1 Before installation these instructions must be fully read and understood As capacity relief of the system is satisfied, system pressure will begin to decrease. When it does, the pilot will actuate and direct system pressure to the main valve dome. This closes the main valve. The pilot is the non-flowing type. With the main valve open and relieving at steady pressure, no process gas or fluid flows through the pilot. When process pressure changes, the pilot actuates to change the lift of the main valve piston. During these actuations a small amount of gas or fluid from the main valve dome flows through the pilot and is discharged thru the pilot exhaust. The set pressure range is 100 psig to 1480 psig. Table of contents 1 General valve description and start-up Main valve maintenance Pilot maintenance Pilot set pressure adjustment Valve assembly testing Pilot set pressure field test procedure Soft goods repair kits Pilot accessories Assembly and maintenance equipment General valve description and start-up 1.1 General The Anderson Greenwood Series 400 valve is designed for modulating action. The main valve will open at nameplate set, but only an amount proportional to the relieving capacity required. As process pressure increases, the valve will open more and be in full lift at 110% of set. The main valve uses the principle of pressurizing the top or large area of a differential area piston with line pressure to hold the piston closed up to set pressure. At set pressure, the pilot relieves, depressurizing the volume above the piston, the main valve dome, and the piston lifts permitting discharge from the main valve. 1.2 Installation Either or both inlet and outlet may be standard ANSI flanges or ANSI pipe threaded connections and are to be installed in accordance with accepted piping practices. When remote pressure pick-up is used the pilot supply tube is connected to a remote location rather than to the inlet neck of the valve. A block valve in the remote pilot supply line is not recommended. If one is used it must be opened before pressurizing the main valve. NOTE Remote pressure pick-up piping must have the equivalent flow area of 3/8 tubing for lengths up to 100 feet. For lengths greater than this, consult factory. 1.3 Start-up There must be pressure at the valve inlet or at the pilot inlet/sense port for valves with remote sense to establish a differential force across the piston and load it in the closed position. Pressure must pass through the pilot and exert force on the top of the piston. On normal plant start-up the valve will close itself as pressure increases. Block valves are often used under safety valves to isolate them when maintenance is required. When putting the safety valve in service be sure the block valve is fully opened. If the block valve is opened after system start-up, the safety valve may briefly vent before the dome gets pressurized to close the main valve seat. Engineering Doc. # Rev. K Emerson.com/FinalControl 2017 Emerson. All rights reserved. VCIOM EN 18/02

2 1.4 Maintenance Anderson Greenwood recommended main valve and pilot maintenance procedures including pilot set pressure adjustment and valve assembly testing are described in the following paragraphs. Following these procedures in a regular pressure relief valve maintenance program appropriate for the specific operating conditions will ensure satisfactory valve performance and provide optimum service life. Should the pressure/media requirements of a pilot operated pressure relief valve be outside the capabilities of the repair facility, contact Anderson Greenwood for specific instructions before starting any maintenance activity. This manual is provided as a general guide for the maintenance of the safety valves described herein. It does not include procedures covering all valve configurations and variations manufactured by Anderson Greenwood. The user is advised to contact Anderson Greenwood or one of our authorized representatives for assistance with valve configurations and variations not covered in this manual. 2 Main valve maintenance 2.1 Disassembly Before beginning disassembly, bleed off any pressure trapped in the main valve or pilot. Refer to Figure 1A (piston/seat Type XX3) and Figure 1B (piston/seat Type XX9) for parts description and location. Remove cap (Item 17) from the body (Item 1). Remove the liner seal (Item 6), liner (Item 5) and piston (Item 10). Remove the soft goods from the piston. If the piston is equipped with a wedge ring (Item 23), clean and retain for use during assembly. The dipper tube (Item 4) is swaged in place and no attempt should be made to remove it. The nozzle (Item 3) should not be removed unless it is damaged or the nozzle seal (Item 2) is leaking. NOTE Do not remove lock pin and lift adjusting bolt (Items 11 and 12) on valves so equipped unless nozzle is removed. This bolt controls the piston lift and hence the valve s relieving capacity. If either or both the nozzle and lift bolt were removed, then lift must be reset following the procedure of paragraph (Type XX3 or paragraph (Type XX9) Nozzle and nozzle seal disassembly Refer to Figure 2 for parts description and location. 1. Remove lock pin and lift adjusting bolt from piston, if applicable. 2. Place liner in body and piston, without seat or seat retainer, into liner and on top of nozzle. 3. Place appropriate spacer (see Table I) on top of piston and then the cap over the spacer. 4. Thread the appropriate number of cap bolts (see Table I) into threaded holes on top of body. If two bolts are used, they should be 180 apart. When using four bolts, they should be 90 apart. Always use the shortest cap bolts supplied with the valve unless all cap bolts are required. For example, the 1 Type 40/50 is equipped with two 1.50 long bolts and two 1.88 long bolts but only the two 1.50 long bolts should be used. However, the 2 Type 40/50 is equipped with two 1.25 long bolts and two 1.62 long bolts and all four bolts are required for nozzle installation. 5. Tighten cap bolts evenly to the torque listed in Table I to compress nozzle seal. 6. Use a punch or bar with a light hammer and tap on the nozzle retainer teeth to loosen the nozzle retainer. Unthread nozzle retainer approximately ½ turn. 7. Loosen cap bolts to remove load from nozzle. Remove components from main valve. 2.2 Main valve nozzle rework Should the main valve nozzle seating face become nicked or scratched such that the main valve seat does not seal, the imperfections can be removed by polishing the seating face with 400 grit sandpaper. If necessary, the nozzle may be removed from the body and the nozzle seating face (only the seating face) may be remachined and/or polished using 400 grit sandpaper on a flat surface plate. The resurfaced nozzle must be within the limiting dimensions shown in the table and figure below. If the resurfaced seating face standoff is less than the minimum projection height listed, the nozzle must be replaced. Valve size and type X = Main valve piston/seat type, 3 or 9 Min. nozzle projection height (in) 1/1.5 x 2 Type 44X/45X (D, E and F orifice) x 2/3 Type 44X/45X (G and H orifice) Type 44X/45X Type 44X/45X Type 44X/45X Type 44X/45X Type 44X/45X Type 46X Type 46X Type 46X Type 46X Type 46X x 88 Type 46X x 10 Type 46X Type 46X.030 Minimum projection R

3 2.3 Assembly Nozzle and nozzle seal installation 1. Place nozzle seal and nozzle in body. 2. Place nozzle retainer over nozzle and thread into body until it stops on nozzle shoulder. Do not lubricate nozzle retainer threads or mating body threads. 3. Repeat steps 3 through 5 of disassembly procedure to compress nozzle seal. Thread nozzle retainer into body as seal is compressed to keep nozzle retainer from binding against piston. 4. Use a punch or bar with a light hammer and tap on the nozzle retainer teeth to snug the nozzle retainer threads. 5. Loosen cap bolts to remove load from spacer. 6. Remove spacer from valve Soft goods installation and main valve reassembly Refer to Figure 1A (piston/seat Type XX3) and Figure 1B (piston/seat Type XX9) for parts description and location. On 1 to 4 Type 43/53 and 1.5 to 3 Type 63 valves, if either or both the nozzle and lift bolt were removed, then lift needs to be set. If lift setting gages are available, use lift setting procedure (gas service) or (liquid service); otherwise use procedure Install new piston seal along with original wedge ring (if so equipped). Lubricate upper portion of liner I.D., piston seal, and wedge ring (if present) with Dow Corning No. 33 or equivalent for all gas service valves and for liquid service valves with set pressure below 275 psig. Liquid service valves with set pressure at 275 psig and above use Desco 600 or equivalent. Use lubricant sparingly. Insert liner and piston into body and install new liner seal. Install the cap making sure it is seated squarely into body. Torque cap bolts uniformly so as not to cock cap. Such a condition may result in leakage at the liner seal or cause the piston and liner to bind. See Table II for torque values Type XX3 piston and seat Clean and apply a light coating of Dow Corning No. 33 or equivalent silicone lubricant on all threads. Install new seat and reassemble seat retainer and seat retainer screw or screws. NOTE Over tightening of seat retainer screw or screws can distort or damage the seat and cause leakage. Retainer screw or screws should be installed until assembly is snug. Then tighten an additional ¼ to ½ turn to secure assembly. Table I Valve size and type X = Main valve seat type, 3 or 9 Spacer P/N Cap bolt thread # Cap bolts to use Cap bolt torque (ft lb) 1/1.5 x 2 Type 44X/45X (D, E and F orifice) UNF x 2/3 Type 44X/45X (G and H orifice) UNF x 2/3 Type 44X/45X (G and H orifice) UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNF Type 44X/45X UNS Type 46X UNF Type 46X UNF Type 46X UNF Type 46X UNF Type 46X UNF Type 46X UNF x 88 Type 46X UNF x 10 Type 46X UNF Type 46X UNF

