1 April 2010 Process Industry Practices Vessels PIP VEFTA100 Tank Miscellaneous Details
2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PRINTING HISTORY April 2010 Issued Not printed with State funds
3 April 2010 Process Industry Practices Vessels Table of Contents 1. Introduction Purpose Scope... 3 Drawings PIP VEFTA100 Tank Miscellaneous Details VEFTA101 Removable Well Pipe Type 1 - Carbon or Stainless Steel Applications (3 Pages) VEFTA102 Removable Well Pipe Type 2 - Stainless Steel Applications VEFTA103 Removable Well Pipe Type 3 - Carbon Steel Applications VEFTA104 Removable Well Pipe Type 4 - Aluminum Applications VEFTA105 Removable Well Pipe Types 2, 3, and 4 - Attachments VEFTA106 Removable Well Pipe - Support Type A VEFTA107 Removable Well Pipe - Support Type B VEFTA108 Removable Well Pipe - Support Type C VEFTA109 Nonremovable Well Pipe - Temperature Measurements in Tanks (2 Pages) VEFTA110 Nonremovable Well Pipe - Support Type A VEFTA111 Nonremovable Well Pipe - Support Type B VEFTA112 Nonremovable Well Pipe - Support Type C VEFTA113 Removable Well Pipe - Temperature Measurements in Tanks (2 Pages) VEFTA114 Removable Slotted Thief-Hole Well Pipe - Unlined Tanks (2 Pages) VEFTA115 Removable Slotted Thief-Hole Well Pipe - Lined Tanks (2 Pages) VEFTA116 Floor Supported Slotted Gauge Well Pipe - Fixed Roof Tanks VEFTA117 Floor Supported Slotted Gauge Well Pipe - External Floating Roof Tanks Process Industry Practices Page 1 of 3
4 April 2010 VEFTA118 Shell Supported Slotted Gauge Well Pipe - Floating Roof Tanks VEFTA119 Slotted Gauge Well Pipe - Float Seal VEFTA120 Leg Caps for Fixed Low Removable High Legs - Floating Roof Tanks VEFTA121 Emergency Roof Drain Plug - Pontoon Floating Roof Page 2 of 3 Process Industry Practices
5 PIP VEFTA100 April 2010 Tank Miscellaneous Details 1. Introduction 1.1 Purpose This Practice provides fabrication and installation details for well pipes and other miscellaneous tank components. 1.2 Scope This Practice describes typical fabrication and installation requirements for well pipes, generally constructed of carbon steel, stainless steel, or aluminum components. These well pipes may be used for measuring levels and temperatures, for liquid inlet, for liquid pump-out, for recycle loops, and/or for content sampling in tanks. This Practice provides details for removable and nonremovable well pipe installations. This Practice also provides details for well pipe supports and other components. Process Industry Practices Page 3 of 3
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
PIP ELEMT01 Guidelines for Selecting IEEE and API Standards for AC Motors 250 HP (185 kw) and Larger
COMPLETE REVISION April 2013 Process Industry Practices Electrical PIP ELEMT01 Guidelines for Selecting IEEE and API Standards for AC Motors 250 HP (185 kw) and Larger PURPOSE AND USE OF PROCESS INDUSTRY
More informationPIP PNSMV007 Carbon Steel Butterfly Valve Descriptions
October 2017 Piping PIP PNSMV007 Carbon Steel Butterfly Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationPIP PNSMV054 Nickel and Nickel Alloy Globe Valve Descriptions
February 2015 Piping PIP PNSMV054 Nickel and Nickel Alloy Globe Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationCOMPLETE REVISION December Piping
December 2015 Piping Piping Material Specification 3SA0J01 Class 300, 304/304L Stainless Steel, Jacketed Construction, 0.000 C.A. Core: Process Jacket: Steam PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
More informationCOMPLETE REVISION December Piping
December 2015 Piping PIP PN01SA0J01 Piping Material Specification 1SA0J01 Class 150, 304/304L Stainless Steel, Jacketed Construction, 0.000 C.A. Core: Process Jacket: Steam PURPOSE AND USE OF PROCESS INDUSTRY
More informationPIP PN01SD0B03 Piping Material Specification 1SD0B03 Class 150, 316/316L Stainless Steel, Butt Weld, C.A., Process
May 2016 Piping Piping Material Specification 1SD0B03 Class 150, 316/316L Stainless Steel, Butt Weld, 0.000 C.A., Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost
More informationPIP PN03SA0B01 Piping Material Specification 3SA0B01 Class 300, 304/304L Stainless Steel, Butt Weld, C.A., Lube Oil & Seal Oil
May 2016 Piping PIP PN03SA0B01 Piping Material Specification 3SA0B01 Class 300, 304/304L Stainless Steel, Butt Weld, 0.000 C.A., Lube Oil & Seal Oil PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an
