1 ver ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN Owner of the declaration: Moelven Modus Program operator: Publisher: Declaration number: NEPD EN Registration number: NEPD EN ECO Platform reference number: Issue date: Valid to: Portal and Door Package Moelven Modus AS/AB NEPD EN Portal and Door Package, Moelven Modus AS/AB 1/7

2 General information Product: Portal and Door Package patition system Owner of the declaration: Moelven Modus AS/AB Contact person: Matti Makkonen Phone: Program operator: Post box 5250 Majorstuen, 0303 Oslo, Norway Manufacturer: Moelven Modus AS/AB Postbox 63, 2051 Jessheim, Norway Phone: Phone: Declaration number: ECO Platform reference number: This declaration is based on Product Category Rules: CEN Standard EN serve as core PCR PCR for room partition systems, v. 1.2, by the Institut Bauen und Umwelt. Date of PCR version 1.4: Statement of liability: The owner of the declaration shall be liable for the underlying information and evidence. EPD Norway shall not be liable with respect to manufacturer information, life cycle assement data and evidences. Declared unit: 1 m² of the fullwall element of the Portal and Door Package partition system, including the associated fixing components and sealants at the interfaces with the stationary wall, floor and ceiling. The door leaf is not manufactured by Moelven and is not included in this EPD. Declared unit with option: Production and waste handling of 1 m 2 of the fullwall element of the Portal and Door Package partition system, including the associated fixing components and sealants at the interfaces with the stationary wall, floor and ceiling Place of : Hulån (Sweden) Management system: ISO 9001 ISO Organisation no.: Issue date: Valid to: Year of study Comparability: EPDs of construction products may not be comparable if they do not comply with EN and are not seen in a building context. The EPD has been worked out by: Martyna Mikusinska Verification: The CEN Norm EN serves as the core PCR. Independent verification of the declaration and data, according to ISO 14025:2010 interntal Third party verifier: external Approved PhD Andreas Brekke (Independent verifier approved by EPD Norway) NEPD EN Portal and Door Package, Moelven Modus AS/AB 2/7

3 Product Product description The Portal and Door Package partition wall consists of sealed fields of MDF boards and doorframes of solid wood, and constitutes complementing products to other system walls from Moelven, such as the products series Glass Front and Flush Front. The Modules are preconstructed in factories and easily mounted at the construction site for a sleek separation of space.the design of the partition wall makes it easy to disassemble, move and put together again without breaking any parts. Thus, during its lifetime, Portal and Door Package can be moved several times to conform with changes in the indoor layout of the building. Portal Door package Materials Share Share MDFboard 25,13 Wood 17,90 Metal 1,43 Plastics 0,02 Mineral wool 0,43 Topcoat 1,35 Primer 1,50 Glue 0,04 Rubber 0,13 Total 47,96 52,4% 37,3% 3,0% 0,04 % 0,9% 2,8% 3,1% 0,1% 0,27 % 100 % 35,70 10,10 1,34 0,02 0,44 1,35 1,50 0,04 0,11 50,60 70,6% 20,0% 2,6% 0,0% 0,9% 2,7% 3,0% 0,1% 0,2% 100 % Product specification In this EPD, the products Portals and Door Package are declared. The utility of the products are equal, and the material composition similar. A visual difference between Portal and Door Package is that the door leaf in Door Package is placed slightly inward from the door frame while the door leaf in Portal is leveled with the rest of the surface. Both products have an inner structure consisting of wood studs and an isolating layer of stone wool. The surface consists of painted MDFboards and wooden frames. Reference service life, product 60 years Technical data Dimensions and weight of a standard module: (Portal / Door Package) Width: 994 mm Height: mm Thickness: 122 mm Area: 1,7 m 2 Weight: 82 / 86 Sound insulation index Rw LAB 3035 db Market Nordic LCA: Calculation rules Documentation of performed sound resistance tests is presented in appendix 6 of the bacround report, LCAreport Sweco Declared unit with option Production and waste management of 1 m² of the fullwall element of the Portal and Door Package partition system, including the associated fixing components and sealants at the interfaces with the stationary wall, floor and ceiling. System boundary The following stages have been declared: A1A5 ( phase), C14 (waste management phase). See flowsheet to the right. B1B7 (use phase) is not accounted for. Cutoff criteria All major raw materials and all the essential energy is included. Production processes for raw materials and energy flows which represent very small amounts (<1 %) have been excluded. This cutoff rule does not apply for hazardous substances. Allocation The allocation is made in accordance with the provisions of EN Principally allocation is avoided by subdivision of included processes. When subdivision is no option, incoming energy and material flows are allocated among all products made in the given processbased on physical relationships between them. Energy flows in Moelven Modus factory, which could not be subdivided (lights, computers, heating etc.) were allocated based on the amount of space that each product requires for its. Division by use of space is well applicable in this case because, besides the units for which energy use was subdivided, the factory is largely used as a warehouse. Data quality Specific data for usage of energy and materials have been used for 90% of the product's mass. Bacround data have been modelled with generic data from the Ecoinvent 3.1 database. Extraction natural resources Metal manufacturing Metal components Use of energy and water Silviculture and logging Wood treatment MDFboards Production of Portal and Door Package Installation Use >60 years Dismantling Silviculture and logging Wood treatment Wooden boards Waste managment, recycling, incineration, landfill Extraction natural resources Material/ substances manufacturing Remaining components Primer and topcoat System boundary The data is representative according to temporal, geographical and technological requirements. Bacround datasets are from 2003 or later, and updated 2010 or later. For assessment of MDFboards and mineral wool verified EPD:s were used as datasource (see full references in bibliography at the end of this EPD). Specific processes were assessed with average data for one year of (principally year 2016). Glue Packaging A1A4 A5 B1B7 C1C4 NEPD EN Portal and Door Package, Moelven Modus AS/AB 3/7

