TRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval
|
|
- Vincent Greene
- 5 years ago
- Views:
Transcription
1
2
3
4
5 Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc Folsom Street San Francisco, CA Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are sending you: As Builts Change Order Contract Copy of Letter Insurance O& M Manuals Plans Samples Submittals Manuals Copies Date Description 1 of 1 05/31/ Medium Voltage Cable These are transmitted as checked below: For approval Approved as submitted Resubmit copies for approval For your use Approved as noted Submit copies for distribution As required Return for correction Return copies approved or corrected For review and comment FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US Remarks: Copy to: Job File Signed: Tony Maisano 2775 Northwestern Parkway, Santa Clara, California Phone: (408) Fax: (408) Electrical Contractors State License Number
6
7 Okoguard-Okoseal Type MV kV Shielded Power Cable One Okopact (Compact Stranded) Iii:\ Copper Conductor/1 osoc Rating ~ Product Data Section 2: Sheet 9 1$-'Q ~.:i ~o<»!<..'~>' o'~>' ~... ~ Okoguard Insulation: 175 mils (4.45mm), 100% Insulation Level / / / / ~ ~ Ok oguar dl nsu If a 1on: 220 m1s 'I (5 59 mm, ) 1330fc o I nsu If a 10n L eve / / / ~ / ~ ~ Visit Okonite's web site, for the most up to date dimensions..._ Authorized stock Item. Available lrom our Customer SeNice Centers. Aluminum Conductors (1) Aluminum conductors are available on special order. Ampacltles (2) Ampacities are in accordance with Table of the NEC for three single Type MV-105 conductors, or single conductors twisted together (triplexed) and installed in an isolated conduit in air at an ambient temperature of 40 C and a conductor temperature of 1 05 C. (3) Ampacities are in accordance with Table of the NEC for an insulated single conductor directly buried with a conductor temperature rating of 105 C, ambient earth temperature of 20 C, 100% Load Factor, thermal resis lance (RHO) of 90, 7 1/2 inch spacing between conductor center lines, and 24 inch spacing between circuits. (4)Ampacities are in accordance with Table of the NEC for three single conductors or triplexed cable in one underground raceway, three feet deep with E/ a conductor temperature of 1 05 C, 100% Load Factor, an ambient earth temperature of 20 C, and thermal resistance (RHO) of 90. Refer to the NEC, IEEEIICEA S-135 Power Cable Ampacities, or the Okonite Engineering Data Bulletin for installation in duct banks, multiple point grounded shields, other ambient temperatures, circuit configurations or installation requirements. (5) Recommended size of rigid or nonmetallic conduit for three conductors based on 40% maximum fill. *The jam ratio, conduit I. D. to cable O.D. should be checked to avoid possible jamming. ~THE OKONITE COMPANY ~ Ramsey, New.Jersey 07446
8 Description Single conductor cab le with stranded copper or aluminum conductor, triple extruded insulation system consisting of a thermosetting semiconducting conductor shield, high dielectric strength EPROTENAX" EPR insulation, thermosetting semiconducting insulation shield, helically applied bare copper tape shield, and black PVC jacket. Specifications a AEIC CS8* a ICEA S a ICEA S II UL 1072 =IEEE 383 Flame Test II! IEEE 1202 Flame Test Ratings Type MV-105 Sunlight Resistant For CT USE (1/0 AWG and Larger) (1/0 AWG and Larger) (250 MCM and Larger) For 1 osoc continuous, 140 C emergency, 250 C short-circuit operation. *Due to a conflict between ICEA S and AEIC CS8, all diameters will be in accordance with ICEA S only. Design Parameters Conductor Class B compressed concentric strand aluminum alloy 1350 or compact concentric soft drawn annealed copper per ASTM. Conductor Shield Extruded thermosetting semiconducting shield which is free stripping from the conductor and bonded to the insulation. Insulation Natural high dielectric strength EPROTENAX" EPR-based insulation, combined with other materials and agents that enhance the electrical and mechanical characteristics assuring extended cab le life. Insulation Shield Extruded thermosetting semiconducting shield with controlled adhesion to the insulation providing the requi red balance between electrical integrity and ease of stripping. Metallic Shield Helically applied non-magnetic copper tape(s) over the insulation shield with a minimum overlap of 25%. Jacket Black sunlight resistant polyvinyl chloride (PVC) jacket tightly applied over the copper tape. Options Strandseal Compressed or compact stranded conductors Colored Jackets CPE, LLDPE, or LSOH Jacket Multiplex cables Oil Resistant Jacket Installations Conduit in Air Underground Duct With Messenger Direct Buried Isolated in Air ~ Wet Locations - - ~ Dry Locations Industrial In Cable Tray MEDIUM VOLTAGE section iv.10 0 Prysmian Power Cables and Systems United States: 700 Industrial Drive Lexington, South Carolina Canada: 425 rue St-Louis Saint-Jean-sur-Richelieu Quebec. Canada J3B 1 Y (US) (West-CAN) (East-CAN)
9 QM441CA 2 AWG CU QM641CA 1 AWG CU QM841CA 1/0 AWG CU QM941CA 2/0 AWG CU QMA41CA 3/0 AWG CU QMB41CA 4/0 AWG CU QMC41CA 250 MCM CU QMD41CA 350 MCM CU QME41CA 500 MCM CU QMF41CA 750 MCM CU QMG41CA 1000 MCM CU kV 133% Copper One Conductor A QN441CA 2 AWG CU QN641CA 1 AWG CU A QN841CA 1/0 AWG CU AQN941CA 2/0 AWG CU QNA41CA 3/0 AWG CU A QNB41 CA 4/0 AWG CU A QNC41CA 250 MCM CU AQND41CA 350 MCM CU A QNE41CA 500 MCM CU A QNF41 CA 750 MCM CU A QNG41CA 1000 MCM CU PRODUCT NOTES: A Items are Prysmian authorized stock. The above dimensions are approximate and subject to normal manufacturing tolerances. MEDIUM VOLTAGE are base<lon the followmg: Three Phase Operation In Duct (NEG Table ): Three single cables in plastic duct, direct-buried, 105'C conductor temperature. 20'C ambient temperature, earth RHO of 90'C-cmM'att. 100% load factor. and shields short-circuited. Isolated in Air (NEC Table ): Single conductor cable, 105'C conductor temperature. 40'C ambient temperature, and shields grounded at one point. secti on iv.10 B In Cable Tray: Per NEC Article , for single conductor cables. sizes 1/0 AWG and larger. installed in a single layer in an uncovered cable tray. with a maintained space of not less than one cable diameter between in dividual conductors. the ampacities shall not exceed the allowable ampacities stated in Table (Copper). "Isolated in Air" values noted above. teprotenax" EPA-insulated cables are capable of operating at 105'C. However, the maximum operating temperature of the cable should be based on the maximum operating temperature of the cable accessories to be used. W Information Subject to Change without Not1ce. ~ PRYSMIAN CA8lES&SVSTEMS (US) (West-CAN) (East-CAN)
10 B4060 THRU B4093 INSULCLAMP CABLE CLAMPS (Replaces porcelain clamps) Assembly includes: 1 Insulclamp & 1 pr. zinc plated Pipe Straps with Everdur (Silicon Bronze) Hardware The thermoplastic elastomer Insulclamp has a dielectric strength of 640 volts/mil The flame retardant one piece design allows for trouble free assembly Everdur hardware is non-ferrous and prevents magnetic induction Hole Dia. Insulclamp Clamps A B Wt./C Clamp No. Part No. Hole Dia. Lbs. kg A B (included) B /8 (9.5) 25 (11.3) B /2 (12.7) 25 (11.3) 1.36 (34.5).56 (14.2) B2030 B /8 (15.9) 25 (11.3) B /4 (19.0) 37 (16.8) B /8 (22.2) 37 (16.8) B (25.4) 37 (16.8) 1.86 (47.2).81 (20.8) B2034 B /8 (28.6) 37 (16.8) B /4 (31.7) 58 (26.3) B /8 (34.9) 58 (26.3) B /2 (38.1) 58 (26.3) 2.36 (59.9) 1.06 (26.9) B2038 B /8 (41.3) 58 (26.3) B /4 (44.4) 76 (34.5) B /8 (47.6) 76 (34.5) B (50.8) 76 (34.5) 2.86 (72.6) 1.31 (33.3) B2042 B /8 (54.0) 76 (34.5) B /4 (57.1) 90 (40.8) B /8 (60.3) 90 (40.8) B /2 (63.5) 90 (40.8) 3.36 (85.3) 1.56 (39.6) B2046 B /8 (66.7) 90 (40.8) B /4 (69.8) 109 (49.4) B /8 (73.0) 109 (49.4) B (76.2) 109 (49.4) 3.86 (98.0) 1.81 (46.0) B2050 B /8 (79.4) 109 (49.4) B /4 (82.5) 130 (58.9) B /8 (85.7) 130 (58.9) B /2 (88.9) 130 (58.9) 4.36 (110.7) 2.06 (52.3) B2054 B /8 (92.1) 130 (58.9) B /4 (95.2) 160 (72.6) B /8 (98.4) 160 (72.6) B (101.6) 160 (72.6) 4.86 (123.4) 2.31 (58.7) B2058 B /8 (104.8) 160 (72.6) B /4 (107.9) 160 (72.6) B /8 (111.1) 160 (72.6) 5.24 (133.1) 2.50 (63.5) B2018 B /2 (114.3) 160 (72.6) Electrical Accessories Reference page 154 for general fitting and standard finish specifications. U.L. Wire Fill Chart on pages
11 Porcelain & Maple Clamps B4050 & B4051 PORCELAIN CABLE CHANNEL SADDLE Electrical porcelain has an dielectric strength of 50 volts/mil B4094 & B4095 PORCELAIN CABLE RACK SADDLE Electrical porcelain has an dielectric strength of 50 volts/mil Designed for use with B449 Brackets x R x R Wt./C Part No. A R Lbs. kg B (76.2) 1 3 /8 (34.9) 72 (32.6) B (101.6) 2 1 /8 (54.0) 100 (45.3) B4035A THRU B4035F 4 (101.6) BUS BAR MAPLE CLAMPS Assembly Includes: 1 pr. Maple Clamps (Paraffin Impregnated) 3 pcs. 1 /2 Flat Washers 3 pcs. N225WO 3 pcs. SQN- 1 /2 3 pcs. ATR- 1 /2 x L (Length) Required number of Separators 1 /4 (6.3) x 2 (50.8) and 1 /4 (6.3) x 6 (152.4) Bus Bar Maple Clamps available 1 5 /8 (41.3) A 2 1 /4 (57.1) Wt./C Part No. A R Lbs. kg B /8 (73.0) 1 3 /8 (34.9) 67 (30.4) B /8 (98.4) 2 1 /8 (54.0) 106 (48.1) B4037B 1 /4 (6.3) x 4 (101.6) BUS BAR SEPARATOR Wt./C 9 Lbs. (4.1 kg) 4 7 /16 (112.7) A 3 (76.2) A 3 1 /2 (88.9) 1 /4 (6.3) C B Electrical Accessories No. of Bus No. of Bars Wt./C Part No. A B C Separators Per Leg Lbs. kg B4035A 8 1 /2 (215.9) 1 /4 (6.3) (188.7) B4035B 9 1 /2 (241.3) 3 /4 (19.0) (202.7) B4035C /8 (187.3) /2 (266.7) 1 1 /4 (31.7) (217.3) B4035D 11 1 /2 (292.1) 1 3 /4 (44.4) (231.8) B4035E 12 1 /2 (317.5) 2 1 /4 (57.1) (245.8) B4035F 13 1 /2 (342.9) 2 3 /4 (69.8) (260.3) Reference page 154 for general fitting and standard finish specifications. U.L. Wire Fill Chart on pages
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30 ELASTIMOLD System Planning Guide ELASTIMOLD INTRODUCTION Catalog 2001 provides an easy-to-use, comprehensive listing of ELASTIMOLD products for 5kV thru 35kV underground power distribution systems. Included are separable elbow connectors, cable joints, splices, terminations, surge arresters, fused elbows and other cable accessory components. The catalog incorporates information relative to product application, ratings and selection. ELASTIMOLD is recognized as the leading producer of premolded cable accessory components worldwide. Utilizing specially formulated materials with 100% peroxide-cured insulation and shielding, Elastimold products represent the state-of-the-art in premolded process technology. Durable, quality construction and non-degrading, high-reliability, maintenance-free performance is assured when specifying ELASTIMOLD products. ELASTIMOLD s broad line of premolded products offer significant advantages over field-fabricated and other alternatives, including:100% factory assurance testing prior to delivery and installation; simplified, single-piece construction with built-in insulating, shielding and sealing surfaces; ease of installation with no special skills or tools required; and compact, lightweight, durable designs for easy handling and application. Separable Elbow Connectors and their related accessories are available in 200 Amp loadbreak, 200 Amp deadbreak and 600 Amp deadbreak styles. Rated for padmount, subsurface, vault, indoor, outdoor and other applications, units feature interchangeable interfaces which can be easily engaged or separated to provide a convenient method to connect or disconnect cable and equipment to the distribution system. Cable Joints and Splices are available in permanently crimped or bolted (separable) connector styles. Units are rated the same as the cable they are connecting and are available for all applications including direct buried. Cable Terminations are available in single-piece or modular designs. Rated for indoor, outdoor or padmount applications, units allow connection and transition from shielded underground cables to bare overhead conductors and live-front equipment. Surge Arresters are constructed using metal oxide blocks for overvoltage protection and 200 Amp separable connector interfaces for attachment to other ELASTIMOLD accessories. Fused Elbows combine replaceable current-limiting fuses for overcurrent protection and 200 Amp separable connector interfaces for attachment to other ELASTIMOLD accessories. Loadbreak Switches, Molded Current Limiting Fuses, Molded Power Fuses and Transmission Class Products are shown on the back cover. For additional catalog information on these product lines, please contact your ELASTIMOLD Sales Representative. Elastimold Special Component Services Group provides custom products tailored to specific application requirements. Please contact the factory for further information regarding this service.