4 2.3.4 Type XX9 piston and seat Clean and apply a light coating of Dow Corning No. 33 or equivalent silicone lubricant on all threads. Do not apply any lubricant to any of the soft goods. Install new seat and reassemble seat retainer and seat retainer screw or screws. NOTE Over tightening of seat retainer screw or screws can distort or damage the seat and cause leakage. Retainer screw or screws should be installed until assembly is snug. Then tighten an additional ¼ to ½ turn to secure assembly. On 1 to 4 Type 49/59 and 1.5 to 3 Type 69 valves, if either or both the nozzle and lift bolt were removed, then lift needs to be set. If lift setting gages are available, use lift setting procedure (gas service) or (liquid service); otherwise use procedure Install new piston seal along with original wedge ring (if so equipped and snap ring. Insert liner and piston into body and install new liner seal. Install the cap making sure it is seated squarely into body. Torque cap bolts uniformly so as not to cock cap. Such a condition may result in leakage at the liner seal or cause the piston and liner to bind. See Table II for torque values. Table II Bolt size Torque value (ft lbs) ¼ 7 5/16 12 ⅜ 21 7/16 33 ½ 45 9/16 59 ⅝ 97 ¾ 130 ⅞ ⅛ 408 Parts list Item No. Part name 1 Body 2 Nozzle seal [1] 3 Nozzle [1] 4 Dipper tube 5 Liner 6 Liner seal [2] 7 Seat [2] 8 Seat retainer 9 Seat retainer screw 10 Piston 11 Lift adjusting bolt [4] 12 Lock pin [4] 13 Piston seal [2] 15 Nozzle retainer 16 Dome spring 17 Cap 18 Cap bolt 21 Supply tube 22 Tube connector 23 Wedge ring [3] Notes [1] Field replaceable only if required. [2] Recommended spare parts for repair. [3] Used only for liquid service. [4] Not used on 6, 8 Type 443/453 and 4 and larger Type 463. Refer to Section 7.1 for soft goods repair kit part numbers See detail A Detail A Liquid service Detail A Gas service Figure 1A - Main valve 443/453/463 4

5 See detail A Detail A With wedge ring Detail A Without wedge ring Figure 1B - Main valve 449/459/ Parts list Item no. Part name 1 Body 2 Nozzle seal [1] 3 Nozzle [1] 4 Dipper tube 5 Liner 6 Liner seal [2] 7 Seat [2] 8 Seat retainer 9 Seat retainer screw 10 Piston 11 Lift adjusting bolt [4] Item no. Part name 12 Lock pin [4] 13 Piston seal [2] 14 Snap ring [2] 15 Nozzle retainer 16 Dome spring 17 Cap 18 Cap bolt 21 Supply tube 22 Tube connector 23 Wedge ring [3] Notes [1] Field replaceable only if required. [2] Recommended spare parts for repair. [3] Used 1 / 1½ (D,E,F orif. liq.only), 2 (liq. only), and 4 and larger Type 449/459 and 1½ (liq. only), and 3 and larger type 469. [4] Not used on 6 or 8 Type 449/459 and 4 and larger Type 469. Refer to Section 7.1 for soft goods repair kit part numbers. 5

6 Cap bolt Cap Spacer Liner Piston Nozzle retainer Nozzle Nozzle seal Body Figure 2 6

7 3 Pilot maintenance Refer to Figures 3, 4, and 5. Arrange all parts in an orderly sequence on a flat work surface during disassembly. This will facilitate assembly and help ensure that the correct parts are assembled in the proper sequence. 3.1 Disassembly Before beginning disassembly, bleed off any pressure trapped in the main valve or pilot Standard pilot gas or liquid service Note If the pilot is equipped with a lift lever, the lift lever handle assembly (Item 42) must be removed from the cap (Item 17) before continuing with disassembly. To do this, hold the lift lever handle in the position shown in Figure 3, unscrew the handle assembly bushing (Item 43) from the cap, and remove the handle assembly. Remove the cap (Item 17), for pilot with lift lever remove jam nut (Item 44) and lift lever nut (Item 45), loosen the jam nut (Item 16), and turn the adjustment screw (Item 15) counterclockwise to relieve the spring tension. Exercise caution when removing the spring bonnet (Item 14) from pilots set above 500 psig, as spring tension is not completely relieved until the bonnet is removed. Remove the spring bonnet, spring (Item 6), and spring washers (Item 13). Lift the piston plate (Item 4) with internal parts attached upward and remove from the body (Item 1). Unscrew the piston nut (Item 9) from the feedback piston (Item 3) and remove the lock washer (Item 36). Disassemble the sense piston (Item 10) and feedback piston from the piston plate. Unscrew the inlet nozzle (Item 5) from the feedback piston. Remove the spool spring (Item 8) and inlet nozzle with the spool from the feedback piston Iso-Dome pilot gas service NOTE All Iso-Dome pilots are gas service pilots; however, fully assembled valves with these pilots may be either gas service valves or liquid services valves. After bleeding off any pressure trapped in the main valve or pilot, remove the pilot with the regulator (Item 55) attached from the main valve. Unscrew and remove bracket bolts (Items 52) and bracket bolts (Items 53). Slide the bracket (Item 49) outward approximately 1½ along the regulator cover spacer (Item 50). Using an 11 /16 wrench, unscrew the adapter (Item 48) with regulator attached from the body (Item 1). If necessary, slide the bracket farther out along the cover spacer so that it does not hit the body. Support the regulator during this operation in order to avoid damaging the adapter threads or the body threads. Loosen set screw (Item 54) and remove regulator cover cap (Item 51), regulator cover spaces (Item 50), and bracket. Continue pilot disassembly in accordance with the procedures described in paragraph except that the Iso-Dome pilot uses an adapter in place of the body plug (Item 2) in a standard pilot Iso-Sense pilot gas or liquid service The Iso-Sense pilot sectional drawing shown in Figure 3 is presented for identification purposes only. This is a special pilot assembly which may incorporate non-standard components. Contact Anderson Greenwood for replacement parts and maintenance instructions for individual pilots (serial number is required for complete identification). Remove the bias spring (Item 11) and body plug (Item 2) from the body. Using a hex key (Allen wrench) inserted through the bottom of the body into the hex socket in the outlet nozzle (Item 25), unscrew the outlet nozzle and remove it through the top of the body. Note that when viewed from the bottom of the body, the hex key is turned clockwise to unscrew the outlet nozzle. 7

8 3.1.4 Pilot variations and accessories For pilot equipped with a one-piece spool, Figure 3 Style A, remove the spool seal (Item 28) and the outlet seat (Item 30) from the spool (Item 31; then remove the spool from the inlet nozzle. For pilot equipped with a three-piece spool, Figure 3 Style E, unscrew the spool nut (Item 39) from the inner spool (Item 41), remove the outer spool (Item 40) from the inlet nozzle and remove the inner spool from the outer spool. For pilot equipped with a field test accessory, Figure 4, remove this accessory with the shuttle from the body (Item 1). Disassemble the dome connector from the field test body and remove the spring, plunger, and shuttle. For pilot equipped with a backflow preventer and pilot exhaust backflow check valve, Figure 5, remove these accessories from main valve dome port (backflow preventer) and the pilot exhaust port (backflow check valve). Unscrew the backflow preventer bushing from the body and remove the shuttle. Unscrew the fitting from the backflow check valve body and remove the flow washer and ball. Remove and discard all old seats, seals, and O-rings before beginning assembly. 3.2 Assembly Standard pilot gas or liquid service Assembly is done in the reverse order of disassembly. Lightly lubricate all O-rings, all sliding surfaces, screw threads and spring washer pivot points with Dow Corning No. 33 Silicone grease or equivalent. Do not lubricate the inlet seat (Item 7) or the outlet seat (Item 30). For pilot with lift lever, do not install lift lever handle assembly (Item 42) until final pilot adjustment is completed, see paragraph Iso-Dome pilot gas service All Iso-Dome pilots are gas service pilots (see Note paragraph 3.1.2). Assemble pilot in accordance with procedures described in paragraph Support the regulator when threading the adapter (Item 48) with regulator attached into the body (Item 1). With an 11 /16 wrench used to back-up the adapter, the regulator may be rotated ± ¼ turn about the adapter axis to align the bracket (Item 49) mounting surfaces on the body and the regulator bracket (Item 56). If alignment can not be achieved with ± ¼ turn, unthread the regulator from the adapter. Clean the ¼ NPT threads on the adapter and in the regulator outlet port and wrap the adapter threads with several wraps of PTFE thread seal tape. Screw the regulator onto the adapter and tighten sufficiently to effect a thread seal and alignment of the bracket mounting surfaces. Loosen the two #10-24 socket head cap screws in the regulator bracket so that the bracket can slide along the outside of the regulator. Install the bracket and hand tighten two bracket bolts (Item 52) into the body. Hand tighten two bracket bolts (Item 53) into the regulator bracket and securely tighten the two #10-24 socket head cap screws into the regulator bracket. Securely tighten the four bracket bolts. Do not install the regulator cover spacer and regulator cover cap until final adjustment is completed, see paragraph 4.3. Pilot assembly and pretest When assembling piston plate with attached internal parts subassembly to body subassembly, orient hole in plate to fit over the length of damper bushing (Item 38) projecting past the body face. Engage spool in outlet nozzle and press gently until assembly drops in place. Pretest to verify proper feedback piston function by depressing piston stack assembly downward. The bias spring should return the stack assembly to the upward position. If the stack assembly does not return, identify and correct source of malfunction before completing assembly. 8

