EXHIBIT B Water Meter Review and Testing November 2008

Size: px
Start display at page:

Download "EXHIBIT B Water Meter Review and Testing November 2008"

Transcription

1 EXHIBIT B Water Meter Review and Testing November 2008 Prepared by: HDR Engineering, Inc.

2 Technical Memorandum To: Ken TeKippe, City of Dubuque From: HDR Engineering Project: Dubuque Water Meter Review and Testing Date: November 13, 2008 Job No: HDR RE: Technical Memorandum Water Meter Review and Testing Table of Contents 1.0 Executive Summary Meter Testing Program Meter Testing Goals and Objectives Description of Water Meter Technologies Tested Methodology Meter Test Results Small Meter Test Results Large Meter Test Results Revenue Analysis Recommendations Appendices Small Meter Test Results Large Meter Test Results HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 1 of 26

3 1.0 Executive Summary During July through October of 2007, HDR performed a Water Meter System Evaluation for the City of Dubuque. Recommendations for future improvements and upgrades to the water meter system were developed. A recommendation from the study was to perform testing and evaluation of the existing water meters due to the large portion of the City s meter population nearing or past the expected life span of approximately 15 to 20 years. As meters age, they become worn, which over time reduces or slows the overall registration of the meter. This meter inaccuracy affects water consumption measurement which in turn reduces collected revenue. In order to determine the magnitude of potential meter inaccuracies within the City s meter population, HDR was selected in cooperation with M.E. Simpson to conduct a Water Meter Review and Testing program. The program tested a sampling of Dubuque s meters to identify typical meter inaccuracies resulting from their age and application. The following discussion summarizes the results and recommendations of the Review and Testing program. A significant number of small and large meters failed testing: 35.7% of the small meters (5/8-inch to 1-inch) and 40.3% of the large meters (1-1/2-inch to 8-inch) failed, indicating that meter replacement is needed. A considerable number of relatively new large compound type meters failed, indicating that a meter testing and maintenance program would be beneficial once new meters are installed. It is not cost effective to repair small meters, although testing a sample of the small meter population is useful to determine meter accuracy, lost revenue, and the need for future meter replacement. Large meters measure a much higher consumption volume with higher associated revenue than a small meter. For example, a single turbine meter may measure 500 to 1,000 times more water than a residential meter. Although the number of large meters in the system is small, a regular preventative maintenance and repair program would provide significant benefits through extend meter life, proper accuracy and associated maximized water revenue. The additional testing would require additional staff or outsourcing to a contractor. This study s revenue analysis, which is based on meter size, consumption information and testing results, estimates that 17,482,500 cubic feet of water or 6.9% of annual consumption is not recorded by the water meters. The volume of water not recorded results in a projected loss of water and sewer revenue of approximately $676,000 for fiscal year This figure will increase as meter inaccuracies continue to worsen and water rates increase over time. The high number of meters out of specification and the associated annual lost revenue support implementing a meter change-out program. The 2007 Water Meter Plan and System Evaluation recommended installing a fixed radio network meter system as the lowest cost alternative. A fixed radio network allows remote reading of water meters, eliminating the need for labor intensive manual meter reading. From the 2007 Water Meter System Evaluation cost model, the 20 year present value cost of a fixed radio network water meter system will be approximately $6,400,000 and includes the cost of new water meters, radio equipment, computers and other hardware. Based on current lost revenue and the estimated 2007 cost for a new fixed network meter system, the payback period would be approximately nine years. Table 1-1 shows the preliminary payback period for the fixed radio network meter replacement program. The lost revenue figure will be compounded over time as existing meter accuracy decreases and water rates increase. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 2 of 26

4 Table 1-1 Revenue Recovery for Fiscal Year 2009 Rates Fixed Radio Network Meter System, 20 Year NPV Capital Cost Years to Payback at Given Inaccuracy 5% 6.9% 10% $6,400, The fixed radio system requires fewer employees for meter reading and results in lower operating and total costs than the existing system contracting with Aquila to read the meters. The fixed radio system alternative assumes City staff will be responsible for the radio network, billing and will continue to perform routine meter maintenance and replacement as is currently done. The Aquila alternative assumes Aquila will read the meters and City staff will be responsible for meter maintenance and billing. There is not expected to be a significant change in City staff levels from the current system to the fixed radio network system. However, the cost of contracting with Aquila will be saved. Currently, the annual cost for Aquila is about $140,000 and is expected to increase approximately 3% per year. In addition to direct cost savings, there are many non-direct financial benefits of moving to a fixed radio network meter system compared to the existing meter system. Fixed radio network meters improve customer service and staff efficiency by allowing real-time meter reading. Water meter remote registers on the side of buildings will be removed and problems with meter accessibility and the need to enter a home or business for meter reading will be eliminated. The large amount of data that can be easily and remotely collected with a fixed radio network system will allow City staff to efficiently develop water system hydraulic models, track water consumption trends and plan for future water system requirements. Parts for repairs for some of the older existing water meters are becoming more difficult due to the lack of availability. The high number of meters out of specification, annual lost revenue, and other benefits support implementing a meter change-out program. Based on a meter asset life of twenty years and a payback period of nine years, there is a positive payback period and it is recommended that meter replacement be considered. 2.0 Meter Testing Program 2.1 Meter Testing Goals and Objectives The water meter review and testing program was designed to locate inconsistencies in the metering of water and to identify meter accuracy problems resulting from age of meters, and application. The review helps the development of a cost-effective replacement schedule for water meters and provides recommendations for the correction of the identified problems. Select information for various meter accounts was copied from the City s database for review and evaluation. These data were used to put together a cross section of meters based on their age, size, and type. Based on patterns of consumption and meter record information, an application evaluation was performed. This evaluation compared the historical meter use to American Water Works HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 3 of 26

5 Association (AWWA) standard specifications relating to proper meter size and application as well as age and wear. 2.2 Description of Water Meter Technologies Tested The following sections briefly describe three common types of water meters Positive Displacement Meters Positive displacement meters are typically used in residential and commercial applications with low flow rates and sizes of less than 2-inches. Displacement meters work by using water to push or displace a piston or nutating disk connected to a measuring system. Displacement meters are commonly used in applications with flow rates of less than 50 gallons per minute. High flow rates in displacement meters can create high head losses that make their use impractical for large meters Compound Meters Compound meters are used for applications that require measurement of a wide range of flow rates. A compound meter consists of two separate meters and a check valve that controls flow to each meter. The low flow meter is usually a positive displacement meter and the high flow meter is often a turbine meter. As flow rates increase, a check valve opens to divert a portion or all of the water to the high flow meter. The readings from each meter are added to determine the total water consumption. Compound meters can experience inaccuracy during change-over when the check valve is partially open and flow is diverted to both meters. It is important to test compound meters over a wide range of flow rates. Compound meters tend to require more maintenance than other meter types. Inaccuracy at high flow rates caused by either a faulty check valve or faulty high flow meter can result in potentially high losses in revenue Turbine Meters Turbine meters work by using water to rotate a turbine connected to a measuring device. Turbine meters are designed for high flow applications and low head losses. Turbine meters are not very accurate at low or highly variable flow rates and are commonly available in sizes 2-inches and greater. The number of turbine meters used in most cities is typically small compared to other meter types; however a single turbine meter may measure 500 to 1,000 times more water volume than a residential meter per month, making them an important consideration. 2.3 Methodology Small meters up to 1-inch were tested in the City maintenance shop following AWWA standards. The large meter testing program went beyond the stated AWWA meter testing specifications. There are differences between meter testing conducted in the field versus testing meters in a controlled laboratory environment or established meter testing shop using volumetric tanks. Field conditions should be taken into consideration when testing meters in the field. Also the AWWA M-6 meter testing manual has no set standards for field testing, only to try to emulate as close as possible the suggested meter testing flow or to follow each meter manufacturer s suggested flow rates. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 4 of 26