31 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS COMPONENT APPLICATION AND SELECTION Catalog 2001 includes component group schematics, part numbers and standard ratings of ELASTIMOLD products for application on underground power distribution systems utilizing solid dielectric cable. Go directly to the product section in the table of contents or follow the decision path outlined below for component selection and application. SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS SURGE ARRESTERS Determine if the application involves Deadfront (shielded) or Livefront (unshielded) connections. Terminations are air insulated and classified as Livefront. Determine if the application requires Separable Connectors, Fused Elbows, Cable Joints, Terminations or Surge Arresters. If Separable Connectors are involved, determine the required current class: 200 Amp or 600 Amp and above. This decision is based on the conductor size, loading, and system short circuit currents. The selected connector must be compatible with the mating interface on any equipment. 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 200 Amp connectors are available in Loadbreak and Deadbreak styles. Determine which style is required. 600 Series Connectors are Deadbreak only and Fused Elbows are Loadbreak only. 5-15kV 25kV 35kV Determine the part number related to the specific Voltage Class by utilizing the schematic layouts and product tables. PART # If the component mates with cable, determine the cable insulation diameter, conductor size, type of cable shield and if jacket sealing is required. TABLE OF CONTENTS Certified Tests and Performance...2 Separable Connector Interfaces Amp Loadbreak Connectors Amp Deadbreak Connectors...8,9 600 Series Deadbreak Connectors Series Deadbreak Connectors Cam-Op, Link-Op...14, Series Deadbreak Connectors Stick-Op, Window-Op...16, Series Deadbreak Cable Joints...18,19 PCJ Cable Joints...20,21 Cable Terminations Surge Arresters...26,27 Shield Adapters, Grounding Kits & Jacket Seals...28, 29 How to specify size-sensitive products...30,31 WX Size Tables...32,33 AEIC Cable Insulation Diameter Reference...34 Cable Conductor Diameter Reference...35 Equipment Bushings...36 Loadbreak Switches, Molded Current Limiting Fuses, Molded Power Fuses and Transmission Class products...back Cover CATALOG 2001 Page 1 ID: 0198
32 CERTIFIED TESTS AND PERFORMANCE Elastimold Separable Connectors, Cable Joints, Cable Terminators, Surge Arresters, Fused Elbows and other cable accessory products have been designed and tested per applicable portions of IEEE, ANSI, NEMA and other industry standards including: IEEE 386 Standard For Separable Connectors IEEE 404 Standard For Cable Joints and Splices IEEE 48 Standard For Cable Terminations CABLE JOINTS, TERMINATIONS AND ARRESTER RATINGS Refer to the pages listed below for rating information: PCJ Cable Joints, page 20. Surge Arresters, page 26. Cable Terminations, page 22 TABLE 1 15kV Class Ratings 25kV Class Ratings 35kV Class Ratings OPERATING VOLTAGE 8.3kV 15.2kV 21.1kV Maximum line-to-ground (See Application Info Note 1) BIL Impulse withstand 1.2 x 50 microsecond wave 95kV 125kV 150kV WITHSTAND VOLTAGE AC One Minute 34kV 40kV 50kV DC Fifteen Minute 53kV 78kV 103kV CORONA EXTINCTION 3pC Sensitivity 11kV 19kV 26kV 200 AMP Products Continuous Current: Symmetrical Momentary Current: 600 Series Products Continuous Current: Symmetrical Momentary Current: IEEE C62.11 Standard For Metal Oxide Surge Arresters ANSI C37.41 Standard For Current Limiting Fuses IEEE 592 Standard For Exposed Semiconducting Shields ANSI C119.4 Standard For Copper and Aluminum Conductor Connectors AEIC CS5 and CS6 Standards For XLP and EPR Insulated Cables SEPARABLE CONNECTOR RATINGS Table 1 shows voltage and current ratings which apply to all Separable Connectors including 200 AMP Loadbreak, 200 AMP Deadbreak and 600 Series Deadbreak products. Table 2 shows switching and fault close ratings which only apply to 200 AMP Loadbreak Connectors. 200 AMP* 10kA sym, 10 cycle duration 600 and 900 AMP* 25kA sym, 10 cycle duration * Designed for 90 C maximum continuous operating temperature TABLE 2 LOADMAKE/ LOADBREAK SWITCHING FAULT CLOSE 15kV Class Ratings 1ø and 3ø circuits 8.3kV line to ground, 14.4kV max. across open contacts. 10 loadmake/break operations at 200 Amps max. with 70 to 80% lagging power factor. 1 fault close operation at 8.3kV or 14.4kV; 10,000 Amps, rms, sym. 10 cycles (0.17 sec.) 1.3 max. asym factor applies to new or used mating parts (up to maximum designated switching operations.) 25kV Class Ratings 35kV Class Ratings 1ø and 3ø circuits 15.2kV line to ground, 26.3kV max. across open contacts. 10 loadmake/break operations at 200 Amps max. with 70 to 80% lagging power factor. 1ø and 3ø circuits 21.1kV line to ground, 36.6kV max. across open contacts. 10 loadmake/break operations at 200 Amps max. with 70 to 80% lagging power factor. 1 fault close operation at 15.2kV or 26.3kV; 10,000 Amps, rms, sym. 10 cycles (0.17 sec.) 1.3 max. asym factor applies to new or used mating parts (up to maximum designated switching operations.) 1 fault close operation at 21.1kV or 36.6kV; 10,000 Amps, rms, sym. 10 cycles (0.17 sec.) 1.3 max. asym factor applies to new or used mating parts (up to maximum designated switching operations.) Application Information: 1. Loadbreak connectors are designed and rated for use on grounded WYE systems. For application on ungrounded WYE or delta systems, the next higher voltage class product is recommended. Examples: 5kV ungrounded: use 15kV class products; 15kV ungrounded: use 25kV class products; 25kV ungrounded: use 35kV class products; 35kV ungrounded: contact factory. 2. Products are designed and constructed for all applications including padmount, subsurface, vault, indoor, outdoor, direct sunlight, direct buried and continuously submerged in water. 3. Products are designed and rated for ambient temperatures of -40 C to +65 C. It is recommended that loadbreak connectors be hotstick operated at -20 C to +65 C ambient temperature range and at altitudes not exceeding 6000 feet. ELASTIMOLD CATALOG 2001 Page 2 ID: 0198
33 SEPARABLE CONNECTOR INTERFACES STANDARD INTERFACES FOR SEPARABLE CONNECTORS, COMPONENTS AND EQUIPMENT BUSHINGS ANSI/IEEE Standard 386 defines the specific interface dimensions that 200 Amp and 600 Series elbows, inserts, junctions, equipment bushings and any mating components must conform to insure interchangeability. The table below provides information concerning the types of interfaces supplied by Elastimold for various applications and is useful to assure proper matching of components. Bushing Interface Voltage Interface Standard No Class Description Figure No. A 200 AMP DEEPWELL 15kV, 25kV 200 AMP Bushing IEEE EQUIPMENT BUSHING and 35kV Well Interface A kV, 15.2kV, Fig kV B C D E F G 200 AMP LOADBREAK INSERT 15kV 200 AMP Loadbreak IEEE 8.3kV and kV/14.4kV Fig AMP LOADBREAK INSERT 25kV 200 AMP Loadbreak IEEE 15.2kV and kV/26.3kV Fig. 7, Note AMP LOADBREAK INSERT 35kV 200 AMP Loadbreak IEEE Interface No kV and Fig. 7, Note kV/36.6kV 200 AMP DEADBREAK INSERT 15kV and 25kV 200 AMP Deadbreak IEEE 8.3kV and 15.2kV Fig SERIES EQUIPMENT BUSHING 15kV and 25kV 600 AMP Deadbreak IEEE Interface No kV and 15.2kV Fig.11, Note SERIES EQUIPMENT BUSHING 35kV 600 AMP Deadbreak IEEE Interface No kV Fig.13, Note 2 B C D E F G NOTES: 1. Was Fig. 10 in previous IEEE publication. 2. Was Fig. 11 in previous IEEE publication. 3. Elastimold uses Fig. 7 interface for both 25 and 35kV applications. CATALOG 2001 Page 3 ID: 0198
34 SEPARABLE CONNECTORS 200 AMP LOADBREAK 200 Amp loadbreak connectors and accessories provide a convenient method to connect/disconnect cable and equipment on power distribution systems. Loadbreak elbows include provisions for energized operation using standard hotstick tools, allowing loadmake/break operation and a visible disconnect. Components can be isolated with insulated caps, plugs and parking bushings. Optional accessories allow system grounding, testing, bypass, lightning surge protection and current limiting fusing. Additional connecting points and taps can be provided by use of junctions or feed-thrus. RATINGS OVERVIEW See page 2 for complete information including switching and fault close ratings. CURRENT RATINGS 200A Continuous 10kA sym. 10 Cycles VOLTAGE RATINGS 15kV Class 8.3kV Phase-to-Ground 14.4kV Phase-to-Phase 95kV BIL 34kV AC Withstand 53kV DC Withstand 11kV Corona Extinction 25kV Class 15.2kV Phase-to-Ground 26.3kV Phase-to Phase 125kV BIL 40kV AC Withstand 78kV DC Withstand 19kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction 200 AMP LOADBREAK SEPARABLE CONNECTOR COMPONENTS BUSHING WELL CABLE TO EQUIPMENT CONNECTIONS BUSHING WELL PLUG PARKING STAND LOADBREAK FEED-THRU INSERT BOLTED ELBOW W/TAP OPERATING ACCESSORIES LOADBREAK BUSHING INSERT EXTENDED BUSHING INSERT INSULATED PARKING BUSHING GROUNDING PLUG FEED THRU INSULATED CAP INSULATED CAP WITH GROUND LOADBREAK ELBOW CONNECTOR WITH OR WITHOUT TEST POINT SEE CABLE NOTES GROUNDING ELBOW TEST ROD REPAIR ELBOW SEE CABLE NOTES FUSED ELBOW SEE PAGE 6 REPLACEMENT ELBOW SEE CABLE NOTES ASSEMBLY TOOL SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS ELASTIMOLD CATALOG 2001 Page 4 ID: 0198
35 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 200 AMP LOADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Elbow 15kV 165LR-WX N2,3,4,5 Connector Use Tables W1 and X1 25kV 273LR-WX N2,3,4,5 Use Tables W2 and X1 35kV 375LR-WX N2,3, 5 Use Tables W3 and X2 Elbow 15kV 166LR-WX N2,3,4,5 Connector Use Tables W1 and X1 w/ Test Point 25kV 274LR-WX N2,3,4,5 Use Tables W2 and X1 35kV 376LR-WX N2,3, 5 Use Tables W3 and X2 Repair Elbow 15kV 167ELR-WX N5,10,18 Connector Use Tables W5 and X1 25kV 273ELR-WX N5,10,18 Use Tables W5 and X1 Repair Elbow 15kV 168ELR-WX N5,10,18 Connector Use Tables W5 and X1 w/ Test Point 25kV 274ELR-WX N5,10,18 Use Tables W5 and X1 Replacement 15kV 167RLR-WX N5,11,13 Elbow Use Tables W4 and X1 25kV 273RLR-WX N5,11,13 Use Tables W2 and X1 Replacement 15kV 168RLR-WX N5,11,13 Elbow Use Tables W4 and X1 w/ Test Point 25kV 274RLR-WX N5,11,13 Use Tables W2 and X1 Fused Elbow 15kV 166FLR-WX N5,15 (General Purpose Use W and X Tables Current Limiting) on Page 6 Bolted Elbow 15kV 167LRT-WX N17 w/ Tap Use Tables W4 and X1 Bushing Insert 15kV 1601A4 N4,8 25kV 2701A4 N4,8 35kV 3701A4 N6 35kV 3701A3 N8 Extended 15kV 1601EA4 N8 Bushing 25kV 2701EA4 N8 Insert Feed-Thru 15kV 1602A3R N16 Insert 25kV 2702A1 N16 35kV 3702A1 N6,16 Insulated Cap 15kV 160DR Insulated Cap 15kV 160DRG w/ Ground 15kV 167DRG N7 25kV 273DRG N7 35kV 375DRG N7 Insulated Cap 15kV 168DRG N7 w/ Ground and 25kV 274DRG N7 Test Point 35kV 376DRG N7 Grounding 15kV 161GP Plug 25kV 272GP (1/0 AWG x 6' Ground Lead) Grounding 15kV 160GLR Elbow 25/35kV 370GLR N12 (1/0 AWG x 6' Ground Lead) Feed-Thru 15kV 164FT 25kV 274FT 35kV 373FT Feed-Thru 15kV 164FTV Vertical 25kV 274FTV 35kV 373FTV Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Feed-Thru 15/25kV K1601WFT Well Feed-Thru 15/25kV K1601WFTV Well Vertical Insulated 15kV 161SOP Parking Bushing 25kV 272SOP 35kV 372SOP Test Rod ALL 370TR N9 Bushing Well 15/25kV 276BWP Plug 35kV M276BWP Assembly Tool ALL 200AT N8,9 Contacts: Use Table X1 Long Bi-Metal ALL 02500X N9 ELR Bi-Metal 15/25kV 02509X N10 Copper ALL 02702X N1,9 LRT Contact 15kV 02800X RLR Contact 15/25kV 00400X N11 Elbow Probe 15kV 166LRF 25kV 274LRF 35kV 376LRF Elbow ALL 10EP-W N9 Cable Entrance Use Table W6 Insulating Plug Cable Size 15kV 160CA-W N14 Adapter Use Table W6 EB-FA Only N1. Copper lug for use on COPPER CONDUCTOR ONLY. N2. Incudes 02500X long bi-metal compression lug as standard. N3. Also available as housing only. Specify: 165BLR-W; 273BLR-W; 375BLR-W; 166BLR-W; 274BLR-W; 376BLR-W. N4. Also available as elbow/insert combination. Specify: 165A4-WX; 273A4-WX; 166A4-WX; 274A4-WX; 274A4-WX. N5. Also available with jacket seal included. Add - S suffix to part number. See 200ECS page 28. N6. Rated for single-phase applications only. N7. Equipped with insulated cuff. N8. Includes internal torquing feature using 200AT Assembly Tool. N9. Rated for 15kV thru 35kV applications. N10. Repair elbow has extended length (3-1/4 ) contact and elbow housing. N11. Replacement elbow has extended length (9-7/8 ) contact and elbow housing. N12. Rated for 25kV thru 35kV applications. N13. Includes long bi-metal contact 00400X. N CA Cable Size Adapter can only be used with elbow part numbers 165LR/166LR C size only. N15. See page 6 for WX size tables and for fuse sizes. N16. Fully rotatable for 360 positioning. Includes bail assembly to secure feed-thru insert to bushing well. N17. Incudes 02800X long bi-metal contact. N18. Incudes 02509X long bi-metal contact. JUNCTIONS CONTINUED ON PAGE 6. Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 5 ID:0198
