Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR

Size: px
Start display at page:

Download "Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR"

Transcription

1

2

3

4 Report of the 6 th Joint Co-ordination Committee Meeting of IPPs Granted LTA in WR held on High Capacity Power Transmission Corridors IV (MP+Chhattisgarh), High Capacity Power Transmission Corridors V (Chhattisgarh) and Up-gradation of WR-NR tr. corridors with IPPs in Chhattisgarh 1. The 6 th meeting of the Joint Co-ordination Committee of IPPs in WR associated with various high capacity power transmission corridors was held in POWERGRID office, Gurgaon on 27 th September, The meeting was attended by CEA and the representatives of IPPs who have been granted LTA in the Chhattisgarh complex and M.P. The list of participants of the meeting is enclosed at Annexure POWERGRID welcomed the participants and made a presentation about the status of implementation of transmission system including establishment of pooling stations in these corridors. The location of pooling stations is enclosed at Annexure-2. The land for all the pooling stations is under possession by POWERGRID. It was informed that for implementation purpose, high capacity corridor in Chhattisgarh has been divided in nine sub-projects, out of which 8 sub-projects are already under implementation. For remaining 1 sub project the location of HVDC terminal point has been modified from Dhule, Maharashtra in WR to Pugalur, Tamil Nadu in SR. 3. POWERGRID stated that it has been generally observed that generation developers implement the interim transmission arrangement and after connecting to ISTS through interim arrangement, they do not focus on implementing the final dedicated transmission lines. It was emphasized by POWERGRID that interim arrangement have been provided as a contingency measure, till the availability of final system. As a result, transmission system constraints may be observed when IPPs are connected to the network through LILO of existing lines. Therefore, to enable power evacuation from the generation project, IPPs should also focus on implementation of final dedicated transmission system along with the commissioning of generating units. 4. The progress of generation project and dedicated transmission system of various IPPs connected to High capacity corridors which have been granted regulatory approval by CERC, was reviewed by CEA & POWERGRID. The details are given in following paragraphs: a) Chhattisgarh Complex 14 no. IPPs have signed the BPTA and submitted the BG for this corridor. List of IPPs in Chhattisgarh Complex is enclosed at Annexure-3. The review of the progress made by each of the IPP in Chhattisgarh Complex is as under: (i) RKM Powergen (4x360 MW) No representative of M/s RKM was present for the meeting however they have send the progress report through and is as under: Land: acre land already acquired against total requirement of 900 acre. Page 1 of 21

5 Fuel linkage: FSA for Unit-1 signed on and for Units-2, 3 & 4 signed on with SECL. Environmental clearance including consent to establish obtained for all 4 units and NOC received from forest department. Water linkage is obtained. EPC award placed for BTG package in July 07 and for BoP packages in Feb 09. Physical works progress at site: Boundary & fencing completed. Foundation work for wagon tippler going on, cooling tower I & II civil work under progress. Drum lifting for all 4 units done. All BOP packages have been ordered, foundation of Chimney I & II has been completed, shell concreting work of 270meter height of Chimney I&II is in progress, Unit I, II & III turbine reached site, column work under progress, TG Deck raft concreting work completed. TG hall column work has been done. Switchyard equipment erection 65% completed. Financial closure achieved for phase-i in Jan 09 and for Phase-II in June 10. Amount of loan disbursed is Rs Cr. out of Cr.(Ph-1) and Rs Cr. Out of Cr. (Ph-2) as on RKM also informed that they have signed PPA with CSEB and PTC. Further, commissioning schedule is as U#1 Oct 13, U#2-Jan 14, and U #3- Apr 14, U #4- July 14. Regarding dedicated transmission line, 62/69 tower foundation completed and 47 towers erected. 11/19 multi-circuit tower foundations completed. (ii) Athena Chhattisgarh (2x600 MW) No representative of M/s Athena Chhattisgarh (ACPL) was present for the meeting however they have sent the progress report through and informed the status as under: Land: 911 acres of the required 930 acres is under possession. Fuel linkage: For unit-1 LOA received from SECL for 70% of coal requirement. Signing of FSA awaited. For 2 nd unit, they have joint coal block allocation of Fatehpur (East) coal block, which has been jointly allocated to ACPL and is being developed by a joint venture company with ACPL as a partner. Letter of allotment of coal block has been received from MoC, prospective license executed at Raigarh collectorate, mining lease application has been submitted on within the time stipulated by MoC. Secretary, Revenue dept., has given the permission for Pvt. Land acquisition, Geological reports have been submitted to CMPDIL & GSI, hydro-geological study of the mines has been Page 2 of 21

6 completed and NOC for mining operations obtained from all four villages falling under the coal block. Mine plan approval received from MoC on Appointed M/s SRK Mining as Technical Consultant and M/s CRISIL as commercial & Legal Consultant to appoint MDO. Scope of MDO finalized, EOI published, Inviting prospective MDO s. Qualification documents received and are under review. Route detailed survey completed and detailed project report (DPR) is ready for submission to SECR for approval. Application for TOR submitted to MoEF. MoEF approved TOR. EIA, EMP & Field studies completed. EIA report submitted to Chhattisgarh Environmental Conservation Board. State approved the Mining Lease Prior approval application for Fatehpur East Coal Block and forwarded to MOC for prior approval on Environmental clearance obtained and no forest involved. Water linkage is obtained. Consent to establish obtained. EPC award placed for BTG/BOP package. Financial closure achieved for Rs Cr. Athena informed that they have signed PPA with PTC for 1100MW who in turn have signed PPA with CSPTCL (444 MW) and received LoI from UPPCL for 300 MW and PPA signed with Nepal electricity Authority for 150MW. Commissioning schedule as provided is U#1 Oct 14 & U#2 Jan 15 (U#1 Jun 14 & U#2 Sep 14 as per 5 th JCC). Regarding physical works at site: Boundary wall is nearing completion, drum lifting for Unit-1 on and Unit-2 is scheduled in Oct 13, BoP packages have been awarded and their work is under progress, turbine related activities are in progress, hydraulic test is scheduled in Dec 13 for Unit-I and in Jun 14 for Unit-II. For dedicated Transmission system: Length of the dedicated line is 25km for which Sec-68 has been received and Sec-164 application has been submitted in Sep /56 foundation completed for D/c and 10/19 foundation completed for multi-circuit portion. Tower erection completed for 29/56 towers. At switchyard, most of the equipment foundations are completed, tower erection completed, gantries completed. Equipment erection almost completed and testing of the same is in progress. Conductor stringing, IPS tube erection, cable laying work etc. in progress. (iii) SKS Power Generation (Ch) Ltd (4x300 MW) The representative of M/s SKS informed the status report and is as under: Page 3 of 21