6 Therefore, the Project Team found it imperative to adhere to a strict method of field testing while taking into consideration the AWWA meter performance standards. This methodology was designed to allow for a systematic diagnosis of the meter s performance based on several flow rates across that specific meter s size and type beyond the AWWA s three tests (minimum, intermediate, and maximum). Meters were tested across a range of flows in order to determine patterns of mechanical wear at various flow rates. The flow rates used are a combination of AWWA recommended flow rates (per M-6 manual of the AWWA) and meter manufacturer flow rates. All compound meters were tested at six flows rates, concentrating on the change over rate which is the most critical flow rate in a compound water meter. (AWWA states three tests, the change over rate being one of them. *Reference AWWA M6 Manual, 4 th edition Chapter 5) 1-1/2-inch and larger meters were tested by comparative methods using a certified test meter to test the water customer s meter within its normal operating range or by volumetric methods per AWWA M-6 Manual. Our comparative test meters were Sensus (formerly Rockwell) models that record total volume and current velocity for each of the 4 to 6 tests conducted. The test meters had Electronic Registers" that were automatically reset to zero after each test. These comparative test meter units are themselves "Tested and Certified Accurate" at least once each year. Certificates of were available on the service trucks if questions existed about how the meters were to be tested. There was a minimum of a two person field crew working on the meter testing program at all times, both in the field and during the shop testing of the smaller meters. All meters with a test port were tested in place. Meter installations where there were no test ports were documented. Each meter was analyzed as to the meter setting (i.e. installed piping connection configuration and service application) to determine if the meter could be tested in place without removal, and without undue inconvenience to the water customer. The Project Team observed each setting for an inlet valve, an outlet valve to be able to isolate the meter from use during testing, and a test port of correct size as well as position to attain enough flow velocity to test the meter across the range of flow rates for that specific meter. If a by-pass line was available, it was flushed prior to testing to insure no water service interruption for a critical customer such as a hospital. During each test, proper meter application and sizing were confirmed by visual inspection of the general area and observed meter readings to ensure the correct meter was in place and the setting is correct for the application (the meter setting is important because improper configurations can adversely affect meter accuracy). Some of the 1-1/2-inch and 2-inch displacement meters were able to be tested in place by using available test ports of existing backflow preventors. Here it was critical to achieve at least 10% or more of the lower operating range of that particular meter to be able to qualify as a valid meter test (per AWWA M-6 manual). Some of the 1-1/2-inch and 2-inch meters were tested at a sink using a calibrated small meter. Again, the flow tests used were at or over the lower 10% of the operating range of the meter. Shutdowns were limited when possible to minimize inconvenience for water customers. Meters were selected randomly for testing by year of installation and size. A total of 196 meters were selected for testing, ranging in size from 5/8-inch to 8-inches. However, two large meters were not able to be tested, resulting in a total of 194 meters being tested as follows: 5/8-inch meters: 40 tested ¾-inch meters: 20 tested 1-inch meters: 10 tested 1-1/2-inch meters: 46 tested HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 5 of 26

7 2-inch meters: 27 tested 3-inch meters: 2 turbine meters and 27 compound meters were tested 4-inch meters: 3 turbine meters and 13 compound meters were tested. Two 4-inch compound meters were found not to be testable due to site conditions (see individual reports) 6-inch meters: 5 compound meters were tested 8-inch meter: 1 (8 x2 ) fire meter (turbine) was tested The Project Team maintained an interactive role with the City Staff. The field staff met with assigned City Staff daily, and as needed. The Project Team worked with the City and water customers for all test scheduling and two (2) person teams were used to perform the work. Frequent communication was maintained with City Staff so problem meters and/or issues with water customers could be addressed in a timely manner. The Project Team conducted short interviews with staff about the particulars of the selected meter locations such as changes in the occupancy of the buildings, age of the meters, meter reading systems, etc. This provided a greater understanding of how meters were functioning, allowing priorities to be assigned to particular segments of the work. City personnel were not required to assist field technicians except where there were issues with gaining entry due to security or other concerns. In some cases, City personnel helped the field crews and their help was genuinely appreciated. 3.0 Meter Test Results 3.1 Small Meter Test Results A total of 70 small meters were selected for testing ranging from 5/8-inch to 1-inch inch meters, 20 3/4-inch meters, and 40 5/8-inch meters were tested. Appendix 6.1 shows details of the test results for the small meters. The test results were subjected to two weighted averages, one was the 15%-70%-15% as set by AWWA and the other weighted average was set at 5%-90%-5%. The percentages refer to the weighting given to the test results at low flow, intermediate flow and high flows. The highest weighting is given to intermediate flows since small meters usually do not operate at low or high flows for extended lengths of time under normal usage. AWWA recommends 15%-70%-15% as a weighted average to help figure usage patterns for residential meters. Additionally, another weighted average was included with the results. This average was set at 5%- 90%-5% for the low, intermediate, and high flow ranges. The 5%-90%-5% has been found to be more representative for some customers. There was little variation between the 15%-70%-15% and 5%-90%-5% weighted averages. 33% of the small meters failed at the 15%-70%-5% weighted average and 36% failed at the 5%-90%-5% weighted average. The overall accuracy of the small meters at the 15%-70%-15% average was 92.27% and 92.38% at 5%-90%-5%. Without detailed monitoring of the actual usage of each meter, it is impossible to know the actual weighted average of the meter. Given the similar results for both weighted averages, the AWWA recommended 15%-70%-15% weighted average will be used for the purposes of this report. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 6 of 26

8 Figure 3-1 shows the small meter test results. Figure 3-1 Small Meter Test Results The small meter test results indicate there is loss of revenue occurring. By the AWWA standards, this is considered Non-Revenue Water. Since water meters are the cash registers for the utility, the City of Dubuque is losing money with these meters. The level of lost revenue varies by meter is generally higher for older meters. Almost 50% of the 5/8-inch meters tested failed, representing a large portion of the City s meter population. Most of the small meters tested were installed before 1988, although the exact age could not be determined. Based on City records, a significant number of the small meters were installed prior to As would be expected given the age of the meters, the failure rate for the residential meters is high. With increasing age, meter failures and inaccuracy will increase further. 3.2 Large Meter Test Results Appendix 6.2 presents detailed summaries of the large meter testing results. Results of the Commercial/Industrial testing indicate there is loss of revenue occurring due to meters not performing to accepted standards. By the AWWWA standards, this is considered Non-Revenue Water. Since water meters are the cash registers for the water system, the City of Dubuque is losing money with these meters as well. Figure 3-2 shows the large meter test results. A significant number of the large meters failed testing. Large meters make up a smaller portion of the meter population than the small meters, but convey much higher flow rates per meter and are potentially sources of significant revenue loss. A 4-inch meter will typically produce revenues of HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 7 of 26