4 LCA: Scenarios and additional technical information The following information describes the scenarios in the different modules of the EPD. Reference service life The RSL of 60 years is defined for a scenario with standard use in an office environment, which could involve moving of the partition wall to conform to changes in the office space. Accidents or other types of unexpected changes of environment are not taken into account for the RSL. Production of Portal and Door Package at Moelven Modus (A3) The manufacture of Portal and Door Package at Moelven Modus factory comprises milling, cutting and painting of MDFboards. Additionally, mineral wool and wooden studs are cut according to specific order. Processed components are then put together into modules which easily can be mounted at the building site. All of the components are packed on wooden pallets for transport to the building site (A4). Transport from place to user (A4) The estimation of an average distance between the unit and construction site is based on actual distances between the unit and main cities within Sweden. Module A4 has been divided into two values depending on whether the wall is used in Sweden (A41) or Norway (A42). Type Lorry, A41 Capacity utilisation (incl. return) % Type of vehicle Distance km 50 % Diesel, 1632 ton, Euro Fuel/energy consumption l/tkm Value (l/t) Installation in the building (A5) The installation of the Portal and Door Package does not require any use of materials or energy. The walls are fitted and installed manually with the use of basic building tools. Usage of manual tools have not been included in this assessment. During the installation of the components, packagings are sorted and disposed. Material spillage from installation and waste management of packagings are the only flows reported in module A5. A5 Packagings to recycling Material loss (spillage) Unit Portal/Door Package Use phase (B1B7) The usage of the Portal and Door Package partition system does generally not entail any specific maintenance. Modules B1 and B5 B7 have been assessed as nonrelevant as Portal and Door Package does not require any materials or energy for usage or refurbishment. In case of stains, the prescribed cleaning procedure includes usage of lukewarm water and a mild neutral or alkaline detergent. Cleaning and maintanance (modules B2B4) have been excluded from the study due to uncertainties and inablility to control how the product is managed by the final user. End of life (C1, C3, C4) After disassembly, MDFboards and plasterboards are separated from metal components and mineral wool. Metal components are assumed to be collected and sent to recycling, while MDFboards, sealing strips and wooden studs are discharged for incineration. Mineral wool is in turn sent to landfill. Hazardous waste disposed Collected as mixed construction waste Landfill Recycling Energy recovery Incineration Door package 0,4 1,4 43,1 0,4 1,3 45,8 3,0 3,0 Waste type Unit Portal Transport to waste processing (C2) The distance to disposal site is assumed to be 50 km. Type Waste collection lorry Capacity utilisation (incl. return) % Type of vehicle Distance km Diesel, 21 ton 50 Fuel/energy consumption 0,4 l/tkm Value (l/t) NEPD EN Portal and Door Package, Moelven Modus AS/AB 4/7

5 LCA:Results Key environmental indicators Global warming Energy use Dangerous substances Share of energy used from renewable sources Unit CO 2 MJ % % Cradle to gate, A1A3 Portal Door Package 4,8 1, % 40 % The software used for modelling the life cycle of the products and assessing the environmental impacts is SimaPro 8.0. For calculation of environmental impacts the LCIA method CMLIA baseline was applied, with certain modifications of characterisation factors according to EN System boundaries (X=included, MND=module not declared, MNR=module not relevant) Product stage Assembly stage Use stage End of life stage Beyond the system boundaries Raw materials Transport Manufacturing Transport Assembly Use Maintenance Repair Replacement Refurbishment Operational energy use Operational water use Deconstruction demolition Transport Waste processing Disposal ReuseRecovery RecyclingPotential A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 B7 C1 C2 C3 C4 D x x x x x MND MND MND MND MNR MNR MNR x x x x MND Environmental impact Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 GWP CO 2 eqv 3,34E+01 5,95E+00 3,22E+01 2,29E+00 6,74E+00 2,14E01 3,10E+00 6,44E+01 7,88E+00 Biogenic CO 2 7,39E+01 9,51E+00 6,44E+01 Fossil CO 2 4,09E+01 5,95E+00 2,27E+01 2,29E+00 6,74E+00 2,14E01 3,10E+00 7,88E+00 ODP CFC11eqv 2,44E06 1,10E06 3,20E06 4,20E07 1,24E06 2,55E08 5,56E07 7,71E08 POCP C 2 H 4 eqv 6,67E02 1,00E03 6,35E03 3,89E04 1,15E03 1,30E04 5,86E04 4,14E04 AP SO 2 eqv 1,57E01 2,50E02 6,84E02 1,00E02 2,69E02 3,30E03 1,48E02 1,04E02 EP PO 3 4 eqv 8,10E02 5,80E03 2,51E02 2,07E03 6,10E03 4,27E03 3,13E03 1,42E02 ADPM Sbeqv 1,90E04 1,63E05 4,15E05 6,71E06 1,98E05 2,41E07 2,04E06 8,20E07 ADPE MJ 6,01E+02 8,95E+01 2,13E+02 3,48E+01 1,03E+02 2,97E+00 4,38E+01 9,05E+00 Reading example: 9,0 E03 = 9,0*10 3 = 0,009 GWP Global warming potential (biogenic and fossil flows of CO2 declared separately in italic ); ODP Depletion potential of the stratospheric ozone layer; POCP Formation potential of tropospheric photochemical oxidants; AP Acidification potential of land and water; EP Eutrophication potential; ADPM Abiotic depletion potential for non fossil resources; ADPE Abiotic depletion potential for fossil resources Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 GWP CO 2 eqv 3,95E+01 6,33E+00 3,45E+01 2,38E+00 7,02E+00 2,14E01 3,27E+00 6,82E+01 7,85E+00 Biogenic CO 2 7,94E+01 1,12E+01 6,82E+01 Fossil CO 2 4,00E+01 6,33E+00 2,33E+01 2,38E+00 7,02E+00 2,14E01 3,27E+00 7,85E+00 ODP CFC11eqv 1,99E06 1,14E06 2,72E06 4,37E07 1,29E06 2,55E08 5,96E07 8,13E08 POCP C 2 H 4 eqv 9,00E02 1,10E03 5,43E03 4,06E04 1,20E03 1,30E04 6,18E04 4,38E04 AP SO 2 eqv 1,20E01 2,61E02 6,10E02 9,52E03 2,81E02 3,30E03 1,56E02 1,10E02 EP PO 3 4 eqv 7,00E02 6,00E03 2,29E02 2,16E03 6,36E03 4,27E03 3,30E03 1,50E02 ADPM Sbeqv 1,49E04 1,79E05 3,67E05 6,99E06 2,06E05 2,41E07 2,16E06 8,61E07 ADPE MJ 6,04E+02 9,58E+01 2,01E+02 3,63E+01 1,07E+02 2,97E+00 4,62E+01 9,55E+00 In the GWPcategory, module A1 shows a lower environmental impact due to consideration of uptake of biogenic CO 2 in woodbased components. The biogenic CO 2 is modelled to be released in module C3, which explains the high impact within GWP for this module. NEPD EN Portal and Door Package, Moelven Modus AS/AB 5/7

