EGR Actuator Slow Learn April Installation of the DD13 Exhaust Gas Recirculation Valve Actuator Pull Rod

Similar documents
EGR Actuator May Description and Operation of the DD13 Exhaust Gas Recirculation Valve Actuator

Publication Number / Title Platform Section Title Change. Removal of DD15 and DD16 Delphi Exhaust Gas Recirculation Valve Actuator

Additions, Revisions, or Updates

Exhaust and Exhaust Gas Recirculation September Testing of the DD13. Exhaust Gas Recirculation Cooler Water Manifold Assembly - In Chassis

Section 7.3 Water Manifold has been updated.

NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: July 2009

GHG14 DD15 Asymmetrical Turbocharger May Removal of the GHG14 DD15 Asymmetrical Turbocharger

Additions, Revisions, or Updates

Rev Rev. Additions, Revisions, or Updates

Hydrocarbon Fuel Doser Injector Valve Fuel Supply Line December Publication Number / Title Platform Section Title Change

Installation of the DD13,DD15, and DD16 Cylinder Head February Installation of the DD13 Cylinder Head

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: August 2009

Removal and Installation of the DD15 and DD16 Cylinder Head April Removal of the DD15 and DD16 Cylinder Head

Additions, Revisions, or Updates

EPA10 DOC Inlet Pressure Sensor November Removal of the EPA10 Diesel Oxidation Catalyst Inlet Pressure Sensor. without Sensor Box

Additions, Revisions, or Updates

Oil Pan July DDC-SVC-MAN-0081 DD Platform Installation of the Oil Pan Added graphics, additional torque specs.

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Engine Replacement Procedures September Removal of the Complete Powertrain Assembly. Replacement Long Block Engine Preparation

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Exhaust Gas Recirculation Crossover Pipe December Description and Operation of the EGR Crossover Pipe (Cast)

Additions, Revisions, or Updates

Publication Number / Title Platform Section Title Change. Description and Operation of the Diesel Particulate Filter End Cap

18SP589* Series 60 Right Side EGR Bolt-Together System with Hydraulic Actuator Valve

NUMBER: S.M. REF.: 8.5 ENGINE: EPA07 Series 60 DATE: November 2008

Additions, Revisions, or Updates

EGR heater plate removal and installation procedure has been added.

18SP596 Series 60 Right-Side EGR Bolt-Together System to a Spherical Joint Tube-and-Shell Cooler with Hydraulic Actuator Valve

Removal of the Needle, Amplifier, and Pressure Limiting Valve Return Lines Three-Filter System

Additions, Revisions, or Updates

Publication Number / Title Platform Section Title Change. Removal of the High Pressure Fuel Pump Drive Gear - Three-Filter System

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: October 2009

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: May 2013 SUBJECT: SPN 2631/FMI 2 ADDITIONS, REVISIONS, OR UPDATES

Belt Drive January Platform Section Title Change. Description and Operation of the Belt Drive Tensioner System. Removal of the Belt Tensioner

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

18SP597 Series 60 Right-Side EGR Bolt-Together System to a Spherical Joint Tube-and-Shell Cooler with Pneumatic Actuator Valve

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA04 MBE 4000 DATE: April 2009

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: April 2009

Additions, Revisions, or Updates

FIS Low Pressure Leak Test March Publication Number / Title Platform Section Title Change. FIS Low Pressure Leak Test- Three-Filter Fuel System

SPN 3509 (MCM) (EPA10) and SPN 3509 (MCM) (GHG14) June 2014 SPN 3509/FMI 3 - EPA10 SPN 3509/FMI 4 - EPA10 SPN 3509/FMI 3 - GHG14

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: April 2009

Installation of the Fuel Rail -Three-Filter System January Publication Number / Title Platform Section Title Change

Additions, Revisions, or Updates

Notice Added to Sections Listed Below February Removal of the Bypass Valve. Removal of the Pressure Relief Valve

Removal of the High Pressure Fuel Pump April Publication Number / Title Platform Section Title Change. Removal of the High Pressure Fuel Pump

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2010

Diagnostic Test - Power Verification With Chassis Dynamometer November Power Verification with Chassis Dynamometer

Removal and Installation of the Fuel Injector Cup February Removal of the Fuel Injector Cup Three-Filter System and Two-Filter System

Aftertreatment System December Removal of the 1-BOX from the Vehicle. Installation of the 1- BOX to the Vehicle

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Symptom Diagnostics - Hard Start/No Start April Hard Start/No Start - Two-Filter Fuel System (This Test Must Be Done First)

Additions, Revisions, or Updates

Hard Start/No Start - Two-Filter Fuel System (This Test Must Be Done First) Test-A - Two-Filter Fuel System. Test-C - Two-Filter Fuel System