7 Land: acres of the required acres is under possession. Govt. land of acre and Pvt. Land of acres under possession. The plant switchyard changed from AIS to GIS. Fuel linkage: FSA signed with SECL for Unit-1 on and Unit-2 on Environmental clearance including consent to establish obtained for all 4 units and no forest is involved. Water linkage is obtained. EPC award placed for Main Plant (BTG) and BoP. Financial closure achieved and SBI is the lead banker. Rs Crores spent as on M/s SKS have signed PPA for 37.5% of the project capacity with CSPTradeco and for 550MW with Tata Power Trading Co. Ltd. They have also participated in case-i bidding of RVPNL for 100MW. LOI is yet to be received. Commissioning schedule is U#1 Dec 14, U#2-Mar 15, U#3-Dec 15, U#4- Mar 16 (U#1 June 14, U#2-Sep 14, U#3-Dec 14, U#4-Mar 15 as per 5 th JCC). Regarding physical works at site: Boundary wall and fencing has been completed. Drum lifting completed in May, 2013 for two units, GIS is in advance stage of completion. Chimney works are under progress (upto 150meter completed). Turbine deck work is under progress. Hydraulic test will be completed in Nov 13. Regarding dedicated transmission system: Contract for 27.5km 400kV D/c line has been placed and is scheduled to be completed by December They have awarded bays contract as well as GIS construction contract with Alstom. Bays will be completed by end of Nov 13. (iv) Korba West Power Co. Ltd (1x600 MW) Representative of M/s Korba West submitted status report as under: Land: For Ph-I, 100% land is under their possession ( acre). Fuel linkage: FSA signed with SECL on Forest clearance obtained and water linkage is also available. For Ph-I TOR, EC and CTE have been received. Financial closure achieved. Loan of Rs. 2150Cr. disbursed. Page 4 of 21

8 Regarding PPA, they have submitted that for PH-I letter of comfort for 35% from CSPTCL has been received. Medium term, Short term sale of power (210MW) tied up with Reliance Energy Trading Co. Ltd. Commissioning schedule is U#1 Sep 13. Regarding physical works at site, M/s Korba West Power Co. Ltd. informed that boundary wall and fencing has been completed. Roads, gate complex, field hostel are operational. Drum lifting has been done, BOP packages have been ordered and their work is in progress. Shell construction is completed and flue can erection completed. All 4 turbines have been placed on their respective pedestals and Hydraulic test has been done. M/s Korba West informed that they are connected to ISTS through interim arrangement and drawing start up power. The length of their dedicated line is 16.78km. 22/42 tower casting completed, 16/42 tower erected, stringing work yet to start. (v) DB Power Ltd (2x600 MW) Representative of M/s DB Power submitted status report as under: Land: already 100% land under possession (630 acre). Fuel linkage: Coal block allotted is Durgapur-II/Sariya. Permanent coal linkage is obtained for 2.497MTPA from SECL. FSA signed on Tapering coal linkage is obtained for 2.497MTPA form SECL. Stage-I forest clearance achieved on Stage-II forest clearance under progress. Environmental clearance including consent to establish obtained. Water linkage obtained. Forest clearance not applicable. EPC award placed for BTG package to BHEL and BoP Packages to L&T. Financial closure achieved. Loan of Rs Cr. disbursed. Civil works are under progress. Boundary wall and fencing is completed. Drum lifting for both the units have been done. Foundation and erection of chimney has been completed. Turbine erection for unit-i &II on advanced stage of completion. TG box up done for unit 1 on Condenser flood test done on TG box up for unit 2 is planned on Nov Hydraulic test for both units is completed. Boiler light up for 1 st unit is done whereas for 2 nd unit, it is planned in Oct 13. Commissioning schedule is U#1-Nov/Dec 13, U#2- Mar/April 14 (U#1-June 13, U#2- Oct 13). M/s DB Power Ltd. informed that they have charged 11kV and 6.6 kv switchgear systems. Page 5 of 21

9 DB power informed that they signed PPA with CSPTradeco for supply 30% of capacity and 5%/7.5% net power generated at Busbar of power station. They have already signed PPA for 208 MW with TANGEDCO. They have participated in case-i binding of UPPCL for 203MW & RVPN for 311MW. Bids are under evaluation. DB Power is connected to ISTS through LILO of Raigarh-Raipur 400 kv line since May 13. (vi) Visa Power Ltd (1x x660 MW) Representative of M/s Visa Power Ltd. submitted status report as under: All land acquired except 23 acres of Govt land and 67 acres of court case land which is also under process. Fuel linkage: Fatehpur east Coal Block had been jointly allocated to them by Ministry of Coal. However, fuel (coal) supply agreement signed with Indonesian coal supplier in case domestic coal availability is later than COD of Unit#1. No coal linkage for Unit#2. Mine plan for Fatehpur East block approved in Apr 12 by MoC. TOR granted by MoEF for conducting EIA- EMP study. Letter received from Secretary (Revenue Dept, Raipur) for acquisition of private land. Application of mining lease submitted. Forest Diversion proposal is currently with state Govt. Socio economic survey completed and R&R plan has been prepared & submitted to MRD, Raigarh. MDO selection is in process, RfQ floated on Draft EIA report prepared and submitted to Chhattisgarh Environment Conservation Board. Environment clearance received from MoEF. Water linkage obtained. Forest clearance not required. Consent to establish received. They have recently signed PPA with WBSEDCL for 200 MW with an option to increase upto 510 MW and also signed PPA with CSPTCL (424 MW). Financial closure is achieved and loan of Rs. 610 Cr (as on Dec 2011) disbursed. EPC award placed on BHEL for BTG and on L&T for BoP for Unit-1 for Unit-2 Boundary completed. Boiler erection is under progress and drum lifting expected in Mar 14, Switchyard foundation is completed, and Major equipments received, TG building erection is under progress. Water treatment plant civil work is under progress. CHP Civil work is under progress at site. Chimney raft civil work completed. Turbine deck civil work is under progress and hydraulic test is expected by Nov 14. Page 6 of 21

