1 Name of Substation Date of Audit Observations/Remarks 00kV Thrichy SS..0 The old electromagnetic/static relays may be replaced with numerical relays. The possibility of testing relays as per schedule may be explored. Existing 0 V set- Batteries may be enhanced to adequate capacity. It was informed that action has been initiated. 00kV Salem SS(IS)..0 The existing static distance protection relays of 00 kv feeders may be replaced with numerical relays 0kV Madurai SS..0 Possibility of providing time synchronising system (GPS unit) for protection relays. The existing static distance protection relays to be replaced with numerical relays. Dedicated Event logger may be provided for post tripping analysis. The existing KVA DG set may be enhanced to 0 KVA. An additional V battery set may be provided for reliable PLCC operation. The partially damaged RCC equipment support structure may be attended on urgent basis. 0kV Pugalur SS 0..0 Possibility of providing CB for sectionalised bus may be explored. DG set capacity may be enhanced to 0 KVA from KVA by providing additional KVA DG set. Fire extinguisher system of the power transformer may be enhanced. GPS system may be installed for synchronising relays. Better protection infrastructure facilities like Event Logger Disturbance Recorder with dedicated computer systems, printers (As of now only one system available). 0kV Kundah-(Gen) kv GC Breaker may be erected and commissioned urgently to avoid tripping of tie feeders in the event of tripping of auto transformers 0kV Kundah-(Gen).0.0 sets of Las have been provided at bus only. Second core of Bus VT has been used for line protection. Line CVTs are only for synchronising purpose. 0kV Pykara Ultimate SS(Gen).0.0 DC leakage observed in the station. Yet to be attended. 0kV Tudiyalur SS kV Warangal SS kV Ramagundam SS(IS), &.0.0 Distrubance Recorders (ABB, INDACTIC) not having GPS time synchronisation (for 00 kv Warangal Line, 00 kv Gajwel Line, 00 kv Malkaram Line, 00 kv Hyderabad Line #, 00 kv Hyderabad Line # ), 00 kv Dichipalli Numerical relay (DR) not having GPS time synchronisatiion. Distrubance recorder of 00 kv Nagarjunasagar- sent for repair. However, built-in DR available with the relay MICOM. DC supply-ii: +ve to Earth voltage measured is V, -ve to Earth voltage measured is -0 V. Over current & earth fault protection enabled in Chandrapur - & and N'Sagar & as per instructions of NTPC CC (Mail copy verified) CT ratio test results for Dichipalli (Tie & Main), Auto- (Main & Tie), Auto- (Main & Tie), Hyderabad- (Main & Tie), Hyderabad- (Main & Tie), Warangal (Main & Tie), Main & Tie Cts of Gen-, Gen-, Tie-, Tie- will be submitted to SRPC, Bangalore by NTPC Ramagundam subsequently. CVT test results for Warangal, Auto-,, & and Hyderabad & will be submitted to SRPC, Bangalore by NTPC Ramagundam subsequently. NTPC Ramagundam has confirmed that copy of recommended/adopted relay settings for all the feeders will be submitted to SRPC, Bangalore subsequently. Time synchronising system (GPS), Distrubance Recorder (DR), Event Logger (ER), Synchro check relay not available in the station.

2 00kV Neyveli TS-II SS O/V protection for stage-ii may be considered for instantaneous trip nd source for V PLCC battery system may be considered. Record of relay setting approved by competent authority is to be made available 00kV NeyveliTS-II Expn Ss Switchyard, control room and battery room are maintained neatly. However, the access way to the battery bank- is found with dumped store material. Replacement of rushed cable trays in the switchyard duct is under progress. One set of Siemens make SF CT in 00 kv for Pondy feeder has been installed with gas monitoring facility. Test reports and registers for periodical testing of relays, equipment and earth mat are maintained properly. Separate auto-reclose relays are available for all the feeders except 00 kv Pugalur-I feeder which has the built-in auto-reclose facility in the numerical relay on selection of Main-I and Main-II. Siemens network client for monitoring the relay settings and actuation with disturbance and event recorder (Siemens DIGSI software) is available. All the relays including the front panel can be viewed from the operator's desk. Oil leak was noticed on ICT- & ICT-. The record of relay settings approved by competent authority to be made available. Efforts hall be taken for arresting oil leak on ICT- & ICT-. The view of NLC in regard to 00 kv auto reclosing scheme and UFR review is received and enclosed. 00kV NeyveliTS-I Expn Ss Switchyard equipments and yard maintained neatly. Relay panel and battery rooms are maintained properly Available GPS clock not synchronised with the protective relays Setting approval for the relays not available Test report documents are only in hand written register Only one black of V battery for PLCC is available. As dedicated Event logger for switchyard events not in service, the events are logged with GPS time stamping in Main plant ABB make DCS, Separate A/R (static) relay from M & M protections is found in use. The inbuilt A/R facility available in M protection is found not used. GPS time to be synchronised with the protection system. Existing micro mho distant protection (Main I) relays to be retrofitted with numerical relays. Record of relay setting approved by competent authority is to be made available Periodical testing of all the relays and switchyard equipments to be done - there is no test record for a few relays/equipments after commissioning 0kV Tandur Ss(IS).0.0 Diesel set has to be commissioned. APTRANSCO should have two independent DC sources to the protection and switchgears and one source should be for back up. Carrier aided protection scheme has to be implemented.

3 & 00kV Mamidipalli SS & 0kV Mamidipalli SS.0.0 The 00 kv and 0 kv Line Panels, Main-I (ABB REL00) and Main-II (ABB RAZFEE) relays are to be replaced by the latest version numerical relays for the following reasons: a) The existing relays are very old. The manufacturer has stopped production and services. b) DR facility is not available in the existing relays. c) REL 00 relay will not show the distance of fault sometimes. d) The DEFR protection has to be enabled in any one of the relays (Main-I or Main-II) as per CBIP guidelines, but they cannot be initiated with the existing relays. Need to adopt uniform protection philosophy. Event logger is not available for 00 kv feeders. Carrier aided protection is not implemented for some of the 0 kv feeders. The existing old analog meters in the control room are to be replaced by Digital Meters (for critical parameters). Remote analog temperature indicators are to be replaced with digital meters. Adoption of different parameters (R&X) for transmission lines using same conductor by APTRANSCO and Power Grid. This requires fresh look as it affects the Zone-, Zone-II and Zone-III distance protection scheme for transmission lines. Closed circuit cameras may be arranged at strategic points inside the switchyard as well as along the fencing of the substation to monitor any critical situation insie and to keep vigilance on outside elements for taking view of changing security threat perceptions to substation. 00kV Nellore SS(IS) 9, kv Nellore SS 9, kV Simhapuri SS kV Meenakshi SS.0.0-0kV T.K.Halli SS 0..0 To provide Bus bar protection for 0kV Bus system at the earliest. To provide GPS synchronisation for 0kV protection system. All the elements in the yard and earthing may be identified. 0kV Subramanyapura SS 0..0 To provide Bus bar protection relays for 0kV system. To provide GPS synchronised system for 0kV protection. 0kV Kadakola SS(IS) 0..0 Recommended to put 0 kv busbar protection system in service at the earliest possible. Recommended to provide time synchronising system (GPS) for protection system. 0 kv Vrushabavathi S/S kv Lines provided with Main I only, Main II protection to be provided. GPS not available, to be provided for time synchronisation. 00kV Jundal SS The over voltage stage - and stub protection functions for 00 kv lines may please be 0..0 enabled for better protection schemes.

