FRYER MACHINE SYSTEMS HR SERIES MECHANICAL MANUAL

Size: px
Start display at page:

Download "FRYER MACHINE SYSTEMS HR SERIES MECHANICAL MANUAL"

Transcription

1 FRYER MACHINE SYSTEMS HR SERIES MECHANICAL MANUAL FRYER MACHINE SYSTEMS, INC. 70 JON BARRETT ROAD ROBIN HILL CORPORATE PARK PATTERSON, NY PHONE: FAX:

2 MECHANICAL DRAWINGS...3 HEAD ASSEMBLY...4 Y AXIS COLUMN...7 X AXIS TABLE HR 30/ X AXIS TABLE HR 50/60/ Z AXIS SADDLE...14 HR SHEET METAL...18 RETENTION KNOB...21 Leveling Procedure For HR or MC Machines...22 LEVELING PROCEDURE FOR OUTRIGGERS...25 High Pressure Coolant System...26 maintenance HR SERIES.doc 2 OF 29

3 MECHANICAL DRAWINGS maintenance HR SERIES.doc 3 OF 29

4 HEAD ASSEMBLY maintenance HR SERIES.doc 4 OF 29

5 HEAD ASSEMBLY ITEM Part No. Description Specification Qty 1 BEN-1112 Spindle Cartridge 8000RPM 1 1 BEN-1115 Spindle Cartridge 10,000RPM 1 1 BEN-1116 Spindle Cartridge 12,000RPM 1 2 FH00121 Coolant Nozzle 3 3 FH Jaw 1 4 FH00123 Draw Bar 1 5 FH00124 Collar 1 6 DBR-2080 Draw Bar Washer 1 7 FH00126 Collar 1 8 FH00127 Nut 1 9 FH00128 Headstock 1 10 FH00129 Motor Plate 1 11 BEN-1075 Spindle Belt 720-8M-30, 6000RP 8000 RPM HR 30/ BEN-1080 Spindle Belt 760-8M-30, 6000 R 8000 RPM HR 50/60/80/ BEN-1085 Spindle Belt 840-8M-30, 10,000 10,000 RPM HR 50/60/80/ Motor Pulley Refer to Machine Serial Number 1 13 FH00132 Cylinder Seat 1 18 DBR-2070 Draw Bar Actuator Complete 1 19 MTR-3136 ANILAM SM075 Standard Spindle Motor 20 HP 1 19 MTR-3134 ANILAM SM100C Spindle Motor 20 HP for 6300 Control 1 19 MTR-3142 ANILAM SM120C Spindle Motor 30 HP for 6000 Control 1 19 MTR-3810 FANUC A12i/3000 Servo Motor 1 MABS, Str. Key W/ Brake 1 19 MTR-3820 FANUC B8/3000IS Servo Motor With Brake and Keyway 1 19 MTR-3840 FANUC 30HP Peak Spindle Motor Dual Winding with Drive 1 20 WA013 Washer 4 21 N/A Screw M12 * N/A Washer 4 23 N/A Screw 1/2 * 1-1/4" 4 24 FH00126 Gib 1 25 FH00127 Gib Screw 2 26 FH00128 Bracket 1 27 FH00139 Gib 1 28 FH00130 Gib 1 29 N/A Screw M12 * FH00131 Bracket 1 31 FH00132 Gib Screw 4 32 FH00133 Wiper 2 33 FH00134 Wiper 2 34 N/A Screw M5 * ACC-9540 BARUFFALDI Gearbox (Optional) Gearbox 2 Speed CE SWT-5014 Home Limit Switch 1 37 BEN-1340 Spindle Proximity Switch (Optional) 10,000 & 12,000 rpm 1 38 SWT-5110 Drawbar Limit Switch 2 39 SWT-5300 Tool Pushbutton Non-illuminated 1 40 BEN-1058 Solenoid Valve for Drawbar 110 Vac 1 maintenance HR SERIES.doc 5 OF 29

6 41 POL-1010 Halogen Worklamp 24 Vac 1 42 MSE-5310 ANILAM Encoder Cable 20' for 6000 Control 1 42 FANUC Spindle Encoder Cable 1 43 ASY-6170 ANILAM Motor Cable Assembly 1 43 FANUC Spindle Motor Cable Assembly 1 44 BEN-2054 Chiller for 10,000, 12,000 RPM Refrig. Unit for High Speed Spindle 1 maintenance HR SERIES.doc 6 OF 29

7 Y AXIS COLUMN maintenance HR SERIES.doc 7 OF 29

8 Y AXIS COLUMN ITEM Part No. Description Specification Qty 1 FC00301 Chain Supporter 1 2 N/A Washer 4 3 N/A Screw M8 * N/A Washer 4 5 N/A Screw M8 * Belt REFER TO SERIAL NUMBER 1 7 Pulley REFER TO SERIAL NUMBER 1 8 FC00303 Motor Plate 1 9 BEN-1225 Bearing 4 10 FC00304 Shaft 4 11 FC00305 Wheel 4 12 FC00306 C Ring 8 13 FC00307 Nut 1 14 Pulley REFER TO SERIAL NUMBER 1 15 FC00309 Spacer 1 16 N/A Screw M6 * FC00310 Bearing Cover 1 18 BEN-1220 X/Y Axis Ballscrew Thrust 7205 HR 30/ POL-1040 Thrust Bearing for X,Y, Z HR 50/60/80/ N/A Screw M8 * FC00311 Bearing Bracket 1 21 N/A Key 8-16mm 1 22 N/A Screw M6 * BEN-4116 Y-Axis Ballscrew HR 30/40/50/ BEN-4214 Y-Axis Ballscrew HR 80/ N/A Screw M10 * FC00313 Yoke 1 26 FC00314 Upper Stay 1 27 BEN-1060 Y-Axis Ballscrew Cover, Spring 1 28 N/A Screw 1 29 FC00316 Lower Stay 1 30 BEN-1225 X/Y- Axis Ballscrew end Bearing 2 31 FC00317 Bearing Bracket 3 32 N/A Screw 1 33 BEN-1800 Roller Chain for Counter Weight 2 34 BEN-1802 Chain Master Link 1 35 FC00319 Count Blance 1 36 FC00320 Frame 1 37 N/A Screw 3/4" - 3" 6 38 N/A Washer 6 39 MSM-2884 NORGREN Air Regulator 1/4"NPT 125 PSI SWT-5120 Low Air Pressure Switch 1 41 MTR-3156 ANILAM 6000 Y-MOTOR 2.42kW W/BRAKE 1 42 MSE-5310 ANILAM ENCODER CABLE 20' FOR 6000 CONTROL 1 42 Y Axis FANUC Encoder Cable 1 43 ASY-6170 ANILAM MOTOR CABLE ASSEMBLY 1 maintenance HR SERIES.doc 8 OF 29

9 43 Y Axis FANUC Motor Cable Assembly 1 44 BEN Gang Solenoid Valve W/Base (Optional) 1 45 BEN-1058 AirBlast Solenoid Valve 110 Vac 1 Y Lower Way Cover HR 30/40 1 BEN-1166 Y Lower Way Cover HR 50/60 BEN-1255 Y Lower Way Cover HR 80/100 maintenance HR SERIES.doc 9 OF 29

10 X AXIS TABLE HR 30/40 maintenance HR SERIES.doc 10 OF 29

11 X AXIS TABLE HR 50/60/80 maintenance HR SERIES.doc 11 OF 29

12 X AXIS TABLE ITEM Part No. Description Specification Qty 1 HR BEN-1180 X-Axis Waycover HR HR BEN-1160 X-Axis Waycovers Left & Right HR HR HR N/A Screw M10 * N/A Washer 4 4 FT00201 Table 1 6 N/A Screw (HR 30/40 only) M6 * N/A Screw (HR 30/40 only) M6 * N/A Screw (HR 30/40 only) M6 * FT00202 Pulley Cover HR POL-1740 Bearing, Back Gear HR Pulley (HR 30/40 only) HR 30/40 1 9A BEN-2600 Rotex Coupling GS 28/38 HR 50/60/80/ N/A Screw M6 * FT00204 Bearing Cover 1 12 FT00205 Nut 1 13 BEN-1220 X/Y Axis Ballscrew Thrust 7205 HR 30/ POL-1040 Thrust Bearing for X,Y, Z HR 50/60/80/ N/A Screw M8 * N/A Washer 4 16 BEN-1190 X-Axis Motor Housing HR 30/ A X-Axis Motor Housing HR 50/60/80/ N/A Key mm 1 18 BEN-4106 X-Axis Ballscrew HR BEN-4102 X-Axis Ballscrew HR BEN-4110 X-Axis Ballscrew HR BEN-4120 X-Axis Ballscrew HR HR BEN-4210 X-Axis Ballscrew HR N/A Screw M6 * FT00208 Yoke 1 21 N/A Screw M8 * FT00209 Bearing Bracket 1 23 N/A Screw M8 * BEN-1225 X/Y- Axis Ballscrew end Bearing HR 30/ HR 50/ HR 80/ FT00210 Bearing Cover 1 26 N/A Screw M6 * N/A Screw (HR 30/40 only) M8 * N/A Washer HR 30/ Pulley (Motor) (HR 30/40 only) REFER TO SERIAL NUMBER 1 30 Belt (HR 30/40 only) REFER TO SERIAL NUMBER 1 maintenance HR SERIES.doc 12 OF 29

13 31 FT00212 Motor Plate (HR 30/40 only) 1 32 FT00213 Gib Screw 2 33 FT00214 Gib 1 34 FT00215 Saddle 1 35 FT00216 Gib 1 36 FT00217 Wiper 2 37 FT00218 Wiper 2 38 FT00219 Gib Screw 2 39 FT00220 Bracket 1 40 FT00221 Gib 1 41 FT00222 Gib 1 42 FT00223 Gib Screw 6 43 WA024 Washer N/A Screw M5 * N/A Screw M12 * FT00224 Bracket 1 47 SWT-5014 X-Y Home Limit Switch 1 48 MTR-3154 ANILAM 6000 X/Y 2.42kW 1160E MOTOR 1 48 MTR-3402 ANILAM AM1160A 6000 X/Y AXIS MOTOR 1 48 MTR-3410 ANILAM AM1160C 6000 X/Y- AXIS MOTOR 1 48 MTR-3432 ANILAM AM1550C X/Y AXIS MOTOR 1 48 MTR-3810 FANUC A12i/3000 SERVO MOTOR 1 48 MTR-3820 FANUC B8/3000IS SERVO MOTOR W/ BRAKE 1 49 MSE-5310 ANILAM ENCODER CABLE 20' FOR 6000 CONTROL 1 49 X Axis FANUC Encoder Cable 1 50 ASY-6170 ANILAM MOTOR CABLE ASSEMBLY 1 50 X Axis FANUC Motor Cable Assembly 1 maintenance HR SERIES.doc 13 OF 29