More informationPipeline Systems PIP PLSMV008 Carbon Steel Plug Valve Descriptions
October 2017 Pipeline Systems PIP PLSMV008 Carbon Steel Plug Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationPIP PN01SV0S01 Piping Material Specification 1SV0S01 Class 150, Alloy 254 SMO (UNS S31254), Socket Weld, C.A., Process (PTFE Packing/Gaskets)
May 2016 Piping PIP PN01SV0S01 Piping Material Specification 1SV0S01 Class 150, Alloy 254 SMO (UNS S31254), Socket Weld, 0.000 C.A., Process (PTFE Packing/Gaskets) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
More informationPIP REEE003 Guidelines for General Purpose Non-Lubricated Flexible Couplings
September 2016 Machinery PIP REEE003 Guidelines for General Purpose Non-Lubricated Flexible Couplings PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry
More informationPIP PN01CS1B02 Piping Material Specification 1CS1B02 Class 150, Carbon Steel, Butt Weld, C.A. Process
March 2016 Piping PIP PN01CS1B02 Piping Material Specification 1CS1B02 Class 150, Carbon Steel, Butt Weld, 0.063 C.A. Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the
More informationPIP PN01CA1S01 Piping Material Specification 1CA1S01 Class 150, Impact Tested Carbon Steel, Socket Weld, 0.063" C.A., Process
December 2017 Piping Piping Material Specification 1CA1S01 Class 150, Impact Tested Carbon Steel, Socket Weld, 0.063" C.A., Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationPIP PN01CS2S01 Piping Material Specification 1CS2S01 Class 150, Carbon Steel, Socket Weld, 0.125" C.A., Process
May 2016 Piping PIP PN01CS2S01 Piping Material Specification 1CS2S01 Class 150, Carbon Steel, Socket Weld, 0.125" C.A., Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the
More informationCOMPLETE REVISION December Process Industry Practices Electrical. PIP ELCGL01D Data Sheets for Electrical Design Criteria
COMPLETE REVISION December 2013 Process Industry Practices Electrical PIP D Data Sheets for Electrical Design Criteria PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of
More informationExhaust Gas Cleaning System Guidelines An Update May 2017
Exhaust Gas Cleaning System Guidelines An Update May 2017 Working together for a safer world MARPOL Annex VI Regulation 14 Sulphur oxides and particulate matter Limits the sulphur content of any fuel oil
More informationMILITARY SPECIFICATION LUBRICATING OIL, VACUUM PUMP, MECHANICAL
INCH-POUND MIL-DTL-83767C 24 September 2007 SUPERSEDING MIL-L-83767B 8 February 1980 MILITARY SPECIFICATION LUBRICATING OIL, VACUUM PUMP, MECHANICAL Reactivated after 24 September 2007 and may be used
More informationTEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION
TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION SPECIFICATION NO. AMENDED: NOVEMBER 2004** WARNING LIGHT SYSTEM, INCANDESCENT, LIGHTBAR PUBLICATION This specification is a product of the Texas
More informationEXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES
EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES UPDATED MAY 24, 2017 Table of Contents Section 1: Water Service Charges... 2 Monthly Water System Charge... 2 Commodity
More informationGENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL
More informationTank services Questionnaire
Tank services Questionnaire 1 CLIENT INFORMATION Company name www. Plant name Street address Zip postal code State/Provence City Country Main contact filled in this document Inspection department contact
More informationMicrogeneration Installation Standard: MCS
Microgeneration Installation Standard: MCS 001-01 MCS Contractor Certification Scheme Requirements Part 1: Requirements for MCS Contractors Issue 3.1 This Microgeneration Installation Standard is the property
More informationPUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES
PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES 3rd EDITION - 01/2006 Foreword This publication, together with the
More informationPIP RESP73H Application of ASME B Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process
May 2013 Process Industry Practices Machinery PIP RESP73H Application of ASME B73.1-2001 Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process PURPOSE AND USE OF PROCESS INDUSTRY
More informationFinding Aid for the National Legal Aid and Defender Association Records NEJL.023