4 00kV Guttur SS 0..0 Eventlogger and Time synchronisations facilities are not available. 00kV Hiriyur SS kV STCMS SS(Gen) kV PP Nallur SS(Gen) kV Kalpakkam SS(Gen) kV Shamshabad SS 0..0 ICT- differential, bus bar relays and some of 0 kv lines distance relays are static type relays and are not having the disturbance recorder facilities and hence replacement of the same with numerical type relays may be examined as there is no separate DR facilities. Condition based maintenance like Capacitance & tan delta, Leakage Current Monitoring of Las, DGA, DCRM tests of switchyard equipments may be carried out as per the requirements. SOTF time delay has observed high and same may be examined as per the requirements. The record of CT & CVT ratio test results for old bays which was commissioned in 99 are not available and hence measured values and error calculation for CT & CVT is not mentioned for some base in the format. Atmospheric conditions as specified by the manufaturers of relays may be maintained for smooth operation of relays like cooling system which is observed insufficient. Station is generally found to be in order Replacement of the following static relays by numerical relays may be examined a) Distance relay type LZ9 ABB make b) Busbar protection relay The audit is found beneficial to ST-CMS to confirm about the integrity of the protection functions and maintenance of test records. ST-CMS felt that advance written information may be given before conducting such audits Switchyard, battery room, control rooms are maintained neatly. Most of the records & commissioning reports are available & furnished. The test reports of CT, CVT & CB are to be furnished. The stability test conducted was confirmed orally however no records could be verified Synchronizing relay details to be furnished. Latest Tested dates of Line protection Relays MI, MII, LBB & PLCC are to be furnished Line Parameters for Acharpakkam & Bhavini are yet to be furnished. Recommended line protection relay settings with the latest fault levels and the adapted settings could not be verified. The revised recommendations & copy of adapted relay settings to be submitted by MAPS, NPCIL The Line CVT in the Y phase of the feeder was not available in all the feeders except SP koil : To be reviewed The pending details will be submitted shortly by MAPS, NPCIL. Bus bar protection is not available and in turn there is no LBB protection for circuit breakers. The older version Main- relays (REL-*) for both 0 kv feeders may be replaced with upgraded versions for quick analysis of the faults and access to the relay configuration. Only one set of 0 v battery bank is available. 00 MVA PTR- remote temperature indicator is not functioning. 00 MVA PTR- LV over flux relay is not available.

5 0kV HAIL SS 0..0 Earth leakage observed, the same may be rectified. 0kV Shapoornagar SS 0..0 Over flux relay is to be provided on HV side of 0/ kv, 00MVA PTR, 0 MVA PTR &. Carrier aided protection scheme has to be implemented. Precommissioning test reports of CT & CVT are not available to record the percentage ratio error & ratio measured. & 00kV Malkaram SS & 0kV Malkaram SS kV ITPL SS 0..0 DC Main battery, +ve ground is observed & the same may be rectified. The distance protectio-main-i and Main-II and busbar protection - periodic testing not conducted so far from commissioning. The same may be tested immediately for the healthyness of the above system. PLCC / Protection Coupler not in service. The same may be put into service. 0kV Hoody SS..0 Main-II relays not available in all 0 kv feeders. The same to be provided. PLCC / Protection Coupler not provided in all 0 kv feeders. The same to be provided. CVT not provided in all phases of all feeders in 0 kv feeders. The core CTs are provided in 0 kv feeders. The same may be replaced with core CTs. 00 kv Hoody SS..0 Main-II protection not provided in 0 kv feeders instead Backup protection are provided. Protection Couplers are not provided in the 0 kv feeders. Busbar protection is not provided in the 0 kv systems since old and new stations share the common 0 kv Bus & CT's of the old station do not have separate core for Busbar protection. 9 0kV Sriperumbudur SS.0.0 Static THR relay - Main-II Vallur - I & II feeder has been replaced - retrofitted with REL 0 N relay. Because of i) Ma-operation of Zone- and Faulty. Ii) Mal-operation of Zone- and Zone- and Zone-, tripping time delay might be kept uniform throughout all feeders at Sriperubudur. (Other Main Zone- other Zone tripping including the reverse sign is not uniformly adjusted and to be reviewed.) 0 & 00kV kalavindapattu SS(IS) & 0kV kalavindapattu SS kv feeder Zone- and Zone- trip timings are 0 m sec and 00 m sec. where as in TNEB it is 0 m sec and 00 m sec. This may be looked into. 00kV Vallur SS.0.0-0kV Areakode SS 9..0 The existing Main- (Electrostatic Quadramho) Distance Relays should retrofitted with latest version Numerical Relays for easy and quick analysis of the faults. Over flux protection is not available 0/0 kv, 0 MVA Transformer. Possibility of using separate DC Sources for Main- & Main- may be explored for reiability of DC supply. 0kV Kaniyampeta SS 0..0 Bus bar protection is not available. The 0 kv line's Main I (Electrostatic QUADRAMHO) Distance Relays should retrofitted with latest version Numerical Relays for easy and quick analysis of faults. DG Set is not available. Only one set of Battery charger and battery set is available.

6 0kV Mettur TPS SS(Gen).0.0 Both Main-I and Main-II protection schemes are fed from one DC source. Periodically DC source is switched manually to second DC source. No protection coupler available for MTPS-Stage-III and MTPH feeders. Synchronisation cores of Line VT and Bus VT are of different voltage ratios. Time synchronization facility for global common timer reference is not available at the substation which is given in CEA (Measures relating to Safety and Electric Supply) Regulations, 00 under section, clause -(viii). On 0 kv feeders except MTPS-Stage-III feeder, Main-II relays are of static type, but as per CEA (Technical Standards for Connectivity to Grid) Regulations, 00 under Part-III, Section-, both Main-I and Main-II distance relays are to be of numerical type. 0kV Gobi SS 0..0 As neutral bushing CT is not available for Auto transformer, REF protection is not made available. Time synchronization facility for global common timer reference is not available at the substation which is given in CEA (Measures relating to Safety and Electric Supply) Regulations, 00 under section, clause -(viii). On 0 kv feeders except Arasur feeder Main-II relay is static type, bus as per CEA (Technical Standards for Connectivity to Grid) Regulations, 00 under Part-III, Section-, both Main-I and Main-II distance relays are to be of numerical type. Main-I & Main-II Numerical relays provided on 0kV Arasur feeder are of same make and model. 0kV Ingur SS 0..0 Time synchronization facility for global common timer reference is not available at the substation which is given in CEA (Measures relating to Safety and Electric Supply) Regulations, 00 under section, clause -(viii). On 0 kv MTPS feeder Main-II relay is static type, bus as per CEA (Technical Standards for Connectivity to Grid) Regulations, 00 under Part-III, Section-, both Main-I and Main-II distance relays are to be of numerical type. Main-I & Main-II Numerical relays provided on 0kV Arasur and K.R.Thoppur feeders are of same make and model. In Busbar Protection same CT is used for Main & Check zone relay. 0kV North Chennai TPS SS(Gen) 9, Current Transformer were tested for Tan Delta during the commissioning only. No periodic tests and maintenance carried out till date. The dates of commissioning of individual Ct s is listed. CTD protection are not provided in all 0KV feeders and Transformers. Earthing pits are not maintained since commissioning. Earth mat resistance and individual earth pit resistance are not regularly observed. Adequate fire extinguishers are not provided as specified on the name plate. Observations was made that the relay setting as decided by local competent authorities. Mid point of station battery should be connected to earth leakage relay. But it is observed that the charger voltage values are monitored instead battery voltage. nd source of D.C supply is availed from Generating station batteries. Observation are made that same type and make relays are provided in some of the feeders. Remote temperature indicators may be provided for station transformers. As per the data available regarding nd source of D.C supply it is not reliable to depend on this supply. It was also discussed with Generation wing and found that the nd source of supply 9 cannot be relied on Gen station battery. Hence it is suggested for a new battery system as nd source of supply for the switch yard.

