1 Appendix 4-28 Technical Memorandum PS-1 on Pumping Stations Condition Assessment

2 TECHNICAL MEMORANDUM PS-1 March 8, 2013 To Copy to From Town of Falmouth, MA File; Project Team Nathan C. Weeks, P.E., BCEE J. Jefferson Gregg, P.E., BCEE Marc R. Drainville, P.E., BCEE, LEED AP Tel Subject Wastewater and Nutrient Management Services Pumping Stations Condition Assessment Job No A condition assessment was completed for the pre-1990 pumping stations that were put into service in 1985 and include: Jones Palmer Pumping Station (PS) Shivericks Pond PS Woods Hole PS Gardiner Road PS Falmouth Beach PS Inner Harbor PS The purpose of the condition assessment was to prioritize possible maintenance and repair activities and to identify the timeline for long-term improvements or replacement of these pumping stations. Similar to the evaluation of the Blacksmith Shop Road WWTF, this condition assessment does not provide a detailed evaluation of the structural, electrical, or ventilation facilities. It focuses on the main processes of the pumping stations which include the process of pumping wastewater to other locations in the collection system and ultimately to the Blacksmith Shop Road WWTF, and the support processes of flow metering, odor control, influent shredding (comminuting), and chemical feed. The condition assessment was completed through the following main steps: 1 Review of background information on the pumping station. 2 Meeting with Charlie Pires (WWTF Operator) to review issues with the collection system and pumping stations. 3 Site visit to the pumping station with Charlie Pires and Amy Lowell (Assistant Wastewater Superintendent) on December 13, 2012 to inspect each one, note problems, and document these problems with photographs. The photographs are attached as Appendices PS-1-1 through PS Summarize the findings of the condition assessment in this Technical Memorandum with short-term and long-term recommendations.

3 TM PS-1 1. JONES PALMER, SHIVERICKS POND, AND WOODS HOLE PUMPING STATIONS 1.1 Introduction These three pumping stations are grouped together because they are the larger capacity pumping stations with above-ground buildings to provide support facilities for each station. These pumping stations are equipped with flow meters and chemical feed and/or odor control facilities. 1.2 Odor Control (Air-Treatment) Facilities Odor control (air-treatment) facilities are provided for Jones Palmer and Shivericks Pond Pumping Stations. Jones Palmer has a packaged biofilter system installed in 2004 which has addressed odor complaints at that station due to odors generated in the long force main from Woods Hole. A new activated carbon facility at Shivericks Pond PS is currently (March 2013) under construction and is being implemented to address organic and sulfide odors at that location. Odor complaints have occurred mainly in the summer months and this implementation is designed to address these odors. No odor control (air-treatment) facilities are provided at the Woods Hole PS and we are not aware of any odor complaints at this location. 1.3 Hypochlorite Feed Facilities Hypochlorite feed facilities are provided at both the Jones Palmer and Woods Hole pumping stations. New storage tanks with improved hatches and access ladders have been installed at these locations to address past access and storage problems. Improved hypochlorite level indicators are still needed. The hypochlorite is pumped into the force main whenever the pumping station pumps sewerage. This chemical feed has been successful at reducing odors and corrosion in the downstream receiving facilities. The Woods Hole PS hypochlorite feed was discontinued for several months in the early 2000 s which added to concrete corrosion at the Jones Palmer influent manhole and Jones Palmer wet wells. This corrosion is evidenced by raised aggregate in the concrete surfaces of these structures due to the cement being decayed. This problem was first observed by GHD and documented in the 2008 Collection System Chemical Evaluation Report. The apparent deterioration in these areas has not worsened since 2008 due to the hypochlorite feed being resumed. No hypochlorite feed facilities are provided in the Shivericks Pond PS and there is no apparent need. 1.4 Influent Comminuting Influent comminuting facilities (shredding of influent solids) are provided at all three of these pumping stations with the following items noted: The two (2) original comminuters at the Jones Palmer PS are operational. The Operations staff have recently rebuilt one comminuter and are working on the other. They appear to be working well and no visible large solids were apparent in the wet wells. The equipment is old with much corrosion on the surface of the equipment. The original comminuters at Shivericks Pond PS were replaced with one Muffin Monster channel grinder. This works well for one channel and wet well. The other wet well is not used. 2