36 SEPARABLE CONNECTORS 200 AMP LOADBREAK Cont d from Pg. 5 RATINGS OVERVIEW See page 2 for complete information including switching and fault close ratings. CURRENT RATINGS 200A Continuous 10kA sym. 10 Cycles VOLTAGE RATINGS 15kV Class 8.3kV Phase-to-Ground 14.4kV Phase-to-Phase 95kV BIL 34kV AC Withstand 53kV DC Withstand 11kV Corona Extinction 25kV Class 15.2kV Phase-to-Ground 26.3kV Phase-to Phase 125kV BIL 40kV AC Withstand 78kV DC Withstand 19kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction 200 AMP LOADBREAK SEPARABLE CONNECTOR COMPONENTS CABLE TO CABLE CONNECTIONS 4-POINT JUNCTION 3-POINT JUNCTION 3 POINT WELL JUNCTION 2-POINT JUNCTION 2 POINT WELL JUNCTION LOADBREAK BUSHING INSERT LOADBREAK BUSHING INSERT SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS 4 POINT WELL JUNCTION LOADBREAK BUSHING INSERT FUSED ELBOW ORDERING INSTRUCTIONS Step 1 (W) Determine the insulation diameter of the cable. Select the insulation letter code that best straddles the insulation diameter. Insert code into catalog number. Step 2 (X) Choose the proper connector code according to the conductor size. Insert code into the catalog number after the insulation code. ELASTIMOLD 166FLR Cable Insulation Diameter Range Inches Step 1 (W) Symbol For W FAB FB FG GA GAB Step 2 (X) Conductor Size* (AWG) 2 1 1/0 2/0 3/0 *Cu or AI Conductor Symbol For X Stranded/ Compr. Solid/ Compact ORDERING INSTRUCTIONS FOR FUSE KIT (to be ordered separately) Determine the ampere rating required. Insert rating into the catalog number below. 166PF8 - Voltage (kv) 8.3 Ampere Rating The Fused Elbow kit contains the following: 1 - Upper elbow half 1 - Lower elbow half 1 - Upper connector 1 - Lower connector 1 - Probe 1 - Torque-limiting wrench 1 - Lubricant 1 - Instruction sheet 30 The Fuse Kit includes the following: 1 - Current limiting fuse 1 - Allen wrench 1 - Air vent rod 1 - Instruction sheet To order replacement parts, specify the following: For an upper elbow half, specify 166BFLR-T For a lower elbow half, specify 166BFLR-W For an upper connector, specify For a lower connector, specify 02600X For a probe, specify 166LRF CATALOG 2001 Page 6 ID: 0198
37 DEADFRONT LIVEFRONT SEPARABLE CONNECTORS FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 200 AMP LOADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number 2-Way Well 15/25kV K1601WJ2 N2 Junction w/ s.s. Bracket 2-Way Well 15/25kV K1601WJ2-5 N1, N2 Junction w/ U Straps 3-Way Well 15/25kV K1601WJ3 N2 Junction w/ s.s. Bracket 3-Way Well 15/25kV K1601WJ3-5 N1, N2 Junction w/ U Straps 4-Way Well 15/25kV K1601WJ4 N2 Junction w/ s.s. Bracket 4-Way Well 15/25kV K1601WJ4-5 N1, N2 Junction w/ U Straps 2-Point Junction 15kV 164J2 with/stainless 25kV 274J2 steel bracket 35kV 373J2 2-Point Junction 15kV 164J2-5 N1 w/ U -straps 25kV 274J2-5 N1 35kV 373J2-5 N1 3-Point Junction 15kV 164J3 with/stainless 25kV 274J3 steel bracket 35kV 373J3 3-Point Junction 15kV 164J3-5 N1 w/ U -straps 25kV 274J3-5 N1 35kV 373J3-5 N1 4-Point Junction 15kV 164J4 with/stainless 25kV 274J4 steel bracket 35kV 373J4 4-Point Junction 15kV 164J4-5 N1 w/ U -straps 25kV 274J4-5 N1 35kV 373J4-5 N1 N1. Also available without straps. Specify suffix -4 in place of -5 in the part number. N2. Supplied with replaceable stud. Replacement stud available separately. Specify 1601RS. CATALOG 2001 Page 7 ID: 0198
38 SEPARABLE CONNECTORS 200 AMP DEADBREAK 200 Amp deadbreak connectors and accessories provide a quick disconnect feature for cable and equipment connections on power distribution systems. All deadbreak connectors must be DE- ENERGIZED before operating and must be mechanically secured with bails when connected. Components can be isolated with insulated caps, plugs and parking bushings. All deadbreak elbows are equipped with test points as standard. Optional accessories allow system grounding, bypass and lightning surge protection. Additional connecting points and taps can be provided by use of junctions or feed-thrus. RATINGS OVERVIEW See page 2 for complete information. CURRENT RATINGS 200A Continuous 10kA sym. 10 Cycles VOLTAGE RATINGS 15kV Class 8.3kV Phase-to-Ground 14.4kV Phase-to-Phase 95kV BIL 34kV AC Withstand 53kV DC Withstand 11kV Corona Extinction 25kV Class 15.2kV Phase-to-Ground 26.3kV Phase-to-Ground 125kV BIL 40kV AC Withstand 78kV DC Withstand 19kV Corona Extinction 200 AMP DEADBREAK SEPARABLE CONNECTOR COMPONENTS INTEGRAL BUSHING ALL 200 A DEADBREAK CONNECTIONS MUST BE MECHANICALLY SECURED WITH SEE PAGE 26 FOR SURGE ARRESTERS APPLICATIONS ELASTIMOLD CATALOG 2001 Page 8 ID: 0198
39 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 200 AMP DEADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Elbow Connector 15/25kV 156LR-WX N1,2 w/ Test Point Use Tables W4 and X1 Bail Assembly 15/25kV 150BA for 156LR Elbow Bushing Insert 15/25kV K1501A1 N3 Feed-thru Insert 15/25kV K1502A1 N3,4 Insulated Plug 15/25kV K150DP N3 Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number BAIL 15/25kV 150TB4 N5 BAIL 15/25kV 150TB5 N5 Contacts: Long Bi-Metal 15/25kV 02500X Copper 15/25kV 02702X N7 Elbow 15/25kV 10EP-W N10 Cable Entrance Use Table W6 Insulating Plug Cable Entrance 15/25kV 152EA-W N11 Insulating Plug Use Table W6 Insulated Cap 15/25kV K150DR N3 Insulated Parking 15/25kV K150SOP N3 Bushing Grounding Plug 15/25kV 151GP N3 Feed-Thru 15/25kV K1501FT N3,6 2-Point Junction 15/25kV K1501J2-U N3,6 3-Point Junction 15/25kV K1501J3-U N3,6,7 4-Point Junction 15/25kV K1501J4-U N3,6,7 N1. Includes bail assembly. N2. Includes 02500X long, bi-metal compression lug as standard. N3. Bails are required but not included. Order separately. Consult factory for bails not listed for a specific application. N4. Fully rotatable for 360º positioning. Includes bail assembly to secure feed-thru insert to bushing well. N5. Refer to general catalog for application details. N6. Center-to-center spacing equals 4 inches. N7. Copper lug for copper cable only. N8. To order cable legs for different cable sizes, list each leg size W and X. Example: K151LY-FB240-FB240-FAB220. See Tables W6 and X8 for sizes. N9. To order locking contacts for K151LS and K151LY, order 01401X (Al) or 01402X (Cu) for plug contact. Order 01301X (Al) or 01302X (Cu) for receptacle. See Table X8 for sizes. N10. For use with 156LR elbows. N11. For use with K151SR, K151SP, K151LS, K151LY receptacles, plugs and splices. N12. Also available as housing only. Specify K151SPH-W or K151SRH-W. Elbow Probe 15/25kV 156LRF Straight 15/25kV K151SR-WX N3,12 Receptacle Use Tables W6 and X5 Straight Plug 15/25kV K151SP-WX N3,12 Use Tables W6 and X5 Tee Splice 15/25kV K150T N3 In-Line Junction 15/25kV K150S N3 Locking Splice 15/25kV K151LS-WX N8,9 Use Tables W6 and X8 Locking Y 15/25kV K151LY-WX N8,9 Splice Use Tables W6 and X8 BAIL 15/25kV 150TB1 N5 BAIL 15/25kV 150TB2 N5 BAIL 15/25kV 150TB3 N5 Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 9 ID: 0198
40 SEPARABLE CONNECTORS 600 SERIES DEADBREAK 600 Series deadbreak elbows, straight receptacles, junctions, vault stretchers and accessories are used to connect equipment and cable on primary feeder and network circuits. Designs accommodate large conductors and feature bolted connections and deadfront modular construction for maximum reliability, performance and versatility. DE-ENERGIZED connectors can be quickly and easily connected and disconnected using standard hand tools and equipment in accordance with accepted operating practices. Optional accessories allow visible external separation, by-pass, isolation, deadending, grounding, and testing as well as adding taps, surge arresters and circuit protection. Hot-stick operable and separable joint systems are shown on pages 14 thru 19. RATINGS OVERVIEW See page 2 for complete information. CURRENT RATINGS (Prefixes: 650, K650, K655, K656, 750, 755, 756 & 03700) 600 Amp Continuous 25kA sym.,10 cycles (Prefixes 675, K675,K676,775, 776 & 03702) 900 Amp Continuous 25kA sym.,10 cycles NOTE: 900 Amp ratings require copper cable and copper current-carrying components. VOLTAGE RATINGS 15/25kV Class (5kV thru 28kV) 16.2kV Phase-to-Ground 28kV Phase-to Phase 140kV BIL 45kV AC Withstand 84kV DC Withstand 21.5kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction Note: Elastimold has increased the IEEE Standard Production and Design Test levels for 25kV Class products to include 27kV and 28kV systems. SEPARABLE CONNECTORS 600 SERIES DEADBREAK SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS CABLE TO EQUIPMENT INTEGRAL BUSHING THREADED STUD CABLE TO CABLE (UTILIZING JUNCTIONS) 4 PT JUNCTION OPERATING ACCESSORIES 3 PT JUNCTION LINK CONNECTOR LINK-OP 2 PT JUNCTION HOTSTICK OPERABLE 600 SERIES CONNECTORS - SEE PAGES THREADED COMPRESSION LUG GROUNDING PLUG INSULATED PARKING BUSHING LINK-OP RETAINER SLEEVES BUSHING EXTENDER STICK-OP LOADBREAK REDUCING TAP PLUG CONNECTING PLUG STICK-OP SEE PGS 16 & 17 LINK-OP SEE PGS 14 & 15 THREADED STUD 600 SERIES ELBOW COMPRESSION LUG CABLE ADAPTER THREADED STUD CABLE ADAPTER COMPRESSION LUG VAULT STRETCHER CONNECTOR THREADED STUD VAULT STRETCHER COMPRESSION LUG STRAIGHT RECEPTACLE ADAPTER ELBOW CONNECTOR BUSHING EXTENDER INSULATED CAP WITH TEST POINT INSULATING PLUG BOLT & WASHERS CONNECTING PLUG VOLTAGE DETECTION CAP STRAIGHT RECEPTACLE STRAIGHT RECEPTACLE HOUSING 600 SERIES TAPS CABLE TO CABLE UTILIZING L-KITS SEE PGS 12 & 13 COMPRESSION LUG DEADBREAK REDUCING TAP PLUG REDUCING TAP WELL LOADBREAK REDUCING TAP PLUG RETAINING RING CABLE ADAPTER 200A TAPS 200A DEADBREAK SEE PAGES 8 & 9 SPANNER WRENCH 200A LOADBREAK SEE PAGES 4 & 5 WINDOW-OP SEE PGS 16 &17 L-4 L-3 L-2 L-1 VS2 VS3 CAM-OP RETAINER SLEEVES CAM-OP LINK CONNECTOR CAM-OP SEE PGS 14 & 15 CABLE ADAPTER CABLE TO CABLE UTILIZING VAULT STRETCHERS SEE PGS 12 & 13 VS4 ELASTIMOLD CATALOG 2001 Page 10 ID: 0198
41 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 600 SERIES DEADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number 600 Series Elbow 15/25kV K655LR-W0X N1,2 (w/ Insul. Plug, Use Tables W7 and X6 Cap, Stud, Lug & 35kV 755LR-W0X N1,2 Cable Adapter) Use Tables W9 and X6 600 Series Elbow 15/25kV K656LR-W0X N1,2 w/ Test Point Use Tables W7 and X6 (w/ Insul. Plug, 35kV 756LR-W0X N1,2 Cap, Stud, Lug & Use Tables W9 and X6 Cable Adapter) 600 Series Elbow 15/25kV K655BLR N1,3 Housing only 35kV 755BLR N1,3 (w/ Stud) 600 Series Elbow 15/25kV K656BLR N1,3 w/ Test Point 35kV 756BLR N1,3 (Housing only w/ Stud) 600 Series Straight 15/25kV K655SR-W0X N1,2,12 Receptacle Use Tables W7 and X6 (w/cable Adapter, Lug & Retaining Ring) 600 Series Straight 15/25kV K655BSR N1,12 Receptacle Housing (Lug & Cable Adapter not included) Straight Receptacle 15/25kV K650SRA N1,4 Adapter 600 Series 15/25kV K655BVS N1,9 Vault Stretcher (Housing only w/ Stud) Cable Size 15/25kV 655CA-W Adapter Use Table W7 35kV 755CA-W Use Table W9 Compression ALL 03700X N5 Lug Use Table X6 ALL 03702X N6 Use Table X6 600 Series Elbow 15/25kV 655CK-W0X N2 Size Sensitive Kit Use Tables W7 and X6 (Cable Adapter 35kV 755CK-W0X N2 & Lug) Use Tables W9 and X6 Adapter ALL 650ARR-X Retaining Ring Use Table X6 600 Series Straight 15/25kV 655CK-W0X-ARR N2 Receptacle Size Use Tables W7 and X6 Sensitive Kit (Cable 35kV 755CK-W0X-ARR N2 Adapter, Retaining Use Tables W9 and X6 Ring & Lug) Bushing 15/25kV K655BE N1,3 Extender 35kV 755BE N1,3 (w/ Stud) Insulated Cap 15/25kV K656DR N3,7 w/ Test Point (w/ Stud) Insulating Plug 15/25kV K650BIP N1,7,8 (w/ Cap) 35kV 750BIP N1,7,8 Grounding Plug 15/25kV 650GP N1,7,8 (Ground Lead 35kV 750GP N1,7,8 2/0 AWG x 30") Insulated 15/25kV K650SOP N7,8 Parking Bushing 35kV 750SOP N7,8 Connecting Plug 15/25kV K650CP N1,7,8,9 35kV 750CP N1,7,8,9 Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Deadbreak 15/25kV K650RTP N1,7,8,9 Reducing Tap Plug Reducing Tap 15/25kV K650RTW N1,7,8,9 Well Loadbreak 15kV 650ETP N1,7,8,10,13 Reducing 25kV K650ETP N1,7,8,10,13 Tap Plug 35kV 750ETP N1,7,8,10,13 Vault Stretcher 15/25kV 650VSA N1 Threaded Stud 600 Series Elbow 15/25kV 650SA N1 Threaded Stud 35kV 750SA N1 Assembly Tool ALL 600AT N10 Spanner Wrench ALL 600SW N9 2-Point Junction 15/25kV K650J2 N1,11 35kV 750J2 N1,11 3-Point Junction 15/25kV K650J3 N1,11 35kV 750J3 N1,11 4-Point Junction 15/25kV K650J4 N1,11 35kV 750J4 N1,11 N1. For 900 Amp ratings, substitute 675 for 650 and 655; 676 for 656; K675 for K650 and K655; K676 for K656; 775 for 750 and 755; 776 for 756 and 2X for 0X in the part number. The 900 Amp rating requires copper current-carrying connector components and copper conductor cable. N2. Add suffix symbol from page 29 to include cable shield grounding kit and/or cable jacket sealing kit. N3. Available without the stud by adding N to the part number. N4. Straight Receptacle Adapter is used to connect Straight Receptacles K655YBSR and K655YSR-W0X (Pg.14) to equipment bushings. N5. Aluminum lug for use on aluminum or copper conductors. DO NOT substitute threaded 03600X lug. N6. Copper lug for use on COPPER CONDUCTOR ONLY. DO NOT substitute threaded 03602X lug. N7. Available with the stud factory-assembled by adding SP to the part number. N8. Available with a loose stud by adding suffix S to the part number. N9. 600SW spanner wrench is recommended for installation of connecting plugs, deadbreak reducing tap plugs and reducing tap wells.. N AT assembly tool is required for installation of loadbreak reducing tap plugs. N11. Rubber junction with stainless steel mounting plate and back plate. Add -U for rubber junction with stainless steel mounting plate, back plate and adjustable bracket. Add -4 for rubber junction only. Add -5 for rubber junction, stainless steel U-straps and back plate. N Series Elbows and Straight Receptacles with IEEE Std. 386 capacitive test points are available by substituting 656 for 655; K656 for K655; K676 for K675; 756 for 755; 676 for 675; K676 for K675 and 776 for 775 in the part number. N13. See page 17 for Window-Op Connector Kit. Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 11 ID: 0198