9 greater than $10,000 per year. Failure of a single large meter is equivalent in lost revenue to many small meter failures. There was a higher than expected rate of failure among some of the newer meters, especially compound meters. Compound meters tend to require higher levels of maintenance than other meter types. Consideration should be given to implementing a regular meter maintenance program for larger meters, especially compound type meters 3-IN and above. Table 3-1 shows the large meter tested accuracy by age. Figure 3-2 Large Meter Test Results Table 3-1 Large Meter Tested by Age Meter 1.5-IN 2-IN 3-IN 4-IN 6-IN 8-IN Age, Years Number Tested/ Number Tested/ Number Tested/ Number Tested/ Number Tested/ Number Tested/ % % % % % % % % % % % N/A N/A % % 1 99% % % N/A N/A % % 2 99% N/A N/A % N/A N/A % 2 98% N/A N/A N/A N/A N/A N/A Displacement Meters Tested Selected 1-1/2-inch and 2-inch displacement meters were tested by the Project Team. The test results indicate that a significant number of meters are failing (34.7% of the 1-1/2-inch and 48% of the 2-inch). These meters should be replaced as part of a future meter replacement program. Most commercial meters reviewed appeared to be properly sized. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 8 of 26

10 3.2.3 Compound Meters Tested Compound meters are designed to operate over a wide range of flow rates. Typical consumption recorded by compounds should indicate 30-40% of usage on the low side, and 60-70% on the high side inch, and 13 4-inch compound meters were tested. Based on the evaluations conducted by the Project Team, the compound meters appear to be properly sized for the accounts that were visited. More than one-third of these meters failed to test within recommended specs. It would appear that many of the compound meters that failed are meters that have not been regularly tested and maintained. These meters should be replaced as part of a future meter replacement program Turbine Meters Tested Two 3-inch, three 4-inch, five 6-inch, and one 8-inch turbine meters were tested. These meters appear to be big revenue generators for the City. Most are installed in settings where water usage is fairly consistent. Relatively few turbine meters are used by the City but the number of failures and potential lost revenue indicate a replacement is in order. The Project Team tested for start flows of the turbine meters. This allowed the team to observe wear patterns for each meter. If the start flow was close to the minimum flow and the minimum flow was testing slow, this indicated the probability of the meter registering high at the high flow. This is due to the mechanics of the meter. Although these meters failed, most of the failures were not catastrophic. However, since these meters are registering incorrectly, there is potential for complete failure at any time without warning. 4.0 Revenue Analysis A revenue analysis has been developed to estimate the revenue lost due to inaccurate water meters. The analysis is based on meter size and consumption information provided by the City. Meter age was not considered for the revenue analysis since consumption information was not available based on meter age. Meter age can be considered in evaluating revenue in terms of availability of parts to repair meters. As meters age, accuracy tends to decrease leading to higher lost revenue. Table 4-1 shows meter accuracy by age range. Meter Age, Years Table 4-1 Meter by Age Percent of Meter Population Average Percent % 92.6% % 93.6% % 97.6% % 90.5% % 88.5% 25+ (1) 41.7% 90% (1) Majority are residential meters installed prior to the mid 1980s HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 9 of 26

11 Figure 4-1 shows the tested meter accuracy, number of total meters and percent of total consumption by meter size. The shaded area represents the range of acceptable accuracy specified by AWWA. The range of acceptable accuracy varies by meter size with values outside of the shaded area considered to fail testing. Figure 4-1 Meter Percent by Meter Size Total water and wastewater revenue fiscal year 2008 was approximately $8,987,278. A 9% increase is projected for fiscal year 2009 resulting in total revenue of $9,796,133. Table 4-2 shows that 6.9% of total water consumption is not recorded due to meter inaccuracy, resulting in a projected loss in revenue of approximately $676,000 for fiscal year The lost revenue figure will be compounded over time as existing meter accuracy worsens and water rates increase. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 10 of 26

12 Table 4-2 Estimate of Meter Inaccuracies Volume of Consumption NOT Recorded, 100 cubic feet Meter Size Total Consumption, 100 cubic feet Percent of Consumption Percent 5/8-IN 1,271, % 91.6% 106,795 ¾-IN 60, % 90.1% 6,035 1-IN 116, % 99.07% 1, /2-IN 88, % 94.8% 4,592 2-IN 299, % 93.4% 19,797 3-IN 258, % 94.2% 15,009 4-IN 210, % 91.2% 18,520 6-IN 79, % 97.5% 1,994 8-IN 166, % 99.4% 1,002 Total 2,552, % 174,825 Total (as % of total production) 6.9% Projected Fiscal Year 2009 Water and Wastewater Revenue Projected Fiscal Year 2009 Revenue Lost to Meter Inaccuracy $9,796,000 $676, Recommendations The 2007 Water Meter Plan and System Evaluation considered multiple options for a new meter system. Based on the recommendations of the 2007 Meter Plan and System Evaluation and the results of the recently completed Water Meter Review and Testing, the following recommendations constitute the preferred strategic plan. Meter Reading Technology: Fixed Radio. After preliminary consideration of many meter technologies and detailed consideration of several potential meter options, the automatic meter reading (AMR) alternative of a fixed radio network was identified as the best option for implementation by the City. A fixed radio network allows remote reading of water meters eliminating the need for meter reading labor for monthly billing readings. It is recommended that specific meter brands and options be re-evaluated once bids are solicited and costs are updated. Deployment Time Period: Short (Contractor Installed). A short time period is recommended for deployment of new meters and meter reading technology. With contractor installation, City-wide meter replacement could occur within two years. The deployment period would likely increase to approximately ten years if the City were to deploy new equipment with existing City staff. Deployment Strategy: Opportunistic and Geographical. The recommended meter deployment approach is a combination of opportunistic and geographical strategies. Early opportunistic deployment will allow the City to first replace large meters with known accuracy problems and significant loss of revenue followed by geographical replacement HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 11 of 26

13 which is most efficient when working with Aquila for the replacement meter system replacement. Meter Maintenance/Management: o Before Meter Replacement: Contractor-Managed Meter Testing: This report details the results of the water meter review and testing program. The results of the testing helps the development of a cost-effective replacement schedule for water meters and provides recommendations for the correction of the problems located. o During Meter Replacement: City-Managed: It is recommended that the City establish a new meter testing protocol. A statistical sampling of one-half to one percent of all new meters would establish base-line data and confirm accuracy. This phase of meter management would be managed by the City, but the actual meter testing would conducted by the contractor as part of the meter replacement program. o After Meter Replacement: City-Managed: The most important aspect of a water meter plan is the long-term management of the meters to ensure reliability and accuracy. It is recommended that the City develop a routine testing program to track trends in accuracy and maintenance. It is likely that a meter testing program would require some additional number of staff depending on the meter technology selected, which will influence the number of required field staff to an extent. Testing and maintenance is especially important for larger meters since relatively little labor can save significant loss in revenue. Regular testing of compound and turbine meters 3- inches and above and less frequent testing of smaller meters is recommended. Implementation The following are key steps that will aid in implementation of the recommendations outlined above. Site Visits: Visit other utilities to observe their experiences with water meter replacement programs and systems. Several regional utilities have recently implemented new meter systems. Develop Meter Maintenance/Management Program: The information that can be obtained regarding its existing metering system will enable the City to better justify revenue recovery, construct bid specifications, develop deployment strategies, and plan for future replacement cycles. Develop Bid Specifications: The City should consider developing bid specifications for Citywide meter replacement, in parallel with developing the meter maintenance and management program. The purpose of this effort is to learn precisely what options vendors have available to the City and their associated costs. The City will also need to examine these project management requirements. Even with a turnkey project, there are numerous project management and support tasks that must be performed by the City or an agent retained to represent the City. These decisions will affect the overall cost of the project. Re-evaluate Return on Investment: Once vendor bids are received for City-wide water service meter replacement, the information should be evaluated using the tools such as the cost model and previously discussed approaches. An overriding feature of the meter plan is that it, and the City, must remain flexible and open to change during implementation. The 2007 Water Meter Plan and System Evaluation recommended installing a fixed radio network meter system as the lowest cost alternative. A fixed radio network allows remote reading of water meters, eliminating the need for labor intensive manual meter reading. From the 2007 Water Meter System Evaluation cost model, the 20 year present value cost of a fixed radio network water meter system will be approximately $6,400,000 and includes the cost of new water meters, radio equipment, computers and other hardware. Based on current lost revenue and the estimated 2007 HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 12 of 26

