Wind Turbine Machine Head Evaluation Page 1 of 32 Appendix I. Sketch of 1.5XLE (from GE literature).
|
|
- Brent Sutton
- 6 years ago
- Views:
Transcription
1 Wind Turbine Machine Head Evaluation Page 1 of 32 Figure 1 Sketch of 1.5XLE (from GE literature). Figure 2 Sketch of 1.5XLE (from GE literature).
2 Wind Turbine Machine Head Evaluation Page 2 of 32 Figure 3 image). viewed through windshield at accident scene (GE provided Figure 4 image). viewed through windshield at accident scene (GE provided
3 Wind Turbine Machine Head Evaluation Page 3 of 32 Figure 5 Left side of machine head. Figure 6 Front of machine head; nacelle fractured at bottom center.
4 Wind Turbine Machine Head Evaluation Page 4 of 32 Figure 7 Machine head identity marking on right front of nacelle. Figure 8 Right side of machine head with nacelle scrape marks and penetrations.
5 Wind Turbine Machine Head Evaluation Page 5 of 32 Figure 9 Penetration in nacelle near the right rear. Figure 10 Penetration in nacelle right side near the center.
6 Wind Turbine Machine Head Evaluation Page 6 of 32 Generator Top Box Gearbox Lube oil pump motor Figure 11 Left side of machinery space viewed to the rear. Top box (control panel) in right background.
7 Wind Turbine Machine Head Evaluation Page 7 of 32 Heat exchanger Heat exchanger exhaust duct Generator Figure 12 Aft end of generator with heat exchanger discharge duct through nacelle; viewed from the right side.
8 Wind Turbine Machine Head Evaluation Page 8 of 32 Pillow block main bearing Gearbox elastomeric mounts Yaw drives Figure 13 Left side of machinery space viewed to the front. Pillow block bearing in the background.
9 Wind Turbine Machine Head Evaluation Page 9 of 32 Slip ring Brake disc Lube oil pump Lube oil filter Flex coupling Figure 14 Gearbox viewed from the left rear.
10 Wind Turbine Machine Head Evaluation Page 10 of 32 Generator Heat exchanger air inlet Brake hydraulic power unit Brake caliper Bake disc Cat walks Brake disc & flex coupling guards removed by GE Gearbox Figure 15 Right side of machinery space viewed to the rear. Generator and heat exchanger inlet fan in the background.
11 Wind Turbine Machine Head Evaluation Page 11 of 32 Oil Cooler Pillow block main bearing Gearbox elastomeric mounts Yaw drives Figure 16 Right side of machinery space viewed to the front. Pillow block bearing in the background.
12 Wind Turbine Machine Head Evaluation Page 12 of 32 Figure 17 Oil cooler forward of gearbox with blue flex duct separated from nacelle. Figure 18 Pillow block main bearing viewed from the left side.
13 Wind Turbine Machine Head Evaluation Page 13 of 32 Figure 19 Close-up view of main pillow block bearing left side bolting. Figure 20 Left front yaw drive mounted on bedplate viewed through catwalk cutout.
14 Wind Turbine Machine Head Evaluation Page 14 of 32 Figure 21 Tower cables coiled below main shaft viewed from the left side. Figure 22 Tower cables coiled below main shaft. Bent shipping legs at arrow.
15 Wind Turbine Machine Head Evaluation Page 15 of 32 Figure 23 Fractured left front bottom of nacelle. Viewed to the front below the catwalk. Yaw gear at arrow. Figure 24 Bent shipping legs attached to the yaw gear.
16 Wind Turbine Machine Head Evaluation Page 16 of 32 Figure 25 Bent shipping legs attached to the yaw gear.
17 Wind Turbine Machine Head Evaluation Page 17 of 32 Left rear yaw drive Left center nacelle attachment Left front yaw drive Left front nacelle attachment Figure 26 Left side of nacelle viewed to the rear below the catwalk level.
18 Wind Turbine Machine Head Evaluation Page 18 of 32 Bedplate Connector Nacelle bracket Figure 27 Left front nacelle attachment viewed to the rear. Bolting not moved. Bedplate Nacelle bracket Connector Figure 28 Left front nacelle attachment viewed from above. Bolting not moved. Connector not bent.
19 Wind Turbine Machine Head Evaluation Page 19 of 32 Figure 29 Left center nacelle attachment viewed from above. Nacelle bracket Bedplate Connector Figure 30 Left center nacelle attachment viewed from above. Bolting not moved. Connector not bent.
20 Wind Turbine Machine Head Evaluation Page 20 of 32 Figure 31 Front of Top Box viewed to the rear.
21 Wind Turbine Machine Head Evaluation Page 21 of 32 Figure 32 Left side interior of Top Box.
22 Wind Turbine Machine Head Evaluation Page 22 of 32 Nacelle bracket Top Box Connector Top Box support connected to generator frame Figure 33 Left rear nacelle attachment adjacent to Top Box. Figure 34 Left rear nacelle attachment. Bolting moved on nacelle end of connector.