4 TM PS-1 The original comminuter in Woods Hole PS is still in service and appears to be working satisfactorily. The comminuter equipment is old and the surface is corroded due to age and conditions in the wet wells. Influent comminuters should be replaced when pumping stations are overhauled. 1.5 Pumping Station Pumps The pumping station pumps are all original except two pumps in Jones Palmer that were recently (2012) replaced/rebuilt, and one provided with a VFD. The pumps work well and appear to be well maintained. The current multiple-pump configuration at the stations provides adequate redundancy. Pumps should be replaced when pumping stations are overhauled. 1.6 Flow Monitoring These pumping stations were all built with ultrasonic Doppler-type flow meters used with a Venturi mounted vertically in the discharge piping before the pipe exits the station. All of these Venturi meters have been replaced by strap-on ultrasonic flow meters. Much effort has been exerted to calibrate the meters in Jones Palmer and Woods Hole pumping stations and information provided by the operators indicate that these meters are well calibrated. Operations staff indicate that the flow meter in Shivericks Pond PS is currently not reliable. These flow meters should be replaced at the time of pumping station overhaul. Often, where there is a shortage of space in a pumping station for a new meter, we recommend the placement of an inline magmeter in a vault outside the station with suitable bypass piping. Major pumping stations should be equipped with reliable flow meters to consider I/I and other flow issues in a wastewater collection area. 1.7 Major Electrical Equipment Major electrical equipment (MCC equipment and backup generator sets) are located on the top floor (ground floor) of each pumping station. This equipment appears to be well maintained. The MCC cabinets have been modified over the years as new process equipment has been added or old equipment eliminated. Comments from the operations staff indicated that electrical contractors that have worked in the Jones Palmer MCC cabinets have commented on apparent metal corrosion. 1.8 Underground Fuel Tanks The original underground fuel tanks for the backup generator sets are in the process of being removed by the Operations and Highway Department staff: The underground fuel tank for Jones Palmer PS has been removed and a new 250-gallon tank is located in the wet well side of the station in the old odor control room. The Shivericks Pond PS existing 500-gallon underground tank is still in use and is expected to be removed in the future. The underground storage tank for Woods Hole PS has recently been removed and the generator set is serviced only by its day tank. Operations staff are considering installing a new fuel tank in the station. 3

5 TM PS-1 Long-term fuel storage solutions are needed for Shivericks Pond and Woods Hole pumping stations. 1.9 Condition of Other Facilities Condition of other facilities and equipment at the Pumping Station is as follows: Jones Palmer PS: Concrete erosion in the wet wells and influent manhole due to high levels of hydrogen sulfide that are believed to have occurred when the Woods Hole PS hypochlorite feed facilities were not operational. Electrical equipment and conduit in the wet well side show corrosion which would be typical for a wet well. Electrical contractors that have worked in the MCC cabinets have indicated that there is corrosion in those cabinets. Piping, valves, and pipe supports have some corrosion and the operations staff have replaced several knife gate valves. Additional valve replacement is planned. The walls and floor of the pump room have some corrosion near the hypochlorite feed facilities. Shivericks Pond PS: Corrosion on the walls, equipment, and conduit in the wet well side is minimal for a pumping station this age. New gate valves have been installed in the pump effluent piping and appear in good condition. Other portions of this pumping station have minimal apparent corrosion (especially as compared to Jones Palmer) possibly due to smaller sulfide loads in this pumping station. Woods Hole PS: Corrosion on the walls, equipment, and conduit in the wet well side is typical of a pumping station this age. Piping is corroded particularly near the hypochlorite feed pump that appears to be leaking. Other portions of this pumping station have minimal apparent corrosion (especially as compared to Jones Palmer) possibly due to smaller sulfide loads in this pumping station. These corrosion problems should be repaired as operational funds and resources allow. All remaining corroded equipment and surfaces should be repaired or replaced at the time of pumping station overhaul Continuous Gas Monitoring Systems The continuous gas monitoring systems for these pumping stations are not working and have not worked for many years according to operations staff. The operations staff utilizes portable gas monitors when they enter 4

6 TM PS-1 the pumping stations to comply with OSHA requirements. The continuous gas monitoring systems should be repaired and made operational Summary of Condition Assessment for Jones Palmer, Shivericks Pond, and Woods Hole Pumping Stations and Recommendations for Long-Term Overhaul These pumping stations are major pumping stations that represent long-term investments in the Town s wastewater infrastructure. They are in good condition due to consistent operation and maintenance. Several repair and maintenance items have been identified that should be addressed as part of regular operations, maintenance, and repair; and the annual operation budgets should be increased/adjusted to allow for these repairs. It is understood that there is an important decision to be made regarding which repairs should be addressed as repair and maintenance, and which ones should be made as part of a systematic pumping station overhaul. Often, this decision is supported by long-term budget and Capital Improvement Planning. In 2015, these pumping stations will be 30-years old. We recommend planning for pumping station overhaul starting in the next five to ten years as wastewater management proceeds in Falmouth. Pumping station overhaul is an expensive component depending on the age and condition of the station. GHD has just completed the design of the Town of Chatham Stage Harbor Pumping Station which is the station that has provided total flow to the Chatham WWTF (similar to Jones Palmer). This is a major upgrade of this station which is over 40 years old and includes: New generator New MCCs New pumps New piping New flow meter New chemical feed The estimated cost for this pumping station upgrade is $2,000,000 (not including design and construction phase services), and overhaul of Falmouth s major pumping stations are expected to be of a similar magnitude. Consideration at each station relative to new codes and design guides for these facilities regarding electrical and other support systems will impact their costs. The approach that is taken to address these design guides and code compliance issues will affect the overhaul costs of these pumping stations. At this point in the planning process, we recommend planning for the pump station overhaul of these three pumping stations in the next five to ten years. 5