6 Resource use Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 RPEE MJ 6,32E+02 1,13E+00 2,94E+02 4,60E01 1,36E+00 6,00E02 1,90E01 1,60E01 RPEM MJ 8,76E+02 2,47E+02 TPE MJ 1,51E+03 1,13E+00 5,42E+02 4,60E01 1,36E+00 6,00E02 1,90E01 1,60E01 NRPE MJ 6,91E+02 9,56E+01 4,34E+02 3,87E+01 1,14E+02 1,60E+01 4,74E+01 9,58E+00 NRPM MJ 5,87E+01 3,35E+01 TRPE MJ 7,49E+02 9,56E+01 4,68E+02 3,87E+01 1,14E+02 1,60E+01 4,74E+01 9,58E+00 SM 6,14E01 RSF MJ NRSF MJ 1,00E02 W 1,30E01 2,00E02 1,25E02 1,00E02 2,00E02 1,00E03 3,00E03 5,00E02 m 3 RPEE Renewable primary energy resources used as energy carrier; RPEM Renewable primary energy resources used as raw materials; TPE Total use of renewable primary energy resources; NRPE Non renewable primary energy resources used as energy carrier; NRPM Non renewable primary energy resources used as materials; TRPE Total use of non renewable primary energy resources; SM Use of secondary materials; RSF Use of renewable secondary fuels; NRSF Use of non renewable secondary fuels; W Use of net fresh water Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 RPEE MJ 5,53E+02 1,22E+00 2,39E+02 4,60E01 1,35E+00 6,50E02 2,03E01 1,70E01 RPEM MJ 9,12E+02 2,47E+02 TPE MJ 1,46E+03 1,22E+00 4,86E+02 4,60E01 1,35E+00 6,50E02 2,03E01 1,70E01 NRPE MJ 7,19E+02 1,02E+02 3,74E+02 3,87E+01 1,14E+02 1,60E+01 5,00E+01 1,01E+01 NRPM MJ 8,34E+01 3,35E+01 TRPE MJ 8,02E+02 1,02E+02 4,08E+02 3,87E+01 1,14E+02 1,60E+01 5,00E+01 1,01E+01 SM 5,76E01 RSF MJ NRSF MJ 1,00E02 W m 3 1,80E01 2,00E02 1,10E02 1,00E02 2,00E02 1,00E03 3,00E03 5,40E02 End of life Waste Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 HW 1,62E02 6,71E05 1,60E04 2,13E05 6,27E05 4,82E06 1,53E05 2,04E01 NHW 1,03E+01 5,14E+00 3,11E+00 1,63E+00 4,80E+00 6,08E02 1,92E01 4,75E+01 RW 4,67E02 7,52E04 4,36E03 2,38E04 7,02E04 1,01E04 3,19E04 9,56E06 HW Hazardous waste disposed; NHW Non hazardous waste disposed; RW Radioactive waste disposed Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 HW 2,25E02 6,54E05 1,28E04 9,10E05 2,68E04 4,82E06 1,61E05 2,15E01 NHW 8,11E+00 5,02E+00 3,55E+00 1,15E+00 3,38E+00 6,08E02 2,03E01 5,03E+01 RW 6,52E02 7,33E04 3,56E03 1,90E03 5,60E03 1,01E04 3,37E04 9,99E06 End of life Output flow Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 CR MR 8,74E01 1,43E+00 MER 6,32E+00 1,43E+01 4,31E+01 EEE MJ ETE MJ CR Components for reuse; MR Materials for recycling; MER Materials for energy recovery; EEE Exported electric energy; ETE Exported thermal energy Parameter Unit A1 A2 A3 A41 A42 A5 C2 C3 C4 CR MR 8,74E01 1,34E+00 MER 7,44E+00 1,43E+01 4,58E+01 EEE MJ ETE MJ NEPD EN Portal and Door Package, Moelven Modus AS/AB 6/7

7 Additional Norwegian requirements Greenhous gas emission from the use of electricity in the manufacturing phase National mix from import, low woltage ( of transmission lines, in addition to direct emissions and losses in grid) of applied electricity for the manufacturing prosess (A3). Data source Amount Unit Swedish electricity from Ecoinvent v 3.1 August ,053 CO 2 eqv/kwh Dangerous substances The product contains no substances given by the REACH Candidate list or the Norwegian priority list The product contains substances given by the REACH Candidate list or the Norwegian priority list that are less than 0,1 % by weight. The product contain dangerous substances, more then 0,1% by weight, given by the REACH Candidate List or the Norwegian Priority list, see table. The product contains no substances given by the REACH Candidate list or the Norwegian priority list. The product is classified as hazardous waste (Avfallsforskiften, Annex III), see table. Indoor environment Emission tests have been performed on the MDF board (which is the component of Portal and Door Package which most likely could affect the indoor climate) and a declaration of the results can be found in Appendix 7 of the LCAreport (LCAreport Sweco 20161). Performed tests on the MDF board indicate that the component meets the requirements for low emissions (M1) according to EN15251: 2007 Appendix E. The paint does not contain any toxic substances or substances with irritating properties. Remaining components do not emit any notable substances into air. Bibliography ISO 14025:2010 ISO 14044:2006 EN 15804:2012+A1:2013 ISO 21930:2007 PCR, Institut Bauen und Umwelt, 2016 LCI/LCA Report ECHA, 2017 Norwegian Environment Agency, 2017 Environmental labels and declarations Type III environmental declarations Principles and procedures Environmental management Life cycle assessment Requirements and guidelines Sustainability of construction works Environmental product declaration Core rules for the product category of construction products Sustainability in building construction Environmental declaration of building products Product Category Rules for BuildingRelated Products and Services; Part A: Calculation Rules for the Life Cycle Assessment and Requirements on the project report, Version 1.3 Part B: Requirements on the EPD for Room partition systems, Version 1.4, Bacround report for Portal and Door Package. Report number: LCAreport Sweco ECHA: "Candidate List of Substances of Very High Concern for authorisation". Available at Last update: Mars 2017 List of Priority Substances Available at: Updated: 2 Mars 2017 Program Operator and Publisher Phone: Post Box 5250 Majorstuen, 0303 Oslo post@epdnorge.no Norway web Owner of the declaration Phone Moelven Modus AS/AB Fax Post Box 63 Asfaltvegen 1, 2051 Jessheim post.modus@moelven.no Norway web Author of the Life Cycle Assessment Phone Martyna Mikusinska Sweco Environment AB martyna.mikusinska@sweco.se Fredsgatan 14, Örebro, Sweden web NEPD EN Portal and Door Package, Moelven Modus AS/AB 7/7