42 SEPARABLE CONNECTORS 600 SERIES DEADBREAK Cont d from Pg Series deadbreak elbows, straight receptacles, junctions, vault stretchers and accessories are used to connect equipment and cable on primary feeder and network circuits. Designs accommodate large conductors and feature bolted connections and deadfront modular construction for maximum reliability, performance and versatility. DE-ENERGIZED connectors can be quickly and easily connected and disconnected using standard hand tools and equipment in accordance with accepted operating practices. Optional accessories allow visible external separation, by-pass, isolation, deadending, grounding, and testing as well as adding taps, surge arresters and circuit protection. Hot-stick operable and separable joint systems are shown on pages 14 thru 19. RATINGS OVERVIEW See page 2 for complete information. CURRENT RATINGS (Prefixes: 650, K650, K655, K656, 750, 755, 756 & 03700) 600 Amp Continuous 25kA sym.,10 cycles (Prefixes 675, K675,K676,775, 776 & 03702) 900 Amp Continuous 25kA sym.,10 cycles NOTE: 900 Amp ratings require copper cable and copper current-carrying components. VOLTAGE RATINGS 15/25kV Class (5kV thru 28kV) 16.2kV Phase-to-Ground 28kV Phase-to Phase 140kV BIL 45kV AC Withstand 84kV DC Withstand 21.5kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction Note: Elastimold has increased the IEEE Standard Production and Design Test levels for 25kV Class products to include 27kV and 28kV systems. SEPARABLE CONNECTORS 600 SERIES DEADBREAK SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS CABLE TO EQUIPMENT INTEGRAL BUSHING THREADED STUD CABLE TO CABLE (UTILIZING JUNCTIONS) 4 PT JUNCTION OPERATING ACCESSORIES 3 PT JUNCTION LINK CONNECTOR LINK-OP 2 PT JUNCTION HOTSTICK OPERABLE 600 SERIES CONNECTORS - SEE PAGES THREADED COMPRESSION LUG GROUNDING PLUG INSULATED PARKING BUSHING LINK-OP RETAINER SLEEVES BUSHING EXTENDER STICK-OP LOADBREAK REDUCING TAP PLUG CONNECTING PLUG STICK-OP SEE PGS 16 & 17 LINK-OP SEE PGS 14 & 15 THREADED STUD 600 SERIES ELBOW COMPRESSION LUG CABLE ADAPTER THREADED STUD CABLE ADAPTER COMPRESSION LUG VAULT STRETCHER CONNECTOR THREADED STUD VAULT STRETCHER COMPRESSION LUG STRAIGHT RECEPTACLE ADAPTER ELBOW CONNECTOR BUSHING EXTENDER INSULATED CAP WITH TEST POINT INSULATING PLUG BOLT & WASHERS CONNECTING PLUG VOLTAGE DETECTION CAP STRAIGHT RECEPTACLE STRAIGHT RECEPTACLE HOUSING 600 SERIES TAPS CABLE TO CABLE UTILIZING L-KITS CABLE TO CABLE UTILIZING VAULT STRETCHERS COMPRESSION LUG DEADBREAK REDUCING TAP PLUG REDUCING TAP WELL LOADBREAK REDUCING TAP PLUG RETAINING RING CABLE ADAPTER 200A TAPS 200A DEADBREAK SEE PAGES 8 & 9 SPANNER WRENCH 200A LOADBREAK SEE PAGES 4, & 5 WINDOW-OP SEE PGS 16 &17 L-4 L-3 L-2 L-1 VS2 VS3 VS4 CAM-OP RETAINER SLEEVES CAM-OP LINK CONNECTOR CAM-OP SEE PGS 14 & 15 CABLE ADAPTER ELASTIMOLD CATALOG 2001 Page 12 ID: 0198
43 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 600 SERIES DEADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number 1-way 15/25kV K655L1 N1,2,3,4 L-Kit 35kV 755L1 N1,2,3,4 2-way 15/25kV K655L2 N1,2,3,4 L-Kit 35kV 755L2 N1,2,3,4 2-way 15/25kV K655VS2 N1,2,3 VS-Kit 3-way 15/25kV K655L3 N1,2,3,4 L-Kit 35kV 755L3 N1,2,3,4 N1. For 900 Amp ratings, substitute 675 for 650 and 655; 676 for 656; K675 for K650 and K655; K676 for K656; 775 for 750 and 755; 776 for 756 and 2X for 0X in the part number. The 900 Amp rating requires copper currentcarrying connector components and copper conductor cable. N2. 600SW spanner wrench is recommended for installation of connecting plugs, deadbreak reducing tap plugs and reducing tap wells. N3. L-Kits and VS-Kits do not include cable adapters, compression lugs or adapter retaining rings. These items must be ordered separately. N Series Elbows and Straight Receptacles with IEEE Std. 386 capacitive test points are available by substituting 656 for 655; K656 for K655; K676 for K675; 756 for 755; 676 for 675; K676 for K675 and 776 for 775 in the part number. 3-Way 15/25kV K655VS3 N1,2,3 VS Kit 4-Way 15/25kV K655L4 N1,2,3,4 L-Kit 35kV 755L4 N1,2,3,4 4-Way 15/25kV K655VS4 N1,2,3 VS-Kit Spanner Wrench ALL 600SW N2 VAULT STRETCHER Provides an alternate method of splicing and joining various types and styles of cables using standard 600 Series components. Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 13 ID: 0198
44 SEPARABLE CONNECTORS CAM-OP, LINK-OP 600 SERIES DEADBREAK Elastimold s 600 Series Cam-Op~, and Link-Op~ deadbreak connector systems incorporate provisions for hotstick operation of DE-ENERGIZED primary feeder or network circuits. Configurations allow external visible break, testing, grounding and isolation. Retrofit kits allow upgrading existing equipment. Cam-Op systems utilize pin and socket connectors. Link-Op connectors are bolted and installed using torque controlled tools. Either system can be retrofitted to existing equipment. The Cam-Op and Link-Op connectors are unique, allowing all hotstick operations to be completed without moving the cable, an important consideration when large, stiff cables prohibit movement. The Cam-Op connector is easily installed or removed by hotstick operation of the cam action disconnect lever. RATINGS OVERVIEW See page 2 for complete information. CURRENT RATINGS 600 & 900 Amp Continuous 25kA sym.,10 cycles NOTE: 900 Amp ratings require copper cable and copper current-carrying components. CONTINUOUS VOLTAGE RATINGS 15kV Class 8.3kV Phase-to-Ground 14.4kV Phase-to Phase 95kV BIL 34kV AC Withstand 53kV DC Withstand 11kV Corona Extinction 25kV Class 15.2kV Phase-to-Ground 26.3kV Phase-to Phase 125kV BIL 40kV AC Withstand 78kV DC Withstand 19kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction CAM-OP & LINK-OP SYSTEM 600 SERIES DEADBREAK EQUIPMENT BUSHING CABLE TO EQUIPMENT EQUIPMENT BUSHING MOUNTABLE INSULATED PARKING BUSHING SEE CABLE NOTES CABLE ADAPTER COMPRESSION LUG OR CAM-OP CABLE TO CABLE CONNECTION INSULATED PARKING BUSHING CAM-OP LINK-OP OR INSULATED CAP 600 SERIES ELBOW CAM-OP LINK-OP ALIGNMENT BRACKET LOADBREAK ELBOW CONNECTOR LINK CONNECTOR OR RETAINER SLEEVES OR ALIGNMENT BRACKET OR 2-POINT INSULATED BUSHINGS ELBOW ARRESTER LINK-OP 600 SERIES ELBOW 600 SERIES ELBOW RETROFIT COMPONENTS FOR EXISTING EQUIPMENT W/O PROVISIONS FOR MOUNTABLE INSULATED BUSHING BUSING EXTENDER COMPRESSION LUG CABLE ADAPTER OR COMPRESSION LUG CABLE ADAPTER SEE CABLE NOTES SEE CABLE NOTES CAM-OP RETAINER SLEEVES LINK-OP OR OR LINK CONNECTOR LINK-OP CAM-OP LOADBREEAK REDUCING TAP PLUG INSULATED CAP LOADBREAK ELBOW CONNECTOR ELBOW ARRESTER OPERATING TOOL TEST ROD SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS GROUNDING ELBOW CAM-OP LINK-OP ELASTIMOLD CATALOG 2001 Page 14 ID: 0198
45 DEADFRONT LIVEFRONT SEPARABLE CONNECTORS FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS CAM-OP & LINK-OP Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number AB ABV CAM-OP 15kV 655LINK-C-LR-W0X-B-DRG N1,3,11, CONNECTOR Use Tables W7 and X6 13,14,18 KIT 25kV K655LINK-C-LR-W0X-B-DRG N1,3,11, Use Tables W7 and X6 13,14,18 35kV 755LINK-C-LR-W0X-B-DRG N1,3,11, Use Tables W9 and X6 13,14,18 LINK-OP 15kV 655LINK-B-LR-W0X-B-DRG N2,3,11,12 CONNECTOR Use Tables W7 and X6 13,14,18 KIT 25kV K655LINK-B-LR-W0X-B-DRG N2,3,11, Use Tables W7 and X6 13,14,18 35kV 755LINK-B-LR-W0X-B-DRG N2,3,11, Use Tables W9 and X6 13,14,18 Mountable 25kV K650LBM-3 N3 Insulated 35kV 750LBM-3 N3 Bushing RETROFIT 15kV 655LINK-C-LR-W0X-A-DRG N5,11,13 CAM-OP Use Tables W7 and X6 14,18 CONNECTOR 25kV K655LINK-C-LR-W0X-A-DRG N5,11,13 KIT Use Tables W7 and X6 14,18 35kV 755LINK-C-LR-W0X-A-DRG N5,11,13 Use Tables W9 and X6 14,18 RETROFIT 15kV 655LINK-B-LR-W0X-A-DRG N6,11,12, LINK-OP Use Tables W7 and X6 13,14,18 CONNECTOR 25kV K655LINK-B-LR-W0X-A-DRG N6,11,12, KIT Use Tables W7 and X6 13,14,18 35kV 755LINK-B-LR-W0X-A-DRG N6,11,12, Use Tables W9 and X6 13,14,18 Insulating 25kV K650LB N4 Plug 35kV 750LB N4 CAM-OP 15kV 650CAB Alignment 25kV K650CAB Bracket 35kV 750CAB LINK-OP ALL 650AB N15 Alignment ALL 650ABV N15 Bracket (Retrofit LINK-OP Only) Compression ALL 03700X N7 Lug Use Table X6 N8 ALL 03702X Use Table X6 CAM-OP & 15/25kV 655CK-W0X N13 LINK-OP Size Use Tables W7 and X6 Sensitive Kit 35kV 755CK-W0X N13 (Cable Adapter Use Tables W9 and X6 & Lug) CAM-OP Re- ALL 650RSC N11 taining Sleeve LINK-OP ALL 650RS N11 Retaining Sleeve CAM-OP 15kV 655BI-LINK-C-LR-WOX-DRG N9,11,13 CABLE JOINT Use Tables W7 and X6 14,18 KIT 25kV K655BI-LINK-C-LR-WOX-DRG N9,11,13 Use Tables W7 and X6 14,18 35kV 755BI-LINK-C-LR-WOX-DRG N9,11,13 Use Tables W9 and X6 14,18 LINK-OP 15kV 655BI-LINK-B-LR-WOX-DRG N10,11,12, CABLE JOINT Use Tables W7 and X6 13,14,18 KIT 25kV K655BI-LINK-B-LR-WOX-DRG N10,11,12, Use Tables W7 and X6 13,14,18 35kV 755BI-LINK-B-LR-WOX-DRG N10,11,12, Use Tables W9 and X6 13,14,18 CAM-OP 15kV 650LK-C-VB Loadbreak 25kV K650LK-C-VB Reducing 35kV 750LK-C-VB Tap Plugs (Visi-Break) LINK-OP 15kV 650LT-B N11 Loadbreak 25kV K650LT-B Reducing 35kV 750LT-B Tap Plug Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Grounding 15kV 160GLR Elbow 25kV 370GLR N19 (1/0 AWG x 6' 35kV 370GLR N19 Ground Lead) Test Rod ALL 370TR Assembly Tool ALL 600AT N11 CAM-OP 15kV 650CAM-OK N16 OPERATING 25kV K650CAM-OK N16 KIT 35kV 750CAM-OK N16 LINK-OP 15kV 650LINK-OK N17 OPERATING 25kV K650LINK-OK N17 KIT 35kV 750LINK-OK N17 N1. Cam-Op connector kit includes: 1- Cam-Op link; 1- elbow housing; 1- cable adapter; style lug; 1- bushing extender; 2- retainer sleeves; 1- insulated cap; 1- mountable insulated bushing and 1- alignment bracket. N2. Link-Op connector kit includes: 1- Link-Op link; 1- elbow housing; 1- cable adapter; style lug; 1- bushing extender; 2- retainer sleeves; 2- insulated caps; and 1- mountable insulated bushing. N3. Mountable insulated bushing included with Cam-Op and Link-Op connector kit. Requires 3 threaded studs on equipment faceplate for installation. N4. Use with the Retrofit Cam-Op and Retrofit Link-Op connector kit. N5. Retrofit Cam-Op connector kit includes: 1- link; 1- elbow housing; 1- cable adapter; style lug; 1- bushing extender; 2- retainer sleeves; 1- insulated cap; 1- insulating plug; and 1- alignment bracket. N6. Retrofit Link-Op connector kit includes: 1- link; 1- elbow housing; 1- cable adapter; style lug; 1- bushing extender; 2- retainer sleeves; 2- insulated caps; 1- insulating plug; and 1- alignment bracket. N7. Aluminum lug for use on aluminum or copper conductors. DO NOT substitute threaded 03600X lug. N8. Copper lug for use on COPPER CONDUCTOR ONLY. DO NOT substitute 03602X threaded lug. N9. Cam-Op Cable Joint Kit includes: 1- Cam-Op link; 1- Cam-Op BI-SOP; 2- elbow housings; 2- cable adapters; style lugs; 2- retainer sleeves; 1- insulated cap. N10. Link-Op Cable Joint Kit includes: 1- Link-Op link; 1- Link-Op BI-SOP; 2- elbow housings; 2- cable adapters; style lugs; 2- retainer sleeves; 2- insulated caps. N AT assembly tool required for operation and/or installation. N12. For 900 Amp ratings, substitute 675 for 650 and 655; 676 for 656; K675 for K650 and K655; K676 for K656; 775 for 750 and 755; 776 for 756 and 2X for 0X in the part number. The 900 Amp rating requires copper current-carrying connector components and copper conductor cable. N13. Add suffix symbol from page 29 to include cable shield grounding kit and/or cable jacket sealing kit. N14. To add elbows or arresters instead of insulating caps, replace the DRG with LR-WX for elbows (with test point) or ESA for elbow arresters. N15. The 650ABV is required when the bushing horizontal spacing on the equipment or junctions is less than 5". N16. Cam-Op operating kit includes accessories that enable visible break, testing, isolation and grounding functions to be performed. Kit includes: 3- Cam-Op loadbreak reducing tap plugs; 3- grounding elbows; 1- assembly tool; 1- test rod; 1- carry case; 1- lubricant; 1- instructions. N17. Link-Op operating kit includes accessories that enable visible break, testing, isolation and grounding functions to be performed. Kit includes: 6- Link-Op loadbreak reducing tap plugs; 3- grounding elbows; 1- assembly tool; 1- test rod; 1- carry case; 1- lubricant; 1- instructions. N Series Elbows and Straight Receptacles with IEEE Std. 386 capacitive test points are available by substituting 656 for 655; K656 for K655; K676 for K675; 756 for 755; 676 for 675; K676 for K675 and 776 for 775 in the part number. N19. Rated for both 25kV and 35kV applications. Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 15 ID: 0198