14 cost for a new fixed network meter system, the payback period would be approximately nine years. Table 5-1 shows the preliminary payback period for the fixed radio network meter replacement program. The lost revenue figure will be compounded over time as existing meter accuracy decreases and water rates increase. Table 5-1 Revenue Recovery for Fiscal Year 2009 Rates Fixed Radio Network Meter System, 20 Year NPV Capital Cost Years to Payback at Given Inaccuracy 5% 6.9% 10% $6,400, The fixed radio system requires fewer employees for meter reading and results in lower operating and total costs than the existing system contracting with Aquila to read the meters. The fixed radio system alternative assumes City staff will be responsible for the radio network, billing and will continue to perform routine meter maintenance and replacement as is currently done. The Aquila alternative assumes Aquila will read the meters and City staff will be responsible for meter maintenance and billing. There is not expected to be a significant change in City staff levels from the current system to the fixed radio network system. However, the cost of contracting with Aquila will be saved. Currently, the annual cost for Aquila is about $140,000 and is expected to increase approximately 3% per year. In addition to direct cost savings, there are many non-direct financial benefits of moving to a fixed radio network meter system compared to the existing meter system. Fixed radio network meters improve customer service and staff efficiency by allowing real-time meter reading. Water meter remote registers on the side of buildings will be removed and problems with meter accessibility and the need to enter a home or business for meter reading will be eliminated. The large amount of data that can be easily and remotely collected with a fixed radio network system will allow City staff to efficiently develop water system hydraulic models, track water consumption trends and plan for future water system requirements. Parts and repairs for some of the older existing water meters are becoming more difficult; new meters will allow for easier meter repair work. The high number of meters out of specification, annual lost revenue, and other benefits support implementing a meter change-out program. Based on a meter asset life of twenty years and a payback period of nine years, there is a positive payback period and it is recommended that meter replacement be considered. HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 13 of 26

15 6.0 Appendices 6.1 Small Meter Test Results Table 6-1 Small Meter Test Summary size S/N Min GPM Min Acc. Inter. GPM Inter. Acc. Max GPM Max Acc. Overall Pass/Fail Year of Meter Installation 5/8" F Pre /8" P Pre /8" P Pre /8" P Pre /8" F Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" F Pre /8" F Pre /8" P Pre /8" F Pre /8" F Pre /8" F /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" F /8" F Pre /8" F Pre /8" F Pre /8" F Pre /8" F Pre /8" F Pre /8" P Pre /8" F /8" P Pre /8" F /8" P 1985 HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 14 of 26

16 Table 6-2 Small Meter Test Summary (Continued) size S/N Min GPM Min Acc. Inter. GPM Inter. Acc. Max GPM Max Acc. Overall Pass/Fail Year of Meter Installation 5/8" F /8" F /8" F /8" P /8" P Pre /8" F /4" P Pre /4" P Pre /4" P Pre /4" F Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre " P Pre " F Pre " F Pre " P Pre " F Pre " P Pre " P Pre " P Pre " P Pre " P Pre HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 15 of 26

17 Table 6-3 Small Meter 15%-70%-15% Weighted Results Minimum Flow Intermediate Flow Maximum Flow Overall Results Limits (95%- 101%) Limits (98.5% %) Limits (98.5% %) Limits (98.5% %) size S/N GPM Min Acc. 15% weighted average Inter. GPM Inter. Acc. 70% weighted average Max GPM Max Acc. 15% weighted average Overall Overall Pass/Fail Year of Meter Installation 5/8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" F Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" F Pre /8" F Pre /8" F Pre /8" F Pre /8" P Pre /8" F /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" F /8" F Pre /8" P Pre /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" P Pre /8" F /8" F Pre HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 16 of 26

18 Limits Table 6-4 Small Meter 15%-70%-15% Weighted Results (Continued) Minimum Flow Intermediate Flow Maximum Flow Overall Results (95%- 101%) (98.5% %) (98.5% %) (98.5% %) size S/N GPM Min Acc. 15% weighted average Inter. GPM Inter. Acc. 70% weighted average Max GPM Max Acc. 15% weighted average Overall Overall Pass/Fail Year of Meter Installation 5/8" F /8" P /8" F /8" F /8" F /8" P /8" P Pre /8" F /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre " P Pre " P Pre " F Pre " P Pre " F Pre " P Pre " P Pre " P Pre " P Pre " P Pre HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 17 of 26

19 Table 6-5 Small Meter 5%-90%-5% Weighted Results Limits (95%- 101%) Limits (98.5% %) Limits (98.5% %) Limits (98.5% %) size S/N GPM Min Acc. 5% weighted average Inter. GPM Inter. Acc. 90% weighted average Max GPM Max Acc. 5% weighted average Overall Overall Pass/Fail Year of Meter Installation 5/8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" P Pre /8" F Pre /8" F Pre /8" F Pre /8" F Pre /8" P Pre /8" F /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" F /8" F Pre /8" P Pre /8" P Pre /8" F Pre /8" P Pre /8" F Pre /8" P Pre /8" P /8" F Pre /8" F 1985 HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 18 of 26

20 Table 6-6 Small Meter 5%-90%-5% Weighted Results (Continued) Limits (95%- 101%) Limits (98.5% %) Limits (98.5% %) Limits (98.5% %) size S/N GPM Min Acc. 5% weighted average Inter. GPM Inter. Acc. 90% weighted average Max GPM Max Acc. 5% weighted average Overall Overall Pass/Fail Year of Meter Installation 5/8" P /8" F /8" F /8" F /8" P /8" P Pre /8" F /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" F Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre /4" P Pre " P Pre " P Pre " F Pre " P Pre " F Pre " P Pre " P Pre " P Pre " P Pre " P Pre HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 19 of 26

21 6.2 Large Meter Test Results HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 20 of 26

22 Table /2-inch Meter Test Summary Limits Low Flow Inter. Flow High Flow Size Mfg. Type : S/N GPM ACC. GPM ACC. GPM ACC. Status Year Installed 1.5" Sensus Displacement FAILED Pre " Sensus Displacement FAILED Pre " Sensus Displacement FAILED Pre " Sensus Displacement FAILED " Sensus Displacements FAILED Pre " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED Pre " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED Pre " Sensus Displacement FAILED Pre " Sensus Displacement PASSED Pre " Sensus Displacement FAILED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre-1988 HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 21 of 26

