Operating Procedure. EIR (webregistry) (POR/POD dropdown) AZPS NGILAN_5_N034 North Gila 500 NRTHGILA500 NRTHGILA500 NORTHGILA500_ITC

Similar documents
Wheeling Access Charges

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure

California Independent. System Operator. Market Overview and Design Construct

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

WestConnect TTC/ATC Workshop. Joint CCPG-SSPG-SWAT Meeting NOVEMBER 16, 2017

SDG&E Valley-Rainbow Project

SDG&E High Voltage DC WECC Path 46 Rating Increase Comprehensive Progress Report

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

Full Network Model Scope for FNM DB59

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

Full Network Model Scope for FNM DB2016Q1

Wheeling Access Charges

APS and Regional Transmission Systems Overview

Decision on the ISO Transmission Plan

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

APPENDIX F: Project Need and Description

TransWest Express Project

for DRECP Alternatives

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

Electric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP

Updates and Modifications to Report

Valley - Rainbow Interconnection Project Feasibility Study Report

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

Background Information

North Gila Generator Interconnection

Overview of APS U.S.-JORDAN ELECTRIC POWER TRANSMISSION PARTNERSHIP EXECUTIVE EXCHANGE VISIT. Bob Smith

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Opening Transmission Planning Process Stakeholder Meeting Tom Cuccia Lead Stakeholder Engagement and Policy Specialist November 19-20, 2014

Agenda Less than $50 Million Projects and Preliminary Economic Assessment Results

Merger of the generator interconnection processes of Valley Electric and the ISO;

Updates and Modifications to Report

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Introduction and Overview

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

Four Corners Queue Transmission Interconnection Study

Reliability Must-Run Analysis th BTA Presentation. Bob Smith Manager Transmission Planning June 6, 2006

WHEELING CHARGES. Ali Miremadi (916)

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

2015 CPS2 Bounds (Effective June 15, 2015)

Q51 Generation Interconnection

Market Highlights 1 (February 22 March 7)

Load Modeling for Power System Studies

WestConnect 2019 Annual Interregional Information. Annual Interregional Coordination Meeting February 19, 2019

WESTERN EIM BENEFITS REPORT Second Quarter 2018

Agenda. Draft ISO Transmission Plan Stakeholder Meeting. Tom Cuccia Sr. Stakeholder Engagement and Policy Specialist February 12, 2014

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Updates and Modifications to Report

PSE Attachment K Puget Sound Area Transmission Meeting

Re: Comments on the 12/7/09 Dynamic Transfer Stakeholder Meeting

EIA clearinghouse of hourly electric power operating data in 2015

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Q217 Generator Interconnection Project

Lugo-Victorville RAS. Presentation to RASRS. November 14, Edison Team Members:

PMUs and Blackout Analysis

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Arizona Transmission Challenges

Arizona Energy Consortium Conference

Transmission from East to West Transmission Policy Institute The History, Present and Future Of Electric Transmission Planning

Market Highlights 1 (February 8 February 21)

Q196 Generation Interconnection

2016 SDG&E Grid Assessment Results

Non-wire Methods for Transmission Congestion Management through Predictive Simulation and Optimization

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail

Cascade-Based Planning Analysis. Robert W. Cummings NERC Senior Director of Engineering and Reliability Initiatives

March 7, Subject: Southern California Edison 2011 Annual Progress Report

2013 Grid of the Future Symposium

Dynamic Scheduling NI A F S NI S. Where:

WestConnect Regional Planning Update

P. Desert Southwest Region Transmission, Transmission Losses, Unreserved Use Penalties, and Ancillary Services Rate Order No.

Silicon Valley Power TAC Presentation Overview 8/28/2017

SunZia Southwest Transmission Project

Memorandum. This is a status report only. No Board Action is required. Executive Summary

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

WECC Regional Planning Review. Canada/Pacific Northwest Northern California Transmission Line Project. Technical Analysis Committee Report

Goldstrike Power Plant Presentation June 8, Western Mining Electrical Association

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Distributed Energy Resources

Full Network Model Scope for FNM DB61

Consulting Agreement Study. Completed for Transmission Customer

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Second Report of the Tehachapi Collaborative Study Group

California Independent System Operator. Memorandum

Improving Transmission Asset Utilization Through Advanced Mathematics and Computing

