DETAILS OF CONTRACTS AWARDED DURING THE MONTH ELECTRICAL DEPARTMENT (KAWR) Type of Bidding (Single/ Two Bid System) Last date of receipt of tender
|
|
- Antonia Long
- 5 years ago
- Views:
Transcription
1 DETAILS OF CONTRACTS AWARDED DURING THE MONTH Month : Jan ELECTRICAL DEPARTMENT (KAWR) 2 KR/KW/EL/AMC/T/17/14 Annual maintenance of pumping On Website, By Limited (I)M/s Power Nil Yes LOA M/s R.D.Electricals, 13,83,436/ installations and siren motors between notice Electric Service, Udupi, KR/KW/EL/ MAO. Asnoti station to Thokur station (both and (ii)m/s AMC/T/17/14 inclusive) plus RRM's camp office, R.D.Electricals, MAO. Dt: Mangalore under Karnataka section of Karwar Region of Konkan Railway. 4 KR/KW/EL/T/22/14 1. Provision of energy efficient split type airconditioners On Website, By Limited (i)m/s J.J. Nil Yes LOA M/s Kiran 8,46,390/ for SM's cabin at 1st floor, notice Refrigeration, Mumbai, KR/KW/EL/T Enterprises, Madagon station. (ii)m/s J.K. Electricals, /22/14 Bhatkal. 2. Provision of energy efficient split type airconditioners Madgaon and (iii)m/s Dt: for extended portion of Officers's Kiran Enterprises, rest house (ORH), Madgaon & replacement Bhatkal. of old window ACs with energy efficient split type air-conditioners at ORH,Madgaon. 3.Provision of energy efficient air-conditioners at Konkan Railway Academy (KRA) Bhatkal. 5 KR/KW/EL/T/20/14 1.Power supply arrangement & On Website, By Limited (i)m/s Alpha Nil Yes LOA M/s Devidas M. 17,93,412/ electrification of additional loop line notice Techno KR/KW/EL/T Ramawat, Thane. (phase II) at Thivim Railway station under Mumbai, (ii)m/s Nirakar /20/14 Karwar Region. 2.Power supply Engineering, Goa, Dt: (iii)m/s Devidas M. arrangement & electrification for Holiday Home at Karmali under Karwar Region. (iv)m/s Mahamaya 3.Power supply arrangement & electrification for second pitline (phase II) at Madgaon under Karwar region. 4.Power supply arrangement for 150 HP compressor at DRSD shed, verna under Mechanical Head. s Whether & er/ 1 KR/KW/EL/T/15/14 Modification of SCADA system of Barcem On Website, By Limited (i)m/s Infiniti Nil Yes LOA M/s Infiniti Digitech 5,81,198/ tunnel to incorporate feedback of DG and notice Digitech Pvt. Ltd., Pvt. Ltd., Mumbai. lighting parameters. Mumbai. KR/KW/EL/T /15/14 Dt: KR/KW/EL/T/19/14 Provision of power supply arrangement On Website, By Limited (i)m/s Mahamaya Nil Yes LOA M/s Om Electricals, 10,01,556/ & electrification of proposed High level notice Elecricals, Karwar, KR/KW/EL/T Karwar. platform on west side of existing main line /19/14 at Mookambika Road Byndoor station & Dt: Provision of 11KV GOS for alternate power Mumbai and (iii)m/s Om supply arrangement at Gokarna station. Page 1
2 Month : Feb 3 KR/KW/EL/AMC/T/18/14 Annual maintenance of pumping installations On Website, By Limited (i)m/s Om Nil Yes LOA M/s Om Electricals, 13,01,696/ and electrical motors between Pernem notice KR/KW/EL/ Karwar. station to loliem station (both inclusive) under (ii)m/s Mahamaya AMC/T/18/14 Goa section of Karwar region of Konkan Electricals, Karwar and Dt: Railway. (iii)m/s R.D.Electrical Woks, Madgaon. 4 KR/KW/EL/T/25/14 Power supply and electrification of escalator On Website, By Limited (i)m/s Nirakar Nil Yes LOA M/s Devidas M. 4,35,156/ at Madgaon station. notice Engineering, Goa, KR/KW/EL/T Ramawat, Thane. (ii)m/s Devidas M. /25/14 Dt: (iii)m/s Mahamaya Month : Mar 1 KR/KW/EL/T/21/14 Provision of power supply arrangement On Website, By Limited (i)m/s Alpha Nil Yes LOA M/s Alpha Techno 25,24,721/ & electrification for Sarzora station notice Techno KR/KW/EL/T building along with lighting arrangement Mumbai and (ii)m/s /21/14 Mumbai. for platform & circulating area, Kitchen & Nirakar Engineering, Dt: Dinning at KRA Madgaon, 3 rd floor of KRA Madgaon, 4 rooms at KRA Bhatkal, Toilets at LC 43, 45, 46, 47, 72, 89 & 92, & converted type-ii qtrs from type-iii (UD- 2 nos, BTJL- 2 nos, THVM - 4 nos) and provision of power supply arrangement for airconditioners at to two class rooms at KRA Bhatkal. 