An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

Size: px
Start display at page:

Download "An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling"

Transcription

1 An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

2 How is a Dual Gradient Achieved with the DBDG Process? Heavier downhole mud weight is pumped down drillstring, through bit, and into annulus. At injection point (i.e., usually bottom of riser), a lighter density dilution mud is injected into annulus at a fixed dilution ratio. Downhole and dilution muds combine at injection point, resulting in column of diluted mud weight above injection point. Diluted mud is returned to rig and, in a continuous process, separated by specialized centrifuges back into downhole and dilution mud weight components. 2

3 Simplified DBDG Circulating Process Surface Diluted Mud Riser SHAKERS CENTRIFUGE SEPARATION Heavy Weight Discharge Injection Point Dilution Mud Boost Line Light Weight Discharge Annulus below Wellhead Downhole, Dilution, and Diluted muds are all the same fluid, only with varying concentrations of barite. Downhole Mud Drillstring 3

4 How Do Dilution-based and Pumpbased Dual Gradient Systems Differ? Dilution-based Dual Gradient (DBDG) Pump-based Dual Gradient (PBDG) Well Design Fewer casing strings compared to single gradient design. Casing points may vary between DBDG and PBDG based on respective pressure profiles. Wellhead Hydrostatic Pressure Diluted Riser Mud Hydrostatic Usually Seawater Hydrostatic Location of Inflection (Injection) Point At seafloor, or potentially sub-mudline At seafloor Location of Complex Componentry At surface At seafloor 4

5 Basic Dual Gradient Concept Pressures and Gradients PBDG: Inflection point at seafloor To achieve 12.5ppg equivalent mud weight at 20,000ft, the PBDG system would require a 16.5ppg mud below the seabed (at 10,000ft), with seawater hydrostatic at the wellhead. 5

6 Basic Dual Gradient Concept Pressures and Gradients DBDG: Inflection (injection) point at seafloor To achieve 12.5ppg equivalent mud weight at 20,000ft, the DBDG system could use a 14.5ppg mud below the wellhead (at 10,000ft), with a diluted 10.5ppg mud weight in the riser above the wellhead. 6

7 Dual Gradient Concept with Sub-Mudline Injection Pressures and Gradients DBDG w/ SMLI: Inflection (injection) point moved, e.g., to surface casing shoe To achieve 12.5ppg equivalent mud weight at 20,000ft, the DBDG system could use a 16.5ppg mud below the sub-mudline injection point (at 13,300ft), with a diluted 10.5ppg mud weight above the injection point. 7

8 DBDG vs. Single Gradient Well Design Well Design Considerations Not all casing seats determined solely by PP/FG/MW inter-relationship. Isolation of stray hydrocarbon zones. Maintaining adequate kick tolerance. Maintaining multiple barriers between reservoir and the world. Contingency planning. Completions design. 8

9 DBDG vs. PBDG Well Design 9

10 DBDG vs. PBDG Well Design Depleted Sand 10

11 DBDG w/ SMLI vs. DBDG Well Design 11

12 DBDG Circulating System Using Surface BOP Stack (Not Shown) DRILLSTRING DEGASSER SHALE SHAKERS INJECTION STRING CENTRIFUGES MUD PITS MUD PITS MUD PITS MUD PUMPS DILUTION MUD = LIGHT WEIGHT DISCHARGE FLOW STOP VALVE DOWNHOLE MUD = HEAVY WEIGHT DISCHARGE DILUTED MUD = MIX MUD = FEED MUD 12

13 DBDG Circulating System Using Subsea BOP Stack DRILLSTRING DEGASSER SHALE SHAKERS BOOST LINE MARINE RISER CENTRIFUGES CHOKE LINE KILL LINE SUBSEA BOP MUD PITS MUD PITS MUD PITS MUD PUMPS DILUTION MUD = LIGHT WEIGHT DISCHARGE FLOW STOP VALVE DOWNHOLE MUD = HEAVY WEIGHT DISCHARGE DILUTED MUD = RISER MIX MUD = FEED MUD 13