Q137 Generation Interconnection

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

WECC Regional Planning Pacific Northwest/Canada to Northern California Transmission Project

Low Carbon Grid Study: Analysis of a 50% Emission Reduction in California

MISO Generation Fuel Mix Report Readers' Guide. Last Updated: 28 June 2015 Version: 1.0

Southwest Power Pool Network Integration Transmission Service Application

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) EXHIBIT SCE-1

The Upgrade of the Northern Terminal of the Pacific NW-SW HVdc Intertie Celilo Converter Station

PUBLIC SERVICE COMPANY OF NEW MEXICO (PNM)

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Transcription:

1. Procedure Detail 1.1. Purpose The California ISO market Scheduling paths are associated with the market Scheduling and tie points. In most cases, the name registered in the NAESB Electric Industry Registry (EIR) provided by the OATI webregistry system is the same as the Tie Point. WECC tagging specifications require a single point to be designated as POR/POD on NERC tags. The following table provides a cross reference to match the NERC POR/POD with the ISO market Scheduling path. This information regarding registered POR/POD s can also be found in the OATI Web Registry at https://www.naesbwry.oati.com/cgibin/webplus.dll?script=/naesbwry/sys-main.wml, but it requires a security certificate. 1.2. ADJ BA Scheduling Point Name Physical Tie Name EIR (webregistry) (POR/POD dropdown) ISO Market TIE POINT Intertie Constraint AZPS NGILAN_5_N034 North Gila 500 NRTHGILA500 NRTHGILA500 NORTHGILA500_ITC AZPS WILOWBCH_6_ND001 CAPTJACK_5_N510 SMD5_ASR-APND CAPTJACK_5_N509 SMD6_ASR-APND CAPTJACK_5_N511 SMD4_ASR-APND CAPTJACK_5_N507 SMD8_ASR-APND Willow Beach 500 WILLOWBEACH WILLOWBEACH ELDORADO_ITC Cottonwood 230 CTW230 CTW230 Lawrence Livermore 115 Round Mountain 230 Rancho Seco/Bellota 230 (2 lines) CTW230_ITC TRCYTEA_ITC LLL115 LLL115 LLNL_ITC RDM230 RDM230 RDM230_ITC RAN230 RANCHOSECO RNCHLAKE_ITC Table Note Page 1 of 9

CAPTJACK_5_N508 SMD7_ASR-APND Lake - Goldhill 230 LAK230 LAKE RNCHLAKE_ITC STANDFD2_1_N011 Standiford- Warnerville 115 (2 lines). CCSF/ISO Standiford NPTO TIE (MID) STANDIFORD STANDIFORD STANDIFORD_ITC CAPTJACK_5_N506 SMD9_ASR-APND Tracy - Tesla 230 1 and 2 TESLA230 and TRY230 TESLA230 TRACY230_ITC TRCYTEA_ITC Note 6 (MID) CAPTJACK_5_N504 SMDB_ASR-APND CAPTJACK_5_N505 SMDA_ASR-APND Westley -Tesla 230 (MID) Tracy 500 Intertie with TESLA230 WESTLYTSLA WESTLYTSLA_ITC TRY500 TRCYPGAE TRACY500_ITC TRCYTEA_ITC Note 8 Note 8 Note 8 CAPTJACK_5_N512 SMDH_ASR-APND CAPTJACK_5_N015 SMDG_ASR-APND CAPTJACK_5_N513 SMD2_ASR Tracy 500 Intertie with Tracy 500 Intertie with Schedules at Tracy 230, Tracy 500 or Cottonwood 230 for registered Dynamic Transfer TRY500 TRY500 TRCYCOTPISO TRCYCOTP COTPISO_ITC TRACY500_ITC TRCYTEA TRCYTEA TRCYTEA_ITC BPA MALIN_5_N101 Malin 500 kv MALIN500 MALIN500 MALIN500 Page 2 of 9