7 9 &0 00kV Almatty SS(IS) & 0kV Almatty SS 0..0 Protection Relays on 00 kv & 0 kv side are not synchronised with GPS. Main I & Main II Relays found to be of same type & make for some 0 kv #s. In the 00 kv & 0 kv yard the following observations were made. i) Earth mat was designed and installed at the time of commissioning only. There is no provision to measure earth resistances. The Neutral of each ICT have individual earth pit but there is no provision to measure earth resistance and the earth pits are not maintained at regular periods. ii) The Mulsifire Systems are found to be not installed properly. Also since installation, no maintenance has been carried out. Earth leakage Relays are not in service. 0kV Tiruvalam SS(IS) 0..0 Lightning Arresters are not provided on all 0 and 0KV feeders. Battery earth leakage meters provided for DC source I & II are not working. Non Directional Over Current relay with 0% on both sides of all Auto Transformers are provided. Earth fault relay on both side are not adopted. 00kV BTPS SS 0..0 High setting for the bus bar differential protection i.e. V. A/R Selection switch is kept in non auto mode for all 00 kv lines. Dead 0 V DC Earth fault for both sets i.e. Positive to Earth V. Periodic checking of the 0V DC and V DC batteries should be adopted. GPS time synchronisation for all the relays & DR not carried. Pole descripency relay setting kept at 0. Sec for all the lines. Periodic checking of all the switch yard equipment needs to be carried.. Switch yard deweeding needs to be carried. 0kV BTPS(IS) kv Bus coupler not commissioned. Dead Earth fault in 0 V DC set &. relays not Synchronised with GPS. A/R Scheme for 0 kv Lines not available for lines. 0kV Alipur(IS) 0..0 All 0 kv line and bus coupler C&R panels distance relays are retrofitted with ABB REL relays & REL0 respctively, but the existing panels back-up electromechanical relays are very old and sluggish, most of the TS relays are not working properly, announciation not working hence it is suggested to replace the panels at the earliest. Diesel set battery need to be replaced. Bus coupler breaker is out of service due to compressor problem, needs immediate rectification. Carrier aided protection scheme has only single channel for 0 kv BTPS feeder and for 0 kv Ragulapadu line is out of service. Telecome panel need to be replaced. For both transformer protection relay setting adopted differs with the recommended setting same should be reviewed and adopted. No PL carrier voice communication available. For Ragulapadu line carrier inter tripping should be restored. For 00MVA-I No REF protection available and over flux relay should be restored. 9 Bus coupler relay setting for lines differ with recommended setting same to be reviewed and adopted. 0 Battery set 0V-SET I and V both set are of more than years needs capacity check and curative discharge. For putting battery set in to Float/boost proper system should be adopted, during audit it was observed that battery set-i had sp gravity more than 0 but still kept in boost charging.

8 0kV Gajwel SS 0,..0 Carrier aided protection scheme implementation to be examined. PC Test reports of CT's and CVT's shall be mailed by APTRANSCO. It is observed that all 0 kv lines relay panel contains same make relays for Main &. It may be examined for utilising two different make numerical relays. It is observed that 0 kv KAMAREDDY line distance relay settings are not matching with recommended settings of some function. It is observed that 00MVA PTR-I, O/L Relay settings of HV and LV side are mismatching. Periodical relays testing records of 00 MVA, PTR-II & 0 kv MEDCHEL-II not available. Periodical Tan-Delta and Capacitance measurement tests of CT's are not done. Replacement of Static type ABB make Differencial relays (RADSB) provided in, PTR-& by numerical relays may be examined. 00MVA PTR- OLTC tap position indicator in RTCC panel is faulty. 00kV Gajwel SS 0, kv Ramagundam line PLCC Panels are very old and replacement of PLCC Panels to be examined. PC Test reports of CT's and CVT's shall be mailed by APTRANSCO. MVA ICT- O/L realy setting of HV & LV adopted is not matching with the recommended setting. Recommended setting of Main- & Main- is not available for verification. Hence adopted setting to be verified with recommended setting. Adopted setting of Main- relay is not verified due to the non availabilty of relay software. MVA ICT- OLTC tap position indicator in RTCC panel is faulty. Periodical relay testing records of MVA, ICT-II not available. Periodical Tan-Delta and Capacitance measurement tests of CT's are not done due to non availability of testing equipment. Replacement of Static type ABB make Differencial relays (RADSB) provided in ICT-& by numerical relays may be examined. Downloaded copies of DR are to be maintained. 0kV Yeddumailaram SS 0..0 MAX. DC Earth leakage observed in the 0V DC system, to be rectified. Precommissioning test reports of CT & CVT are not available to record the percentage ratio error & ratio measured. Implementation of carrier aided protection scheme may be examined. providing second DC sources for all the control and relay panels may be examined for better reliability. 0 kv Bus bar protection relay along with in-built LBB function is kept out of service. It is observed that 00MVA PTR-I Relay panel contains DTH- static relay and 00MVA PTR-III contains RADSB static relay for differential protection. 0 kv Shamshabad line Main- I distance realy is having static relay of ABB (RAZOA). Replacement of above mentioned static relays by numerical relays may be examined. settings of HV and LV side are mismatching. It is observed that 0MVA PTR-II, HV over flux is provided and LV side over flux is not provided. 00 MVA, PTR-III Earth fault relay Time setting for HV and LV side to be verified as adopted setting is not matching with the recommended settings. 0MVA, PTR-II HV O/L and E/F realys are faulty and also LV side E/F relay to be checked. So replacement of faulty realys to be made. 00 MVA, PTR-III recommended settins of O/F realy not provided for verification. 0 kv Gachibowli line Main-II distance relay is found deffective. 9 Adopted Zone-III setting in Shadnagar Main-I Distance protection is not matching with the recommended settings. 0 Adopted Zone-III Timing setting in Shamshabad-II Distance realy is not matching with the revised recommended settings. Metal sprading is not found in 0 kv S/S yard & kv yard. Cable Trench is not provided in 0 kv Gachibowli, 00MVA PTR-II and B/C.

9 0kV Shivarampalli SS DC earth leakage observed in the 0KV DC-I system, to be rectified. Precommissioning test reports of CT & CVT are not available to record the percentage ratio error & ratio measurement. Implementation of carrier aided protection scheme may be examined. Utilising the two DC sources available for all the control and relay panels may be examined. 9 0kV Gachibowli SS 0 00kV Mysore SS 00kV UPCL SS It is observed 0 KV mamidipally & Gachibowli lines realy panel contains same make relays for Main &. It may examined for utilising two different make numerical relays. It is observed that 00 MVA PTR-I relay panel contains static relay for differential protection. 0 KV HIAL & Gachibowli-I are having ABB (RAZOA)make static relays for Main-II distance protection. Repalcement of above mentioned static relays by numerical relays may be examined. It is observed that 00MVA PTR-I, LV over flux is removed. To be provided. 00MVA PTR-III Existing LV directional earth fault relay is faulty, hence relay may be replaced. 00MVA PTR-III HV directional earth fault relay is not responding, the relay may be tested and replaced if necessary. Provision is not available for LV over flux protection in 00 MVA, PTR-II. Distance relay calculation details shall be provided. Over flux relay is to be provided on HV side of 0/ kv, 00MVA PTR-. DC earth leakage observed in the 0KV DC system-i&ii, to be rectified. Carrier aided protection scheme has to be implemented. Precommissioning test reports of CT & CVT are not available to record the percentage ratio error & ratio measured. Utilising the two DC sources available for all the control and relay panels may be examined. Replacement of existing Main-II Static distance scheme in feeders, Differencial relay DTH provided in 00 MVA PTR-may be examined. Replacement of static relays (THR, CAG, RADHA etc.) with numerical relays may be looked into. Co-ordination of protection settings for 0 kv Downstream lines may be done to avoid un wanted trippings at Mysore SS. Station is generally found to be in order It is observed that 00 kv BuS voltage is on the higher side since from the commissioning of 00 kv Hassan-Udipi line,. Action needs to be taken to reduce the stress on the equipment. The extension of permissive trip to Hassa SS in the event of O/V trip also at Udipi end needs to be verified & rectified at Udipi end. Based on the revised line parameters received from KPTCL, new settings adopted in Main- & relays during October 0.