46 SEPARABLE CONNECTORS STICK-OP, WINDOW-OP 600 SERIES DEADBREAK Elastimold s 600 Series Window-Op~ and Stick-Op~ deadbreak connector systems incorporate provisions for hotstick operation of DE-ENERGIZED primary feeder or network circuits. The Window-Op and Stick-Op connectors allow direct testing and grounding with no required cable movement. Window-Op is ideal for equipment applications which include viewing windows to provide an internal visible break that does not require hot stick removal of the elbows. Stick-Op provides an external visible break by hot stick removal of the elbow. Window-Op and Stick-Op connectors are bolted and installed using torque controlled tools. INSULATED CAP BOLTED CONNECTION LOADBREAK REDUCING TAP PLUG STICK-OPERABLE RATINGS OVERVIEW See page 2 for complete information. CURRENT RATINGS 600 & 900 Amp Continuous 25kA sym.,10 cycles STICK-OP & WINDOW-OP SYSTEM 600 SERIES DEADBREAK SEE PAGE 26 FOR SURGE ARRESTER APPLICATIONS STICK-OP NOTE: 900 Amp ratings require copper cable and copper current-carrying components. CONTINUOUS VOLTAGE RATINGS 15kV Class 8.3kV Phase-to-Ground 14.4kV Phase-to Phase 95kV BIL 34kV AC Withstand 53kV DC Withstand 11kV Corona Extinction 25kV Class 15.2kV Phase-to-Ground 26.3kV Phase-to Phase 125kV BIL 40kV AC Withstand 78kV DC Withstand 19kV Corona Extinction 35kV Class 21.1kV Phase-to-Ground 36.6kV Phase-to-Phase 150kV BIL 50kV AC Withstand 103kV DC Withstand 26kV Corona Extinction INTEGRAL BUSHING STAND-OFF PLUG GROUNDING PLUG OPERATING ACCESSORIES 600 SERIES ELBOW THREADED COMPRESSION LUG STICK-OP OR COMPRESSION LUG WINDOW-OP CABLE ADAPTER SEE CABLE NOTES STICK-OP 600DB/200LB BUSHING/ELBOW ADAPTER LOADBREAK REDUCING TAP PLUG WINDOW-OP INSULATED CAP TEST ROD ASSEMBLY TOOL (WINDOW-OP) ASSEMBLY TOOL (STICK-OP) GROUNDING ELBOW ELASTIMOLD CATALOG 2001 Page 16 ID: 0198
47 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS STICK-OP & WINDOW-OP Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number WINDOW-OP 15kV 655ETP-W0X-DRG N1,3,4,5, CONNECTOR Use Tables W7 and X6 6,13 KIT 25kV K655ETP-W0X-DRG Use Tables W7 and X6 35kV 755ETP-W0X-DRG Use Tables W9 and X6 STICK-OP 15kV 655LRTP-W0X-DRG N2,3,4,5, CONNECTOR Use Tables W7 and X6 8,13 KIT 25kV K655LRTP-W0X-DRG Use Tables W7 and X6 35kV 755LRTP-W0X-DRG Use Tables W9 and X6 WINDOW-OP 15kV 650ETP N4,15 Loadbreak 25kV K650ETP N4,15 Reducing 35kV 750ETP N4,15 Tap Plug STICK-OP 15kV 650LRTPA3 N3,4 Loadbreak 25kV K650LRTPA2 Reducing 35kV 750LRTPA2 Tap Plug STICK-OP 15kV 650BEA3 N3,4 Bushing 25kV K650BEA2 Adapter 35kV 750BEA2 Compression ALL 03700X N6 Lug Use Tables X6 WINDOW-OP ALL 03702X N7 Use Tables X6 Threaded ALL 03600X N8 Compression Use Tables X6 Lug ALL 03602X N9 STICK-OP Use Tables X6 WINDOW-OP 15/25kV 655CK-W0X N5 Size Sensitive Kit Use Tables W7 and X6 (Cable Adapter 35kV 755CK-W0X N5 & Lug) Use Tables W9 and X6 STICK-OP 15/25kV 655TCK-W0X N5 Size Sensitive Kit Use Tables W7 and X6 (Cable Adapter 35kV 755TCK-W0X N5 & Threaded Lug) Use Tables W9 and X6 Extraction Tool ALL 600ET N3,10 N1. Window-Op Kit includes: insulated cap; Window-Op reducing tap plug; 600 Series elbow housing; cable adapter; and 0370 style compression lug. N2. Stick-Op Kit includes insulated cap; Stick-Op Loadbreak reducing tap plug; 600A Elbow Housing; cable adapter; and threaded 0360 style compression lug. N3. 600AT assembly tool required for operation and/or installation. N4. For 900 Amp ratings, substitute 675 for 650 and 655; 676 for 656; K675 for K650 and K655; K676 for K656; 775 for 750 and 755; 776 for 756 and 2X for 0X in the part number. The 900 Amp rating requires copper current-carrying connector components and copper conductor cable. N5. Add suffix symbol from page 29 to include cable shield grounding kit and/or cable jacket sealing kit. N6. Aluminum lug for use on aluminum or copper conductors. DO NOT substitute threaded 03600X lug. N7. Copper lug for use on COPPER CONDUCTOR ONLY. DO NOT substitute 03602X threaded lug. N8. Threaded aluminum lug (Stick-Op only) for use on copper or aluminum conductors. DO NOT substitute unthreaded 03700X lugs. DO NOT use with 675, 676, K675, K676, 775 or 776 part numbers. N9. Threaded copper lug (Stick-Op only) for use on copper conductors only. DO NOT substitute unthreaded 03702X lugs. N10. Required to disassemble Stick-Op loadbreak reducing tap plug from the threaded compression lug and 600 Series elbow after the shear-pin is broken during assembly. N11. Stick-Op Operating Kit includes accessories that enable visible break direct testing, isolation, and grounding functions to be performed. Kit includes: 3-insulated parking bushings; 3-grounding elbows; 3-600DB/200LB bushing/elbow adapters; 1-assembly tool; 1-test rod; 1-carry case; l-lubricant; 1-instructions. N12. Window-Op Operating Kit includes accessories that enable visible grounding and direct testing functions to be performed. Kit includes: 3-grounding elbows; 1-test rod; 1-carry case; 1-lubricant; 1-instructions. N Series Elbows and Straight Receptacles with IEEE Std. 386 capacitive test points are available by substituting 656 for 655; K656 for K655; K676 for K675; 756 for 755; 676 for 675; K676 for K675 and 776 for 775 in the part number. N14. Rated for both 25kV and 35kV applications. N ATM assembly tool required for Window-Op assembly. Grounding 15kV 160GLR Elbow 25kV 370GLR N14 (1/0 AWG x 6' 35kV 370GLR N14 Ground Lead) Test Rod ALL 370TR Assembly Tool ALL 600AT N3 (Stick-Op) Assembly Tool ALL 600ATM N15 (Window-Op) STICK-OP 15kV 650STICK-OK N11 OPERATING 25kV K650STICK-OK N11 KIT 35kV 750STICK-OK N11 WINDOW-OP 15kV 650WINDOW-OK N12 OPERATING 25kV K650WINDOW-OK N12 KIT 35kV 750WINDOW-OK N12 Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 17 ID: 0198
48 SEPARABLE CONNECTORS CABLE JOINTS 600 SERIES DEADBREAK 600 Series Separable Cable Joints are available in 2, 3 and 4-way versions and include a capacitive test point as standard. Units are interchangeable, featuring bolted connections. Designs are compact and ideally suited for small vaults and manholes. DE-ENERGIZED joints can be quickly and easily connected and disconnected using standard hand tools and equipment in accordance with accepted operating practices. Bus bars can be changed to add or remove cables from the joint. Optional accessories include insulating and grounding caps and plugs which allow visible external separation, by-pass, isolation, dead-ending, grounding and testing. RATINGS OVERVIEW See page 2 for complete information CURRENT RATINGS (Prefixes: 650, K650, K655, K656 & 03700) 600 Amp Continuous 25kA sym.,10 cycles (Prefixes: 675, K675, K676 & 03702) 900 Amp Continuous 25kA sym.,10 cycles NOTE: 900 Amp ratings require copper cable and copper current-carrying components. VOLTAGE RATINGS 15/25kV Class (5kV thru 28kV) 16.2kV Phase-to-Ground 28kV Phase-to Phase 140kV BIL 45kV AC Withstand 84kV DC Withstand 21.5kV Corona Extinction Note: Elastimold has increased the IEEE Standard Production and Design Test levels for 25kV Class products to include 27kV and 28kV systems. SEPARABLE CABLE JOINTS 600 SERIES DEADBREAK B A 4-WAY INSULATED BUS BAR W/ TEST POINT C A 3-WAY INSULATED BUS BAR BOLT & RETAINING WASHERS RING STRAIGHT RECEPTACLE HOUSING D CABLE ADAPTER 2-WAY INSULATED BUS BAR COMPRESSION LUG SEPARABLE H-JOINT (4-WAY) SEPARABLE WYE-JOINT (3-WAY) SEPARABLE STRAIGHT JOINT (2-WAY) OPERATING ACCESSORIES INSULATED CAP WITH BAIL INSULATING PLUG W/TEST POINT & CAP Note: The separable cable joints shown here use a special Y interface that may not be interchangeable with other 600 Series interfaces. GROUNDING CAP GROUNDING PLUG DIMENSION A B C D INCHES 4 1/4 37 1/8 8 1/8 3 7/8 ELASTIMOLD CATALOG 2001 Page 18 ID: 0198
49 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS 600 SERIES DEADBREAK Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Separable 15/25kV K656I-W0X N1,6,8 Straight Joint Pkg. Use Tables W7 and X6 (2-way) w/ Test Point Basic Housing Pkg. 15/25kV K656I-HP N2,6 Straight Joint w/ Test Point Separable 15/25kV K656CY-W0X N1,6,8 Wye Joint Pkg. Use Tables W7 and X6 (3-Way) w/ Test Point Basic Housing Pkg. 15/25kV K656CY-HP N2,6 Wye Joint w/ Test point Separable 15/25kV K656CH-W0X N1,6,8 H Joint Pkg. Use Tables W7 and X6 (4-Way) w/ Test Point Basic Housing Pkg. 15/25kV K656CH-HP N2,6 H Joint w/ Test Point 2-Way 15/25kV K656I-BUS N3,6 Insulated Bus Bar w/test Point 3-Way 15/25kV K656CY-BUS N3,6 Insulated Bus Bar w/test Point 4-Way 15/25kV K656CH-BUS N3,6 Insulated Bus Bar w/test Point Straight Receptacle 15/25kV K655YSR-W0X N4,6,8 Use Tables W7 and X6 Straight 15/25kV K655YBSR N5,6, Receptacle 10 Housing Only Insulated Cap w/ Bail 15/25kV K655YDR Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number N1. Complete Joint Packages consisting of: insulated bus bar; straight receptacle housings, retaining rings, cable size adapters, lugs, bolts and washers. N2. Housing Packages consisting of the following non-size sensitive components of the joint: insulated bus bar, straight receptacle housings, bolts and washers. N3. Insulated bus bar only. Insulating Plug w/ 15/25kV K650YBIP Test Point & Cap Grounding Plug 15/25kV 650YGP (4/0 AWG x 6' Ground Lead) Grounding Cap 15/25kV 650YGDR (4/0 AWG x 6' Ground Lead) Aluminum Bolt 15/25kV 650BAW N6 & Washers Brass Bolt & 15/25kV 675BAW N6 Washers N4. Straight Receptacle consisting of: straight receptacle housing, retaining ring, cable adapter, lug, bolt and washers. N5. Straight receptacle housing consisting of: straight receptacle housing, bolt and washers. N6. For 900 Amp ratings, substitute 675 for 650 and 655; 676 for 656; K675 for K650 and K655; K676 for K656; 775 for 750 and 755; 776 for 756 and 2X for 0X in the part number. The 900 Amp rating requires copper current-carrying connector components and copper conductor cable. N7. Aluminum lug for use on aluminum or copper conductors. DO NOT substitute threaded 03600X lug. N8. Add suffix symbol from page 29 to include cable shield grounding kit and/or cable jacket sealing kit. N9. Copper lug for use with COPPER CONDUCTOR ONLY. DO NOT substitute threaded 03602X lug. N10. Available without the bolt & washers by adding N to the part number. Bail Only Cable Adapter Adapter Retaining Ring 15/25kV 650BA 15/25kV 655CA-W Use Table W7 15/25kV 650ARR-X Use Table X6 Compression Lug 15/25kV 03700X N6,7 15/25kV 03702X N6,9 Use Table X6 600 Series 15/25kV 655CK-W0X N8 Straight Receptacle Use Tables W7 and X6 Size Sensitive Kit (Cable Adapter, Retaining Ring & Lug) Assembly/ Disassembly Tool 15/25kV 600YADT Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 19 ID: 0198
50 PCJ CABLE JOINTS PCJ~Power Cable Joints utilize permanently crimped connectors. PCJ Housings are fully insulated, shielded and sealed for direct buried, vault, submersible and other severe service applications. Units have been designed and tested per IEEE Standard 404 to assure system matched performance and ratings equal to the cable to which the splice will be installed. PCJ Power Cable Joints are available in 2 styles: Style 1 uses a single piece housing that is sized to accommodate a specific range of cable. Style 1 units are ideally suited for straight splicing of the same or similar cable. Style 2 designs incorporate a universal housing with separate cable adapters to allow transition splices of different types and sizes of cable. ELECTRICAL RATINGS SUMMARY The follow ratings summary is based on IEEE Std. 404 and applies to all Elastimold PCJ Power Cable Joints. VOLTAGE A. 15kV Class (8.7kV Phase-to-Ground) B. 25kV Class (14.4kV Phase-to-Ground) C. 35kV Class (20.2kV Phase-to-Ground) Impulse Withstand: A=110kV, B=150kV, C=200kV BIL,1.2 x 50 microsecond wave. Corona Extinction Voltage: A=13kV, B=22kV, C=31kV minimum, 3pC sensitivity. DC Withstand: During installation: A=56kV, B=80kV, C=100kV (Reference AEIC CS5 and CS6, Section L.1.) DC Withstand: After installation and in service for the first 5 years: A=18kV, B=25kV, C=31kV for XLPE Insulated Cables and A=45kV, B=64kV, C=80kV for EPR Insulated Cables. (Reference AEIC CS5 and CS6, Section L.2.) CURRENT Continuous rating equal to the rating of the cable. Short-Time rating equall to the rating of the cable. SHIELD DESIGN Meets IEEE standard 592 for Exposed Semiconducting Shields on Premolded High Voltage Cable Joints and Separable Insulated Connectors. Production tests include 100% tests of the premolded joints to assure: Corona Extinction Voltage: A=13kV, B=22kV, C=31kV minimum, 3pC sensitivity. AC Withstand: A=35kV, B=52kV, C=69kV, 60 Hz, 1 minute. Design tests on production joints demonstrate compliance with IEEE 404 including: Corona Extinction Voltage: A=13.0kV, B=21.6kV, C=30.3kV minimum, 3pC sensitivity. AC Withstand: A=35kV, B=52kV, C=69kV, 60 Hz 1 minute. DC Withstand: A=70kV, B=100kV, C=125kV negative polarity, 15 minutes. Impulse Withstand (BIL): A=110kV, B=150kV, C=200kV, 10 positive and 10 negative, 1.2 x 50 microsecond wave, at conductor temperatures of 20º and 130ºC, nominal. Short-Time Current: magnitude equal to cable. Cyclic Aging: 30 days at: A=26.1kV, B=43.2kV, C=60.2kV AC continuous, load current for 8 hours per day providing 130º conductor temperature. Joints then subjected to: A=35kV, B=52kV, C=69kV for 5 hours followed by: A=53kV, B=78kV, C=104kV for 1 hour. Load Cycle: Connectors meet thermal and mechanical requirements of ANSI C119.4, Class A heat cycle, Class 2 partial tension. ELASTIMOLD CATALOG 2001 Page 20 ID: 0198