Finding Aid for the National Legal Aid and Defender Association Records NEJL.023 This finding aid was produced using the Archivists' Toolkit April 01, 2014 Describing Archives: A Content Standard National
More informationAustralian Standard. Electricity metering equipment (AC) Particular requirements
AS 62053.21 2005 Reconfirmed 2016 AS 62053.21 2005 Australian Standard Electricity metering equipment (AC) Particular requirements Part 21: Static meters for active energy (classes 1 and 2) (IEC 62053-21,
More informationREVISED REQUEST FOR QUOTATIONS FOR PRINTING SERVICES Food and Nutrition Technical Assistance Project III (FANTA)
November 02, 2017 REVISED REQUEST FOR QUOTATIONS FOR PRINTING SERVICES Food and Nutrition Technical Assistance Project III (FANTA) Issue date: Nov 2, 2017 Submit Questions by: Submission Deadline: Contact
More informationAutomotive Technician-Advanced
Measuring What Matters in Job Ready Assessment Blueprint Automotive Technician-Advanced Test Code: 4008 / Version: 01 Copyright 2006 General Assessment Information Automotive Technician-Advanced Blueprint
More informationEnergy Performance Information Request Timeline
Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when
More informationFRANK VIVIAN PAPERS, (Bulk ) Accession 89
Finding Aid for FRANK VIVIAN PAPERS, 1907-1950 (Bulk 1940-1950) Finding Aid Published: June 2011 20900 Oakwood Boulevard Dearborn, MI 48124-5029 USA research.center@thehenryford.org www.thehenryford.org
More informationADDENDUM 02. To All Bidders:
ADDENDUM 02 Project: 2017 Water Truck Request for Tender Addendum: A-02 Location: 117 7 Avenue SE, Drumheller, Alberta Date: October 11, 2017 To All Bidders: 1. General 1.1. This addendum shall be read
More informationRESOLUTION MEPC.181(59) Adopted on 17 July GUIDELINES FOR PORT STATE CONTROL UNDER THE REVISED MARPOL ANNEX VI
MEPC 59/24/Add.1 RESOLUTION MEPC.181(59) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International Maritime Organization concerning the functions of the
More informationDEPARTMENT OF DEFENSE INTERFACE STANDARD
INCH-POUND MIL-STD-1560C 23 January 2017 SUPERSEDING MIL-STD-1560C 11 February 2015 DEPARTMENT OF DEFENSE INTERFACE STANDARD INSERT ARRANGEMENTS FOR MIL-DTL-38999, MIL-DTL-27599, AND SAE-AS29600 SERIES
More informationGuide to the Timken Roller Bearing Company Collection
Guide to the Timken Roller Bearing Company Collection Don Darroch October 11, 1990 Archives Center, National Museum of American History P.O. Box 37012 Suite 1100, MRC 601 Washington, D.C. 20013-7012 archivescenter@si.edu
More informationRelay Retrofit Program Cutting Tool Safety Guide
Relay Retrofit Program Cutting Tool Safety Guide Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted
More informationRelay Retrofit Program for REX 521 Cutting Tool Safety Guide
SAFET Y GUIDE Relay Retrofit Program for REX 521 Cutting Tool Safety Guide Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents
More informationTechnical Information
WC22 - Replacing Camshaft Controller (Workshop Campaign) Revision: Revision 1: March 18, 2013, this revision amends WC22 with: a. Additional text under "Action Required" b. Adds Scope 1, 2, 3 and 4 c.
More informationAHRI Standard 1371 (SI) 2017 Standard for Performance Rating of Electronic Expansion Valves
AHRI Standard 1371 (SI) 2017 Standard for Performance Rating of Electronic Expansion Valves IMPORTANT SAFETY DISCLAIMER AHRI does not set safety standards and does not certify or guarantee the safety of
More informatione-get-m1005 GE Industrial Systems Instructions for Choosing the Optimal Rotor Construction
g e-get-m1005 GE Industrial Systems Instructions for Choosing the Optimal Rotor Construction These instructions do not purport to cover all of the details or variations in equipment nor to provide for
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60086-1 Ninth edition 2000-11 Primary batteries Part 1: General Piles électriques Partie 1: Généralités IEC 2000 Copyright - all rights reserved No part of this publication may
More informationLube Level Maintainer
Lube Level Maintainer Models LM2000/LM2000S Installation Instructions 00-02-0423 Revised 08-12-09 Section 15 In order to consistently bring you the highest quality, full featured products, we reserve the
More informationThe Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time.
