1 SECTION UTILITY DISTRIBUTION SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Related Sections: Custom Fabricated Equipment Cooking Equipment. 3. Division 15 - Water supply, drainage, gas, and related piping. 4. Division 16 - Electrical connections SUBMITTALS A. Shop Drawings: 1. Submit shop drawings with dimensioned plans prepared in minimum 1/4" scale showing mechanical/electrical roughing-in data for each piece of equipment and their relationships to the space the equipment occurs. 2. Include accurately dimensioned details and locations of any special wall openings required by items of equipment extending through walls. 3. Include plans, elevations, and sections, all dimensioned and suitable to be used for actual construction of items specified. B. Product Data: Submit manufacturer's name, descriptive data, mechanical connections required, and other information necessary for review of standard manufactured articles and equipment QUALITY ASSURANCE A. References: 1. Comply with applicable standards or requirements of the following: a. National Sanitation Foundation (NSF). b. Underwriters Laboratories Listings (UL). c. National Electrical Manufacturers Association (NEMA). d. National Fire Protection Association 96 (NFPA). Project No. SPECIFICATION GUIDELINES

2 B. Source Quality Control: 1. Manufacturer: Provide equipment manufactured by one manufacturer except where otherwise noted, uniform throughout as to method and type of construction used. 2. Nameplates: a. Identify model and manufacturer with appropriate nameplates. b. Show electrical characteristics on appropriate nameplates SPECIAL REQUIREMENTS A. Modify accepted manufacturer's standard items and construction to conform with special requirements listed as follows: 1. Special Requirements Gas: a. Provide minimum of 1 gas drop of at least 3/4" NPT (255,000 BTU) extended from raceway and capped for future use for each 6 feet of horizontal gas pipe, regardless of number of specified drops. b. Quick disconnects furnished for connection of gas hoses from appliances shall not allow connection of other type of plumbing hoses, even if they are the same size. 2. Special Requirements Water: a. Wherever there is an 8-foot horizontal run of hot or cold water supply without a specified drop, provide a minimum of one each 3/8" NPT drop extended from the raceway and capped for future use. 3. Special Requirements, Labels, Wiring Diagrams, and Plumbing Diagrams: a. Clearly label remote breakers for each piece of equipment they serve. b. Breaker plates shall bear a label clearly indicating amperage, voltage, phase of breaker, and item number and type of equipment to be connected. c. Breaker plates located beneath raceways or otherwise hidden from normal view shall have a Project No. SPECIFICATION GUIDELINES

3 duplicate identification label located in plain view and designating location of plate. d. Color-code and word or letter identifying utilities behind each side access panel in a raceway. e. Clearly label shutoffs, fuses, circuit breakers, or components requiring periodic maintenance, service, or adjustment and locate on the external portion of the raceway or chase. f. Provide wiring and plumbing schematics affixed to inside of access panels for raceways, control boxes, disconnect controls and energy management systems and indicate location of schematics on shop drawings submitted for approval. 4. Special Requirements, Component Location, and Access Panels: a. Side Access Panel: Maximum 48 inches long. 1) Where a component, requiring periodic access for maintenance, service, or adjustment, is located behind a side panel in the raceway, side panel shall not exceed 24 inches in length. b. Any fuse or circuit breaker provided for circuit protection in a raceway shall either be located externally or in the riser behind a hinged access door. 5. Special Requirements Indicator Lights: a. Indicator Lights: Snap in or screw in incandescent type with slip on or screw on terminals. b. House breaker status indicator lights located in end panel of island raceways or face of wall type raceways in a recessed panel with a clear plexiglass cover to protect them. 6. Special Requirements Breaker Plates: a. Provide each breaker plate with a separate ground wire, minimum 12 inches long, to maintain ground when plate is removed from the raceway mounting. b. Provide breaker plates with a hinged waterproof cover over receptacle. c. Provide breaker plates located within 24 inches of the floor, or in a location where they are Project No. SPECIFICATION GUIDELINES

4 prone to get wet with a hinged waterproof cover over breaker switch. d. If an indicator light or other device is located on a breaker plate, it shall be in a full recess or otherwise protected from damage. e. Color-code and mark breaker switch to indicate trip status without relying on operation of an indicator light. f. Make breaker located in a raceway interchangeable with breaker plate located in a power chase. g. Provide breakers serving refrigerators, freezers, icemakers, or otherwise critical equipment with a lockout clip to prevent accidental shutoff while allowing normal tripping. 7. Special Requirements Safety: a. Single and Two Pole Breakers Up to 30 Amps: Provide with GFI per NEC. b. Manual Trip Mechanism: Provide to trip electric shunt at breaker and easily accessible location. c. Bus Bar Insulation: Each electrical bus bar individually insulate for its full length. d. Safety Insulated Shield: Provide electrical service connections and terminals with a safety insulator shield. e. Electric Shutoff: Accomplish by the main electrical service to raceway being provided by electrical contractor. 8. Special Requirements Other: a. All components used in the raceways, chases, and the line, shall be readily obtainable locally. b. Components shall not require soldering to connect or install. PART 2 PRODUCTS 2.01 EQUIPMENT (KITCHEN AND SERVING LINES, SPACE ( ) A. Item # : Utility Distribution System - Greitzer Model "Single Disconnect" (with built-in garbage disposer control) shall be 5'-6" long vertical raceway, 6 inch x 18 inch cross section completely prewired and preplumbed for final connection of electrical and cold water for Item # and hot and cold water for Item #. Project No. SPECIFICATION GUIDELINES

5 1. Attach bottom end of vertical raceway to raceway extension built-into the backsplash of Item #. 2. Raceway manufacturer shall furnish a 14 inch long section of matching raceway to custom stainless steel fabricator. 3. The raceway shall be incorporated into Item #. 4. Construction: 18 gage, Type 304 stainless steel with #4 mill finish. 5. Service Requirements: 3/4" cold water, 3/4" hot water connection; 40 amp 120/208/60/3, 4W. a. Electrical: Provide liquid tight flexible metallic tubing exiting from bottom end of raceway to serve Item #. b. Disposer Control: Provide NEMA 1 enclosure, 18 gage, Type 304 stainless steel with #4 mill finish; install in face of the riser. 1) Enclosure Includes: a) Automatic reversing control. b) Dual magnetic starters. c) Control transformer. d) "Run" indicator light. e) Start-Stop button. c. Disposer (Item # ) and Vegetable/Salad Sink (Item # ). 1) Water supply shall be completely prepiped within riser to allow, in addition to supply connections at top of unit, connections from bottom of unit to connect Items # & #. 2) Piping Includes: a) 3/4" vacuum breaker. b) 3/4" flow control. c) 3/4" solenoid valve. d) 1/2" union/ 3/4" union. B. Item # : Utility Distribution System - GREITZER Model IUD raceway system 12'-0" long, 12 inches x 18 inches cross section with 6 inch peaked top completely prewired and preplumbed for final connection for electricity, hot water, cold water, and gas to service equipment Item # and lights for Item # (Hoods # and # ) and exhaust/makeup air /strip heater system EMF # (1HP/1HP/8KW/480/60/3) and exhaust/makeup air/strip heater system EMF # (1HP/1HP/8KW/60/3). Project No. SPECIFICATION GUIDELINES

