of a 90% of energy savings and 37% of OPEX, approximately -40-

41 2.- B18 Field - CDM PROJECT: Incorporate Additional Gas Supply -41-

42 Gas avalability vs Power Demand Gas projection indicates continuing decrease in quantity: - Current 12 MMSCF vs.0.1mmscf (2022) Power demand increasing, expected peak of 23 MW in 2011 Future flare gas deficit in power demand peak: 3 MMSCFPD -42-

43 Project Generation Demand POWER GENERATION DEMAND MW Crude oil required= 1.6 MMBBLs Crude oil equivalent= 0.3 MMBBLs Total crude oil= 1.9 MMBBLs Years POWER GENERATION WITH GAS POWER GENERATION WITH CRUDE OIL POWER DEMAND PROJECTION (MW) -43-

44 Gas consumption GAS CONSUMPTION MMSCFPD Years AVAILABLE NET GAS REQUIRED GAS FROM OTHER FIELDS TOTAL NET GAS REQUIRED -44-

45 Objectives Gas purchase from nearby oil fields. Near future: Replace crude oil burning with gas burning. Expected savings aprox. 1.6 million barrels of crude oil in 14 years for the Block 18 oil field. Project development, currently status at Identification & Evaluation phase. -45-

46 Objectives Expected total savings of aprox. of 1.3 MMTCDE (not burning crude oil) during 14 years. Project meets CDM requirements Bonuses CER s are expected Project could be part of the Programatic CDM activities of Petrobras-PESA -46-

47 Thank You -47-

Note: This rule is effective on July 1, 2018, through June 30, 2019.

Note: This rule is effective on July 1, 2018, through June 30, 2019. RULE 3020 PERMIT FEE SCHEDULES (Adopted May 21, 1992; Amended July 16, 1992; Amended December 17, 1992; Amended August 21, 1997; Amended March 17, 1999; Amended June 15, 2000; Amended January 17, 2008;

More information

Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development

Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development For Official Use DSTI/SU/SC(2007)25 DSTI/SU/SC(2007)25 For Official Use Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development 14-May-2007 English

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000

More information

Monthly Market Detail - June 2018 Single Family Homes Miami-Dade County

Monthly Market Detail - June 2018 Single Family Homes Miami-Dade County ly Market Detail - June 218 Summary Statistics June 218 June 217 Paid in Cash 1,335 1,346 -.8% 286 33-5.6% $355, $335, 6.% Average Sale Price Dollar Volume $598,494 $57,82 18.% $799. Million $682.5 Million

More information

Monthly Market Detail - June 2018 Townhouses and Condos Miami-Dade County

Monthly Market Detail - June 2018 Townhouses and Condos Miami-Dade County ly Market Detail - June 218 Summary Statistics June 218 June 217 Paid in Cash 1,257 1,323-5.% 657 682-3.7% $24, $235, 2.1% Average Sale Price Dollar Volume $439,546 $384,319 14.4% $552.5 Million $58.5

More information

Summary Statistics. Closed Sales. Paid in Cash. Median Sale Price. Average Sale Price. Dollar Volume. Median Percent of Original List Price Received

Summary Statistics. Closed Sales. Paid in Cash. Median Sale Price. Average Sale Price. Dollar Volume. Median Percent of Original List Price Received ly Market Detail - May 218 Summary Statistics May 218 May 217 Paid in Cash 1,667 1,647 1.2% 888 943-5.8% $168, $159, 5.7% Average Sale Price Dollar Volume $231,288 $21,944 9.6% $385.6 Million $347.4 Million

More information

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping IBIA/BMS United A glimpse into the future of shipping 30 May 2018, Athens, Greece

More information

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE Title of the measure: SPA51-PIVE Efficient-Vehicle Incentive Programme General description PIVE Programme was approved in Cabinet Meeting of 27 September 2012 with an initial budget allocation of 75 million,

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Procurement Authorization Amendment Purchase of 18 Forty Foot Low Floor Clean Diesel City Buses Date: July 29, 215 To: From: TTC Board Chief Executive Officer Summary This