7 TM PS-1 2. INNER HARBOR, FALMOUTH BEACH, AND GARDINER ROAD PUMPING STATIONS 2.1 Introduction and Assessment These pumping stations are grouped together because they are similar designs manufactured by Boydco of East Providence, Rhode Island. They are completely underground with separate dry and wet sides. The dry side has two floor levels: the top level has the generator set and the MCC equipment, and the lower level has the pumps, bubbler system, and piping. The wet side has a grated platform above the wet well, with no other equipment (no comminuter or channels) in it. These pumping stations have no odor control or hypochlorite feed equipment and they have relatively short force mains. The pumping station pumps are all original and appear to be well maintained. Dual pumps in each pumping station are controlled by a bubbler system which provides little recording function and requires an air compressor in the dry side. The operator would like to modify these controls and standardize on a level sensing control system for each station. Major electrical equipment is located on the upper level (first level down) as discussed previously. This equipment appears to be well maintained for each station. The underground fuel storage tanks for these pumping stations are planned for removal. They have been emptied and the operators are filling the generator day tanks in the stations. A permanent, larger volume fuel storage solution is needed for these pumping stations. As identified above, these pumping stations are not equipped with influent shredding (comminuting) devices. This is not a problem for the Falmouth Beach and Gardiner Road collection areas due to the residential land use in these areas. It is a problem at the Inner Harbor area because of the commercial/hotel land use in that area. Operations staff often have to remove rags that clog the pumps at the Inner Harbor PS. This often occurs weekly. During the site visit, three options to address this issue were described: Installation of an inline grinder between the wet well and the pump. This grinder would turn on when the pump runs. Replacement of the existing pumps with grinder pumps. Installation of a shredding device in the wet well. Inner Harbor PS should be equipped with influent shredding in the future. The access point to the wet side of these pumping stations is through a primitive hatch or manhole. Watertight hatches or better seals on the existing hatches should be provided to reduce inflow to these structures especially at the Gardiner Road PS where the wet side is at a low spot on the site. These stations have minimal corrosion in the dry sides and appear to be well maintained. The Gardiner Road PS does have staining on the wells that appears to be from groundwater leakage and iron staining in the groundwater. 6

8 TM PS Summary of Condition Assessment for Inner Harbor, Falmouth, Beach, and Gardiner Road Pumping Stations and Recommendations for Long-Term Overhaul These pumping stations do not have the same level of infrastructure as the major pumping stations (Jones Palmer, Shivericks Pond, and Woods Hole) discussed previously. They are located completely underground and are located in flood-prone areas. They are generally in good condition and can be operated for several years into the future before overhaul or replacement is needed. Several repair and maintenance items have been identified that should be addressed as part of regular operations, maintenance, and repair; and the annual budgets should be increased/adjusted to allow for these repairs. Pump capacity increases have been identified and budgeted as discussed in TM S-2 as part of the preliminary design of the Lower Little Pond Watershed sewer extension. Similar to the larger pumping stations discussed earlier, there are decisions to be made regarding which repairs should be addressed as repair and maintenance, and which should be made as part of a systematic overhaul. We recommend planning for pumping station overhaul starting in five years. Overhaul of these stations is not expected to be as expensive as for the other major pumping stations. A possible approach for station overhaul would be abandonment of the pumping equipment in the dry side and installation of duplex submersible pumps in the wet well. The dry side would be overhauled for new electrical equipment. If the Town did not want to put these electrical facilities in the old dry side, they could be installed in a raised structure similar to the New Silver Beach Pumping Station. This second option may not be acceptable to the neighbors because it will obstruct the view of the adjacent water bodies and wetlands. A budget cost for an overhaul of this type would be the construction cost of the New Silver Beach Pumping Station. In summary, similar to the larger pumping stations, we recommend planning for station overhauls in five to ten years. 3. NEXT STEPS TO ADDRESS ISSUES IDENTIFIED IN THIS CONDITION ASSESSMENT We have identified several maintenance and repair items that are needed to improve performance and extend the lifetime of these pumping stations. We have also identified recommendations and approaches for pumping station overhauls in the next five to ten year periods. G:\86\15097\WP\Memos\Technical Memos\Final Submittal\Final Submittal\PS-1 Cond Assessment Memo\PS-1 Memo.docx 7

9 Appendix PS-1-1 Falmouth Beach PS Photos 1 1 All photos for all appendices were delivered to Amy Lowell on a CD and were numbered in the file name according to pump station and number.