6 1. Utility distribution system shall consist of 2 sections, each section 6'-0" long with 3 risers and no pedestals and shall suspend from 3 points through Hoods # and #. 2. Provide complete with ground fault equipment protection, fire fuel shut-off, point-of-use breakers with remote indicator lights, flexible quick disconnect plumbing hoses for all connected equipment and UL listed matching special purpose power supply cord and plug sets for each connection plate, exhaust and makeup air fan control packages, hood light controls and makeup air strip heater controls. 3. Service Requirements: 3/4" cold water connection, 3/4" hot water connection, 1-1/4" looped gas service, 225 amp, 120/208/3PH, 5W with main service breaker (no tripping) equal to bus capacity. 4. Construction: Fixed risers, 6 inch peaked top, end caps and raceway exterior panels shall be constructed of 16 gage, Type 304 stainless steel with #4 mill finish and hung from overhead structural system with pipe supports (black iron pipe). a. Filler Panels: Provide minimum 22 gage stainless steel filler panels (2 required) to close openings in underside of hood assembly between risers. b. Bumper Strips: Provide neoprene bumper strip full length of both sides. 5. Electrical: Electrical compartment shall be completely enclosed with sheet metal housing accessible by removal of concealed pan head type machine screws having a minimum thread depth of 1/2". a. Bus Bar: 1) Provide 4 conductor bus bar full length of raceway as internal main feeders for electrical fired cooking equipment. a) Bus bar shall be manufactured from 100 percent copper and mounted on nonconductive insulators, spaced at 24 inch to 30 inch centers and equipped with connection lugs for future main service. b) Bus Capacity: 120/208/3PH, 280 amps. b. Connection Plates: Project No. SPECIFICATION GUIDELINES

7 1) Provide 5 inch x 9 inch, 16 gage, stainless steel connection plates at 12 inches on center the full length of raceway. 2) As required by each of Items # equip the appropriate connection plate with a point-of-use circuit breaker with UL listed knob type watertight actuator and status indicator light. 3) Status lights shall be dual color (GREEN-ON, RED-OFF) LED type 24 volt, constant-on. 4) Connection plate shall also be equipped with grounding type receptacle and matching power supply cord having specific NEMA polarized configuration and metallic label with permanently lettered electrical characteristics. c. Light Controls/Hood # : Provide switch, circuit breaker, and power supply pre-wired in 10 foot long flexible conduit ready for connection to light junction box in hood. 1) Install switch in front riser. d. Light Control/Hood # : Provide switch, circuit breaker, and power supply pre-wired to 10 foot long flexible conduit ready for connection to light junction box in hood. 1) Install switch in rear riser. e. Fan/Strip Heater Controls/Hood # /EMF # : Provide NEMA 1 Enclosure 18 gage, Type 304 stainless steel with #4 mill finish, install in front riser. 1) Include the following: a) Adjustable time delay of 0-5 minutes. b) Magnetic starter with thermal overload and reset station. c) Malfunction alarm, 24 volt, solid state horn, and light. d) On-Off indicator lights. e) Manual control for strip heater with indicator lights. f) Pressure differential horn and light warning system to indicate condition of filters with 110v to 24v transformer. Project No. SPECIFICATION GUIDELINES

8 f. Fan/Strip Heater Control/Hood # /EMF # : Provide NEMA 1 enclosure 18 gage, Type 304 stainless steel with #4 mill finish, install in rear riser. 1) Include the following: a) Adjustable time delay 0-5 minutes. b) Magnetic starter with thermal overload and reset station. c) Malfunction alarm, 24 volt, solid state horn and light. d) On-Off indicator lights. e) Manual control for strip heater with indicator lights. f) Pressure differential horn and light warning system to indicate condition of filters with 110v to 24v transformer. g. Duplex Convenience Outlet (DCO): 20 amp 120/1. Provide at each end in end cap. h. Fire Fuel Shutoff: 1) Provide for gas services for individual pieces of equipment per NFPA No.96. 2) Gas solenoid valves shall be equipped with 5 second delay to eliminate instantaneous power interruptions from causing nuisance pilot outages. a) Entire shutoff system shall be completely pre-wired and pre-plumbed, requiring only one final connection by the electrical contractor from 120v power source in fire extinguishing system relay or micro-switch (STDP, Form C relay when both gas and electric are specified). b) Provide manual reset for gas and each individual electric connection. c) External solenoid valves, contactors, relays, or shunt trips are not allowed. i. Duplex Convenience Outlet (DCO): 20 amp 120/1. Provide at each end in end cap. 6. Plumbing: a. Plumbing compartment shall be isolated from electrical compartment. Project No. SPECIFICATION GUIDELINES

9 b. All piping and disconnect in system shall be color-coded. c. Hot and Cold Water Piping (including individual branch pipe connections: 1) Hard temper type "L" copper tubing with copper sweat type solder fittings. 2) Each branch connection shall be provided with brass double shutoff quick disconnect assembly of twin wall construction, including brass bellows type corrugated hose with built-in stainless steel restraining chain capable of withstanding an in-tension pull of 3,200 lbs., bursting pressure of 5,000 lbs., and crush pressure of 9,000 lbs. 3) Provide Polytec clear coating with encapsulated color-coding. d. Valves and Gauges: 1) Provide direct reading combination pressure temperature gauges for incoming services for hot water and cold water. 2) Provide quarter turn ball type shutoff valves for all gas and water main incoming services. 3) Provide quarter turn ball type shutoff valve on raceway for gas. 4) Piping shall be connected to individual equipment. e. Hose Bibb: Provide 140 degree hot water threaded hose bibb beneath each end of raceway. f. Pot Filler: 1) Provide T & S Pot filler with spray head and brush cleaning attachment with 5 foot hose. 2) Include mixing valve and stainless steel bracket to extend outward between the kettles (Item # ) for hanging. 3) Pot Filler: Integral part of raceway. g. Gas Piping: 1) Black iron pipe with welded threadlets to branch connections and drip tee on service riser. 2) Each branch connection shall be provided with quarter turn steel ball type shut-off valve, cadmium plated steel quick disconnect Project No. SPECIFICATION GUIDELINES