2 KR/KW/EL/T/27/14 1. Electrical works associated with On Website, By Limited (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 16,33,765/ improvement to existing passenger amenity notice KR/KW/EL/T facilities i.e widening of PF 1 at Udupi /27/14 railway station. Dt: Provision of power supply arrangement Mumbai and (iii)m/s & electrification for escalator at Udupi Shanthi Electricals, railway station. Udupi. s Whether & er/ 1 KR/KW/EL/T/23/14 Provision of ON GRID solar power system On Website, By Limited (i)m/s Olympus 01 M/s Power Yes LOA M/s Shree Aditya 18,80,800/ at Karmali Railway station in Karwar Region notice Power Pvt. Ltd., Pune Engineering and KR/KW/EL/T Solar System, and (ii)m/s Shree Aditya Automation Pvt. Ltd., /23/14 Panvel. Solar System, Panvel. Bangalore Dt: (Unsolicited ) 2 KR/KW/EL/T/24/14 Provision of escalator at Madgaon railway On Website, By Limited (i)m/s Johnson Nil Yes LOA M/s Johnson Lifts 73,00,000/ station. notice Lifts Pvt. Ltd., Chennai. KR/KW/EL/T Pvt. Ltd., Chennai /24/14 Dt: s Whether & er/ 3 KR/KW/EL/T/1/15 Provision of escalator from ground level to On Website, By Limited (i)m/s Johnson Nil Yes LOA M/s Johnson Lifts, 71,80,000/ RCC ramp in front of Udupi Railway station. notice Lifts, Mumbai. KR/KW/EL/T Mumbai. /1/15 Dt: Page 2
3 Month : Apr 1 KR/KW/EL/AMC/T/3/15 AMC for maintenance contract for 2 years for On Website, By Limited (I)M/s Devidas M. Nil Yes LOA M/s Devidas M. 58,33,408/ lighting arrangements provided for notice KR/KW/EL/ Ramawat, Thane. tunnels, substations, platforms, approach (ii)m/s Illumination AMC/T/3/15 roads & circulating areas from Enterprises, Mumbai. Dt: Asnoti to Thokur of Karnataka section under Karwar Region. 2 KR/KW/EL/AMC/T/4/15 AMC for maintenance contract for 2 years for On Website, By Limited (I)M/s Devidas M. Nil Yes LOA M/s Devidas M. 64,45,562/ lighting arrangements provided for tunnels, notice KR/KW/EL/ Ramawat, Thane. substations, platforms, approach roads & (ii)m/s Illumination AMC/T/4/15 circulating areas from Pernem to Loliem Enterprises, Mumbai. Dt: of Goa section under Karwar Region. s Whether & er/ Month : May 1 KR/KW/EL/T/13/14 Replacement of outlived / corroded GI lighting On Website, By Limited (i)m/s Apsara Nil Yes LOA M/s Apsara 4,86,072/ poles at pitline Madgaon. notice KR/KW/EL/T Electrical /13/14 Engineering Works, Dt: Karwar. Mumbai, (iii)m/s Nirakar Engineering, Goa and (iv)m/s Mahamaya 3 KR/KW/EL/T/7/14 Replacement of outlived overhead LT line by On Website, By Limited (i)m/s Om Nil Yes LOA M/s Apsara 8,37,298/ under ground cable at RRM's office, Karwar. notice KR/KW/EL/T Electrical (ii)m/s Mahamaya /7/14 Engineering Works, Dt: Karwar. (iii)m/s Apsara Electrical Engineering Works, Karwar and (iv)m/s Nirakar Engineering, s Whether & er/ 2 KR/KW/EL/T/2/15 Replacement of conventional type visibility On Website, By Limited (i)m/s Span Nil Yes LOA M/s Infiniti Digitech 6,92,932/ sensors by motorised type visibility sensors at notice Systems, Mumbai, Pvt. Ltd., Mumbai. Karwar & Barcem tunnels. (ii)m/s Infiniti Digitech Pvt. Ltd., Mumbai and (iii)m/s Jain System Mumbai. KR/KW/EL/T /2/15 Dt: Month : June Nil s Whether & er/ Page 3
4 Month : July 3 KR/KW/EL/T/11/14 Replacement of conventional lightning On Website, By Limited (i)m/s Mark Energy Nil Yes LOA M/s JMV LPS 7,14,708/ arrester by complete lightning & surge notice Solutions Pvt. Ltd., KR/KW/EL/T Limited, Noida. protection system for tunnel ventilation control Mumbai and (ii)m/s JMV /11/14 room & substation at Barcem tunnel. LPS Limited, Noida. Dt: s Whether & er/ 1 KR/KW/EL/T/7/15 1.Upgradation of power supply On Website, By Limited (i)m/s Nirakar Nil Yes LOA M/s Devidas M. 41,31,447/ arrangement for 6 th line at Madgaon notice Engineering,Goa, (ii)m/s KR/KW/EL/T Ramawat, Thane. Mahamaya Electricals, /7/15 station. Karwar. (iii)m/s Alpha Dt: Provision of power supply Techno Electricals, arrangement & electrification for C- Mumbai, and (iv)m/s schedule building at Madgaon. Devidas M. Ramawat, 3.Provision of power supply Thane. arrangement & electrification of parcel room at Madgaon station. 2 KR/KW/EL/AMC/T/5/15 Comprehensive Maintenance of Train On Website, By Open (i)m/s Dhara Rail Nil Yes LOA M/s Devidas M. 99,55,177/ Lighting (TL) Systems and Train Lighting (TL) notice KR/KW/EL/ Ramawat, Thane. Equipments in 108 Nos Train Lighting & 18 News AMC/T/5/15 Paper. Dt: Nos. Air Conditioned coaches at Madgaon Coach care Centre of Konkan Railway. Projects Pvt. Ltd., Mumbai and M/s Devidas M. Ramawat, Thane. Month : Aug 3 KR/KW/EL/T/6/15 Replacement of main LT control panel at On Website, By Limited (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 4,29,000/ KV substation, Verna. notice KR/KW/EL/T /6/15 Dt: Mumbai and (iii)m/s Nirakar Engineering s Whether & er/ 1 KR/KW/EL/AMC/T/9/15 Annual maintenance of AC units and water On Website, By Limited (i)m/s J.J. Nil Yes LOA M/s J.J. 15,36,598/ coolers in Goa section (Pernem station to notice Refrigeration, Navi KR/KW/EL/ Refrigeration, Navi Loliem station both inclusive) Mumbai and (ii)m/s J.K. AMC/T/9/15 Mumbai. Electricals, Madgaon. Dt: KR/KW/EL/T/8/15 Provision of standby DG set for 11KV On Website, By Limited (i)m/s Alpha Nil Yes LOA M/s Alpha Techno 33,75,000/ substation at Madgaon and Konkan Railway notice Techno KR/KW/EL/T Academy (KRA) at Bhatkal. Mumbai and (ii)m/s Fuji /8/15 Mumbai. technical Services Pvt. Dt: Ltd., Navi Mumbai. Page 4