14 Z AXIS SADDLE maintenance HR SERIES.doc 14 OF 29

15 Z AXIS BASE ITEM Part No. Description Specification Qty 1 BEN-1005 Leveling Pads & Bolts (Set of 6) 6 2 BEN-1005 Nut 6 3 BEN-1005 Screw 3/4" - 3" 6 4 FB00403 Base 1 5 FB00404 Motor Plate 1 6 N/A Washer 4 7 N/A Screw M8 * Belt REFER TO SERIAL NUMBER 1 9 Pulley REFER TO SERIAL NUMBER 1 10 FB00406 Bearing Bracket 1 11 N/A Screw M8 * BEN-1225 Z Axis Ballscrew end Bearing HR 30/40/50/ Z Axis Ballscrew end Bearing HR 80/ FB00407 Yoke 1 14 N/A Screw M12 * N/A Screw M8 * BEN-4104 Z-Ballscrew HR 30/ BEN-4114 Z-Ballscrew HR 50/ Z-Ballscrew HR 80/ N/A Key 6-30 mm 1 18 FB00409 Bearing Bracket 1 19 N/A Screw M6 * BEN-1220 Z Axis Thrust and End Bearing HR 30/40/50/ POL-1040 Z Axis Thrust and End Bearing HR 80/ FB00410 Bearing Cover 1 22 N/A Screw M6 * FB00411 Nut 1 24 Pulley REFER TO SERIAL NUMBER 1 25 FB00413 Pulley Cover 1 26 N/A Screw M5 * BEN-1155 Z-Axis Front Waycover HR 30/ BEN-1252 Z-Axis Front Waycover HR 50/ Z-Axis Front Waycover HR 80/ BEN-1150 Z-Axis Rear Waycover HR 30/ BEN-1250 Z-Axis Rear Waycover HR 50/ Z-Axis Rear Waycover HR 80/ MTR-3154 Z-Axis Motor AM 1160 E 1 29 MTR-3402 ANILAM AM1160A 6000 X/Z AXIS MOTOR 1 29 MTR-3410 ANILAM AM1160C 6000 X/Z- AXIS MOTOR 1 29 MTR-3432 ANILAM AM1550C X/Z AXIS MOTOR 1 29 MTR-3810 FANUC A12i/3000 SERVO MOTOR 1 29 MTR-3820 FANUC B8/3000IS SERVO MOTOR W/ BRAKE 1 30 MSE-5310 ANILAM ENCODER CABLE 20' FOR 6000 CONTROL 1 30 Z Axis FANUC Encoder Cable 1 maintenance HR SERIES.doc 15 OF 29

16 31 ASY-6170 ANILAM MOTOR CABLE ASSEMBLY 1 31 Z Axis FANUC Motor Cable Assembly 1 32 BEN-1015 WAYLUBE OIL PUMP 110V, PROGRAMABLE for all HRs 1 33 BEN-1035 FLOOD COOLANT PUMP 1/4HP, 110VAC for all HRs 1 34 MSE-3200 Oil Skimmer (optional) SKIMPY 1 maintenance HR SERIES.doc 16 OF 29

17 HR TABLE GUARD ITEM Part No. Description Specification Qty 1 VB00101 Table guard 1 2 BEN-2250 Upper slide rail HR 30/ BEN-2252 Upper slide rail HR 50/60 3 VB00103 Rail way 2 4 VB00104 Cover 2 5 VB00105 Sight glass 2 6 VB00106 Left door 1 7 VB00107 Right door 1 8 VB00108 Handle 2 9 VB00109 Roller 4 BEN-2130 TABLE MOUNTED SPLASH GUARD (COMPLETE) BEN-2140 TABLE MOUNTED SPLASH GUARD (COMPLETE) BEN-2150 TABLE MOUNTED SPLASH GUARD (COMPLETE) BEN-2160 TABLE MOUNTED SPLASH GUARD (COMPLETE) BEN-2180 TABLE MOUNTED SPLASH GUARD (COMPLETE) BEN-2190 TABLE MOUNTED SPLASH GUARD (COMPLETE) HR-30 HR-40 HR-50 HR-60 HR-80 HR-100 maintenance HR SERIES.doc 17 OF 29

18 HR SHEET METAL maintenance HR SERIES.doc 18 OF 29

19 ARM TOOL CHANGER NOTE 1 OIL CUP NOTE 2 SOLENOID VALVE NOTE 1: OIL CUP SHOULD BE CHECKED MONTHLY FILL AS NEEDED WITH HYDRAULIC OIL FILL CUP HALF WAY NOTE 2: SOLENOID VALVE FUNCTIONS 1.POT UP 2.POT DOWN 3.ARM ORIGIN 4.ARM 60 5.ARM UP & DOWN maintenance HR SERIES.doc 19 OF 29

20 ARM TOOL CHANGER NO PART NO. DESCRIPTION SPECIFICATIONS QTY 1 Arm Assembly 1 2 Pot 24 3 Carousel Motor 220 VAC 200W 1 4 Soleniod 6 5 Limit Switch 1 6 Proximity Sensor 2 7 Air cylinder Arm up & down 1 8 Air cylinder Pot up & down 1 9 Proximity Switch on pot up/down cylinder 2 10 Air cylinder 60 deg.cylinder ass Air cylinder 180 deg. cylinder ass. 1 maintenance HR SERIES.doc 20 OF 29

21 FRYER PART NUMBERS CAT 40 TOL-5450 BT 40 TOL-5456 CAT 50 TOL-5454 NOTE: IF THRU COOLANT IS NEEDED, PLEASE CALL FOR PROPER PART NUMBER RETENTION KNOB maintenance HR SERIES.doc 21 OF 29

22 Leveling Procedure For HR or MC Machines When leveling a machine with more than 6 leveling pads, care must be taken to not twist the base of the machine. This procedure will review the proper steps to level successfully. Tools required per foot level, & 32 mm (1.25) wrench Estimated time HR 1 to 2 hrs, MC 2 to 3 hrs Step 1 With the table centered, level the machine s four outside pads. Be sure that the center pads are not touching, and all four outside pads have load. Also check to make sure that the machine s casting is not touching the floor. Place level in center of table Adjust four pads Step 2 Bring four inside pads down till they are just touching. maintenance HR SERIES.doc 22 OF 29

23 Step 3 Move table to the front of the travel, and level the four front pads. The majority of adjustment should be on the two middle pads. Once level is achieved, verify all four pads have load. Two center pads Step 4 Now move the table to the rear and adjust the final two leveling pads. Once level is achieved, verify all eight pads have load Final pads maintenance HR SERIES.doc 23 OF 29

24 Step 5 Now that the machine should be level, jog the Z-axis back and forth to verify that level is consistent. If it is still out, slowly adjust pads to achieve level thru the travel of the machine. Jog machine Step 6 The final check to be performed is traming of the head. Over a 12 diameter circle you must be within.0005 total indicator reading TABLE SWEEP OVER 12 DIAMETER IN X-Y AXIS maintenance HR SERIES.doc 24 OF 29

25 LEVELING PROCEDURE FOR OUTRIGGERS HR 80 & 100 For added rigidity and better machine performance Fryer Machine Systems recommends that the machine itself and the right and left outriggers be securely bolted to the floor of your facility. Unfortunately due variations in casting design we are unable to give exact dimensions on where each bolt should be. This must be done on a machine to machine basis. Each step must first be completed on both sides before moving to the next step. First: The machine must be leveled. In our facility we use a precision level accurate to within.0005 over 12. A level of that caliber or better will be more than adequate for the set up process of your machine. Second: After the machine is leveled you will need to place the outriggers into position. The two Outriggers as well as the four locating brackets will be marked as to which side is which and also Front and rear. The two outriggers must be placed under the saddle supports but not making Contact with the linear roller bearing. Third: Each bearing on the saddle supports is on its own tapered way. To start the roller bearings must be Pushed as far in toward the center of the saddle support as possible while still being able to Securely tighten the lock nut on the threaded rod. Doing this will give you as much adjustment As possible to eliminate any table rock that will occur when the table is moved from side to side. Fourth: Move the Z axis into the middle of its travel. Place a.002 piece of shim stock in between the roller bearing and the outrigger way. Slowly raise the outrigger with the leveling bolts until there is some friction between the shim and The roller bearing. While doing this you must be sure to keep the outrigger running parallel with The Z axis. This can be checked by placing an indicator base on the saddle, the needle on the way Of the outrigger and running the y axis back and forth over the full travel. If this is not done Serious damage could result. Fifth: After you have some friction between the shim and the roller bearing; remove the shim. Now you Will need two indicators. One must be placed on the front of the saddle with the needle on the Outrigger way and the second on the back of the saddle with the needle also on the way. After this Set up is done move the X axis from the middle of the travel to the end of the travel on the side that The indicators are set up on. The numbers you see on the indicators is the amount of table rock. The table rock can be taken up pulling the roller bearings out towards the front and rear of the Machine. This will put more pressure between the outrigger way and the roller bearing. Make small adjustments and re-check the table rock after each adjustment. When the correct Amount of pressure is applied the resulting table rock amount should be from If you find that you can not adjust the bearing enough to achieve the desired number you can Also raise the outrigger with the leveling bolts some more.(be sure to keep the outrigger running Parallel with the Z axis.) After these steps are completed you should be able to move your axis around with no problem. We recommend that some grease be applied the way surface to lubricate the roller bearing. Also the table rock should be rechecked and adjusted if need be about one week after installation. If you have any questions, comments or concerns please feel free to call Fryer Machine Systems at maintenance HR SERIES.doc 25 OF 29

26 High Pressure Coolant System Component description and service procedures Low pressure tank - this component holds the coolant filter and supplies the hi pressure pump. Input feed from the coolant tank. Transfer pump supplies coolant to the low pressure tank, as well as the standard flood coolant system. This pump is not self-priming. Only prime if coolant tank is full High pressure pump supplies the high pressure thru spindle coolant only when turned on separate from flood coolant. MC max pressure 1000psi HR max pressure 300psi maintenance HR SERIES.doc 26 OF 29

27 High pressure pump adjuster this is preset from the factory, and do not recommend changing High pressure gauge will only display reading if there is sufficient backpressure. Tank pressure gauge will display 30 to 35psi with a new filter installed. You must replace the filter if pressure exceeds 50psi. Tank pressure relief valve use to bleed excess air out of the tank after replacing the coolant filter. maintenance HR SERIES.doc 27 OF 29