10 00kV Hassan SS It is observed that 00 kv BuS voltage is generally on higher side. This problem has further aggravated with commissioning of Hassan-Udipi, lines. (As seen from the data available for 0 & th of October 0 approx, 0% of the time voltage is more than 0 kv.) It is observed that permissive trip is being received at HassanSSintheevnt of any trip in line protection relays at Udipi end, which is unwarrented. It needs to be verified at Udipi end. POWERGRID has already informed the issue to RT/KPTCL/HSN for necessary followup/correction. Based on the revised line parameters received from KPTCL, new settings adopted in Main- & relays. It is already under review at POWERGRID/RHQ. Early action may be taken to adopt the revised relay settings. 00kV Somanahalli SS(IS) Nomenclature of Binary Inputs/Binary Outputs & function is to be made in DR. 0kV Somanahalli SS kV Ennore TPS SS(Gen) 0..0 The highest element setting of HV side DOCR & DEFR of each 00 MVA Transformer in Amps. The same is to be reviewed taking 00 kv Bus fault level into consideration. CT/PT Ratio Error is not being done periodically. Synchronizing facility available, is not usede. Condition monitoring of switch yard equipments need to be carried out at regular basis. Synchonising is being used selectively. Recommended for usage at all Lines. Facility for downloading of disturbance records is to be made available. VT fuse fail indication available in Main-I relay of Tondiarpet and Manali feeders. Synchronisation relay not available for feeders. Being done manually by watching indicating meters Earth fault relay not provided on HV & LV sides of Auto t/p #, and TO # t/f. Over fluxing relay also not provided. OT and WT indicators suspected for not working. May be checked. PRV device not available on Auto T/f # and. Since switchyard is very old, it is advisable to physically see the rusting status of earth mat. Switchyard equipment earthing needs to be improved. No LA is available on R-phase LV side of Auto # Surge counters not available on lightening arrestor. Negative terminal of both 0 D/C system found earthed. May be removed. 0V DC 9 system to be maintained isolated from earth. 0 0 msec discrepancy in Z T Main-I & Main-II relays may also be looked into. Dedicated feeder PT/CVT not available for feeders protection. However, single phase CVT available for measurement and synchronisation purpose.

11 0kV Todiyarpet SS kv transmission line earth is generally to be connected to gantry shield wire and further to substation (SS) earth mat. Transmission line earth wire not connected to SS earth mat at Tondiarpet. This may be looked into in perspective of relay accuracy. Provision of LAs at line entry for 0 kv feeders may be considered. 00 MVA, 0/0 kv transformer #&,backupo/crelaysareset at 0% of full load current on boty HV and LV sides. This may be examined. Providing E/f relays on both HV & LV sides may be explored. REF for transformer #, overfluxing relays for both t/f #, not available. May be explored. Earthing of equipment needs improvement. Measurement of earth resistance to be carried out. Synchronous relay not available. Being done manually. Positive terminal of 0 V DC system observed to be earthed. May be rectified. Availing tertiary connection may be explored for auxiliary supply of station. 9 Separate treated earthpit for DG set may be provided. Body of DG Set to be earthed with suitable flat or conductor. 0kV Manali SS 0..0 The condition of 0 kv & 0 kv switchyard is observed to be execessively deteriorating. May faults were attributable to conductor leads/jumpers cut or damage and non operation of circuit breakers. Heavy rusting on equipment and its earth flats is observed. It is felt that this fast deterioration may be due to prevailing environment conditions. To maintain the reliability of this substation, suitable alternatives may be explored to obviate the fast deterioration in future. O/C and E/f relays on HV & LV sides of both auto transformers is set at 0% of full load current. The setting may be revised to suit full load current. Providing LAs at entry and connecting TL earthwire to SS mat may be looked into. Practice of adopting same make and same type relays for both Main-I & II of a 0 kv feeder may be discouraged. Positive terminal of both the 0 V DC systems earthed. May be rectified. Earth resistance meaured on It is observed to be violating in more number of earth pits. The same may be rectified on top priority. 0kV Peenya SS V Battery set # (Exide) commissioned during 9 still in working condition. In Hebbal feeder CVT is provided in "R" ph only. The same may be provided in one more phase. Bus bar protection was not available, same may be provided. GPS, Disturbance recorder and event logger are not available and same may be provided. Control panel annunciation not in working condition except transformers Main-II Distance protections were not propvided in all 0 kv feeders and PLCC/Protection coupler was not provided except 0 kv Hebbal feeder DC negative to earth is persisting and same to be attended early. The support structure and equipments to be replaced. The above works may be taken up on priority basis under the renovation and modernisation which h has already been approved.

12 9 & 0 00kV Nelamangala SS(IS) & 0kV Nelamangala SS Main II distance protection were not provided in all 0 kv lines and PLCC/Protection Coupler were not provided except Nittur & Dabuspet lines Separate Event Loggers are not available, GPS are not synchronised with SAS & Distance Protection Relays. Main II relays not in service in 00 kv Hassan line, 00 kv Talaguppa line & 00 kv Hoody line- and the same may be made available in the above feeders. It is noticed that the LA is failed in the same phase (Talaguppa line) for times previously. Analysis may be done and take remedial action to avoid reoccurrence. 0kV NRS SS.0.0 Event logger and DRS not available for Peenya & Vrushabavathi Lines. Annunciation panel for Peenya line & Vrushabhavathy line are not in working condition. The same may be made available. Winding / Oil temperature Indicator are not in working condition. The same may be made in working condition. Capacity of the DG is insufficient for the Station Aux Supply. Main II Distance protection Relays for all 0 Kv feeders is not available & the Protection Coupler for Peenya & Vrushabavathi Lines are not available. 0kV Spectrum SS(Gen)..0 It is observed that there is no O/V protection, df/dt & UFR protection for both the 0 kv feeders. PLCC inter trip protection is not in service for both feeders. GPS is not available. 00kV Vemagiri SS 0..0 Observed that there are no under frequency and df/dt protections. 0kV GMR Bordge SS(Gen)..0 For 0 kv line # protection relay recommended settings to be adopted. In 0 kv line #, main # & protection relay following deviations observed: a) Distance protection Zone: time of operating t pp adopted:. sec; Recommended 09.sec b) Power swing detection I base current adopted: 000 A; Recommended: 00 A c) Time delayed phase overcurrent protection () Adopted: ON; Recommended: OFF d) Time delayed phase overcurrent protection () Adopted: ON; Recommended: OFF e) Time delayed over voltage protection () Adopted: ON; Recommended: OFF f) Synchro check (9) Adopted: ON; Recommended: OFF For 0kV Line # Distance protection Zone: time of operating t pp Adopted:. sec; Recommended : 0.9 sec 00kV Gauthami SS 9..0 Auto reclose scheme is kept in OFF position for both 00 kv feeders. Over voltage stage- time setting of line- is deviating from recommended setting i.e. recommended setting is sec & adopted setting is sec. It is observed that there is no under frequency and df/dt protections for both 00 kv feeders. 0kV Reliance SS(Gen) 9..0 Recommended relay settings are not available with the utility Main-I protection zone settings are deviating with recommended settings as per record of M/s. Reliance. PLCC Inter Tripping Scheme was not in service. O/V, U/F & df/dt protections are not available for both the feeders. M/s. Reliance request APTRANSCO to communicate for any modifications required in relay settings 00kV Konaseema SS 0..0 Over current relay High. Set value of STGT is 9. instead of. Over voltage stage- time delay setting is sec instead of sec in 00 kv Line #. Observed Auto reclose selection is in non auto mode for both the 00 kv feeders Observed there is no U/F & df/dt functions for both the 00 kv feeders