5 Month : Sept 2 KR/KW/EL/T/16/15 Provision of ground mounted type single jet On Website, By Limited (i)m/s Color Design Nil Yes LOA 01 (i)m/s Color 5,05,291/ illuminated fountain near North bank of river notice India, New Delhi. KR/KW/EL/T Design India, New Zuari bridge (in Goa state) of Konkan /16/15 Delhi. Railway. Dt: KR/KW/EL/T/13/15 Lighting arrangement for 50 Nos. Of modular On Website, By Limited (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 5,80,251/ shelters at various stations under Karwar notice Electricals, Karwar and KR/KW/EL/T Region. (ii)m/s Nirakar /13/15 Engineering, Dt: Month : Oct Month : Nov s Whether & er/ 1 KR/KW/EL/T/15/15 Provision of Solar steet light at Off way side On Website, By Limited (i)m/s Shree Nil Yes LOA M/s Popular Solar 3,32,100/ platform at various station under Karwar notice System, Sirsi. region. s Adittya Solar Systems, Panvel and (ii)m/s Popular Solar System, Sirsi. KR/KW/EL/T /15/15 Dt: Whether & er/ 1 KR/KW/EL/T/17/15 Hiring of utility vehicle for day to day electrical On Website, By Limited (i)m/s Santhosh l. Nil Yes LOA M/s Santhosh L. 12,38,400/ maintenance activities under electrical depot notice Bandekar, Karwar. (KW-3 section) at Karwar. s Bandekar, Karwar and (ii)m/s Pramod S Naik, Karwar. KR/KW/EL/T /17/15 Dt: Whether & er/ 1 KR/KW/EL/T/19/15 Electrical works associated with construction On Website, By Limited (i)m/s Shanthi Nil Yes LOA M/s Megarail Power 15,13,099/ of ROB at Km 739/093 at Thokur. notice Electricals, Udupi, KR/KW/EL/T Projects LLP, (ii)m/s Nirakar /19/15 Thane. Engineering, Goa and Dt: (iii)m/s Megarail Power Projects LLP, Thane. Page 5
6 2 KR/KW/EL/T/11/15 Replacement of outlived and defective On Website, By Limited (i)m/s ABB India Nil Yes LOA M/s Mark Energy 20,10,000/ Vaccum circuit breakers of Barcem & notice Solutions Pvt. Ltd., Karwar ventilated tunnels Pune. 4 KR/KW/EL/T/18/15 1.Power supply arrangement for Food On Website, By Limited (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 18,27,660/ court at Madgaon. notice KR/KW/EL/T 2.Provision of power supply arrangement (ii)m/s Om Electricals, /18/15 & electrification for Holiday Home for staff Karwar and (iii)m/s Dt: Nirakar Engineering, at Karmali. 3.Provision of power supply arrangement & electrification of stores depot at Verna Phase 1 & II. 4. Electrical works for conversion of existing sky bus electrical sub-station into exhibition hall at Madgaon. 5 KR/KW/EL/AMC/TLAC/10/15 Comprehensive Maintenance of Air On Website, By Open (i)m/s Sidwal Nil Yes LOA M/s Sidwal 80,21,447/ Conditioned (AC) Systems and Air notice Refrigeration Industries, KR/KW/EL/ Refrigeration Conditioned (AC) Equipments in 20 Nos. AC News New Delhi. AMC/TLAC/10/1 Industries, New coaches at Madgaon Coach Care Centre of Paper. 5 Dt: Delhi. Konkan Railway and Escorting of AC Coaches between Madgaon & Mumbai CST. Month : Dec 1 KR/KW/EL/T/12/15 Relocating of transformer center along with On Website, By Limited (i)m/s Nirakar Nil Yes LOA M/s Nirakar 8,49,751/ overhead line for development works at notice Engineering, Goa and KR/KW/EL/T Engineering, Thivim station. (ii)m/s Mahamaya /12/15 Dt: Limited and (ii)m/s Mark Energy Solutions Pvt. Ltd., Pune. NO.KR/KW/EL/ T/11/15 Dt: KR/KW/EL/T/20/15 Replacement of old & outlived 70W HPSV On Website, By Limited (i)m/s Illumination Nil Yes LOA M/s Megarail Power 15,04,844/ fittings with energy efficient 24W LED fittings notice Enterprises, Mumbai KR/KW/EL/T Projects LLP, in Barcem tunnel. and (ii)m/s Megarail /20/15 Thane. Power Projects LLP, Dt: Thane. s Whether & er/ Page 6
DETAILS OF CONTRACTS AWARDED DURING THE MONTH ELECTRICAL DEPARTMENT (KAWR)