10 assembly of twin wall construction, including stainless steel bellow type corrugated hose with built-in restraining chain capable of withstanding an in-tension pull of 3,750 lbs., bursting pressure of 6,000 lbs., and crush pressure of 9,000 lbs. 3) Provide Polytec clear coating with encapsulated color-coding. 7. Control Center: a. Provide recessed control panel mounted in each end cap (Model IUD). 1) Control panel shall include DCO with breaker and separate indicator lights numerically coded to indicator lights on each connection to show "power off", fire fuel shutoff with delay, warning light and solid state whistle. 8. Mounting Pipe Supports (black iron pipe): Pipe, brackets, hangers and miscellaneous hardware furnished by Utility Distribution System manufacturer. C. Item # : Utility Distribution System - GREITZER Model "Power Column", 12 inch x 12 inch cross section, 18 gage, Type 304 stainless steel, with #4 mill finish. Divide system into 2 separate compartments, each 6 inches x 12 inches. 1. "Power Column" shall extend from finished floor to a minimum of 2 inches above the finished ceiling. 2. Unit shall be completely pre-wired and pre-plumbed for electric, cold water and hot water to serve Item #. 3. Provide UL listed matching special purpose power supply cord and plug set, flexible hose with mixing faucets and one DCO, 20 amp 120/1. 4. Service Requirements: 1/2" cold water connection, 1/2" hot water connection, 70 amp, 120/208/60/3PH, 4W. a. Electrical: Provide digital timer and set mechanism. b. Include magnetic motor controller, push-to-start button and one DCO. c. Provide hinged access to timer and set mechanism. Project No. SPECIFICATION GUIDELINES

11 5. Plumbing: a. Water supply shall be completely pre-piped within riser. b. Provide complete with T & S Pot Filler with spray head and brush cleaning attachment with 5 foot hose. c. Include mixing valve and stainless steel hanger bracket for flexible pot filler. d. Provide hinged access cover for access to plumbing compartment. 6. Menu Card and Time Chart Holder: a. Provide menu card type holder for notes, etc., and holder for laminated HCM time chart. b. Include laminated time chart. D. Item # : Utility Distribution System - GREITZER Model WUD raceway system 8'-0" long, 6 inches x 18 inches cross section with sloped top completely pre-wired and preplumbed for final connections for electric, hot water, cold water and gas to serve equipment Items # and lights for Item # Hood # and exhaust/makeup air/strip heater system EMF # (1-1/2HP/15KW/480/60/3). 1. Unit shall consist of one section with one riser at the right end, no pedestal and shall be wall mounted. 2. Riser shall extend into Hood #. 3. Provide complete with ground fault equipment protection, fire fuel shutoff, point-of-use breakers with remote indicator lights, flexible quickdisconnect plumbing hoses for all connected equipment and UL listed matching special purpose power supply cord and plug sets for each connection plate, exhaust/makeup air fan control packages, hood light controls and makeup air strip heater controls. 4. Service Requirements: 1/2" cold water connection, 1/2" hot water connection, 1 inch gas service, 50 amp, 120/208/60/3PH, 4W. 5. Construction: a. Fixed Riser, 6 inch sloped top, and raceway exterior panels shall be constructed of 16 gage, Type 304 stainless steel with #4 mill finish all prepared for wall installation by means of separate wall mounted channels. b. Filler Panel: Provide minimum 22 gage stainless steel filler panel to close opening in underside of hood assembly along wall. Project No. SPECIFICATION GUIDELINES

12 c. Bumper Strip: Provide neoprene bumper strip full length of the unit. 6. Electrical: Electrical compartment shall be completely enclosed with sheet metal housing accessible by removal of concealed pan head type machine screws having a minimum head of 1/2". a. Provide 5 inch x 9 inch, 16 gage stainless steel connection plates at 12 inches on center full length of raceway as required by Items #, equip appropriate connection plate with a point-of-use breaker with UL listed knob type watertight actuator and status indicator light. 1) Status lights shall be dual color (GREEN-ON, RED-OFF), LED type 24 volt, constant-on. b. Connection plate shall be equipped with grounding type receptacle and matching power supply cord having specific NEMA polarized configuration and metallic label with permanently lettered electrical characteristics. c. Provide quick-connect and quick-disconnect means of separating each fire fuel shutoff and all control wiring from Utility Distribution System. 7. Light Controls/Hood # : a. Provide switch, circuit breaker and power supply pre-wired in 10 foot long flexible conduit ready for connection to light junction box in hood. b. Install switch in riser. 8. Fan/Strip Heater Controls/Hood # /EMF # : Provide NEMA 1 enclosure, 18 gage, Type 304 stainless steel with #4 mill finish. a. Install in riser. 1) Enclosure Includes: a) Adjustable time delay 0-5 minutes b) Magnetic starter with thermal overload and reset station. c) Malfunction alarm, 24 volt, solid state horn and light. d) On-Off indicator lights. e) Manual control for strip heater with Project No. SPECIFICATION GUIDELINES

13 9. Fire Fuel Shutoff: indicator lights. f) Pressure differential horn and light warning system to indicate condition of filters with 110v to 24v transformer. a. Provide for gas services for individual pieces of equipment according to NFPA No.96. 1) Gas solenoid valve shall be equipped with 5 second delay to eliminate instantaneous power interruptions from causing nuisance pilot outages. 2) Entire shutoff system shall be completely pre-wired and pre-plumbed, requiring only one final connection from 120 volt power source in fire extinguishing system relay or micro-switch (STDP, Form C relay when both gas and electric are specified. 3) Provide manual resets for gas and each individual electric connection. a) External solenoid valves, contactors, relays, or shunt trips are not allowed. 10. Duplex Convenience Outlet (DCO): Provide one duplex convenience outlet in end cap at left end of unit. 11. Plumbing: Plumbing compartment shall be isolated from electrical compartment. a. All piping and disconnects in system shall be color-coded. b. Hot and cold water piping including individual branch pipe connections, shall be hard temper type "L" copper tubing with copper sweat type solder fittings. 1) Each branch connection shall be provided with brass double shut-off quick-disconnect assembly of twin wall corrugated hose with built-in stainless steel restraining chain capable of withstanding an in-tension pull of 3,000 lbs., bursting pressure of 5,000 lbs., and crush pressure of 9,000 lbs. 2) Provide Polytec clear coating with encapsulated color-coating. 3) Piping for connection to Item # shall include 1/2" vacuum breakers. Project No. SPECIFICATION GUIDELINES