13 & 9 00kV Jegurupadu SS & 0kV Jegurupadu Ss(Gen)..0 Auto reclosing scheme is in off condition for both Line- and Line-. O/V Stage- protection setting is observed at % (V) instead of recommended 0% (0V) 0 & 00kV Pondichery SS(IS) & 0kV Pondichery SS(IS) 9 & Switchyard, DG Set yard, Battery Room, Bay control KIOSKS, Control Room are maintained neatly. Most of the records & commissioning reports are available & furnished. Substation declared & operated as unmanned (Remote operation from Sriperumbudur SS) w.e.f The station name in test report of ICT & are wrongly mentioned as Sriperumbudur Botyh LBB & BB Protection are in-built in the same Siemens SIPROTEC Relay for both Main & Time Settings in 0 kv VLNR & BHR noted in the relay are as follows: a) Zone : 00 ms b) Zone : 00 ms The Zone & Zone timing of the 0kV feeders as per PGCIL CC Engg are 00ms & 00ms respectively and the actual settings adapted as 00ms & 00ms may be reviewed 0kV Nagjheri SS(Gen)..0 0kV Kadra SS(Gen) 0..0 & 00kV Talguppa SS & 0kV Talaguppa SS..0 0 kv Nagjhari-Ambewadi & lines does not have CVTs on the line. Carrier tripping was not available for these lines. Remaining six 0 kv lines have only one R-Phase CVT and Y & B Phase CVTs are not available. Synchronising of 0 kv feeders is not being done with synchroscope, only Generator Transformer Units are being synchronised. The Neutrals of generator transformers are not earthed exclusively and all LAs also not found to be earthed exclusively. The Emulsifier system nozzles are not directed towards Power Transformer body in the middle. The LBB relay time & current are sdet at. sec & 0. A for all feeders and generating transformers. Carrier protection is out of service for Karwar & feeders Main- Distance protection (SHPM0) is not in service due to power supply module problem for Karwar & feeders Karwar & fereders have only R Ph CVT available (Y and B Ph CVTs are not available). For Kaiga and Kodasalli feeders have only R & B CVTs available. (Y Ph CVT not available) Double earthing of all the supporting structures/elements is to be ensured. Neutrals of generating transformers and LAs are to be exclusively earthed. Bus coupler and transfer bus are out of service, bus coupler module on busbar protection panel is kept out of service. Synchronising of 0 kv feeders is not being done with synchroscope (Synchroscope available) but generator transformer units are being synchronised. CTs should be tested for capacitance and Tan-delta periodically to monitor the insulation healthiness at least once in a year. All isolators and breakers should be tested for contact resistance measurement periodically. All breakers should be tested for Trip/Close timings periodically. LA monitoring reading (leakage current) may be recorded periodically to monitor the healthiness of LAs.

14 0kV Sharavathi SS(Gen) 0..0 Instrument Transformers Only cores are present on certain 0 kv feeders and generator transformers CTs, limiting the Bus Bar protection to only Main zone without check zone. Only one CVT is present on all 0 kv feeders, limiting the line protection Main and Main-II to be only on Bus PT Recommendations corectsmaybereplacedwithcrorectstokeepthebusbarprotectioninfullshape with both Main and Check Zone. CVTs may be provided on all 0 kv feeders so as to keep the Main-II protections on Bus PT or CVT which increases the reliability of the protection system. Bus bar Relay Bus bar protection scheme not having check zone feature due to lack of check zone relay and lack of cores in CTs of certain feeders. Bus bar scheme is very old (Electro mechanical Type-9) and obsolete. Recommendations Bus bar protection panels may be replaced with new panels of numerical relay type to have the bus bar protection in full shape with all features (check zone, CT fail, iso fail etc. features) as the existing scheme is not having check zone facility. Certain CTs with cores should also be changed to have cores for bus bar protection. LBB relay timing is observed to be 0. sec which is high, can be reduced to 0 to 00 m.sec in coordination with pole discrepancy relay of breaker. Transmission line protection Certain 0 kv feeders (S, S, S and ST) are having both Main- & Main- protection on the same core. Certain 0 kv feeders (SS, SS) are having same Make & Type (ABB-REL ) relays as Main-I and Main-II protections Certain 0 kv feeders (S, S, S, S, ST, ST, SB) are having O/C and E/F relays as Main-II protection. Certain 0 kv feeders (SS, SS) are not having carrier protection. Recommendations Feeders having same core for Main-I and Main-II should be separated to individual cores, i.e. Main-I and Main-II should be on different CT cores. Feeders with same Make & Type relay as Main-I & Main-II should be changed with different Make/Type relays for Main-I & Main-II. Feeders having O/C and E/F relays as Main-II may be replaced with distance relays for good protection coordination on 0 kv Grid. Carrier protection should be kept in service for the feeders having no carrier protection. DC supply ThereaeNosbattery banks (00 AH, 000 AH) of lead acid type, for which there is no practice of subjecting the batteries onto periodical load discharge test and recording the battery performance on load condition. The battery bank-i is of led acid type and are observed under poor condition leading to individual cell average cell voltages of. V with average specific gravity 90, which is far below the healthy values. The battery back-ii is also of lead acid type and observed under complete deterioration condition with total bank open circuit voltage V which is far below the 0 V. DC earth leakage oserved on DC-I system with +ve to ground 0 V and -ve to ground. V. Recommendations Battery bank-i should be properly maintained subjecting the batteries to regular periodical load discharge test on every month/fortnight and duly recording the individual cell parameters for future reference/observance. The battery bank-ii may be replaced with VRLA (maintenance free) type batteries to increase the reliability of DC system, as the existing both banks are of lead acid type are under complete deterioration condition. DC earth leakage should be arrested on top priority to avoid spurious trippings due to DC earth leakage. Breakers Nos. 0 kv breakers are of bulk oil type breakers (BOCB, 9 made) which are on Bus Sectionalizer-I & II, which are very old and are observed in poor condition, served beyond its life. The breakers are having inbuilt CTs, used for bus bar protection which on failure is very difficult to replace of its type. Recommendations New SF type circuit breakers may be replaced without door type CTs on either side of the breaker in place of existing old BOCBs, as the sectionaliser breakers are very vital while clearing the very high level bus faults. Earthmat resistance There is no practice of measuring earthmat resistance periodically and recoording the values. Recommendations Earthmat resistance (combined earthmat resistance and individual earth pit) should be measured and recorded periodically. General remarks CTs, transformers may be tested for capacitance and Tan-delta periodically to monitor the insulation healthiness. All protective relays should be tested periodically (once in a year) without fail. Substation GPs may be connected to event logger and protection relays for correct recording of the sequence of events. All generator transformers OTI & WT shall be brought to control room for better monitoring of the transformer performance. PLCC counter upon every tripping may be recorded. LA monitoring reading may be recorded periodically to monitor the healthiness of LAs.