DETAILS OF CONTRACTS AWARDED DURING THE MONTH ELECTRICAL DEPARTMENT (KAWR) Month : December-17 Item/Nature of work Mode of Date of Type of Last date Nos. of Nos. and Nos. and Whether Contract & Date Contractor
More informationELECTRICAL DEPARTMENT
ELECTRICAL DEPARTMENT I. Electrical Department on Konkan Railway is headed by the Chief Electrical Engineer (CEE) who is assisted by two Deputy Chief Electrical Engineers and one Senior Electrical Engineer
More informationCommercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow
Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107
More informationReliable Reduction of Chemical Usage in Field Injection Pumps
Reliable Reduction of Chemical Usage in Field Injection Pumps Shawn French President, Voodoo Injection Management Ltd. Mark Scantlebury President and CEO, Extreme Telematics Corp. 2 ETC Background ETC
More informationVan Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015
Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8
More informationResearch Partnership Platform 8th meeting. Uber - The Competition Killer or The Competition Trigger?
Research Partnership Platform 8th meeting Wednesday, 5 July 2017 Room XVII, Palais des Nations, Geneva Uber - The Competition Killer or The Competition Trigger? Presentation by Mr. Shirish Deshpande Chairman
More informationGlendale Water & Power Smart Grid Project
Glendale Water & Power Smart Grid Project Key Dates in Project History Key Dates Project History On July 10, 2007, City Council directed GWP to develop a long term plan for smart meters On October 23,
More informationPROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)
Public Disclosure Authorized PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP) Revision 4.0 Public Disclosure Authorized I. General 1. Project Information Country Borrower Project Name Loan
More informationImplementation Status & Results India Mumbai Urban Transport Project (P050668)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Mumbai Urban Transport Project (P050668) Operation
More informationPCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project
PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan
More informationSYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions
SYSTEM INTEGRATION Railway and urban transport electrification Energy-efficient and reliable solutions 2 R A I LWAY & U R B A N T R A N S P O R T E L E C T R I F I C AT I O N S O L U T I O N S ABB s substation
More informationsoc-april13.xls BANK OF BARODA DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF APRIL 2013 Nos and names of parties qualified after technical
BANK OF BADA DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF RIL 203 Nos of s recorded not to lowest er / L Apr-3 BCC EM Premises & Facility Management Services for BST Building News Paper 8.03.3 System
More informationINTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.
Brescia Subway INTRODUCTION The origin of the project Metro Brescia comes from a decision of Brescia city council in 1987, when in accordance with the technical and economic examination of the various
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationBC Hydro System 2017 Annual Progress Report
March 14, 2017 Philip Augustin, P.E. Chair, Technical Studies Subcommittee 503-464-7783 philip.augustin@pgn.com Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, UT 84103-1114
More informationMobility Management: Caltrain
Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review
More informationProcurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency
More informationABB Wind Power Solution
Feng Li, Wind ISI, CNABB, November, 2016 ABB Wind Power Solution November 13, 2016 Slide 1 ABB deliveries from A to Z into the wind industry Wind power generation, transmission and integration, control
More informationPRODUCT BROCHURE. ABB Ability Wireless Monitor for surge arrester Enabling reliability and availability of power supply
PRODUCT BROCHURE ABB Ability Wireless Monitor for surge arrester Enabling reliability and availability of power supply ABB Ability Wireless Monitor for surge arresters is a remote condition monitoring
More informationPRAGATI ENGINEERING COLLEGE
Report on Industrial Visit to Power Grid 765/400 KV (GIS) Sub-Station No. of days of Visit : Two days Date(s) of Visit : 19 th September, 2017& 7 th October, 2017 Faculty In-charges : 4 Members 1. Mr.S.Ashokreddy,
More information3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay.