10 M/s Visa Power have indicated that their commissioning schedule is U#1- Sep 15 and U#2- Sep 17 (as against U#1-Mar 15 and U#2- Mar 17 as per 5 th JCC). For dedicated transmission system, 50% of civil foundation work for 400kV transmission line completed and 40% tower erection work completed. 90% of civil foundation work for 400kV Bay extension work is completed. Structure erection has started for both equipment & towers. (vii) Jindal Power Ltd (4x600 MW) Representative of M/s Jindal Power submitted status report as under; Land: 100% land for main plant, for green belt 75% land is available and balance 25% is under acquisition. Off-site facilities : Ash dyke 212 Ha- land required for Lagoon 1 available. Fuel linkage: Coal linkage has been received for 2 units i.e. for 2x600MW, LOA from SECL and Mahanadi Coal fields Ltd. have been received. FSA signed between MCL and JPL on 28 th Aug 2013 for unit 1 & 2. Also, FSA singed between SECL & JPL on 29 th Aug 2013 for Unit 1 & 2. MoP has recommended Coal ministry for coal linkage of balance 2 units. JPL shall use imported coal from m/s JSPL Mozambique minerals LDA till the time domestic coal linkage is available. Environmental clearance: received for all four units from MoEF. No forest is involved. Water linkage available. Consent to establish received. EPC award placed for BTG package on BHEL. Award placed for BoP. Financial closure: Achieved for all 4 units. PPA of 400 MW signed with Tamil Nadu Generation & Distribution Corporation Limited on 23rd August 2013 for 15 years. Participated in Case-1 bids of UP and same under evaluation. Commissioning schedule indicated by the developer for synchronization of units is U#1-Sep 13, U#2- Jan 14, U#3-Mar 14, and U #4- Sep 14 (as against is U#1-Aug 13, U#2- Nov 13, U#3-Jan 14, and U #4- Jul 14 as per the 5 th JCC). Regarding physical works progress at site, M/s JPL informed that Boundary wall has been competed, drum lifting done for 3 units, chimney-1 completed and for chimney -2, Shell completed. Hydraulic test completed for unit 1 & 2. TG on Barring gear completed for 1st unit. TG erection commenced on 5th Jan13 for 2nd unit. TG Erection commenced on for 3rd unit. Stringing completed for 3 nos. circuits; stringing of 75mtr span pending in the 4th circuit. 4 nos. bays at pooling station are being constructed by PGCIL as Page 7 of 21

11 consultancy work. Construction of 2 nos. Bays completed and test charging of the transmission line planned on 30th Sep13. Balance 2 nos. bays expected to be completed by 15 th Oct nos. line bays at JPL end completed and 3rd line bay will be ready by 30 th Sep 13 and 4 th line bay by 31 st Oct 13. (viii) KSK Mahanadi Power Co. Ltd (6x600 MW) Representative of M/s KSK informed that 100% land of acres is under possession. Fuel linkage: Fuel supply and investment agreement with GMDC has been signed, FSA with GIDC has also been signed and tapering coal linkage is assured by SECL. Environment clearance obtained. Water linkage obtained. Forest clearance received. EPC award placed for BTG and BoP packages. Financial closure: Achieved with PFC as the lead banker and loan of Rs Crs. disbursed as on M/s KSK informed that they have signed PPA for 1010 MW with GUVNL, 235 MW with CSPTCL. They have to supply 250 MW to Goa, as per Coal Supply Agreement. They have signed PPA with Discoms of AP for 400MW under Case- 1 medium term bid. MTOA for 400MW is operational from to Participated in Case-1 bids for UPPCL (1000MW), RRVPNL (475MW) and TANGEDCO (500MW). M/s KSK informed the commissioning schedule as U#1: Aug 13, U#2: Dec 13, U#3: May 14, U#4: Sep 14, U#5: Jan 15, U#6: Mar 15, (as against U#1: Apr 13, U#2: Aug 13, U#3: Dec 13, U#4: Apr 14, U#5: Aug 14, U#6: Dec 14 indicated in 5 th JCC). COD scheduled 2 months after synchronization. Regarding physical works at site, M/s KSK informed that Boundary wall for the generation project has been completed, Drum lifting has been done for 3 units and for remaining 3 units drum lifting is under progress. BoP work is under progress. Chimney shell casting completed for 2 nos. of chimney, flue can fabrication completed for 1 no. and under advance stage for 2 nd Unit. Turbine for Unit#1 under operation and for balance units activities are under progress. Hydraulic test has been done for units 1 & 2 also for balance in advance stage. Regarding dedicated transmission system, M/s KSK informed that under interim arrangement LILO of ckt #1 charged. For ckt #2 81/83 foundations completed and stringing of 17.5 kms completed out of 27 kms. Under permanent arrangement part of the LILO lines shall be used and the remaining portion 18/98 foundations completed. Switchyard back charged on 27 Aug 12. Page 8 of 21

12 Bays for 4nos line, 2nos station transformer & 2 nos Generating transformer completed. (ix) Bharat Aluminium Co. Ltd (4x300 MW) Representative of M/s BALCO did not attend the meeting but submitted their status report as under; Land: 100% land under possession. Fuel linkage: Coal linkage has been obtained and FSA is under final stage of approval. Environmental clearance including consent to establish obtained. No forest is involved. Water linkage obtained. Financial closure achieved. PPA has not been yet signed. For U#1 and U#2- commissioning activities have been completed. For U#3, steam blowing completed. For U#4 steam blowing and turbine rolling completed. Regarding dedicated transmission system, M/s BALCO informed that under interim arrangement is operational since Oct 11. Under permanent arrangement, contract has been awarded, work is under progress, 20/70 foundations are completed till date. (x) Vandana Vidhyut Ltd (2x135+1x270 MW) Representative of M/s Vandana Vidhyut Ltd (VVL) did not attend the meeting but submitted their status report as under; Land : 100% land under possession (261 Ha) Fuel linkage: Ministry of Coal, Govt. of India has allotted Fatehpur East Coal Block jointly. Ministry of Coal has granted tapering Coal linkage for 2x135 MW. Milestone as per LoA achieved. FSA executed for 2x135 MW Capacity on with SECL. MoEF has granted Environment clearance. No forest is involved. Water linkage obtained. EPC award placed for BTG package Financial closure achieved. PPA: With Chhattisgarh State Power Trading Co.Ltd. for 35% of net power generated, for rest they are waiting for case-1 bid of Discom for Page 9 of 21

13 participation. At present medium term LoI received from power trading companies. Commissioning schedule is indicated as U#1: Oct 13, U#2: Feb 14, U#3: Oct 15 (as against #1: Mar 13, U#2: Sep 13, U#3: Mar 15 as per 5 th JCC) Regarding transmission system, M/s VVL informed that they are already connected through interim arrangement. The dedicated line has not been awarded yet. (xi) Lanco Amarkantak Power Ltd (2x660 MW) Representative of M/s Lanco Amarkantak Power Ltd. submitted status as under; M/s Lanco informed that out of total requirement of 832 acres, 547 acres is under possession which is sufficient for main plant. Balance land needed for green belt, township etc. Environmental clearance is received, consent for establishment is available and water approval has been received. Fuel linkage: FSA signed for 80% requirement for both units on subject to PPA. Financial closure has been achieved on Loan of Rs Cr. disbursed as on M/s Lanco indicated commissioning schedule for U#3 as Dec 14, U#4 as Mar 15 (As against U#3 as Jun 14, U#4 as Oct 14 as per 5 th JCC) 5% PPA to be signed with CSPTCL. Regarding dedicated transmission line: M/s LANCO informed that construction work of dedicated line is in progress for 46KM long line, structural and conductor supplied at site. Foundation work is under progress. Out of total 151 towers, 51 foundations completed, 15 tower erection completed. Transmission line shall be completed by Sep 14. Termination bay in substation is being implemented by PGCIL on consultancy basis. (xii) GMR Chhattisgarh Energy Pvt. Ltd. (2x685 MW) Representative of M/s GMR informed that 100% land for the project (850 acre) is in possession. Environmental clearance obtained. Water linkage obtained. No forest land involved. Consent for establishment available. Financial closure achieved. Axis bank is the lead banker. Loan of Rs Crs. Disbursed as on date. Page 10 of 21