15 0kV Mylapore SS 0..0 For 0 kv Basin Bridge Feeder Protection Main I No carrier scheme is available No protection during VT Fail condition Main II Numerical relay may be provided Auto Transformers I & II No E/L protection on HV & LV side LAs may be provided for desired protection of Auto Transformers DC System Neither +ve or -ve have high resistance grounding Earth leakage monitoring system is required For V (SCADA/PLCC) only set of Battery and Charger, No back up is available. Earthing System No record/log is available for periodic earth resistance measurement No separate earthing for DC system No separate earthing for V DC system General All the CTs, PTs, CBs are tested during the commissioning only, no periodical tests were crried out. No commissioning test results are certified by competent authority Only Bus PT supply is available for Main I & II protection, no line VT supply is available for protection. No Capacitor Tripping Devices are kept in service for Feeders and Transformers. It is learnt that relay settings for feeders and transformers are calculated as per TANTRANSCO. DG set of 0 KVA was commissioned recently, no full load test was carried out. Evidence for recommended/approved settings were not furnished during audit.' Low voltage profile were observed. 9 It is suggested to provide GPS for synchronisation for better disturbance analysis purpose. 0 Inbuilt DRs in the relays are configured, no separate DRs & EL found. To maintain the adequate temperature for GIS equipments air conditioned may be required.

16 Name of Substation 0kV Basin Bridge SS Date of Audit..0 Observations/Remarks For 0 kv Mylapore Feeder Protection No carrier scheme is available No protection during VT Fail condition For 0 kv Tondiar Feeder Protection No protection during VT Fail condition Auto Transformers I, II, III No E/L protection on HV & LV side O/L settings may be reviewed DC System For V (PLCC) only set of Battery, No back up is available. Earthing System No record/log is available for periodic earth resistance measurement No separate earthing for DC system (0 V DC) General All the CTs, PTs and Auto Transformers are tested during commissioning only, no periodical tests were carried out to know the deterioration. No commissioning test results are certified by competent authority Only Bus PT supply is available for Main I & II protection, no line VT supply is available for protection. No Capacitor Tripping Devices are kept in service for Feeders and Transformers. 9 0kV Hitech SS(Gen)..0 It is learnt that relay settings for feeders and transformers are calculated as per TANTRANSCO stipulated standards. It is suggested that it may be calculated by considering system fault levels and time gradation in addition to other parameters as per manual. DG set is required for alternate source. Evidence for recommended/approved settings were not furnished during audit.' Low voltage profile were observed. 9 It is suggested to keep GPS in service at the earliest for better fault analysis. 0 Auto reclosure is not enabled for feeders. Power swing block settings may be reviewed. Evidences for recommed/approval relay settings are not available. Earthing system may be improved. There is no standby battery bank and charger. Periodical testing of switchgear shall be carrie out. Real time data transfer facility to SLDC shall be established. Dedicated hot line speech facility to SLDC shall be established.

17 90 0kV Koratur SS..0 Protection During VT fail condition no protection is available (Backup > disabled) No E/L relay protection on ATR, & HVs V/F protection is not available on ATR-, & It is observed that Main- & schemes of feeders are of same make General Only Bus PT supply is available for Main I & II protection. There is no line VT supply available for protection. Only Bus PT supply is available for Main- & protection. There is no Line VT supply available for protection. No capacitor tripping devices are provided on 0 kv feeders & ATRs. 9 0kV Naganathpura SS 9 0kV HSR Layout SS 9 0kV Lingapur SS It is learnt that the relay settings for feeders and transformers are calculated as per TANTRANSCO stipulated standards. It is suggested that it may be calculated by considering system fault levels and time gradation in addition to other parameters as per Relay manual. Evidence for recommended/approved settings were not furnished during audit. GPS may be established for effective fault analysis. In Bus bar protection relay Master Card is faulty, sent for repair to M/s. ERL. Main-: Numerical Distance Protection and Main- is Back up protection with OCR & EFR. Main- protection is Distance Relay and Main- protection is Back up relays with OCR & EFR. Bus Bar protection relay is out of service, the same may be put back to service for protection. DC Charger-I, the earth reference point may be rectified/checked. On for the 0 kv Hoody Line fault, the transformer- HV & LV tripped. The relay setting may be reviewed. CVTs should be there for all the feeders for protection. LAs are not available for all feeders except Jindal & Surge monitor needs to be provided for Jindal Only one core of CTs is used for both main and B/U relays for all feeders except Jindal & Bus bar protection not available GPS clock is not available PTs are to be commissioned on reserve bus Synchronisation relay is not working For all feeders O/C and E/F relay as B/U protection can be replaced with distance 9 scheme mostly numerical relay is recommended. 0 Approved relay settings are not available for all B/U relays. Only single carrier channel is available for carrier protection and all the feeders does not have carrier protection except BTPS, Sindanoor, Gudadahalli - &andharthi. New CTs and CVTs available at yard needs to be commissioned at the earliest.

18 9 0kV A'Station 0..0 Busbar protection is to be commissioned One DC source is being user for protection. Main-II protection is not available. However, electromechanical type backup protection relays have been provided. 9 0kV Hebbal SS 0..0 One DC source is being user for protection. Main-II protection is not available. However, electromechanical relay used as back up protection. LBB relays not available. DG set is not available. 9 0kV Yerandahalli SS(IS)..0 For Main-II distance relays preferably numerical relays are not available in all 0 kv feeders, the same to be provided. Busbar protection is not provided in the 0 kv system, the same to be provided. 9& 9 00kV Tuticorin SS &0kV Tuticorin TPS SS(Gen)..0 Nil 99 0kV Kayathar SS..0 Earth resistance to be measured and recorded. Grass growth to be controlled in the switchyard area. Cable routing to be done properly. Renovation of control room to be done. Proper fire fighting and oil drain pit to be provided for transformers. 00 0kv Arani SS..0 Static Version relays are to be replaced with latest version numerical relays for quick and accurate analysis of faults. V/F protection is not enabled in TNEB upto the level of 0 kv. REF protection is not implemented in TNEB for Transformer Capacity below 00 MVA. Lightning Arrestors are not provided for 0 kv feededrs. Second source of DC may be reviewed for connectivity. DG set is under faulty and enhancement proposed. DC leakages are to be attended for source I. No written documents for approved relay settings. 9 Syn check relay is not available. 0 0kv Aliyar SS(Gen) 9..0 Nil 0 0kV Theni SS(IS)..0 Nil 0 0kV Kadamparai SS(Gen) 0..0 Nil 0 0kV Raichur SS(Gen) V DC earth fault persisting negative dead grounded Old electromagnetic relays can be replaced with numerical relays. LBB Relay RAICA RXKL setting for ICT-II is kept at 0 ma. 0 00kV Raichur SS (IS) V DC earth fault persisting with leakage current of ma Daily Battery reading is not taken by putting charger in OFF condition PD settings for Munirabad, BTPS and Mahboobnagar kept at 0. sec Time synchronisation for all the relays, EL and DR are done with GPS RTPS-Munirabad line Zone-II setting (.0 Ohm) is more than Zone-III (. Ohm) No fault locator working for Munirabad and Mehboobnagar lines DR communication is not working for Munirabad and Mehboobnagar lines DG set is not extended to 00 kv SS 9 Old electromagnetic relays can be replaced with numerical relays. 0 0kV Lingsugur SS.0.0 Bus Bar protection is not available in the station, same is to be provided. All 0 kv line and bus coupler C&R panels, distance relays are retrofitted with ABB REL relays & REL0, but the existing panels back up electromechanical relays are very old and sluggish, most of the TS Relays are faulty, annunciation not working, hence it is suggested to replace the panels at the earliest. PLCC Batteries set to be provided. Capacity test and curative discharge needs to be done.

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region SOUTHERN REGIONAL POWER COMMITTEE BANGALORE AGNEDA FOR THE 15 th MEETING OF PROTECTION SUB- OF SRPC TO BE HELD ON 18.07.2012. COMMITTEE 1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE SOUTHERN REGIONAL POWER COMMITTEE BANGALORE Minutes of the 25 th Meeting of Protection Coordination Sub-Committee of SRPC held on 22.10.2013 1. Introduction 1.1 The 25 th Meeting of Protection Coordination

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 15 th MEETING OF PROTECTION SUB- SRPC HELD ON 18.07.2012. COMMITTEE OF 1. INTRODUCTION 1.1 The 15 th meeting of Protection Sub-Committee was held

More information

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006.