More information

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which: DATE: July 16,2007 TO: FROM: SUBJECT: CITY COUNCIL CITY MANAGER CONSIDERATION OF ADOPTION OF NEW FEDERAL STANDARDS RELATING TO ELECTRIC UTILITIES UNDER THE PUBLIC UTILITIES REGULATORY POLICIES ACT AND

More information

Appendix G Examples and Recommended Methods

Appendix G Examples and Recommended Methods Reporting Outages to the Generating Availability Data System (GADS) Introduction The examples in this appendix illustrate the reporting of outages and deratings to GADS. They are based on a fictional 600

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

Contributing to a better lifestyle by addressing congestion and environmental damages from transportation

Contributing to a better lifestyle by addressing congestion and environmental damages from transportation Contributing to a better lifestyle by addressing congestion and environmental damages from transportation Giorgio Brosio Universita di Torino Prepared for el Foro sobre Cambio Climático y Estilos de desarrollo

More information

Contact person: Pablo Taboada Mobile:

Contact person: Pablo Taboada   Mobile: Contact person: Pablo Taboada e-mail: ptaboada@aenor.es Mobile: 34 609015450 Génova 6 28004 Madrid. Spain Phone: 34 91 4326004 Fax: 34 91 3190581 CDM Executive Board RESPONSE TO REQUEST FOR REVIEW Request

More information

Hoerbiger Wellhead Compression at OMV PETROM. Bucharest, April 2015 Rudolf Navratil Vasile Stănculescu

Hoerbiger Wellhead Compression at OMV PETROM. Bucharest, April 2015 Rudolf Navratil Vasile Stănculescu Hoerbiger Wellhead Compression at OMV PETROM Bucharest, Rudolf Navratil Vasile Stănculescu Joining Forces OMV-PETROM Biggest company in Romania and biggest oil & gas company in South Eastern Europe Hoerbiger

More information

Docket No EI Date: May 22, 2014

Docket No EI Date: May 22, 2014 Docket No. 140032-EI Big Bend Units 1 through 4 are pulverized coal steam units that currently use distillate oil 2 for start-ups and for flame stabilization. The Company seeks to use natural gas in place

More information

PET(S) FIRST & LAST NAME: January 2019

PET(S) FIRST & LAST NAME: January 2019 January 2019 1 2 3 4 5 New Year's Day 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SPECIAL TE We will not have Doggie available during these dates: *3/29-4/7, 4/19-4/21, 5/24-5/27,

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 5842 Available on www.roymorgan.com Roy Morgan Unemployment Profile Thursday, 2 October 2014 Unemployment climbs to 9.9% in September as full-time work lowest since October 2011; 2.2 million

More information

7th national report on promoting the use of biofuels and other renewable fuels in transport in Portugal Directive 2003/30/EC

7th national report on promoting the use of biofuels and other renewable fuels in transport in Portugal Directive 2003/30/EC Directorate-General for Energy and Geology 7th national report on promoting the use of biofuels and other renewable fuels in transport in Portugal Directive 2003/30/EC (2009) June 2010 1. Introduction

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Engineers Ireland Site Visit 23 rd March 2010

Engineers Ireland Site Visit 23 rd March 2010 Whitegate Independent Power Plant CER Site Visit 24 th October 2008 CER Site Visit 24 th October 2008nt Engineers Ireland Site Visit 23 rd March 2010 Agenda Presentation of project and progress to date.

More information

Pedro Nunes. July 2016

Pedro Nunes. July 2016 Integration of PV and electric vehicles in future energy systems Pedro Nunes July 2016 1. background 2 context Sectors of energy and transport are the biggest GHG emitters in the EU (30% and 20%, respectively)

More information

California s Success in Controlling Large Industrial Sources

California s Success in Controlling Large Industrial Sources California s Success in Controlling Large Industrial Sources Endicott House 2006 Symposium Mike Scheible Deputy Executive Officer California Air Resources Board California Environmental Protection Agency

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000

More information

Impacts of Weakening the Existing EPA Phase 2 GHG Standards. April 2018

Impacts of Weakening the Existing EPA Phase 2 GHG Standards. April 2018 Impacts of Weakening the Existing EPA Phase 2 GHG Standards April 2018 Overview Background on Joint EPA/NHTSA Phase 2 greenhouse gas (GHG)/fuel economy standards Impacts of weakening the existing Phase