14 Fuel linkage: FSA is signed between GCEL (buyer) & GEL (seller) for supply of imported coal. For domestic coal, Govt of Chhattisgarh, CEA & MoP has recommended to MoC for allotment of coal linkage for the said project. EPC for main plant placed on M/s Doosan, Korea. Total expenditure incurred till 31 st Jan 13 is /8290 Cr. PPA signed with Chhattisgarh for sale of 35% of power. Commissioning schedule indicated by the developer is U#1 synchronization- Apr 14, COD -Aug 14, U#2 synchronization - Sep 14, COD - Jan 15. (as against Oct 13, COD -Jan 14, U#2 synchronization - Feb 14, COD - May 14 indicated in 5 th JCC). M/s GMR also informed that Boundary is complete. Chimney shell completed, Hydraulic test for U#1 completed. Transmission line will be ready by 15 th Oct 13. Switchyard will be completed by 15 th Oct 13. (xiii) TRN Energy Private Limited (2x300 MW) Representative of M/s TRN energy submitted status report as under: Land: Out of total 548 acre of land, 501 acres is in possession. Fuel linkage: LOA has been received from SECL for supply of 2.6 MTPA F grade coal. FSA to be signed shortly. Environmental clearance obtained. Water linkage is obtained. No forest is involved. Consent to establish received. EPC award placed for BTG package as well as for BoP packages. Financial closure achieved (Lead Banker-Axis Bank Ltd). Rs LC opened for USD 135 million to cover entire supplies of BTG. M/s TRN also informed PPA for sale of 390 MW power has been signed with UPPCL through PTC on long term basis and have entered with Chhattisgarh State Power Trading Company Limited for sale of 35% Power in accordance with MOU with Govt. of Chhattisgarh. Commissioning schedule is U#1 Aug 14, U#2-Feb 15 (As against U Mar 14, U#2-Jun 14 as indicated in 5 th JCC). (i) Chhattisgarh (Bilaspur) & MP Complex 5 nos of IPPs has been granted LTOA in the Chhattisgarh (Bilaspur) & MP complex. List of IPPs in Chhattisgarh (Bilaspur) & MP Complex is enclosed at Annexure-4. All of the above IPPs have signed BPTA and submitted BG. Jaiprakash Power Ventures Ltd (2x660 MW) Page 11 of 21

15 M/s Jaiprakash Power Ventures informed that total land of Ha is under possession. Amelia(North) and Dongri Tal II Coal Blocks allotted respectively to JV company of Jaiprakash associates Ltd & MP state mining corporation Ltd. FSA for Amelia(North) and Dongri Tal II has been signed. Mining activities have been started. Environmental clearance has been obtained. Consent for establishment received. Water linkage available. No forest involved. EPC award placed on L&T for BTG. Award for BoP packages also placed. PPA has been signed with GoMP for supply of 37.5% power to them. Balance is for the merchant sale. Financial closure (ICICI bank-lead banker) achieved. Amount of Rs. 5, Cr. has been disbursed. Commissioning schedule indicated by them was U#1 Jan 14 and U#2-Jul 14. Site activities are under progress. Boundary wall completed. Chimney has been completed upto 275 meter height and flue duct work is in progress. Hydraulic test is completed for U# 1. Order for major BoP packages has been placed and their work is under progress, drum lifting is not required as this project is based on super critical technology. Dedicated transmission line is 161 km long. 408/439 nos. foundations completed. 375/439 nos. towers erected. Stringing complete for 109/161 km complete. Line is expected to be completed by Dec 13. (ii) Bina Power Supply Co. Ltd (2x250 MW) Plant commissioned along with dedicated transmission system. (iii) Maruti Clean Coal & Power Ltd (1x300 MW) Representative of M/s Maruti Clean Coal submitted status as under: Land: about 408 acres (95%) land under possession against requirement of 428 acre. Fuel linkage: Fuel Supply Agreement (FSA) singed with M/s. SECL, Bilaspur on Environmental clearance including consent to establish obtained. No forest involvement. Water linkage obtained. Page 12 of 21

16 EPC contract for BTG package awarded to M/s IOT infrastructure and energy services limited. Contract for BoP also awarded. Financial closure achieved. Commissioning schedule is Mar 14 (as against Dec 13 as per 3 rd JCC). PPA signed with PTC. Regarding Physical works progress at site, M/S MCCPL informed that construction of boundary wall has been completed, drum lifting has been done, and work for all major BoP packages is under progress. Chimney foundation and shell completed. Flue can fabrication completed. Erection under progress. Hydraulic test is completed. Their dedicated transmission system has been modified to LILO of one circuit of ACB TPS- Bilaspur pool 400kV D/c line at MCCPL switchyard. (iv) Dheeru Powergen Pvt Ltd (3x350 MW) Representative of M/s Dheeru did not attend the meeting and status of their project was also not submitted. (v) Aryan MP Power Gen. Pvt Ltd. (2x600 MW) Representative of M/s Aryan MP Power Gen did not attend the meeting but submitted status report as under: Land: 100% land under possession. Fuel linkage: Domestic Coal linkage yet to be available. Applied to MoC for long term coal linkage on Environmental clearance: TOR issued on Public Hearing held on Final EIA report submitted on EC deferred due to want of coal linkage. Forest clearance not applicable. 44MCM allotted from Banas River. NOC for construction of Chimney received from Ministry of Defence. EPC award is under finalization. Financial closure under process. PPA for sale of 5% power on variable cost to MP has been signed. COD schedule is indicated as U#1: Mar 17, U#2: Sep 17. Transmission system strengthening in WR-NR transmission corridor for IPPs in Chhattisgarh High capacity HVDC corridor between WR and NR (Champa Pool- Kurukshetra ±800 kv, 3000 MW HVDC Bipole) is proposed to be up-graded to 6000 Page 13 of 21