COMMERCIAL & INDUSTRIAL CUSTOMERS Program Overview The CPS Energy Rebate Program for Commercial and Industrial Customers (Rebate Program) was developed to provide incentives for the new installation and
More informationManual No: Revision: B. CCVP Rain Shield. Installation Guide
Manual No: 577013-978 Revision: B CCVP Rain Shield Installation Guide Notice Veeder-Root makes no warranty of any kind with regard to this publication, including, but not limited to, the implied warranties
More informationStandard Reference Document OPERATING STANDARD 2 SELECTIVE COUPLINGS FOR ROAD TANKERS DEDICATED TO AVIATION FUEL OS 2
Standard Reference Document OS 5 OPERATING STANDARD 2 SELECTIVE COUPLINGS FOR ROAD TANKERS DEDICATED TO AVIATION FUEL OS 2 SAFE LOAD PROGRAM The contents, concepts and information in this operating standard
More informationDeclaration of Environmental Product Attributes ECMA TR/70
Ecma/TC38/2004/42 Technical Committee 38 Product-Related Environmental Attributes Declaration of Environmental Product Attributes ECMA TR/70 Rue du Rhône 114- CH-1204 Geneva - T: +41 22 849 6000 - F: +41
More informationMobile Food Vendors Policy. 1.0 Purpose. 2.0 Policy NO Virginia Polytechnic Institute and State University
Mobile Food Vendors Policy NO. 5810 Policy Effective Date: 1/23/2017 Last Revision Date: Policy Owner: Sherwood Wilson Policy Author: (Contact Person) Kayla Smith Affected Parties: Faculty Staff Other
More informationGuide to the Division of Transportation: Railroads' Engineering Data
Guide to the Division of Transportation: Railroads' Engineering Data Lisa Ulrich and Robert Harding June 1986 Archives Center, National Museum of American History P.O. Box 37012 Suite 1100, MRC 601 Washington,
More informationSOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT
SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY
More informationADDENDUM NO. 1 INVITATION FOR BID FOR BUS ENGINE SUPPLY. IFB NO: 2018-FP-08 Date Issued: August 6, 2018
602 N. Staples, Corpus Christi, Texas 78401 p. 361-289-2712 f. 361-903-3578 www.ccrta.org ADDENDUM NO. 1 INVITATION FOR BID FOR BUS ENGINE SUPPLY IFB NO: 2018-FP-08 Date Issued: August 6, 2018 INSTRUCTIONS:
More informationEV-2051-M Electric Motor. Operation and Maintenance Manual
EV-2051-M Electric Motor Operation and Maintenance Manual Table of Contents Safety... 3 General...3 Safety Notices...6 Cautions, Warnings and Dangers...7 Cautions...8 Warnings...11 Dangers...13 Important
More informationAutomotive Technician-Advanced
Job Ready Assessment Blueprint Automotive Technician-Advanced Test Code: 4008 / Version: 01 Copyright 2006. All Rights Reserved. General Assessment Information Automotive Technician-Advanced Blueprint
More informationCenterwide System Level Procedure
5.ARC.0004.2 1 of 10 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release J. Hanratty 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-029).
More informationPlease review the below list and ensure that your request for quote does not match one of these NO QUOTE factors.
Thank You for considering us to complete your fuel tank project. This document will help guide you in providing us with the information we require to offer accurate pricing, lead times and ultimately get
More informationJob Ready Assessment Blueprint. Diesel Technology. Test Code: 4127 / Version: 01. Copyright All Rights Reserved.