10

11

12

13

14

15 Appendix PS-1-2 Gardiner Road PS Photos 1

16

17

18

19

20

21

22 Appendix PS-1-3 Inner Harbor PS Photos 1

23

24

25

26

27 Appendix PS-1-4 Jones Palmer PS Photos 1

28

29

30

31

32

33

34

35

36

37 Appendix PS-1-5 Shivericks Pond PS Photos 1

38

39

40

41

42

43

44 Appendix PS-1-6 Woods Hole PS Photos 1

45

46

47

48

49

50

51

City of Grand Island Tuesday, October 10, 2017 Council Session

City of Grand Island Tuesday, October 10, 2017 Council Session City of Grand Island Tuesday, October 10, 2017 Council Session Item G-12 #2017-276 - Approving Change Order No. 1 for Lift Station No. 20 Upgrade and Force Main Rehabilitation & Lift Station No. 14 Abandonment;

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

Section 5 - Operations and Maintenance Program

Section 5 - Operations and Maintenance Program Section 5 - Operations and Maintenance Program A. Introduction The intent of this section of the SSMP is to describe the current operation of the City s wastewater collection system. There are five areas

More information

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 December 31,2.012 Mr. Charles Aspinwall Town

More information

STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR CIP Title FINAL2:Layout 1 7/27/17 3:34 PM Page 6 STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221

More information

Appendix C Capital Improvement Program Project Descriptions and Details

Appendix C Capital Improvement Program Project Descriptions and Details Appendix C Capital Improvement Program Project Descriptions and Details GIG HARBOR WW COMP PLAN DRAFT CAPITAL IMPROVEMENT PROGRAM LIFT STATION COST ESTIMATE Lift Station 1 Item Qty Units Unit Cost Extended

More information

ANDERSON, ECKSTEIN AND WESTRICK, INC.

ANDERSON, ECKSTEIN AND WESTRICK, INC. ANDERSON, ECKSTEIN AND WESTRICK, INC. 51301 Schoenherr Civil Engineers Road, Shelby Township, Michigan 48315 Surveyors Architects 586-726-1234 Mr. Matthew Tepper City of Grosse Pointe Farms 90 Kerby Road

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

Comprehensive Lift Station Evaluation Buffalo, Minnesota

Comprehensive Lift Station Evaluation Buffalo, Minnesota City of Buffalo Comprehensive Lift Station Evaluation Buffalo, Minnesota W3.088 Submitted by: Bolton & Menk, Inc. 040 Hwy East Willmar, MN 560 P: 30-3-3956 F: 30-3-970 Certification Comprehensive Lift

More information

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775

More information

City of Alpena Septage Receiving Facility Operating Plan

City of Alpena Septage Receiving Facility Operating Plan City of Alpena Septage Receiving Facility Operating Plan August 2008 Amended 3/30/10 Updated 1/17/18 Alpena Water/Wastewater Utility Alpena Water Recycling Plant Septage Receiving Facility Operating Plan

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Tom Parece, Reggie Donoghue and Mike Domenica P. R. Ammann

Tom Parece, Reggie Donoghue and Mike Domenica P. R. Ammann To: From: Subject: Tom Parece, Reggie Donoghue and Mike Domenica P. R. Ammann TM #7 A STEP Effluent Has a Big Cost Advantage over a Gravity for Downtown Orleans Date: January 12, 2017 Summary In its preliminary

More information

Municipality of Strathroy- Caradoc

Municipality of Strathroy- Caradoc Directed to: Prepared by: Department: Subject: Municipality of Strathroy- Caradoc Mayor Vanderheyden and Members of Council Mark Harris Environmental Services Strathroy WPCP Blower Replacement Update Page

More information

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital

More information

FY Capital Improvement Program Street Lighting

FY Capital Improvement Program Street Lighting FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 In-Fill and Repair and/or Replacement of Existing Systems FY 216-22 (74413) High Voltage Series Street Light

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Wastewater System Asset Management Plan Report. Prepared For: Department of Public Works Jaffrey, New Hampshire

Wastewater System Asset Management Plan Report. Prepared For: Department of Public Works Jaffrey, New Hampshire Wastewater System Asset Management Plan Report Prepared For: Department of Public Works Jaffrey, New Hampshire June 2016 Revised September 9, 2016 Table of Contents Section 1 Introduction 1.1 Project Overview

More information

Public Information Centre

Public Information Centre Junction Street Wastewater Pumping Station & Forcemain Schedule B Municipal Class Environmental Assessment Study Public Information Centre June 28, 2017. 6:00 to 8:00 pm. The Burlington Performing Arts

More information

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including: Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-17-18 Date of Report: March 24, 2017 Date of Meeting: March 30, 2017 Subject:

More information

What We Heard Report - Metro Line NW LRT

What We Heard Report - Metro Line NW LRT What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail

More information

Spartanburg Water, a water and wastewater

Spartanburg Water, a water and wastewater Slick Solutions: Fairforest Grease & Septage Receiving Station M. Steve Cavanaugh Jr. and Janet Hurley Cann Steve Cavanaugh Jr., P.E., is the founder and president of Cavanaugh & Associates, a engineering,