17 MW with IPPs in Chhattisgarh. 3 nos of IPPs have been granted LTA with this strengthening. List of these IPPs in Chhattisgarh is enclosed at Annexure-5. Subsequently, Lara TPS (2x800MW) of NTPC has been granted LTA with the above transmission system strengthening. LTAA with WR constituents for the same have been signed/ are being signed. (i) Karnataka Power Corporation Ltd. (2x800 MW) Representative of M/s Karnataka Power Corporation Ltd. submitted status report as under: Land: 1016 acres of land has been acquired against total requirement of 1260 acres. Possession of land in progress. Fuel linkage: Applied to MoC. Environmental clearance: Application has been filed with MoEF for clearance along with DPR & REIA. No forest is involved. Water linkage available. Consent to establish applied. LOA for EPC contracts will be issued after MoEF clearance. Regarding PPA they informed that Power to be consumed by Karnataka state. Financial closure: After MoEF clearance. Total expenditure made on the project by the company till Jan 13 is Rs Crore. Commissioning schedule indicated by the developer is U#1-48 months from the date of issue of LOA for BTG package, U#2-54months from the date of issue of LOA for BTG package. Civil activities at site are to be started after MoEF clearance. (ii) Sarda Energy and Minerals Ltd. (2x150 +1x50 MW) Representative of M/s Sarda Energy did not attend the meeting but submitted their status report as under; Land: acres is in possession against total land requirement of acres. Fuel linkage: Captive coal mine at village Karwahi, Raigarh. Capacity enhancement in progress. Environmental clearance: EC issued by state level environment impact assessment authority, Chhattisgarh, GoI, MoEF. Forest clearance under process. Water linkage available. Consent to establish after EC. Page 14 of 21

18 EPC award yet to be placed. Financial closure: IDFC has agreed in principle to finance the project and detailed appraisal is under progress. Initial expenditure will be financed by the company from internal accruals towards its equity contribution for the project. Commissioning schedule indicated by the developer is U#1-Dec 17, U#2- Apr 18. (iii) Jayaswal Neco Urja Ltd. (2x300 MW) Representative of M/s Jayaswal Neco did not attend the meeting but submitted status report as under; Land: Already acres out of total requirement of acres is in possession. Fuel linkage: 1.8 MTPA is being sourced as middling from the own mines of JNIL and for balance 1.1 MTPA, application has been submitted to MoC for coal linkage. Application is pending with MoC. Environmental clearance: Final EIA submitted and presented before the EAC. Compliance on certain observations is in progress and is expected to be completed shortly. There is very small patch of forest land i.e 8.06 acres. For the diversion of this patch application has been filed with DFO Raigarh and is in process. 10MCM of Water has been allotted by the WRD of GoCG and additional allotment of 7.88MCM had been recommended for allocation by Water Resource Department to the GoCG for allotment. This is likely to be allotted shortly. Consent to establish after EC. EPC specs finalized. Global tenders are expected to be floated by March-April 2014 and EPC award would be finalized by Sept Financial closure: Achieved through PFC as lead banker in February However is to be restored. As per MoU with state Govt., GoCG shall purchase 37.5% power and no other PPA has been signed yet. Commissioning schedule indicated by the developer is U#1-Sep 17, U#2- Dec 17. Regarding physical progress at site, M/s Jayswal submitted that boundary marking work is being taken up on the acquired portion of private land. Transmission system for connectivity of MB power (M.P) Limited (2x600MW) Representative of M/s MB power informed that 100% land of 996 acres is under possession. Page 15 of 21

19 Fuel linkage: Fuel Supply Agreement (FSA) for long term coal linkage for both the units of the Project (2X600 MW) has been executed with South Eastern Coalfields Ltd. (SECL, a subsidiary of Coal India Ltd) on Environment clearance obtained. Water linkage obtained. Forest clearance received. Consent to establish received. EPC award placed for BTG and BoP to M/s Lanco Infratec Ltd. PPA signed with PTC for 420 MW, PPA for 30% power signed with MPPTCL and DISCOMS and 5% power signed with GoMP. Long term PPA for 428MW signed with PTC India Ltd. They also informed that they have participated in case-i bidding invited by the states of UP & Rajasthan and submitted its bids for sale of 361MW and 200MW respectively. Financial closure: Achieved. Loan of Rs Cr. disbursed. Commissioning schedule for U#1: May 14 and U#2: Sep 14. Regarding civil works at site, M/s MB power stated that boundary wall including fencing has been completed. Drum lifting for Unit-I & Unit -II is done. All BoP packages are awarded and their work is in progress. Chimney Shell construction has been completed. Chimney completion expected by November 13. TG erection work under progress. Hydro test is expected to be completed within September 13. All major works like switchyard, cooling tower, chimney, CW system, DM plant, PT plant and CHP are progressing as per schedule xxx Page 16 of 21

20 Annexure-1 SL. NAME DESIGNATION ORGANIZATION NO 1. Awdhesh Kumar Dy. Director Central Electricity Yadav Authority 2 Y. K. Sehgal COO (CTU) POWERGRID yugal@powergridindia.com 3 N. K. Jain GM POWERGRID nkjain.cc@gmail.com (Commercial) 4 Manju Gupta DGM (CTU) POWERGRID manju@powergridinida.com 5 R. V. M. M. Rao Chief POWERGRID rvmrao@powergridindia.com Manager(CTU) 6 K. K. Gupta Chief Manager POWERGRID kkgupta@powergridindia.com (Chhattisgarh) 7 S. K. Varshney Chief Manager POWERGRID skvarshney@powergridindia.com (Commercial) 8 Bhaskar L Wagh Engineer (CTU) POWERGRID bhaskarwagh@powergrid.in 9 Sanjay Khurana Deputy KWPCL Sanjay.khurana@avanthapower.com Manager(BD) 10 Chetna Khanna AM (BD) KWPCL chetna.khanna@avanthapower.com 11 Lakshmi Suri AM (BD) KWPCL lakshmi.suri@avanthapower.com 12 Ravi Arya Sr. VP MB Power (MP) Ltd. ravi.arya@moserbaer.in 13 Abhishek Gupta Sr. Manager MB Power (MP) Ltd. abhishekgupta@moserbaer.in 14 P.K Sharma GM (Projects) Lanco Power Ltd. pramod.sharma@lancogroup.in 15 Vikas Kumar AM (Projects) Lanco Power Ltd. vikas.kr@lancogroup.in 16 C. Narsimha Manager KSK Mahanadi power narasimha@ksk.co.in Ltd. 17 Arvind Narula GM (Projects) GMR Energy arvind.narula@gmrgroup.in 18 Rajnish Mahajan AGM (T/L) GMR Energy rajnesh.mahajan@gmrgroup.in 19 Narendra Singh Sr.GM JPVL narendra1.singh@jalindia.co.in 20 Alok Gupta DGM JPVL alok.gupta@jalindia.co.in 21 V. K. Head - Contract DB Power Ltd. Vinodk_kul@yahoo.co.in Kulshrestha 22 Himanshu Sr. Manager DB Power Ltd. himanshu.sharma@dbpower.in Sharma 23 Vikas Saxena EVP Jindal Power Ltd. vikas.saxena@jindalsteel.com 24 Mohit Manager Visa Power Ltd. mt.chakraborty@visapower.net Chakraborty 25 V.K. Chadha GM Aryan MP Power Gen acbpower@acbindia.com (P) Ltd., Maruti Clean Coal Pvt Ltd., TRN Energy Ltd. 26 Ramkrishna Rao Sr. VP SKS Powergen (Ch) Ltd. rk@spgcl.com 27 Sannappa T. Resident Engineer KPCL sannappaiit@gmail.com Page 17 of 21