14 CAPM (Continuous Annular Pressure Management) System 14

15 CAPM Circulating System DRILLSTRING PDP PDIL CONVENTIONAL FLOWLINE PRCD ROTATING CONTROL DEVICE SHALE SHAKERS INNER RISER DRILLING CHOKE MANIFOLD CORIOLIS FLOWMETER DEGASSER MARINE RISER PCHOKE PRISER BOOSTER LINE CENTRIFUGES CHOKE LINE KILL LINE MUD PITS MUD PITS MUD PITS PBOP SUBSEA BOP MUD PUMPS FLOW STOP VALVE PPWD DILUTION MUD = LIGHT WEIGHT DISCHARGE DOWNHOLE MUD = HEAVY WEIGHT DISCHARGE DILUTED MUD = RISER MIX MUD = FEED MUD 15

16 Customized DBDG Centrifuge 16

17 Customized DBDG Centrifuge 17

18 DGS / TO Centrifuge Testing Flottweg Centrifuge Testing Results SOBM Drilling Fluid G Force, in/sec 2 Feed Rate, gpm Diluted Feed MW, ppg Downhole Heavy MW, ppg Dilution Light MW, ppg Dilution Rate, Q Light / Q Heavy Min - Ave - Max 90/10 OWR /19 OWR, no LCM 81/19 OWR, w/ LCM Downhole, Dilution, and Diluted muds are all the same fluid, only with varying concentrations of barite. 18

19 DGS Flow Stop Valve 19

20 Dual Gradient Drilling FSV U-Tube Arrested with Pumps Off Upstream - Drillstring with Downhole Mud Downstream - BHA and Drill Bit U-tube Pressure Resisted by Spring Forces 20

21 Dual Gradient Drilling FSV Bringing on Pumps Through Choke Pump Pressure + U-Tube Overcome Spring Force Flow is Restricted to Provide Main Piston Opening Pressure 21

22 Dual Gradient Drilling FSV Main Valve Opened for Normal Drilling Choke is Bypassed once Main Valve Opens 22

23 Dual Gradient Drilling FSV Valve Closes Once Pumps Off Upstream - Drillstring with Downhole Mud Downstream - BHA and Drill Bit 23

24 Thank You

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment.  REV 1c : The cost effective solution for efficient deep water drilling in mild environment. REV 1c Concept The ED concept was born from the experiences of the Unocal 76 Deepwater Asia Team from 1997-2005. The

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

PIPELINES (Last update - February 2004)

PIPELINES (Last update - February 2004) PIPELINES (Last update - February 2004) Note: 1. The PINC s L-102 through L-143 address DOI regulated offshore pipelines, only. 2. During pipeline inspections, the API RP 14C SAC reference must be verified

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

Subsurface Flow Controls

Subsurface Flow Controls Subsurface Flow Controls Subsurface Flow Controls Landing Nipples X, R, RPT, FBN Lock Mandrels and accessories Nippleless Tubing Plugs - Mirage plug, Monolock DuraSleeve Sliding Side-Door circulating device

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

New Technology Concept. Thru-Tubing Multiple Conduit Super Abrasive Filament Cutter

New Technology Concept. Thru-Tubing Multiple Conduit Super Abrasive Filament Cutter New Technology Concept Thru-Tubing Multiple Conduit Super Abrasive Filament Cutter This page intentionally left blank 2 www.oilfieldinnovations.com June 2017 Abrasive Strand Filament Cutter for Tubular

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

INTRODUCTION TO GEOTHERMAL DRILLING

INTRODUCTION TO GEOTHERMAL DRILLING Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

Methods and Tools of Killing an Uncontrolled Oil-Gas Fountain Appearing After an Explosion of an Offshore Oil Platform "

Methods and Tools of Killing an Uncontrolled Oil-Gas Fountain Appearing After an Explosion of an Offshore Oil Platform Methods and Tools of Killing an Uncontrolled Oil-Gas Fountain Appearing After an Explosion of an Offshore Oil Platform " Authors: Dr. S. Tseytlin, D. Tseytlin Relevance of the topic and scope of the invention

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Well Completions. Thursday, 4 July 13

Well Completions. Thursday, 4 July 13 Well Completions Well Completions Well Completions Components and Functionality Components and Functionality Components and Functionality Xmas Tree & Wellhead Open-Hole Completion Open-Hole Completion