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re : : Docket No. SB-00-0 () : Testimony of David M. Campilii, P.E. June, 00 PROV-- 0 0 TESTIMONY OF DAVID M. CAMPILII,

More information

Impacts of Hurricane Sandy to NYCDEP WWTPs and Pump Stations. December 12, 2012

Impacts of Hurricane Sandy to NYCDEP WWTPs and Pump Stations. December 12, 2012 Impacts of Hurricane Sandy to NYCDEP WWTPs and Pump Stations December 12, 2012 Presentation Agenda Overview of NYC Sewer System and Treatment Plants Preparations Made in Anticipation of Sandy Status of

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Wastewater Capacity Evaluation Update. January 7, 2019

Wastewater Capacity Evaluation Update. January 7, 2019 Wastewater Capacity Evaluation Update January 7, 2019 Future Wastewater Needs Decision Factors driving the decision Design-Permitting-Construction timeline Will take ±4 years to deliver a project Raleigh

More information

EXHIBIT B Water Meter Review and Testing November 2008

EXHIBIT B Water Meter Review and Testing November 2008 EXHIBIT B Water Meter Review and Testing November 2008 Prepared by: HDR Engineering, Inc. Technical Memorandum To: Ken TeKippe, City of Dubuque From: HDR Engineering Project: Dubuque Water Meter Review

More information

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269) City of South Haven City Hall 539 Phoenix Street South Haven, Michigan 49090-1499 Telephone (269) 637-0700 Fax (269) 637-5319 Dunkley and Black River Infrastructure Improvements Dunkley - Dyckman Avenue

More information

Home Elevator. Planning Guide

Home Elevator. Planning Guide Home Elevator Planning Guide Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site preparation or construction. 2 Table of Contents Elvoron Home Elevator...4

More information

ELVORON HOME ELEVATOR

ELVORON HOME ELEVATOR Creating An Accessible World ELVORON HOME ELEVATOR PLANNING GUIDE www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site preparation

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,

More information

Memorandum. Project Administration Department. 324 East Pine Street Tarpon Springs FL (727)

Memorandum. Project Administration Department. 324 East Pine Street Tarpon Springs FL (727) Project Administration Department 324 East Pine Street Tarpon Springs FL 34689 (727) 942-5638 Memorandum Date: March 19, 2019 To: Mayor, and Board of Commissioners Through: Mark LeCouris, City Manager

More information

MEMORANDUM SHANE TAYLOR, PUBLIC WORKS SUPERVISOR UTILITIES

MEMORANDUM SHANE TAYLOR, PUBLIC WORKS SUPERVISOR UTILITIES MEMORANDUM TO: FROM: BY: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SHANE TAYLOR, PUBLIC WORKS SUPERVISOR UTILITIES SUBJECT: CONSIDERATION TO APPROVE THE PURCHASE OF A REPLACEMENT BACKUP PUMP AND

More information

NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723

NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723 NORTH SLOPE BOROUGH Department of Public Works P.O. Box 350 Barrow, Alaska 99723 Phone: 907-852-0489 Fax: 907-852-0251 Charlie Sakeagak, Director ATQASUK TRANSMISSION LINE PROJECT INTRODUCTION The continuing

More information

AN UPDATE ON THE IMPLEMENTATION

AN UPDATE ON THE IMPLEMENTATION AN UPDATE ON THE IMPLEMENTATION OF THE STICKNEY, CALUMET AND NORTHSIDE WATER RECLAMATION PLANTS MASTER PLANS THOMAS E. KUNETZ Assistant Chief Engineer, Engineering Dep t. Metropolitan Water Reclamation

More information

Engineering - Other Projects

Engineering - Other Projects Capital Improvement Plan Project Summary # Aerial Photo / Orthophotos 50,000-50,000-70,000 - # Equipment and Vehicle Replacement 1,478,400 1,566,400 1,700,985 1,700,985 1,930,500 2,025,000 # Right of Way

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: April 11, 2017 AGENDA ITEM #G-6 ITEM: Consider Approval of a Budget Amendment & Award of a Contract to J. Ranck Electric Inc. for the Pedestrian

More information

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP Agenda Rocky River WWTP Background Ohio Sludge Rules EPA Request for Alternative Digester Cleaning Project Page 2 Rocky River WWTP Background and History

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

TOWN OF FRIDAY HARBOR, WASHINGTON PAGE 1

TOWN OF FRIDAY HARBOR, WASHINGTON PAGE 1 TOWN OF FRIDAY HARBOR WWTP IMPROVEMENTS ADDENDUM NO. (7 pages total) Issue Date: September 0, 08 General: Recitations of each and every section of the bid documents impacted by this addendum are not given.