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after February 1, 2019. SEDC:60/7/8/9 SECTION 1. AVAILABILITY AND APPLICABILITY 1.1

More information

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1 Docket No. DE - Dated: 0/0/0 Attachment CJG- Page 8 9 Summary of Forecasted Energy Service 0 Cost For January 0 Through December 0 TOTAL COST Cents per KWH Reference Fossil energy costs $ 9,9 $. Attachment

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Sustainable Growth and EU 2020 Sustainable Mobility and Automotive Industry Brussels, 7 March 2014 ENTR/B4/GG (2014)651836 by email to: 1998Agreement-Missions@lists.unece.org,

More information

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009 3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009 Nitrogen emission data, as well as the model results presented here have been approved by the 35 th Session of the Steering Body of EMEP in Geneva

More information

Flexible Fossil Power Generation- A Manufacturer s Perspective

Flexible Fossil Power Generation- A Manufacturer s Perspective Flexible Fossil Power Generation- A Manufacturer s Perspective Greg Kelsall 12/03/ 2014 Agenda Alstom Background Clean Power, Clean Solutions Flexible Fossil Power Generation - 12/03/2014 P 2 Three main

More information

Effect of SOx and NOx Regulation Implementation, ECA s and NOx Tier III Current Developments in General

Effect of SOx and NOx Regulation Implementation, ECA s and NOx Tier III Current Developments in General Effect of SOx and NOx Regulation Implementation, ECA s and NOx Tier III Current Developments in General ASEF 2013, KOBE, November 6, 2013 Toru Nakao Hitachi Zosen Corporation, Japan 2 ECA status Emission

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule

More information

Regulatory update on implementation of the 0.50% sulphur limit for international shipping

Regulatory update on implementation of the 0.50% sulphur limit for international shipping Regulatory update on implementation of the 0.50% sulphur limit for international shipping Marshall Islands Quality Council (MIQC), 19 April 2018 Trinity House, London Dr Edmund Hughes Marine Environment

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018) ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA () Availability This rate shall be available for the firm power requirements

More information

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience Workshop on Air Quality and Environmentally Sustainable Transport April 28 th 2011 Don S. Jayaweera Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through

More information

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool 2018 6 1 1:Sun, 2:Mon 2018-2019 Date Event or Holiday Aug 16 Board Meeting 6pm Aug 23 Open House June 2018 July 2018 August 2018 Sep 06 Board Meeting 6pm Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th

More information

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019 No. January 209 CONSUMER PRICE INDICES Information bulletin Moscow 209 No. (87) January 209 Consumer prices by group of goods and services (per cent change month-on-month) Table Inflation Core inflation

More information

FUEL ADJUSTMENT CLAUSE

FUEL ADJUSTMENT CLAUSE Page 26.1 ENTERGY NEW ORLEANS, INC. ELECTRIC SERVICE Supersedes: FAC effective 6/1/09 RIDER SCHEDULE FAC-5 Schedule Consists of: One Sheet Plus Schedule A and Attachments A and B FUEL ADJUSTMENT CLAUSE

More information

Section 10. Renewable Energy

Section 10. Renewable Energy Section 1. enewable Energy Sources. The Nation consumed 6.2 quadrillion Btu of renewable energy in 23, accounting for 6 percent 1 of total energy consumption during the year. At 2.8 quadrillion Btu, conventional

More information

The Director, Purchasing and Materials Management recommends that:

The Director, Purchasing and Materials Management recommends that: STAFF REPORT ACTION REQUIRED Request for Quotation 6902-07-3168 For the supply, delivery and off-loading of Pre-blended Ethanol Unleaded Gasoline, and Pre-blended Bio-diesel and Low Sulphur Diesel Fuels

More information

The Oil and Gas Sector

The Oil and Gas Sector Yuriy Bobylev The Oil and Gas Sector The world market in was characterized by the persistence of high global oil and natural gas prices. The average price of Russian Urals crude oil on the European market,

More information

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule) KEY RATE DEFINITIONS Seasonal Rate Periods (applicable to all rates) Billing Months are defined as June, July, August, and September. Billing Months are defined as December, January, February, and March.