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

ISOLATION/UNIVERSAL TOOLS

ISOLATION/UNIVERSAL TOOLS ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy

More information

TABLE OF CONTENTS. About Pruitt. MPD Coriolis Meter. Vent Flare Stack. Drill Thru Degasser. Process Flow Diagram PRCD High Pressure Series RCDs

TABLE OF CONTENTS. About Pruitt. MPD Coriolis Meter. Vent Flare Stack. Drill Thru Degasser. Process Flow Diagram PRCD High Pressure Series RCDs 375 Q1-387 TABLE OF CONTENTS About Pruitt 1 MPD LiteTM Modular Choke Manifold 2 MPD Coriolis Meter 4 Vent Flare Stack 4 Drill Thru Degasser 5 Process Flow Diagram 6 PRCD 316 7 High Pressure Series RCDs

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Delivering innovation through engineering

Delivering innovation through engineering Delivering innovation through engineering +44 1224 727480 Completions & Work-over Operations Bore Selector gives access to either the main production bore or annulus in a traditional vertical xmas tree,

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Health, Safety and Environment: Product Performance: Proven Quality: Presence: Client Focus: Tried and Tested:

Health, Safety and Environment: Product Performance: Proven Quality: Presence: Client Focus: Tried and Tested: Wenzel Downhole Tools is the leading motor and drilling tool supplier, with worldwide operations supporting the oilfield and construction industries. Wenzel s capability to engineer, manufacture and service

More information

12/08/2015. Introduction to Subsea Production Systems. Template and manifold. 05 Templates and Manifolds OIL & GAS. DNV GL 2013 August 2015

12/08/2015. Introduction to Subsea Production Systems. Template and manifold. 05 Templates and Manifolds OIL & GAS. DNV GL 2013 August 2015 OIL & GAS Introduction to Subsea Production Systems 05 Templates and Manifolds August 2015 1 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Template and manifold 2 1 Goal Know the purpose and design requirements

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

Pi PK Information Document

Pi PK Information Document Pi PK - 500 Information Document CONTENTS RIG TECHNICAL SPECIFICATION...1 RIG STORAGE CAPACITIES... 1 DIESEL FUEL...1 POWER PLANT... 1 MAIN POWER GENERATOR SYSTEM...1 ELECTRICAL LIGHTING SYSTEM...2 EMERGENCY

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

REDA Coil. Coiled tubing-deployed ESP system

REDA Coil. Coiled tubing-deployed ESP system REDA Coil Coiled tubing-deployed ESP system Alternative ESP Deployment Method Minimizes Costs and Deferred Production Conventional ESP systems are conveyed by production tubing and require workover rigs

More information

SERVICE & OPERATING MANUAL

SERVICE & OPERATING MANUAL SERVICE & OPERATING MANUAL 8-4 Mud Cleaner (03-00-060) INTRODUCTION The Triflo 8-4 Mud Cleaner is capable of processing up to 520 gallons per minute and can get do to cut point of approximately 35 microns.

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

The Lease Pumper s Handbook CHAPTER 8 HYDRAULIC LIFT

The Lease Pumper s Handbook CHAPTER 8 HYDRAULIC LIFT 8-i The Lease Pumper s Handbook CHAPTER 8 HYDRAULIC LIFT A. Introduction to Hydraulic Lift 1. Principles of Hydraulic Lift. 2. Designing and Installing Hydraulic Lift Systems at the Wellhead. 3. The Insert

More information

Land Drilling Packages Integrated, standardized solutions for efficient operations

Land Drilling Packages Integrated, standardized solutions for efficient operations Land Drilling Packages Integrated, standardized solutions for efficient operations Maximize Drilling Efficiency with a Comprehensive Solution Maximum uptime means lower total cost of ownership and greater

More information

Flo-Line Cleaner 2000 Component Shaker System. Part of the Flo-Line Cleaner Series

Flo-Line Cleaner 2000 Component Shaker System. Part of the Flo-Line Cleaner Series Flo-Line Cleaner 2000 Component Shaker System Part of the Flo-Line Cleaner Series Derrick uses only the highest quality materials in the manufacturing of the FLC 2000. Super G motors are built with high