14 12. Valves and Gauges: a. Provide direct reading combination pressure temperature gauges for incoming services for hot water and cold water. 1) Provide quarter turn ball type shutoff valves for all water main incoming services. 2) Piping shall be connected to individual equipment. b. Hose Bibb: Provide 140 degree hot water threated hose bibb beneath left end of raceway. 13. Gas Piping: a. Black iron pipe with welded threadlets to branch connections and drip tee on service riser. 1) Each branch connection shall be provided with quarter turn steel ball type shutoff valve, cadmium plated steel quick disconnect assembly of twin wall construction, including steel bellows type corrugated hose with built-in restraining chain capable of withstanding an in-tension pill of 3,750 lbs., bursting pressure of 6,000 lbs, and crush pressure of 9,000 lbs. 2) Provide Polytec clear coating with encapsulated color-coding. b. Valves and Gauges: 1) Provide quarter turn ball type shutoff valves for gas incoming services. 2) Provide quarter turn ball type shutoff valves on raceway for gas. 3) Piping shall be connected to individual equipment. 14. Control Center: a. Provide recessed control panel mounted on riser front. b. Control panel shall include duplex convenience outlet with breaker and separate indicator lights numerically coded to indicator lights on each connection plate to show "power-off", fire fuel shutoff with delay, warning light and solid state whistle. Project No. SPECIFICATION GUIDELINES

15 15. Mounting Channels, Brackets, and Miscellaneous Hardware furnished by Utility Distribution System manufacturer. E. Item # ; Utility Distribution System - GREITZER Model "Equipment Disconnect Control", 6 inches wide x 30 inches long x 9 inches high, constructed of 18 gage, Type 304 stainless steel with #4 mill finish. "Disconnect Control" shall mount to finish floor on top of a 9-inch high stainless steel box of matching material, finished width and length. Finished assembly shall fit into cutout in lower shelf of Item # as shown on detail sheet #. 1. NEMA 1 enclosure shall contain point-of-use breaker/disconnect for Items #. 2. Service Requirements: 70 amp, 120/208/60/3PH, 4W. 3. Electrical: a. Provide safety interlock to prevent door from opening unless unit is in "OFF" position. 1) Provide 24 volt constant read, dual color LED status indicator light (GREEN-ON, RED- OFF). b. Provide separate power sensitive ground fault protection devices, with red/green LED light and test button for each piece of connected equipment. 1) Fail-safe Ground Fault System shall sense field current of all phases and shall operate regardless of improper ground connection or ground continuity. 4. Provide receptacles and matching power supply cord sets for each pieces of connected equipment. a. Locate receptacles on rear face of enclosure (facing the center of the table, Item #. 5. Duplex Convenience Outlet (DCO): Provide one duplex convenience outlet (20 amp, 120/1) at left end of rear face. 6. Fire Fuel Shutoff: Consisting of an internal relay trip mechanism in breaker/disconnect which shall interrupt power supply when activated by an external 120v circuit. Project No. SPECIFICATION GUIDELINES

16 2.02 EQUIPMENT (FOOD PREP. LAB.) A. Item # : Utility Distribution System - GREITZER Model, "Power Chain" raceway system 8'-6" long, 6 inches wide x 9 inches high cross section with flat top completely pre-wire and pre-plumbed for final connection for electric, cold water, and waste to serve equipment Items # and one additional duplex convenience outlet (DCO). 1. Unit shall have one pedestal at left end and shall stand alongside of and fit over top of Item #. 2. Service Requirements: 1/2" cold water connection, 1-1/2" air-gap waste, 125 amp, 120/208/60/3PH, 4W. 3. Construction: a. Fixed Riser and raceway extension shall be constructed of 18 gage, Type 304 stainless steel with #4 mill finish. 1) Provide means for attachment to the floor and to the top rear surface of Item #. 2) Set in approved sealant material to provide watertight joints. b. Horizontal electrical compartment shall be bolted (not welded) to the top of inverted channel shaped, horizontal plumbing compartment for ease of removal for access to cold water and waste piping. 1) Provide single piece end cap to cover both electrical and plumbing compartment. c. Riser shall have vertical electrical and plumbing compartments. 4. Electrical: 1) Provide each with full height hinged panels to facilitate final field connection and future maintenance. a. Provide 5 inch x 9 inch, 16 gage stainless steel connection plates at 12 inches on center full length of front face of raceway starting at intersection with riser. 1) As required by Items #, equip Project No. SPECIFICATION GUIDELINES

17 appropriate connection plate with a pointof-use breaker with UL listed knob type watertight actuator and status indicator light. a) Status lights shall be dual color (GREEN-ON, RED-OFF), LED type 24 volt, constant-on. b. Connection plate shall also be equipped with grounding type receptacle and matching power supply cord having specific NEMA polarized configuration and metallic label with permanently lettered electrical characteristics. 1) Where active plates are not called for provide blank plates for future use. c. Provide quick-connect and quick-disconnect means of separating each fire fuel shutoff and on control wiring from the Utility Distribution System. 5. Control Center: a. Provide recessed control panel control mounted in rear face of riser. b. Panel shall include duplex convenience outlet (DCO) with breaker and separate indicator lights numerically coded to indicator lights on each connection plate to show "power off". 6. Plumbing: a. Color-code piping and disconnects in system. b. Cold water and waste piping shall be hard temper type "L" copper tubing with copper sweat type solder fittings and galvanized pipe with threaded fittings respectively. c. Provide cold water connection with brass shutoff quick-disconnect assembly of twin wall corrugated hose with built-in stainless steel restraining chain capable of withstanding an in-tension pull of 3,200 lbs., bursting pressure of 5,000 lbs., and crush pressure of 9,000 lbs. Provide Polytec clear coating with encapsulated color-coding. d. Piping for connection for Item # shall include 1/2" vacuum breaker. 1) Include necessary pipe and fittings for hard Project No. SPECIFICATION GUIDELINES