28 Do not open if drivers are powered on. Machine must be in E-stop. Filter replacement should be performed if the tank pressure gauge exceeds 50psi. You may also experience a high-pressure coolant fault on the cnc control. If this fault occurs check the pressure first. Filter replacement procedure 1. Place machine in e-stop 2. Open ball valve to insure the tank has no pressure. 3. Open top lid of the tank and remove the filter. 4. Discard filter (filter is not reusable) 5. Insert new filter and use installation tool to push the filter down until you feel it snap into place. 6. Close the tank lid and ball valve 7. Now turn on the drives and coolant option 8. You will need to bleed the tank with the ball valve while the high pressure thru spindle coolant is running 9. Now you should be able to continue machine operation. maintenance HR SERIES.doc 28 OF 29

29 Fill point for pump oil - Replace hydraulic oil once a year. If you are using the machine more than a typical 40 hr work week, change oil more frequently. Drain plug for pump oil maintenance HR SERIES.doc 29 OF 29

30 FRYER MACHINE SYSTEMS ELECTRICAL & PROCEDURES MANUAL ANILAM 6000i CONTROL FRYER MACHINE SYSTEMS, INC. 70 JON BARRETT ROAD ROBIN HILL CORPORATE PARK PATTERSON, NY PHONE: FAX: Electrical Manual Anilam 6000i.doc Page 1 of 25

31 Maintenance Manual Electrical and Procedure Section for Anilam 6000i control Table of Contents Safety Rules.Page 3 Startup Procedure.Page 4 Startup Report..Page 6 Electrical Panel Layout Page 8 External Transformer wiring Page 9 Pneumatic Arm ATC adjustment and repair Page 11 Carousel ATC details Page 16 Coolant system connections.page 21 Anilam 6000i M codes.page 22 Maintenance schedule...page 23 Renishaw tool probe installation..page 24 Optional Spindle chiller details Page 25 Electrical Schematics Page 26 Electrical Manual Anilam 6000i.doc Page 2 of 25

32 SAFETY RULES READ BEFORE OPERATING MACHINE 1. PREVENT LOOSE CLOTHING, HAIR, JEWELRY FROM CONTACTING SPINDLE 2. NEVER: CHANGE TOOLS, HANDLE SPINDLE, CHANGE PARTS OR PERFORM WORK ON MILL UNLESS CNC IS IN EMERGENCY STOP OR TOOL CHANGE MODES 3. ALWAYS WEAR EYE PROTECTION WHEN OPERATING MILL. 4. DO NOT OPERATE MILL WITHOUT AXIS MOTOR COVERS OR AXIS WAY COVERS IN PLACE. 5. DO NOT PLACE OBJECTS OR HANDS BETWEEN COLUMN AND TABLE/SADDLE ASSY, UNLESS CNC IS IN EMERGENCY STOP POSITION. 6. DO NOT MODIFY EQUIPMENT WITHOUT APPROVAL FROM FRYER MACHINE SYSTEMS. DOING SO MAY VOID YOUR WARRANTY. 7. ELECTRICAL ENCLOSURES CONTAIN HIGH VOLTAGE. DISCONNECT EQUIPMENT FROM POWER SOURCE BEFORE OPENING CABINETS. 8. CHECK LUBRICANT FILL LEVELS BEFORE OPERATING. 9. DO NOT OPERATE POWER DRAWBAR UNIT WHILE SPINDLE IS IN MOTION. 10. EMERGENCY STOP MILL WHEN NOT IN USE 11. KEEP VISES, CLAMPS, FIXTURE OR WORKPIECE FROM EXTENDING BEYOND BACK EDGE OF TABLE. 12. TURN OFF POWER IF: POWER PROBLEMS DEVELOP IN THE EVENT OF ELECTRICAL STORMS. AMBIENT TEMPERATURES EXCEED 105 DEGREES FARENHEIT. Electrical Manual Anilam 6000i.doc Page 3 of 25

33 STARTUP PROCEDURE FOR FRYER VB/MC SERIES MILLS WITH ANILAM 6000i CONTROLLERS Unpack Machine: 1. Remove plastic wrap. Carefully inspect for any damage. 2. Install leveling pads and level machine. (This is usually the responsibility of the rigger or customer) Assistance will be necessary to perform the following steps: 3. Using a socket or suitable wrench (Pliers are not recommended) turn the Z ballscrew clockwise from the top of the screw enough to remove wooden shipping block on table. Be careful not to let the ratchet/wrench slip backwards. 4. Turn the ratchet/wrench counter clockwise until counterweight chains are taut, and counterweight bar is free 5. Remove counterweight bar. At this time you must remove the ratchet/wrench otherwise serious damage could occur. 6. Install the Z-Axis motor and drive belt, and any other items that may have been removed for shipping purposes. Make sure to align marks on direct drive coupling if equipped. Do not tighten motor locking bolts until motor is floated into center. 7. Check that front panel with swivel arm is clear of Z-Axis head motion. (If equipped) 8. Optional ATC: Remove the carousel support bolted to the table. Remove the locking orange bracket to prevent the carousel to slide back and fourth(mounted on rear of atc next to large air cylinder). Line voltage check: 1. Verify 230/460 vac. (+/- 10%) is wired to the main disconnect correctly. (460vac. Optional). The factory configuration is stamped on the serial number plack. The transformer equipped with all 6000i controls has multiple taps, that should be configured for 400VAC at the control amplifier input. See documentation included with this manual. 2. Check all wire connections, relays, contacts, and plugs to be sure nothing has come loose. If so, reseat or tighten before turning on main power. All voltage checks should be recorded on the STARTUP REPORT form. Machine power-up procedure: 1. Turn the 230/460VAC disconnect switch rod on the electrical cabinet with a pair of pliers a ¼ turn clockwise. 2. Boot-up the control. 3. Release the E-stop switch and press SERVO RESET to engage servo drives. Electrical Manual Anilam 6000i.doc Page 4 of 25

34 Voltage checks (All voltages +/- 10%): 1. Check for 110vac: terminal strip #1 AC hot #2 AC neutral 2. Check for 220 vac 3 phase: terminal strip #13- #14- #15 3. Check for 400 vac 3 phase: terminal strip #L1-#L2-#L3 4. Check for +24vdc: terminal strip #12=24 vdc #20=com Additional Checks: 1. Make sure way surfaces are receiving sufficient oil from pump. 2. Make sure air pressure to regulator-lubricator unit is set at 90 psi minimum. 3. Check the tool change height and orient position. 4. Check for proper phasing on all three phase motors. Especially arm style ATC carousel motor, flood pump, wash-down pump, chip auger, and spindle motor fan. All information should be recorded on a Fryer Machine Startup Form with any unusual conditions listed and returned to Fryer Machine Service Dept. If any problems are encountered or if you have any questions, please contact FRYER MACHINE SYSTEMS Service Department at (845) Electrical Manual Anilam 6000i.doc Page 5 of 25

35 70 Jon Barrett Road Robin Hill Corporate Park Patterson, N.Y Phone: (845) Fax: (845) STARTUP REPORT - ANILAM 6000i Control CUSTOMER DATE: MODEL #: SERIAL #: CONTROL SN#: DISTRIBUTOR: SERVICE TECH: SHOP CONTACT: TITLE: ATTENTION: ITEMS CAN BECOME LOOSE DURING SHIPPING CAUSING A LOSS OF CONNECTIONS. THIS MAY RESULT IN IMPROPER MACHINE FUNCTION AND/OR DAMAGE TO THE MACHINE OR COMPONENTS. BEFORE INITIAL POWER-UP: TIGHTEN ALL SCREWS AND ELECTRICAL CONNECTIONS IN THE ELECTRICAL CABINET. CHECK TO ENSURE THAT ALL ELECTRICAL COMPONENTS ARE PROPERLY SEATED AND SECURED. ELECTRICAL CONNECTIONS AND COMPONENTS CHECKED: ELECTRIAL CABINET 220/440vac: (MAIN DISCONNECT SWITCH) 110vac: (tb#1- tb#2) 400vac: (tb#l1-tb#l2-tb#l3) 24vdc: (tb#12-tb#20) AIR PRESSURE: WAYLUBE PRESENT AT X, Y & Z BOX WAY SURFACES. HOUR METER READING COUPLING ORIENTATION AND AXIS TRAVEL CHECKED INITIAL START-UP QUALITY SURVEY At Fryer Machine Systems, we strive to continuously improve the quality of our products and services. As a qualified machine tool technician, your feedback is an essential part of this ongoing process. Please take a moment to fill out the following information. It will be greatly appreciated. Please circle the appropriate response (1=worst, 5=best) for each question. Feel free to add any comments. Electrical Manual Anilam 6000i.doc Page 6 of 25

36 MISSING PARTS Were there any parts missing?...yes No If yes, what was missing? INITIAL IMPRESSIONS Was machine received in satisfactory condition?...yes No If no, what was lacking? Please rate the overall appearance of the machine: Comments: PERFORMANCE Please rate the mechanical systems of the machine: Please rate the electrical systems of the machine: Comments: SERVICE Were there any problems with the machine during start-up?...yes No If yes, please list: What issues, if any, are still outstanding? Was our Service Dept. helpful during the start-up? Please rate us: ADDITIONAL COMMENTS: Electrical Manual Anilam 6000i.doc Page 7 of 25

37 PANEL LAYOUT Electrical Manual Anilam 6000i.doc Page 8 of 25

38 Fryer Mill with Anilam 6000 and 20KVA Transformer Setup The Anilam 6000 control requires special secondary voltage of 400 vac. This requires a special transformer to be installed on all mills equipped with this control. The 20KVA transformer is used on all mills except ones with the 30 Horsepower spindle option. The transformer is pre-wired at the factory for the primary voltage specified at time of order and the machine serial number tag. Main input power must ONLY be connected to the line side (TOP) of the disconnect switch located inside the electrical cabinet. NEVER connect main power directly to the Transformer. Following is an explanation of how to configure the transformer (all wiring changes are done inside the transformer) for the two most common incoming primary voltage ranges. Refer to the specifications on the front cover of the transformer for other possible inputs ( V). For VAC input (Voltage must be within this range or warranty will be void.), connect the internal tap wires from H1-H2-H3 to each corresponding tap (4=250, 5=230, 6=210) respectively (one wire per phase). The 3-12 AWG black wires labeled as should be connected to H1, H2, H3 respectively alongside with the input AC wires ONLY when volt primary is used. For VAC input (Voltage must be within this range or warranty will be void), connect the internal tap wires from H1-H2-H3 to each corresponding tap (1=483, 2=460, 3=437) respectively (one wire per phase). The 3-12 AWG black wires labeled as should be connected to X1-13, X2-14, X3-15 Electrical Manual Anilam 6000i.doc Page 9 of 25