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN 15804

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN 15804 ver1 215 ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 1425, ISO 2193 and EN 1584 Owner of the declaration: Program operator: Publisher: Declaration number: Ab Rani Plast Oy The Norwegian EPD

More information

Coda Office Chair Product

Coda Office Chair Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation 02.05.2017 02.05.2022

More information

R-48 Seating chair Product

R-48 Seating chair Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to R-48 Seating chair

More information

Coda Chair Product. ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO Nordic Comfort Products AS

Coda Chair Product. ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO Nordic Comfort Products AS ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number NEPD-1319-426-EN Issue date Valid to

More information

R-80 Table Product. ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO Nordic Comfort Products AS

R-80 Table Product. ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO Nordic Comfort Products AS ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD-1392-460-EN

More information

Logic Edge table 160 x 80 cm with manually adjustable t-legs Product

Logic Edge table 160 x 80 cm with manually adjustable t-legs Product 10.5.2016 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD-441-314-EN 11.05.2016

More information

CITY ORGINAL Product ENVIRONMENTAL PRODUCT DECLARATION. Fora Form AS. In accordance with ISO Issue date Valid to

CITY ORGINAL Product ENVIRONMENTAL PRODUCT DECLARATION. Fora Form AS. In accordance with ISO Issue date Valid to ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number 1(3' (1 Issue date Valid to CITY ORGINAL

More information

Senso - 3 seater,low backrest Product

Senso - 3 seater,low backrest Product ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to Fora Form As The Norwegian EPD Foundation Senso - 3 seater,low backrest

More information

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN 15804

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN 15804 ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 1425, ISO 2193 and EN 1584 Owner of the Declaration: Knauf AS Program operator: Publisher: Declaration number: ECO Platform reference number: Issue

More information

Duun 3-seater sofa. Product

Duun 3-seater sofa. Product 2.2.2018 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation Duun 3-seater

More information

Pan Chair with armrest. Product

Pan Chair with armrest. Product 16.6.2017 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to Pan Chair

More information

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN Owner of the declaration:

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025, ISO and EN Owner of the declaration: Side 1 ver1 215 ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 1425, ISO 2193 and EN 1584 Owner of the declaration: Program operator: Publisher: Declaration number: Knauf A/S NE 5 24 EN ECO Platform

More information

Pan 3-seater Product ENVIRONMENTAL PRODUCT DECLARATION. Helland Møbler AS. In accordance with ISO NEPD EN Pan 3-seater 1/6

Pan 3-seater Product ENVIRONMENTAL PRODUCT DECLARATION. Helland Møbler AS. In accordance with ISO NEPD EN Pan 3-seater 1/6 9.6.2017 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to Pan 3-seater

More information

Fjell chair / 5 arm base with weels / armrest Product

Fjell chair / 5 arm base with weels / armrest Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to Fjell chair / 5

More information

Clint Stackable - high back Product

Clint Stackable - high back Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation Clint Stackable

More information

Office furniture, Table screen 1700x600x13mm, birch Product

Office furniture, Table screen 1700x600x13mm, birch Product 20.10.2015 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD 3 2 EN 2 0 20 2 0 2020

More information

Nordic Light Table 120X45 Product

Nordic Light Table 120X45 Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to Nordic Light Table

More information

Office furniture, Frontpanel 1600x500mm, Bøk Product

Office furniture, Frontpanel 1600x500mm, Bøk Product 15.10.2015 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD 3 2 2 8 EN 0 20 0 2020

More information

CON III Product ENVIRONMENTAL PRODUCT DECLARATION. Fora Form AS Manufacturer ISO Issue date Valid to. Bilde 22 x 18 cm (BxH)

CON III Product ENVIRONMENTAL PRODUCT DECLARATION. Fora Form AS Manufacturer ISO Issue date Valid to. Bilde 22 x 18 cm (BxH) ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to Fora Form as The Norwegian EPD Foundation 1(3' (1 CON III Product

More information

Pan Highback Chair Product

Pan Highback Chair Product 9.6.2017 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number Issue date Valid to Pan Highback

More information

Transit 24 three seat sofa Product

Transit 24 three seat sofa Product ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Fora Form As Program holder and publisher The Norwegian EPD Foundation Declaration number 1(3' (1 Issue date Valid

More information

Office furniture, Optima table ø1200 with HD laminate and one column Product

Office furniture, Optima table ø1200 with HD laminate and one column Product 15.9.2015 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD 3 2 0 EN 0 20 0 2020

More information

Office furniture, Titan 2A4 w/sliding doors - Oak Product

Office furniture, Titan 2A4 w/sliding doors - Oak Product 14.10.2015 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD 3 3 2 8 EN 0 20 0 2020

More information

Office furniture, Titan 4A4 w/two hinged doors Product

Office furniture, Titan 4A4 w/two hinged doors Product 14.10.2015 ENVIRONMENTAL PRODUCT DECLARATION ISO 14025 Owner of the declaration Program holder and publisher Declaration number Issue date Valid to The Norwegian EPD Foundation NEPD 3 2 EN 0 20 0 2020