23 Wind Turbine Machine Head Evaluation Page 23 of 32 Figure 35 Left front generator mount. Figure 36 Left front generator mount. Generator frame attachment bolting not moved.
24 Wind Turbine Machine Head Evaluation Page 24 of 32 Figure 37 Left front generator mount. Elastomeric insert bolting moved. Figure 38 Left rear generator mount.
25 Wind Turbine Machine Head Evaluation Page 25 of 32 Figure 39 Left rear generator mount. Generator frame attachment bolting not moved. Figure 40 Left rear generator mount. Elastomeric insert bolting moved.
26 Wind Turbine Machine Head Evaluation Page 26 of 32 Nacelle bracket Connector Right rear generator mount Generator frame Figure 41 Right rear nacelle attachment. Figure 42 Right rear nacelle attachment. Connector bent. Nacelle bracket bolting moved.
27 Wind Turbine Machine Head Evaluation Page 27 of 32 Figure 43 Right rear generator mount. Generator frame attachment bolting not moved. Figure 44 Right rear generator mount. Elastomeric insert bolting moved.
28 Wind Turbine Machine Head Evaluation Page 28 of 32 Figure 45 Right front generator mount. Generator frame attachment bolting not moved. Elastomeric insert bolting moved. Figure 46 Right front generator mount. Elastomeric insert bolting moved.
29 Wind Turbine Machine Head Evaluation Page 29 of 32 Slip ring Brake disc Flex coupling Right center nacelle attachment Figure 47 Flex coupling area viewed from the right side. Figure 48 Right center nacelle attachment. Connector bent. Nacelle bracket bolting moved.
30 Wind Turbine Machine Head Evaluation Page 30 of 32 Figure 49 Right rear gearbox mount bolting. Typical of right front gearbox bolting. Figure 50 Right front yaw drive.
31 Wind Turbine Machine Head Evaluation Page 31 of 32 Figure 51 Main pillow block bearing right side bolting.
32 Wind Turbine Machine Head Evaluation Page 32 of 32 Right front yaw drive Nacelle bracket Connector Bedplate Figure 52 Right front nacelle attachment viewed to the rear.
JOINT VENTURE: Wind Power Development Project United States of America. - Proposal Appendix -
EnerQuest Power Development Corporation France Wind Technologies JOINT VENTURE: Wind Power Development Project United States of America. - Proposal Appendix - APPENDIX TABLE of CONTENTS. Appendix I : Examples
More informationProject Report on Engineering Services for the Wind Turbine Project at the Cuyahoga County Fair
Lorry Wagner, Ph.D. 216-361-4250 x101 lorry@phillipselectric.com 4126 St. Clair Ave Cleveland, Ohio 44103 Project Report on Engineering Services for the Wind Turbine Project at the Cuyahoga County Fair
More informationC13 / C15 / C18 SOUND ATTENUATED ENCLOSURES
/ / SOUND ATTENUATED ENCLOSURES US Sourced Diesel Generator Set - 750 60 Hz Image shown may not reflect actual configuration Features Robust / Highly Corrosion Resistant Construction Factory installed
More informationC13/C15/C18 Sound Attenuated Enclosures. Features. Enclosures. U.S. Sourced Diesel Generator Set kw 60 Hz
// Sound Attenuated Enclosures U.S. Sourced Diesel Generator Set - kw 60 Hz Image shown may not reflect actual configuration Features Robust/Highly Corrosion Resistant Construction Factory installed on
More information6060/6060 FS. Hydraulic Shovel. Operating Weight. General Data. Features
00/00 FS Hydraulic Shovel General Data Operating Weight Face Shovel 9 tonnes tons Backhoe 0 tonnes 8 tons Engine output SAE J99 Cat 3C Standard bucket capacity Face Shovel (heaped :) Backhoe (heaped :)
More informationRenewable Energy Systems
Renewable Energy Systems 8 Buchla, Kissell, Floyd Chapter Outline Wind Turbine Control 8 Buchla, Kissell, Floyd 8-1 PITCH AND YAW CONTROL 8-2 TURBINE ORIENTATION 8-3 DRIVE TRAIN GEARING AND DIRECT DRIVE
More informationWind Power Services. One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES
Wind Power Services One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES In-Shop Repair Services One Standard for Safety, Quality & Repairs Across North America Leveraging
More informationWind Power Services. One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES
Wind Power Services One Standard for Safety, Quality & Repairs Across North America INTEGRATED POWER SERVICES In-Shop Repair Services One Standard for Safety, Quality & Repairs Across North America Leveraging
More informationGRAND RENEWABLE ENERGY PARK PROJECT DESCRIPTION REPORT. Attachment C. Turbine Specifications
GRAND RENEWABLE ENERGY PARK PROJECT DESCRIPTION REPORT Attachment C Turbine Specifications Published by and copyright 2009: Siemens AG Energy Sector Freyeslebenstrasse