23 Table inch Meter Test Summary Limits Low Flow Inter. Flow High Flow Size Mfg. Type S/N GPM ACC. GPM ACC. GPM ACC. Status Year Installed 2" Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED 1995 Pre- 2" Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED " Sensus Displacement FAILED Pre " Sensus Displacement FAILED Pre " Sensus Displacement FAILED 1991 Pre- 2" Sensus Displacement FAILED " Sensus Displacement PASSED " Sensus Displacement PASSED Pre " Sensus Displacement PASSED Pre " Sensus Displacement PASSED " Sensus Displacement PASSED 1997 Pre- 2" Sensus Displacement PASSED " Sensus Displacement PASSED 1997 Pre- 2" Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED " Sensus Displacement PASSED 1991 Pre- 2" Sensus Displacement PASSED 1988 HDR Engineering, Inc. Dubuque Water Meter Review and Testing Page 22 of 26

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION

REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION Final Report 2001-06 August 30, 2001 REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION Bureau of Automotive Repair Engineering and Research Branch INTRODUCTION Several

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

Essential Elements of a Successful Preventive Maintenance Program

Essential Elements of a Successful Preventive Maintenance Program Essential Elements of a Successful Preventive Maintenance Program OCTOBER 19, 2015 PRESENTED BY: ROBBIE L. SARLES RLS & ASSOCIATES, INC. Why Be Concerned with Preventive Maintenance Required by FTA Required

More information

Sample Geographic Information System (GIS) Staffing and Response Time Report Virtual County Fire Department GIS Analysis

Sample Geographic Information System (GIS) Staffing and Response Time Report Virtual County Fire Department GIS Analysis Sample Geographic Information System (GIS) Staffing and Response Time Report Fire Department GIS Analysis Executive Summary This study examines predicted response times and geographic coverage areas for

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E8: Battery Condition Assessment E8.1 GENERAL Plant or station batteries are key components in hydroelectric powerplants and are appropriate for

More information

MOTOR SURVEY. Solutions for Industry

MOTOR SURVEY. Solutions for Industry In the United States, motors consume almost of 70 percent of the electricity used by industry, which translates to more than $30 billion in annual cost. This is why implementing even small improvements

More information

The 1997 U.S. Residential Energy Consumption Survey s Editing Experience Using BLAISE III

The 1997 U.S. Residential Energy Consumption Survey s Editing Experience Using BLAISE III The 997 U.S. Residential Energy Consumption Survey s Editing Experience Using BLAISE III Joelle Davis and Nancy L. Leach, Energy Information Administration (USA) Introduction In 997, the Residential Energy

More information

Solar*Rewards Frequently asked questions system size and customer usage

Solar*Rewards Frequently asked questions system size and customer usage Solar*Rewards 1. Will a PV system work with my home? 2. Am I eligible to participate in the Solar*Rewards program? 3. What size system should I get? 4. Can a customer at a service location apply for the

More information

Oregon DOT Slow-Speed Weigh-in-Motion (SWIM) Project: Analysis of Initial Weight Data

Oregon DOT Slow-Speed Weigh-in-Motion (SWIM) Project: Analysis of Initial Weight Data Portland State University PDXScholar Center for Urban Studies Publications and Reports Center for Urban Studies 7-1997 Oregon DOT Slow-Speed Weigh-in-Motion (SWIM) Project: Analysis of Initial Weight Data

More information

Appendix B CTA Transit Data Supporting Documentation

Appendix B CTA Transit Data Supporting Documentation RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

Low and medium voltage service. Power Care Customer Support Agreements

Low and medium voltage service. Power Care Customer Support Agreements Low and medium voltage service Power Care Customer Support Agreements Power Care Power Care is the best, most convenient and guaranteed way of ensuring electrification system availability and reliability.

More information

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012 A Guide to the medium General Service Conservation Rate BC Hydro Last Updated: February 24, 2012 Executive summary The way Medium General Service (MGS) accounts pay for electricity is changing. MGS is

More information

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks by Georges Barbarin Executive summary Aging electrical switchgear infrastructure is a threat to the reliability of power

More information

Cordova Psychrophiles Bio-Digester. Benefit-Cost and Sensitivity Analysis

Cordova Psychrophiles Bio-Digester. Benefit-Cost and Sensitivity Analysis Cordova Psychrophiles Bio-Digester Benefit-Cost and Sensitivity Analysis December 2012 Prepared by: Sohrab Pathan, Alejandra Villalobos Meléndez and Ginny Fay Institute of Social and Economic Research

More information

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES UPDATED MAY 24, 2017 Table of Contents Section 1: Water Service Charges... 2 Monthly Water System Charge... 2 Commodity

More information

Denver Car Share Program 2017 Program Summary

Denver Car Share Program 2017 Program Summary Denver Car Share Program 2017 Program Summary Prepared for: Prepared by: Project Manager: Malinda Reese, PE Apex Design Reference No. P170271, Task Order #3 January 2018 Table of Contents 1. Introduction...

More information

Who has trouble reporting prior day events?

Who has trouble reporting prior day events? Vol. 10, Issue 1, 2017 Who has trouble reporting prior day events? Tim Triplett 1, Rob Santos 2, Brian Tefft 3 Survey Practice 10.29115/SP-2017-0003 Jan 01, 2017 Tags: missing data, recall data, measurement

More information

The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007

The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007 The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007 Oregon Department of Transportation Long Range Planning Unit June 2008 For questions contact: Denise Whitney

More information

Demystifying HVAC What To Do When They Cut Your Budget By Ron Prager

Demystifying HVAC What To Do When They Cut Your Budget By Ron Prager Demystifying HVAC What To Do When They Cut Your Budget By Ron Prager It s no secret that the current state of the economy and the horrific events of September 11 th are having a major effect on the retail

More information

Agenda. Industry Rate Trends Summary of Financial Targets Cost of Service Information. Valuation of Solar

Agenda. Industry Rate Trends Summary of Financial Targets Cost of Service Information. Valuation of Solar Agenda Industry Rate Trends Summary of Financial Targets Cost of Service Information Customer charges Residential Demand Charges Time of Use Rates Valuation of Solar Industry Trends Increasing demand charges

More information

Appendix G - Danvers Electric

Appendix G - Danvers Electric Appendix G - Danvers Electric Energy Efficiency and Conservation Programs Revision ID Date Author Notes Approval (initials and date) 1.0 9-6-2011 Clint Allen The purpose of Version 1 is to release certain

More information

VEHICLE PREVENTIVE MAINTENANCE PROGRAM PURPOSE AND COMPONENTS OF A VEHICLE MAINTENANCE PROGRAM

VEHICLE PREVENTIVE MAINTENANCE PROGRAM PURPOSE AND COMPONENTS OF A VEHICLE MAINTENANCE PROGRAM VEHICLE PREVENTIVE MAINTENANCE PROGRAM Regardless of how your vehicle fleet is funded, it is important for all agencies providing public transportation to have a strong vehicle maintenance program since

More information

Residential Lighting: Shedding Light on the Remaining Savings Potential in California