More information

Xena nr 14 bordplate 1800x900x26 rektangulær HVIT

Xena nr 14 bordplate 1800x900x26 rektangulær HVIT 9.10.2017 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 Owner of the declaration Program holder and publisher The Norwegian EPD Foundation Declaration number 1(3' (1 Issue date Valid to

More information

BMA Axia 2.5 Product ENVIRONMENTAL PRODUCT DECLARATION. Scandinavian Business Seating AB Manufacturer. In accordance with ISO 14025

BMA Axia 2.5 Product ENVIRONMENTAL PRODUCT DECLARATION. Scandinavian Business Seating AB Manufacturer. In accordance with ISO 14025 23.1.217 ENVIRONMENTAL PROUCT ECLARATION In accordance with ISO 1425 Owner of the declaration Program holder and publisher eclaration number Issue date Valid to [1] Scandinavian Business Seating AS The

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000009 Issue: 03 ECO EPD Ref. No.: 000075 This is to certify that this verified Environmental Product Declaration provided by: ROCKPANEL Group Is in accordance

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000060 Issue: 01 ECO EPD Ref. No.: 000182 This is to certify that this verified Environmental Product Declaration provided by: Knauf Insulation (Northern

More information

ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO and ISO 21930

ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO and ISO 21930 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 and ISO 21930 Gyproc Ytskiva Renovation Board Verification Date : 2 July 2013 Version : 1.0 REGISTRATION N EPD : S-P-00390 Gyproc AB, P.O.

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000008 Issue: 02 ECO EPD Ref. No.: 000093 This is to certify that this verified Environmental Product Declaration provided by: Tremco-illbruck Ltd Is

More information

MRPI -EPD+ STICHTING MRPI

MRPI -EPD+ STICHTING MRPI MRPI -EPD+ STICHTING MRPI PROGRAMME OPERATOR PRODUCT Stichting MRPI NEXIEZ-MRL (machine room less) elevator Kingsfordweg 151 13GR Amsterdam MRPI -REGISTRATION 1.1.009.28 COMPANY INFORMATION EPD-REGISTRATION

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000059 Issue: 01 ECO EPD Ref. No.: 000181 This is to certify that this verified Environmental Product Declaration provided by: Knauf Insulation (Northern

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000051 Issue: 01 ECO EPD Ref. No.: 000109 This is to certify that this verified Environmental Product Declaration provided by: Knauf Insulation (Northern

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000010 Issue: 03 ECO EPD Ref. No.: 000076 his is to certify that this verified Environmental Product Declaration provided by: ROCKPANEL Group. S Is in

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration EPD Number: BREG EN EPD 000002 Issue: 02 This is to certify that this verified Environmental Product Declaration provided by: The Brick Development Association Is in accordance

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000079 Issue: 01 ECO EPD Ref. No.: 000240 This is to certify that this verified Environmental Product Declaration provided by: Habas A.S (member of UK

More information

EPD Glass Architecture

EPD Glass Architecture EPD Glass Architecture Short version Environmental Product Declaration Acc. to ISO 14025 and EN 15804 CI System Glass Architecture PR60 and Smoke lift M (company EPD) LAMILUX Heinrich Strunz GmbH Declaration

More information

Environmental Declaration Product family MNS ABB Low Voltage Systems

Environmental Declaration Product family MNS ABB Low Voltage Systems Environmental Declaration Product family MNS ABB Low Voltage Systems ABB Main manufacturers: ABB Schaltanlagentechnik GmbH DE 68526 LADENBURG, Germany Tel: +49 (0)6203 71 0 Fax: +49 (0)6203 71 2351 ABB

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration BREG EN EPD No.: 000078 Issue: 01 ECO EPD Ref. No.: 000239 This is to certify that this verified Environmental Product Declaration provided by: Colakoglu Metalurji A.S

More information

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO and EN 15804

ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO and EN 15804 ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025 and EN 15804 Declaration holder Publisher Programme holder Declaration number Issue date Validity DORMA GmbH + Co. KG Institut Bauen und Umwelt

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration EPD Number: BREG EN EPD 000002 Issue:01 This is to certify that this verified Environmental Product Declaration provided by: The Brick Development Association Is in accordance

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration EPD Number: BREG EN EPD 000009 Issue:01 This is to certify that this verified Environmental Product Declaration provided by: ROCKPANEL Group Is in accordance with the

More information

Life Cycle Assessment of biodiesel using jatropha as feedstock

Life Cycle Assessment of biodiesel using jatropha as feedstock Life Cycle Assessment of biodiesel using jatropha as feedstock under the frame of the JatroMed project implementation Elena Koukouna Lignocellulosic Crops as feedstock for future Biorefineries Summer School

More information

European Commission (DG ENV)

European Commission (DG ENV) European Commission (DG ENV) COMPARATIVE LIFE-CYCLE ASSESSMENT OF NICKEL-CADMIUM (NiCd) BATTERIES USED IN CORDLESS POWER TOOLS (CPTs) VS. THEIR ALTERNATIVES NICKEL-METAL HYDRIDE (NiMH) AND LITHIUM-ION

More information

Life Cycle Assessment (LCA) of Nickel Metal Hydride Batteries for HEV Application

Life Cycle Assessment (LCA) of Nickel Metal Hydride Batteries for HEV Application Life Cycle Assessment (LCA) of Nickel Metal Hydride Batteries for HEV Application IARC, Basel, 4 th March 2010 Dr. Matthias Buchert, Öko-Institut e.v. m.buchert@oeko.de 1 Funding Partners of the LCA RECHARGE

More information

paper industry units. The latest study carried out in UPM s Augsburg mill

paper industry units. The latest study carried out in UPM s Augsburg mill UPM Greenhouse Gas Inventory 2.2.2018 Descriptive information Company response Company name Consolidation approach Description of the businesses and included in the company s organisational boundary UPM-Kymmene

More information

The environmental performance of an alternative fry-drying process for sewage sludge: A life cycle assessment study

The environmental performance of an alternative fry-drying process for sewage sludge: A life cycle assessment study The environmental performance of an alternative fry-drying process for sewage sludge: A life cycle assessment study By : PhD student Carlos-Alberto PEREGRINA-CAMBERO Principal Advisor: Prof Didier LECOMTE

More information

Environmental Product Declaration

Environmental Product Declaration Environmental Product Declaration UniSwitch Medium Voltage Equipment Table of contents:. Environmental Product Declaration... 2. ABB... 2 2. ABB Transmit Oy... 2 2.2 ABB Transmit Oy, MV Systems Division...