9 3.2.3 Accessories Assembly is done in the reverse order of disassembly. On backflow preventers (Reference Figures 4 and 5), lightly lubricate the bushing threads with Dow Corning No. 33 silicone grease or equivalent. A small amount of lubricant can be applied to the bushing seal(s). Do not get any lubricant on the shuttle, shuttle seat(s) and or bushing seat. When re-installing the backflow preventer on the main valve dome port orient it so that the bushing is connected to the pilot (process) side , , Style E Dome A A Rotated 90 for clarity Inlet Exhaust Style A Section A - A Figure 3 - Pilot (Continued thru page 11) 9

10 Lift lever assembly Iso-Dome pilot assembly Figure 3 - Pilot (Continued from page 9) 10

11 Parts list Item Description 1 Body 2 Plug, body 3 Piston, feedback 4 Plate, piston 5 Nozzle, inlet 6 Spring 7 Seat, inlet [1] 8 Spring, spool 9 Nut, piston 10 Piston, sense 11 Spring, bias 12 Seal, feedback/sense piston [1] 13 Washer, spring 14 Bonnet, spring 15 Screw, adjustment 16 Nut, jam 17 Cap 18 Vent, bonnet 19 Bolt, piston plate 20 Bolt, body 21 Seal, body/piston plate [1] 22 Seal, piston plate [1] 23 Seal, feedback piston [1] 24 Seal, inlet nozzle [1] 25 Nozzle, outlet 26 Seal, upper outlet nozzle [1] 27 Seal, body plug [1] 28 Seal, spool [1] Item Description 29 Seal, lower outlet nozzle [1] 30 Seat, outlet [1] 31 Spool 32 Seal, sense piston [1] 33 Screen, inlet 34 Plug, body f.t. port 35 Vent, exhaust port [3] 36 Washer, lock 37 Insert, bonnet 38 Bushing/damper 39 Nut, spool [2] 40 Spool, outer [2] 41 Spool, inner [2] 42 Handle assy, lift lever 43 Bushing, lift lever handle assy 44 Nut, jam 45 Nut, lift lever 46 Rod, lift lever 47 Bushing, lift lever 48 Adapter 49 Bracket 50 Spacer, regulator cover 51 Cap, regulator cover 52 Bolt-DH, bracket 53 Bolt, bracket 54 Screw-set 55 Regulator 56 Bracket -regulator 57 Coupling Notes [1] Recommended spare parts for repair. [2] For style E pilots. [3] After Nov pilot exhaust connected to main Iso-Sense pilot assembly valve outlet for standard assemblies and exhaust vent not supplied except standard Iso-Dome pilot assemblies exhaust to atmosphere and are supplied with exhaust vent. Figure 3 - Pilot (Continued from page 9) 11

12 A Dome connection port Plunger spring Spring* Dome connector Plunger seal A Field test body Shuttle seal Plunger Shuttle* Plunger seat View A - A Figure 4 - Field test accessory * Spring based shuttle design standard from July 1st,

13 Pilot Main valve backflow preventer Dome connection Main valve outlet Pilot exhaust backflow check valve Backflow preventer connection Main valve inlet Bushing seal Shuttle seat Bushing seat Bushing seal Body Shuttle Bushing Shuttle Bushing Shuttle seat Body Spring Backflow preventer (Standard prior to September 2002) Backflow preventer with bias spring (Standard beginning in September 2002) Check valve seal Ball Flow washer Fitting Figure 5 - Pilot exhaust backflow check valve 13

14 4 Pilot adjustment 4.1 Definitions Set pressure is defined as the supply pressure at which the dome pressure is 70% of the supply pressure. This corresponds to the initial audible discharge of gas or first steady stream of liquid from the main valve. Crack pressure is defined as the supply pressure at which gas flow begins at the pilot exhaust. Reseat pressure is defined as the supply pressure at which the dome pressure increases to 75% of supply pressure. The dome pressure will continue to increase until the supply pressure decreases to 94% of set. 4.2 Set pressure, standard pilot Gas service pilot To adjust the set pressure, a test set-up similar to that shown in Figure 6 should be used. The test media should be air. The adjustment screw should be turned IN most of the way. Increase the supply pressure to nameplate setting and slowly back out the adjustment screw until flow through the pilot exhaust begins. Continue to slowly back out the adjustment screw until dome pressure is 70% of the supply pressure and the supply pressure meets the required set pressure tolerance of paragraph 4.5. After adjustment is completed, securely tighten the jam nut. To determine reseat pressure, shut off the air supply and use the accumulator vent valve to slowly reduce the supply pressure until the dome pressure is 75% of supply pressure. Close the shut-off valve and slowly open the bleed valve. When the dome pressure gauge reading is zero, the pilot may be removed from the test set-up. Increase the air supply pressure to nameplate setting and slowly back out the adjustment screw until water flow through the pilot exhaust begins. Continue to slowly back out the adjustment screw until dome pressure is 70% of the supply pressure and the supply pressure meets the required set pressure tolerance of paragraph 4.5. To determine reseat pressure, shut off the air supply and use the accumulator vent valve to slowly reduce supply pressure until the dome pressure is 75% of supply pressure. Close the shut-off valve in the water line to the pilot inlet port and slowly open the bleed valve. When the dome pressure gauge reading is zero, the pilot may be removed from the test set-up. The optional indicator assembly shown in Figure 7 may be used for set pressure above 70 psig. If an indicator assembly is used, slowly increase the supply pressure until the indicator pin pulls into the indicator assembly and is approximately flush with the end of the indicator body. The pressure when the pin pulls in is the set pressure. Loosen the jam nut, adjust the adjustment screw, and retighten the jam nut as required to meet the set pressure tolerance of paragraph 4.5. Shut off the air supply and use the accumulator vent valve to slowly bleed down supply pressure until the indicator pin pops out of the indicator assembly (full extension of the pin is approximately 7 /16 ). The pressure when the pin pops out is the reseat pressure. Close the shut-off valve in the water line to the pilot inlet port and slowly open the bleed valve. When the dome pressure gauge reading is zero, the pilot may be removed from the test set-up Liquid service pilot NOTE An initial set pressure adjustment may be made with air as the supply pressure media using a test set-up similar to that shown in Figure 6 and following the procedure described in paragraph above. This initial set pressure will be approximately 1½% lower than the set pressure observed when the pilot is tested on liquid. To adjust the set pressure, a test set-up similar to that shown in Figure 7 should be used. The test media should be water. Some air volume must be maintained above the water surface in the accumulator. 14

15 4.3 Set pressure, Iso-Dome pilot NOTE All Iso-Dome pilots are gas service pilots (See Note paragraph 3.1.2) Gas sense pilot To adjust set pressure, a test set-up similar to that shown in Figure 8 should be used. The air supply to the regulator inlet should be adjusted so that the dome pressure gauge reading is 92% ± 2% of nameplate set pressure. The pressure at the regulator inlet should be a minimum of 200 psi greater than the specified dome pressure. The adjustment screw should be turned IN most of the way. Generally it is not necessary to perform any service work on the regulator; however, if maintenance or repair is indicated, contact the regulator manufacturer for instructions and parts. The regulator output pressure should be adjusted if service was performed on the regulator or the pilot set pressure is being changed. Apply pressure to the regulator inlet port of 200 psi greater than the specified dome pressure. Using a ½ open end wrench, turn the regulator adjusting screw, clockwise rotation increases and counterclockwise rotation decreases output pressure, as required to produce a dome pressure gauge reading equal to 92% ± 2% of the specified pilot set pressure. Final adjustment should be made in the increasing pressure direction (with clockwise rotation). After final adjustment is completed, install the regulator cover spacer and the regulator cover cap. Adjust regulator adjusting screw so that socket head set screw in regulator cover cap will tighten against the flat of the regulator adjusting screw. This may require ± ¼ turn of regulator adjusting screw. Securely tighten the socket head set screw to lock the cover cap to the regulator adjusting screw Liquid sense pilot To adjust the set pressure, a test set-up similar to that shown in Figure 9 should be used. The air supply to the regulator inlet should be adjusted so that the dome pressure gauge reading is 92% ± 2% of nameplate set pressure. The pressure at the regulator inlet should be a minimum of 200 psi greater than the specified dome pressure. Generally it is not necessary to perform any service work on the regulator; however, if maintenance or repair is indicated, contact the regulator manufacturer for instructions and parts. If service was performed on the regulator or if the pilot set pressure is being changed, the regulator output pressure should be adjusted following the procedure described in paragraph Adjust the pilot set pressure in accordance with procedure described in paragraph except no initial set pressure adjustment is made. Close the block valve in the air supply line to the accumulator, close the block valve in the air supply line to the regulator, verify that the shutoff valve in the water line to the pilot is open, slowly open the vent valve, and slowly open the bleed valve. When the supply pressure gauge and the dome gauge each read zero, the pilot may be removed from the test set-up. 4.4 Range of adjustment All pilots can be adjusted ± 5% beyond the nameplate setting. If a set pressure change is made that requires a new spring, consult factory or refer to appropriate spring chart in Anderson Greenwood report number to make proper selection. Warning If regulator output pressure is set outside of the 92 ± 2% of nameplate set pressure limits, the pilot (and the assembled valve) set pressure may not comply with the tolerance requirements of Section VIII of the ASME Boiler and Pressure Vessel Code. Increase the supply pressure to the nameplate setting and slowly back out the adjustment screw until flow through the pilot exhaust begins. Continue to slowly back out the adjustment screw until dome pressure is 70% of the supply pressure. After adjustment is completed, securely tighten the jam nut. Close the block valve in the air supply line to the accumulator, close the block valve in the air supply line to the regulator, verify that the shutoff valve is open, slowly open the vent valve, and slowly open the bleed valve. When the supply pressure gauge and the dome pressure gauge each read zero, the pilot may be removed from the test set-up. 4.5 Performance requirements Set pressure (psig) Set pressure tolerance Crack pressure minimum Reseat pressure limits 100 to 1480 inclusive ± 3% 94% of set 96 to 100% of set 15