Camshaft and Idler Gear August Removal of the Camshafts. Installation of the Camshafts. Removal of the Intake Rocker Shaft Assembly

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Fuel Injection System Low Pressure Leak Test Two-Filter Fuel System. Potential Fuel Leak Points Two-Filter. System

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

High Pressure Fuel Rail Feed Lines September Platform Section Title Change

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Removal and Installation of the Camshaft Housing Assembly February Removal of the Camshaft Housing Assembly

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Publication Number / Title Platform Section Title Change SPN 5246/FMI 0- EPA10 SPN 5246/FMI 15 - EPA10 SPN 5246/FMI 16 - EPA10 SPN 5246/FMI 0 - GHG14

Additions, Revisions, or Updates

SPN 4364 (ACM)(EPA10); SPN 4364 (ACM)(GHG14) January Publication Number / Title Platform Section Title Change SPN 4364/FMI 18 - EPA10

SPN 1176/FMI 3 SPN 1176/FMI 4

SPN 4364/FMI 17 - GHG17 SPN /FMI 16 - GHG17 SPN /FMI 14 - GHG17 SPN 3216/FMI 16 - GHG17 SPN 3216/FMI 18 - GHG17 SPN 3217/FMI 2 - GHG17

Additions, Revisions, or Updates

18SP684Rev2 EPA07 and EPA10 DD Platform EGR Delta Pressure Sensor Update

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 MBE 4000 DATE: September 2009

Additions, Revisions, or Updates

NUMBER: 08 DDEC VI 10 S.M. REF.: 92 ENGINE: EPA07 Series 60 DATE: March 2008

Cylinder Liner January Removal of the Cylinder Liner. Cleaning of the Cylinder Liner. Inspection of the Cylinder Liner

Additions, Revisions, or Updates

Additions, Revisions, or Updates

NUMBER: S.M. REF.: Listed in Table 1 ENGINE: DD13 DATE: July 2009

Piston and Connecting Rod Assembly January Removal of the Piston and Connecting Rod Assembly

Fuel Filter Maintenance Intervals July EPA10/GHG14 DD Series Preventive Maintenance Tables

Additions, Revisions, or Updates

Additions, Revisions, or Updates

NUMBER: 08 DDEC VI 16 S.M. REF.: listed in Table 1 ENGINE: DD15 DATE: April 2008 SUBJECT: SPN 1636 AND SPN 2630 PUBLICATION: DDC-SVC-MAN-0029

Transcription:

1 4 07-13 SUBJECT DATE EGR Actuator Slow Learn April 2013 Additions, Revisions, or Updates Publication Number / Title Platform Section Title Change DDC-SVC-MAN-0083 Installation of the DD13 Exhaust Gas Actuator Pull Rod Installation of the DD15 and DD16 Exhaust Gas DD Platform Actuator Pull Rod Installation of the GHG14 DD15 AT Exhaust Gas Actuator Pull Rod Final step adds Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. Installation of the DD13 Exhaust Gas Actuator DDC-SVC-MAN-0083 DD Platform Installation of the GHG14 DD15 AT Exhaust Gas Actuator Installation of the DD15 and DD16 Exhaust Gas Actuator Step 10 now says to Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. DDC-SVC-MAN-0083 DD Platform Installation of the GHG14 DD15 AT Exhaust Gas /Hot Pipe Installation of the DD15 and DD16 Exhaust Gas Final step adds Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. All information subject to change without notice. 3

1 4 07-13 4 All information subject to change without notice. Copyright 2013 DETROIT DIESEL CORPORATION 4 07-13

2 Installation of the DD13 Exhaust Gas Actuator Pull Rod NOTE: If installing a new style Exhaust Gas Recirculation (EGR) valve actuator pull rod, the end with the offcenter bearing is attached at the EGR valve actuator and the part number is facing away from the engine. 1. Install the EGR actuator valve pull rod on the EGR valve linkage stud and the EGR valve actuator linkage. NOTICE: Ensure the nut used to attach the pull rod to the linkage has a 12mm hexagon pattern. A larger 13mm hexagon pattern nut will cause damage to the pull rod bearing. 2. With the EGR valve actuator pull rod installed on the EGR valve and the EGR valve actuator, apply a small amount of copper-based anti-seize compound to the nut threads. Install and torque to 20 N m (15 lb ft). 3. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. All information subject to change without notice. 5

3 Installation of the DD15 and DD16 Exhaust Gas Actuator Pull Rod 3 Installation of the DD15 and DD16 Exhaust Gas Actuator Pull Rod NOTE: Install with the "V" cast into the EGR valve actuator pull rod facing UP and toward the EGR Valve. Also be sure that the part number faces outward. 1. Install the pull rod onto both the EGR valve and the EGR valve actuator. NOTICE: Ensure the nut used to attach the pull rod to the linkage has a 12mm hexagon pattern. A larger 13mm hexagon pattern nut will cause damage to the pull rod bearing. 2. Install the nuts and hand tighten. 3. Hold the EGR valve actuator pull rod so that when torquing the nut the pull rod will not come into contact with the stops. 4. Torque the nuts to 20 N m (15 lb ft). 5. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. 6 All information subject to change without notice. Copyright 2013 DETROIT DIESEL CORPORATION 4 07-13