More information

Regency Square - Huntley, IL

Regency Square - Huntley, IL Regency Square - Huntley, IL Product Description: Bricks have long been prized for their classic look, durability, and weather resistance. CalStar Products, Inc. has developed a proprietary new manufacturing

More information

Product Environmental Declaration according to ISO Type II siemens.com/mobility

Product Environmental Declaration according to ISO Type II siemens.com/mobility Avenio Product Environmental Declaration according to ISO 14021 Type II siemens.com/mobility Avenio The product The product Avenio, the new family of low-floor trams: unique vehicles made for today s cities.

More information

C Series CS300 ENVIRONMENTAL PRODUCT DECLARATION

C Series CS300 ENVIRONMENTAL PRODUCT DECLARATION C Series CS300 ENVIRONMENTAL PRODUCT DECLARATION In September 2016, we were proud to be the first aircraft manufacturer to release an Environmental Product Declaration for our CS100 aircraft type. Fred

More information

C Series CS100 ENVIRONMENTAL PRODUCT DECLARATION

C Series CS100 ENVIRONMENTAL PRODUCT DECLARATION C Series CS100 ENVIRONMENTAL PRODUCT DECLARATION C Series Meet the only community-friendly aircraft family optimized for the 100- to 150-seat market Fred Cromer, President, Bombardier Commercial Aircraft

More information

Environmental Report BMW 530iA

Environmental Report BMW 530iA Environmental Report BMW 530iA Abstract Goal and scope: The scope of the study is the life cycle assessment of the BMW 530iA with start of production in 2016. Its purpose is to assess the environmental

More information

ENVIRONMENTAL PRODUCT DECLARATION as per ISO and EN 15804

ENVIRONMENTAL PRODUCT DECLARATION as per ISO and EN 15804 ENVIRONMENTAL PRODUCT DECLARATION as per ISO 14025 and EN 15804 Owner of the Declaration Programme holder Publisher Declaration number Issue date 22.07.2013 Valid to 21.07.2018 BASF Construction Chemicals

More information

Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen

Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen Environmental Life Cycle Evaluation of Electric Vehicles and the Significance of Traction Batteries 10th International AVL Exhaust Gas

More information

Life Cycle Assessment of Biodiesel Production from Microalgae in Thailand: Energy Efficiency and Global Warming Impact Reduction

Life Cycle Assessment of Biodiesel Production from Microalgae in Thailand: Energy Efficiency and Global Warming Impact Reduction A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 29, 2012 Guest Editors: Petar Sabev Varbanov, Hon Loong Lam, Jiří Jaromír Klemeš Copyright 2012, AIDIC Servizi S.r.l., ISBN 978-88-95608-20-4; ISSN

More information

Introduction of the section about electricity production mix

Introduction of the section about electricity production mix Introduction of the section about electricity production mix Third elcar Workshop Wolfsburg, December 6 th 2012 E. Szczechowicz Project Consortium: This project is supported by the European Commission

More information

How to calculate the environmental impact of electric vehicles? Energirelaterad Fordonsforskning &5 Oktober 2017 Patricia van Loon

How to calculate the environmental impact of electric vehicles? Energirelaterad Fordonsforskning &5 Oktober 2017 Patricia van Loon How to calculate the environmental impact of electric vehicles? Energirelaterad Fordonsforskning 2017 4&5 Oktober 2017 Patricia van Loon BACKGROUND 0.16% of all vehicles are fully electric (bilsweden.se,

More information

ABB industrial drives. Recycling instructions and environmental information ACS drives

ABB industrial drives. Recycling instructions and environmental information ACS drives ABB industrial drives Recycling instructions and environmental information ACS880-0 drives List of related manuals Drive hardware manuals and guides ACS880-0 drives recycling instructions and environmental

More information

The Caddy Environmental Commendation

The Caddy Environmental Commendation The Caddy Environmental Commendation There s more to being good than just quality The Environmental Commendation for the Caddy Versatility and economy are the hallmarks of the Caddy. But no less impressive

More information

Environmental evaluation of valorization options for used cooking oil

Environmental evaluation of valorization options for used cooking oil Environmental evaluation of valorization options for used cooking oil ANA CLÁUDIA DIAS, MARIA ISABEL NUNES, ELMA FERREIRA, LUIS ARROJA Department of Environment and Planning & CESAM University of Aveiro

More information

Life cycle assessment of bioenergy

Life cycle assessment of bioenergy EPROBIO Intensive program Foggia, July 2012 Life cycle assessment of bioenergy Wouter Achten & Joana Almeida KU Leuven, Belgium Content Revisit general methodology Methodology issues in LCA of bioenergy

More information

ABB general purpose drives. Recycling instructions and environmental information ACS480 drives

ABB general purpose drives. Recycling instructions and environmental information ACS480 drives ABB general purpose drives Recycling instructions and environmental information ACS480 drives List of related manuals Drive manuals and guides ACS480 drives recycling instructions and environmental information

More information

Good practices in Design for Environment: -15 years of experiences at Bombardier Transportation. Pia Öhrn Manager Design for Environment

Good practices in Design for Environment: -15 years of experiences at Bombardier Transportation. Pia Öhrn Manager Design for Environment Good practices in Design for Environment: -15 years of experiences at Bombardier Transportation Pia Öhrn Manager Design for Environment 2006-09-18 Topics History of DfE Examples of improvements To work

More information

ABB MACHINERY DRIVES ACS380 drives Recycling instructions and environmental information

ABB MACHINERY DRIVES ACS380 drives Recycling instructions and environmental information ABB MACHINERY DRIVES ACS380 drives Recycling instructions and environmental information List of related manuals Drive hardware manuals and guides ACS380 drives recycling instructions and environmental