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT DRAFT STAFF REPORT Draft Amendments to Rule 4621 (Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants) and Rule 4622 (Gasoline Transfer into Motor Vehicle Fuel Tanks)

More information

Monthly Checklist For Depot

Monthly Checklist For Depot Monthly Checklist For Depot ANNEXURE 1.L(iv) TANK FARM Notes : i. The scope covers piping, valve & fittings, general housekeeping, pumps & motors, effluent management, fire protection and security within

More information

APPENDIX G PH NEUTRALIZATION SYSTEM TECHNICAL MEMORANDUM

APPENDIX G PH NEUTRALIZATION SYSTEM TECHNICAL MEMORANDUM APPENDIX G PH NEUTRALIZATION SYSTEM TECHNICAL MEMORANDUM BCM Construction Project No.: 151-205 ProDELTA Plus Continuous ph Neutralization System PDP-200-2-SC-G-B-T-AX-4-N4-LR-OCV 9/4/2015 Submitted for

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Provision of Proprietary Software Licences and Maintenance from Innovyze Inc. for Hydraulic Modelling and Asset Management

Provision of Proprietary Software Licences and Maintenance from Innovyze Inc. for Hydraulic Modelling and Asset Management PW8.9 STAFF REPORT ACTION REQUIRED Provision of Proprietary Software Licences and Maintenance from Innovyze Inc. for Hydraulic Modelling and Asset Management Date: September 18, 2015 To: From: Wards: Reference

More information

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016 Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number #545.3 Final Report October 1, 2016 Prepared for: Waste Diversion Ontario Continuous Improvement Fund Office Barrie, Ontario

More information

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar No. Question Answer 1 Is it mandatory to have an Engineer sign off on all TMP's containing a lane closure even in a 50 or 60

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES UPDATED MAY 24, 2017 Table of Contents Section 1: Water Service Charges... 2 Monthly Water System Charge... 2 Commodity

More information

1BGrease Traps and. Frequently Asked Questions About Grease:

1BGrease Traps and. Frequently Asked Questions About Grease: 0B 1BGrease Traps and Interceptors 112 W Washington Ave. Fergus Falls MN 56537 Building Department (218)332-5434 Frequently Asked Questions About Grease: Is grease a problem? What is a grease trap and

More information

Battery Technology for Data Centers and Network Rooms: Site Planning

Battery Technology for Data Centers and Network Rooms: Site Planning Battery Technology for Data Centers and Network Rooms: Site Planning White Paper # 33 Executive Summary The site requirements and costs for protecting information technology and network environments are

More information

OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms

OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms November 2016 The Department of Energy Office of Inspector

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

PURPOSE RESPONSIBILITY

PURPOSE RESPONSIBILITY PAGE 1 OF 6 PURPOSE This Standard Operating Procedure (SOP) provides guidance and methods for Underground Storage Tank (UST) inventory control at Massachusetts Department of Transportation, Highway Division

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

Too Good to Throw Away Implementation Strategy

Too Good to Throw Away Implementation Strategy Too Good to Throw Away Implementation Strategy Council Briefing by Sanitation Services October 4, 2006 Purpose of Briefing Summarize preparations for Too Good To Throw Away recycling services FY07 Recommend

More information

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation Municipal Road and Bridge Revolving Loan Fund 2014 Program Summary Rhode Island Department of Transportation The Basics The FY2014 Budget passed by the Rhode Island General Assembly included Article 20,

More information

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014 Presented To: Operations Committee Request for Decision Pedestrian Lighting Standards for Road Right-of-ways Presented: Monday, Mar 17, 2014 Report Date Thursday, Mar 06, 2014 Type: Presentations Recommendation

More information

WELCOME. New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA)

WELCOME. New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA) WELCOME New Septage Waste Haulage Receiving Station Municipal Class Environmental Assessment (Class EA) Public Information Centre (PIC) No. 1 Thursday November 9 th, 2017 6:00pm-8:00pm Please SIGN IN to

More information

April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS. Geoff Dillard, P.E.

April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS. Geoff Dillard, P.E. April 17, 2018 CITY OF BONNEY LAKE WATER PROJECTS Geoff Dillard, P.E. HOW TO DECIDE? Council vested in making informed decisions which protect the City s assets and citizens Factors that influence decisions

More information

Robert L. Griffin, PE. Mark C. Boland, PE. C. Russell McDaniel, PE. President / Chief Operations Officer Shield Engineering, Inc.

Robert L. Griffin, PE. Mark C. Boland, PE. C. Russell McDaniel, PE. President / Chief Operations Officer Shield Engineering, Inc. Robert L. Griffin, PE President / Chief Operations Officer Shield Engineering, Inc. Mark C. Boland, PE Principal Engineer Shield Engineering, Inc. C. Russell McDaniel, PE Director Environmental Engineering,

More information

Test was abandoned as the 4-inch submersible pump (rated for 5 gpm) was clogged right after the pump was turned on.