16 4.6 Lift lever handle assembly installation For pilot equipped with a lift lever, install the lift lever handle assembly (Item 42) after completing the final pilot adjustment. Screw the lift lever nut (Item 45) on the threaded portion of the lift lever rod (Item 46) until the lower face of the lift lever nut is approximately 2 1 /16 above the top of the spring bonnet (Item 14). Use the jam nut (Item 44) to lightly lock the lift lever nut in place. Screw the cap on the threaded projection of the bonnet insert (Item 37) until it is hand tight against the spring bonnet. The lower face of the lift lever nut should be even with the center of the threaded hole in the cap. If the lift lever nut is not positioned correctly, remove the cap and adjust the nuts as required, and reinstall the cap. With the lift lever handle held in the position shown in Figure 3, install the handle assembly by screwing the handle assembly bushing (Item 43) into the cap. The cam surface of the lift lever handle assembly must contact the lower face of the lift lever nut between 15 and 45 of clockwise or counterclockwise rotation of the handle past its null or centered position. Resistance of the handle indicates contact has occurred. If resistance occurs at less than 15, the lift lever nut must be positioned higher. If resistance first occurs at more than 45, the nut must be positioned lower on the lift lever rod. If necessary, remove the handle assembly from the cap following the procedure of paragraph 3.1 and repeat this assembly procedure in order to correctly position the lift lever nut and jam nut on the threaded portion of the lift lever rod. When correctly positioned lock the lift lever nut with the jam nut, install and securely tighten the cap, install the handle assembly, and securely tighten the handle assembly bushing. Caution To avoid damaging any of the lift lever components, do not rotate the lift lever handle past that position where the cam surface of the handle assembly first contacts the lower face of the lift lever nut. Set pressure adjustment (turn in to increase set pressure) (turn out to decrease set pressure) Bleed valve Pilot exhaust* Dome pressure gauge Flexible hose (to inlet port) Supply pressure gauge Shut-off valve Mounting stub Block valve Accumulator (approx. ¼ cu ft) Air supply Vent fitting in pilot exhaust port not supplied with standard pilots after Nov Vent valve Figure 6 16

17 Set pressure adjustment (turn in to increase set pressure) (turn out to decrease set pressure) Bleed valve Dome pressure gauge Shut-off valve (optional) Pilot exhaust Flexible hose (to inlet port) Indicator assembly (optional) Indicator Optional indicator assembly installation Solid bar w/threaded ends Supply pressure gauge Shut-off valve Water supply Vent valve Block valve Air supply Block valve Accumulator (approx. ¼ cu ft) Shut-off valve (optional isolation valve) Drain Shut-off valve Figure 7 17

18 Set pressure adjustment (turn in to increase set pressure) (turn out to decrease set pressure) Bleed valve Pilot exhaust Dome pressure gauge Flexible hose Block valve Air supply (regulator inlet) Flexible hose (to inlet port) Shut-off valve Regulator Mounting stub Supply pressure gauge Block valve Accumulator (approx. ¼ cu ft) Air supply Vent valve Figure 8 18

19 Set pressure adjustment (turn in to increase set pressure) (turn out to decrease set pressure) Bleed valve Dome pressure gauge Pilot exhaust Shut-off valve (optional) Flexible hose Air supply (regulator inlet) Block valve Optional indicator assembly installation Regulator Indicator assembly (optional) Indicator Solid bar w/threaded ends Supply pressure gauge Flexible hose (to inlet port) Shut-off valve Water supply Vent valve Block valve Air supply Block valve Accumulator (approx. ¼ cu ft) Shut-off valve (optional isolation valve) Drain Shut-off valve Figure 9 19

20 5 Valve assembly testing 5.1 General The complete valve assembly should be tested for internal and external leakage and to verify set pressure using a test set-up similar to that shown in Figures 10, 11, or 12. The test media should be air. Caution Do not test liquid service valves using water or other liquid test media. Liquid service valves should be tested using air as the test media in accordance with the procedures described below. Testing fully assembled liquid service valves using air ensures that no water or other liquid will remain in the main valve dome after final valve testing 5.2 Low pressure leakage check NOTE For valve with Iso-Dome pilot, apply regulator supply pressure equal to a minimum of 200 psi greater than 92% of set pressure Valve for gas service or valve with Iso-Dome pilot Slowly increase the supply pressure to 30% of set pressure. Check for main valve nozzle, seat, and piston seal leakage at the main valve outlet. To help in seating the valve seat and piston seal, the valve may be actuated several times. No leakage shall occur in 15 seconds Valve for liquid service Slowly increase supply pressure to 30% of set pressure. Check for main valve nozzle, seat, and piston seal leakage at the main valve outlet. To help in seating the valve seat and piston seal, the valve may be actuated several times. No leakage shall occur in 15 seconds. If leakage is detected at the valve outlet, note the leakage in bubbles observed in 15 seconds and remove the leakage test device from the outlet flange. With the same supply pressure applied to the valve inlet, use a bubble test leak detector to measure leakage through the pilot exhaust. Low pressure leakage performance is acceptable if the leakage at the main valve outlet is equal to the pilot exhaust leakage and this leakage value does not exceed 15 bubbles in 15 seconds. 5.3 High pressure leakage check NOTE For valve with Iso-Dome pilot, apply regulator supply pressure equal to a minimum of 200 psi greater than 92% of set pressure Valve for gas service or valve with Iso-Dome pilot Apply supply pressure to the inlet equal to 90% of the set pressure. Check for leakage at the main valve outlet. Using a suitable gas and air leak detector solution, check for leakage at the cap seal and other pressure connections. No leakage shall occur at the valve outlet and no visible leakage shall be detected at the cap seal or other pressure connections in one minute Valve for liquid service Apply supply pressure to the inlet equal to 90% of the set pressure. Check for leakage at the main valve outlet. Using a suitable gas and air leak detector solution, check for leakage at the cap seal and other pressure connections. No leakage shall occur at the valve outlet and no visible leakage shall be detected at the cap seal or other pressure connections in one minute. If leakage is detected at the valve outlet, note the leakage in bubbles observed in one minute and remove the leakage test device from the outlet flange. With the same supply pressure applied to the valve inlet use a bubble test leak detector to measure leakage through the pilot exhaust. High pressure leakage performance is acceptable if the leakage at the main valve outlet is equal to the pilot exhaust leakage and this leakage value does not exceed 60 bubbles in one minute. Liquid service valve with Iso-Dome pilot to be tested per paragraph Where superimposed back pressure is specified, the downstream or exhaust connections which are exposed to the back pressure shall be tested at 1.5 times the specified back pressure and all mechanical connections so pressurized will be checked for leaks. No visible leakage shall occur in one minute using a suitable gas and air leak detector solution. Liquid service valve with Iso-Dome pilot should be tested per paragraph

21 5.4 Main valve function check Caution This test must be performed at a slow rate of pressure increase to ensure that the main valve does not go into full lift. The pressure applied to the inlet is not to exceed 105% of nameplate set pressure. ¼ O.D. X.028 wall tube After completing the high pressure leakage check of paragraph 5.3, verify main valve opening as follows. Remove the leakage test device from the outlet flange. Slowly increase the inlet pressure above 90% of set pressure. Continue increasing inlet pressure until an audible discharge at the valve outlet verifies main valve opening. ¼ I.D. flexible elastomer or rubber tubing.10 Ported blind flange Supply pressure gauge Supply Figure 10 - Test set-up for valve with standard pilot 21