39 Fryer Mill with Anilam 6000i Controls and 25KVA Transformer Setup The Anilam 6000 control requires special voltage of 400 volts AC. This requires a special transformer to be installed on all mills equipped with this control. The 25 KVA transformer is only used on mills equipped with the 30 HP spindle motor. The transformer is pre-wired at the factory for the primary voltage specified on the order and the machine serial number tag. Main input power is ALWAYS connected to the line side of the disconnect switch located inside the electrical cabinet. NEVER connect main power directly to Transformer wires. Following is an explanation of how to configure the transformer ( all wiring changes are done inside the transformer) for the two possible incoming voltage ranges. For VAC input (Voltage must be within this range or warranty will be void.), connect the wires with white insulation from H1-H2-H3 to corresponding taps #2 on the transformer phase columns. The 12 AWG black wires labeled as should be connected to H1, H2, H3 respectively along with the input AC wires. For VAC input (Voltage must be within this range or warranty will be void), connect the wires with white insulation from H1-H2-H3 to corresponding taps #1 on the transformer phase columns. The 12 AWG black wires labeled as should be connected to Y1, Y2, Y3 respect.. Electrical Manual Anilam 6000i.doc Page 10 of 25

40 ATC Pneumatic Arm Operation and Repair with Anilam 6000i control ATC Operation Guidelines Due to the complexity and timing of the ATC, it should only be operated with the M6 command. Never interrupt the tool changer in the middle of cycle, wait for it to complete the tool change. If a low air alarm sets and the tool gets stuck in the spindle, then go to the recovery section on page 3 of this document. This is a random access tool changer to reduce tool change time. The machine will always keep track of the correct tool even though it may not agree with the bin #. You can have the carousel move to the next tool requested with a T# command on a line by itself. When a tool change is specified (M6) this tool # will be loaded into the spindle. If the t code is programmed on the same line as the M6 command make sure the M6 is before the T code (example: M6T4). Most tools have a deeper notch on one side of the tools v-flange. The ATC carousel will only allow this deeper notch to fit into the carousel key. Make sure when installing tools in spindle this orientation is verified. After spindle orientation the key slot on the v-flange of the tool furthest from the operator will align with the key on the carousel. The carousel motor is a 3 phase motor and must be phased correctly for proper direction. M58 will increase carousel position to next higher tool number. The machine is phased properly at the factory before shipment, so if carousel rotates wrong direction switch any two incoming power wires at disconnect. Make sure main power breaker is off! Manual operation of tool change solenoid valves If the tool changer gets hung up the solenoid valves can be operated manually to reset the tool changer. Here is a description of the operation of the valves. Access the air solenoid valves for the tool changer behind the door on the front of the ATC. There is a diagram of the operation of each solenoid. These can be run manually by depressing the blue manual override buttons. Make sure you push the buttons in sequence otherwise damage could be done to the ATC. There are three two way solenoid valves mounted horizontally. The top solenoid valve controls the carousel tool pot; left button returns tool pot to up position, right button drops pot down. The middle solenoid controls the arm movement 60 under the spindle and to normal rest position. The right button moves the arm under the spindle nose to grab a tool, left button moves the arm back to its normal clearance position. The bottom solenoid controls the arm down and 180 and arm up. The right button moves the arm down and then 180, the left button returns the arm up. The proper sequence of a tool change and the respective M-codes is as follows: (Note that you will have to press the cycle start button twice to execute these commands) 1. T-code to move carousel to pending tool 2. M52 tool pot down 3. M68 moves z axis to tool change position 4. M60 spindle orient 5. M62 Arm moves under spindle to grab tool and carousel pot 6. M54 turns drawbar on 7. M64 Arm removes tool from spindle and carousel tool pot and swaps them 8. M65 arm up to install pending tool in spindle and old tool into carousel pot. 9. M55 Drawbar off to grab tool in spindle. 10. M63 Arm origin 11. M53 carousel tool pot up Electrical Manual Anilam 6000i.doc Page 11 of 25

41 Tool Change Height Adjustment The proper tool change height must be set for the ATC to perform correctly. The tool change height (machine coordinates from home position) is stored in parameter NP_DG_TC_pos_Z_put_in. This will have to be checked if the home position is different due to removing the z motor or home switch or dog. Here is a procedure to set this height correctly: There is some allowance ( play ) allowed for the tool change height (about.03 ) This is the difference between the v flange groove of the tool and the v location of the arm. You will see this vertical play if you install a tool into the arm when the machine is in e-stop. Make sure you do not leave the tool there! 1. Home the machine. 2. Move the z-axis to the tool change height with an M68 command in manual mode. The number is derived from the distance from home position (machine zero) to the proper height for tool change. To get to this parameter from manual mode: -Press shift -(F3) config -Password= 222 (may not be necessary if you already typed in the password) -(F6) config data -Now you will have to follow the directory tree by opening up each folder and edvancing into the proper subfolders. The path is a follows: System-PLC-cfgoemposition The parameter for tool change height is: NP_DG_TC_pos_z_put_in. That number is in MM (millimeters) and is a negative value. Change display to read in MM to get a direct read out in the Machine Coordinates box in Z =(ex MM) 3. Orient the spindle with an M60 command. 4. Install a tool in the spindle. 5. Press the middle right solenoid manual button to grab the tool, see the description of manual solenoid operation. 6. Look to see if the position of the z axis will cause the v flange groove of the tool is in the center of the arm v notch. Return the arm manually back out of way with the middle left button on the solenoid valve. Adjust the tool change height parameter outlined in step 2 and repeat until correct alignment is achieved. 7. At this time you can alternate the middle left and middle right button to check for smooth engagement of the arm into and away from the tool. If the arm doesn t respond smoothly then further z axis height adjustment may be required. Spindle Orient Adjustment 1. With z axis at maximum positive limit and ATC arm under spindle nose (manual solenoid button 2 nd on right). Make sure spindle can be spun without spindle keys hitting ATC arm. 2. Orient spindle with M60 3. Look to see if spindle keys are in alignment with notch in the arm. 4. In manual follow the steps below to get to the orient postion parameter: -Press shift -Password=222 (may not be necessary if you already typed in the password) -(F6) config data -Now you will have to follow the directory tree by opening up each folder and edvancing into the proper subfolders. The path is a follows: System-PLC-cfgoemposition The parameter for spindle orient position is: NP_DG_TC_pos_spindle 5. Command M5 cycle start. This will turn off the orient command. 6. Repeat steps 2 and 5 and adjust parameter until correct. Recovering From Tool Change Failure If the tool changer fails you may get an alarm timeout in spindle sequence, this means that after 30 seconds of waiting a function did not get it s proper finish signal. You must look to see what function did not complete. It most likely had to do with movement of the arm. Look at the solenoid valves, the solenoid valve that is illuminated is the operation that failed. Press emergency stop. If the arm did not complete grabbing the tool, make sure the pot is down and then press the arm return manual button. Refer to manual operation of tool changer pneumatic solenoid valves. After the arm is returned to normal resting position, tool is removed from the spindle and carousel pot returned manually, the carousel pots may have to be reset. If the carousel does not rotate check the fuses in the electrical cabinet. Refer to electrical schematics in maintenance manual. Electrical Manual Anilam 6000i.doc Page 12 of 25

42 Tool Carousel Reset To reset all the tool bin locations follow this procedure. 1. Remove tool from spindle 2. In MDI command : M6T0 cycle start 3. Remove any tool from spindle 4. In MDI command : M61 cycle start ( this will index carousel to bin #1 ) 5. Go to tool table, soft key F9, and then press soft key F4 BIN. The bin numbers on the left hand side will be 0-#pots in carousel, set the tool number to the same as the bin number leaving bin 0 blank. 6. Remove all tools from carousel and reinstall. Arm Alignment If the arm no longer moves in the proper angular alignment then an adjustment may be required. The arm is held in place on the arm shaft with a compression clamp. 1. Install tool in spindle 2. Orient spindle M60 3. Install tool in carousel pot 4. Drop carousel pot down with manual button(top right) 5. Move z axis to tool change height M68 6. Move arm to grab tools with manual button.(middle right) 7. Loosen socket head cap screws at bottom center of arm and align arm to grab tools fully. Once completed adjustment tighten screws. 8. Move arm back to origin location with manual button (middle left) 9. Remove tools 10. Reset carousel pot back up with manual button. (top left) 11. Turn off orient with M5 command Electrical Manual Anilam 6000i.doc Page 13 of 25

43 Arm Up/Down Ram 6 control solenoids (6) (1) (5) (2) (4) (3) Home and In Position at spindle indicators. Figure 1: Pneumatic ATC unit with covers off (front view). Tool Pot up/down ram w/ position sensors mounted on it. Electrical Manual Anilam 6000i.doc Page 14 of 25

44 6 control solenoids (6) (1) (5) (2) (4) (3) Note the blue button on each for manual activation. Home and In Position at spindle indicators. Oiler cup with oil at proper level for operation. Oil should always be visible In the glass bowl with a minimum level at the disk in the lower portion of the bowl. Figure 2: Pneumatic ATC unit with covers off. A typical recovery sequence for an out of position ATC arm is as follows: Be sure that Z-axis is up at home position (if possible) and all tool holders are removed from arm and spindle first. Push the blue buttons on the solenoid controls shown in Figure 1 and 2 above in the following order. 1. Push blue button on #3 2. Push blue button on #2 3. Push blue button on #4 4. Push blue button on #5 5. Push blue button on #6 Electrical Manual Anilam 6000i.doc Page 15 of 25

45 CAROUSEL TOOL CHANGER Electrical Manual Anilam 6000i.doc Page 16 of 25

46 SERIES SPECIFICATIONS Carousel Tool Changer Maintenance Electrical Manual Anilam 6000i.doc Page 17 of 25

47 Electrical Manual Anilam 6000i.doc Page 18 of 25

48 Electrical Manual Anilam 6000i.doc Page 19 of 25

49 Electrical Manual Anilam 6000i.doc Page 20 of 25

50 COOLANT SYSTEM HOOK-UP PROCEDURE THE COOLANT PUMP HAS 2 PORTS LOCATED ON EITHER SIDE OF THE PUMP. THE (IN) PORTS WHICH ARE A ¾ SIZE MUST BE HOOKED UP TO THE COOLANT PAN OUT PORTS. THESE ARE LOCATED ON THE LOWER REAR CORNERS OF THE MACHINE. SECURE THE HOSE USING HOSE CLAMPS, THE (OUT) SIDE OF THE PUMP HAS 3 PORTS, ONE IS A ½ HOSE AND TWO ARE A ¾ HOSE. THE ½ HOSE GETS HOOKED UP TO THE COOLANT FEED LINE AND THE ¾ HOSE GETS HOOKED UP TO THE WASHDOWN PORTS LOCATED ON BOTH SIDES OF THE MACHINE. THE WASH DOWN PORT IS EQUIPPED WITH A BALL VALVE ENABELING THE OPERATOR TO SHUT DOWN THE WASHDOWN COMPLETELY OR JUST ONE SIDE SECURE ALL LINES USING HOSE CLAMPS. Electrical Manual Anilam 6000i.doc Page 21 of 25