More information

HOFIM Technology. Oil-free compression systems

HOFIM Technology. Oil-free compression systems HOFIM Technology Oil-free compression systems HOFIM the result of a decade of technology pioneering For more than a decade, MAN Diesel & Turbo has pioneered the development of turbocompressor systems using

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this

More information

Minimizing risk with innovative design. Dual ESP Systems and Accessories

Minimizing risk with innovative design. Dual ESP Systems and Accessories Minimizing risk with innovative design Dual ESP Systems and Accessories Dual ESP Systems When you need to improve the performance of your high-asset-value wells, Schlumberger dual ESP systems provide the

More information

FLC 503 and 504 Component Shaker System

FLC 503 and 504 Component Shaker System FLC and Component Shaker System Part of the Flo-Line Cleaner Series A Price Sensitive 7.0 G Linear Motion Shale Shaker Derrick uses only the highest quality materials in the manufacturing of the Flo-Line

More information

DrillSafe Fluids Management and Bulk Mixer Inc.

DrillSafe Fluids Management and Bulk Mixer Inc. DrillSafe Fluids Management and Bulk Mixer Inc. Present The Technology of Drilling Fluids Bulk Mixing and Material Handling IADC Spark Tank December 12, 2018 DrillSafe Fluids Management Mission: Provide

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

MPD Manifold 4 x psi with Integrated Control System and Coriolis Flowmeter

MPD Manifold 4 x psi with Integrated Control System and Coriolis Flowmeter MPD Manifold 4 x 6 2000psi with Integrated Control System and Coriolis Flowmeter The MTC Managed Pressure Drilling (MPD) manifold has been designed to automatically maintain the annulus surface back pressure

More information

Powered Rotary Steerable System Technology

Powered Rotary Steerable System Technology Powered Rotary Steerable System Technology B.Antony Fayaz 1,Govindan.S 2 1,2 Department of Petroleum Engineering, AMET University, Chennai -603112 Abstract: As the demand of hydrocarbons are growing high

More information

Applied Technology and Best Practices in CEE. Conference. Budapest, 17 November Society of Petroleum Engineers

Applied Technology and Best Practices in CEE. Conference. Budapest, 17 November Society of Petroleum Engineers Applied Technology and Best Practices in CEE Conference Budapest, 17 November 2011 Society of Petroleum Engineers 1 APPLIED TECHNOLOGY AND BEST PRACTICES IN CEE 17 th of November 2011 Budapest, Hungary

More information

Setting a Global Standard. Rapid-dePloy Marine Drilling System

Setting a Global Standard.   Rapid-dePloy Marine Drilling System Setting a Global Standard www.dril-quip.com Rapid-dePloy Marine Drilling System Dril-quip s Rapid-dePloy Marine Drilling Systems A s the offshore oil industry ventures into deeper water and greater well

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Hydraulic rig for marginal fields: Design and use of the G-125

Hydraulic rig for marginal fields: Design and use of the G-125 Hydraulic rig for marginal fields: Design and use of the G-125 Bruno Pini, Saipem SpA THE LAST FEW YEARS have produced major changes and innovations in technology to answer today s challenge: how to provide

More information

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill 2 1 /8 in Neyrfor TTT Thru Tubing Turbodrill In 1956, the first Neyrfor turbodrill was developed. Today, Neyrfor turbodrilling systems have become more advanced and power-efficient than ever before. Based

More information

TMK QUANTUM Infinity. Unlimited Stage Fracturing System COMPLETIONS

TMK QUANTUM Infinity. Unlimited Stage Fracturing System COMPLETIONS TMK QUANTUM Infinity Unlimited Stage Fracturing System COMPLETIONS TMK QUANTUM Infinity TMK QUANTUM Infinity ball-actuated sliding sleeve system utilizes a revolutionary, patent pending electronic counter

More information

W I L D W E L L C O N T R O L COILED TUBING

W I L D W E L L C O N T R O L COILED TUBING COILED TUBING Coiled Tubing Learning Objectives You will learn about types of coiled tubing rigs. You will learn best practices and techniques for conducting coiled tubing operations. You will learn the

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

RODEC "C" Low Profile Rotator / RODEC "C" Integral Rotator (3 in 1)

RODEC C Low Profile Rotator / RODEC C Integral Rotator (3 in 1) We have been providing effective tubing wear solutions for over 70 years. Whether using rod pumping units or progressing cavity downhole pumps, we offer the most complete package of wear prevention solutions

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Downhole Tools Worldwide.