18 connection of Item # to waste piping. e. Valves and Gauges: 1) Provide direct reading combination pressure temperature gage for incoming service for cold water. 2) Provide quarter turn ball type shut-off valve for incoming water service. 7. Fire Fuel Shut-Off: a. Entire Shut-off System shall be enclosed requiring only one final connection from 120v power source in fire extinguishing system relay or micro-switch. b. Provide manual resets for each individual connection. c. External valves, contactors, relays, or shunt trips are not allowed. PART 3 EXECUTION 3.01 INSTALLATION A. Deliver, assemble, and install Utility Distribution System as specified. 1. Perform assembly and installation under factory authorized supervision. B. Provide drawings to appropriate trades referencing all utility service locations to Utility Distribution System and coordinate final connections. C. Furnish wiring and plumbing diagrams to the Board to facilitate future changes to and/or addition of equipment. D. Connect UL listed power cords with appliance grips to equipment Items # in SPACE and equipment Items # in SPACE. E. Install Utility Distribution System Plumb and level. 1. Provide ells, nipples, reducing fittings, and the like to present a neat appearance and to prevent flexible hoses from touching floor. Project No. SPECIFICATION GUIDELINES

19 F. Connect metal flexible hoses provided with union to Utility Distribution System and to equipment Items # in SPACE and equipment Items # in SPACE. 1. Gas connection assemblies shall be N.P.T. DIA. 3/4" with single disconnects. 2. Provide 2 spare gas connection assemblies N.P.T. DIA. 3/4" with single disconnect. END OF SECTION Project No. SPECIFICATION GUIDELINES

Utility Distribution Systems Installation, Operation, and Maintenance Manual

Utility Distribution Systems Installation, Operation, and Maintenance Manual Utility Distribution Systems Installation, Operation, and Maintenance Manual RECEIVING AND INSPECTION Upon receiving unit, check for any interior and exterior damage, and if found, report it immediately

More information

Utility Distribution System

Utility Distribution System READ AND SAVE THESE INSTRUCTIONS Utility Distribution System Installation, Operation and Maintenance Manual Warning!! Improper installation, adjustment, alteration, service or maintenance can cause property

More information

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work Section 16435 - SWITCHBOARDS Introduction Part 1 - General Related Work Section 16070 Seismic Anchorage and Restraint Section 16075 Electrical Identification Section 16080 Power Distribution Acceptance

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 ENCLOSED SWITCHES AND PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following individually mounted, enclosed switches and circuit breakers rated 600V AC and less: 1. Fusible switches.

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5 DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5 1.1. APPLICABLE PUBLICATIONS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this

More information

Design Standard. Purpose: Design Standard:

Design Standard. Purpose: Design Standard: Design Standard Purpose: This design standard has the purpose of creating a consistent application of motor-control centers throughout the East Side Union High School District, therefore achieving a standard

More information

A. Provide a complete system of overcurrent protective devises as indicated on the drawings, and as specified herein.

A. Provide a complete system of overcurrent protective devises as indicated on the drawings, and as specified herein. 16475 OVERCURRENT PROTECTIVE DEVICES ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 28 16 An optional

More information

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

1. The term withstand means the unit will remain in place without separation of any parts from the device when subjected to the seismic forces. SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fusible switches. 2. Nonfusible switches. 3. Receptacle switches. 4. Shunt trip switches. 5.

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS SPEC WRITE NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

SECTION AIR TERMINAL UNITS

SECTION AIR TERMINAL UNITS SECTION 23 36 00 AIR TERMINAL UNITS PART 1 - GENERAL 1.1 SUMMARY A. Section includes constant volume terminal units, variable volume terminal units, dual duct terminal units, fan powered terminal units,

More information

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types: SECTION 262913 600 VOLT ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification

More information

A. This Section includes the following domestic water piping specialties:

A. This Section includes the following domestic water piping specialties: SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following domestic water piping specialties: 1. Backflow preventers. 2. Water pressure-reducing

More information

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards 1 General 1.1 Switchboards shall be U.L. listed and labeled. 1.2 Each switchboard shall have its own main disconnecting means unless it is located in the same room as its source of origin. In most cases

More information

SECTION WIRING DEVICES

SECTION WIRING DEVICES SECTION 16140 - WIRING DEVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

IN2 Enclosed Switches and Circuit Breakers

IN2 Enclosed Switches and Circuit Breakers Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Enclosed Switches and Circuit Breakers Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

A. Products shall be designed, manufactured, tested, and installed in compliance with the following standards:

A. Products shall be designed, manufactured, tested, and installed in compliance with the following standards: SECTION 26 29 13 ENCLOSED MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

SECTION HVAC CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY. A. Section Includes:

SECTION HVAC CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY. A. Section Includes: SECTION 15970 HVAC CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Thermostats, temperature transmitters, controllers, automatic valves, dampers, damper operators, pneumatic/ electric

More information

University of Houston Master Construction Specifications Insert Project Name SECTION ELECTRONIC VARIABLE SPEED DRIVES PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION ELECTRONIC VARIABLE SPEED DRIVES PART 1 - GENERAL SECTION 23 04 10 ELECTRONIC VARIABLE SPEED DRIVES PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Applications. Trim are flat gauge steel per code. Standard painted finish ANSI 61 gray. Directory card with plastic cover on front of trim

Applications. Trim are flat gauge steel per code. Standard painted finish ANSI 61 gray. Directory card with plastic cover on front of trim Applications The CDP panels provide protection for lightning and power distribution circuits in the commercial and industrial establishments. The circuit breakers thermomagnetic trip allows for momentary

More information

A. Motors shall be designed, built, and tested in accordance with the latest revision of the following standard documents.