More informationZoom and Print Options
Vehicle» Engine, Cooling and Exhaust» Engine» Cylinder Head Assembly» Valve Cover» Service and Repair» Procedures» RH Valve Cover RH Removal 1. Disconnect the battery ground cable. 2. Remove the air cleaner
More informationTechnical Documentation Wind Turbine Generator Systems /60 Hz
Technical Documentation Wind Turbine Generator Systems 3.8-130 - 50/60 Hz imagination at work www.gepower.com Visit us at https://renewable.gepower.com Copyright and patent rights All documents are copyrighted
More informationMAJOR SYSTEM FUNCTIONS
MAJOR SYSTEM FUNCTIONS The ROTOR converts the aerodynamic energy in the wind to mechanical shaft torque. It also provides a lightning path from the blade tips to the main shaft. The GENERATOR converts
More informationEvaluation of HALUS Power systems
Evaluation of HALUS Power systems Contents Introduction...3 Remanufacturing Process...4 Towers...4 Generators...5 Gearboxes...6 Yaw gear...7 Electrical System...8 Other components...9 Conclusion...11 Introduction
More informationGEARBOX REPLACEMENT OUTLINE OF TASKS, RESPONSIBILITIES
GEARBOX REPLACEMENT OUTLINE OF TASKS, RESPONSIBILITIES 01 Contracting Liftra to replace gearboxes with the LT1000-2 Self-Hoisting Crane. LIFTRA SELF-HOISTING CRANE ADVANTAGES REDUCED MOBILIZATION SAVE
More informationReport Turbine inspection WTG 15035, Groettocht 7
Report Turbine inspection WTG 15035, Groettocht 7 Report No. V662015067 17-11-2015 Contents 1 Purpose... 3 2 Abbreviations... 3 3 General information... 4 4 Wind turbine main components... 4 5 Documents...
More informationNew dimensions. Siemens Wind Turbine SWT Answers for energy.
New dimensions Siemens Wind Turbine SWT-3.6-107 Answers for energy. 2 New dimensions The SWT-3.6-107 wind turbine is the largest model in the Siemens Wind Po wer product portfolio. It was specifically
More informationAPPENDIX J V90 3.0MW Turbine Specifications
APPENDIX J V90 3.0MW Turbine Specifications V90-3.0 MW An efficient way to more power Innovations in blade technology 3 44 meters of leading edge In our quest to boost the efficiency of the V90, we made
More informationBolt Tensioning Technology for Wind Turbines
Bolt Tensioning Technology for Wind Turbines www.torcup.com WTB Series Fully aware of the difficulties associated with wind turbine blade tensioning, the new TorcUP WTB Series is a purpose designed range
More informationV MW An efficient way to more power
V90-3.0 MW An efficient way to more power Innovations in blade technology 3 44 metres of leading edge In our quest to boost the efficiency of the V90, we made sweeping improvements to two aspects of our
More informationHigh Load Capacity Cylindrical Roller Bearings
NTN TECHNICAL REVIEW No.7426 New Product High Load Capacity Cylindrical Roller Bearings Takuya OZU NTN has developed high load capacity cylindrical roller bearings appropriate for gearbox of wind turbines
More informationPERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST MUSTANG
specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST 1969-70 MUSTANG CONTROL & OPERATING INSTRUCTIONS The controls on your new Perfect
More informationV MW The future for low wind sites
V0-2.75 MW The future for low wind sites Knowing which way the wind blows The V0-2.75 MW turbine know which way the wind blows, and is designed to follow it. A significant advance in wind turbine efficiency,
More information9. Examples of hydro energy conversion
9. Examples of hydro energy conversion VATech Hydro, Austria Prof. A. Binder 9/1 Variable speed pump storage power plant Prof. A. Binder 9/2 Conventional pump storage power plant with synchronous motor-generators
More informationGOLDWIND S48/750 (50Hz) Technical Specifications
GOLDWIND S48/750 (50Hz) Technical Specifications Content 1. GOLDWIND S48/750 General Overview page 3-5 2. Nacelle - Major Components Overview page 6 8 3. Gearbox & Main Shaft page 9-10 4. Brake System
More informationGenx-1B P-N S-N Check List
Engine P/N Genx-1B P-N S-N Check List CM Project (if relevant) 2305M70G07 ACCESSORY GEARBOX ASSY (MODULE 64X) core lwr l/h 1962M22P01 ACCLRM-TURBINE CENTER FRAME core upr l/h 3291883-1 HPT ACTIVE CLEARANCE
More informationReport Turbine inspection WTG 12801, Oudelandertocht 11
Report Turbine inspection WTG 12801, Oudelandertocht 11 Report No. V662015041 09-11-2015 Contents 1 Purpose... 3 2 Abbreviations... 3 3 General information... 4 4 Wind turbine main components... 4 5 Documents...