21 (a) Locations of Pooling Stations associated with High Capacity Corridors Annexure-2 Raipur Pool N E (About 20 Kms. from Durg on Durg Dhamdha Road) Champa Pool N E (Near Vill. Taga / Pona, near Janjgir / Akaltara) Raigarh (Kotra) Pool N E (Approx. 14 Kms. from Raigarh, near Kotra.) Raigarh (Tamnar) Pool N E (Approx. 3 Kms. from Gharghoda on Raigarh - Garghoda Road) Dharamjaygarh/Korba N E (Approx. 10 Kms. from Korba, near Urga / Bhaisma) Jabalpur Pool N E Vadodara N E Page 18 of 21

22 Details of IPP Projects in Chhattisgarh Annexure-3 Applicant Installed Capacity LTA (MW) (MW) RAIGARH(KOTRA) COMPLEX 1 RKM Powergen Ltd.(4x360) Athena Chhattisgarh Power Ltd.(2x600) SKS Power Gen. (Ch) Ltd.(4x300) Korba West Power Co. Ltd.(1x600) DB Power Ltd.(2x600) Visa Power Ltd sub-total RAIGARH(TAMNAR) COMPLEX 1 Jindal Power Ltd.(4x600) Jindal Power Ltd. (225 MW from Dongamahua CPP+ 175MW from existing Tamnar TPS 3 TRN Energy Pvt. Ltd.(2x300) sub-total JANJGIR-CHAMPA COMPLEX 1 KSK Mahanadi Power Co. Ltd (6x600) Lanco Amarkantak Power Pvt. Ltd.(2x660) sub-total RAIPUR COMPLEX 1 GMR Chhattisgarh Energy Pvt. Ltd Sub Total Dharamjaygarh/Kotra Complex 1 BALCO(4x300) Vandana Vidyut Ltd.(2x135+1x270) Sub Total Chhattisgarh State Power Trading Co. Ltd 5809 Total Page 19 of 21

23 Details of IPP Projects in Chhattisgarh (Bilaspur) & M.P. Annexure-4 Applicant Gen. Project Capacity (MW) LTOA Applied for (MW) Chhattisgarh IPP Maruti Clean Coal(1X300 MW) Dheeru Power Gen (3x350 MW) Chhattisgarh State Power Trading Co. Ltd 432 Sub-total Madhya Pradesh IPP Jaiprakash Power Ventures Ltd.(2x660 MW) Aryan MP Power generation Pvt. Ltd(2x600 MW) Bina Power Supply Company Ltd.(2x250 MW) Sub total Total Page 20 of 21

24 Annexure-5 Details of IPP Projects in Chhattisgarh with Transmission System Strengthening in WR-NR transmission Corridor (Up-gradation of Champa Pool- Kurukshetra ±800 kv HVDC Bipole to 6000 MW) Applicant Gen. Project Capacity (MW) LTOA Applied for (MW) Chhattisgarh IPP Karnataka Power Corporation Ltd. (2X800 MW) Sarda energy and minerals Ltd. (2x150 +1x50 MW) Jayaswal Neco Urja Ltd. (2x300 MW) Lara TPS (2x800MW) of NTPC Total Page 21 of 21

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh.

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh. 1. Sh. J Mohan GM (Planning) R.K.M POWERGEN Pvt. Ltd. No.14, Dr.Giriappa Road, T. Nagar, Chennai 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 2. Sh. R. Srinivasan, Vice President (Corp.) Athena

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon

Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 25.05.2015 at POWERGRID, Gurgaon 1. The 9 th Joint Co-ordination Committee meeting of IPPs in WR was held at POWERGRID

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

Engineers Ireland Site Visit 23 rd March 2010

Engineers Ireland Site Visit 23 rd March 2010 Whitegate Independent Power Plant CER Site Visit 24 th October 2008 CER Site Visit 24 th October 2008nt Engineers Ireland Site Visit 23 rd March 2010 Agenda Presentation of project and progress to date.

More information

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 TRANSMISSION SECTOR GROWTH HIGHLIGHTS Source - POWERLINE Transmission line length

More information

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh mohammad_alauddin4124@yahoo.com December 19, 2013 Total area

More information

Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh

Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 Sh. T Rajesh Kumar Manager

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon पत क स च : Sl. Organization Address Tele/Fax No./email No. 1 PGCIL Sh. I S Jha, Chairman & Managing Director, Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana-122001.

More information

Distribution List - WR:

Distribution List - WR: Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 3. Sh. R. Srinivasan Vice

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,

More information

RFP Corrigendum No. 01

RFP Corrigendum No. 01 RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 1 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition

More information

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply INDEX S. No. PARTICULARS PAGE NO. A EDS REPLY 1-3 ANNEXURE I ESSENTIAL DETAILS SOUGHT (EDS) 4-5 ANNEXURE II LEASE DOCUMENTS 6-58 ANNEXURE III AUTHENTICATED PAST PRODUCTION DATA 59 ANNEXURE IV CTE (AIR)

More information

Strategies for Promoting CMM Project Development in India

Strategies for Promoting CMM Project Development in India Strategies for Promoting CMM Project Development in India A.K. Singh CMD, CMPDI Co-Chair, Coal Sub-Committee Methane to Markets Cagliari, Italy 29-30 April,2008 Strategies for Promoting CMM Project Development

More information

Minutes of the 19 th Joint Co-ordination Committee meeting of Generation projects granted Connectivity/LTA in Western Region (WR) held on 28.03.2018 at POWERGRID, Gurgaon 1. The 19th Joint Co-ordination

More information

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region 1. Confirmation of minutes of 27th meeting held on 30.5.2009 1.1 Minutes of 27 th meeting was circulated

More information

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on 26.0.20 at CC, POWERGRID. The 6 th meeting of the Joint Co-ordination Committee of IPPs in ER was held at POWERGRID Office,

More information

Bangladesh s Power Sector : At a Glance

Bangladesh s Power Sector : At a Glance Bangladesh s Power Sector : At a Glance December, 2014 Installed Capacity (MW) : 10,709 De-rated Capacity (MW) : 10,130 Maximum Generation (MW) : 7,418 Total Consumers (in Million) : 15.4 Transmission