CAISO CAISO N/A N/A Existing Gen. Zone North of Path 15 Existing Gen Zone South of Path 15 CEN ROA-230_2_N101 La Rosita Tie CFEROA CFEROA CEN TJI-230_2_N101 Tijuana Tie CFETIJ CFETIJ NP15 N/A N/A Note 4 SP15 N/A N/A Note 4 CFE_ITC CFEROA_ITC CFE_ITC CFETIJ_ITC IID COACHELV_2_N101 RAMON_2_N001 Mirage Coachella 230 MIR2 MIR2 IID-SCE_ITC IID LDWP ELCENTRO_2_N001 MCCULLGH_5_N101 Imperial Valley 230 McCullough Eldorado 500 IVLY2 IVLY2 IID-SDGE_ITC ELDORADO500 ELDORADO500 MCCULLGH_ITC LDWP N/A Inyo INYO N/A N/A Note 3 LDWP VICTORVL_5_N101 Lugo-Victorville 500 LUGO LUGO VICTVL_ITC LDWP/ GONDER_2_N501 Gonder 230 GON.IPP GONIPP ADLANTO- GONDIPPDC_ITC IPPDCADLN_ITC IPPUTAH_ITC Page 3 of 9

LDWP INTERM1G_7_N501 IPP 345kV & 500 (DC) IPP IPP ADLANTO- IPPDCADLN_ITC LDWP INTERMT_3_N506 IPPPUTAH IPPUTAH IPPUTAH ADLANTO- IPPDCADLN_ITC IPPUTAH_ITC LDWP N/A Adelanto 500 ADL N/A N/A LDWP/ PACE MONA_3_N501 Mona 345 MDWP MDWP ADLANTO- IPPDCADLN_ITC IPPUTAH_ITC MONAIPPDC_ITC LDWP/ WALC MARKETPL_5_N501 Marketplace 500 MARKETPLACE MARKETPLACE ADLANTO- MKTPCADLN_ITC LDWP MCCULLGX_5_N501 McCullough 500 MCCULLOUG500 MCCULLOUG500 ADLANTO- MCCLMKTPC_ITC MKTPCADLN_ITC LDWP/ BPA SYLMARDC_2_N501 Nevada - Oregon Border (PDCI) NOB NOB NOB_ITC LDWP SYLMARLA_2_N501 Sylmar AC SYLMAR SYLMAR SYLMAR-AC_ITC Page 4 of 9

MAGNOLIA_2_N008 NSO_2_N008 Merchant 230 ELDORADO230 ELDORADO230 MERCHANT_ITC NWEST_2_SN001 Northwest 230 NWEST NWEST AMARGOSA_1_SN001 Amargosa 138 AMARGOSA230 AMARGOSA230 NWEST230_ITC VEA_ITC AMARGO_ITC VEA_ITC MOH-LGHN_5_N001 Mohave-Laughlin 500 MOHAVE500 MOHAVE500 LAUGHLIN_ITC MERCURY_1_N008 Mercury Switching Center: 3 lines at Innovation, Jackass Flats, & Mercury Distribution(DOE) MERCURY138 MERCURY138 MERCURY_ITC VEA_ITC MARBLSPP_6_N001 Marble (Plumas- Sierra) 60 NPTO tie MARBLE60 MARBLE60 MARBLE_ITC SUMMIT_ASR-APND Summit 60 and 120 Ties SUMMIT120 SUMMIT120 SUMMIT_ITC SLVRPS2_7_N001 Silver Peak 55 Tie SILVERPEAK55 SILVERPEAK55 SILVERPK_ITC PACW CRAGVIEW_1_GN001 Crag View Cascade 115 CRAG CRAG CASCADE_ITC SRP PALOVRDE_ASR- APND PV West 500 PVWEST PVWEST PALOVRDE_ITC Note 2 Page 5 of 9

TID OAKDLTID_1_N001 CCSF/ISO Oakdale NPTO TIE (TID) OAKDALE OAKDALE OAKDALE_ITC TID CAPTJACK_5_N003 SMDC_ASR-APND Westley Quinto 230 (TID) WESTLY WESTLYQNTO WESTLYLBNS_ITC WALC BLYTHE_1_N101 Blythe 161 BLYTHE161 BLYTHE161 BLYTHE_ITC WALC MEADS_2_N101 Mead 230 MEAD230 MEAD230 WALC MEADN_2_N501 Mead 230 MEAD230 MEAD2MSCHD MEAD_ITC MEADTMEAD_ITC MEAD_ITC WALC MEAD_5_N501 Mead 500 MEAD500 MEAD5MSCHD ADLANTO- MEADMKTPC_ITC MKTPCADLN_ITC WALC/ AZPS WESTWING_5_N501 Westwing 500 WESTWING500 WESTWING500 ADLANTO- MEADMKTPC_ITC MKTPCADLN_ITC WSTWGMEAD_ITC WALC PARKER_2_N101 Parker Davis 230 PARKER230 PARKER230 PARKER_ITC Page 6 of 9