More informationW8X. Inspection of 12 W2E-93/2.0 at Houston Port REPORT. H. Hoffmann F. Weber COPYRIGHT. W2E Wind to Energy GmbH 2017 PROJECT TITLE
EDITED BY LANGUAGE PAGES 24 H. Hoffmann F. Weber ENGLISH CLASSIFICATION COSTUMER STATUS RELEASED DATE 18.10.2017 COPYRIGHT W2E Wind to Energy GmbH 2017 W2E Wind to Energy GmbH Strandstraße 96 D-18055 Rostock
More informationWind Turbine Generator System. General Specification for HQ2000
Wind Turbine Generator System General Specification for HQ2000 April 15, 2010 Hyundai Heavy Industries Co., Ltd Electro Electric Systems h t t p : / / w w w. h y u n d a i - e l e c. c o. k r 1. General
More informationSECTION AXIAL HVAC FANS
SECTION 233413 - AXIAL HVAC FANS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information4.1. Manufacturing field F2 Preformed and field coil windings
4.1 Manufacturing field F2 Preformed and field coil windings 4.1.2.2 Manufacturing field F2 - Preformed and field coil windings 4.1.2.2.1 Range of services preformed coils One of the most important areas
More informationCOOLING TOWER MOTORS Three-Phase TEFC & TEAO. Features that make a difference: Standard Features:
COOLING TOWER MOTORS Three-Phase TEFC & TEAO WEG s cooling tower motors are designed for operation in 100% humidity and the most corrosive environments. They designed to operate in either horizontal or
More informationLEAP-X Program Update
LEAP-X Program Update 29 Oct 09 NYC CFM International Proprietary Information The information in this document is CFM Proprietary Information and is disclosed in confidence. It is the property of CFM International
More informationSECTION CENTRIFUGAL HVAC FANS
SECTION 233416 - CENTRIFUGAL HVAC FANS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationEx. 1-1 Nacelle Familiarization and Safety Discussion
Exercise 1-1 Nacelle Familiarization and Safety EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with key components and safety aspects of the nacelle trainer. You will be
More informationStructure of Wind Supply Chain Onshore to Offshore. Ed Weston Director, GLWN Copyright 2012 GLWN A WIRE-Net Initiative
Structure of Wind Supply Chain Onshore to Offshore Ed Weston Director, GLWN eweston@glwn.org FIND Connections Company name WIND Classification Component Families Radius Search Active Suppliers Almost 1600
More informationV MW & 2.0 MW Built on experience
V90-1.8 MW & 2.0 MW Built on experience Innovations in blade technology Optimal efficiency The OptiSpeed * generators in the V90-1.8 MW and the V90-2.0 MW have been adapted from those in Vestas highly
More informationDoc #: 2100-AD Revision: A. 4M Mayall Maintenance Manual. Author(s): Larry Reddell
Doc #: 2100-AD-015-0003 Revision: A 4M Mayall Maintenance Manual Author(s): Larry Reddell 2100-AD-015-0003.DOCX 2 Revision Description Date Name --- Original: 2100-AD-015-0001 4/12/2014 Larry Reddell 2100-AD-015-0003.DOCX
More informationV MW Creating more from less
V82-1.65 MW Creating more from less Grid compliance As wind turbines capture more of the electricity market each year, they have an increasingly significant role to play in grid management. Fortunately,
More informationTechnical Specifications
Technical Specifications SENNEBOGEN Rubber Tired Material Handler Leading Through Innovation Engine Model Net Power Operating Weight M/rubber tired Cummins QSB., Tier Final HP (18 kw) 8,9 lb (8, kg) Reach
More informationTechnical Specifications SENNEBOGEN Rubber Tired Material Handler
Technical Specifications SENNEBOGEN Rubber Tired Material Handler Leading Through Innovation Engine Model Net Power Cummins QSB.-C Tier Final HP ( kw) Reach standard optional '" (. m) (stick pin) '" (
More informationSiemens Cold Climate Strategy
Siemens Cold Climate Strategy Improving output in harsh conditions Unrestricted Siemens Wind Power, 2015 All rights reserved. Agenda Siemens Wind Power Blade De-Icing Experience Next Steps & Challenges
More informationPioneer P750/49. The Premium 750 KW Wind Turbine. green. pioneer. go go with
Pioneer P750/49 The Premium 750 KW Wind Turbine green go go with pioneer Transforming the Power of Wind Corporate Profile Pioneer Wincon Private Limited (PWPL) is a member company of the Pioneer Asia Group
More informationInventory # Lot # Lead
2125800 5 Transformer Cooler 2125801 6 Valves 2125802 7 Globe Valve 2125803 8 Check Valve 2125804 9 Flow Control Valve 2125805 10 Tricentic Valves 2125806 11 Gate Valve 2125807 12 Gate Valves 2125808 13
More informationRAS-5E PART NO Date: 04/08/02
33-400, 33-401, 33-402, 33-403 14 RADIAL SAWS 33-410, 33-411, 33-412, 33-413 16 RADIAL SAWS 33-420, 33-421, 33-422, 33-423 18 RADIAL SAWS RAS-5E PART NO. 424-03-651-0018 Date: 04/08/02 Page1/ RAS-5E /DEB
More informationRH340B. Hydraulic Mining Excavator RH340B HYDRAULIC MINING EXCAVATOR. General Data: Features. Product Specification Sheet.