Test was abandoned as the 4-inch submersible pump (rated for 5 gpm) was clogged right after the pump was turned on. # Test Purpose Date Duration Result Comments 1 BW6 constantrate pumping test; 7/31 Target duration: 48 hours Target rate= 5 pgm 1) Estimate large scale equivalent T and S interval of BW6; 2) Start a series

More information

Possible Locations for EV Chargers

Possible Locations for EV Chargers Possible Locations for EV Chargers RECOMMENDATION: THAT Council approve the installation and locations for two electric vehicle (EV) Level 2 chargers at each of the following locations: Eustace Road near

More information

Two Sludges One Belt Press Waste Activated Sludge and Lime Sludge Handling

Two Sludges One Belt Press Waste Activated Sludge and Lime Sludge Handling Two Sludges One Belt Press Waste Activated Sludge and Lime Sludge Handling We are very satisfied with the Or-Tec Belt Press & the service provided by the Or-Tec Company. WEST LIBERTY The village of West

More information

wipes ready technology

wipes ready technology MUFFIN MONSTER 1K series Muffin Monster The 1K Series Muffin Monster is a compact grinder, tough on solids in sludge and sewage applications. It fits into areas with limited space requirements while still

More information

Quonset Business Park

Quonset Business Park Quonset Business Park September 28, 2010 Katherine Trapani Planning Manager Quonset Development Corporation Quonset Business Park 3,160 Total Acres 168 Companies 8,842 Jobs QDC Input into URI Study Water

More information

City of St. Pete Beach Model Capacity Report Addendum

City of St. Pete Beach Model Capacity Report Addendum Model Capacity Report - Addendum City of St. Pete Beach Model Capacity Report Addendum Prepared for: City of St. Pete Beach 155 Corey Avenue St. Pete Beach, FL 33706 Prepared By: Kimley-Horn and Associates,

More information

STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION RE: PENNICHUCK WATERWORKS, INC. DW 13-

STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION RE: PENNICHUCK WATERWORKS, INC. DW 13- STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION RE: PENNICHUCK WATERWORKS, INC. 2013 WATER INFRASTRUCTURE AND CONSERVATION ADJUSTMENT FILING DIRECT TESTIMONY OF DONALD L. WARE

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER A19 ADMINISTRATIVE REPORT Report Date: July 10, 2007 Author: Chris Darwent Phone No.: 604.873.7358 RTS No.: 6866 VanRIMS No.: 13-1400-20 Meeting Date: July 24, 2007 TO: FROM: SUBJECT:

More information

Ambleside Boat Launch Closure. Ramp to Close by December 31, 2016

Ambleside Boat Launch Closure. Ramp to Close by December 31, 2016 Ambleside Boat Launch Closure Ramp to Close by December 31, 2016 District of West Vancouver approved the Ambleside Waterfront Concept Plan June 13 2016. The otio approved dire ts staff to: Close vehicular

More information

RAS & WAS Pumps (FLYGT Pump)

RAS & WAS Pumps (FLYGT Pump) RAS/WAS Pumping Pumping of sludge from the secondary clarifiers to the aeration tanks maintains active biomass in the aeration tanks This is referred to as return activated sludge (RAS) pumping RAS pumps

More information

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board. Date: May 30, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Electric Vehicle Charging Stations and Cellular Infrastructure in English Bay Parks RECOMMENDATION

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: COMMUNITY BUS SERVICES ACTION ITEM RECOMMENDATION It is recommended that the Board not approve any routing

More information

VILLAGE OF ORLAND PARK

VILLAGE OF ORLAND PARK 14700 Ravinia Avenue Orland Park, IL 60462 www.orland-park.il.us Monday, 6:00 PM Village Hall Public Works Committee Chairman Michael F. Carroll Trustees James V. Dodge and Carole Griffin Ruzich Village

More information

Reduction of NRW Losses by Using an integrated WLM and WPM System

Reduction of NRW Losses by Using an integrated WLM and WPM System Water and Wastewater Europe 2005 Reduction of NRW Losses by Using an integrated WLM and WPM System ABB Group - 1 - WLM + WPM Content General Water Leakage Management (WLM) Water Pressure Management (WPM)

More information

NYSDEC PBS REGULATIONS Heating Oil Tanks

NYSDEC PBS REGULATIONS Heating Oil Tanks 1 NYSDEC PBS REGULATIONS Heating Oil Tanks Central Office/Region 2 Division of Environmental Remediation Bulk Storage Compliance Program NISTM 2017 New York Storage Tank Conference Saint Francis College,

More information

INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE

INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE Robert A. Ferlis Office of Operations Research and Development Federal Highway Administration McLean, Virginia USA E-mail: robert.ferlis@fhwa.dot.gov

More information

EA Closing Report Page 1 of 9

EA Closing Report Page 1 of 9 EA06-002 Closing Report Page 1 of 9 SUBJECT: Rear coil spring fracture ENGINEERING ANALYSIS CLOSING REPORT EA No: EA06-002 DATE OPENED: 24-Jan-2006 DATE CLOSED: 05-Feb-2007 SUBJECT VEHICLES: Model Year