A. Motors shall be designed, built, and tested in accordance with the latest revision of the following standard documents. PART 1: GENERAL 1.01 This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is to apply the

More information

SECTION MOTOR CONTROL

SECTION MOTOR CONTROL SECTION 26 24 19 MOTOR CONTROL PART 1 - GENERAL 1.1 SECTION INCLUDES A. Manual motor starters B. Magnetic motor starters C. Combination magnetic motor starters D. Solid-state reduced voltage motor starters

More information

MECHANICAL AND ELECTRICAL COORDINATION SECTION MECHANICAL AND ELECTRICAL COORDINATION PART 1 - GENERAL

MECHANICAL AND ELECTRICAL COORDINATION SECTION MECHANICAL AND ELECTRICAL COORDINATION PART 1 - GENERAL 13686.00 MECHANICAL AND ELECTRICAL COORDINATION 230002-1 SECTION 230002 MECHANICAL AND ELECTRICAL COORDINATION 1.1 WORK INCLUDED PART 1 - GENERAL A. Work Included in This Section: Materials, equipment,

More information

WARREN COUNTY, N.Y. M/E REFERENCE

WARREN COUNTY, N.Y. M/E REFERENCE SECTION 262000 - ELECTRIC DISTRIBUTION PART 1 - GENERAL 1.1 DESCRIPTION A. Provide a complete secondary distribution system as indicated on the Contract Documents and as specified herein. 1.2 QUALITY ASSURANCE

More information

East Central College

East Central College SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 WORK INCLUDES A. Base and Alternate Bids: 1. Contractor Provide: a. Wall switches. b. Receptacles c. Device plates and decorative box covers. 1.2 RELATED

More information

SECTION (15444) - DOMESTIC WATER PACKAGED BOOSTER PUMPS

SECTION (15444) - DOMESTIC WATER PACKAGED BOOSTER PUMPS SECTION 22 11 23.13 (15444) - DOMESTIC WATER PACKAGED BOOSTER PUMPS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Packaged Domestic Water Booster Pumps B. Related Sections: 1.02 REFERENCES 1. Section

More information

MAGNETIC MOTOR STARTERS

MAGNETIC MOTOR STARTERS Chapter 6 MAGNETIC MOTOR STARTERS 1 The basic use for the magnetic contactor is for switching power in resistance heating elements, lighting, magnetic brakes, or heavy industrial solenoids. Contactors

More information

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION MOTOR REQUIREMENTS for HVAC

SECTION MOTOR REQUIREMENTS for HVAC PART 1 GENERAL 1.1 SECTION INCLUDES A. Single-phase electric motors B. Three-phase electric motors 1.2 REFERENCES SECTION 23 05 13 MOTOR REQUIREMENTS for HVAC A. ABMA 9 - Load Ratings and Fatigue Life

More information

A. This Section includes the following types of sectional overhead doors:

A. This Section includes the following types of sectional overhead doors: SECTION 08361 - SECTIONAL OVERHEAD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

VERTICAL LIFT FIRE/BLAST DOORS

VERTICAL LIFT FIRE/BLAST DOORS International Door, Inc. 8001 Ronda Drive Canton, MI 48187 (800) 231-9521 Website: www.international-door.com Sales Dept. E-Mail: sales@international-door.com Engineering Dept. E-Mail: engineering@international-door.com

More information

Mipco Connections for Refrigerated Containers. No One Does It Like Mipco. The Mipco. Advantage. Reliability. Safety. Easy Installation & Service

Mipco Connections for Refrigerated Containers. No One Does It Like Mipco. The Mipco. Advantage. Reliability. Safety. Easy Installation & Service No One Does It Like Mipco Mipco Interlocked Reefer Power Outlets are used extensively in port terminals and shipboard applications to provide a safe, watertight electrical connection for refrigerated containers.

More information

Specification Number: Product Name: GROUP MOUNTED MAIN FUSIBLE SWITCH, GROUP MOUNTED BRANCH FUSIBLE SWITCH (LONG) SECTION

Specification Number: Product Name: GROUP MOUNTED MAIN FUSIBLE SWITCH, GROUP MOUNTED BRANCH FUSIBLE SWITCH (LONG) SECTION Specification Number: 26 24 13.20 Product Name: GROUP MOUNTED MAIN FUSIBLE SWITCH, GROUP MOUNTED BRANCH FUSIBLE SWITCH (LONG) SECTION 26 24 13.20 SWITCHBOARDS (Long) Main Disconnect Group Mounted Fusible

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION MOTORS, STARTERS & DRIVES

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION MOTORS, STARTERS & DRIVES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Coordinate starter needs for mechanical equipment prior to 50% CD and confirm again for 100% CD submittal. B. Coordinate temperature controls requirements

More information

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse Power Pedestal

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse Power Pedestal DRILL \ PUNCH OUT TO SIZE REQUIRED DRILL \ PUNCH OUT TO SIZE REQUIRED Lighthouse Power Pedestal - Specifications Lighthouse Power Pedestal Dimensions Height: 44.00" (1117.60 mm) Width: 13.67" (347.22 mm)

More information

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS DIVISION 26 ELECTRICAL SECTION 26 28 19 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install circuit breakers in switchboards, distribution panelboards, and separate enclosures for overcurrent protection

More information

General Specifications for Lighthouse Power Pedestal

General Specifications for Lighthouse Power Pedestal Dimensions Height: 44.00 11 (1117.60 mm) Width: 13.67" (347.22 mm) Depth: 13.75" (349.25 mm) Lighthou98 Base Diagram ---13,75 1 --- Approximate Weight: 30 lbs. (13.6 kg) Multiply base dimensions by 25.4

More information

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS SECTION 22 1123.13 DOMESTIC-WATER PACKAGED BOOSTER PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

University of Delaware

University of Delaware SECTION 23 36 00 _ SUMMARY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Constant/Variable volume supply terminal units. 2. Fan powered terminal units. 3. Exhaust valves B. Related Sections: Section

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS SECTION 16420 ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SOUND-RETARDANT- VERTICAL LIFT DOORS

SOUND-RETARDANT- VERTICAL LIFT DOORS International Door, Inc. 8001 Ronda Drive Canton, MI 48187 (800) 231-9521 Website: www.international-door.com Sales Dept. E-Mail: sales@international-door.com Engineering Dept. E-Mail: engineering@international-door.com

More information

SECTION VARIABLE FREQUENCY DRIVE UNITS

SECTION VARIABLE FREQUENCY DRIVE UNITS SECTION 26 29 23 PART 1 - GENERAL 1.1 THE REQUIREMENT A. General: The CONTRACTOR shall provide variable frequency drive (VFD) units, complete and operable, in accordance with the Contract Documents. It

More information

1. Division 26 Section "Elevator Shunt-Trip Fused Disconnect Switches".

1. Division 26 Section Elevator Shunt-Trip Fused Disconnect Switches. SECTION 26 28 16 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail

More information

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV) SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products for utilities

More information

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (38KV) SUBSTATION VACUUM CIRCUIT BREAKER (38KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products for utilities

More information

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV) SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products

More information

Installation, Operation and Maintenance Manual

Installation, Operation and Maintenance Manual Document 470404 Model XM Installation, Operation and Maintenance Manual Please read and save these instructions for future reference. Read carefully before attempting to assemble, install, operate or maintain

More information

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified.