RH0B Hydraulic Mining Excavator,00 ( General Data: Operating Weight,00 (,0 (0, (,00 (,00 (,0 (,0 (,00 ( Features,000 ( 0,0 (,000 ( 0 TriPower shovel attachment,0 (,0 ( RH0B HYDRAULIC MINING EXCAVATOR Face
More informationNCF fans 50 Hz. Protection class IP 55
The Nederman NCF Fans have direct drive motors which means a safe and cost effective operation. Installing an energy efficient NCF fan with our other Nederman products saves time and reduces energy costs.
More informationContents. TS220 Features
TS220 Towed Scraper Scraper Bowl Capacity Heaped 18 m 3 23.5 yd 3 Width of Cut, to Router Bits 3480 mm 11 ft 5 in Rated Load 25 580 kg 56,400 lb Capacity Struck 13 m 3 17 yd 3 Depth of Cut max 262 mm 10.3
More information2002 Jeep Grand Cherokee Laredo
Removal WARNING: DO NOT REMOVE THE CYLINDER BLOCK DRAIN PLUGS OR LOOSEN THE RADIATOR DRAINCOCK WITH THE SYSTEM HOT AND UNDER PRESSURE. SERIOUS BURNS FROM COOLANT CAN OCCUR. REFER TO COOLING SYSTEM DRAINING.
More informationORDERLY NEGOTIATED SALE MICON M1500 WIND TURBINES EQUIPMENT CATALOG AUCTION DIVISION Rochester, Minnesota
ORDERLY NEGOTIATED SALE www.maascompanies.com 4- MICON M1500 WIND TURBINES EQUIPMENT CATALOG AUCTION DIVISION 507.285.1444 Rochester, Minnesota 10 MICON A/S - WIND TURBINE, TOWER MOUNTED: Consisting of
More informationRIKT Isothermal Turbocompressors. With integrated cooling
RIKT Isothermal Turbocompressors With integrated cooling RIKT Isothermal Turbocompressors With integrated coolers MAN Diesel & Turbo s isothermal compressors have been built since 1915 and more than 1,400
More informationSQBI BLOWERS BACKWARD INCLINED CLASS II CLASS IIP CLASS III. OEM and Industrial Air Handling Specialist
OEM and Industrial Air Handling Specialist SQBI BLOWERS BACKWARD INCLINED CLASS II CLASS IIP CLASS III 7697 Snider Road, Mason, OH 4040-913 Telephone: 13-73-0600 Visit us at www.cincinnatifan.com for more
More informationOPERATION, INSTALLATION, & MAINTENANCE MANUAL. Aircon BRS Below-Roof Separator. and. BRV Below-Roof Valve
OPERATION, INSTALLATION, & MAINTENANCE MANUAL for Aircon BRS Below-Roof Separator and BRV Below-Roof Valve Aircon Corporation P.O. Box 80446 2873 Chelsea Avenue Memphis, TN 38108-0446 Telephone: (901)
More informationBucket Elevators & Conveyors
Bucket Elevators & Conveyors Bucket Elevator Heads GSI's bucket elevators & conveyors are engineered to perform and built tough to provide years of reliable service. Whether your business is industrial
More informationTechnological Achievements
Open Rotor Technological Achievements François MIRVILLE SAFRAN/Snecma July 1, 2014 1/ SUMMARY Open Rotor Architectures and Aircraft Integration Main Technical Objectives Technologies involved Technology
More informationGearbox Mount. Gearbox. Main Shaft Options. Typical Gearbox 4/8/2014
Gearbox Gearbox Mount Andrew Kusiak 2139 Seamans Center Iowa City, Iowa 52242-1527 andrew-kusiak@uiowa.edu Tel: 319-335-5934 Fax: 319-335-5669 http://www.icaen.uiowa.edu/~ankusiak Peeters, Vandepitte,
More informationIngenuity for Life Wind Power Morten Pilgaard Rasmussen. Restricted Siemens AG 2016
Ingenuity for Life Wind Power Morten Pilgaard Rasmussen Restricted Siemens AG 2016 Cost improvement drives further competitiveness of wind and enables further market growth Source: IEA World Energy Outlook
More informationReport Inspection of wind turbine
Report Inspection of wind turbine Report no. : 7193-06 Owner : Nørhede-Hjortmose Vindudvikling ApS Kirkemarken 7 Ølstrup 6950 Ringkøbing Manufacture : Vestas Type : V66-1,75 MW Serial number : 1463 Site
More informationKüba SG industrial
66 Küba Blue Line : Specific advantages The is a master of customisation. No matter how great the demand for power, the is the answer. Its versatility allows the Küba SG industrial to master the most complex
More informationTHOMSON AIRWAYS LIMITED DISCREPANCY SHEET
IPC REF FIG ITEM DESCRIPTION FROM 72.35.01 01 085/220 ROTATING FAIRINGS 72.31.11 01 280 LP BLADES (22 OFF) 73.11.07 01 645/725 MAIN FUEL INLET TUBE 29.11.03 02 100 HYD. SUPPLY,RIGID TUBE 29.11.03 02 200
More informationENCLOSURES. WEATHER PROTECTIVE and SOUND ATTENUATED. three levels of sound attenuation. D40-6 to D200-2 D40-6s to D100-6S.
