NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: October 2009

Similar documents
NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: August 2013 SUBJECT: VALVE LASH ADJUSTMENTS ADDITIONS, REVISIONS, OR UPDATES

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: August 2009

Section 7.3 Water Manifold has been updated.

NUMBER: S.M. REF.: Listed in Table ENGINE: DD15 DATE: March 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA04 MBE 4000 DATE: April 2009

NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: July 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: April 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA10 DD Platform DATE: August 2010

Removal of the Needle, Amplifier, and Pressure Limiting Valve Return Lines Three-Filter System

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07/10 DD Platform DATE: September 2010

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

Removal and Installation of the DD15 and DD16 Cylinder Head April Removal of the DD15 and DD16 Cylinder Head

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: February 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: June 2012 SUBJECT: E3 FUEL INJECTOR TUBE ADDITIONS, REVISIONS, OR UPDATES

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: July 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2010

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: DD Platform DATE: May 2010

Additions, Revisions, or Updates

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: DD15 DATE: February 2009

NUMBER: S.M. REF.: 8.5 ENGINE: EPA07 Series 60 DATE: November 2008

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: February 2011

Additions, Revisions, or Updates

NUMBER: 08 DDEC VI 16 S.M. REF.: listed in Table 1 ENGINE: DD15 DATE: April 2008 SUBJECT: SPN 1636 AND SPN 2630 PUBLICATION: DDC-SVC-MAN-0029

SPN 1176/FMI 3 SPN 1176/FMI 4

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Removal and Installation of the Fuel Injector Cup February Removal of the Fuel Injector Cup Three-Filter System and Two-Filter System

EPA10 DOC Inlet Pressure Sensor November Removal of the EPA10 Diesel Oxidation Catalyst Inlet Pressure Sensor. without Sensor Box

NUMBER: 08 FSTG 12 REV S.M. REF.: Listed in Table ENGINE: EPA07 DD15 DATE: February 2009

Hydrocarbon Fuel Doser Injector Valve Fuel Supply Line December Publication Number / Title Platform Section Title Change

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Fuel Injection System Low Pressure Leak Test Two-Filter Fuel System. Potential Fuel Leak Points Two-Filter. System

Installation of the Fuel Rail -Three-Filter System January Publication Number / Title Platform Section Title Change

Removal and Installation of the Camshaft Housing Assembly February Removal of the Camshaft Housing Assembly

Additions, Revisions, or Updates

Camshaft and Idler Gear August Removal of the Camshafts. Installation of the Camshafts. Removal of the Intake Rocker Shaft Assembly

Additions, Revisions, or Updates

Installation of the DD13,DD15, and DD16 Cylinder Head February Installation of the DD13 Cylinder Head

SPN 3480/FMI 0, 1, 3, 4, 14, 21, 31 October 2012 SPN 3480/FMI 0 SPN 3480/FMI 1 SPN 3480/FMI 3 SPN 3480/FMI 4 SPN 3480/FMI 14 SPN 3480/FMI 21

FIS Low Pressure Leak Test March Publication Number / Title Platform Section Title Change. FIS Low Pressure Leak Test- Three-Filter Fuel System

Belt Drive January Platform Section Title Change. Description and Operation of the Belt Drive Tensioner System. Removal of the Belt Tensioner

Notice Added to Sections Listed Below February Removal of the Bypass Valve. Removal of the Pressure Relief Valve

EGR heater plate removal and installation procedure has been added.

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Cylinder Liner January Removal of the Cylinder Liner. Cleaning of the Cylinder Liner. Inspection of the Cylinder Liner

Additions, Revisions, or Updates

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: May 2013 SUBJECT: SPN 2631/FMI 2 ADDITIONS, REVISIONS, OR UPDATES

Additions, Revisions, or Updates

Oil Pan July DDC-SVC-MAN-0081 DD Platform Installation of the Oil Pan Added graphics, additional torque specs.

Additions, Revisions, or Updates

High pressure fuel line and transfer tube removal and installation procedures have been updated.

How to Replace the Lubricating Oil and Oil Filter October How to Replace the Lubricating Oil and Oil Filter

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA04 MBE 4000 DATE: September 2009

EGR Actuator May Description and Operation of the DD13 Exhaust Gas Recirculation Valve Actuator

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: April 2009

Publication Number / Title Platform Section Title Change. Removal of DD15 and DD16 Delphi Exhaust Gas Recirculation Valve Actuator

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Refer to 2.5 ENGINE: 60 DATE: January 2007

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Exhaust and Exhaust Gas Recirculation September Testing of the DD13. Exhaust Gas Recirculation Cooler Water Manifold Assembly - In Chassis

Publication Number / Title Platform Section Title Change. Description and Operation of the Diesel Particulate Filter End Cap

Additions, Revisions, or Updates

The EPA07 Series 60 Workshop Manual has been revised. Listed in Table 1 are the revisions.

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

There are changes to the fuel system leak detection and threshold resetting procedure.

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: September 2009

Two SPNs and their FMIs have been reassigned numbers as listed in Table 1. The troubleshooting procedures are the same.