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006. 1 MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006. The 1st meeting of Protection Sub-Committee was held on 25 th July 2006 in the Conference Hall of Southern Regional

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

16kA Solid Dielectric, Triple Option Reclosers Catalog VLT12

16kA Solid Dielectric, Triple Option Reclosers Catalog VLT12 16kA Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A continuous current, 16kA symmetrical interrupting

More information

PRAGATI ENGINEERING COLLEGE

PRAGATI ENGINEERING COLLEGE Report on Industrial Visit to Power Grid 765/400 KV (GIS) Sub-Station No. of days of Visit : Two days Date(s) of Visit : 19 th September, 2017& 7 th October, 2017 Faculty In-charges : 4 Members 1. Mr.S.Ashokreddy,

More information

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

Schedules 1 to 4, Lot B: Extension of the Lessos Substation 1.0 LIGHTNING ARRESTORS 1.1 ZNO lightning arrester, 192 kv rated voltage, 10 ka nominal discharge current 2.0 CAPACITIVE VOLTAGE TRANSFORMER ea. 45 2.1 220 kv capacitive voltage transformer 220/ 3 / 0.11/

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 45 th Meeting of Protection Coordination Sub-Committee (PCSC 45) of SRPC held on 25.06.2015 1. Introduction The 45 th meeting of Protection Coordination

More information

SYSTEM OCCURRENCE: Various system occurrences during the period were analysed. Details are as under:

SYSTEM OCCURRENCE: Various system occurrences during the period were analysed. Details are as under: MINUTES OF THE 2nd MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 08th DECEMBER 2006. The 2nd meeting of Protection Sub-Committee was held on 08th December 2006 in the Conference Hall of Southern Regional

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit

More information

III. Substation Bus Configurations & Substation Design Recommendations

III. Substation Bus Configurations & Substation Design Recommendations III. Substation Bus Configurations & Substation Design Recommendations 1.0 Introduction Pre-existing conditions, electrical arrangements or the criticality of the existing facility may limit this flexibility,

More information

Chapter 6 Generator-Voltage System

Chapter 6 Generator-Voltage System Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals

More information

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14 Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A or 800A continuous current, 12.5 or 16kA symmetrical

More information

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant.

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant. CURRICULUM VITAE Personal details MANIKANDAN. Y manikandan.y@gmail.com Date of Birth : 17.07.1988 Nationality : Indian Sex : Male Marital Status: Single Passport No : J2470486 Current Visa : S pass Contact

More information

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations 1 IEEE1818-2017 Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations Sponsored by the IEEE Substations Committee Presented By Joe Gravelle Organization of the Guide 1. Scope

More information

Transformer Protection

Transformer Protection Transformer Protection Course No: E01-006 Credit: 1 PDH Andre LeBleu, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com

More information

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category General Title Reference Number PMP 01 (RIC Standard: EP 00 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards and

More information

SUBSTATION DESIGN TRAINING

SUBSTATION DESIGN TRAINING 2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near

More information

CHAPTER 4 PROTECTION REQUIREMENTS

CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS 4.1 General Means of protection for automatic disconnection against phase and earth faults shall be provided on the customer main switch.

More information

Dual Power. Protection. Protection

Dual Power. Protection. Protection 54 Fault Clearing Systems by Damien Tholomier., AREVA T&D Automation, Canada Dual Power Single Battery What if it? Short circuits and other abnormal power system conditions are very rear, but may result

More information

PQC - STATCON The ultra fast Power Quality Compensator

PQC - STATCON The ultra fast Power Quality Compensator PQC - STATCON The ultra fast Power Quality Compensator PQC - STATCON The ultra fast power quality compensator PQC - STATCON is based on IGBT voltage source inverter technology. It is a shunt connected

More information

DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN)

DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN) DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN) -A.R. Subraaanian -R.A.A. Palani -J. Thomson A new 3.3 K.V. 4200 KVAR auto switching capacitor bank has been installed

More information

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT By Girija Shankar Sharma, M.Tech (Power System), DGM (O&M-Opn), NTPC-Rihand, E-mail: gssharma@ntpc.co.in Presentation Points System Description and Grid

More information

Breaker-failure protection RAICA

Breaker-failure protection RAICA Breaker-failure protection RAICA Features Provides local back-up protection when the primary breaker fails to operate Initiates tripping of adjacent back-up breakers for disconnection of the fault, thus

More information

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS 104660-ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 14 years hands-on experience in low, medium voltage and

More information

Failure of Transformer Cable box A case study

Failure of Transformer Cable box A case study Failure of Transformer Cable box A case study Presented by Janardan Choudhary, Executive Director (O&M) 1 INTRODUCTION The 280 MW Dhauliganga Power Station, NHPC Ltd, situated at remote place of Pithoragarh

More information

B kv Gas-insulated Substations

B kv Gas-insulated Substations 72.5 145 kv Gas-insulated Substations The increasing demand for electrical power in cities and industrial centres requires the installation of a compact and efficient distribution and transmission network.

More information

2015 WDC Disturbance and Protection Standards Overview

2015 WDC Disturbance and Protection Standards Overview NERC Update 2015 WDC Disturbance and Protection Standards Overview Rich Bauer Senior Manager Reliability Risk Management / Event Analysis IEEE PSRC meeting Denver, Co May 12, 2016 2 System Protection and

More information

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian Shunt Capacitor Bank Protection in UHV Pilot Project Qing Tian 2012-5 INTRODUCTION State Grid Corp. of China, the largest electric power provider in the country, has first build a 1000 kv transmission

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 6 PROTECTIONS 1 FUNCTION OF ELECTRICAL PROTECTION SYSTEMS Problems:

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14 Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 27kV, 630A or 800A continuous current, 12.5 or 16kA symmetrical

More information

2 Unit Petrol Engine Spare parts kits for 4 WD Nissan Patrol

2 Unit Petrol Engine Spare parts kits for 4 WD Nissan Patrol 04-62-70001 4 WD NISSAN PATROL STATION WAGON SGL, 4500 cc 2 Unit Petrol Engine 04-62-70002 Spare parts kits for 4 WD Nissan Patrol 4 Set Station Wagon 04-62-70003 Belt-Fan 11720-03J00 4 Each 04-62-70004

More information

Modular integrated transportable substation (MITS)

Modular integrated transportable substation (MITS) Technical Data TD027002EN transportable substation (MITS) Contents Description Page Voltage regulation with bypassing........................................................ 2 Mobile MITS application...............................................................

More information

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS A. 11 KV SWITCHGEAR 1.0 SWITCHGEAR ASSEMBLY 1.1 Make : 1.2 Type : 1.3 Reference Standard : 1.4 Voltage (Nom./Max.) KV : 1.5 Phase, Frequency No,Hz.