WEATHER PROTECTIVE and SOUND ATTENUATED ENCLOSURES three levels of sound attenuation D-6 to D200-2 D-6s to D100-6S Picture shown may not represent actual package. Features HIGHLY CORROSION RESISTANT CONSTRUCTION
More informationSTANDBY 1500 ekw 1875 kva 50 Hz 1500 rpm 400 Volts
DIESEL GENERATOR SET STANDBY 1500 ekw 1875 kva Caterpillar is leading the power generation marketplace with Power Solutions engineered to deliver unmatched flexibility, expandability, reliability, and
More informationEnclosures. Weather Protective and Sound Attenuated Enclosures D40-6 to D200-2 D40-6S to D100-8S. Features
s Weather Protective and Sound Attenuated s D40-6 to D-2 D40-6S to D100-8S Picture shown may not reflect actual configuration Features Highly Corrosion Resistant construction Stainless steel flush fitting
More informationBulletin ACF 103 AIRFOIL CENTRIFUGAL FANS DESIGN 10A
Bulletin ACF 103 AIRFOIL CENTRIFUGAL FANS DESIGN 10A Quieter, More Efficient Airfoil Fans for Commercial and Light Industrial Applications Design 10A Fans with Airfoil Wheels Fourteen Sizes to 80" Volumes
More informationOEM and Industrial Air Handling Specialist Snider Road, Mason, OH Telephone:
HDBI BLOWERS OEM and Industrial Air Handling Specialist BACKWARD INCLINED CLASS II CLASS III CLASS IV 797 Snider Road, Mason, OH 45040-915 Telephone: 51-57-000 Visit us at www.cincinnatifan.com for more
More informationCHAPTER 63 MAIN ROTOR DRIVE SYSTEM
Section Title CHAPTER 63 MAIN ROTOR DRIVE SYSTEM 63-00 Description............................................... 63.1 63-10 Engine Shaft Weldment...................................... 63.1 63-11 (Engine
More informationRIKT 71 Isothermal Turbocompressor
RIKT 71 Isothermal Turbocompressor RIKT 71 Isothermal Turbocompressor MAN s RIKT isothermal turbocompressor family has a new member: the RIKT 71. In 2001, MAN introduced the RIKT to the market and many
More informationWP Application and Use of Linear Interpolation Models: A Case Study. Investigative Training Service, LLC. Eric Hunter, P.E.
WP 2016-1 Application and Use of Linear Interpolation Models: A Case Study Eric Hunter, P.E. Investigative Training Service, LLC. Copyright 2015 Engineering Dynamics Corporation ABSTRACT Computer simulations
More informationPrecision Air Drilling Services Equipment Information & Specifications
Equipment Information & Specifications Joy Super Booster Specifications Joy WB-12 5000 Specifications Page 2 of 10 Table of Contents Joy Super Booster Specifications... 2 Joy WB-12 5000 Specifications...
More informationTechnical Sheet: Boeing 777
BRUCE'S CUSTOM COVERS 18850 Adams Ct Morgan Hill, CA 95037 www.aircraftcovers.com a div. of Aircraft Covers Inc. Phone: 408/738-3959 Toll Free (U.S.): 800/777-6405 Fax: 408/738-2729 Email: bruce@aircraftcovers.com
More informationGE Renewable Energy. GE s 3 MW Platform POWERFUL AND EFFICIENT.