Note 2: Note 3: Note 4: : Note 6: Note 8: This scheduling point is a combination of two 500 kv lines 1) PV 500 kv to Devers 500 kv and 2) PV 500 kv to North Gila 500 kv. PV West interconnects with SP15. Actual Interchange only, NOT a scheduled tie, per LADWP BAA. Used to define load, generation and network POR/POD zones within the CAISO Balancing Authority Area. External CISO SPTO Market Transmission rights across LADWP IPP and WALC Mead-Phoenix systems. See the California ISO Tagging Templates for Interchange Schedule tagging instructions for the SPTO market Schedules. For tagging purposes TESLA230 AND TRY230 must both be used to identify an interchange transaction at TESLA230. TRCYCOTP (1567 MW), TRCYPGAE and TRCYCOTPISO (33 MW of ISO rights) are all Market Tie Points that are aggregated at TRY500 for checkout with. 2. Supporting Information Operationally Affected Parties Shared with Public. References Resources studied in the development of this procedure and that may have an effect upon some steps taken herein include but are not limited to: CAISO Tariff CAISO Operating Procedure NERC Requirements Page 7 of 9

WECC Criterion Other References Definitions Unless the context otherwise indicates, any word or expression defined in the Master Definitions Supplement to the CAISO Tariff shall have that meaning when capitalized in this Operating Procedure. The following additional terms are capitalized in this Operating Procedure when used as defined below: Version History Version Change Date 10.2 Removed tie point Devers Coachella 230 and TSIN - DEVERS230 5/29/2013 10.3 SPPC-Nevada Power merge, alphabetized entire list per BA 1/1/2014 10.4 Changed FOURCORNE345 to FOURCORNE500 due to Four Corners asset transfer 1/4/2014 10.5 Added MERCURY138 for VEA boundary change 6/11/2014 11.0 Added new column, Scheduling Points, for Transaction IDs, and removed the 4/29/2015 MESQUITE230 row. 11.1 Added TRCYTEA for WAPA, Sierra Nevada Region 5/28/2015 11.2 Changed AMARGO to AMARGOSA230 to match with WALC in NAESB EIR. Also in 6/30/2015 ADJ BA, fixed LDWP/SPP to for Gondor missed in v10.3. 11.3 Changed North Gila 69 to North Gila 500 due to APS boundary change, aka HANG2. 7/24/2015 Changed Scheduling Point Name of NGILA1_5_N001 to NGILAN_5_N034. 11.4 Changed Westley Los Banos to Westley Quinto. Replaced MSL with ITC - final identity change across systems (ETCC) from _MSL to 11/4/2015 Page 8 of 9

_ITC resulted from removing need for MSLs from Spring 2014 Dynamic transfer market enhancement. 11.5 Removed MERCHANT_2_N101, corresponding to Merchant north bus, due to NVE and 12/18/2015 SDG&E Merchant boundary change. 11.6 Changed CFE to CEN under Adj. BA. 12/31/2015 11.7 Created the procedure in Centric. 4/6/2016 11.8 Replaced FOURCORNE345 RES_IDs with WILLOWBEACH for the transition of Four 7/6/2016 Corners/Moenkopi to Willow Beach from SCE/ISO to APS. 11.9 Included additional column, "Intertie Constraint." 11/16/2016 11.10 Section 1.2: Updated two references in the EIR column for due to SMUD e- 8/10/2017 Tagging Protocol revisions. Note Table, : Replaced reference of 8110G with, since 8110G has retired and the information related to this reference is now included in. 11.11 Section 1.2: 11/16/2017 In main table: Removed row 1 (AZPS ELDORADO500) for the retirement of FORCORNE345 and MOENKOPI500 ISO market tie points for the transition of Four Corners and Moenkopi to Willow Beach from SCE/ISO to APS. Replaced Path 26 with Path 15. In Notes table: Removed Note 1 due to removal of row 1 noted above. Updated reference. Removed Note 7 as it corresponds to nothing in above table. Note: Numbering will not be adjusted, for version control. Page 9 of 9