22 ¼ O.D. X.028 wall tube ¼ I.D. flexible elastomer or rubber tubing.10 Ported blind flange Supply pressure gauge Figure 11 - Test set-up for valve with remote sense pilot Supply Iso-Dome pilot ¼ O.D. X.028 wall tube ¼ I.D. flexible elastomer or rubber tubing Regulator supply pressure gauge.10 Regulator supply Ported blind flange Supply pressure gauge Supply Figure 12 - Test set-up for valve with Iso-Dome pilot 22

23 5.7 Iso-Sense pilot operated pressure relief valve In this special pilot operated pressure relief valve, the sense pressure applied to the pilot inlet/sense port is supplied from a remote source and the sense pressure media is isolated from the process media. The valve assembly is available for either a gas or liquid process media with either a gas or liquid sense media. The typical Iso-Sense pilot operated pressure relief valve shown in Figure 13 below is presented for identification purposes only. This is a special pressure relief valve assembly which may require special set pressure adjustment procedures. Contact Anderson Greenwood for replacement parts and maintenance instructions for individual valve assemblies (serial number is required for complete identification). Iso-Sense pilot Remote isolated sense pressure line Figure 13 - Iso-Sense pilot operated pressure relief valve 23

24 6 Pilot set pressure field test procedure 6.1 General Gas vent (indicator plunger) Field test Caution If the pressure relief valve is not isolated from the process media while performing this test, the main valve will open if system pressure rises to set point or above. Test gauge alternate location Flexible hose The set pressure of valves equipped with a field test accessory can be checked with the valve installed, in operation. The field test accessory consists of a check valve in the pilot supply line through which test pressure from an external source can be supplied to the pilot. A test set-up similar to that shown in Figure 14 and procedure similar to the following should be used. This procedure accurately checks the set pressure; it does not provide an accurate check of reseat pressure. Test gauge Block valve A NOTE Gas flows through the flexible hose and vents past the indicator plunger to atmosphere when the plunger begins to retract. With gas flowing through the hose, there will be a pressure drop from the gas bottle to the field test fitting port. To ensure an accurate reading of set pressure, the flexible hose should be a ⅜ inside diameter hose and if the length exceeds 10-feet, the test gauge should be positioned at the alternate location (see Figure 14). If the test gas is supplied through a regulator, the effective orifice diameter of the regulator should be a minimum of inch. The main valve will not open while performing this field test as long as the process pressure remains below the set pressure. To cause the main valve to open, slowly increase the test pressure above the set pressure until the piston lifts and process media is discharged through the main valve. To close the main valve, close block valve A and open vent valve C. Figure 14 Vent valve C Warning Keep all parts of body clear of indicator plunger during test to avoid contact with gas venting past the indicator plunger. D. To remove set up, close block valve A, open vent valve C, and remove flexible hose from field test fitting port. Gas bottle 6.2 Procedure A. Connect flexible hose from test gas bottle to field test fitting port. B. Close vent valve C. C. Open block valve A slowly to increase pressure until the indicator actuates. The set pressure will be the pressure indicated on the test gauge at the time gas vents past the indicator plunger and/or the indicator plunger retracts (test gauge reading will decrease if rate of pressure increase is sufficiently slow). 24

25 7 Soft goods repair kits The kits listed below are available from stock. Each kit contain all the seals and seats to repair a main valve or pilot and any required lubricants. Pilot kits also contain all the seals and seats for field test and backflow accessories. To order soft goods kits specify the base number and select the last three digits from the following tables. To ensure the correct soft goods kit is ordered, specify the valve model and serial number. For soft goods kits with elastomers other than those listed, contact Anderson Greenwood or an authorized representative. 7.1 Main valve kit base number: XXX Type 443/453 1 x 2 1½ x 3* 2 x 3 3 x 4 4 x 6 6 x 8 8 x 10 Material 1½ x 2 Urethane and NBR seats, NBR seals Urethane and FPM seats, FPM seals Urethane and EPR seats, EPR seals * Also 1½ x 2 threaded valve with G and H orifice Type 463 1½ x 2 2 x 3 3 x 4 4 x 6 6 x 8 8 x 8 x 8 8 x x 14 Material 2 x 3 x 3 3 x 4 x 4 4 x 6 x 6 6 x 8 x 8 8 x 10 x 10 Urethane and NBR seats, NBR seals Urethane and FPM seats, FPM seals Urethane and EPR seats, EPR seals Type 449/459 1 x 2 1½ x 3* 2 x 3 3 x 4 4 x 6 6 x 8 8 x 10 Material 1½ x 2 PTFE seat/seal (set press., psig) (15-600) (15-600) (15-400) (15-400) (15-400) (15-275) (15-275) PTFE seat/seal (set press., psig) ( ) ( ) ( ) ( ) ( ) ( ) ( ) * Also, 1½ x 2 threaded valve with G and H orifice Type 469 1½ x 2 2 x 3 3 x 4 4 x 6 6 x 8 8 x 8 x 8 8 x x 14 Material 2 x 3 x 3 3 x 4 x 4 4 x 6 x 6 6 x 8 x 8 8 x 10 x 10 PTFE seat/seal (set press., psig) (15-400) (15-400) (15-400) (15-400) (15-275) (50-275) (15-275) (50-275) PTFE seat/seal (set press., psig) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) 25

26 7.2 Pilot - (Includes seals for BFP and FT) Material psig Piston type NBR FPM EPR AFLAS KALREZ Accessories - (Supply filter kit includes filter screen) Material Accessory Kit NBR Spike snubber FPM Spike snubber PTFE/SST Supply filter Pilot accessories 8.1 Lift lever conversion kits Pilot set pressure kit part no psig psig Assembly and maintenance equipment 9.1 Nozzle removal and installation spacer kits Description kit part no. All sizes and types All types All types All sizes and types except without Series All types except without Series Lift stop setting gauge kits Description kit part no. All sizes and types all services All sizes and types gas service only Pilot test stands Description kit part no. Multiple configurations available Contact Anderson Greenwood Indicator assembly for liquid service pilots Neither Emerson, Emerson Automation Solutions, nor any of their affiliated entities assumes responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use, and maintenance of any product remains solely with the purchaser and end user. Anderson Greenwood is a mark owned by one of the companies in the Emerson Automation Solutions business unit of Emerson Electric Co. Emerson Automation Solutions, Emerson and the Emerson logo are trademarks and service marks of Emerson Electric Co. All other marks are the property of their respective owners. The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of such products at any time without notice. Emerson.com/FinalControl 26

Anderson Greenwood Series 800 POSRV Installation and Maintenance Instructions

Anderson Greenwood Series 800 POSRV Installation and Maintenance Instructions Before installation these instructions must be fully read and understood Table of contents 1. General valve description and start-up... 1 2. Main valve maintenance... 2 3. Pilot maintenance... 6 4. Pilot

More information

ANDERSON GREENWOOD. Before installation these instructions must be fully read and understood.

ANDERSON GREENWOOD. Before installation these instructions must be fully read and understood. ANDERSON GREENWOOD Before installation these instructions must be fully read and understood. 1.1 General The Anderson Greenwood Series 200 Pilot Operated SRV uses the principle of pressurizing the larger

More information

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood TABLE OF CONTENTS 1. General valve description and start-up... 1 2. Main valve maintenance... 1 3. Pilot maintenance... 5 4. Pilot

More information

ANDERSON GREENWOOD SERIES 9290 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 9290 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood TABLE OF CONTENTS 1 General valve description and instructions... 2 2 Main valve maintenance... 2 3 Pilot maintenance... 12 4 Pilot

More information

Anderson Greenwood Series 727 Pilot Operated Safety Relief Valves Installation and Maintenance Instructions

Anderson Greenwood Series 727 Pilot Operated Safety Relief Valves Installation and Maintenance Instructions Before installation these instructions must be fully read and understood Table of contents 1 General valve description... 2 2 Main valve maintenance... 2 3 Pilot maintenance... 7 4 Pilot set pressure adjustment...

More information

Baumann Series Flexsleev Control Valve Instructions

Baumann Series Flexsleev Control Valve Instructions Instruction Baumann 86000 Series Instructions Baumann 86000 Series Flexsleev Control Valve Instructions Contents Introduction...1 Scope...1 Safety Precautions...1 Maintenance...2 Installation...3 Air Piping...3

More information

ANDERSON GREENWOOD SERIES 727 PILOT OPERATED SAFETY RELIEF VALVES MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 727 PILOT OPERATED SAFETY RELIEF VALVES MAINTENANCE INSTRUCTIONS Series 727 Pilot Operated Safety Relief Valves (POSRV) for single pilot manifold steam service Before installation these instructions must be fully read and understood All installation, maintenance, adjustment,

More information

Baumann Mikroseal Control Valve

Baumann Mikroseal Control Valve Instruction Manual 81000 Valve Baumann 81000 Mikroseal Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 3 Installation... 3 Air Piping... 4 Flow Direction...