Job Ready Assessment Blueprint Diesel Technology Test Code: 4127 / Version: 01 Copyright 2014. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written
More informationANSI/BIFMA X Desk/Table Products - Tests. American National Standard for Office and Institutional Furnishings
BSR/BIFMA X5.5-201X ANSI/BIFMA X5.5-2014 Desk/Table Products - Tests American National Standard for Office and Institutional Furnishings American National Standard Approval of an American National Standard
More informationRULE 326. STORAGE OF REACTIVE ORGANIC COMPOUND LIQUIDS. (Adopted 12/14/1993, revised 1/18/2001)
RULE 326. STORAGE OF REACTIVE ORGANIC COMPOUND LIQUIDS. (Adopted 12/14/1993, revised 1/18/2001) A. Applicability This rule applies to equipment used to store reactive organic compound (ROC) liquids with
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services
More informationMN/DOT Specification Light Emitting Diode (LED) Luminaire 03/20/2012
1. LISTING REQUIREMENTS MN/DOT Specification Light Emitting Diode (LED) Luminaire 03/20/2012 1.1. The Luminaire shall be listed by a National Recognized Testing Laboratory (NRTL) as defined by the U.S.
More information2017 Edition Updated: August 22, Unit Ventilators: 840
2017 Edition Updated: August 22, 2017 Unit Ventilators: 840 The latest issue of the directory may be downloaded, at no charge, from www.ahridirectory.org. Other certified products are published in the
More informationAdministrative Circular TO ALL NATIONAL COMMITTEES. Dear Sir/Madam, Co-operation and Licence Agreement between IEC and IEEE
Administrative Circular 138/AC 2002-12-13 TO ALL NATIONAL COMMITTEES Dear Sir/Madam, Co-operation and Licence Agreement between IEC and IEEE Further to document C/1257A/RV and the decision on Council Document
More informationDIVISION 14 CONVEYING EQUIPMENT
DIVISION 14 CONVEYING EQUIPMENT Page 1 of 4 Part 1 General 1.1 SCOPE OF WORK.1 Supply and install one (1) complete overhead (push trolley electric chain hoist) under running monorail crane systems as mentioned
More informationCraigieburn Employment Precinct North and English Street
Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street
More informationJob Ready Assessment Blueprint. Diesel Technology. Test Code: 4127 / Version: 01. Copyright All Rights Reserved.
Job Ready Assessment Blueprint Diesel Technology Test Code: 4127 / Version: 01 Copyright 2014. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written
More informationINSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER MODELS F-7 F-8 DRAWING NUMBERS AD045B[ ] AD046BB AD046BO MANUAL NUMBER IOM-113 REVISION Rev. B, 3/22/2017 TABLE OF CONTENTS SAFETY 3 1. PRODUCT
More informationA Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk
A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk by: Kelly Eberle, P.Eng. Beta Machinery Analysis Calgary, AB Canada keberle@betamachinery.com keywords: reciprocating
More informationINVITATION TO BID Fort Morgan Golf Course Golf Carts
INVITATION TO BID The is accepting sealed bids to Lease or Lease-purchase 45 until 4:00 p.m. (our clock) on September 2, 2011 at City Hall located at 110 Main Street, Fort Morgan, Colorado 80701 at which
More informationUnited States Air Force Aircraft History Cards Microfilm
United States Air Force Aircraft History Cards Microfilm Paul Silbermann 2000 National Air and Space Museum Archives 14390 Air & Space Museum Parkway Chantilly, VA 20151 NASMRefDesk@si.edu URL: http://airandspace.si.edu/research/resources/archives/
More informationANNEX 8 RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS
RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention
More informationREQUEST FOR PROPOSALS EAGLE COUNTY RECYCLE DROP-OFF COLLECTION CONTAINER HAULING
REQUEST FOR PROPOSALS EAGLE COUNTY RECYCLE DROP-OFF COLLECTION CONTAINER HAULING INTRODUCTION August 27, 2010 Eagle County is soliciting proposals from qualified service providers to haul collected recyclable
More information2020 GLOBAL SULPHUR LIMIT HISTORY, CURRENT STATUS, AND THE INTERNATIONAL MARITIME ORGANIZATION S (IMO S) WORK PLAN FOR EFFECTIVE IMPLEMENTATION
2020 GLOBAL SULPHUR LIMIT HISTORY, CURRENT STATUS, AND THE INTERNATIONAL MARITIME ORGANIZATION S (IMO S) WORK PLAN FOR EFFECTIVE IMPLEMENTATION Marshall Islands Registry and Korean Industry Stakeholders
More informationSolar Storage Solutions
Solar Storage Solutions 1 With many economic obstacles arising out of numerous uncertainties, we all seek a degree of predictability and certainty. For organisations no more is this sought than when it
More informationQuick Reference. 4-Point PRO Mounting Hardware. For Aluminum & Carbon Series Back Supports