51 ANILAM 6000i M Codes This document is information pertaining to operation and maintenance of all Fryer machining centers and vertical bed machines with Anilam 6000i controls. LIST OF M-CODES *M00 PROGRAM STOP *M01 OPTIONAL PROGRAM STOP *M02 END OF PROGRAM *M03 SPINDLE CLOCKWISE *M04 SPINDLE COUNTERCLOCKWISE *M05 SPINDLE STOP *M06 TOOL CHANGE REQUESTED *M07 MIST COOLANT OUTPUT(SPINDLE MAY HAVE TO BE ON) / OPTIONAL AIR BLAST *M08 FLOOD COOLANT (SPINDLE MAY HAVE TO BE ON) *M09 COOLANT (FLOOD AND MIST) OFF *M10 INDEXER CYCLE START WAIT FOR COMPLETION *M11 MISC. MCODE M11=ON *M12 MISC. MCODE M12=OFF *M13 U AXIS BRAKE ON *M14 U AXIS BRAKE OFF *M15 W AXIS BRAKE ON *M16 W AXIS BRAKE OFF *M17 HIGH PRESSURE THRU SPINDLE COOLANT ON *M18 HIGH PRESSURE THRU SPINDLE COOLANT OFF *M19 SPINDLE POSITION AND LOCK *M20 CHIP AUGER ON (CHIP WASHDOWN. PRIME PUMP FIRST) *M21 CHIP AUGER REVERSE *M22 CHIP AUGER OFF *M40 SHIFT GEARBOX INTO LOW RANGE *M41 SHIFT GEARBOX INTO HIGH RANGE *M50 DISABLE SPINDLE DRIVE FOR INDICATING PURPOSES *M51 ENABLE SPINDLE DRIVE FOR OPERATION *M52 ATC CAROUSEL IN (ARM ATC POT DOWN) *M53 ATC CAROUSEL OUT (ARM ATC POT UP) *M54 DRAWBAR ON *M55 DRAWBAR OFF *M58 ATC CAROUSEL CW 1 POSITION *M59 ATC CAROUSEL CCW 1 POSITION *M60 SPINDLE ORIENT FOR TOOL CHANGE *M61 HOME ATC CAROUSEL TO POCKET 1, ASUMES TOOL 0 IN SPINDLE *M62 ARM ATC GRAB TOOL(ON ELECTRIC ATC ALSO SWAPS TOOLS AND GOES UP) *M63 ARM ATC ARM ORIGIN *M64 PNEUMATIC ARM ATC ARM DOWN AND SWAP TOOLS *M65 PNEUMATIC ARM ATC ARM UP Electrical Manual Anilam 6000i.doc Page 22 of 25

52 MAINTENANCE SCHEDULE fill lube pump 1 fill drawbar lube 2 check coolant level change coolant 3 check machine level check gibs check backlash check belt tension check servo cabinet and console fans, clean filters daily weekly monthly 3 months 6 months yearly as req d. replace servo cabinet and console filters 4 X X X X X X X X X X 1 -Mobil Vactra #2 (ISO 68) or equivalent 2 -Break-Free Synthetic Air Tool Oil (5W) or equivalent 3 -Valenite Turn Tech Blue Metalworking Fluid or equivalent 4 -See Anilam Manual Electrical Manual Anilam 6000i.doc Page 23 of 25

53 Renishaw Tool Probe Installation This will assist you in setting up and installing your Renishaw TS-27R tool probe on your Fryer milling machine with Anilam control. Make sure you read the instruction manual that came with the Renishaw probe and the Anilam manual pertaining to probing cycles. The probe has been pre-wired and tested on the Fryer machine at the factory. The manuals also can be downloaded in PDF format from either Renishaw.com or Anilam.com Installation should be completed at the customer s facility. Follow these basic instructions referring to the manufacturers manuals for further details: 1. Find a suitable mounting location for the probe ( most common is the far right hand corner of the table ) The probe should be mounted with the stylus pointing up and towards the left, this will exit the cable to the right. The Stylus should be approximately ½ the largest tool diameter used from the positive limit in x axis and at the rearmost t-slot(as long as it is a couple inches from the y limit). A t-nut can be used to mount the probe base with a ½-13 socket head cap screw. Make sure the cable will not interfere with anything during machine operation. 2. Once the probe is securely mounted tram the probe within.0002 perpendicular and parallel to the machine slides. See Renishaw installation manual for further details. 3. Follow the Anilam instructions to set the parameters according to your installation. 4. Now you will need a tool with a known diameter to preset the tool presetter. You should use the Anilam G150 or tool probe calibration cycle. See the Anilam manual for further details. 5. Once the G150 cycle is accomplished a G53 fixture offset should be activated and set to the top of the part so that all other tool to be set with the G151 cycle will be referenced to the top of the part. Electrical Manual Anilam 6000i.doc Page 24 of 25

54 Fryer Optional Chiller Instructions Used on all optional high speed spindles and automatic gearbox INSTALLATION: The chiller has been wired and tested at the factory. The reservoir is filled with ISO#32 spindle oil. At installation check the level at the tank sight glass and top off as necessary. The ambient temperature to run the chiller must be between Fahrenheit (5-40 Celsius). The working range of the chiller is between Fahrenheit (25-35 Celsius). The factory preset is to run at 77 F. This is the optimal setting for most applications. The chiller must be located in a clean dry area with good ventilation and level. WIRING: The chiller is pre-wired at the factory. Incoming 3 phase power is applied at terminals R-S-T. Ground is connected to E. Terminals 93 and 95 are fault contacts going back to the CNC control. Terminals 224 and 225 are the remote start inputs. Do not turn the chiller off or on with the on switch on the chiller operator panel. This will bypass the remote on from the CNC and cause an alarm on the CNC. ADJUSTMENT: The display on the chiller normally shows the oil temperature. To adjust the preset temperature when the refrigeration will cycle on press the left arrow button. The display will now show the preset value. This should be set at 25 Celsius (77 Fahrenheit). Use the right and left arrow keys to adjust. Wait for 5 seconds and the display should revert back to displaying the liquid temperature. TROUBLESHOOTING: 1. Alarm on CNC control Spindle chiller alarm : Look at the chiller for any alarms. If the display is blank press the ON button on the chiller. If there still is no display check the fuses in the CNC electrical cabinet (normally fuses D1- D2_D3). 2. If there is an alarm displayed on the chiller,here is a brief listing: AL-1 REV: Phase failure or out of phase, The is not three phase present or line is out of phase. Switch any two lines at the terminal strip in the chiller R-S or T. Check the fuses in the CNC cabinet. AL-2 PUMP: The pump motor is not functioning properly. -Check that there is no obstruction in lines -Reverse red and white wire of thermal relay 51P in chiller -Replace pump -Add recirculating oil to the reservoir -Adjsut the oil pressure switch to.3kgf/cm2 under.5-.8cmhg -Reset the thermal overload AL-3 COMP: The compressor motor is not functioning properly. -Reset the thermal overload -Replace the compressor AL-4 RA: Temperature probe of the room is not functioning properly -Replace the RA room temperature probe AL-5 RO: Temperature probe of oil is abnormal -Replace the RO liquid temperature sensor AL-6 OT: The cooling oil is overheating -Shut down the coller and wait until the temperature drops to acceptable levels. -Recharge Freon. -Check level of oil MAINTENANCE: -Clean the filter net periodically as required. -Replace oil as required and make sure there is no blockage in the lines. Electrical Manual Anilam 6000i.doc Page 25 of 25

55

56

57

58

59

60

61

62

FRYER MACHINE SYSTEMS MC P MECHANICAL MANUAL

FRYER MACHINE SYSTEMS MC P MECHANICAL MANUAL FRYER MACHINE SYSTEMS MC 30-60 P MECHANICAL MANUAL FRYER MACHINE SYSTEMS, INC. 70 JON BARRETT ROAD ROBIN HILL CORPORATE PARK PATTERSON, NY 12563 PHONE: 845-878-2500 FAX: 845-878-2525 WWW.FRYERMACHINE.COM

More information

FRYER MACHINE SYSTEMS VB SERIES MECHANICAL MANUAL

FRYER MACHINE SYSTEMS VB SERIES MECHANICAL MANUAL FRYER MACHINE SYSTEMS VB SERIES MECHANICAL MANUAL FRYER MACHINE SYSTEMS, INC. 70 JON BARRETT ROAD ROBIN HILL CORPORATE PARK PATTERSON, NY 12563 PHONE: 845-878-2500 FAX: 845-878-2525 WWW.FRYERMACHINE.COM

More information

BARON-MAX V Range Vertical Machining Centers Powerful Machines, Simple User Friendly Programming At a Very Affordable Pricing

BARON-MAX V Range Vertical Machining Centers Powerful Machines, Simple User Friendly Programming At a Very Affordable Pricing BARON-MAX V Range Vertical Machining Centers Powerful Machines, Simple User Friendly Programming At a Very Affordable Pricing Cost Effective, High Performance Vertical Machining Centers BARON-MAX V Range

More information

Centers. power and. accuracy. 12/16 KW 24 tools Double arm. High quality surface finishing. to 12,000 rpm. tools ATC Magazine

Centers. power and. accuracy. 12/16 KW 24 tools Double arm. High quality surface finishing. to 12,000 rpm. tools ATC Magazine BARON-MA AX VL Range Vertical Machining Centers Linear Guide ways VL Rangee Powerful Machines, Simple User Friendly Programming Att a Very Affordable Pricing Cost Effective, High Performance Vertical Machining

More information

BARON-MAX VB Series Vertical Machining Centers

BARON-MAX VB Series Vertical Machining Centers BARON-MAX VB Series Vertical Machining Centers Heavy Duty Performance The Baron Max VB series offers versatility and value. Ideal for production and job shop applications, the rugged construction allow

More information

Haas Factory Outlet. A Division Of Trident Machine Tools, Inc. SERVO: 5907 MOTION: 242. Performance Inspection Report VMC SPINDLE: 1074

Haas Factory Outlet. A Division Of Trident Machine Tools, Inc. SERVO: 5907 MOTION: 242. Performance Inspection Report VMC SPINDLE: 1074 Haas Factory Outlet USAGE TIME A Division Of Trident Machine Tools, Inc. SERVO: 5907 MOTION: 242 Performance Inspection Report VMC SPINDLE: 1074 RUN: 6047 MACHINE: MM CUSTOMER: Diman Regional Vo Tech TOOL:

More information

BARON-MAX VL Range Vertical Machining Centers

BARON-MAX VL Range Vertical Machining Centers BARON-MAX VL Range Vertical Machining Centers Linear Guide ways VL Range Higher Efficiency, Rigid Structure, Excellent and Stable Accuracy At a Very Affordable Pricing Cost Effective, High Performance

More information

CNC Vertical Machining Centers

CNC Vertical Machining Centers CNC Vertical Machining Centers The Best Valued VMC in the Market Today... Take a Minute and Compare Whatever the requirement there is a Storm VMC for Every Application Storm CNC Vertical Machining Centers

More information

Wherever you are there is a qualified service engineer available to meet your service needs.