More information

Anderson Greenwood Single Active SSV Installation and Maintenance Instructions

Anderson Greenwood Single Active SSV Installation and Maintenance Instructions Before installation these instructions must be fully read and understood The intent of these instructions is to acquaint the user with the storage, installation and operation of this product. Please read

More information

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

INSTALLATION, OPERATION, & MAINTENANCE MANUAL High Performance Safety Relief Valves F7000 / 8000 SERIES PILOT-OPERATED SAFETY RELIEF VALVE INSTALLATION, OPERATION, & Revision: T Date of Issue: December 17, 2018 Approved by: jwo Engineering Projects

More information

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Environmental Performance for Industry! F70VP SERIES VACUUM RELIEF VALVE INSTALLATION, OPERATION, & Revision: A Date of Issue: Oct. 31, 2003 Approved by: Design Engineer Service Manager Engineering Manager

More information

Fisher D2T FloPro Control Valve

Fisher D2T FloPro Control Valve Instruction Manual D2T FloPro Valve Fisher D2T FloPro Control Valve Contents Introduction... 1 Scope of Manual... 1 Description... 1 Educational Services... 2 Specifications... 3 Installation... 3 Setting

More information

Baumann Sanitary Angle Control Valve

Baumann Sanitary Angle Control Valve Baumann 83000 Sanitary Angle Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Educational Services... 2 Maintenance... 3 Installation... 3 Air Piping... 4 Flow Direction...

More information

Fisher 656 Diaphragm Actuator

Fisher 656 Diaphragm Actuator Instruction Manual 656 Actuator Fisher 656 Diaphragm Actuator Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Specifications... 2 Maximum Pressure Limitations...

More information

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been

More information

Fisher 3024C Diaphragm Actuator

Fisher 3024C Diaphragm Actuator Instruction Manual 3024C Actuator Fisher 3024C Diaphragm Actuator Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 3 Installation... 5 Mounting the Actuator on the Valve...

More information

Fisher RSS Lined Globe Valve

Fisher RSS Lined Globe Valve Instruction Manual D0990 RSS Valve July 07 Fisher RSS Lined Globe Valve Contents Introduction... Scope of Manual... Description... Educational Services... Specifications... Installation... Maintenance...

More information

Fisher 2052 Diaphragm Rotary Actuator

Fisher 2052 Diaphragm Rotary Actuator Instruction Manual 2052 Actuator Fisher 2052 Diaphragm Rotary Actuator Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 4 Installation... 4 Actuator Mounting and Changing

More information

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Baumann Sanitary Diaphragm Angle and Inline Control Valve Instruction Manual 84000 Valve Baumann 84000 Sanitary Diaphragm Angle and Inline Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Flow Direction...

More information

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators I & M Mark (/ ) 0 Wasson Road Cincinnati, OH 0 USA Phone --00 Fax -8-00 info@richardsind.com www.jordanvalve.com Installation & Maintenance Instructions for Mark Pressure Regulators Warning: Jordan Valve

More information

Fisher 657 Diaphragm Actuator Sizes and 87

Fisher 657 Diaphragm Actuator Sizes and 87 Instruction Manual 657 Actuator (30-70 and 87) Fisher 657 Diaphragm Actuator Sizes 30 70 and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Installation... 3 Mounting

More information

Pressure Relief Valve Maintenance Manual

Pressure Relief Valve Maintenance Manual Technical Manual 1098T Pressure Relief Valve Maintenance Manual Farris Engineering Division of Curtiss-Wright Flow Control Corporation TABLE OF CONTENTS - Manual Revision 0 Introduction & Safety Tips...

More information

Fisher RSS Lined Globe Valve

Fisher RSS Lined Globe Valve Instruction Manual D0990 November 009 RSS Valve Fisher RSS Lined Globe Valve Contents Introduction............................... Scope of Manual.......................... Description...............................

More information

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED DIAPHRAGM BALANCED All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to

More information

Baumann Way Control Valve

Baumann Way Control Valve Instruction Manual 24003 Valve Baumann 24003 3-Way Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Educational Services... 3 Maintenance... 3 Installation... 3 Air

More information

Before installation these instructions must be fully read and understood

Before installation these instructions must be fully read and understood Before installation these instructions must be fully read and understood Yoke bushing Split gland bushing One-piece body with accessible internals Gland Swing bolts Fully retractable stellite disc Figure

More information

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions Instruction Manual D103356X012 24000C Control Valve Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions CONTENTS Introduction...1 Scope...1 Safety Precautions...1 Maintenance...2 Flow

More information

METERING VALVE 2" STEM GUIDED

METERING VALVE 2 STEM GUIDED 2" STEM GUIDED All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to be construed

More information

Model DF233 Control Valve

Model DF233 Control Valve Figure 1 DF233 Control Valve TABLE OF CONTENTS Introduction 2 Body and Packing Reassembly 7 Specifications 3 Fail Closed Actuator Reassembly 8 Valve Sizes 3 Fail Open Actuator Reassembly 9 Unpacking 4

More information

Anderson Greenwood Series 5100 Pilot Operated Pressure Relief Valves

Anderson Greenwood Series 5100 Pilot Operated Pressure Relief Valves ANDERSON GREENWOOD Series 5100 Modulating Safety Relief Valve Anderson Greenwood has developed the revolutionary Series 5100 specifically to serve Economizer applications requiring pressure relief under

More information

Baumann 24000F Wafer Control Valve

Baumann 24000F Wafer Control Valve Instruction Manual 24000F Valves Baumann 24000F Wafer Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Installation... 3 Air Piping... 3 Disassembly...

More information

Fisher 644 and 645 Differential Pressure Pump Governors

Fisher 644 and 645 Differential Pressure Pump Governors Instruction Manual 644 and 645 Pump Governors Fisher 644 and 645 Differential Pressure Pump Governors Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services...

More information

Baumann Pneumatic Actuators

Baumann Pneumatic Actuators Instruction Manual Baumann Pneumatic Actuators Baumann Pneumatic Actuators Contents Introduction... 1 Scope of Manual... 1 Design Notes... 2 Installation... 2 Attaching an Air-to-Retract (ATR) Actuator

More information

Crosby Series HSJ safety valves Installation, operation and maintenance instructions

Crosby Series HSJ safety valves Installation, operation and maintenance instructions Before installation these instructions must be fully read and understood Warning The safety of lives and property often depends on the proper operation of the safety valves. Consequently, the valves should

More information

Crosby Style JQ pressure relief device

Crosby Style JQ pressure relief device A combination pressure relief device designed with internal parts completely isolated from corrosive fluids and environments Features Designed in collaboration with the Chlorine Institute, Inc. Provides

More information

Model DF269 Control Valve

Model DF269 Control Valve Figure 1 DF269 Control Valve TABLE OF CONTENTS Introduction 2 Fail Open Actuator Disassembly 6 General 2 Body and Packing Reassembly 7 Scope 2 Fail Closed Actuator Resassembly 8 Specifications 3 Fail Open

More information

Baumann Little Scotty Bronze Control Valve

Baumann Little Scotty Bronze Control Valve Instruction Manual 24000 Valve Baumann 24000 Little Scotty Bronze Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Installation... 3 Air Piping...

More information

Model DFR 070/156/220 Rotary Actuator

Model DFR 070/156/220 Rotary Actuator Figure 1 DFR 156 TABLE OF CONTENTS General 2 Actuator Assembly 18 Scope 2 Bushing / Yoke Assembly 18 Principles of Operation 2 Spring Barrel Assembly 18 Safety Caution 2 Diaphragm Plate Assembly 20 Specifications

More information

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

HIGH PRESSURE CONTROL VALVE PISTON BALANCED PISTON BALANCED All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to be

More information

Baumann Sanitary Diaphragm Angle & In-Line Control Valve Instructions

Baumann Sanitary Diaphragm Angle & In-Line Control Valve Instructions Instruction Manual D103370X012 84000 Control Valve Baumann 84000 Sanitary Diaphragm Angle & In-Line Control Valve Instructions CONTENTS Introduction...1 Scope...1 Safety P recautions...1 Maintenance...2

More information

Type 644 and 645 Differential Pressure Pump Governors

Type 644 and 645 Differential Pressure Pump Governors Instruction Manual 644 and 645 Pump Governors Type 644 and 645 Differential Pressure Pump Governors Introduction Scope of Manual This instruction manual provides information on installation, adjustment,

More information

Types C401, C402, C407, C421, C427, C403, and C831 Jet Bleed Internal Valve Retrofit Kits

Types C401, C402, C407, C421, C427, C403, and C831 Jet Bleed Internal Valve Retrofit Kits Instruction Manual MCK-2290 Types C401, C402, C407, C421, September 2012 Types C401, C402, C407, C421, C427, C403, and C831 Jet Bleed Internal Valve Retrofit Kits! Warning Failure to follow these instructions