Quick Reference 4-Point PRO Mounting Hardware For Aluminum & Carbon Series Back Supports Customer Satisfaction 1.0 Stealth Products strives for 100% customer satisfaction. Your complete satisfaction is
More informationDODGE CUMMINS GDP Big Line Kit
Installation Manual P/N 9852BLK 1998.5-2002 DODGE CUMMINS GDP Big Line Kit Installation Instructions P/N 9852BLK GDP Big Line Kit Installation PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION
More informationSSC Sensor Replacement Board for the SSC Evaluation Kit. Features. Benefits
SSC Sensor Replacement Board for the SSC Evaluation Kit ZSC31XXX / ZSSC3XXX Datasheet Brief Description The SSC Sensor Replacement Board is included in IDT s modular SSC Evaluation Kits, which provide
More informationregistered with TRA as a carbon levy direct remitter for transportation fuels; or
Tax and Revenue Administration (TRA) Transportation Fuels Carbon Levy Remitter Return Instruction Guide Date released / updated: January 2018 Transportation Fuels Carbon Levy Remitter Return Instruction
More informationPIP RESP003H Specification for High Power Horizontal Centrifugal Pumps for Water Service
October 2013 Process Industry Practices Machinery PIP RESP003H Specification for High Power Horizontal Centrifugal Pumps for Water Service PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to
More informationSan Joaquin Valley Unified Air Pollution Control District Permit Services Division
San Joaquin Valley Unified Air Pollution Control District Permit Services Division Organic Liquid Storage Tanks Cleaning Requirements Approved By: Date: 2/20/08 David Warner Director of Permit
More informationPennBarry Fan Guide Specification. Laboratory Exhaust System: Model vplume
PennBarry Fan Guide Specification Laboratory Exhaust System: Model vplume This document 2018 PennBarry vplume is a commercial lab exhaust fan that ensures a greater margin of safety by effectively dispersing
More informationSolar*Rewards Frequently asked questions system size and customer usage
Solar*Rewards 1. Will a PV system work with my home? 2. Am I eligible to participate in the Solar*Rewards program? 3. What size system should I get? 4. Can a customer at a service location apply for the
More informationModel MTB-ASME Vertical Pre-Piped Bladder Tanks
DATA SHEET Model MTB-ASME Vertical Pre-Piped Bladder Tanks Features n Pre-piped configurations with a wide selection of proportioner sizes, including the SKUM TPW-150 MK2 for closedhead sprinkler systems
More informationRECYCOIL Used Oil Tank
RECYCOIL Used Oil Tank Owners and Users Manual *Tanks may not be exactly as shown. 198900 Rev. 5 Revised 03-12-13 LIMITED WARRANTY Westeel Division of Vicwest Corporation ( Westeel ) warrants products
More informationFURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING
E MARINE ENVIRONMENT PROTECTION COMMITTEE 67th session Agenda item 5 MEPC 67/5 1 August 2014 Original: ENGLISH FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL
More informationETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)
EN 301 783-2 V1.2.1 (2010-07) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Commercially available amateur
More informationTank Cleaning Screening Questionnaire
Company: Tank Cleaning Screening Questionnaire Project-N.: General information about the Client Company URL: www. Street: State / town: Primary contact: Department: Name of person(s) in charge of tankage
More informationBiodiesel Fuels Made of Used Cooking Oil Version1.0. Certification Criteria
Eco Mark Product Category No. 160 Biodiesel Fuels Made of Used Cooking Oil Version1.0 Certification Criteria - Applicable Scope- Fuels for diesel engines (for automobiles, for construction machines, for
More informationComponents, Mounting Systems, In-roof PV Solutions FATH Solar About us Page 3
Important matters Brochure Content Components, Mounting Systems, In-roof PV Solutions FATH About us Page 3 S1 System S1: Half as Complex and Twice as Safe Page 4 S1: Pivotal Advantage for all Standard
More informationAn Overview of NSPS Subpart QQQ VOC Emissions from Petroleum Refinery Wastewater Systems
An VOC Emissions from Petroleum Refinery Wastewater Systems Michelle Yakubisin Senior Engineer, ERM Copyright 2018 by ERM Worldwide Group Limited and/or its affiliates ( ERM ). All Rights Reserved. No
More informationGuide to the Nagle Engine and Boiler Works Records
Guide to the Nagle Engine and Boiler Works Records Alexandra Asal 2017 Archives Center, National Museum of American History P.O. Box 37012 Suite 1100, MRC 601 Washington, D.C. 20013-7012 archivescenter@si.edu
More informationELD Countdown Days! There will be no Idealease Safety Bulletin next week Friday Nov 24th during the Thanksgiving Holiday week.