GE Renewable Energy GE s 3 MW Platform POWERFUL AND EFFICIENT www.gerenewableenergy.com GE S 3 MW PLATFORM PITCH Since entering the wind industry in 2002, GE Renewable Energy has invested more than $2.5
More informationOne. The performance of your wind turbine relies on the quality of its small components. ia.danfoss.com. Brochure Mobile Hydraulic
Brochure Mobile Hydraulic The performance of your wind turbine relies on the quality of its small components One stop shop - reducing your supply base and boosting your bottom line ia.danfoss.com Efficient
More informationPERFORMANCE DATA Intermittent Volume (Parallel Flow), Standard Design
FAN CURVES vs FAN SIZE A AS 05, 06, 07 1/6 H.P. Motor FAN SIZE B AS 06, 07, 08 1/6 H.P. Motor NOTES: 1. External Static Pressure (ESP) consists of down stream ductwork, coils, flex, duct, etc. 2. Pressure
More informationOPERATION, INSTALLATION, & MAINTENANCE MANUAL. Aircon Paper-Scrap Rotary Valves
OPERATION, INSTALLATION, & MAINTENANCE MANUAL for Aircon Paper-Scrap Rotary Valves Aircon Corporation P.O. Box 80446 2873 Chelsea Avenue Memphis, TN 38108-0446 Telephone: (901) 452-0230 FAX: (901) 452-0264
More informationThe wind is outside. Fluitecnik is inside. Hydraulic and Cooling Systems
The wind is outside. Fluitecnik is inside. Hydraulic and Cooling Systems FLUITECNIK was created in 1991, and has a large international presence in the field of renewable energies. Currently, we have over
More information3516B Generator Set Electric Power
Caterpillar is leading the power generation marketplace with Power Solutions engineered to deliver unmatched flexibility, expandability, reliability, and cost-effectiveness. Image shown may not reflect
More informationDESIGN GUIDELINES FANS PAGE 1 of 7
DESIGN GUIDELINES FANS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the
More informationReport Inspection of wind turbine
Report Inspection of wind turbine Report no. : 7273-02 Owner : Højstrup Vind KS Manufacture : Vestas Type : V44-600 kw Serial number : 2418 Site : Højstrupvej 42, 9750 Østervrå Location, UTM 32 : 579700,
More informationMAZDA GLOBAL MX-5 CUP HOMOLOGATION DOCUMENT
MAZDA GLOBAL MX-5 CUP HOMOLOGATION DOCUMENT Version 2018.06.14.00 June 14, 2018, 2018 LONG ROAD RACING, CORPORATION Statesville, NC, USA 1 CONTENTS 2 NOTES:... 3 3 BODY... 4 4 Brakes... 5 5 Cooling...
More informationSINGLE DUCT TERMINAL UNITS
www.igcaire.com SINGLE DUCT TERMINAL UNITS Direct Digital Control, Pressure Independent FEATURES 22 Gauge Galvanized Steel Casing Construction with a 20 Gauge Casing Option that Provides Strength and Product
More informationChapter 71. Power Plant
Chapter 71 Power Plant PAGE 1 Table of Contents Chapter Title 71-10-00 COWLING.................................. 3 71-20-00 ENGINE MOUNT............................ 5 71-20-01 Shock Mounts................................
More informationCOMPONENT IDENTIFICATION
This CFMI publication is for Training Purpose Only. The information is accurate at the time of compilation; however, no update service will be furnished to maintain accuracy. For authorized maintenance
More information2019 TECHNICAL REGULATIONS FOR THE HISTORIC PRODUCTION CAR GROUP 1 SALOON CARS (161684/144)
2019 TECHNICAL REGULATIONS FOR THE HISTORIC PRODUCTION CAR GROUP 1 SALOON CARS (161684/144) Permissions: With the exception of the under mentioned allowance, no other additions or modifications whatsoever
More informationMotorcycle parts compatibility on ebay.co.uk
Motorcycle parts compatibility on ebay.co.uk Review the full list of categories and subcategories in which you can list motorcycle and scooter parts. Last updated: 10 August 2016 Motorcycle Parts (10063)
More informationOil/Air Cooler Units. Compact application with AC Motor OK-ELC Type
COMPACT OIL / AIR COOLERS NEW COMPACT DESIGN WITH AC ELECTRIC FANS AND HIGH COOLING PERFORMANCE Application These coolers are designed specifically for hydraulic applications where high performance and
More informationTechnical specifications. Wind Turbine GS 21 S. Power 60 kwp
Technical specifications Wind Turbine GS 21 S Power 60 kwp GS 21 S - 60 kwp The best wind turbines, without compromise. In order to exploit the kinetic energy contained in the wind and convert it into
More informationRH200. Hydraulic Mining Excavator RH200 HYDRAULIC MINING EXCAVATOR. General Data: Features. Product Specification Sheet.