More information

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

Keystone Butterfly valves ParaSeal Installation and maintenance instructions Before installation these instructions must be fully read and understood Please read these instructions carefully Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

BIRKETT SAFESET SERIES PILOT OPERATED SAFETY RELIEF VALVES

BIRKETT SAFESET SERIES PILOT OPERATED SAFETY RELIEF VALVES Pop action and modulating pilot operated safety valves with a unique full nozzle design and dimensions to API 526 FEATURES GENERAL APPLICATION Safeset valves are self-contained pilot operated safety relief

More information

Baumann Sanitary Control Valve

Baumann Sanitary Control Valve Instruction Manual 89000 Valve Baumann 89000 Sanitary Control Valve Contents Introduction... 2 Scope of Manual... 2 Educational Services... 2 Safety Precautions... 3 Maintenance... 4 Installation... 4

More information

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc. TREATER VALVE All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to be construed

More information

Type 289P Pilot-Operated Relief Valve

Type 289P Pilot-Operated Relief Valve Instruction Manual D102680X012 Type 289P July 2017 Type 289P Pilot-Operated Relief Valve Figure 1. 1 NPT Type 289P Pilot-Operated Relief Valve Figure 2. 2 NPT Type 289P Pilot-Operated Relief Valve Introduction

More information

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting I & M 8000 Series 3170 Wasson Road Cincinnati, OH 45209 USA Phone 513-533-5600 Fax 513-871-0105 lowflow@richardsind.com www.lowflowvalve.com Installation & Maintenance Instructions for 8000 Series Low

More information

TECHNICAL DATA 1-1/2 (dn40)

TECHNICAL DATA 1-1/2 (dn40) July 1, 2011 Deluge Valves 209a DESCRIPTION The Viking Model E-3 1-1/2 Deluge Valve is a quick-opening, differential type flood valve with a rolling diaphragm clapper. The deluge valve is used to control

More information

Installation, Operation, and Maintenance Manual. Welker Automatic Insertion Corrosion Coupon Device Model AID-1CC

Installation, Operation, and Maintenance Manual. Welker Automatic Insertion Corrosion Coupon Device Model AID-1CC Installation, Operation, and Maintenance Manual Welker Automatic Insertion Corrosion Coupon Device Model The information in this manual has been carefully checked for accuracy and is intended to be used

More information

Fisher TBX Hydro Plug Fixture

Fisher TBX Hydro Plug Fixture Instruction Manual TBX Hydro-Plug Fixture Fisher TBX Hydro Plug Fixture Contents Introduction... 1 Scope of Manual... 1 Description... 2 Educational Services... 2 Principle of Operation... 2 Maintenance...

More information

Fisher D4 Control Valve Assembly

Fisher D4 Control Valve Assembly Fisher D4 Control Valve Assembly Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services... 2 Installation... 4 Spring Adjustment... 5 Maintenance... 6

More information

Fisher CVX Hydro Plug Fixture

Fisher CVX Hydro Plug Fixture Instruction Manual CVX Hydro-Plug Fixture Fisher CVX Hydro Plug Fixture Contents Introduction... 1 Scope of Manual... 1 Description... 1 Educational Services... 2 Principle of Operation... 2 Maintenance...

More information

Welker Adjustable Probe with Check Valve and Welker Automatic Insertion Probe with Check Valve

Welker Adjustable Probe with Check Valve and Welker Automatic Insertion Probe with Check Valve a Installation, Operation, & Maintenance Manual Welker Adjustable Probe with Check Valve and Welker Automatic Insertion Probe with Check Valve Models AP-3MI & AIP-3MI The information in this manual has

More information

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 )

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 ) I & M Mark 8 Series 0 Wasson Road Cincinnati, OH 4509 USA Phone 5-5-5600 Fax 5-8-005 info@richardsind.com www.jordanvalve.com Installation & Maintenance Instructions for Mark 8 Control Valves (-/ - ) Warning:

More information

Fisher 685 Piston Actuator

Fisher 685 Piston Actuator Instruction Manual 685 Piston Actuator Fisher 685 Piston Actuator Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services... 3 Principle of Operation...

More information

Bettis M11 Manual Hydraulic Override System Operating Instructions for HD, T, and G Series Pneumatic and Hydraulic Actuators

Bettis M11 Manual Hydraulic Override System Operating Instructions for HD, T, and G Series Pneumatic and Hydraulic Actuators Instruction Manual D102755X012 March 2010 Bettis M11 Bettis M11 Manual Hydraulic Override System Operating Instructions for HD, T, and G Series Pneumatic and Hydraulic Actuators The following instruction

More information

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP PAGE 1 OF 10 OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP EFFICIENT, EASY OPERATION Air operated pump Wide range of pressures and volumes Easy to operate controls Output pressure

More information

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators Bulletin 71.4 D0163X012 Type 1808 February 17 Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators Type 1808 Type 1808A Figure 1. Types 1808 and 1808A Pilot-Operated Relief Valves

More information

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP Installation, Operation, & Maintenance Manual Welker Sampler Model GSS-4HP The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct

More information

Fisher V250 Ball Valve

Fisher V250 Ball Valve Instruction Manual Fisher V250 Ball Valve Contents Introduction... 1 Scope of Manual... 1 Description... 1 Installation... 3 Maintenance... 6 Replacing the Follower Shaft Seal... 6 Replacing the Drive

More information

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 )

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 ) I & M Mark 8 Series 30 Wasson Road Cincinnati, OH 4509 USA Phone 53-533-5600 Fax 53-8-005 info@richardsind.com www.jordanvalve.com Installation & Maintenance Instructions for Mark 8 Control Valves (/ -

More information

Valtek Auxiliary Handwheels and Limit Stops

Valtek Auxiliary Handwheels and Limit Stops Valtek Auxiliary s and Limit Stops Table of Contents Page 1 General information 2 Installation 2 Side-mounted handwheels, size 25 and 50 (linear actuators) 3 Side-mounted handwheels, size 100 and 200 (linear

More information

Type N550 Snappy Joe Emergency Shutoff Valves

Type N550 Snappy Joe Emergency Shutoff Valves Instruction Manual MCK-1149 Type N550 March 2010 Type N550 Snappy Joe Emergency Shutoff Valves Failure to follow these instructions or to properly install and maintain this equipment could result in an

More information

Installation, Operation, and Maintenance Manual GENERAL VALVE GENERAL VALVE TRUSEAL / IOM-GEN-TRUSEAL. Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual GENERAL VALVE GENERAL VALVE TRUSEAL / IOM-GEN-TRUSEAL. Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual GENERAL T GENERAL VALVE Installation, Operation, and Maintenance Manual Cameron s Valves & Measurement Group Revised 10/07 IOM-GEN-TRUSEAL Installation,

More information

KEYSTONE FIGURE 79 PNEUMATIC ACTUATOR OPERATING AND MAINTENANCE INSTRUCTIONS

KEYSTONE FIGURE 79 PNEUMATIC ACTUATOR OPERATING AND MAINTENANCE INSTRUCTIONS Operating and Maintenance Instructions for: Figure 79 Pneumatic Actuators (U/E options) Double Acting Actuator 4. If pipelines are hydraulically tested, then the lines should be blown down with high pressure

More information

Maintenance & Repair Manual

Maintenance & Repair Manual SM64055 November 2012 Aerospace Group Conveyance Systems Division Applicable additional manuals: None Carter Brand Ground Fueling Equipment Maintenance & Repair Manual 4 Inch Internal/Bottom Loading Valves

More information

INSPECTION & MAINTENANCE BULLETIN ARI 1301/1302 1" Plug Type Angle Valves

INSPECTION & MAINTENANCE BULLETIN ARI 1301/1302 1 Plug Type Angle Valves INSPECTION & MAINTENANCE BULLETIN ARI 1301/1302 1" Plug Type Angle Valves Item # Description Item # Description 1 Body 12 Washer 2 Packing Retainer 13 Bushing 3 Packet Set 14 Bolt 4 Jam Nut 15 Yoke 5 Stud

More information

BRAKE E

BRAKE E 8-1 GENERAL...8-2 SPECIFICATIONS...8-6 COMPONENTS...8-7 FRONT BRAKE...8-12 DISASSEMBLY INSPECTION REASSEMBLY (Pn1, Cu2 3 TON SERIES)...8-12 DISASSEMBLY INSPECTION REASSEMBLY (Pn2 3 TON SERIES)...8-17 BRAKE

More information

Fisher 1051 and 1052 Style H and J Sizes 40, 60 and 70 Rotary Actuators

Fisher 1051 and 1052 Style H and J Sizes 40, 60 and 70 Rotary Actuators Instruction Manual 1051 and 1052 H & J Actuators Fisher 1051 and 1052 Style H and J Sizes 40, 60 and 70 Rotary Actuators Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