In This Issue: ELD Countdown...32 Days How Idealease will Support Your Compliance with the ELD Regulation While Operating our Rental or Lease Vehicles Breaking ELD News! ELD Exemptions ELD Questions of
More informationRFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of:
RFQ 2016-23 Fleet Vehicles The City of Dawson Creek is requesting quotations for the supply and delivery of: One (1) 2016 Minimum GVW 4300kg, 4 Wheel Drive, Regular Cab, Long Box Truck. One (1) 2016 Minimum
More informationDhatec Document No.: DHA415-APS-PH
Elskensakker 8, NL-5571 SK Bergeijk, The Netherlands Tel +31 497 542 527 Fax +31 497 555 399 Email info@dhatec.nl Web www.dhatec.nl Application Procedure Specification Dhatec Pipe Hook Dhatec Document
More informationCompressed Natural Gas Vehicle Fuel System Inspection Guidance
Prepared by NGVAmerica Technology & Development Committee Fuel System Inspection Working Group Compressed Natural Gas Vehicle Fuel System Inspection Guidance Disclaimer LEGAL NOTICE: NGVAmerica makes great
More informationFERNO. Users Manual. Model 101-H Operating Table. Mortuary. Read this Manual and Retain for Future Reference. October 2010 GLO Pub. No.
FERNO Mortuary Users Manual October 2010 GLO Pub. No. 234-1994-03 Read this Manual and Retain for Future Reference Ferno Technical Support Customer service and product support are important aspects of
More informationDODGE CUMMINS GDP Twin CP-3 Big Line Kit
Installation Manual P/N 0306-TCP3 2003-07 DODGE CUMMINS GDP Twin CP-3 Big Line Kit Installation Instructions P/N 0306-TCP3 GDP Twin CP-3 Big Line Kit Installation PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING
More informationAWRF Associated Wire Rope Fabricators
AWRF Associated Wire Rope Fabricators Recommended Practice and Guideline Disclaimer for version of AWRF Recommended Guideline for Proof Test Procedures for Slings Part I: Alloy Chain Slings Associated
More informationAustralian Standard. Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) AS AS 2788
AS 2788 2002 AS 2788 Australian Standard Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) This Australian Standard was prepared by Committee ME-035, Fluid Power Systems and Components.
More informationPURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...
Reed College 3203 Southeast Woodstock Blvd. Portland Oregon 97202-8199 Crane Safety Policy Effective Date: Revision Dates: February 9, 2011, June 25, 2012, July 2016 Review Dates: I. PURPOSE... 1 II. SCOPE...
More informationADMINISTRATIVE PRACTICES MANUAL
SAFETY MANUAL : 1.0 Scope and Application This policy is intended to prescribe rules and establish minimum requirements for the care, and use of the common types of ladders, in order to insure safety under
More informationOverhead transmission lines Tension clamp
SVENSKA KRAFTNÄT T~ SWEDISH NATIONAL GRID UNIT, BUSINESS AREA AFL, Asset Management Lines OUR REFERENCE TR05-06E DATE 2016-06-09 CONSULTÅTIONS m /j(j TECHNICAL GUIDELINE REVISION 3 Td APPROVED Overhead
More informationINSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER MODEL F-31 DRAWING NUMBER AD044CP MANUAL NUMBER IOM-185 REVISION Rev. A, 4/23/2018 TABLE OF CONTENTS SAFETY 3 1. PRODUCT INFORMATION
More informationRequest for Quote # Armored Vehicle for Hammond Police Swat Team
City Of Hammond Purchasing Department Request for Quote # 15-36 Armored Vehicle for Hammond Police Swat Team Proposals shall be faxed/delivered to the City Of Hammond, Purchasing Department No later than