Wherever you are there is a qualified service engineer available to meet your service needs. Amera-Seiki service is begins with its nationwide chain of dealers, factory trained and well educated in its machine tools. As well, Amera Seiki fields a full complement of factory direct engineers covering

More information

EM-2033L CNC VERTICAL MACHINING CENTER

EM-2033L CNC VERTICAL MACHINING CENTER Page 1 of 11 Quote No. 021315-5 EM-2033L EM-2033L CNC VERTICAL MACHINING CENTER Page 2 of 11 Quote No. 021315-5 EM-2033L CHEVALIER s EM series VMCs are designed for high precision, productivity, and high

More information

NXV1020A. High Performance Vertical Machining Center

NXV1020A. High Performance Vertical Machining Center STANDARD FEATURES POWERFUL 25 HP IDD SPINDLE BBT TYPE HIGH SPEED 24 TOOL SWING-ARM ATC SYSTEM MXP 200FA WITH MANUAL GUIDE I 60 DEGREE CHIP AUGER 12,000 RPM MAXIMUM SPINDLE SPEED 40mm THK NR TYPE LINEAR

More information

CNC Tool Room Milling Center MODEL: VM-760

CNC Tool Room Milling Center MODEL: VM-760 CNC Tool Room Milling Center MODEL: VM-760 MACHINE FEATURES 7.5HP high torque spindle motor, low noise and vibration BT40/CAT40/DIN40 6000 rpm spindle speed, ( Optional 8,000, 10,00, 12,000 or 15,000rpm

More information

Copyright EXTRON All rights reserved E-M-EN EXTRONCNC.com

Copyright EXTRON All rights reserved E-M-EN EXTRONCNC.com YIH CHUAN MACHINERY INDUSTRY CO., LTD HEADQUARTERS 40755 No.8, 9 Rd., Taichung Industrial Park, Taichung, Taiwan T e l : +886-4-2359-3351 Fa x : +886-4-2359-0012 E-mail : extron@extroncnc.com th YIH CHUAN

More information

MSeries. High Rigidity Vertical Machining Centers

MSeries. High Rigidity Vertical Machining Centers MSeries High Rigidity Vertical Machining Centers M Series With 40 years experience of manufacturing machine tools, EXTRON has continuously developed and provided creative machine tools for global customers.

More information

PREPOINT CHAMFER GRINDER MODEL Section 1. Set up and operation

PREPOINT CHAMFER GRINDER MODEL Section 1. Set up and operation PREPOINT CHAMFER GRINDER MODEL 6-94 Set up and operation Section 1 1. Installation of the proper size collet. This machine used a 5-C style collet. This can be changed by loosening of he set screw located

More information

CABINET REEL OPERATING INSTRUCTIONS

CABINET REEL OPERATING INSTRUCTIONS CABINET REEL OPERATING INSTRUCTIONS MODELS 15, 25, 40 & 60 SERIES RAPID-AIR CORPORATION 4601 KISHWAUKEE ST. ROCKFORD, IL 61109-2925 Phone: (815) 397-2578 Fax: (815) 398-3887 Web Site: www.rapidair.com

More information

DAKE / JOHNSON VERTICAL BAND SAW

DAKE / JOHNSON VERTICAL BAND SAW DAKE / JOHNSON VERTICAL BAND SAW Model F - 6 INSTRUCTION MANUAL MODEL:F-6 SERIAL NUMBER: DATE PURCHASED: Need band saw blades? Call Dake DAKE (Division of JSJ) 724 Robbins Road Grand Haven, Michigan 4947

More information

LSeries. High Speed Vertical Machining Center

LSeries. High Speed Vertical Machining Center LSeries High Speed Vertical Machining Center L Series With 40 years experience of manufacturing machine tools, EXTRON has continuously developed and provided creative machine tools for global customers.

More information

CNC Double Column Machining Center. SDV-H Series SDV Series.

CNC Double Column Machining Center. SDV-H Series SDV Series. CNC Double Column Machining Center www.sigmacnc.com.tw Special Patent Design Construction Features The Motion of Z-axis is Supported by 2 Linear Guideways The Motion of Z-axis is Supported by 4 Linear

More information

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 HP COOL TECH, INC. COOLANT PUMP PowerPump INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 1 TABLE OF CONTENTS Page Topic 3 Introduction 3 Specifications 3 Warning 4 Safety 5, 6, 7 Installation 8 Use

More information

PERFORMANCE : VALUE PRODUCT CATALOG

PERFORMANCE : VALUE PRODUCT CATALOG PERFORMANCE : VALUE by P a r t n e r s i n P r o d u c t i v i t y PRODUCT CATALOG PERFORMANCE : VALUE A Leading Global Producer FEELER is a leading global producer of numerically controlled machine tools

More information

Section 03: Installation Procedures

Section 03: Installation Procedures Section 03: Installation Procedures Machine Installation & Hook-Up! IMPORTANT Before beginning the Machine Installation & Hook-Up it is important to review the entire Pre-Installation section. Unpacking

More information

JBI Docupunch P33 Automatic Punch

JBI Docupunch P33 Automatic Punch JBI Docupunch P33 Automatic Punch Instruction Manual Provided By http://www.mybinding.com http://www.mybindingblog.com TABLE OF CONTENTS SECTION I: INSTALLATION & TESTING: 1) Uncrating, Inspection & removal

More information

SERIES DL SERIES. High Performance Double Column Machining Center YIH CHUAN MACHINERY INDUSTRY CO., LTD. Double Column Milling

SERIES DL SERIES. High Performance Double Column Machining Center YIH CHUAN MACHINERY INDUSTRY CO., LTD. Double Column Milling DL SERIES Double Column Milling EXCELLENT TRUSTWORTHY ON AND ON YIH CHUAN MACHINERY INDUSTRY CO., LTD 40755 8, 9 th Rd., Taichung Industrial Park, Taichung, Taiwan TEL : +886-4-2359-3351 FAX : +886-4-2359-0012

More information

U1000 U1000 SUPER RT1000 CNC BED TYPE MILLING MACHINE CNC BED TYPE MILLING MACHINE WITH ROTARY TABLE

U1000 U1000 SUPER RT1000 CNC BED TYPE MILLING MACHINE CNC BED TYPE MILLING MACHINE WITH ROTARY TABLE U1000 U1000 SUPER CNC BED TYPE MILLING MACHINE RT1000 CNC BED TYPE MILLING MACHINE WITH ROTARY TABLE U1000 CNC Bed Type Milling Machine Machine Specification U1000 Surface 2500 / 3100 / 3600 900(1050)mm

More information

VERTICAL MACHINING CENTER

VERTICAL MACHINING CENTER VERTICAL MACHINING CENTER Model: TW-1480 (FANUC 0i /32i) OPERATION MANUAL 1 TW-1480 Operation Manual Content CH 1 Description of Operating BOX. 3 1 Description of Operating Box... 3 1-1 Description of

More information

Opera ons & Parts Manual VersaClipper 3100

Opera ons & Parts Manual VersaClipper 3100 Opera ons & Parts Manual VersaClipper 3100 Heavy Duty Servo Driven & Computer Controlled Fully Automa c and Highly Versa le Clip A aching Machine Model #3100 Serial # 1 Revised 09/21/17 Table of Contents

More information

YCM NH450A MAIN FEATURES

YCM NH450A MAIN FEATURES YCM NH450A MAIN FEATURES POWERFUL 15,000 RPM 30HP (BIG-PLUS SPINDLE) BBT-40 TAPER SPINDLE DELIVERS 148FT/LBS [200NM] OF TORQUE, WITH 430PSI THROUGH SPINDLE COOLANT SYSTEM MICRO OIL-AIR LUBRICATION FOR

More information

Damper Actuator Installation

Damper Actuator Installation FANs 268.1, 977, 1628.3 Installation Bulletin EPP-1000 Issue Date 0800 EPP-1000 Series Electro-Pneumatic Positioners A pplication The EPP-1000 is designed for applications where electronic control of pneumatic

More information

INDEX. Fadal. Maintenance Manual

INDEX. Fadal. Maintenance Manual INDEX Numerics 15/15XT 5 15K Air/Oil Spindle Installation 293 Install Component Plumbing 297 Plumbing Spindle 296 Wiring Harness Installation 295 2016L 12 2216 8 3016 10 3016L 14 3020 26 4020 16 4020A

More information

The Industry Standard. Machines shown with optional equipment. H Series Double-Column Machining Centers

The Industry Standard. Machines shown with optional equipment. H Series Double-Column Machining Centers The Industry Standard Machines shown with optional equipment +1.844.302.3792 H Series Double-Column Machining Centers Outstanding Surface Finish, Precision, and Throughput H10 H12 H16 2 Machines shown

More information

Best Diversified Products, Inc. Product Manual. BestReach Rigid Belt. Models BRB 230 OS BRB 230 SS BRB 460 OS BRB 460 SS

Best Diversified Products, Inc. Product Manual. BestReach Rigid Belt. Models BRB 230 OS BRB 230 SS BRB 460 OS BRB 460 SS Best Diversified Products, Inc. Product Manual TM BestReach Rigid Belt Models BRB 230 OS BRB 230 SS BRB 460 OS BRB 460 SS Best Diversified Products Inc. 107 Flint Street Jonesboro, AR 72401 Phone 870-935-0970

More information

Maintenance Information

Maintenance Information Form 16575334 Edition 1 April 2005 Electric Screwdrivers EL, EP and ET 34V DC Series Maintenance Information Save These Instructions WARNING Maintenance procedures have the potential for severe shock hazard

More information

The leader of CNC-technology and services worldwide

The leader of CNC-technology and services worldwide Line UP The leader of CNC-technology and services worldwide Introduction MOTEC also offers all kinds of industrial services including the distribution of spare parts, consultation for engineering applications

More information

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A Crestline Dampening System Installation Instructions A.B. Dick 350, 360, 375 Single & Dual Lever Machines X88-20 01/01 Rev-A GENERAL INFORMATION ATTENTION CRESTLINE DAMPENER OWNER! Accel Graphic Systems