4 Installation of the GHG14 DD15 AT Exhaust Gas Actuator Pull Rod NOTE: If installing an Exhaust Gas Recirculation (EGR) valve actuator pull rod, the V stamped on the rod is attached at the EGR valve and the part number is on top. 1. Install the EGR actuator valve pull rod on the EGR valve linkage stud with the spacer between the pull rod and the linkage. 2. Install the EGR pull rod to the EGR valve actuator lever stud. NOTICE: Ensure the nut used to attach the pull rod to the linkage has a 12mm hexagon pattern. A larger 13mm hexagon pattern nut will cause damage to the pull rod bearing. 3. With the EGR valve actuator pull rod installed on the EGR valve and the EGR valve actuator, apply a small amount of copper-based anti-seize compound to the nut threads. Install and torque to 20 N m (15 lb ft). 4. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. All information subject to change without notice. 7

5 Installation of the DD13 Exhaust Gas Actuator 5 Installation of the DD13 Exhaust Gas Actuator NOTICE: If reusing the original Exhaust Gas Recirculation (EGR) valve actuator bracket bolts, always apply a small amount of copper-based anti-seize compound to the bolts. The original coating will burn off and that makes it necessary to reapply the anti-seize compound. NOTICE: Ensure the bracket and exhaust manifold are at ambient temperature when the actuator bracket bolts are torqued. NOTICE: Do not turn on the ignition power until all of the installation steps are completed. 1. Install the EGR valve actuator to cylinder block with the bolts and two spacers. Torque bolts to 30 N m (22 lb ft). 2. Install the EGR valve actuator rod onto the actuator, apply a small amount of copper based anti-seize compound to the nut threads and tighten. Torque nut to 20 N m (15 lb ft). 3. Install the coolant line to the EGR valve actuator and fitting on cylinder block. Tighten coolant line to EGR valve actuator to 25 N m (18 lb ft). Tighten coolant line to fitting on cylinder block 40 N m (29 lb ft). 4. Install the coolant line to the EGR valve actuator and water manifold. Tighten coolant line to 35 N m (26 lb ft). 5. Connect the EGR valve actuator to the engine wiring harness. 6. Fill the coolant system. 7. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. 8 All information subject to change without notice. Copyright 2013 DETROIT DIESEL CORPORATION 4 07-13

6 Installation of the DD15 and DD16 Exhaust Gas Actuator NOTICE: If reusing the original actuator bracket bolts, always apply a small amount of copper-based anti-seize compound to the bolts. The original coating will burn off and that makes it necessary to reapply the anti-seize compound. NOTICE: Ensure the bracket and exhaust manifold are at ambient temperature when the actuator bracket bolts are torqued. NOTICE: Do not turn on the ignition power until all of the installation steps are completed. NOTE: The clamping nut and actuator rod must remain installed to the actuator linkage when removing or installing the lock nut to avoid damage to the actuator valve gears. 1. Install the actuator bracket to the exhaust manifold using four bolts and eight special thermal washers. Apply a small amount of copper based anti-seize compound to the bolts and torque the bolts for the bracket to exhaust manifold to 30 N m (22 lb ft). NOTE: The dot (1) on the actuator rod lever (2) must face up. 2. Install actuator onto bracket using three bolts and washers. Torque bolts to 20 N m (15 lb ft). 3. Install linkage onto actuator and secure with one nut. Tighten nut to 25 N m (18 lb ft). NOTICE: To prevent damage to the coolant inlet and outlet lines, hold the adaptor fittings with a wrench during line installation. 4. If removed, install coolant inlet adaptor fitting to cylinder block. Torque fitting to 35 N m (26 lb ft). 5. Install the coolant inlet line to the actuator and adaptor fitting on cylinder block. Tighten the coolant inlet line banjo bolt to 25 N m (18 lb ft); torque the coolant inlet line at adapter fitting to 40 N m (30 lb ft). 6. If removed, install coolant outlet adaptor fittings to EGR valve actuator and water manifold. Torque actuator adaptor fitting to 25 N m (18 lb ft); torque water manifold fitting to 35 N m (26 lb ft). All information subject to change without notice. 9