More information

Rwanda Biofuels Limited. Powering Rwanda s Development

Rwanda Biofuels Limited. Powering Rwanda s Development Rwanda Biofuels Limited Powering Rwanda s Development 1. Global Bio-Fuel Industry Trans esterification of vegetable oil was conducted as early as 1853, many years prior to the first diesel engine. Trans

More information

northeast group, llc South America Smart Grid: Market Forecast ( ) Volume IV February 2018

northeast group, llc South America Smart Grid: Market Forecast ( ) Volume IV February 2018 northeast group, llc South America Smart Grid: Market Forecast (2018 2027) Volume IV February 2018 www.northeast-group.com South America Smart Grid: Market Forecast (2018 2027) After years of slow progress,

More information

EXECUTIVE SUMMARY ATLANTIC SALMON NO 03/06

EXECUTIVE SUMMARY ATLANTIC SALMON NO 03/06 MARKET This table shows development in supply/consumption of Atlantic salmon in the main markets per month, in tonnes r.w The table contains preliminary figures and may diverge from same figures in the

More information

Gas Fuelled Container Ship

Gas Fuelled Container Ship SAMSUNG HEAVY INDUSTRIES Company name Gas Fuelled Container Ship ( Evaluation of Economic Analysis ) H.C. Jung October 16, 2015 1 Contents Background - Environmental Issue - IMO Future Regulation Gas Fuelled

More information

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda UNITED NATIONS Distr. GENERAL 11 July 2001 ENGLISH ONLY SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, 16-27 July 2001 Item 3 (b) of the provisional agenda REPORTS ON

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

Section 5. Crude Oil and Natural Gas Resource Development

Section 5. Crude Oil and Natural Gas Resource Development Section 5. Crude Oil and Natural Gas Resource Development The September 4 rotary rig count was 1,4, slightly higher than the count in August 4 and 13 percent higher than the count in September 3. Of the

More information

M Resort Spa Casino. Tom Chirdon. Faculty Advisor: William P. Bahnfleth Spring 2009

M Resort Spa Casino. Tom Chirdon. Faculty Advisor: William P. Bahnfleth Spring 2009 M Resort Spa Casino Tom Chirdon Faculty Advisor: William P. Bahnfleth Spring 2009 Project Background Project Cost : $1 Billion Ground Breaking: Spring 2007 Opened: March 1, 2009 Owner: Marnell Corrao

More information

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Association of Equipment Managers (AEM) CONEXPO / CON-AGG 2014 Las Vegas, NV March 5, 2014 1 1 Topics To Be Covered

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7353 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 11 October 2017 2.498 million Australians (18.9%) now unemployed or under-employed In September 1.202 million

More information

METHODOLOGY FOR THE ANALYSIS OF THE PRODUCTIVE INTEGRATION AND DEVELOPMENT OF ADDED VALUE LOGISTICS SERVICES POTENTIAL RELATED TO THE IIRSA PROJECTS

METHODOLOGY FOR THE ANALYSIS OF THE PRODUCTIVE INTEGRATION AND DEVELOPMENT OF ADDED VALUE LOGISTICS SERVICES POTENTIAL RELATED TO THE IIRSA PROJECTS METHODOLOGY FOR THE ANALYSIS OF THE PRODUCTIVE INTEGRATION AND DEVELOPMENT OF ADDED VALUE LOGISTICS SERVICES POTENTIAL RELATED TO THE IIRSA PROJECTS Progress of the Application August of 2009 Contents

More information

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective Our energy working for you. TM Power topic #EMERPT-6194-EN Technical information from Cummins Power Generation Medium Combustion Plants Directive White Paper By Pedro Ponte, Project Application Engineer

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

Opportunities in CNG. July, 2016

Opportunities in CNG. July, 2016 Opportunities in CNG July, 2016 1 2 3 4 Where we started Where we re going What we ve learned How we help AMP began by building a renewable CNG plant to supply long-haul trucks with cheap and clean natural