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified. SECTION 26 24 13 LOW VOLTAGE SWITCHBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

PDI PowerWave 2 Bus System

PDI PowerWave 2 Bus System 1 GENERAL 1.1 Summary This specification covers the electrical characteristics and general requirements for a continuous opening, low voltage, vertical or horizontal power busway distribution system. System

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES TSEWG TP-11: UFC 3-500-10N BEST PRACTICES UFC 3-500-10N was developed by NAVFAC and was used as the starting point for the tri-services development of UFC 3-500-10, Design: Electrical Engineering. UFC

More information

SECTION DISTRIBUTION AND GROUNDING

SECTION DISTRIBUTION AND GROUNDING SECTION 16400 DISTRIBUTION AND GROUNDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Furnishing and installation of a complete electrical distribution and grounding system. B. Furnish and install motor control

More information

SECTION HYDRAULIC FOUR FOLD DOORS MODEL 48 LOUVERS

SECTION HYDRAULIC FOUR FOLD DOORS MODEL 48 LOUVERS SECTION 08350 HYDRAULIC FOUR FOLD DOORS MODEL 48 LOUVERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1

More information

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery Alpha System ADAPTABLE LABORATORY FURNITURE KEWAUNEE encouraging new discovery Alpha 6 partition modules with Kemresin worktops. Minneapolis, Minnesota Alpha 6 partition modules with Alpha overhead service

More information

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems.

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems. Issued 2005/06/01 Section 15440 Plumbing Pumps Page 1 of 9 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3 Section 01780 Closeout

More information

BUSWAY Low Voltage (Pow-R-Flex)

BUSWAY Low Voltage (Pow-R-Flex) BUSWAY LOW VOLTAGE (POW-R-FLEX) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein and

More information

Multi-Pak Group Control

Multi-Pak Group Control Multi-Pak Grouping.1 Product....................................... Application.................................... Features Enclosures........................................... V-T-2 V-T-2 V-T-2 Feeder

More information

A. Provide variable frequency drives to operate variable torque loads as shown on the Drawings and as specified herein.

A. Provide variable frequency drives to operate variable torque loads as shown on the Drawings and as specified herein. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 90 71 PART 1 GENERAL 1.01 DESCRIPTION A. Provide variable frequency drives to operate variable torque loads as shown on the Drawings

More information

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL EFFECTIVE JANUARY 10, 2018 Superseding All Previous Parts Lists. The Company reserves the right to make substitution

More information

Quik-Spec Coordination Panelboard Specifications

Quik-Spec Coordination Panelboard Specifications Quik-Spec Coordination Panelboard Specifications 30A - 400A Fusible Panelboards SECTION 26 24 XX (This Specification references CSI MasterFormat 2004) FUSIBLE BRANCH CIRCUIT PANELBOARDS PART 1 1.01 SUMMARY

More information

ELITE SERIES R-410A Ready - Multi-Position

ELITE SERIES R-410A Ready - Multi-Position PRODUCT SPECIFICATIONS AIR HANDLERS CBXM ELITE SERIES R-0A Ready - Multi-Position Bulletin No. 0 October 07 Supersedes June 0 Nominal Capacity -. to Tons Optional Electric Heat -. to 0 kw MODEL NUMBER

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear 13 Low Voltage Switchgear Siemens Type WL low voltage metal-enclosed switchgear is designed, constructed and tested to provide superior power distribution, power monitoring and control. At the heart of

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

Electric Coil [Make-Up Air / Displacement Ventilation / Space Heating] System

Electric Coil [Make-Up Air / Displacement Ventilation / Space Heating] System V-Series (rev. 08/17/10) Electric Coil [Make-Up Air / Displacement Ventilation / Space Heating] System Note: Optional items and/or items requiring a choice, are shown between brackets and/or parentheses

More information

A. This Section includes natural gas piping, specialties, and accessories within the building.

A. This Section includes natural gas piping, specialties, and accessories within the building. SECTION 226313 NATURAL GAS PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION MOTOR CONTROLLERS

SECTION MOTOR CONTROLLERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 11 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // ---- // if not applicable to project. Also, delete any other item or paragraph

More information

Three-Phase Pole Mounted Recloser

Three-Phase Pole Mounted Recloser Three-Phase Pole Mounted Recloser Page 1 of 8 Table of Contents 1 GENERAL... 3 2 CONSTRUCTION... 3-5 3 BUSHINGS... 5 4 LINE CONNECTOR... 5 5 TOOLS....5 6 NAMEPLATES..6 7 PAINT... 6 8 EXTERNAL HARDWARE

More information

SECTION COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

SECTION COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Single phase electric motors. B. Three phase electric motors. 1.2 REFERENCE STANDARDS A. ABMA STD 9

More information

I N ST R UC T I ON MODEL 5614 MEAT SAW MODEL ML (Starting Serial Number ) FORM Rev. A (11-95) MEAT SAWS

I N ST R UC T I ON MODEL 5614 MEAT SAW MODEL ML (Starting Serial Number ) FORM Rev. A (11-95) MEAT SAWS I N ST R UC MEAT SAWS T I ON S MODEL 5614 MEAT SAW MODEL 5614 ML-19553 (Starting Serial Number 27-128-712) EXECUTIVE OFFICES 701 RIDGE AVENUE TROY, OHIO 45374-0001 FORM 16992 Rev. A (11-95) Installation,

More information

WARREN COUNTY, N.Y. M/E REFERENCE A. Submit manufacturer's product data on all motors and adjustable speed drives.

WARREN COUNTY, N.Y. M/E REFERENCE A. Submit manufacturer's product data on all motors and adjustable speed drives. SECTION 230513 - MOTORS AND ADJUSTABLE SPEED DRIVES PART 1 - GENERAL 1.1 DESCRIPTION A. Provide labor, materials, equipment and services as required for the complete installation designed in Contract Documents.