51 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS PCJ Style 1 with single-piece housing ORDERING INFORMATION PCJ Style 2 with universal housing and separate cable adapters that can be varied with the cable application. Voltage Class Power 1- Style 1 2- Style 2 Cable Joint Style Insulation Diameter Conductor 1- Aluminum 2- Copper Conductor Size Code DIMENSION B OUTSIDE DIA. W SIZING INFORMATION AND SELECTION Use Table W8 for 15PCJ Use Table W9 for 25PCJ Use Table W10 for 35PCJ DIMENSION A OVERALL LENGTH X SIZING INFORMATION AND SELECTION Use Table X7 for 15PCJ, 25PCJ and 35PCJ DIMENSIONAL DATA STYLE 1 A B PART NUMBER inches inches 15PCJ1FX 10 1/4" 1 3/4" 15PCJ1GX 10 1/4" 1 3/4" 25PCJ1GX 14 3/8" 2 7/16" 15/25/35PCJ1HX 14 3/8" 2 7/16" 15/25/35PCJ1JX 14 3/8" 2 7/16" 15/25/35PCJ1KX 14 3/8" 2 25/32" 15/25/35PCJ1LX 14 3/8" 2 25/32" 15/25/35PCJ1LMX 14 3/8" 2 25/32" 15/25/35PCJ1MX 14 3/8" 2 25/32" 15/25/35PCJ1NX 15 3/4" 3 3/16" 15/25/35PCJ1PX 15 3/4" 3 3/16" 15/25/35PCJ1QX 15 3/4" 3 3/16" STYLE 2 A B PART NUMBER inches inches 15PCJ2EX 16 3/8" 2 25/32" 15PCJ2FX 16 3/8" 2 25/32" 15/25PCJ2GX 16 3/8" 2 25/32" 15/25/35PCJ2HX 16 3/8" 2 25/32" 15/25/35PCJ2JX 16 3/8" 2 25/32" 15/25/35PCJ2KX 21" 3 3/4" 15/25/35PCJ2LX 21" 3 3/4" 15/25/35PCJ2MX 21" 3 3/4" 15/25/35PCJ2NX 21" 3 3/4" 15/25/35PCJ2PX 21" 3 3/4" 15/25/35PCJ2QX 21" 3 3/4" Description Voltage ELASTIMOLD Notes Class Part Number Power Cable 15kV 15PCJ1W1X N1 Joint 15kV 15PCJ1W2X N2 25kV 25PCJ1W1X N1 Style 1 25kV 25PCJ1W2X N2 35kV 35PCJ1W1X N1 35kV 35PCJ1W2X N2 Power Cable 15kV 15PCJ2W1X N1 Joint 15kV 15PCJ2W2X N2 25kV 25PCJ2W1X N1 Style 2 25kV 25PCJ2W2X N2 35kV 35PCJ2W1X N1 35kV 35PCJ2W2X N2 N1. Kit includes aluminum compression connector suitable for splicing aluminum conductor to aluminum conductor or aluminum conductor to copper conductor. N2. Kit includes copper compression connector suitable for splicing copper conductor to copper conductor only. Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 21 ID: 0198
52 CABLE TERMINATIONS Elastimold cable terminations are available in single piece or modular designs. Terminators allow connection and transition from shielded, underground cable to bare overhead conductors and live-front equipment. Units are designed and rated per IEEE Standard 48 for riser pole, padmount, indoor and outdoor applications. PCT1, PCT2, 16THG and 35MTG terminators provide sufficient creep, strike and weather sealing for class 1 outdoor service. PCT1 and PCT2 also include an integral cable jacket seal. The 35MTGI terminators and 35MSC stress cones are rated for class 2 and class 3 indoor service respectively. Optional mounting brackets, aerial lugs and equipment connectors are available as required. ELECTRICAL RATINGS SUMMARY The following ratings summary is based on IEEE Std. 48 and applies to all the terminations on page 22 thru 25. Elastimold terminations are designed for use on threephase systems, either 3-wire or 4-wire and the single-phase laterals of these systems. VOLTAGE RATINGS 15kV Class 9.5kV Phase-to-Ground 110kV BIL 1.2 x 50 microsecond wave AC Withstand: 50kV 1 min. dry 35kV 6 hr. dry 45kV 10 sec. wet 13kV Corona Extinction 25kV Class 16kV Phase-to-Ground 150kV BIL 1.2 x 50 microsecond wave AC Withstand: 65kV 1 min. dry 55kV 6 hr. dry 60kV 10 sec. wet 21.5kV Corona Extinction 35kV Class 22kV Phase-to-Ground 200kV BIL 1.2 x 50 microsecond wave AC Withstand: 90kV 1 min. dry 75kV 6 hr. dry 80kV 10 sec. wet 30kV Corona Extinction TERMINATIONS SINGLE PIECE TERMINATORS STRESS CONE MODULAR TERMINATORS PCT-1 PCT-2 16THG 16THGS 35MSC 35MSCI 35MTGI 35MTG BRACKETS PB-1 16TB2 35MTB 1535AFB ELASTIMOLD CATALOG 2001 Page 22 ID: 0198
53 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS TERMINATIONS Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number Single-Piece 15kV PCT1-X-4 N12,14, Terminator Use Table X9 15, 22 (Class 1) 25kV PCT2-X-4 N12,14, Use Table X9 15, 23 Housing 15kV PCT1-4 N13, 22 only 25kV PCT2-4 N13, 23 Single-Piece 15/25kV 16THG-WX-4 N2,14 Terminator Use Tables W12 and X8 15 (Class 1) Housing 15/25kV 16THGH-W only Use Table W12 Single-Piece 15/25kV 16THGS-WX N3 Terminator Use Tables W12 and X4 for solid conductor only (Class 1) Stress Cone ALL 35MSC-W N17 (Class 3) Use Table W11 w/grd. Strap ALL 35MSCI-W N17 Use Table W11 Modules ALL 35MG-W N11,16 only Use Table W13 Modular 15kV 35MTG-WX-4-CA N2,11 Terminator Use Tables W13 and X3 (Class 1) 25kV 35MTG-WX-8-CA N2,5,11 Use Tables W13 and X3 35kV 35MTG-WX-10-CA N2,6,11 Use Tables W13 and X3 N1. Use with PCT1 or PCT2 Terminators. N2. Includes contact rod, ground strap and rain cap. N3. Includes crimp ring, ground strap and rain cap. N4. Includes spade contact, ground strap and rain cap. N5. For KA thru PB sizes use 35MTG-WX-6-CA. N6. For KA thru PB sizes use 35MTG-WX-8-CA. N7. For KA thru PB sizes use 35MTGI-W-6. N8. Use with 16THG Terminators. N9. Use with 16THGS Terminators. N10. Use with 35MTG Terminators. N11. Refer to page 24 for detailed ordering instructions. N12. Includes rod contact as standard. Specify suffix -3 in place of -4 for two-hole spade lug. Specify suffix -5 in place of -4 for one-hole spade lug. N13. Specify suffix -3 or -5 in place of -4 for two-hole spade lug housing or one- hole spade style housing. N14. Use 1X for rod contact for aluminum conductors only. N15. Use 0X for rod contact for aluminum or copper conductors. N16. Available in sizes from GA thru PB. N17. Available in sizes EB thru PB. N18. For conductors from 1/0 thru 350 kcmil. N19. For conductors from 400 kcmil thru 1000 kcmil. N20. For conductors from #2 to 1000 kcmil. N21. For conductors from #6 thru 4/0. N22. Use for insulation dia. range from.640" thru 1.070". N23. Use for insulation dia. range from.830" thru 1.180". N24. Select symbol for A from aerial lug ordering information on page 24. N25. W13 Table provides sizing for rain cap X10 Table provides sizing for connectors. Modular 15kV 35MTGI-W-4 N11 Terminator Use Table W13 (Class 2) 25kV 35MTGI-W-6 N11 w/o Rain Use Table W13 Cap 35kV 35MTGI-W-8 N7,11 Use Table W13 Rod Contact 15/25kV 0070X N1 for PCT Use Table X9 Rod Contact 15/25kV 16TCA-X N2, 8 for 16THG Use Table X8 Solid Conductor 15/25kV 16CAS-X N3, 9 Package Use Table X4 for 16THGS 3/4-16 Threaded ALL 35MTGA-WX-1 N2,10,11 Rod for MTG Use Tables W13 and X3 18, Threaded ALL 35MTGA-WX-2 N2,10,11 Rod for MTG Use Tables W13 and X3 19, 25 Two-Hole Spade ALL 35MTGA-WX-3 N4,10,11 for MTG Use Tables W13 and X3 20, 25 Two-Hole Spade ALL 0100X N1 for PCT Use Table X9 One-Hole Spade ALL 0110X N1 for PCT Use Table X9 Universal Rod ALL 35MTCGA-WX-4 N2,10,11 for MTG Use Tables W13 and X3 21, 25 Aerial Lugs ALL 35AL-A N10, 24 for MTG Threaded Rod (Two-hole spade or bare wire) Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 23 ID: 0198
54 CABLE TERMINATIONS cont d QRDERING INSTRUCTIONS FOR MODULAR TERMINATORS I =Indoor Blank = Outdoor 35MTG W X N C A Use Table W13, below Use Table X3, below NOTE: Sizes are limited depending upon connector style selection. See notes 8 thru 11 on page 25. Recommended Number of Modules GA-JB KA-PB 15kV kV kV 10 8 Connector Style Description Available for Symbol Note Conductor Sizes 3/4"-16 1/0 thru -1 N8 Threaded 350 kcmil Rod 1" thru -2 N9 Threaded 1000 kcmil Rod 2-Hole #2 thru -3 N10 Spade 1000 kcmil Universal #6 thru 4/0-4 N11 Rod Aerial Lugs for Threaded Rod Connectors Only Type Connector Symbol Bare Wire 3/4" Rod 2-Hole Spade 3/4" Rod Bare Wire 1" Rod 2-Hole Spade 1" Rod Cable Insulation Table W13 Diameter in Inches Symbol USE FOR FOLLOWING PRODUCTS 35MTG 35MTGI MIN. MAX. for W GA GAB GB GH HA HAB HB HJ JA JAB JB KA KAB KB PA PB Conductor Symbol for X Table X3 SIZE AWG Strand./ Compt./ USE FOR FOLLOWING PRODUCT 35MTG or kcmil Compr. Solid. #6 3 #5 3 #4 2 3 #3 2 #2 1 2 # / / / / ELASTIMOLD CATALOG 2001 Page 24 ID: 0198
55 SEPARABLE CONNECTORS DEADFRONT LIVEFRONT FUSED ELBOWS CABLE JOINTS TERMINATIONS 200 AMP LOADBREAK 200 AMP DEADBREAK 600 SERIES DEADBREAK 5-15kV 25kV 35kV PART # Part numbers that contain the letters W or X are size sensitive. To complete the part number, refer to the W or X tables indicated. SURGE ARRESTERS TERMINATIONS Illustration Description Voltage ELASTIMOLD Notes (not to scale) Class Part Number PCT ALL PB-1 N1,12 Positioning Bracket 16THG Bracket ALL 16TB-2 N6 Bracket ALL 16TB-3 N6 for crossarm mounting 16THG Bracket ALL 16TB-4 N6 for riser pole mounting 16THG Bracket ALL 16TB-5 N6 for tri-mounting 16THG KELLUMS ALL 35MTB1-A N1,2,6,7 GRIP ALL 35MTB1-B N1,3,6,7 Bracket ALL 35MTB1-C N1,4,6,7 ALL 35MTB1-D N1,5,6,7 KELLUMS ALL 35MTB3-A N1,2,6,7 Bracket ALL 35MTB3-B N1,3,6,7 for crossarm ALL 35MTB3-C N1,4,6,7 mounting ALL 35MTB3-D N1,5,6,7 Bracket ALL 35MTB4-A N1,2,6,7 (for riser pole ALL 35MTB4-B N1,3,6,7 mounting) ALL 35MTB4-C N1,4,6,7 ALL 35MTB4-D N1,5,6,7 KELLUMS ALL 35MTB5-A N1,2,6,7 Bracket ALL 35MTB5-B N1,3,6,7 for tri-mounting ALL 35MTB5-C N1,4,6,7 ALL 35MTB5-D N1,5,6,7 ALUMA FORM ALL 1535AFB-1 N1,6,7 Bracket N1. Use with PCT-1 or PCT-2 Terminators. N2. Fits overall cable O.D. from 1.195" to 1.625". N3. Fits overall cable O.D. from.925" to 1.335". N4. Fits overall cable O.D. from.890" to 1.185". N5. Fits overall cable O.D. from 1.500" to 2.000". N6. Use with 16THG & 16THGS Terminators. N7. Use with MTG, MTG1 & MSC Terminators. N8. For conductors from 1/0 thru 350 kcmil. N9. For conductors from 400 kcmil thru 1000 kcmil. N10. For conductors from #2 to 1000 kcmil. N11. For conductors from #6 thru 4/0. N12. Fits overall cable O.D. from.750" to 1.625". ALUMA FORM ALL 1535AFB-3 N1,6,7 Bracket for Crossarm mounting ALUMA FORM ALL 1535AFB-4 N1,6,7 Bracket for riser-pole mounting ALUMA FORM ALL 1535AFB-5 N1,6,7 Bracket for tri-mounting Refer to the W and X tables on pages 32 and 33 for sizing to cable insulation diameter and conductor size. For cable shield adapters and jacket seals, see page 28. CATALOG 2001 Page 25 ID: 0198
56 SHIELD ADAPTERS, GROUNDING KITS AND JACKET SEALS Elastimold elbows, splices and terminators are designed for application on XLP, EPR and other solid dielectric insulated power cables. As shown in the diagram below, a variety of shielding and jacketing methods are available for these types of cables. In some cases, the use of cable shield adapters, grounding kits and/or jacket seals are required in order to properly install Elastimold components. Refer to the diagram below for recommendations, selection and use of adapters, grounding kits and jacket seals. CABLE ENTRANCE DETAIL INSULATION EPDM RUBBER MOLDED SHIELD CONDUCTIVE EPDM RUBBER 600/200 ECS 600/200 ECSG1-2 21MA 20MA 600/ /200 ECSG2-2 ECS3 10TL 10TL NONE REQUIRED CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR CONDUCTOR INSULATION INSULATION INSULATION INSULATION INSULATION INSULATION EXTRUDED SHIELD EXTRUDED SHIELD EXTRUDED SHIELD OR BEDDING TAPE EXTRUDED SHIELD OR BEDDING TAPE CONDUCTIVE JACKET CONCENTRIC NEUTRAL WIRES CONCENTRIC NEUTRAL WIRES DRAIN WIRES COPPER SHIELD SEMI-CON TAPE DRAIN WIRES OUTER JACKET OUTER JACKET OUTER JACKET LEAD JACKET CABLE SHIELD TYPES JACKETED CONCENTRIC NEUTRAL URD CONCENTRIC NEUTRAL URD DRAIN WIRE SHIELDED COPPER TAPE SHIELDED LEAD JACKETED CABLE UNISHIELD 10TL 20 MA 21MA ECS CABLE SHIELD ADAPTERS Cable 10TL 20MA 21MA Insulation Dia. inches inches inches ELASTIMOLD min max JACKET SEALS Jacket 200ECS 600ECS O.D. inches inches min max CATALOG 2001 Page 28 ID: 0198
CATALOG. Underground cable accessories
CATALOG Underground cable accessories 2 ELASTIMOLD UNDERGROUND CABLE ACCESSORIES Choose Thomas & Betts and connect to the power you need For over 100 years, Thomas & Betts has successfully applied innovative
More informationSEE PRODUCT GUIDE PG-PC-E FOR SURGE ARRESTER APPLICATIONS THREADED STUD 600 SERIES ELBOW THREADED STUD CONNECTING BUSHING EXTENDER COMPRESSION LUG
ACCESSORIES 600 Series Deadbreak 600 Series deadbreak elbows, straight receptacles, junctions, vault stretchers and accessories are used to connect equipment and cable on primary feeder and network circuits.