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/TRANS/WP.15/2013/16 Distr.: General 16 August 2013 Original: English Economic Commission for Europe Inland Transport Committee Working Party on the Transport

More information

ILLINOIS COMMERCE COMMISSION

ILLINOIS COMMERCE COMMISSION ILLINOIS COMMERCE COMMISSION Public Notice of Successful Bidders and Average Prices Ameren Illinois Company and Commonwealth Edison Company Spring 2015 Procurement of Standard Energy Products April 1,

More information

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2)

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2) Consultation Document regarding the change in the RSA Producer Price Index (PPI) base used in the calculation of ROMPCO s tariff for volumes not exceeding 120 million gigajoules per annum ( GTA1 tariff

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

Amayo Project Summary

Amayo Project Summary 1 Amayo Project Summary Total Capacity: 39.9 MW Net annual energy production: 169,000 MWh Installation of 19 Suzlon S88v3 wind turbines of 2.1 MW each Suzlon supplies the WTG and completes mechanical and

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective 2 Storage: the DNO perspective Context to the storage boom Smarter Network Storage: What have we achieved?

More information

Refining Fitness Check Concawe Step 2 data Highlights

Refining Fitness Check Concawe Step 2 data Highlights ENVIRONMENTAL SCIENCE FOR THE EUROPEAN REFINING INDUSTRY Refining Fitness Check Concawe Step 2 data Highlights Concawe Symposium Brussels 24 February 2015 C. Caiado, Research Associate Concawe data collection

More information

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE 10 MAY 2018 Page 1 of 19 TABLE OF CONTENTS Introduction... 6 Applicable Law... 6 The Methodology... 6 Decision-Making

More information

Georgia Drycleaner Compliance Calendar

Georgia Drycleaner Compliance Calendar 2011 Georgia Drycleaner Compliance Calendar Georgia Small Business Environmental Assistance Program 4244 International Parkway Suite 120 Atlanta, Georgia 30354 (404) 362-4842 or toll free at 1-877-427-6255

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

The Carnot Group. TCG Boiler Hire. Engineering Solutions. Whatever your steam needs we deliver. LPG Boilers ABN

The Carnot Group. TCG Boiler Hire. Engineering Solutions. Whatever your steam needs we deliver. LPG Boilers ABN The Carnot Group ABN 91 090 511 103 Engineering Solutions TCG Boiler Hire Whatever your steam needs we deliver Electric Boilers Diesel Boilers LPG Boilers Boiler Hire TCG provides a steam boiler rental

More information

Cost Reflective Tariffs

Cost Reflective Tariffs Cost Reflective Tariffs for Large Government,Commercial and Industrial Customers Customer Guide Introduction On September 2016, the Council of Ministers had approved the introduction Cost of Reflective

More information

Bulk Storage Containers

Bulk Storage Containers UCSB AST SPCC SELF-INSPECTION CHECKLIST Year: Responsible Department: Tank Location: Tank ID: Bulk Storage Containers Total tank capacity: Petroleum type and amount: Secondary containment type: (diesel,

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL

More information

Mini refinery feasibility study

Mini refinery feasibility study Mini refinery feasibility study Introduction The first part of any study into a mini-refinery application is an initial assessment of its economic feasibility. This requires an understanding of what a

More information

Investigation of the Impact the I-94 ATM System has on the Safety of the I-94 Commons High Crash Area

Investigation of the Impact the I-94 ATM System has on the Safety of the I-94 Commons High Crash Area Investigation of the Impact the I-94 ATM System has on the Safety of the I-94 Commons High Crash Area John Hourdos and Stephen Zitzow Minnesota Traffic Observatory Overview Project Objectives I- 94 High

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE Effective: April 2015 Billing Cycle AVAILABILITY: The E-27 Price Plan is subject

More information

Ambient PM 10 Monitoring Sechelt, B.C Update

Ambient PM 10 Monitoring Sechelt, B.C Update Ministry of Environment LOWER MAINLAND REGION Ambient PM 10 Monitoring Sechelt, B.C. 2004-2005 Update E N V I R O N M E N T A L Q U A L I T Y Library and Archives Canada Cataloguing in Publication Data