Project: Mannapitlu Mini Hydel Scheme - 15 MW Overview: Mannapitlu Mini Hydel Scheme is the first of the 4 cascading Mini Hydro Electric Projects planned on Gurupur river in Dakshina Kannada District of
More informationPower IT MV Live Tank Vacuum Circuit Breaker Model VBF
Power IT MV Live Tank Vacuum Circuit Breaker Model VBF ABB - a global leader in power and automation technologies ABB (www.abb.com) is a global leader in power and automation technologies that enable utility
More informationEnergy Produced by PV Array (AC):
4x17 2x16 400 x PHOTON SOLAR 4 x KACO new energy PH-250P-60 (HDS) INT 250 W Powador 30,0 TL3 15 ; 0 25,0kW Location: Climate Data Record: PV Output: Gross/Active PV Surface Area: Antalya Antalya (1961-1990)
More information100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD
EXECUTIVE SUMMARY 100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT 1. Location i) State : TAMIL NADU, ii) Locality : KOVILPALAYAM, POLLACHI iii) Latitude : 10 45 16.22 N iv) Longitude : 77 01 15.27 E
More informationSolar PV systems Roof Tops, Ground Mounted & Floating Platform, Grid Tied & Standalone. Solar PV Rooftop 140 kwp at BCP Mumbai
Solar PV systems Roof Tops, Ground Mounted & Floating Platform, Grid Tied & Standalone Solar PV Rooftop 140 kwp at BCP Mumbai 22.08.2017 AUTONIC at a glance Autonic Energy Systems Pvt. Ltd. was incorporated
More informationTABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.
TABLE C-43. Manufacturers' new and unfilled orders, -74 {Amounts in millions of dollars] New orders t, I960. 27, 559 26, 903 30,672 30,115 31,086 33,005 35,322 37,952 41, 803 45, 944 46,763 50, 243 53,
More informationSIAM Viewpoint for improved Inspection & Maintenance in India GITE Regional Workshop on Transport Sector Inspection & Maintenance Policy
Viewpoint for improved Inspection & Maintenance in India GITE Regional Workshop on Transport Sector Inspection & Maintenance Policy 10 th -12 th December 2001 Bangkok Indian Scenario Two types of I&M programmes
More informationCABLE INSTALLATION PROJECTS
SPPA Contract No. 9120482 - Supply & Installation of 230kV XLPE Power, Auxiliary & Accessories (NDC 122 - Route A & C) 10.5km Jun 2015 Viscas Engineering Singapore SPPA Contract No. 9120326 - Supply &
More informationCHAPTER 6 POWER SUPPLY ARRANGEMENTS
6.1 Power Requirements CHAPTER 6 Power supply is the lifeline of Metro System POWER SUPPLY ARRANGEMENTS Electricity is required for operation of Metro system for running of trains, station services (e.g.
More informationDetail of Contracts Concluded during the month of February 2015 by TBMM, Noida
344E169 [0] BSPGCL BARAUNI EXTENSION TPS AIR CONDITIONING EQUIPMENT LT 1-Dec-14 Two 12-Dec-14 1 1) Comfort Systems 344P211 6-Feb-15 Comfort Systems 11.62 31-Jul-15 against BSPGCL BARAUNI EXTENSION TPS
More informationPRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN
PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN WORKSHOP ON SMALL WIND ENERGY AND HYBRID SYSTEMS & ITS RELEVANCE
More informationReference List B: High frequency Motor-Generator Sets: (Capacity above10kva) Ref.No Customer name Equipment supplied/motor kw Date of supply
ANAND ENGINEERING CORPORATION Block No. 7, Luxmi Wollen Mills Compound, Dr E. Moses Road, Mahalaxmi, Mumbai 400 011. www.anandengg.com Tel: 91 22 2497 3325 Manufacturers of: A.C. GENERATORS D.C. MOTORS
More informationSIPRO TECH. A-502,Yasho Narayana Building, Near Panvel Railway Station, Old Panvel, NaviMumbai Ph.no: / ,
Sipro Tech is established in Jan 2008. COMPANY PROFILE The firm is mainly engaged in carrying out all type of Engineering Design works such as detail Engineering of Electrical Systems & Control Panels
More informationNJ Solar Market Update As of 6/30/15
NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately
More informationRESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA
Public Disclosure Authorized Document of The World Bank Report No: 63374-IN Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN
More informationDETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI
DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings
More informationBusiness opportunities and major projects in India
Business opportunities and major projects in India Rajesh Sharma Vice President, Financing Why India? Fastest growing economy now and in future India to become one of the world's three largest economies
More information2018 Annual Progress Report to WECC Pacific Gas and Electric Company
2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,
More informationSubway Modernisation
Subway Modernisation IMechE Presentation, February 2014 Charles Hoskins, Director Projects Contents Overview The Past our origins The present..our challenges and opportunities The future...our modernisation
More informationABB Innovation & Technology Day
AUBURN HILLS, SEPTEMBER 6, 2017 Writing the digital future takes ability. ABB Ability. ABB Innovation & Technology Day Guido Jouret, CDO Important Notices Presentations given during the ABB Innovation