Residential Lighting: Shedding Light on the Remaining Savings Potential in California Residential Lighting: Shedding Light on the Remaining Savings Potential in California Kathleen Gaffney, KEMA Inc., Oakland, CA Tyler Mahone, KEMA, Inc., Oakland, CA Alissa Johnson, KEMA, Inc., Oakland,

More information

Equipment Management Department. Council Budget Presentation

Equipment Management Department. Council Budget Presentation Equipment Management Department Council Budget Presentation Presented: March 15, 2012 Council Inquiries 1. Please provide a brief summary of shifts in your department s operating budget and staffing levels

More information

B. HOLMQVIST Nuclear Fuel Division, ABB Atom AB, Vasteras, Sweden

B. HOLMQVIST Nuclear Fuel Division, ABB Atom AB, Vasteras, Sweden I Iflllll IPIBM1I IHtl!!!! Blini Vllll! «! all REDUCTION OF COST OF POOR QUALITY IN NUCLEAR FUEL MANUFACTURING XA0055764 B. HOLMQVIST Nuclear Fuel Division, ABB Atom AB, Vasteras, Sweden Abstract Within

More information

Section 5 - Operations and Maintenance Program

Section 5 - Operations and Maintenance Program Section 5 - Operations and Maintenance Program A. Introduction The intent of this section of the SSMP is to describe the current operation of the City s wastewater collection system. There are five areas

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

Independent Energy. Home solar battery systems Energy Intelligence developed by

Independent Energy. Home solar battery systems Energy Intelligence developed by Independent Energy Home solar battery systems 2019 Energy Intelligence developed by Evergen A new generation of independent energy Smarter energy for life CSIRO and AMP Capital created Evergen to harness

More information

Too Good to Throw Away Implementation Strategy

Too Good to Throw Away Implementation Strategy Too Good to Throw Away Implementation Strategy Council Briefing by Sanitation Services October 4, 2006 Purpose of Briefing Summarize preparations for Too Good To Throw Away recycling services FY07 Recommend

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in eight US states Quick Take M.J. Bradley & Associates (MJB&A) evaluated the costs and States Evaluated benefits of

More information

Working through the electric motor replacement maze

Working through the electric motor replacement maze Working through the electric motor replacement maze Taking a total cost of ownership approach to motor replacement can save big dollars -- and help save the planet The Department of Commerce currently

More information

Understanding the benefits of using a digital valve controller. Mark Buzzell Business Manager, Metso Flow Control

Understanding the benefits of using a digital valve controller. Mark Buzzell Business Manager, Metso Flow Control Understanding the benefits of using a digital valve controller Mark Buzzell Business Manager, Metso Flow Control Evolution of Valve Positioners Digital (Next Generation) Digital (First Generation) Analog

More information

RESULTS READER SURVEY TRENDS IN EMPLOYMENT MACHINE TOOL INVESTMENT OUTSOURCING AND OTHER GEAR INDUSTRY BUSINESS PRACTICES

RESULTS READER SURVEY TRENDS IN EMPLOYMENT MACHINE TOOL INVESTMENT OUTSOURCING AND OTHER GEAR INDUSTRY BUSINESS PRACTICES READER SURVEY RESULTS TRENDS IN EMPLOYMENT MACHINE TOOL INVESTMENT OUTSOURCING AND OTHER GEAR INDUSTRY BUSINESS PRACTICES 8 of Gear Industry Respondents are Optimistic About their Ability to Compete over

More information

Memorandum. Project Administration Department. 324 East Pine Street Tarpon Springs FL (727)

Memorandum. Project Administration Department. 324 East Pine Street Tarpon Springs FL (727) Project Administration Department 324 East Pine Street Tarpon Springs FL 34689 (727) 942-5638 Memorandum Date: March 19, 2019 To: Mayor, and Board of Commissioners Through: Mark LeCouris, City Manager

More information

Executive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico

Executive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico : Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico The (ES) presents the main observations, conclusions, and recommendations resulting from the evaluation of the

More information

ON-SITE ASSESSMENT REPORT. <Engineering Firm> Presented to: <Customer> <Presentation Date> Funding by: <Report Date>

ON-SITE ASSESSMENT REPORT. <Engineering Firm> Presented to: <Customer> <Presentation Date> Funding by: <Report Date> ON-SITE ASSESSMENT REPORT Presented to: Funding by: This report is for sample purposes only. The customer s actual report will contain information

More information

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority FINAL REPORT CATHODIC PROTECTION EVALUATION 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to 50+00 South Texas Water Authority Prepared for: South Texas Water Authority P.O. Box 1701 Kingsville,

More information

Project Report Cover Page

Project Report Cover Page New York State Pollution Prevention Institute R&D Program 2015-2016 Student Competition Project Report Cover Page University/College Name Team Name Team Member Names SUNY Buffalo UB-Engineers for a Sustainable

More information

GENERAL PLANNING GUIDELINES MULTI-BAY CAR WASH

GENERAL PLANNING GUIDELINES MULTI-BAY CAR WASH GENERAL PLANNING GUIDELINES MULTI-BAY CAR WASH Information to be considered when planning your Multi-Bay Car Wash. The information presented id for a 4 6 bay coin operated car wash. It is based on past

More information

MEETING GOVERNMENT MANDATES TO REDUCE FLEET SIZE

MEETING GOVERNMENT MANDATES TO REDUCE FLEET SIZE H O W W I R E L E S S F L E E T M A N A G E M E N T C A N H E L P E X C E E D F L E E T O P T I M I Z AT I O N G O A L S Table of Contents 3 4 4 5 5 6 6 6 8 8 Overview Using Wireless Fleet Management to

More information

Recharge Kick-off Meeting Recharge Activity Review Process for

Recharge Kick-off Meeting Recharge Activity Review Process for Recharge Kick-off Meeting Debra Fry Executive Director, Operating Budget and Recharge Review Gabriella Hato Manager, Recharge Review Sarah Hislen Analyst, Recharge Review Charet Wynn Analyst, Recharge

More information

PVP Field Calibration and Accuracy of Torque Wrenches. Proceedings of ASME PVP ASME Pressure Vessel and Piping Conference PVP2011-

PVP Field Calibration and Accuracy of Torque Wrenches. Proceedings of ASME PVP ASME Pressure Vessel and Piping Conference PVP2011- Proceedings of ASME PVP2011 2011 ASME Pressure Vessel and Piping Conference Proceedings of the ASME 2011 Pressure Vessels July 17-21, & Piping 2011, Division Baltimore, Conference Maryland PVP2011 July

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Audit Follow-up. Fleet Fuel Operations (Report #0801, Issued October 18, 2007) As of March 31, Summary. Report #0811 June 20, 2008

Audit Follow-up. Fleet Fuel Operations (Report #0801, Issued October 18, 2007) As of March 31, Summary. Report #0811 June 20, 2008 Audit Follow-up As of March 31, 2008 Sam M. McCall, CPA, CGFM, CIA, CGAP City Auditor Fleet Fuel Operations (Report #0801, Issued October 18, 2007) Report #0811 June 20, 2008 Summary This is the first

More information

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) indicated in the 2016-2018 Energy Efficiency

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

GREENER SHIPPING SUMMIT 2017

GREENER SHIPPING SUMMIT 2017 GREENER SHIPPING SUMMIT 2017 EU MRV Regulation Methods of Data Collection of Fuel Differences/Consequences/Evaluation of Methods Antonios Georgantzis 14 November 2017 Eugenides Foundation The EU MRV Timeline

More information

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER ABSTRACT This paper discusses the measures taken to upgrade controls for a coal-fired boiler which was experiencing problems with primary air flow, furnace

More information

Evaluating Losses in Electrical Equipment Focus on Transmission Utilities. CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E.