Model DFR 026 Rotary Actuator

Model DFR 026 Rotary Actuator Figure DFR 026 and 57 Control Valve TABLE OF CONTENTS General 2 Actuator Assembly 4 Scope 2 Bushing Installation 4 Principles of Operation 2 Mounting Yoke / Hub Assembly 4 Safety Caution 2 Spring / Adjuster

More information

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2 SD-03-832 Bendix E-10PR Retarder Control Brake Valve MOUNTING PLATE SUPPLY 4 PORTS ELECTRICAL AUXILIARY DESCRIPTION TREADLE RETARDER CONTROL SECTION EXHAUST DELIVERY 4 PORTS FIGURE 1 - E-10PR RETARDER

More information

Welker Automatic Insertion Diffusing Probe Model AIP-3DP

Welker Automatic Insertion Diffusing Probe Model AIP-3DP Installation, Operation, and Maintenance Manual Welker Automatic Insertion Diffusing Probe Model AIP-3DP The information in this manual has been carefully checked for accuracy and is intended to be used

More information

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators Instruction Manual Form 5116 Types 1808 and 1808A July 2010 Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators! Warning Failure to follow these instructions or to properly install

More information

Baumann 24000CVF Carbon & 24000SVF Stainless Steel Flanged Valve Instructions

Baumann 24000CVF Carbon & 24000SVF Stainless Steel Flanged Valve Instructions Instruction Manual D103360X012 24000CVF/SVF Control Valve Baumann 24000CVF Carbon & 24000SVF Stainless Steel Flanged Valve Instructions CONTENTS Introduction...1 Scope of Manual...1 Safety Precautions...1-2

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual API 6D Piston Check Valve - IOM: Installation, Operation and Maintenance Manual 1/16 Table of Contents 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 DISCLAIMER...

More information

Page 1 of 26 Oteco Inc. Houston, Texas

Page 1 of 26 Oteco Inc. Houston, Texas Page 1 of 26 Page 2 of 26 1.0 OVERVIEW CONTENTS 2.0 INSTALLATION GUIDELINES 2.1 Preferred Valve Orientation 2.2 Pressure Rating and Orientation of Discharge line 2.3 Reaction Forces and Anchoring of Reset

More information

Model INTERNAL/BOTTOM LOADING VALVES SM Maintenance & Repair Manual. July Applicable addition manuals: None

Model INTERNAL/BOTTOM LOADING VALVES SM Maintenance & Repair Manual. July Applicable addition manuals: None SM64128 July 2010 Eaton Aerospace Group Conveyance Systems Division Carter Brand Ground Fueling Equipment Applicable addition manuals: None Maintenance & Repair Manual 6 INTERNAL/BOTTOM LOADING VALVES

More information

CROSBY SERIES BP OMNI-TRIM PRESSURE RELIEF VALVES INSTALLATION, MAINTENANCE AND ADJUSTMENT INSTRUCTIONS

CROSBY SERIES BP OMNI-TRIM PRESSURE RELIEF VALVES INSTALLATION, MAINTENANCE AND ADJUSTMENT INSTRUCTIONS Before installation these instructions must be read fully and understood cause misalignment of the valve parts. It is recommended that the valves be left in their original shipping containers and that

More information

Type 657 Diaphragm Actuator Sizes and 87

Type 657 Diaphragm Actuator Sizes and 87 Instruction Manual Form 1900 January 2000 Type 657-70 & 87 Type 657 Diaphragm Actuator Sizes 30-70 and 87 Contents Introduction............................... 1 Scope of Manual.............................

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (F & G) Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Contents Introduction... 1 Scope of manual... 1 Description... 1 Specifications...

More information

Welker Jet Insert Model Control Valve

Welker Jet Insert Model Control Valve Welker Jet Insert Model Control Valve Model WJ-1N, WJ-2N, WJ-4N, WJ-6N, & WJ-8N The information in this manual has been carefully checked for accuracy and is intended to be used as a guide for the installation,

More information

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood INTRODUCTION Actuator or Counterweight assisted, flanged or welded ends. This manual provides guidelines to be observed for the

More information

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822 Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822 Statements: NIBCO High Performance Butterfly Valves, Series 6822 and 7822, have been designed

More information

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL INSTALLATION, OPERATION, AND MAINTENANCE MANUAL MODEL 4D-200 REDUCED PRESSURE PRINCIPLE (RPZ) & MODEL 4D-700 REDUCED PRESSURE DETECTOR ASSEMBLY (RPDA) BACKFLOW PREVENTERS 2 ½ 10 Conbraco Industries Inc.

More information

DVG/AF Variable Geometry Desuperheater

DVG/AF Variable Geometry Desuperheater Instruction Manual D101616X012 DVG/AF Desuperheater DVG/AF Variable Geometry Desuperheater Contents Introduction............................... 1 Scope of Manual.......................... 1 Description...............................

More information

GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS WITH HYDRAULIC CONTROL PACKAGE PART NUMBER: SE-023 REVISION:

More information

HIGH PRESSURE CONTROL VALVE R2L ACTUATOR

HIGH PRESSURE CONTROL VALVE R2L ACTUATOR R2L ACTUATOR All Rights Reserved. All contents of this publication including illustrations are believed to be reliable. And while efforts have been made to ensure their accuracy, they are not to be construed

More information

Crosby Styles HC and HCA ISOFLEX safety valves Installation, maintenance and adjustment instructions

Crosby Styles HC and HCA ISOFLEX safety valves Installation, maintenance and adjustment instructions Before installation these instructions must be read fully and understood Table of contents 1. Style HC/HCA ISOFLEX - parts... 2 2. Introduction... 3 3. Description of safety valve... 4 4. Storage... 4

More information

Fisher 1061 Pneumatic Piston Rotary Actuator with Style H & J Mounting Adaptations

Fisher 1061 Pneumatic Piston Rotary Actuator with Style H & J Mounting Adaptations Instruction Manual 1061 H & J Actuator Fisher 1061 Pneumatic Piston Rotary Actuator with Style H & J Mounting Adaptations Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

Type 1035/El-O-Matic Rack-and-Pinion Rotary Actuator

Type 1035/El-O-Matic Rack-and-Pinion Rotary Actuator Instruction Manual 1035/El-O-Matic Actuator Type 1035/El-O-Matic Rack-and-Pinion Rotary Actuator Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................

More information

Type 1051 and 1052 Size 33 Diaphragm Rotary Actuator

Type 1051 and 1052 Size 33 Diaphragm Rotary Actuator Instruction Manual Type 1051 and 1052 Size 33 Diaphragm Rotary Actuator 1051 & 1052 Actuator Contents Introduction............................. 1 Scope of Manual........................... 1 Description................................

More information

Types 472, 473, 3572, 3573

Types 472, 473, 3572, 3573 Instruction Manual Form 1844 May 1998 Types 472, 473, 3572, 3573 Types 472, 473, 3572, 3573 Contents Introduction.............................. 2 Scope of Manual............................. 2 Type Number

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Automatic Insertion Heated Regulator High Voltage Model IHRA-4SS-220/230 100 or more inch insertion length The information in this manual has been

More information

IOM Manual. IOM Manual. Series 76/77.

IOM Manual. IOM Manual. Series 76/77. IOM Manual IOM Manual Series 76/77 www.flowlinevalves.com Flow Line Valve and Controls, L.L.C. 110 Main Project Road Schriever, LA 70395 P.O. Box 677 Schriever, LA 70395 Phone 985-414-6004 * Toll Free

More information

OPERATION AND MAINTENANCE INSTRUCTIONS

OPERATION AND MAINTENANCE INSTRUCTIONS OPERATION AND MAINTENANCE INSTRUCTIONS 334 SERIES THREE-PIECE BALL VALVES 1/4 to 2-1/2 Installation and Operation Always install your valve according to accepted industry standards and practices and operate

More information

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual ACRIS PFA LINED BALL VALVES WWW.AMRESIST.COM Table of Contents Safety Instructions - Definition of Terms............................................2 Introduction..............................................................2

More information

Temperature Sensor Series

Temperature Sensor Series GENERAL DESCRIPTION The patented* No. 85026-Series Temperature Sensor contains a two-position valve operated by temperature variations around the integral sensing bulb. It is used to vent or block a pneumatic

More information

Crosby Style HCI ISOFLEX Safety Valves Installation, Maintenance and Adjustment Instruction CROSBY

Crosby Style HCI ISOFLEX Safety Valves Installation, Maintenance and Adjustment Instruction CROSBY CROSBY (For valves purchased prior to January 1, 1998 see IS-V 3143A) Table of contents Ordering Spare Parts 1 Safety Precautions 1 Crosby Style HCI-ISOFLEX - Parts 2 Introduction 3 Description of Safety

More information

Type MR105 Direct-Operated Pressure Reducing Regulators

Type MR105 Direct-Operated Pressure Reducing Regulators Instruction Manual Form 5874 Type MR105 December 2014 Type MR105 Direct-Operated Pressure Reducing Regulators Contents Introduction...2 Specifications...2 Principle of Operation...3 Installation...4 Overpressure

More information