More information[Amounts in millions of dollars] Nondurable. Total. goods. equipment 34,415 30,717 24,506 8,868 9,566 8,981
1970 TABLE C-44. Manufacturers 1 new and unfilled orders, 1947-69 Unfilled orders2 Unfilled orders-shipments Machinery and equipment 1947.. 1948.. 1949.. 23,53.3 3 3 4 3 1961 * 31,085 15,698 17,026 18,522
More informationYield Reduction Due to Shading:
x9 31 x SunPower 1 x Power-One SPR-E0-37 37 W TRIO-8.5-TL-OUTD 10 ; 1x13 1x13 1 x Power-One 10 ; -30 7.5kW 9 x SunPower 1 x Power-One SPR-E0-37 37 W 10 ; 59 7.5kW 7 x SunPower 1 x Power-One SPR-E0-37 37
More informationALLAHABAD CITY RAILWAY STATION Allahabad (Uttar Pradesh)
First Prize Railways Stations Unit Profile ALLAHABAD CITY RAILWAY STATION Allahabad (Uttar Pradesh) Allahabad city railway station was established in the year 1967 and is under Varanasi division of N.E.
More informationPacific Gas and Electric Company s Revised 2016 Annual Progress
March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric
More informationFINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010
FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009
More informationKANPUR ELECTRICITY COMPANY LIMITED
April 26, 2016 KANPUR ELECTRICITY COMPANY LIMITED Report Card for 2015-16 Profile KESCO was formed on 15 jan 2000 as a subsidiary of UPPCL to take care of power distribution work of Kanpur city. KESCO
More informationGeneration Interconnection Facilities Study For
Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...
More informationOverview of Mitsubishi Electric's Transportation Business & Power Device Technology January, 2017 Mitsubishi Electric Corporation
Overview of Mitsubishi Electric's Transportation Business & Power Device Technology January, 2017 Mitsubishi Electric Corporation COMPANY PROPRIETARY NOT TO BE REPRODUCED OR DISCLOSED WITHOUT SPECIFIC
More informationCHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF
CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF 9.1 POWER REQUIREMENTS 9.2 NEED FOR HIGH RELIABILITY OF POWER SUPPLY 9.3 SELECTION OF TRACTION SYSTEM 9.4 SOURCES OF POWER SUPPLY 9.5 AUXILIARY
More informationJayBee List of major contracts in O&G sector executed/executing
List of major contracts O&G sector executed/executg For OIL and other Private E&P companies by M/s JayBee Energy Private SL NO 01 DETAILS OF CLIENT Oil Area of Works Nature of Works Hirg of services for
More informationEGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)
WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment Open House Martin Grove Road to Pearson International Airport September
More informationPower IT MV Live Tank Vacuum Circuit Breaker. Model OVB-SDB
Power IT MV Live Tank Vacuum Circuit Breaker Model OVB-SDB ABB - a global leader in power and automation technologies ABB (www.abb.com) is a global leader in power and automation technologies that enable
More informationS.No Name and Address of the Bidder Qualified Not Qualified Reasons / Remarks. 5 HP A/C - Submersible
NREDCAP :: HYDERABAD Statement showing the Evaluation of Technical Bid for supply and installation of Solar PV Pump Sets in AP in the e - Tender Notification dated:30/04/2016. S.No Name and Address of
More informationCompressor Enclosures. Motorised Sliding Doors. Air Handling Units, Ventilation Systems & Ducting. IP56 Genset Enclosures for offshore application
Product Line Military Application Project Modular Enclosures Containers Generators Pumps Power supply for Missile Launcher System Power supply for Radar Control System Vehicle mounted mobile workshop vehicle
More informationNOVAE MANUFACTURING SOLUTIONS PRIVATE LIMITED
NOVAE MANUFACTURING SOLUTIONS PRIVATE LIMITED Introduction NMS Solar is a registered trademark of Novae Manufacturing Solutions Pvt. Ltd. and doing several of solar solutions. EPC and I & C projects with
More informationANCR CRU Statistics February 2007 to December 2007
ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior
More informationSUBSTATION DESIGN TRAINING
2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near
More informationOnix Structure Private Limited. Solar PV Power Generation System Detailed Project Report
Onix Structure Private Limited Solar PV Power Generation System Detailed Project Report 1 Main Features of the Project Project promoter:- Onix Solar Project location:- Village - Rojasar, Tehsil - Limbdi
More informationEnergy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director
Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D
More informationProcurement Plan ECSEE APL3 - Republic of Macedonia Project. Procurement Method [**] Scope [***] Bid Docs sent. Total cost. G & Supervision ICB
losure Authorized Package December 2009 works VAT and duties Component 1: Expansion 400/110 kv SS Skopje 5 P1 TR-SS Procurement 400/115/(10,5) kv Power Transformer for SS Skopje 5 P2 HVE-SS Procurement
More informationAgenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region
Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity
More informationNIT for Tender No. GCO 8644P13
NIT for Tender No. GCO 8644P13 Oil India Limited, a Government of India Enterprise intends for hiring the Electrical Maintenance services by a team comprising of 1 (one) Electrician (with valid electrician
More information3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009
3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009 Nitrogen emission data, as well as the model results presented here have been approved by the 35 th Session of the Steering Body of EMEP in Geneva
More information` Table 1: Status of Kuthur PHC... 2 Table 2: Source and Quality of Power at Kuthur PHC... 2 Table 3: Average Metrological Data of the Site at Kuthur
` Table 1: Status of Kuthur PHC... 2 Table 2: Source and Quality of Power at Kuthur PHC... 2 Table 3: Average Metrological Data of the Site at Kuthur PHC... 2 Table 4: Solar Irradiation Data of the Site
More informationMotor Protection Circuit Breaker
Motor Protection Circuit Breaker Catalogue 2011 CONTENT Introduction...4 Features...4 Parts Identification...5 Technical information (MPCB)...5 Technical information (Aux. contact, Fault signalling contact)...6
More informationApplication and Prospect of Smart Grid in China
Application and Prospect of Smart Grid in China Wang yimin State Grid Corporation of China Washington DC May 31, 2013 1 1.Roadmap 2015-2020 2009-2010 Planning and Pilot 2011-2015 Roll-out Construction
More informationExample printout. Building project. SDC Example. Dyfi Eco Park SY20 8AX Machynlleth UK. Mr C. Laughton Phone:
Building project SDC Example Dyfi Eco Park SY20 8AX Machynlleth UK Contact person: Mr C. Laughton Phone: 01654 700324 E-Mail: software@solardesign.co.uk Results of annual simulation Installed collector
More informationSmall Scale Generation Connections
RP5 STAKEHOLDER EVENT Small Scale Generation Connections 6 June 2011 Presentation Approach General background with respect to small scale generation connections Anticipated level of connection applications
More informationTVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies. Gerald Johns, P.E. Power Utilization Engineer, TVA
TVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies Gerald Johns, P.E. Power Utilization Engineer, TVA 1 TVA Comprehensive Services Power Factor Studies/Recommendations
More informationSELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS. BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd.
SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd. ALTERNATIVES TRACTION SYSTEMS AC Traction DC Traction 25 KV 50
More informationTackling Power Theft through Meter Data Management and Quality Analysis. Results from NPCL s AMR roll out and AMI trial
Tackling Power Theft through Meter Data Management and Quality Analysis Results from NPCL s AMR roll out and AMI trial R. C. Agarwala 23 rd May 2013 NOIDA POWER COMPANY LIMITED Greater Noida, India 1 NPCL:
More informationYield Reduction Due to Shading:
x Fronius International NA-E35L5 35 W FRONIUS IG Plus 20 V-3 2 0,0kW x Fronius International NA-E35L5 35 W FRONIUS IG Plus 20 V-3 4 0,0kW 84 x SHARP Corporation x Fronius International NA-E35L5 35 W FRONIUS
More informationIndian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME)
Indian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME) Indian Railways Indian Railways 3rd largest network, 66,500 RKM, 8495 stations
More informationCopyright 2016 Boeing. All rights reserved.
Boeing s Commercial Crew Program John Mulholland, Vice President and Program Manager International Symposium for Personal and Commercial Spaceflight October 13, 2016 CST-100 Starliner Spacecraft Flight-proven
More information4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority
,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division
More informationJAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE
JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine
More informationMicrogrid solutions Delivering resilient power anywhere at any time
Microgrid solutions Delivering resilient power anywhere at any time 2 3 Innovative and flexible solutions for today s energy challenges The global energy and grid transformation is creating multiple challenges
More informationOverview Gas Insulated Switchgear Modular and flexible, kV. ABB Group April 17, 2009 Slide 1
Overview Gas Insulated Switchgear Modular and flexible, 52-1100kV April 17, 2009 Slide 1 Tradition and Innovation Milestones from more than 40 Years of Experience Pioneer & Leader in GIS-Technology 1956
More informationMaster Class on PVsyst Solar Project Designing Tool 7 th June 2013
10-06-2013 Master Class on PVsyst Solar Project Designing Tool 7 th June 2013 Objectives Fundamental aspects of PV system design Performance assessment of PV systems PVSyst simulation process PV array
More informationTABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.