More informationELASTIMOLD UNDERGROUND CABLE ACCESSORIES
ELASTIMOLD UNDERGROUND CABLE ACCESSORIES ELASTIMOLD FEATURES AND BENEFITS The Elastimold brand is recognised as the leading producer of premoulded cable accessory components worldwide. Utilising specially
More information600A Deadbreak Elbow. K656LR Elbow Connector (with Test Point) Features:
Issue Date: 07/17/2017 Page: 1 of 5 PSS- K656LR Elbow Connector (with Test ) Applications: The Elastimold K656LR (with test point) is designed to provide fully shielded, dead-front submersible cable connections
More informationMolded Current-Limiting Fuse
Molded Current-Limiting provide fullrange fault current protection using specially designed fuse elements, rated through 23kV line to ground and 50kA interrupting current. Construction is modular with
More informationMEDIUM VOLTAGE
WWW.GENERGYCABLE.COM 800-308-1330 TM MEDIUM VOLTAGE MEDIUM VOLTAGE ASSEMBLIES Type SH Medium Voltage Power Cable Assemblies are designed for heavy-duty MV applications that require temporary or permanent
More information600 A 35 kv class BT-TAP deadbreak connector
Supersedes 600-55 July 2014 600 A 35 kv class BT-TAP deadbreak connector General Eaton's Cooper Power Systems 600 A 35 kv Class BT-TAP deadbreak connector is used to terminate high-voltage underground
More information600 A 15 kv class T-OP II deadbreak connector
Deadbreak Apparatus Connectors CA650017EN Supersedes 600-12 February 2010 COOPER POWER SERIES 600 A 15 kv class T-OP II deadbreak connector General Eaton terminates high-voltage underground cable to transformers,
More informationa Nexans company Catalogue 2008
a Nexans company Catalogue 008 EUROMOLD COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories for medium voltage
More informationInstallation Instructions LINK---C
IS---LINK---C Page 1 of 10 Installation Instructions LINK---C DEADBREAK CAM LINK OPERABLE CONNECTOR SYSTEM The is a 600 amp, connector designed to: 1.) provide a fully shielded, fully submersible hot stick
More informationa Nexans company Catalogue 2009
a Nexans company Catalogue 009 EUROMOLD COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories for medium voltage
More informationTests are conducted in accordance with IEEE Standard 386. ac 60 Hz 1 Minute Withstand 50
Deadbreak Apparatus Connectors 600 A 35 kv Class Bol-T Deadbreak Connector Electrical Apparatus 600-50 General The Cooper Power Systems 600 A, 35 kv Class Bol-T Deadbreak Connector is used to terminate
More informationINTERFACE A MEDIUM VOLTAGE SEPARABLE CONNECTORS AND BUSHINGS CATALOGUE 2017
INTERFACE A MEDIUM VOLTAGE SEPARABLE CONNECTORS AND BUSHINGS CATALOGUE 07 NEXANS NETWORK SOLUTIONS DIV. EUROMOLD COMPANY PRESENTATION EUROMOLD Nexans is the leading European specialised designer, manufacturer
More informationINSTALLATION PRODUCTION TESTS
Deadbreak Apparatus Connectors 600 A 15/25 kv Class Bol-T Deadbreak Connector Electrical Apparatus 600-10 GENERAL The Cooper Power Systems 600 A, 15/25 kv Class Bol-T Deadbreak Connector is used to terminate
More informationLoadbreak Apparatus Connectors
Loadbreak Apparatus Connectors 200 A 25 kv Class POSI-BREAK Loadbreak Elbow Connector with Optional Integral Jacket Seal* Electrical Apparatus 500-29-7 general The POSI-BREAK Loadbreak Elbow Connector
More informationyour Green Power WIND POWER SOLUTIONS only Greener
your Green Power WIND POWER SOLUTIONS only Greener WIND POWER SOLUTIONS Thomas & Betts is committed to being your partner in power delivery by leading the industry in innovative wind power solutions and
More information600 A 25 kv class BT-TAP deadbreak connector
Deadbreak Connectors Catalog Data CA650001EN Supersedes January 2015 600 A 25 kv class BT-TAP deadbreak connector COOPER POWER SERIES General Eaton terminates high-voltage underground cable to transformers,
More informationProduct Description: Objective and Certification: Test Samples and Test Cable:
Product Description: The CableMate 2LBE loadbreak elbow connector and 2LBI loadbreak bushing insert are fully-shielded, fully submersible, insulated plug-in terminations for connecting underground cables
More informationcopper stud. If a 900 A rating is desired, specify a C as the 8th digit when determining your part number (See Table 3, page 3.)
Molded Rub ber Products 600 A 35 kv Class Separable Splices Electrical Ap pa ra tus 700-31 General Cooper Power Systems 600 A, 35 kv Class Deadbreak Separable Splices are used to splice two, three or four
More information(BUSINESS DAYS) 200A Separable Connectors
DATE October 12, 2018 PAGE 1/11 SUBJECT Cable Accessory Inventory Please refer to the following tables of Cable Accessory inventory which is available for immediate shipment from ABB s Byhalia distribution
More informationLoadbreak Elbows. 3 Loadbreak Elbows. 200 Amp 5-15 kv Industrial pg Loadbreak Elbows. 200 Amp 25 kv Industrial pg. 254.
3 Loadbreak Elbows 200 Amp 5-15 kv Industrial pg. 252 Loadbreak Elbows 200 Amp 25 kv Industrial pg. 254 Loadbreak Elbows 200 Amp Industrial pg. 255 Loadbreak Elbows Accessories 3 Loadbreak Elbows 3M 200
More informationPRODUCT BROCHURE. Elastimold ComboT integral separable connectors
PRODUCT BROCHURE Elastimold ComboT integral separable connectors 2 ELASTIMOLD COMBOT INTEGRAL SEPARABLE CONNECTORS One of the shortest stack heights in the industry works in smaller cabinets and installs
More informationLoadbreak Apparatus Connectors. 200 A 15 kv Class Loadbreak Elbow Connector with Optional Integral Jacket Seal GENERAL
Loadbreak Apparatus Connectors 200 A 15 kv Class Loadbreak Elbow Connector with Optional Integral Jacket Seal Electrical Apparatus 500-10-7 GENERAL The Cooper Power Systems Loadbreak Elbow Connector is
More information200 A 15 kv class loadbreak elbow connector with optional integral jacket seal
Loadbreak Connectors Catalog Data CA650062EN Supersedes June 2015 COOPER POWER SERIES 200 A 15 kv class loadbreak elbow connector with optional integral jacket seal General Eaton s Cooper Power series
More information600 A 35 kv class separable splices
Splices Catalog Data CA650050EN Supersedes 700-31 March 2009 COOPER POWER SERIES General Eaton s Cooper Power series 600 A, 35 kv Class deadbreak separable splices are used to splice two, three or four
More informationa Nexans company Catalogue 2015
a Nexans company Catalogue 05 Nexans Network Solutions Div. Euromold COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated
More informationElastimold & Hi-Tech Fuse Products
In this section... Elastimold & Hi-Tech Fuse Products Elastimold & Hi-Tech Fuse Products Overview...H-62 Elastimold Fused Loadbreak Elbows (FLE)... H-63 H-67 Elastimold Molded Current-Limiting Fuses (MCLF)...
More informationDeadbreak Apparatus. connectors. 600 A 15/25 kv Class GENERAL
Deadbreak Apparatus Connectors 600 A 15/25 kv Class BOL-T Deadbreak Connector Electrical Apparatus 600-30 GENERAL The Cooper Power Systems 600 A, 15/25 kv Class BOL-T Deadbreak Connector is used to terminate
More informationHigh Voltage Copper, Smooth Aluminum Shield/Sheath
High Voltage Copper, Smooth Aluminum Shield/Sheath XLPE Insulation, HDPE Jacket, 69 kv - 138 kv Features True triple vertical extrusion system for optimum insulation concentricity, and excellent electric
More information200 A 15 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition
Loadbreak Connectors Catalog Data CA650063EN Supersedes 500-10-7C November 2011 COOPER POWER SERIES 200 A 15 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition General
More informationCATALOG. Hi-Tech Fuse Products
CATALOG Hi-Tech Fuse Products Thomas & Betts is now ABB Installation Products, but our long legacy of quality products and innovation remains the same. From connectors that help wire buildings on Earth
More information35-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp, 900 Amp and 1250 Amp
Page 1 2018 Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other Component 35 kv Separable Insulated Connector (elbow) Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other
More informationNexans Network Solutions Div. Euromold
Catalogue 0 Nexans Network Solutions Div. Euromold COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories for
More information25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp, 900 Amp and 1250 Amp
Page 1 2018 Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other Component 15 kv or 25 kv Separable Insulated Connector (elbow) Equipment Connection Power Cable Power Cable ELRIM Cycloaliphatic
More informationFEBRUARY 14, 2017 Elastimold Solid dielectric switchgear customer presentation
FEBRUARY 14, 2017 Elastimold Solid dielectric switchgear customer presentation Elastimold solid dielectric switchgear agenda Compelling value Design principles Product overview Switchgear applications
More informationC-L-X Aluminum Sheath Type IEC
COMPACT STRAND CONSTRUCTION C-L-X Aluminum Sheath A B C D E F G H J Conductor - Compact Stranded Copper Strand Screen - Extruded Semiconducting EPR Insulation - Okoguard EPR Insulation Screen - Extruded
More information35-kV 200-kV BIL Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp, 900 Amp and 1250 Amp
Page 1 2018 Grounded Metal Equipment Plate Equipment Connection 35 kv Separable Insulated Connector (elbow) Bus Bar or Other Component Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other
More information600 A 15 kv class Cleer loadbreak connector system
Loadbreak/Deadbreak Connectors CA650010EN Supersedes 600-100 April 2013 COOPER POWER SERIES 600 A 15 kv class Cleer loadbreak connector system General Eaton's Cooper Power series Cleer loadbreak connector
More information600 A 28 kv class Cleer loadbreak connector system
Loadbreak/Deadbreak Connectors CA650012EN Supersedes 600-102 April 2013 COOPER POWER SERIES 600 A 28 kv class Cleer loadbreak connector system General Eaton's Cooper Power series Cleer loadbreak connector
More informationHigh Voltage Aluminum, Smooth Aluminum Shield/Sheath
High Voltage Aluminum, Smooth Aluminum Shield/Sheath XLPE Insulation, HDPE Jacket, 69 kv - 138 kv Features True triple vertical extrusion system for optimum insulation concentricity, and excellent electric
More information1500 kva Padmount Transformer delta Primary Voltage 208Y/120 Secondary Voltage
1500 kva Padmount Transformer 12470 delta Primary Voltage 208Y/120 Secondary Voltage Cooper Power Systems Proposal Number: BED1096719 Date: January 4, 2010 Revision 00 Item Number: 00001 Item Details Customer
More information200 A 25 and 28 kv class POSI-BREAK loadbreak elbow connector with optional integral jacket seal-canadian Edition
Loadbreak Connectors CA650101EN Supersedes 500-29-7C November 2011 COOPER POWER SERIES 200 A 25 and 28 kv class POSI-BREAK loadbreak elbow connector with optional integral jacket seal-canadian Edition
More information200 A 25 kv and 28 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition
Loadbreak Connector CA650099EN Supersedes 500-28-7C November 2011 COOPER POWER SERIES 200 A 25 kv and 28 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition General Eaton
More information3M Electrical Markets Division Loadbreaks Deadbreaks Junctions Surge Arresters Disconnectable Joints 3 3M is the exclusive distributor for Richards Medium Voltage cable accessories in Canada. www.richards-mfg.com
More informationOkoguard -Okoseal Type IEC
COMPACT STRAND CONSTRUCTION A B C D E F G H Conductor - Compact Stranded Copper Strand Screen - Extruded Semiconducting EPR Insulation - Okoguard EPR Insulation Screen - Extruded Semiconducting EPR Phase
More information25kV 200A Loadbreak Bushing Insert and Elbow Design Test Report. Report Number:
25kV 200A Loadbreak Bushing Insert and Elbow Design Test Report Report Number: Date: RN-R7604 9/16/2013 Table of Contents I. OBJECTIVE... 2 II. SUMMARY... 2 III. CONCLUSION... 2 IV. CABLE DATA... 2 V.