Additions, Revisions, or Updates

EGR Actuator Slow Learn April Installation of the DD13 Exhaust Gas Recirculation Valve Actuator Pull Rod

Rev Rev. Additions, Revisions, or Updates

Publication Number / Title Platform Section Title Change. Removal of the High Pressure Fuel Pump Drive Gear - Three-Filter System

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Section 1.26 Camshaft Gear Assembly Series 60 Exhaust Gas Recirculation (EGR) Model

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Test A - Three-Filter and Two-Filter Fuel Systems March Test A - Three-Filter Fuel System. Test A - Two-Filter Fuel System

Additions, Revisions, or Updates

Exhaust Gas Recirculation Crossover Pipe December Description and Operation of the EGR Crossover Pipe (Cast)

Publication Number / Title Platform Section Title Change SPN 5246/FMI 0- EPA10 SPN 5246/FMI 15 - EPA10 SPN 5246/FMI 16 - EPA10 SPN 5246/FMI 0 - GHG14

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Removal of the High Pressure Fuel Pump April Publication Number / Title Platform Section Title Change. Removal of the High Pressure Fuel Pump

Aftertreatment System December Removal of the 1-BOX from the Vehicle. Installation of the 1- BOX to the Vehicle

Transcription:

NUMBER: 10 09 09 S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: October 2009 SUBJECT: INTERMEDIATE FRAME / FUEL INJECTOR WIRING HARNESS ADDITIONS, REVISIONS, OR UPDATES Publication Number Platform Section Title Change Page Number(s) DDC-SVC-MAN-0050 DD13 1.10 Fuel Injector Wiring Harness DDC-SVC-MAN-0037 Fuel System Technician's Manual 35.5 Fuel Injector Wiring Harness New Engine section was added for DD13 Fuel Injector Wiring Harness procedures. New section was added for DD13 Fuel Injector Wiring Harness procedures have been modified to include DD13 information. NOTE: Page numbers are based on the most recent version of the individual publication and may be adjusted throughout the annual print cycle. Table 1 1 74 35 20

INTERMEDIATE FRAME / FUEL INJECTOR WIRING HARNESS The wiring harness for the six fuel injectors and two engine brake solenoids is integral to the intermediate frame. Two 14-pin fuel injector harness connectors act as the interface between the six fuel injectors, two engine brake solenoids, and the 120-pin MCM connector. The intermediate frame is made of a plastic material with an elastomer seal. The intermediate frame is located between the rocker cover and the camshaft housing. The rocker cover bolts maintain torque and sealing integrity on the rocker cover seal and intermediate frame seal. 1. Camshaft Housing 5. Intermediate Frame 2. Elastomer Seal 6. Wiring Terminals to Engine Brake Solenoids (4 Qty.) 3. Engine Brake Solenoid (2 Qty.) 7. Wiring Terminals to Injectors (24 Qty.) 4. Injector (6 Qty.) 8. 14-Pin Injector Harness Connectors

REMOVAL OF INTERMEDIATE FRAME / FUEL INJECTOR WIRING HARNESS Remove as follows: 1. Steam clean the engine. 2. Disconnect batteries. 3. Remove eight bolts from the two air filter housing brackets and remove housing brackets from the rocker cover. 4. Remove the remaining eleven bolts from the rocker cover and remove rocker cover. 5. Disconnect both 14-pin injector harness connectors. 6. Disconnect the 24 electrical terminals at the fuel injectors. 7. Disconnect two wiring terminals at each engine brake solenoid. 8. Loosen the Allen screws holding the intermediate frame to the camshaft housing. Remove the intermediate frame. INSPECTION AND CLEANING OF INTERMEDIATE FRAME / FUEL INJECTOR WIRING HARNESS Clean and inspect as follows: 1. Clean intermediate cam frame in clean fuel oil. EYE INJURY To avoid injury from flying debris when using compressed air, wear adequate eye protection (face shield or safety goggles) and do not exceed 276 kpa (40 psi) air pressure. 2. Blow dry with compressed air. 3. Check for damage to the terminals in both 14-pin connectors. Replace if damaged. 4. Check for damage to all terminals that attach to the engine brake solenoids and injectors. Replace if damaged. 5. Inspect for missing or damaged hold-down bolts. Replace if damaged. 6. Check the intermediate frame and seal for damage. Replace if damaged. INSTALLATION OF INTERMEDIATE FRAME / FUEL INJECTOR WIRING HARNESS Install as follows: 1. Install seal into groove in intermediate frame. 2. Install intermediate frame on camshaft housing. Torque Allen bolts to 10 N m (7 lb ft). 3. Install electrical terminals to injectors and torque to 1.5 N m (1 lb ft). 4. Connect engine brake solenoid terminals and torque to 1.5 N m (1 lb ft).

5. Install rocker cover. Refer to "Rocker Cover." 6. Install the two air filter housing brackets onto the rocker cover and torque the eight bolts to 20 N m (14 lb ft). 7. Connect both 14-pin injector harness connectors. ENGINE EXHAUST To avoid injury from inhaling engine exhaust, always operate the engine in a well-ventilated area. Engine exhaust is toxic. 8. Connect batteries. 9. Start the engine and check for leaks.

ADDITIONAL SERVICE INFORMATION Additional service information is available in Power Service Literature. Detroit Diesel, DDC, Series 60 and the spinning arrows design are registered trademarks of Detroit Diesel Corporation. Copyright 2009 Detroit Diesel Corporation. All rights reserved. Printed in U.S.A.