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS REAR DRUM TO DISC BRAKE CONVERSION KIT A130 JEEP CJ SERIES W/AMC-20 REAR AXLES AND 5 x 5-1/2" BOLT CIRCLE Thank you for choosing STAINLESS STEEL BRAKES CORPORATION for your braking

More information

The Storm Range Vertical Machining Centres

The Storm Range Vertical Machining Centres www.colchester-harrison.com The Storm Range Vertical Machining Centres Heavy cast iron base, saddle and table minimise vibration during heavy cutting. 40mm pre-tensioned ballscrews, directly coupled to

More information

Installation Instructions Street Bandit Shifter

Installation Instructions Street Bandit Shifter Installation Instructions Street Bandit Shifter Part Number 80797 (see www.bmracing.com for the latest technical product information) 2006, 2000 by B&M Racing and Performance Products The B&M Street Bandit

More information

EM2040L High-Speed CNC Vertical Machining Center

EM2040L High-Speed CNC Vertical Machining Center Page 1 of 8 8-180063 EM2040L High-Speed CNC Vertical Machining Center MACHINE FEATURES CHEVALIER s EM series VMCs are designed for high precision, productivity, and high speed machining in different industries,

More information

User Notes - Spindle / Motor Setup Guide

User Notes - Spindle / Motor Setup Guide User Notes - Spindle / Motor Setup Guide Air Hoses, Fittings, Air Compressors - CFM / L/s, psi / bar Requirements Please read all instructions before setting up to run the Air Turbine Motors / Air Turbine

More information

Contents. Overview Pinsetter Orientation...1-4

Contents. Overview Pinsetter Orientation...1-4 Contents Overview...1-3 Pinsetter Orientation...1-4 Pinsetter Description...1-5 Ball Pit...1-5 Ball Cushion...1-5 Transport Band...1-7 Ball Accelerator...1-8 Pin Elevator...1-10 Distributor...1-14 Setting

More information

MILLING Bridgeport GX 300 Machining Center

MILLING Bridgeport GX 300 Machining Center MILLING Bridgeport GX 300 Machining Center Quotation to: Quotation Number: Contact: Address: ABMNameAlpha SOHDocumentOrderInvoice Contact Name ShipToAddressLine1 ShipToAddressLine4 ShipToCity1, ShipToState,

More information

Photo 1. Shift pattern gate plate

Photo 1. Shift pattern gate plate Installation Instructions MAGNUM GRIP STREET BANDIT SHIFTER Fits: GM, Chrysler, and Ford Automatic Transmissions See Application Guide for Specific Vehicles Catalog # 81050 WORK SAFELY! For maximum safety,

More information

Section 18: Fuses, Heaters, Parameters

Section 18: Fuses, Heaters, Parameters Section 18: Fuses, Heaters, Parameters March 2003 Section 18: Fuses, Heaters, Parameters 639 640 Section 18: Fuses, Heaters, Parameters March 2003 March 2003 Section 18: Fuses, Heaters, Parameters 641

More information

Trust And Reliability. Roller Guide System V33/V43 VERTICAL MACHINING CENTER LONG CHANG MACHINERY CO., LTD.

Trust And Reliability. Roller Guide System V33/V43 VERTICAL MACHINING CENTER LONG CHANG MACHINERY CO., LTD. Trust And Reliability Roller Guide System V33/V43 VERTICAL MACHINING CENTER LONG CHANG MACHINERY CO., LTD. V33/V43 FEED SYSTEM Heavy duty linear ways are imported from Germany, which are well balanced,

More information

Surepowr Series 100 Installation Manual

Surepowr Series 100 Installation Manual Surepowr Series 100 Installation Manual Safety First In the maintenance and operation of mechanical equipment, safety is the basic factor which must be considered at all times. Through the use of the proper

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

TCA34 Series Tire Changer

TCA34 Series Tire Changer OPERATION INSTRUCTIONS Form 5734-T, 07-10d TCA34 Series Tire Changer Copyright 2008-2011 Hunter Engineering Company OWNER INFORMATION Model Number Serial Number Date Installed Service and Parts Representative

More information

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS ELECTRIC ACTUATOR E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS 94OE IOM Electric Actuator Specifications...2 Overview...3 Actuator Wiring Diagrams...4

More information

Gearbox - Troubleshooting Guide

Gearbox - Troubleshooting Guide LAST UPDATED: 09/20/2018 Gearbox - Troubleshooting Guide Gearbox Assembly Diagram 50-taper Gearbox 1. Gearbox oil pump 2. High/low gear proximity sensors or mechanical switches 3. Spindle encoder 4. Spindle

More information

Fisher 657 Diaphragm Actuator Sizes and 87

Fisher 657 Diaphragm Actuator Sizes and 87 Instruction Manual 657 Actuator (30-70 and 87) Fisher 657 Diaphragm Actuator Sizes 30 70 and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Installation... 3 Mounting

More information

MTAB. MACHINING CENTERS

MTAB.   MACHINING CENTERS MTAB www.mtabcnc.com MACHINING CENTERS OVERVIEW MTAB's Vertical Machining Center is designed to flex with the customers' manufacturing demands and requirements. The machines are high performance systems,

More information

Transmission Overhaul Procedures-Bench Service

Transmission Overhaul Procedures-Bench Service How to Assemble the Lower Reverse Idler Gear Assembly Special Instructions In 1996 Eaton changed the reverse idler system design. In the nut design, the reverse idler bearing was lubricated through a hole

More information

Maintenance and Repair

Maintenance and Repair Maintenance and Repair WARNING ALWAYS shut off the engine, remove key from ignition, make sure the engine is cool, and disconnect the spark plug and positive battery terminal from the battery before cleaning,

More information

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL 2 Table of Contents Section 1: General Information Page Handle Assembly Instructions 4 Maintenance All Models 6 Oil Change Procedures All Models 9 Height Adjustment

More information

QP-L Series. High Speed Vertical Machining Center QP1620-L 2033-L 2040-L QP2440-L 2560-L

QP-L Series. High Speed Vertical Machining Center QP1620-L 2033-L 2040-L QP2440-L 2560-L QP-L Series High Speed Vertical Machining Center QP16-L 33-L 40-L QP2440-L 2560-L QP-L Series High-Speed Vertical Machining Center Engineered for Precision, High Accuracy and Efficiency. Machine Features

More information

SECTION B1: MACHINE COMPONENTS

SECTION B1: MACHINE COMPONENTS SECTION B1: MACHINE COMPONENTS The machine portion of the Injected Metal Assembly system provides the means for: holding, heating and injecting the alloy; distributing and controlling electrical, pneumatic,

More information

LIPPERTCOMPONENTS, INC.

LIPPERTCOMPONENTS, INC. LIPPERTCOMPONENTS, INC. SCHWINTEK INWALL SLIDEOUT SYSTEM OPERATION AND SERVICE MANUAL Contents I. Controls 1-1 System components 1 1-1A versions C1 & C2 2 1-2 Motor wiring harness connections 3 1-3 Extend

More information

DUGARD. HMCs. DUGARD Machine DUGARD. H3XP / H5XP / SH500 Dugard Horizontal Machining Centres. Machine Tools That Create Solutions Since 1939.

DUGARD. HMCs. DUGARD Machine DUGARD. H3XP / H5XP / SH500 Dugard Horizontal Machining Centres. Machine Tools That Create Solutions Since 1939. DUGARD Machine Tools That Create Solutions Since 1939 DUGARD HMCs H3XP / H5XP / SH500 Dugard Horizontal Machining Centres Maximise loading capacity, minimise floor space DUGARD Machine Tools www.dugard.com

More information

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS HVAC/BAC ELECTRIC IOM ELECTRIC ACTUATOR E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS Electric Actuator Specifications... 2 Overview... 3 Actuator

More information

Operations Manual Eagle 1000 Series Stretch Wrapper

Operations Manual Eagle 1000 Series Stretch Wrapper Operations Manual Eagle 1000 Series Stretch Wrapper Models A & B - 1 - READ ALL INSTRUCTIONS CONTAINED IN THIS MANUAL PRIOR TO MACHINE INSTALLATION! - 2 - Contents page 1. Machine Safety Information 1.1

More information

CRD610 Automatic Fitting Inserter

CRD610 Automatic Fitting Inserter CRD610 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 1.2 LAST EDITED 12.12.2018 cleanroomdevices.com 1 Table of Contents Title Page. 1 Table of Contents...2 1.0 General Product & Safety Information....3

More information

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited. SERVICE MANUAL ELECTRIC BRAISING PANS (30 & 40 GALLON) VE30 VE40 ML-126849 ML-126850 VE40 SHOWN - NOTICE - This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used

More information

MODEL MA4210 Installation and Operation Manual Important:

MODEL MA4210 Installation and Operation Manual Important: MODEL MA4210 Installation and Operation Manual Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible

More information

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

SERVICE MANUAL (DOMESTIC & INTERNATIONAL) SERVICE MANUAL (DOMESTIC & INTERNATIONAL) DUAL TECHNOLOGY FINISHER MODEL 1960 & 1980 SERIES Lincoln Foodservice Products, LLC 1111 North Hadley Road Fort Wayne, Indiana 46804 United States of America Telephone:

More information

Troubleshooting Bosch Proportional Valves

Troubleshooting Bosch Proportional Valves Troubleshooting Bosch Proportional Valves An Informative Webinar Developed by GPM Hydraulic Consulting, Inc. Instructed By Copyright, 2009 GPM Hydraulic Consulting, Inc. TABLE OF CONTENTS Bosch Valves

More information

Vertical Machining Centers

Vertical Machining Centers Vertical Machining Centers Offering a Full Line of Vertical Machining Centers About Morrison Machine Tool Group The Morrison Machine Tool Group is dedicated to the success of our Manufacturing Customers

More information

IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL

IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL Operator s Manual IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL ii Table of Contents Operator Safety... 1 Introduction... 2 Unpacking and Setup... 3 Unpacking... 3 Setup... 4 ROCKET

More information

MACHINE SENSORS CONTROL PANEL CONVEYOR SYSTEM SYSTEM SENSORS...

MACHINE SENSORS CONTROL PANEL CONVEYOR SYSTEM SYSTEM SENSORS... TABLE OF CONTENTS TABLE OF CONTENTS... 1 CONTROL PANEL...... 4 MACHINE SENSORS... 5 CONVEYOR SYSTEM... 6 SYSTEM SENSORS... 6 INFEED BACKUP... 6 OUTFEED BACKUP... 6 CHANGEOVERS... 6 CONVEYOR GUIDES ADJUSTMENTS...