More informationOutdoor Power Transmission & Distribution
Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:
More informationSpecifier's Guide COOPER POWER. Line installation and protective equipment master catalog 5 kv - 35 kv electrical distribution systems SERIES
Eaton's Cooper Power series products COOPER POWER SERIES Specifier's Guide Line installation and protective equipment master catalog 5 kv - electrical distribution systems Education and Training OCP CEU-Accredited
More information25 kv class fused loadbreak elbow connector
Loadbreak Connectors Catalog Data CA650070EN Supersedes 500-111 July 2012 COOPER POWER SERIES 25 kv class fused loadbreak elbow connector General Eaton combines a fully-shielded and insulated plug-in termination
More information15kV 200A Loadbreak Fuse Elbow Design Test Report. Report Number:
15kV 200A Loadbreak Fuse Elbow Design Test Report Report Number: Date: RN-R2601 9/3/2015 Table of Contents 1. Partial Discharge Test Fuse Elbow... 2 2. AC Withstand Voltage Test - Fuse Elbow... 3 3. DC
More information25 kv Apparatus Bushings
Page 1 2001 ELRIM Cycloaliphatic Epoxy Provides: Nontracking, self-scouring, nonweathering performance Superior dielectric strength, dielectric loss and power factor Choice of shapes allows design innovation
More informationMC or MV-105 Copper, TR-XLPE Insulated
MC MV-105 Copper, TR-XLPE Insulated 5 kv 35 kv, Shielded Features UL listed as MC MV-105. Cable jacket rated f Sun Resistant and Oil resistant. s 1/0 and larger are UL Listed as CT USE in accdance with
More informationCross Reference Chart CHARDON. PART NUMBER DESCRIPTION Elastimold Cooper Hubbell. Elastimold
Cross Reference Chart CHARDON Elastimold PART NUMBER DESCRIPTION Elastimold Cooper Hubbell 15/25-TB600 15/25 kv, 600A T-Body Connector w/o Test Point K655BLR BT625 625TB 15/25-TB600T 15/25 kv, 600A T-Body
More informationQuick Splice II 5451R. 25/28 kv Molded Rubber Cable Repair Splicing Kit Data Sheet. 1. Product Description. 2. Applications
Quick Splice II 5451R (CN) Cable (JCN) Cable Accessory Splice Jacket 25/28 kv Molded Rubber Cable Repair Splicing Kit Data Sheet 1. Product Description The 3M 5451R Quick Splice II is a 25/28 kv class
More information11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE
11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11.1 GENERAL Only single conductor cables as described in this section are acceptable for connection to PECO Energy Company
More information25-kV Apparatus Bushings A Series (clamp-in) for Elbow to Air-Insulated Service 200 Amp and 600 Amp
Page 1 2018 Grounded Metal Equipment Plate Equipment Connection 15 kv or 25 kv Separable Insulated Connector (elbow) Grounded Metal Equipment Plate Equipment Connection Power Cable Power Cable ELRIM Cycloaliphatic
More informationQuick Splice II. 35 kv Molded Rubber Inline Splicing Kit Data Sheet. 2. Applications. 1. Product Description
Quick Splice II 5461 (CN) Cable (JCN) Cable 35 kv Molded Rubber Inline Splicing Kit Data Sheet Accessory Splice Jacket 1. Product Description The 3M 5461 Quick Splice II is a 35 kv class inline splice
More informationMedium Voltage Cable. marmonutility.com
Medium Voltage marmonutility.com Table Contents Introduction... 2 Hendrix Product Information... 4 Distribution s (URD) 15kV...6 25kV... 10 35kV...12 28kV...14 Electrical Data...16 Kerite Product Information...
More informationTECHNICAL GUIDELINE. Medium Voltage Conductor Ampacities ALUMINUM COPPER. Single Conductor 5kV - 35kV
Medium Voltage Ampacities Single 5kV - 35kV 2 130 145 150 165 2 100 115 115 130 1 155 175 170 190 1 120 135 130 150 1/0 180 200 195 215 1/0 140 155 150 170 2/0 205 225 225 255 2/0 160 175 175 200 3/0 240
More information600 A 15 and 25 kv class deadbreak accessories, tools, and replacement parts
Deadbreak Connectors Catalog Data CA650007EN Supersedes March 2015 COOPER POWER SERIES 600 A 15 and 25 kv class deadbreak accessories, tools, and replacement parts General Eaton connects and assembles
More information3M Cold Shrink QS-III Inline Splice Kits 15 kv 5513A, 5514A, 5515A and 5516A
3M Cold Shrink QS-III Inline Splice Kits 15 kv Data Sheet June 2014! CAUTION Working around energized high-voltage systems may cause serious injury or death. Installation should be performed by personnel
More informationTHORNE & DERRICK UK TEL FAX TEL FAX
a Nexans company Catalogue 2006 EUROMOLD COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories for medium
More informationQS-III. 5513A, 5514A, 5515A and 5516A 15 kv Cold Shrink Inline Splice Kits. Data Sheet CAUTION. 1. Product Description. 2. Applications.
QS-III 5513A, 5514A, 5515A and 5516A 15 kv Cold Shrink Inline Splice Kits Data Sheet Tape Shield Wire Shield UniShield Kit Contents: 1 Cold Shrink Silicone Rubber Splice Body 1 Cold Shrink Adapter Tube
More informationSolid Dielectric Load Break Switch SPECIFICATION. 25kV, 630A, 4 WAYS, 4 WAYS SWITCHED PADMOUNTED VACUUM LOAD INTERRUPTER
Solid Dielectric Load Break Switch SPECIFICATION 25kV, 630A, 4 WAYS, 4 WAYS SWITCHED PADMOUNTED VACUUM LOAD INTERRUPTER MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED VACUUM LOAD INTERRUPTING
More informationIntroduction. Nexans wire and cable. Contact us for all your wire and cable needs
Introduction Nexans is one of the largest wire and cable manufacturers in the world, and in North America. In North America we manufacture in locations across the United States and Canada. We design and
More information200 A and 600 A, 15, 25, and 35 kv junction bars for separable connectors
Loadbreak/Deadbreak Connectors CA650079EN Supersedes 650-10 December 2005 COOPER POWER SERIES and 600 A, 15, 25, and 35 kv junction bars for General Eaton designs its Cooper Power series junction bars
More informationTC-THHN/THWN-2 Copper, PVC/Nylon Insulated
TC-THHN/THWN-2 Copper, PVC/Nylon Insulated PVC Jacketed; ER; FT4; RoHS; 600 V Features Standards Complete cable is RoHS compliance. UL Listed as TC ER sizes 14 AWG 5 AWG. The complete cable (18 AWG and
More informationPadmount Solid Dielectric Switchgear Catalog
Padmount Solid Dielectric Switchgear Catalog p G&W headquarters in Bolingbrook, IL USA Company Profile Since 1905, G&W Electric has helped energize the world with innovative power system solutions. With
More informationTC-RHH/RHW-2 USE-2 Copper
TC-RHH/RHW-2 USE-2 Copper XLPE Insulated, PVC Jacketed, ER; 600 V Features Standards UL Listed as TC-ER - exposed run tray cable. Jacket is rated Sunlight Resistance, Oil Resistance I and Direct Burial.
More informationPRODUCT SHEET. Elastimold advanced connection system (shear bolt)
PRODUCT SHEET Elastimold advanced connection system (shear bolt) 2 Elastimold cable accessories The Elastimold advanced connection system - shear bolt is the latest solution to be incorporated into the
More information35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses
Page 1 2016 EPMR-35-311S-R2/ESW-CM9 Three Phase Two Ways per Phase 200 Amp 35 kv Class Eaton s CPS LRTPs 50 Amp (Max) 27 kv Clip-Mounted NX Fuse Provisions 21.1/36.6 kv Grounded Wye Max Design, 150 kv
More informationE R C. R E R C ; ; W T E C
WTEC and its affiliates is an engineering, manufacturing, procurement and construction company dedicated to the alternative energy market. It designs and produces products to move energy from the generation
More informationElectrical Accessories
complete system of top quality, time saving products, designed for surface metal raceways, lighting and cable supports. Innovative designs offer many installation advantages. -Line s surface raceways are
More information16kA Solid Dielectric, Triple Option Reclosers Catalog VLT12
16kA Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A continuous current, 16kA symmetrical interrupting
More informationa Nexans company Catalogue 2007
a Nexans company Catalogue 2007 EUROMOLD COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories for medium
More informationUnderground Distribution Switchgear
Underground Distribution Switchgear Functional Specification Guide Functional Specification for 15 kv, 25 kv, or 35 kv Underground Distribution Switchgear 1. Scope 1.1. This specification applies to three-phase,
More informationTC-XHHW-2 Copper, XLPE Insulated, PVC Jacketed
TC-XHHW-2 Copper, XLPE Insulated, PVC Jacketed ER; SR; PR; Dir Bur; 600 V Features UL Listed as TC-ER - exposed run tray cable. Jacket is rated Sunlight Resistance, Oil Resistance I and Direct Burial.
More information11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE
11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11.1 GENERAL Only single conductor cables as described in this section are acceptable for connection to PECO Energy Company
More informationa Nexans company Medium voltage symmetrical separable connectors - Interface C -
a Nexans company Medium voltage symmetrical separable connectors - Interface C - Catalogue 2011 Nexans Network Solutions Div. Euromold COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised
More information600 A 35 kv class deadbreak accessories, tools, and replacement parts
Deadbreak Connectors Catalog Data CA650006EN Supersedes 600-66 July 2014 COOPER POWER SERIES 600 A 35 kv class deadbreak accessories, tools, and replacement parts General Eaton's Cooper Power series 600
More informationCorflex. Continuous Corrugated Aluminum Sheathed PL, MC and MV Industrial Cables. Introduction Applications... 3
Corflex Continuous Corrugated Aluminum Sheathed PL, MC and MV Industrial Cables Introduction................................. 2 Applications................................. 3 Corflex PL 300V Instrumentation
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other
More informationM-Force three-phase switch
Supersedes K-SEC 926 December 2012 M-Force three-phase switch Description The M-Force switch from Eaton's Cooper Power Systems is a distribution-class, gangoperated, factory unitized three-phase overhead
More information15-kV Wall-Mount Switchgear Three-Phase Indoor/Outdoor 600 Amp S&C Mini-Rupter Switch
Page 1 2015 Kinked roof prevents standing moisture Glass reinforced barriers meet NEMA GPO-3 Standards 0.625" diameter copper ground bar Elliott air-insulated bushings accept IEEE Standard inserts and
More informationSolid Dielectric, Triple Option Reclosers Catalog O-vlt14
Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A or 800A continuous current, 12.5 or 16kA symmetrical
More informationPRODUCT BROCHURE. Elastimold advanced connection system (shear bolt)
PRODUCT BROCHURE Elastimold advanced connection system (shear bolt) 2 ELASTIMOLD ADVANCED CONNECTION SYSTEM (SHEAR BOLT) Elastimold cable accessories The Elastimold advanced connection system shear bolt
More informationELASTIMOLD & HI-TECH FUSE PRODUCTS
ELASTIMOLD & HI-TECH FUSE PRODUCTS Transmission and Distribution Thomas & Betts the one-stop shop for solutions to your distribution connection and grounding needs. Thomas & Betts offers the connectors,
More informationBUSWAY Low Voltage (Pow-R-Flex)
BUSWAY LOW VOLTAGE (POW-R-FLEX) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein and
More information35-kV Safefront 200 Amp SuperWell Primary Metering Station Pad-Mounted Outdoor
35-kV Safefront 2 Amp SuperWell 5-33 Page 1 216 EPM-PMS-35-311P-R2/ESW Three Phase Two Ways per Phase 2 Amp 35 kv Class Eaton's CPS LRTPs NEMA Standard Outdoor Instrument Transformer Provisions 21.1/36.6
More information35-kV Thru-Bushings F Series (bolt-in) for Air-Insulated to Air-Insulated Service 200 Amp, 600 Amp, 900 Amp and 1250 Amp
Page 1 2018 Equipment Connection Bus Bar, or Grounded Metal Equipment Plate F Series Mounting Holes ELRIM Cycloaliphatic Epoxy Provides: Nontracking, self-scouring, nonweathering performance Superior dielectric
More informationUnderground Distribution Switchgear
Underground Distribution Switchgear Functional Specification Guide Functional Specification for 15 kv, 25 kv, or 35 kv Underground Distribution Switchgear 1. Scope 1.1. This specification applies to three-phase,
More informationJumpers & Load Pickup Tools
Jumpers & Load Pickup Tools Catalog 2300 May 2016 Jumpers & Load Pickup Tools 2300 May 2016 Page 2301 All Chance Insulated Jumpers meet ASTM F 2321 Standard Specification. G4758 15kV 5 5 / 8 " G4765 25kV
More informationMecklenburg County Common Code Defects
Electrical Code Defects Improper Over Current Protection Code Description 310.15 Ampacities for s Rated 0 2000 Volts. (A) General. (1) Tables or Engineering Supervision. Ampacities for conductors shall
More informationgrounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2
grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate www.cable.alcan.com Type XHHW-2 and Type USE-2/RHH/RHW-2 Alcan manufactures XHHW-2 and
More information35-kV Safefront 200 Amp SuperWell Primary Capacitor Station Pad-Mounted Outdoor
Page 1 2016 EPM-PCS-35-320P-R2/ESW-GCM6-2S-SA Three Phase Two Ways per Phase 200 Amp 35 kv Class Eaton's CPS LRTPs 35 kv Elliott Air-Insulated SuperWell Bushings 21.1/36.6 kv Grounded Wye Max Design, 150
More information3M Cold Shrink 3-Conductor Inline Splice Kits QS-III 5786A- MT, 5787A-MT and 5788A-MT 25/28 kv for use with Armored and Non- Armored 3/C Cable
3M Cold Shrink 3-Conductor Inline Splice Kits QS-III 5786A- MT, 5787A-MT and 5788A-MT 25/28 kv for use with Armored and Non- Armored 3/C Cable Data Sheet September 2010 Description 3M Cold Shrink 3-Conductor
More informationSolid Dielectric, Triple Option Reclosers Catalog O-vlt14
Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A or 800A continuous current, 12.5 or 16kA symmetrical
More informationElastimold. Cable Accessories. Underground Distribution Switchgear. Molded Vacuum Switches and Fault Interrupters
Underground Distribution Switchgear Molded Vacuum Switches and Fault Interrupters MVS Molded Vaccum Switches Spring-energy, load-switching devices that make, carry and interrupt load currents through 600
More informationINTERFACE E - 5/8" MEDIUM VOLTAGE SEPARABLE CONNECTORS AND BUSHINGS CATALOGUE 2017
INTERFACE E - 5/8" MEDIUM VOLTAGE SEPARABLE CONNECTORS AND BUSHINGS CATALOGUE 2017 NEXANS NETWORK SOLUTIONS DIV. EUROMOLD COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer,
More informationDisconnect & ByPass Switches
Disconnect & ByPass Switches Disconnect & Oil Circuit Recloser Bypass Switches; Regulator & Current Transformer Bypass Switches Electrical Apparatus K-SEC 060 & 090 Contents Type D-73 Distribution Class
More information