6 Installation of the DD15 and DD16 Exhaust Gas Actuator 7. Install the coolant outlet line to the actuator adaptor fitting and water manifold adaptor fitting. Torque the coolant outlet line to 35 N m (26 lb ft). 8. Connect the electrical harness connector to the EGR valve actuator. 9. Fill the cooling system with coolant. Refer to section "Cooling System Fill Procedure". 10. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. WARNING: PERSONAL INJURY To avoid injury before starting and running the engine, ensure the vehicle is parked on a level surface, parking brake is set, and the wheels are blocked. WARNING: ENGINE EXHAUST To avoid injury from inhaling engine exhaust, always operate the engine in a well-ventilated area. Engine exhaust is toxic. 11. Start the engine and check for leaks 10 All information subject to change without notice. Copyright 2013 DETROIT DIESEL CORPORATION 4 07-13

7 Installation of the GHG14 DD15 AT Exhaust Gas Actuator On the DD15 with an asymmetrical turbocharger, the Exhaust Gas Recirculation (EGR) actuator is located on the cylinder block as opposed to the turbo-compound model DD15, where the EGR actuator is mounted in a bracket on the exhaust manifold. NOTICE: If reusing the original actuator bolts, always apply a small amount of copper-based anti-seize compound to the bolts. Although they were originally coated, it can burn off over time, making it necessary to reapply the anti-seize compound during reassembly. NOTICE: Do not turn on the ignition power until all of the installation steps are completed. 1. Install the coolant fittings into the coolant passages on the EGR actuator. Torque to 35 N m (25 lb ft). 2. Loosely attach the coolant lines onto the EGR actuator in their respective positions. 3. Install the EGR actuator to the cylinder crankcase using three bolts. Torque to 30 N m (22 lb ft). 4. Connect the electrical harness connector to the EGR valve actuator. Secure the connector to the mounting bracket on the cylinder block. NOTICE: To prevent damage to the coolant inlet and outlet lines, hold the adaptor fittings with a wrench while line is being set to the proper torque. 5. Install coolant line banjo fittings with new seals. Torque to 35 N m (25 lb ft). 6. Install the inlet and outlet coolant lines to the coolant collector and block. Torque to 35 N m (25 lb ft). NOTE: The clamping nut and actuator rod must remain installed to the actuator linkage when removing or installing the lock nut to avoid damage to the actuator valve gears. 7. Install the EGR linkage. Refer to section "Installation of the GHG14 DD15 AT Exhaust Gas Actuator Pull Rod" 8. Install heat shield. 9. Fill the cooling system with coolant. WARNING: PERSONAL INJURY To avoid injury before starting and running the engine, ensure the vehicle is parked on a level surface, parking brake is set, and the wheels are blocked. WARNING: ENGINE EXHAUST To avoid injury from inhaling engine exhaust, always operate the engine in a well-ventilated area. Engine exhaust is toxic. 10. 10. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. 11. Start the engine and check for coolant and exhaust leaks. All information subject to change without notice. 11

8 Installation of the GHG14 DD15 AT Exhaust Gas /Hot Pipe 8 Installation of the GHG14 DD15 AT Exhaust Gas Recirculation Valve/Hot Pipe NOTICE: Be sure not to bend or damage the Exhaust Gas Recirculation (EGR) valve lever during handling and installation. 1. Install the EGR valve/hot pipe to the EGR cooler inlet and exhaust manifold outlet using two new sealing gaskets (if originally equipped). Orient the pipe with the lever side attaching to the exhaust manifold outlet. 2. Install new exhaust clamps in the same orientation as noted in removal. Torque to 12 N m (9 lb ft). 3. Gently tap each of the clamps to ensure they are properly seated. Re-torque the clamps to 12 N m (9 lb ft). 4. After installing the EGR valve/hot pipe, sweep the EGR valve lever by hand to verify it does not make contact with the clamps. If contact is made, rotate the clamps as needed to gain clearance. 5. Install the EGR pull rod. Refer to section "Installation of the GHG14 DD15 AT Exhaust Gas Actuator Pull Rod". 6. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. 12 All information subject to change without notice. Copyright 2013 DETROIT DIESEL CORPORATION 4 07-13

9 Installation of the DD15 and DD16 Exhaust Gas 1. Install a new Exhaust Gas Recirculation (EGR) valve gasket. 2. Install the EGR valve. NOTE: The four nuts must be lubricated with high-temp, copper-based anti-seize compound, or NEW copper coated nuts must be used for installation. 3. Install the four nuts and torque to 35 N m (26 lb ft). 4. Install the EGR actuator linkage and torque the nut to 20 N m (15 lb ft). 5. Install the new EGR hot pipe gaskets (if applicable) and then install the EGR hot pipe to the EGR cooler and EGR valve with new spherical clamps. Refer to section "Installation of the Exhaust Gas Recirculation Hot Pipe" 6. Run the EGR Actuator Slow Learn procedure in DDDL or DDRS. All information subject to change without notice. 13