Downhole Tools Worldwide. Downhole s Worldwide. INFLATABLES PRODUCTION PACKER SEV-SET PACKER THRU TUBING PACKER CASING PACKER STRADDLE PACKER HYDRAULIC DISCONNECT ON-OFF SEAL Table of Contents 1-1 1-2 1-3 1-4 1-5 1-6 1-7 TechWest

More information

Completion Systems & Mechanical Products

Completion Systems & Mechanical Products Completion Systems & Mechanical Products ESP Dual Systems ESP Encapsulation (CAN / POD) ESP Bypass Systems performance with reliability Tubing String Products Redundancy Y-Tool - Single ESP System As the

More information

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators. T-2 On-Off Tool Classic Oilfield s T-2 On-Off Tool enables the tubing string to be disconnected above a packer for zonal isolation, tubing retrieval, and temporary zone abandonment. The tool contains an

More information

Collet Connector Comparison

Collet Connector Comparison Collet Connector Comparison Collet Connector Comparison As drilling depths have increased over the years, Cameron collet connectors have evolved to address issues concerning higher internal and external

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Drilling & Wells Divis ion

Drilling & Wells Divis ion Drilling & Wells Divis ion Conor Gallagher Drilling and Intervention Riser Tensioner Load Modelling and its Impact on Wellhead Fatigue and Riser Loading Subsea 2012 Exhibition & Conference 8 th Feb Introduc

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

VALVOLE. Choke Valves Gate Valves WellHead Control Panels Control Systems Oil & Gas Upstream Equipment CELEBRATING

VALVOLE. Choke Valves Gate Valves WellHead Control Panels Control Systems Oil & Gas Upstream Equipment CELEBRATING VALVOLE Choke Valves Gate Valves WellHead Control Panels Control Systems Oil & Gas Upstream Equipment CELEBRATING Your best solution for Oil & Gas Upstream Equipment Quam is a CUSTOMER-ORIENTED company

More information

2001 GAS LIFT WORKSHOP

2001 GAS LIFT WORKSHOP 2001 GAS LIFT WORKSHOP PETROBRAS DEEPWATER GAS LIFT PROJECT Guilherme de Almeida Peixoto PETROBRAS / E&P- Campos Basin B. Unit José Eduardo Mendonça da Silva PETROBRAS / E&P- Rio B. Unit José Octavio do

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

DESCRIPTION & OPERATION

DESCRIPTION & OPERATION DESCRIPTION & OPERATION BRAKE BOOSTER Delco-Moraine Single Diaphragm A combined vacuum-hydraulic unit which uses a combination of intake manifold vacuum and atmospheric pressure to provide power assist.

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

W E L L S I T E S E R V I C E S

W E L L S I T E S E R V I C E S WELL SITE SERVICES TABLE OF CONTENTS Frac Stack and Flow Control High Pressure Sand Removal System...FSFC-1a-d SPS Type 7 Manual and Hydraulic Frac Valve...FSFC-2a-b Frac Stacks...FSFC-3 High Pressure

More information

Wellhead compression Multi well LP gas gathering

Wellhead compression Multi well LP gas gathering Wellhead compression Multi well LP gas gathering With screw compressors siemens.com/answers General Wellhead compression What is it? Compression close to the wellhead lowers the flowing wellhead pressure,

More information

Internal Pressure Pipe Cutters. Manual E540

Internal Pressure Pipe Cutters. Manual E540 Internal Pressure Pipe Cutters Manual E540 Contents Logan Internal Pressure Pipe Cutters Overview...2 Uses...2 Construction...2 Tool Illustration...3 Operation...2 Single Cut from a Fixed Platform... 2