1970 TABLE C-4. and inventories in manufacturing, 1947-69 Inyentories i 1947 1948 1949 1950 1951 195 1953 1954 1955 1956 1957 1958 1959 35,60 54,33 5,507 59,8 70,4 7,377,1 89,05 86,9 1.4 16,16 1,714,59
More informationBC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014
1 BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada IEEE PES Meeting July 2014 General BC Hydro Overview Crown Corporation Serving about 95% of province and 1.9 million customers
More informationList of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007
to: details Version: 2007 Technical Rules 1 16-Jan-08 2 16-Jan-08 3 29-Jan-08 Neerabup (two generating units - Units G11 and G12) Neerabup (two generating units - Units G11 and G12) Bluewaters Power Station
More informationOverview Gas Insulated Switchgear Modular and flexible, kV. ABB Group May 15, 2013 Slide 1
Overview Gas Insulated Switchgear Modular and flexible, 52-1100kV May 15, 2013 Slide 1 Tradition and Innovation Milestones from more than 40 Years of Experience Pioneer & Leader in GIS-Technology 1956
More informationThe $600 Million Rebirth of San Diego Trolley
The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and
More informationMECHMAARK GROUP OF COMPANIES MECHMAARK RENEWABLE ENERGIES PVT.LTD.
MECHMAARK GROUP OF COMPANIES MECHMAARK RENEWABLE ENERGIES PVT.LTD. HEAD OFFICE ADDRESS: L-20, II Floor, Street No.- 7, New Mahavir Nagar, New Delhi 110018 PH- 011-32674311, 25996571 Email: delhi@mechmark.in
More informationenincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series
Railway Electrification Market Opportunities in India 2018 Estimating $ 5000 Million Opportunity Spread for Value Chain Players by 2020 by tracking opportunity tune for EPC players, Original Equipment
More informationDETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)
DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION
More informationMSU Mankato and Ameresco. GESP Project. August 29, Ameresco, Inc. 2017, All Rights Reserved
MSU Mankato and Ameresco GESP Project August 29, 2017 Agenda Campus Utility Baseline GESP Review and Summary Sustainability Overview Energy Savings Achieved Overview of the Project Time Table Financial
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q2 Quarterly Update #13 October 1 December 31, 2017 JPB Board Meeting February 1, 2018 Agenda Item # 8b Electrification - Infrastructure Progression of
More informationNJ Solar Market Update As of 2/29/16
NJ Solar Market Update As of 2/29/16 Prepared by Charlie Garrison March 24, 2016 SOLAR INSTALLED CAPACITY DATA The installed solar capacity as of 2/29/16 is approximately 1,644.3 MW. Approximately 20.3
More informationEmployees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India
Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Date 20th December, 2018 NET PAYROLL DATA EPFO PROVISIONAL ESTIMATE OF NET PAYROLL IN AGE BUCKETS AS PER
More informationPOWER SYSTEM CONSULTANTS POWER-LINKER
GROUP POWER SYSTEM CONSULTANTS POWER-LINKER REFERENCE LIST : CONDITION MONITORING TESTING Given below is a list of Condition Monitoring Testing job executed by us: SR. 132.0 Petronet LNG Ltd., Dahej 131.0
More informationMicro-Grid and Battery Energy Storage Technologies for Large Scale Renewable Energy Integration
Micro-Grid and Battery Energy Storage Technologies for Large Scale Renewable Energy Integration Int l Seminar on Energy Storage Options for Renewable Energy Integration at India Habitat Centre, New Delhi,
More informationMERCRUISER AND MERCURY RACING (STERNDRIVE) SERVICE MANUAL INDEX
MERCRUISER AND MERCURY RACING (STERNDRIVE) SERVICE MANUAL INDEX Mercury MerCruiser 1 90 68648 Feb 1986 Engines & Drives 1963 1973 90 73033 Jet Drive 400 1975 2 90 71707 Feb 1986 Engines, Drives & Jet Drive
More informationP.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)
P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting
More informationInverse-Time Overcurrent & E/F Relays. Type ICM 21, ICM 21B
Inverse-Time Overcurrent & E/F Relays Type ICM 21, ICM 21B ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve
More informationDistribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014
Distribution Capacity Impacts of Plug In Electric Vehicles Chris Punt, P.E. MIPSYCON 2014 1 Outline EV Benefits EV Growth Where are we today? Where are we going? Potential Distribution Capacity Issues
More informationFormerly known as The Calcutta Tramways Co.(1978) Ltd. (Government of West Bengal Undertaking )
Tender No / EOI No : As per Tender Estimated cost : As per Tender Time of Completion : AS PER TENDER Earnest Money : As per Tender Location : AS PER TENDER Details : AS PER TENDER WEST BENGAL TRANSPORT
More informationNOVA Gas Transmission Ltd. Appendix 2: 2013 Facility Status Update (December)
Appendix 2: Facility Status Update () This section describes the current status of facilities that were applied for, are under construction or have been placed on-stream since the 2012 Annual Plan was
More information