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 SPECIFICATIONS FOR A 19 INCH RACK BASE MOUNT (HEATER/AC) (ENVIRONMENTAL FIELD TERMINAL CABINET) N. J. Specification No. Effective

More information

SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM

SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM 1.0 GENERAL 1.1 DESCRIPTION A. Manufacturer shall furnish an aeration system capable of providing more equal distribution of oxygenated water throughout

More information

SECTION MOTOR CONTROLLERS

SECTION MOTOR CONTROLLERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 11 MOTOR CONTROLLERS SPEC WRITER NOTE: Delete between // ---- // if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

SOLAR HEATING SYSTEM

SOLAR HEATING SYSTEM SECTION 13600 SOLAR HEATING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07600 - Flashing and Sheet Metal. 2. 07900 - Joint Sealers. 3. 15260 - Thermal Insulation (Plumbing). 4. 15410 - Piping

More information

Construct Compressed Air Building Near Bldg SECTION OVERHEAD COILING DOORS 07/07

Construct Compressed Air Building Near Bldg SECTION OVERHEAD COILING DOORS 07/07 SECTION 08 33 23 OVERHEAD COILING DOORS 07/07 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

I N ST R UC T I ON MODEL 6801 MEAT SAW MODEL 6801 ML Previous models covered by this manual: 6801 ML

I N ST R UC T I ON MODEL 6801 MEAT SAW MODEL 6801 ML Previous models covered by this manual: 6801 ML I N ST R UC T I ON S MODEL 6801 MEAT SAW MODEL 6801 ML-134094 Previous models covered by this manual: 6801 ML-104948 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 937 332-3000 www.hobartcorp.com FORM 34405

More information

MULTI 9 System Catalog IEC Rated C60N/H/L Circuit Breakers

MULTI 9 System Catalog IEC Rated C60N/H/L Circuit Breakers IEC Rated C60N/H/L Circuit Breakers Standard Features Fast Closing Allows increased withstand to the high inrush currents of some loads Trip-free mechanism: Contacts cannot be held in the on position when

More information

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH 331-SV User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER Ashland, OH 800-363-5842 WWW.PRIMEXCONTROLS.COM Warranty void if panel is modified. Call factory with servicing

More information

SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM

SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM 1.0 GENERAL 1.1 DESCRIPTION A. Manufacturer shall furnish an aspirating directional aerator (aspirator) or a high-flow directional aerator

More information

Duplex Jobsite Wired Basin Package Non-Sparking Stainless Rail Non-Sparking, Class I, Group D, Division 1, with Steel Cover

Duplex Jobsite Wired Basin Package Non-Sparking Stainless Rail Non-Sparking, Class I, Group D, Division 1, with Steel Cover www.cranepumps.com Duplex Jobsite Wired Basin Package Non-Sparking Stainless Rail Non-Sparking, Class I, Group D, Division 1, with Steel Cover Pre-Packaged Fiberglass Systems Specifications: inches (mm)

More information

Continuing Education Course #206 Introduction to Designing Machine Control Systems Part 2

Continuing Education Course #206 Introduction to Designing Machine Control Systems Part 2 1 of 5 Continuing Education Course #206 Introduction to Designing Machine Control Systems Part 2 1. Continuing to answer the following questions indicates that you understands that the presented material

More information

A. This section includes unit capacitors for power factor correction.

A. This section includes unit capacitors for power factor correction. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

SECTION ELECTRIC MOTOR ACTUATORS FOR VALVES

SECTION ELECTRIC MOTOR ACTUATORS FOR VALVES SECTION 40 92 10 - ELECTRIC MOTOR ACTUATORS FOR VALVES PART 1 - GENERAL A. Description This section includes materials and installation of electric motor actuators for valves. B. Submittals 1. Submit shop

More information

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse-SS Power Pedestals

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse-SS Power Pedestals Lighthouse-SS Power Pedestal Dimensions Height: 44.00" (1117.60 mm) Width: 9.565" (242.95 mm) Depth: 9.875" (250.83 mm) Lighthouse-SS Base Diagram Ø0.50" MOUNTING HOLE (TYP.) 9.5625" 8.0625" 7.3125" C:\Documents

More information

Climas y Proyectos Leyco, S.A. de C.V.

Climas y Proyectos Leyco, S.A. de C.V. GENERAL DESCRIPTION : FURNISH AND INSTALL MULTI COMPONENT ROOF MOUNTED LEYCO, MODEL CAH CUSTOM AIR HANDLER MADE SELF-CONTAINED, WEATHER RESISTANT, AIR HANDLING UNITS PER MODEL NUMBER, AND PERFORMANCE DATA

More information

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION Medium Voltage Standby non-paralleling Control 1. GENERAL GUIDE FORM SPECIFICATION A. The requirements of the contract, Division 1, and part 16 apply to work in this section. 1.01 SECTIONS INCLUDE A. Medium

More information

A I R H A N D L E R S CB26UH-R. MERIT Series R-22 - Upflow / Horizontal P R O D U C T S P E C I F I C AT I O N S

A I R H A N D L E R S CB26UH-R. MERIT Series R-22 - Upflow / Horizontal P R O D U C T S P E C I F I C AT I O N S P R O D U C T S P E C I F I C AT I O N S A I R H A N D L E R S CB6UH-R MERIT Series R- - Upflow / Horizontal Bulletin No. 1067 April 01 Supersedes January 01 Nominal Capacity - 1.5 to 5 Tons Optional Electric

More information

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less. PART 1: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other

More information

CONTROLLIX CORPORATION CONTROLLIX.COM LOW VOLTAGE AUTOMATIC SWITCH CAPACITOR BANK SPECIFICATIONS

CONTROLLIX CORPORATION CONTROLLIX.COM LOW VOLTAGE AUTOMATIC SWITCH CAPACITOR BANK SPECIFICATIONS LOW VOLTAGE AUTOMATIC SWITCH CAPACITOR BANK SPECIFICATIONS I. SCOPE a. This specification describes the necessary requirements for the design, fabrication, and operation of automatically switched, low

More information

Lighthouse Power Pedestals,

Lighthouse Power Pedestals, Lighthouse Power Pedestal One of our most popular units, the all-purpose Lighthouse pedestal has a wide range of features. With units in service around the world, this stylish power pedestal is recognized

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Vertical Hollowshaft Electric Motors C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Vertical Hollowshaft Electric Motors C O N T E N T S Revised 04/14/2016 SPECIFICATIONS - DETAILED PROVISIONS Section 16151 - Vertical Hollowshaft Electric Motors C O N T E N T S PART 1 - GENERAL... 1 1.01 SCOPE... 1 1.02 SPECIFIC PROJECT REQUIREMENTS...

More information