Evaluating Losses in Electrical Equipment Focus on Transmission Utilities. CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E. Evaluating Losses in Electrical Equipment Focus on Transmission Utilities CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E. Contents Introduction Present Value of ongoing energy costs

More information

How to Cut Costs in Transportation

How to Cut Costs in Transportation 1 How to Cut Costs in Transportation OSBA leads the way to educational excellence by serving Ohio s public school board members and the diverse districts they represent through superior service, unwavering

More information

Final Report. LED Streetlights Market Assessment Study

Final Report. LED Streetlights Market Assessment Study Final Report LED Streetlights Market Assessment Study October 16, 2015 Final Report LED Streetlights Market Assessment Study October 16, 2015 Funded By: Prepared By: Research Into Action, Inc. www.researchintoaction.com

More information

Program Evaluation and Audit Metro Transit Bus Tire Lease Contract Review

Program Evaluation and Audit Metro Transit Bus Tire Lease Contract Review Program Evaluation and Audit Metro Transit Bus Tire Lease Contract Review 12 December 2007 Background 2007-A15 INTRODUCTION Metro Transit operates a fleet of about 864 buses for daily transit operations.

More information

DECONTAMINATE BY PRIORITY Items such as wheeled vehicles, forklifts, and railcars, which are critical to the site s overall mission, will need to rece

DECONTAMINATE BY PRIORITY Items such as wheeled vehicles, forklifts, and railcars, which are critical to the site s overall mission, will need to rece CHAPTER 5 DECONTAMINATION The idea behind decontamination is relatively the same for a fixed site as for a tactical unit. Personnel need to decontaminate to reduce the hazard and spread of a contaminating

More information

A NEW SPIN ON PUMP STATION TESTING AND ANALYIS: WHAT YOU WISH YOU KNEW ABOUT YOUR PUMP STATION

A NEW SPIN ON PUMP STATION TESTING AND ANALYIS: WHAT YOU WISH YOU KNEW ABOUT YOUR PUMP STATION ABSTRACT Zachary G. Purvis, PE Kimley-Horn and Associates, Inc. 3001 Weston Parkway Cary NC, 27513; 919-653-2963; zak.purvis@kimley-horn.com Wastewater collection system owners are becoming increasingly

More information

ESTIMATING THE LIVES SAVED BY SAFETY BELTS AND AIR BAGS

ESTIMATING THE LIVES SAVED BY SAFETY BELTS AND AIR BAGS ESTIMATING THE LIVES SAVED BY SAFETY BELTS AND AIR BAGS Donna Glassbrenner National Center for Statistics and Analysis National Highway Traffic Safety Administration Washington DC 20590 Paper No. 500 ABSTRACT

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.2 AGENDA TITLE: Receive Update on Citywide Light Emitting Diode (LED) Streetlight Conversion and Provide Guidance on Next Steps MEETING DATE:

More information

ENERGY MANAGEMENT AT COOPER TIRE

ENERGY MANAGEMENT AT COOPER TIRE OMA Energy Committee June 25, 2014 Anthony Smith, PE ENERGY MANAGEMENT AT COOPER TIRE 1 A Leader in the Tire Industry 5% 2012 Sales by Segment 35% North America 65% International 5% Sales by Product 20%

More information

Texas Tech University Energy Savings Program October 2009 Update

Texas Tech University Energy Savings Program October 2009 Update Texas Tech University Energy Savings Program October 2009 Update The Texas Tech Energy Savings Update is being submitted in accordance with Governor s Executive Order RP 49, Electric Conservation by State

More information

Request for Proposal for Trolley Security Services

Request for Proposal for Trolley Security Services Request for Proposal for Trolley Security Services April 6, 2018 Trolley Security Support Services The Loop Trolley Company The Loop Trolley Company (LTC) is requesting proposals for armed on-board security

More information

EA Closing Report Page 1 of 9

EA Closing Report Page 1 of 9 EA06-002 Closing Report Page 1 of 9 SUBJECT: Rear coil spring fracture ENGINEERING ANALYSIS CLOSING REPORT EA No: EA06-002 DATE OPENED: 24-Jan-2006 DATE CLOSED: 05-Feb-2007 SUBJECT VEHICLES: Model Year

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

Future Funding The sustainability of current transport revenue tools model and report November 2014

Future Funding The sustainability of current transport revenue tools model and report November 2014 Future Funding The sustainability of current transport revenue tools model and report November 214 Ensuring our transport system helps New Zealand thrive Future Funding: The sustainability of current transport

More information

Angelo State University Energy Savings Program October 30, 2014

Angelo State University Energy Savings Program October 30, 2014 The Angelo State University Energy Savings Update is being submitted in accordance with Governor s Executive Order, RP 49, Energy Conservation by State Agencies. A. Energy Goals 1. Campus Energy Use Energy

More information

MRC Field Trial Performance Report (Hugoton Deep Reservoir in Kansas) Revision 1.9

MRC Field Trial Performance Report (Hugoton Deep Reservoir in Kansas) Revision 1.9 4 Copyright 2012 - Millennial Research Corporation Page 1 Table of Contents Table of Contents... 2 Table of Figures... 2 Index of Tables... 2 Overview... 3 Description of Equipment... 3 Trial & Test Preparation...

More information

OFFICE OF FLEET MANAGEMENT FISCAL YEAR 2015 BUDGET TESTIMONY APRIL 7, 2014 EXECUTIVE SUMMARY

OFFICE OF FLEET MANAGEMENT FISCAL YEAR 2015 BUDGET TESTIMONY APRIL 7, 2014 EXECUTIVE SUMMARY OFFICE OF FLEET MANAGEMENT FISCAL YEAR 2015 BUDGET TESTIMONY APRIL 7, 2014 EXECUTIVE SUMMARY DEPARTMENT MISSION AND FUNCTION The mission of Office of Fleet Management (OFM) is to support City departments

More information

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1

More information

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY STATISTICAL INVENTORY RECONCILIATION (SIR) GUIDANCE DOCUMENT

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY STATISTICAL INVENTORY RECONCILIATION (SIR) GUIDANCE DOCUMENT BILL OWENS Governor VICKIE L. ARMSTRONG Executive Director JEFFREY M. WELLS Deputy Executive Director RICHARD O. PIPER Acting Director of Oil and Public Safety DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION

More information

OPTIMISING SEWAGE PUMPING STATION PERFORMANCE

OPTIMISING SEWAGE PUMPING STATION PERFORMANCE OPTIMISING SEWAGE PUMPING STATION PERFORMANCE Andrzej Krawiec, Martin Byrnes Sydney Water Corporation, Sydney, NSW, Australia ABSTRACT At Sewage Pump Stations (SPS) grease, fat and other material such

More information

Car Sharing at a. with great results.