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

New York s Mandatory Hourly Pricing Program

New York s Mandatory Hourly Pricing Program New York s Mandatory Hourly Pricing Program Case 03-E-0641 Chris Graves NYS Department of Public Service October 2009 Mandatory Hourly Pricing (MHP) Background September 1998 Niagara Mohawk institutes

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

Proposal for a Traffic Management Policy. National Committee for Economic Development (NCED) 18 th August 2004

Proposal for a Traffic Management Policy. National Committee for Economic Development (NCED) 18 th August 2004 Proposal for a Traffic Management Policy National Committee for Economic Development (NCED) 18 th August 2004 Transport & Economy GDP Rs 1,400 billion Contribution of Transport Rs 170 billion (12%) Employment

More information

The Israel Fuels choices Initiative

The Israel Fuels choices Initiative The Israel Fuels choices Initiative Reducing World Dependence on Oil in Transportation Haim Rosenbaum DOR Group Agenda The importance of finding alternative solutions Oil substitutes current status Dor

More information

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017 FOR RELEASE AT 10:00 AM EDT, TUESDAY, MAY 23, MONTHLY NEW RESIDENTIAL SALES, APRIL Release Number: CB17-80 May 23, - The U.S. Census Bureau and the U.S. Department of Housing and Urban Development jointly

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

California s Emission Reduction Plan for Ports and International Goods Movement

California s Emission Reduction Plan for Ports and International Goods Movement California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency

More information

EU Refining Sector Fitness Check

EU Refining Sector Fitness Check EU Refining Sector Fitness Check Progress Update 22 May 2014 Robert Marschinski - European Commission, (jointly with D.Bakhtieva, L.Delgado, P.Eder, M.Mraz, U.Temurshoev) Content Fitness Check: objective,

More information

Emissions Legislation

Emissions Legislation Emissions Legislation Potential Impact of the Medium Combustion Plant Directive 1 SAACKE Presentation All rights reserved by SAACKE Combustion Services Ltd, UK and SAACKE GmbH, Bremen The formation of

More information

Fuel Savings Agreement using ECO technology for Diesel Reciprocating Engine Power Generators

Fuel Savings Agreement using ECO technology for Diesel Reciprocating Engine Power Generators Fuel Savings Agreement using ECO technology for Diesel Reciprocating Engine Power Generators EXAMPLE: Thirty (30) Diesel Fueled Cummins KTA50 G3 GENSET Operating at 7000 hours a year and power factor of

More information

Kia Financial Statement Changes. January Dear Accounting Customer:

Kia Financial Statement Changes. January Dear Accounting Customer: ADP, Inc. Dealer Services 5607 New King Street Troy, MI 48098 2010 Financial Statement Changes Kia January 2010 Dear Accounting Customer: There have been several changes requested by Kia for the 2010 financial

More information

State of the States NATIONAL BIODIESEL BOARD. Jacobsen Conference. Shelby Neal. May 24, 2018 Chicago, IL

State of the States NATIONAL BIODIESEL BOARD. Jacobsen Conference. Shelby Neal. May 24, 2018 Chicago, IL NATIONAL BIODIESEL BOARD State of the States Jacobsen Conference May 24, 2018 Chicago, IL Shelby Neal Director of State Governmental Affairs National Biodiesel Board 1 NATIONAL BIODIESEL BOARD Represent

More information

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business. Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework

More information

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments FY1996 1. Sept. 22, 1996 280 assemblies in 8 casks to SRS [First East Coast Shipment] FY 1997 Sweden 64 Switzerland 42 Germany 125 Chile 28 Columbia 21 2. Dec. 15, 1996 41 spent fuel assemblies in one

More information

PUBLIC UTILITIES COMMISSION

PUBLIC UTILITIES COMMISSION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. PUBLIC UTILITIES COMMISSION FINAL DECISION THRESHOLD

More information

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918) 999978000 Crane Inspection Log Mailing Address: P.O. Box 581510 Tulsa, OK 74158-1510 Physical Address: 4707 North Mingo Road Tulsa, OK 74117-5904 Phone: (918) 836-0463 Fax: (918) 834-5979 www.autocrane.com

More information