More information

Version 5.0. Draft for consultation 9 May 22 May Proposal for requirements within the third sub process:

Version 5.0. Draft for consultation 9 May 22 May Proposal for requirements within the third sub process: Version 5.0 Draft for consultation 9 May 22 May 2018 Proposal for requirements within the third sub process: Contents 001 Primary Batteries, version 5.0, 09 May 2018 Addresses In 1989, the Nordic Council

More information

Future Energy Systems and Lifestyle

Future Energy Systems and Lifestyle Future Energy Systems and Lifestyle Charging infrastructure and Life Cycle Assessments Martin Beermann Experts Workshop on Energy Efficiency of Electric Vehicle Supply Equipment (EVSE) 28 September 2017

More information

IMIEV3 Service and repair non-live electric and hybrid vehicle systems

IMIEV3 Service and repair non-live electric and hybrid vehicle systems Service and repair non-live electric and hybrid vehicle systems Overview This unit covers the competence and knowledge technicians need to carry out servicing and general repairs on non-live high energy

More information

ABB drives. Recycling instructions and environmental information ACS880-11, ACS880-31, ACH and ACQ drives

ABB drives. Recycling instructions and environmental information ACS880-11, ACS880-31, ACH and ACQ drives ABB drives Recycling instructions and environmental information ACS880-11, ACS880-31, ACH580-31 and ACQ580-31 drives List of related manuals Drive manuals and guides Recycling instructions and environmental

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY Directorate C - Renewables, Research and Innovation, Energy Efficiency C.1 - Renewables and CCS policy Brussels, BK/abd/ener.c.1(2015)4507918 NOTE ON

More information

ISCC s Risk based Certification Approach for Waste and Residues

ISCC s Risk based Certification Approach for Waste and Residues Exploring Export Opportunities for Waste and Residue-Based Raw Materials and Biofuels ISCC s Risk based Certification Approach for Waste and Residues Shanghai, 13 November 2017 Dr Norbert Schmitz, ISCC

More information

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR The EU Toy Directive was revised in order to take into account the new technological developments and increasing child safety requirements.

More information

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018 Performance of Batteries in Grid Connected Energy Storage Systems June 2018 PERFORMANCE OF BATTERIES IN GRID CONNECTED ENERGY STORAGE SYSTEMS Authors Laurie Florence, Principal Engineer, UL LLC Northbrook,

More information

Biodiesel Fuels Made of Used Cooking Oil Version1.0. Certification Criteria

Biodiesel Fuels Made of Used Cooking Oil Version1.0. Certification Criteria Eco Mark Product Category No. 160 Biodiesel Fuels Made of Used Cooking Oil Version1.0 Certification Criteria - Applicable Scope- Fuels for diesel engines (for automobiles, for construction machines, for

More information

Mod: KLD6-12/35XLAS-N

Mod: KLD6-12/35XLAS-N 12/2011 Mod: KLD6-12/35XLAS-N Production code: 1914070 INSTRUCTION MANUAL LOGIC LINE PLUS HOOD Reseller Stamp for Warranty Dear customer, Above all, thank you for choosing our product and we would like

More information

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY (SWA)

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY (SWA) SACRAMENTO REGIONAL SOLID WASTE AUTHORITY (SWA) NON-EXCLUSIVE COMMERCIAL SOLID WASTE COLLECTION FRANCHISE RENEWAL [Pursuant to Sacramento Regional Solid Waste Authority (SWA) Code, Title II] Please complete

More information

Position of the European Sea Ports Organisation on the Commission s proposal on Port Reception Facilities (COM 2018/0012)

Position of the European Sea Ports Organisation on the Commission s proposal on Port Reception Facilities (COM 2018/0012) Position of the European Sea Ports Organisation on the Commission s proposal on Port Reception Facilities (COM 2018/0012) May 2018 1. Introduction ESPO welcomes in principle the new proposal on the revision

More information

Korea Eco-label Standards EL764 Revised 19. JUL Ministry of Environment Batteries EL764:2012

Korea Eco-label Standards EL764 Revised 19. JUL Ministry of Environment Batteries EL764:2012 Korea Eco-label Standards EL764 Revised 19. JUL. 2012 Ministry of Environment Batteries EL764:2012 http://www.me.go.kr Publisher: Minister of Environment Publication: 02. SEP. 2005 Ministry of Environment

More information

MMLV Design and Comparative LCA Study

MMLV Design and Comparative LCA Study MMLV Design and Comparative LCA Study Research Objectives TEXT AND OTHER MATERIALS AREA LIGHTER Lightweight Material and Science CLEANER Efficiency and Sustainability AFFORDABLE Development and Manufacturing

More information

Sustainability evaluation of biodiesel from Jatropha curcas L.

Sustainability evaluation of biodiesel from Jatropha curcas L. October 18th, 2010 BIO 3 Hermosillo, Sonora, Mexico Arenberg Doctoral School of Science, Engineering & Technology Faculty Bioscience Engineering Department Earth and Environmental Sciences Sustainability

More information

AUSTRIAN ELECTRICITY

AUSTRIAN ELECTRICITY REPORT 2016 AUSTRIAN ELECTRICITY DISCLOSURE REPORT 2016 SUMMARY WORKING FOR YOU WHEREVER YOU NEED ENERGY INTRODUCTION The system of electricity disclosure was implemented in Austria in the year 2001. Since

More information

Environmental Certificate Mercedes-Benz E-Class

Environmental Certificate Mercedes-Benz E-Class Environmental Certificate Mercedes-Benz E-Class Contents 3 Editorial 4 Validation 5 1. General environmental issues 9 2. Life Cycle Assessment (LCA) 37 3. Material selection 41 4. Design for recovery 45

More information

B. SECTORAL TABLES 1. Energy

B. SECTORAL TABLES 1. Energy Energy - Total CO 2 emissions from the reference approach and the sectoral approach (1999) B. SECTORAL TABLES 1. Energy CO 2 emissions from total fuel combustion Reference approach Sectoral approach Difference