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

Opportunities for Methane Drainage & CMM Extraction in India. Peeyush Kumar Director (Technical) Ministry of Coal

Opportunities for Methane Drainage & CMM Extraction in India. Peeyush Kumar Director (Technical) Ministry of Coal Opportunities for Methane Drainage & CMM Extraction in India Peeyush Kumar Director (Technical) Ministry of Coal India s GDP: US$ 2.26 Trillion Mining Sector : 2.5%; Coal ; Contributes: about 57% of primary

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

Scaling Successful Mini-grid Programs: Experience of Bangladesh

Scaling Successful Mini-grid Programs: Experience of Bangladesh Frontier Developments in Mini-grids Scaling Successful Mini-grid Programs: Experience of Bangladesh Farzana Rahman Unit Head (Investment), Renewable Energy IDCOL, Bangladesh 6 December 2017 Abuja, Nigeria

More information

Indian Power System Framework

Indian Power System Framework R P SASMAL 1 ST JUNE 2016 Indian Power System Framework Electricity - A Concurrent Subject Both Central & State Govt. are responsible for overall development of Power Sector Generators Central Level Central

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region TRANSMISSION GROUP MERC 5 th August 2011 2 Actual Flows for Mumbai Peak FY12 ( 3209 MW) Tie Line Flows (Amp & MW) during Mumbai

More information

160 MVA 220 kv PTCUL. 5 MVA 161 kv GHANA. 315 MVA 400 kv M.S.E.T.C.L. 71 MVA 330 kv ZESCO

160 MVA 220 kv PTCUL. 5 MVA 161 kv GHANA. 315 MVA 400 kv M.S.E.T.C.L. 71 MVA 330 kv ZESCO Corporate Presentation IMP POWERS LTD. 315 MVA 400 kv M.S.E.T.C.L. 71 MVA 330 kv ZESCO 160 MVA 220 kv PTCUL 5 MVA 161 kv GHANA Disclaimer IMP POWERS LIMITED This presentation and the matter provided therein

More information

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

HIGH CAPACITY POWER TRANSMISSION CORRIDOR HIGH CAPACITY POWER TRANSMISSION CORRIDOR - PROJECT INCEPTION REPORT Power Grid Corporation of India Ltd. Gurgaon BACKGROUND 1. Pursuant to the introduction of Long Term Open Access (LTOA) in the inter-state

More information

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Date 20th December, 2018 NET PAYROLL DATA EPFO PROVISIONAL ESTIMATE OF NET PAYROLL IN AGE BUCKETS AS PER

More information

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017 RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017 Structure of Electricity Sector Generation & Policy Maker Regulator Power Transmission Distribution Producers Ministry of Energy & Mineral Resources

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT 1 GOVERNMENT OF ANDHRA PRADESH ABSTRACT PUBLIC SERVICES Employees Welfare Scheme Andhra Pradesh State Employees Group Insurance Scheme 1984 Revised Rate of Interest on accumulated Savings Fund Communication

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

By: Muhammad Usman Arshad Khan Head of Projects and Policy

By: Muhammad Usman Arshad Khan Head of Projects and Policy By: Muhammad Usman Arshad Khan Head of Projects and Policy Introduction to SME Business Support Fund Sharing of results Pre Audit conducted at Quaid-e-Azam (Kot Lakhpat) Industrial Estate Lahore Overview

More information

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2 Contents 3 Need for the project... 2 3.1. Project Background... 2 3.2. Energy mix and demand forecast... 2 3.3. 5000+ Project... 4 List of tables Table 3-1: Electric power generation sources and energy

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada Making Electricity since December 2015 Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada Cambridge 1 Company Culture Vision Woodstock TMMC's goal is to maintain a

More information

Metal Bulletin Conference

Metal Bulletin Conference Sakura Ferroalloys Project Metal Bulletin Conference Singapore, 01 st April 2015 P R E S E N T E D BY: T I A A N VA N A S W EG E N D I R E C TO R A S S M A N G C H A I R M A N S A KU R A F E R R OALLOY

More information

Joint presentation by: Lead investor EPC, O&M

Joint presentation by: Lead investor EPC, O&M Rwanda 8.5 MW project -the first utility-scale solar plant in East Africa 12 months from PPA to Interconnection - the quickest power project ever in Africa? Joint presentation by: Lead investor EPC, O&M

More information

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER NO. APGCL/CGM (G)/CTPS/Disposal/2018-19/01. DISPOSAL OF 2X30 MW CTPS UNITS INCLUDING MAIN PLANT AND BUILDINGS. The Chief General Manager

More information

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. 1. List of the participants is enclosed at Annex - I. Member (PS) CEA welcomed

More information

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN WORKSHOP ON SMALL WIND ENERGY AND HYBRID SYSTEMS & ITS RELEVANCE

More information

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013 Ensuring adequacy in the planning and development of Inter State Transmission System October 2013-1 - Ensuring adequacy in the planning and development of Inter State Transmission System Contents 1. Background

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

Ayeyarwady Integrated River basin Management Project (AIRBM)

Ayeyarwady Integrated River basin Management Project (AIRBM) Public Disclosure Authorized Public Disclosure Authorized I. GENERAL Ayeyarwady Integrated River basin Management Project (AIRBM) Procurement Plan 1. Project information a. Country/Borrower: Myanmar b.

More information

DL Shah Quality Award

DL Shah Quality Award Application for DL Shah Quality Award Submitted By: National Industries, Ludhiana Sector: Manufacturing- Small (other than Pharma & Food, Code- C2) Date of Submission: 31.12.14 1 Contact Details Company

More information

JOINT PRESS RELEASE BY MYHSR CORPORATION & SG HSR PTE LTD LAUNCH OF ASSETS COMPANY TENDER FOR THE KUALA LUMPUR SINGAPORE HIGH SPEED RAIL PROJECT

JOINT PRESS RELEASE BY MYHSR CORPORATION & SG HSR PTE LTD LAUNCH OF ASSETS COMPANY TENDER FOR THE KUALA LUMPUR SINGAPORE HIGH SPEED RAIL PROJECT JOINT PRESS RELEASE BY MYHSR CORPORATION & SG HSR PTE LTD Date: 20 December 2017 LAUNCH OF ASSETS COMPANY TENDER FOR THE KUALA LUMPUR SINGAPORE HIGH SPEED RAIL PROJECT 1. MyHSR Corporation Sdn Bhd ( MyHSR

More information

Performance of Wipro Limited for Quarter and Year ended - March 31, 2013

Performance of Wipro Limited for Quarter and Year ended - March 31, 2013 Performance of Wipro Limited for Quarter and Year ended - March 31, 2013 Suresh Senapaty Executive Director and Chief Financial Officer April 19, 2013 1 Financial Summary for the Year Ended March 31, 2013

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Operation Name: ROAD INFRASTRUCTURE

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region ----------------------------------------------------------------------------------------------------------------.