Car Sharing at a. with great results. Car Sharing at a Denver tweaks its parking system with great results. By Robert Ferrin L aunched earlier this year, Denver s car sharing program is a fee-based service that provides a shared vehicle fleet

More information

OPTIMAL BATCH DISTILLATION SEQUENCES USING ASPEN PLUS

OPTIMAL BATCH DISTILLATION SEQUENCES USING ASPEN PLUS OPTIMAL BATCH DISTILLATION SEQUENCES USING ASPEN PLUS Bradley H. Cook, Matthew J. Engel, and Anthony J. Zehnder Air Products and Chemicals, Inc. 7201 Hamilton Blvd. Allentown, PA 18195-1501 Craig S. Landis

More information

Product Evaluation. CADEX C7400 Battery Analyzer

Product Evaluation. CADEX C7400 Battery Analyzer Product Evaluation CADEX C7400 Battery Analyzer General The purpose of this product search was to identify and test instrumentation that would prolong the service life of rechargeable batteries in government

More information

Smart Sensor Technology in Condition Monitoring Low Voltage Motors

Smart Sensor Technology in Condition Monitoring Low Voltage Motors 2016-09-22 Smart Sensor Technology in Condition Monitoring Low Voltage Motors Condition Monitoring! Purpose of condition monitoring! Convergence of technologies! Benefits of condition monitoring! Smart

More information

CITY OF RIO VISTA WATER METER RETROFIT PROGRAM

CITY OF RIO VISTA WATER METER RETROFIT PROGRAM CITY OF RIO VISTA WATER METER RETROFIT PROGRAM AB 2572 - Water Meter Requirements AB 2572 Adopted on September 29, 2004 Requires urban water suppliers to install water meters on or before 2025 Definition

More information

Crane modernization raises production, reduces liability

Crane modernization raises production, reduces liability Crane modernization raises production, reduces liability To remain competitive, many companies are pushing their cranes beyond original specifications and paying a hefty cost that can be measured both

More information

Russell Thompson, Public Works Director Michael Hanlon, Principal Engineering Technician

Russell Thompson, Public Works Director Michael Hanlon, Principal Engineering Technician STAFF REPORT MEETING DATE: November 18, 2014 TO: FROM: City Council Russell Thompson, Public Works Director Michael Hanlon, Principal Engineering Technician 922 Machin Avenue Novato, CA 94945 (415) 899-8900

More information

MicroGuard 586 Retrofit Rated Capacity Indicator System. Calibration and Testing for:

MicroGuard 586 Retrofit Rated Capacity Indicator System. Calibration and Testing for: GREER COMPANY Page 1 of 22 MicroGuard 586 Retrofit Rated Capacity Indicator System Machine Model Serial Number Tester Date Calibration and Testing for: GREER COMPANY Page 2 of 22 MicroGuard 586 Retrofit

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2008 SEC(2008) 2861 COMMISSION STAFF WORKING DOCUMT Accompanying document to the Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL

More information

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017 Customer Service, Operations and Security Committee Information Item III-A January 12, 2017 Train Reliability Program Page 4 of 19 Washington Metropolitan Area Transit Authority Board Action/Information

More information

EVALUATING MUNICIPAL SERVICES: SCORECARD CLEANLINESS PROGRAM PROSPECTUS

EVALUATING MUNICIPAL SERVICES: SCORECARD CLEANLINESS PROGRAM PROSPECTUS PROSPECTUS I MAYOR'S OFFICE OF OPERATIONS 100 CHURCH STREET, NEW YORK 10007 THE SCORECARD PROGRAM: OVERVIEW WHAT IS SCORECARD HOW DO YOU MEASURE CLEANLINESS SCORECARD RATING PROCEDURES THE RATING SCALE

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

CUCAMONGA VALLEY WATER DISTRICT FLEET AND EQUIPMENT MECHANIC I/II

CUCAMONGA VALLEY WATER DISTRICT FLEET AND EQUIPMENT MECHANIC I/II FLEET AND EQUIPMENT MECHANIC I/II Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

Draft Project Deliverables: Policy Implications and Technical Basis

Draft Project Deliverables: Policy Implications and Technical Basis Surveillance and Monitoring Program (SAMP) Joe LeClaire, PhD Richard Meyerhoff, PhD Rick Chappell, PhD Hannah Erbele Don Schroeder, PE February 25, 2016 Draft Project Deliverables: Policy Implications

More information

Applicability for Green ITS of Heavy Vehicles by using automatic route selection system

Applicability for Green ITS of Heavy Vehicles by using automatic route selection system Applicability for Green ITS of Heavy Vehicles by using automatic route selection system Hideyuki WAKISHIMA *1 1. CTI Enginnering Co,. Ltd. 3-21-1 Nihonbashi-Hamacho, Chuoku, Tokyo, JAPAN TEL : +81-3-3668-4698,

More information

From: Arthur Canafe, P.E. Approved by: /s/ General Manager

From: Arthur Canafe, P.E. Approved by: /s/ General Manager AGENDA ITEM : 3.F.1 MEETING DATE: 05/17/2010 ADMINISTRATIVE REPORT : 2010-64 To: Honorable Public Utilities Board Submitted by: /s/ Robert Streich AGM Engineering and Operations From: Arthur Canafe, P.E.

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

Pump Control Ball Valve for Energy Savings

Pump Control Ball Valve for Energy Savings VM PCBVES/WP White Paper Pump Control Ball Valve for Energy Savings Table of Contents Introduction............................... Pump Control Valves........................ Headloss..................................

More information

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Gerrit van Middelkoop Bianca Coolen Page 1 2015 DEKRA 06.11.2015 Contents Company introduction Condition

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

Battery Maintenance Solutions for Critical Facilities

Battery Maintenance Solutions for Critical Facilities Battery Maintenance Solutions for Critical Facilities Chapter Two: Meeting Regulatory Requirements and Observing Best Practices Click a section below In chapter one of Emerson Network Power s ebook entitled

More information

Edwards Engineering Corporation

Edwards Engineering Corporation SUGAR MILL DRIVE CONSIDERATIONS One of the most important tasks of a sugar factory manager is deciding on how best to invest limited resources on capital expenditures such as sugar mill drives. In an attempt

More information

Credit: Image Source / Rex / Shutterstock. Sustainability Research November 2017

Credit: Image Source / Rex / Shutterstock. Sustainability Research November 2017 Credit: Image Source / Rex / Shutterstock Sustainability Research November 2017 Sustainability Research November 2017 AGENDA Methodology Respondent Profile Main Findings Summary Presented by: Heather Macleod,

More information

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia.

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia. State: Georgia Grant Number: 08-953 Study Number: 6 LONG RANGE PERFORMANCE REPORT Grant Title: State Funded Wildlife Survey Period Covered: July 1, 2010 - June 30, 2011 Study Title: Wild Turkey Production

More information

Conventional Fuel Management Strategies That Work

Conventional Fuel Management Strategies That Work Conventional Fuel Management Strategies That Work THROUGH RESEARCH, REPLACEMENTS, AND PREVENTIVE MAINTENANCE, FLEET MANAGERS CAN GET THE BIGGEST BANG OUT OF THEIR FLEET DOLLARS. November 2013, By Brad

More information

Urban Construction Initiative Certification Program Update

Urban Construction Initiative Certification Program Update Urban Construction Initiative Certification Program Update Presentation at the UCI Annual Meeting July 28 th, 2011 Todd Halacy, PE VDOT LAD Phil Pullen, PE City of Virginia Beach The Urban Construction

More information