More information

Appendix C. Reclaimed Water System Facility Data Sheets. Appendix C

Appendix C. Reclaimed Water System Facility Data Sheets. Appendix C Appendix C Reclaimed Water System Facility Data Sheets Appendix C Cary Reclaimed Water System Facility Data Sheet List North Cary WRF North Cary Reclaimed Water Pump Station North Cary Reclaimed Water

More information

A NEW SPIN ON PUMP STATION TESTING AND ANALYIS: WHAT YOU WISH YOU KNEW ABOUT YOUR PUMP STATION

A NEW SPIN ON PUMP STATION TESTING AND ANALYIS: WHAT YOU WISH YOU KNEW ABOUT YOUR PUMP STATION ABSTRACT Zachary G. Purvis, PE Kimley-Horn and Associates, Inc. 3001 Weston Parkway Cary NC, 27513; 919-653-2963; zak.purvis@kimley-horn.com Wastewater collection system owners are becoming increasingly

More information

WELCOME Open House on Parking

WELCOME Open House on Parking WELCOME Open House on Parking Tonight we re presenting our policy responses for your input on how to best manage our public parking. Parking is a shared community resource. To best serve everyone in our

More information

March 22, Internal Audit Report Parts, Fuel and Chemicals Inventory Anchorage Water and Wastewater Utility

March 22, Internal Audit Report Parts, Fuel and Chemicals Inventory Anchorage Water and Wastewater Utility Internal Audit Report 2005-2 Introduction. The (AWWU) maintains an inventory of parts, gravel, recycled asphalt, chemicals and fuel. Gravel, recycled asphalt, chemicals and fuel at the King Street and

More information

City of Austin. Airport Leadership Eliminates GSE Emissions

City of Austin. Airport Leadership Eliminates GSE Emissions City of Austin Airport Leadership Eliminates GSE Emissions Topics Motivation for Installing Fast Charging Electric GSE Stations Procurement Methodology DERA Grant Project Highlights Overall Benefits ABIA

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program STAFF REPORT ACTION REQUIRED Contract Awards for Tender Calls 319-2013 and 70-2014 for the Construction of Works Associated with the City's Basement Flooding Protection Program Date: April 30, 2014 To:

More information

Information Meeting Transfer Station Options. September 30, 2014

Information Meeting Transfer Station Options. September 30, 2014 Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function

More information

YUKON DEVELOPMENT CORPORATION

YUKON DEVELOPMENT CORPORATION YUKON DEVELOPMENT CORPORATION 2 http://www.ydc.yk.ca YUKON DEVELOPMENT CORPORATION ANNUAL REPORT 2016 TABLE OF CONTENTS Message from the Chair...4 Message from the President and Chief Executive Office...

More information

GE Critical Power. The Retrofit Case for Upgrading Legacy Power Systems at Telecom Central Offices

GE Critical Power. The Retrofit Case for Upgrading Legacy Power Systems at Telecom Central Offices GE Critical Power The Retrofit Case for Upgrading Legacy Power Systems at Telecom Central Offices Introduction If you were managing an e-commerce, banking or any other mission critical information technology

More information

PROGRESS ON BUDGET THEMES AND PERFORMANCE METRICS RECEIVE AND FILE PROGRESS REPORT ON BUDGET THEMES AND PERFORMANCE METRICS

PROGRESS ON BUDGET THEMES AND PERFORMANCE METRICS RECEIVE AND FILE PROGRESS REPORT ON BUDGET THEMES AND PERFORMANCE METRICS 20 One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Tel metro. net FINANCE, BUDGET AND AUDIT COMMITTEE MARCH 20,2013 SUBJECT: ACTION: PROGRESS ON BUDGET THEMES AND PERFORMANCE METRICS RECEIVE

More information

Water Solutions. API Oil/Water Separators - A Total Approach. siemens.com/energy/water-solutions

Water Solutions. API Oil/Water Separators - A Total Approach. siemens.com/energy/water-solutions Water Solutions API Oil/Water Separators - A Total Approach siemens.com/energy/water-solutions Backed by over 70 years of experience providing new, innovative and cost-effective wastewater treatment solutions,

More information

Section 5. Manhole Inspection Report

Section 5. Manhole Inspection Report Section 5 Inspection Report Ypsilanti Community Utilities Authority Huron River Interceptor I/I Study Inspection Report Technical Memorandum December, 2008 Introduction Several manholes within the Huron

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS

INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS CONTENTS Introduction Safety Operating Principle System Installation Initial Startup System Operations Troubleshooting Maintenance

More information

Sample Geographic Information System (GIS) Staffing and Response Time Report Virtual County Fire Department GIS Analysis

Sample Geographic Information System (GIS) Staffing and Response Time Report Virtual County Fire Department GIS Analysis Sample Geographic Information System (GIS) Staffing and Response Time Report Fire Department GIS Analysis Executive Summary This study examines predicted response times and geographic coverage areas for

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

ES Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number

ES Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number ES-301-1.01 Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number ES-301-1.01 Document Owner: John Hambright 1) Activity Description: Fueling Aircraft, Vehicles, and Auxiliary

More information