More information

SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment

SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment Haas Technical Documentation SL-10/20/30, ST-10/10Y - Motor Coupling - Alignment Applies to machines built from: January, 1995 Scan code to get the latest version of this document Translation Available

More information

2. AC SERVICE AND MOTOR REQUIRED 1. ENCLOSURE REQUIRED

2. AC SERVICE AND MOTOR REQUIRED 1. ENCLOSURE REQUIRED 1. ENCLOSURE REQUIRED If the OC1 control is furnished as an open-chassis unit (standard), mount control in an enclosure 12 x 10 x 5 or larger and mount enclosure where room temperature does not exceed

More information

VMC-127H VERTICAL MACHINING CENTER

VMC-127H VERTICAL MACHINING CENTER VMC-127H HIGH-SPEED & HIGH-ACCURACY VERTICAL MACHINING CENTER VMC-127H VERTICAL MACHINING CENTER Most Suitable for Needing High Speed, High Cutting Rate, High Rigidity Mold Making Industry X & Y axes has

More information

Copyright EXTRON All rights reserved E-EH-EN EXTRONCNC.com

Copyright EXTRON All rights reserved E-EH-EN EXTRONCNC.com YIH CHUAN MACHINERY INDUSTRY CO., LTD HEADQUARTERS 40755 No.8, 9 Rd., Taichung Industrial Park, Taichung, Taiwan T e l : +886-4-2359-3351 Fa x : +886-4-2359-0012 E-mail : extron@extroncnc.com th YIH CHUAN

More information

RP-4000 Reserve Power Control

RP-4000 Reserve Power Control Instruction Manual IM-0580 RP-4000 Reserve Power Control Table of Contents General Information... 2-3 Introduction... 2 Cautions... 2 Receiving/Inspection... 2 Storage... 2 Equipment Return... 2 Identification

More information

CONTENTS. Product Features and Specifications...1. Installation Requirement Steps of Installation.. 5. Exploded View Test Run...

CONTENTS. Product Features and Specifications...1. Installation Requirement Steps of Installation.. 5. Exploded View Test Run... CONTENTS Product Features and Specifications...1 Installation Requirement... 3 Steps of Installation.. 5 Exploded View...18 Test Run...21 Operation Instruction...22 Maintenance... 23 Trouble Shooting...

More information

HIGH EFFICIENCY VERTICAL MACHINING CENTER

HIGH EFFICIENCY VERTICAL MACHINING CENTER HIGH EFFICIENCY VERTICAL MACHINING CENTER 1 HIGH EFFICIENCY VERTICAL MACHINING CENTER FACE MILL S45C Steel Material Removal Rate 138cc/min. EV1020A is built with state-of-the-art technology in mind and

More information

Service and Parts Manual. NO LONGER IN PRODUCTION Some service parts may not be available for this product. Otolaryngology Chair.

Service and Parts Manual. NO LONGER IN PRODUCTION Some service parts may not be available for this product. Otolaryngology Chair. thru 391-001 -002 Otolaryngology Chair Serial Number Prefixes: EN, PD & V Service and Parts Manual NO LONGER IN PRODUCTION Some service parts may not be available for this product. 391-001 thru -002 NOTE:

More information

Double Column Machining Center VM3018A With FANUC 0i MF LINEAR GUIDE WAY ON ALL THREE AXIS

Double Column Machining Center VM3018A With FANUC 0i MF LINEAR GUIDE WAY ON ALL THREE AXIS Offer date:2017/2/8 Quotation No.VM3018AFMF20170208A Double Column Machining Center VM3018A With FANUC 0i MF LINEAR GUIDE WAY ON ALL THREE AXIS Stock Machine for Index: A.) General Machine Description

More information

KMH KMH500/630/800 HORIZONTAL MACHINING CENTERS

KMH KMH500/630/800 HORIZONTAL MACHINING CENTERS KMH KMH5/63/8 HORIZONTAL MACHINING CENTERS Index Cover 1 Cover Contents 2-3 Table of Contents Structure 4-5 Design & Rigidity 6 3 Axis Transmission 7 Ballscrew Cooling System 8-9 ATC Unit Maintenance &

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS ASTRO ENVELOPE FEEDER AMC-2000-5 FOR RYOBI 3302 / ITEK 3985 (2 COLOR) INSTALLATION AND OPERATING INSTRUCTIONS INTRODUCTION Thank you for purchasing the Astro Envelope Feeder. It is fast, efficient, reliable,

More information

Portable Lighting Equipment Operating Instructions Table of Contents

Portable Lighting Equipment Operating Instructions Table of Contents Portable Lighting Equipment Operating Instructions Table of Generac Magnum Ingersoll Rand TEREX AMIDA TEREX GENIE Model: MLT3060 Model: LIGHTSOURCE Model: Amida AL4000 series Model: TML4000N Generac Magnum

More information

KVR SERIES. Quality, Value, and Service MACHINING CENTERS. a.com /

KVR SERIES. Quality, Value, and Service MACHINING CENTERS.   a.com / KVR SERIES Quality, Value, and Service www.kentus a.com / www.kentcnc.com KVR SERIES precision by design KVR-4020A with 24-Tool Dual Arm ATC Go ahead make your cut! Be more competitive! In today s global

More information

PCNC 1100 Series 3 (32085) Column and Head Assembly

PCNC 1100 Series 3 (32085) Column and Head Assembly PCNC 1100 Series 3 (32085) Column and Head Assembly Parts List for PCNC 1100 Series 3 (Upper Exploded) April 2012 ID Number Description ID Number Description 1 30303 Lower spindle bearing 1 49 30353 Screw

More information

Installation Instructions Pro Bandit Shifter Fits: GM Powerglide Automatic Transmissions

Installation Instructions Pro Bandit Shifter Fits: GM Powerglide Automatic Transmissions Installation Instructions Pro Bandit Shifter Fits: 1962-1973 GM Powerglide Automatic Transmissions Part # 80793 WORK SAFELY! For maximum safety, perform this installation on a clean, level surface and

More information

VMC - Hydraulic Counterbalance - Replacement

VMC - Hydraulic Counterbalance - Replacement Haas Technical Documentation VMC - Hydraulic Counterbalance - Replacement AD0289 Rev G Applies to machines built from: May, 1995 to May, 2012 Scan code to get the latest version of this document Translation

More information

Linear way Vertical Machining Center

Linear way Vertical Machining Center TM TM TM TM Linear way Vertical Machining Center MM series National Award of Outstanding 08 ISO :04 ISO :04 EMS 5465 EMS 5465 ISO 9001:08 ISO 9001:08 FM 538421 FM 538421 Feb. 12 MM-/430 MM-800 1 Taiwan

More information

SUREPOWR TM SERIES -SURE 49 FIELD INSTALLATION INSTRUCTIONS

SUREPOWR TM SERIES -SURE 49 FIELD INSTALLATION INSTRUCTIONS SUREPOWR TM SERIES -SURE 49 FIELD INSTALLATION INSTRUCTIONS Safety First In the maintenance and operation of mechanical equipment, SAFETY is the basic factor which must be considered at all times. Through

More information

INSTRUCTION MANUAL ACTUATOR CLASSE I TYPE MA, MB

INSTRUCTION MANUAL ACTUATOR CLASSE I TYPE MA, MB ACTUATOR CLASSE I TYPE MA, MB CONTENTS Page : 2/13 PRODUCT DESCRIPTION General description 3 Product specification 5 INSTALLATION Storage 6 Unpacking 7 Handling 7 Installation : Mechanical 7 Installation

More information

PARTS & SERVICE MANUAL

PARTS & SERVICE MANUAL PARTS & SERVICE MANUAL Impinger Low Profile Advantage Digital Series (Electric) International Models MODELS: Please note that the model numbering system changed March 2007. The chart below shows the old

More information

Electric Actuator Instructions

Electric Actuator Instructions BAC IOM Electric Actuator Instructions E024, E025, E026, E029 & E030 TABLE OF CONTENTS Electric Actuator Specifications...2 Overview...3 Actuator Wiring Diagrams...4 VMS-35 Specifications and Wiring Diagram...5

More information

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CLEAN ROOM DEVICES, LLC WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD600 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 2.1 LAST EDITED 7.25.14 DOCUMENT NUMBER 001 cleanroomdevices.com 1 Table of

More information

JTEKT Toyoda Americas Corporation

JTEKT Toyoda Americas Corporation JTEKT Toyoda Americas Corporation 316 W. University Drive, Arlington Heights, IL 60004 Toll Free: 800-257-2985 Main: 847-253-0340 Fax: 847-253-0540 www.toyoda.com JTEKT Toyoda Americas Corporation Designed

More information

Altra Series Dampener

Altra Series Dampener Crestline TM Altra Series Dampener Installation Instructions Ryobi 512 X88-69 10/98 Rev-A GENERAL INFORMATION ATTENTION CRESTLINE ALTRA SERIES TM DAMPENER OWNER! Accel Graphic Systems provides parts and

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS FOR A136 REAR DRUM TO DISC BRAKE CONVERSION KIT for 1970-75 Jeep, CJ SERIES with Dana 44 flanged axle Thank you for choosing STAINLESS STEEL BRAKES CORPORATION

More information

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual For Use with: SNS4, SNS6, SNS10 & SNS15 Models Additional supplements may be needed for

More information

CHAPTER 21 ENVIRONMENT CONTROL. Section Title Page

CHAPTER 21 ENVIRONMENT CONTROL. Section Title Page CHAPTER 21 ENVIRONMENT CONTROL Section Title Page 21-00 Description........................................ 21.1 21-10 Ventilation........................................ 21.3 21-11 Nose Vent................................

More information

1101 DZB CNC Drilling and Sawing Line

1101 DZB CNC Drilling and Sawing Line File Photo 1101 DZB CNC Drilling and Sawing Line TECHNICAL DESCRIPTION For the web and flange drilling of structural sections according to the following specifications: I-Beams Beam depth Minimum 3-1/8

More information

348002K/348012K Manifold Block Style Service Manual 12/2000

348002K/348012K Manifold Block Style Service Manual 12/2000 348002K/348012K Manifold Block Style Service Manual 12/2000 Service Manual 348002K/348012K Manifold Block Style Recovery/Recycling/Recharging Unit For R-12 or R-134a Only TABLE OF CONTENTS: Theory of Operation

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS REAR DISC BRAKE CONVERSION KIT A125-3 1965-72 GM A-BODY 10 & 12 BOLT AXLES Thank you for choosing STAINLESS STEEL BRAKES CORPORATION for your braking needs. Pleases take the time

More information

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual Sofa Slideout Assembly OWNER'S MANUAL Rev: 06.14.2016 Page 1 Sofa Slideout Owners Manual TABLE OF CONTENTS Warning, Safety, and System Requirement Information 3 Product Information 3 Prior to Operation

More information