RH00 Hydraulic Mining Excavator 7,600 ( General Data: ( 0 8,0 (8 0 7,80 ( 7,0 (,80 (8 6,60 (,780 (9,00 ( 7 Features 7,000 ( 0,0 ( 8 7,000 ( 0 8,70 (8 8 8,760 (8 9 RH00 HYDRAULIC MINING EXCAVATOR Operating
More information335i Upgrade Intercooler Installation Instructions
335i Upgrade Intercooler Installation Instructions Part Number: D330-0015 Applications: 2011-12 E90/E92/E93 335i (N55) 2011-12 E92/E93 335is (N54) 2011-12 E90 335i (N55) with M-Technic bumpers (Except
More informationASO HOMOLOGATION - TECHNICAL REGULATIONS FOR T4.2 TRUCKS FROM 1st of JANUARY 2018 ONWARDS
ASO HOMOLOGATION - TECHNICAL REGULATIONS FOR T4.2 TRUCKS FROM 1st of JANUARY 2018 ONWARDS The yellow parts of the following regulations will be applied to the trucks homologated from the 1st of January
More informationThis bulletin is available on InfoCentral\NAD\Bulletins\Service Bulletins
T&T 416 Date: Service Bulletin: T&T 416 InfoCentral: Subject: This bulletin is available on InfoCentral\NAD\Bulletins\Service Bulletins TriPac APU 3rd Quarter 2006 Changes The following changes have been
More informationDRIVE-CONTROL COMPONENTS
3-1 DRIVE-CONTROL COMPONENTS CONTENTS FRONT SUSPENSION................... 2 Lower Arms............................... 5 Strut Assemblies........................... 6 REAR SUSPENSION.....................
More information1500 Hour PM Inspection
1500 Hour PM Inspection Electrical Start Time Stop Time 1. Perform initial walk around RTG prior to start and verify no excessive damage to crane. Report to Maintenance team immediately if damage is found
More informationCatalog Air Terminal Units. Models MQTH, MQFCI and MQFVI. Model MQTH. Model MQFCI. Model MQFVI
Air Terminal Units Models MQTH, MQFCI and MQFVI Catalog 903-1 Model MQTH Model MQFCI Model MQFVI Table of Contents Single Duct Air Terminal Units.... 3 Introduction....3 MQTH-500 Single Duct Air Terminal
More informationCam Switches, Manual Motor Controllers, Disconnects For Single phase Applications
7/ Moeller Electric Corporation Manual Motor Controllers, Disconnects For use as Padlockable, red handle with yellow collar, suitable as Emergency-Stop Circuit function diagram Front Plate No. ) ON OFF
More informationC9 ACERT MARINE PROPULSION SPECIFICATIONS STANDARD ENGINE EQUIPMENT. 575 mhp (567 bhp)
575 mhp (567 bhp) 423 bkw Image shown may not reflect actual SPECIFICATIONS I-6, 4-Stroke-Cycle-Diesel Emissions... IMO compliant Displacement... 8.82 L (538.23 in 3 ) Rated Speed...2500 Bore... 112.0
More informationRH120E. Hydraulic Mining Excavator RH120E HYDRAULIC MINING EXCAVATOR. General Data: Features. Product Specification Sheet.
RH120E Hydraulic Mining Excavator 6,00 mm (21 ft 4 General Data: Operating Weight 6,000 mm (19 ft 8 7,640 mm (2 ft 1 6,40 mm (21 ft 2 6, mm (20 ft 8 4,90 mm (16 ft 2, mm (7 ft 1 1,940 mm (6 ft 4 1,000
More informationVolkswagen New Beetle 1.8 Liter 4-Cyl. 5V Turbo OBD II Engine Mechanical 19 Engine-Cooling system (Page GR-19)
19 Engine-Cooling system (Page GR-19) Cooling system components, removing and installing Continued coolant circulation pump (V51), checking Coolant hose connection diagram Coolant pump, removing and installing
More informationPneumatic Conveying Systems. Division of
Pneumatic Conveying Systems Division of You can expect from FOX TrimAway: lower first cost, lower operative cost and less noise. Typical Applications Paper, film and foil trim/waste Textiles and non-wovens
More information500-YVI PARALLEL FAN-POWERED AIR TERMINAL UNIT FORM EG3 (404)
500-YVI PARALLEL FAN-POWERED AIR TERMINAL UNIT Table of Contents Introduction...3 500-YVI Features...4-5 Dimensional Data...6-7 ARI Rating Points...8 Statement of Standard Test Conformity...8 Motor Amperage
More informationTVFC Dry and adiabatic cooling
Dry and adiabatic cooling Key benefits Largest adiabatic capacity Highest degree of redundancy Unrivalled reliability cooler characteristics Counter flow, adiabatic pre-cooling, axial fan, induced draft
More informationCF34-8 Technical Manual Index July 1, 2018
CF34-8 Technical Manual Index July 1, 2018 Following is the CF34-8 Component Maintenance Manual Section of the Technical Manual Index. All. An asterisk (*) behind the Rev No. indicates the manual has been
More information