More information

SOLID WASTE ORDINANCE TOWN OF LEE TRANSFER STATION

SOLID WASTE ORDINANCE TOWN OF LEE TRANSFER STATION SOLID WASTE ORDINANCE TOWN OF LEE TRANSFER STATION Authority Pursuant to NH RSA 31:39 and RSA 149-M:17, the Town of Lee adopts these regulations for the use of the Town s Transfer Station. Purpose and

More information

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1 Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1 Introductory note: The hereby presented Special Condition has been classified as important

More information

ABB Drives. Recycling instructions and environmental information ACSM1 product family

ABB Drives. Recycling instructions and environmental information ACSM1 product family ABB Drives Recycling instructions and environmental information ACSM1 product family List of related manuals Drive hardware manuals and guides ACSM1 recycling instructions and environmental information

More information

Towards Resource Efficient Electric Vehicle Sector in India. Souvik Bhattacharjya Fellow, Centre for Resource Efficiency & Governance TERI, New Delhi

Towards Resource Efficient Electric Vehicle Sector in India. Souvik Bhattacharjya Fellow, Centre for Resource Efficiency & Governance TERI, New Delhi Towards Resource Efficient Electric Vehicle Sector in India Souvik Bhattacharjya Fellow, Centre for Resource Efficiency & Governance TERI, New Delhi Market of E-Vehicles Global & India India s electric

More information

EVALUATION ENVIRONNEMENTALE DE LA MOBILITÉ ÉLECTRIQUE : LEVIERS TECHNOLOGIQUES ET POLITIQUES D'AMÉLIORATION

EVALUATION ENVIRONNEMENTALE DE LA MOBILITÉ ÉLECTRIQUE : LEVIERS TECHNOLOGIQUES ET POLITIQUES D'AMÉLIORATION EVALUATION ENVIRONNEMENTALE DE LA MOBILITÉ ÉLECTRIQUE : LEVIERS TECHNOLOGIQUES ET POLITIQUES D'AMÉLIORATION Séance d information «Betriber & Emwelt» 22/10/2015 Dr. Enrico BENETTO HYPOTHESIS Does electro-mobility

More information

SCC Greenhouse Gas Assessment

SCC Greenhouse Gas Assessment SCC Greenhouse Gas Assessment April 2015 March 2016 Produced by CO2balance UK Ltd March 2017 CO2balance UK Ltd, 1 Discovery House, Cook Way, Bindon Road, Taunton, Somerset, TA2 6BJ, UK Tel: +44 (0) 1823

More information

Version 5.0. Draft for consultation 9 May 22 May Proposal for requirements within the third sub process:

Version 5.0. Draft for consultation 9 May 22 May Proposal for requirements within the third sub process: Version 5.0 Draft for consultation 9 May 22 May 2018 Proposal for requirements within the third sub process: Contents Appendix 5 Analysis and testing laboratories 001 Primary Batteries, version 5.0, 09

More information

Batteries shipped by Road

Batteries shipped by Road Batteries shipped by Road Lithium Batteries Extract from the Road Code ADG 7.5 See next page for special provisions and packing instructions (Note: LP = Large Packages over 400 Kg. These Packing Instructions

More information

RockLap H&V Pipe Sections

RockLap H&V Pipe Sections CONSTRUCTION TYPE: HVAC PIPEWORK JANUARY 2017 RockLap H&V Pipe Sections For rapid, efficient pipework insulation are strong lengths of pre-formed insulation with a one piece, factory applied foil facing

More information

ABB Drives. Recycling instructions and environmental information ACS500 product family

ABB Drives. Recycling instructions and environmental information ACS500 product family ABB Drives Recycling instructions and environmental information ACS500 product family List of related manuals Drive hardware manuals and guides ACS500 recycling instructions and environmental information

More information

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements AS/NZS 4777.1:2016 Australian/New Zealand Standard Grid connection of energy systems via inverters Part 1: Installation requirements AS/NZS 4777.1:2016 AS/NZS 4777.1:2016 This joint Australian/New Zealand

More information

Influence of the chosen life cycle assessment approach on the results of the analysis:

Influence of the chosen life cycle assessment approach on the results of the analysis: Influence of the chosen life cycle assessment approach on the results of the analysis: an example with biofuels Faculty of Technology University of Novi Sad Serbia Ferenc E. Kiss Prague, 16. September

More information

REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY

REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY METHODOLOGY REPORT Implementation support provided by: With funding support from:

More information

Lithium-ion Batteries and Nanotechnology for Electric Vehicles: A Life-Cycle Assessment

Lithium-ion Batteries and Nanotechnology for Electric Vehicles: A Life-Cycle Assessment . Lithium-ion Batteries and Nanotechnology for Electric Vehicles: A Life-Cycle Assessment September 14, 2012 Kathy Hart Design for the Environment Program U.S. Environmental Protection Agency Shanika Amarakoon

More information

GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter. Version 1.1. Global Mainstream Dynamic Energy Technology Ltd. 1

GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter. Version 1.1. Global Mainstream Dynamic Energy Technology Ltd. 1 GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter Version 1.1 Global Mainstream Dynamic Energy Technology Ltd. 1 Content Prelude... 4 1. Safety... 5 1.1 How to Use This Manual... 5 1.2 Safety Rules...

More information

Energy and Greenhouse Gas Implications of Biodiesel Production from Jatropha curcas L. Mr. Kritana Prueksakorn Asst. Prof. Dr. Shabbir H.

Energy and Greenhouse Gas Implications of Biodiesel Production from Jatropha curcas L. Mr. Kritana Prueksakorn Asst. Prof. Dr. Shabbir H. Energy and Greenhouse Gas Implications of Biodiesel Production from Jatropha curcas L. Mr. Kritana Prueksakorn Asst. Prof. Dr. Shabbir H. Gheewala* The Joint Graduate School of Energy and Environment,

More information

Carbon Intensity Records under the Renewable and Low Carbon Fuel Requirements Regulation

Carbon Intensity Records under the Renewable and Low Carbon Fuel Requirements Regulation under the 1 of 9 1. Background The Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act (Act) sets low carbon fuel requirements for Part 3 fuel suppliers. A Part 3 fuel supplier is