More information

Salalah Liquefied Petroleum Gas (SLPG) - Salalah LPG Extraction. Salalah Liquefied Petroleum Gas (SLPG) CB&I - Chicago Bridge & Iron Company

Salalah Liquefied Petroleum Gas (SLPG) - Salalah LPG Extraction. Salalah Liquefied Petroleum Gas (SLPG) CB&I - Chicago Bridge & Iron Company Project Summary Project of Client Salalah Liquefied Petroleum Gas (SLPG) - Salalah LPG Extraction Salalah Liquefied Petroleum Gas (SLPG) Budget ($ US) 650,000,000 Contract Value ($ US) 550,000,000 Award

More information

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur 1. Shri Ravinder Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E) Mumbai 400 093

More information

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Third Meeting of Taskforce 2, February 25-26, 2015; Colombo, Sri Lanka LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Surendra Rajbhandari Chief, Project Management Directorate,

More information

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg :Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.

More information

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015 Workshop on International Good Practices of Sustainable Energy Technologies Beirut Energy Forum 9-11 Sep 2015 Eng. Ziad Jebril Sabra Advisor to the Minister Ministry of Energy and Mineral Resources JORDAN

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

SOLAR PLANT PERFORMANCE IN INDIA

SOLAR PLANT PERFORMANCE IN INDIA Now Available SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Report (PDF) Data-set (Excel) India Infrastructure Research SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Table of Contents 1. Solar Power Sector Overview

More information

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5 ALANNA GILLIS ACTING COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL

More information

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA Public Disclosure Authorized Document of The World Bank Report No: 63374-IN Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN

More information

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay.

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay. Project: Mannapitlu Mini Hydel Scheme - 15 MW Overview: Mannapitlu Mini Hydel Scheme is the first of the 4 cascading Mini Hydro Electric Projects planned on Gurupur river in Dakshina Kannada District of

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Steel In The News. A compilation of leading news items on Indian steel industry as reported in major national dailies. Highlight of the Week 2

Steel In The News. A compilation of leading news items on Indian steel industry as reported in major national dailies. Highlight of the Week 2 Steel In The News A compilation of leading news items on Indian steel industry as reported in major national dailies CONTENTS Page Highlight of the Week 2 Raw Material 2 Company News 3 Projects 4 Steel

More information

Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia

Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia CONTENTS Background Renewable Resources Potential Institutional Framework Namibian ESI Current RE Procurement Status Challenges

More information

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016 स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) ¼ããÀ ã ÖñÌããè ƒêãñãä ã È ãšêôã ãäêããä½ã ñ Bharat Heavy Electricals Limited Industry Sector, Integrated Office Complex

More information

Business opportunities and major projects in India

Business opportunities and major projects in India Business opportunities and major projects in India Rajesh Sharma Vice President, Financing Why India? Fastest growing economy now and in future India to become one of the world's three largest economies

More information

EOL tvo'. Eo11)E cyj

EOL tvo'. Eo11)E cyj EOL tvo'. Eo11)E-16132.1cyj grregt-f-altffrtg (atr-{a- whii3t491-.j-0 urataftcr-414wf4arr4 at* s 284129 irt ar eei1ta01:0510-2412716, achoubey@bheljhs.co.in Expression Of Interest (E0I): "For Bending Of

More information

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX : Distribution List : 1. Shri Ravinder Member (Power Systems) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi-110 066 FAX : 011-26102045 3. CEO POSOCO B-9, Qutab Institutional Area Katwaria

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE South Asia Regional Workshop on Policies and Regulations to Increase Cross Border Energy Trade ( February 15-17,2012; New Delhi) RAM

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

(1) Current State and Issues of the Electricity Sector in Indonesia

(1) Current State and Issues of the Electricity Sector in Indonesia Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Java-Sumatra Interconnection Transmission Line Project (I) Loan Agreement: April 30, 2010 Loan Amount:

More information

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai 545-558 Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on 5-09-2014 at Mumbai 1.0 The 37 th meeting of the Standing Committee on Power System Planning

More information

Michigan Thumb Loop Transmission Line Project

Michigan Thumb Loop Transmission Line Project Michigan Thumb Loop Transmission Line Project ITC Holdings Corp. Simon Whitelocke VP., Regulatory and External Affairs October 30, 2013 What is Transmission? The electric transmission system is the network

More information

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development

More information

Tank Farm Additional Storage Site Layout

Tank Farm Additional Storage Site Layout MONTREAL TRUDEAU INTERNATIONAL AIRPORT MIFFC Fuel Committee Meeting Montreal Airport Marriott Hotel, June 15, 2017 Tank Farm Additional Storage Site Layout 1 Tank Farm Additional Storage - Construction

More information

Virginia Offshore Wind Port Readiness Study

Virginia Offshore Wind Port Readiness Study Virginia Offshore Wind Port Readiness Study Briefing to Virginia Offshore Wind Development Authority Richmond, VA 23 April 2015 George Hagerman VCERC Director of Research Virginia Tech Advanced Research

More information

Investor Presentation. For Official Use

Investor Presentation. For Official Use Investor Presentation For Official Use Exchange: A Competitive Market Exchanges provide a transparent, competitive and efficient platform for transactions in any market Stock or commodity. Same is true

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank Off-Grid Renewable Energy Program in Myanmar Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank 1 ADB Off-grid Renewable Energy Program Phase 1: (October 2013 June 2014)

More information

Horseshoe Bay Terminal Open House

Horseshoe Bay Terminal Open House Horseshoe Bay Terminal Open House July 5, 2007 Welcome Aboard The purpose of this Open House is to provide you with information and to receive your input for consideration on the Horseshoe Bay Terminal

More information

Mobilehome Park Utility Upgrade Program

Mobilehome Park Utility Upgrade Program Mobilehome Park Utility Upgrade Program A new opportunity for mobilehome communities PLEASE NOTE: Information reflects current advice letter filed with but not yet approved by the CPUC Commission Approves

More information

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites /

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites   / PRESS STATEMENT The Kenya Power & Lighting Company Limited (KPLC) has submitted an Application to the Energy Regulatory Commission (ERC) for approval of the proposed Electricity Tariffs and Tariff Structures

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

Progress and Challenges in Philippine Energy Sector Reform

Progress and Challenges in Philippine Energy Sector Reform Progress and Challenges in Philippine Energy Sector Reform A Presentation by: Lily Gutierrez Energy Policy Advisor Office of Energy and Environment Infrastructure for Rebuilding and Developing Countries

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676) P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting

More information

NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project

NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project 10 September 2015 Presented by: Louis Dewavrin and Angela Hobbs AGENDA

More information