More information

Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations

Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations Introduction Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations Nordic Well Services and Advanced Drilling Support Services (ADSS) has identified

More information

NeoProducts, LLC New Orleans, LA USA Ph:

NeoProducts, LLC New Orleans, LA USA Ph: NeoHybridPositiveDisplacementBailer Systems General Preparation & Run-in Procedures (NeoHybridPDB Systems) Document # ********************************************************************************************

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

USE OF MAZZEI INJECTORS IN PRESSURIZED SPRINKLER APPLICATIONS

USE OF MAZZEI INJECTORS IN PRESSURIZED SPRINKLER APPLICATIONS USE OF MAZZEI INJECTORS IN PRESSURIZED SPRINKLER APPLICATIONS The selection, installation and use of Mazzei Injectors in pressurized sprinkler systems are simple and straightforward. There are several

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

COILED TUBING TOOLS SALE RENTAL - LEASE

COILED TUBING TOOLS SALE RENTAL - LEASE COILED TUBING TOOLS SALE RENTAL - LEASE GTECH Energy Services LLC 67 Pinepath Pl. Spring, Texas 77381 PH: 713-703-2959 Fax: 713-510-1802 sales@gtechenergyservices.com SALES@GTECHENERGYSERVICES.COM 1 PRODUCT

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

Mud Pump (Emsco Type) Diesel Engine

Mud Pump (Emsco Type) Diesel Engine Houston: +1 713-893 - 5018 Beijing: +86 10 82898786 E-mail: info@cppipe.com Website: www.cppipe.com www.cppipe.cn CP Pipe & Equipment Corporation (CP) is a major US supplier of tubular products, petroleum

More information

Generation IV Single- Trip Multizone FracPac System. Overview

Generation IV Single- Trip Multizone FracPac System. Overview Generation IV Single- Trip Multizone FracPac System Overview Ricki Jannise Principal Product Champion Multizone Sand Control 281 988 2282 or 713 702 6716 Ricki.jannise@halliburton.com What is it? Single-Trip

More information

NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM. March 20, Bucharest

NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM. March 20, Bucharest NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM March 20, Bucharest Route to Drilling performance? Engineering could be the key! Engineering identify real drilling problems ( check deeper

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

SUB SEA SYSTEMS INTERNATIONAL NIGERIA LIMITED CLOCKSPRING

SUB SEA SYSTEMS INTERNATIONAL NIGERIA LIMITED CLOCKSPRING SUB SEA SYSTEMS INTERNATIONAL NIGERIA LIMITED CLOCKSPRING AGENDA Introduction Progress To-Date Cost Comparison: Clock Spring vs Conventional Repairs Highlights of Selected Riser Repairs Value Added to

More information

RODEC TUBING ROTATOR SOLUTIONS

RODEC TUBING ROTATOR SOLUTIONS RODEC TUBING ROTATOR SOLUTIONS RODEC TUBING ROTATOR SOLUTIONS One Company, Unlimited Solutions Since 1841, National Oilwell Varco has been dedicated to ensuring customers receive the highest quality oilfield

More information

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-04-01 DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS

More information

MPD Manifold 4-1/ psi with Integrated Control System

MPD Manifold 4-1/ psi with Integrated Control System MPD Manifold 4-1/16 5000 psi with Integrated Control System The MTC Managed Pressure Drilling (MPD) manifold has been designed to automatically maintain the annulus surface back pressure during drilling

More information

Specialized Tools & Filtration. version 5

Specialized Tools & Filtration. version 5 version 5 Table of contents Specialized Tools 2 Liner Top Test Tools Well Commissioner (WC) 2 Casing Cleaning Tools Bristle Back Redressable 4 MultiBack (MBACK) 5 Heavy-Duty Razor Back (HDRB) 6 Razor

More information

Fidmash. Coiled Tubing and Pressure Pumping Equipment

Fidmash. Coiled Tubing and Pressure Pumping Equipment Fidmash Coiled Tubing and Pressure Pumping Equipment Table of Contents Coiled Tubing Equipment Coiled tubing units (CTU) Skid mounted CTU... 5 Land-based CTU... 5 Pressure control equipment Blowout preventer...

More information