More information

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 1 2 3 4 5 6 7 8 9 Q. Please describe Hydro s terminal station and substation inspections policies and practices. In

More information

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) TRANSMISSION DIRECTORATE HETAUDA-DHALKEBAR-INARUWA 400KV SUBSTATION EXPANSION PROJECT BIDDING DOCUMENT FOR Procurement of Plant Design,

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering University of Sydney School of Electrical and Information Engineering Dr Keith Mitchell ELEC 5205 - High Voltage Engineering ELEC 5205 - High Voltage Engineering 3. Switchgear Types of Power System Switchgear

More information

Solid Dielectric, Three Phase Reclosers CATALOG VS11

Solid Dielectric, Three Phase Reclosers CATALOG VS11 Solid Dielectric, Three Phase Reclosers Providing electronic, three phase overcurrent protection for systems rated through 38kV, 800A continuous current, 12.5kA symmetrical interrupting Reliable performance

More information

Burns & McDonnell ISU Senior Design Project 2010/2011

Burns & McDonnell ISU Senior Design Project 2010/2011 Burns & McDonnell ISU Senior Design Project 2010/2011 STATION DATA BY BTJ DATE 02/04/2013 SHEET 1 OF 10 PROTECTION AND MEASUREMENTS EQUIPMENT SPECIFICATIONS PROJECT SCOPE New substation installaton. Add

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2006/ Date: 08-08-2006 To 1. The Member Secretary, Southern Regional

More information

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H)

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H) 2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 263010-H: SUPPLEMENTAL PARALLELING GEAR (16315-H) Related Sections Basis Guideline: N/A For an explanation of

More information

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited

More information

DG SYNCHRONIZING &AMF PANEL

DG SYNCHRONIZING &AMF PANEL A 80, Sector 80, Phase 2, Noida 201305, Utter Pradesh, India DG SYNCHRONIZING &AMF PANEL Clients Bharat Petroleum Corp.Ltd PROJECT- DG Synchronization panel with AMF function. Design BY:- Errection By

More information

24V 3A EN54 Ancillary Power Supply

24V 3A EN54 Ancillary Power Supply 24V 3A EN54 Ancillary Power Supply Normal supply - green light on Fault condition - call Engineer Control relay - activated 3A Power Supply C-TEC Manufactured in England by C-Tec EN 54-4 : 1997 INSTALLATION

More information

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) INTER PLANT STANDARD STEEL INDUSTRY I P S S SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) Corresponding IS does not exist IPSS: 1-10-036-12 0 FOREWORD 0.1 This

More information

Substation LV AC Supplies. Document Number: 1-11-FR-04

Substation LV AC Supplies. Document Number: 1-11-FR-04 Substation LV AC Supplies Document Number: 1-11-FR-04 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-04 LV AC Supplies Asset Class Strategy Intellectual

More information

Standards, Procedures and Policies for Grid Connection

Standards, Procedures and Policies for Grid Connection Standards, Procedures and Policies for Grid Connection CONTENTS 1 INTRODUCTION 1 2 EMBEDDED GENERATION 1 2.1.1 OUTLINE OF EMBEDDED GENERATION 1 2.1.2 CHANGES IN EMBEDDED GENERATION 1 2.1.3 ASPECTS OF EMBEDDED

More information

Solid Dielectric, Three Phase Reclosers Catalog O-vs18

Solid Dielectric, Three Phase Reclosers Catalog O-vs18 Solid Dielectric, Three Phase Reclosers Providing electronic three phase overcurrent protection for systems rated through 38kV, 800A continuous current, 12.5kA symmetrical interrupting Reliable performance

More information

7. SERVICES OVER 600 VOLTS

7. SERVICES OVER 600 VOLTS 7. SERVICES OVER 600 VOLTS 7.1 GENERAL The Company shall always be consulted to obtain required design criteria where service is contemplated.preliminary plans of the Customer shall be submitted for review

More information

Small Electrical Systems (Microgrids)

Small Electrical Systems (Microgrids) ELG4126: Microgrids Small Electrical Systems (Microgrids) A microgrid is a localized, scalable, and sustainable power grid consisting of an aggregation of electrical and thermal loads and corresponding

More information

Power Systems Trainer

Power Systems Trainer Electrical Power Systems PSS A self-contained unit that simulates all parts of electrical power systems and their protection, from generation to utilisation Key Features Simulates generation, transmission,

More information

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY PART B-04 TITLE: DISTRIBUTION SUBSTATIONS SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 2 YEAR PERIOD) AMENDMENTS/REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

Copyright 2003 Advanced Power Technologies, Inc.

Copyright 2003 Advanced Power Technologies, Inc. Overview of the Standard for Interconnecting Distributed Resources with Electric Power Systems, IEEE 1547 and it s potential impact on operation of the Distributed Generation (DG) systems and on the design

More information

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS INSTRUCTION MANUAL TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS September 2000 TOWER UPS DISTRIBUTION (PTY) LTD 1 1. INTRODUCTION T A B L E O F C O N T E N T S 1.1 General Description... 3 1.2 Features...

More information

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test)

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) ANNEXURE I SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) Paper I & Paper II for General Category of S.C.C. Examination Paper I & Paper

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

1VAL2401-SG Rev D. Spare parts list for Outdoor Products Reclosers, breakers, & padmount switches

1VAL2401-SG Rev D. Spare parts list for Outdoor Products Reclosers, breakers, & padmount switches 1VAL2401-SG Rev D Spare parts list for Outdoor Products Reclosers, breakers, & padmount switches Reclosers GridShield recloser 12A00736H05 Actuator assist capacitor Single-phase upgrade 15 KV, 800 A, 12.5

More information

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel Gas-Insulated Switchgear GHA Gas-Insulated Switchgear Switchgear extension and replacement of a panel During this work, essential parts of the switchgear remain in operation No. AGS 535 066-01 Edition

More information

Advanced Protective Relay Training

Advanced Protective Relay Training Advanced Protective Relay Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq A properly designed protection

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

33 KV STATIC SHUNT CAPACITOR WITH ALLIED EQUIPMENT

33 KV STATIC SHUNT CAPACITOR WITH ALLIED EQUIPMENT 33 KV STATIC SHUNT CAPACITOR WITH ALLIED EQUIPMENT September 2017 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar,

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

Service and Rehabilitation Electrical Power Systems

Service and Rehabilitation Electrical Power Systems Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading

More information

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail

More information

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008 NB Power Customer Service and Distribution June 2008 Prepared by: Steven Wilcox Revised by: Steven Wilcox TABLE OF CONTENTS 1.0 Introduction 4 2.0 NB Power Policy on Independent Power Production 4 3.0

More information

ELE-MOS-E-2006 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-MOS-E-2006 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101162-ELE-MOS-E-2006 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 7 years hands-on experience, mainly in operation, maintenance, commissioning and start-up.

More information

Energy Transmission & Distribution Services - Italy. SVEPPI laboratory...our services for your success. Answers for energy.

Energy Transmission & Distribution Services - Italy. SVEPPI laboratory...our services for your success. Answers for energy. Energy Transmission & Distribution Services - Italy SVEPPI laboratory...our services for your success. Answers for energy. ...our services for your success ENERGY - T&D Services Experience teaches us that

More information

/ I S S : / S T S I

/ I S S : / S T S I Agenda Electrical Transformers (Quality Control) Order Obtaining BIS Licence Requirements of Guidelines / IS 1180-1: 1: 2014 / STI Concerns in Getting BIS Licence Experience with BEE Regulations Recommendations

More information

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

ABB PTTR SPAIN. Zaragoza. The product: Cast coil transformers

ABB PTTR SPAIN. Zaragoza. The product: Cast coil transformers ABB PTTR SPAIN Zaragoza. The product: Cast coil transformers ABB BA Transformers - 1-5/7/2007 Dry Type Vacuum Cast Coil Transformer INTRODUCTION ABB BA Transformers - 2 - Product Portfolio II Dry Type

More information

ELE-CMS-E-2007 Electrical Project Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMS-E-2007 Electrical Project Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 103313-ELE-CMS-E-2007 Electrical Project Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 10 years hands-on experience working in construction, commissioning and maintenance.

More information

ELE-PT-E-2005 Electrical Testing & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-PT-E-2005 Electrical Testing & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 102926-ELE-PT-E-2005 Electrical Testing & Protection Engineer Holds B. Sc. and M. Sc. in Electrical Power & Machines Engineering and has about 9 years hands-on experience in protection, testing and commissioning.

More information

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK 91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW

More information

Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART II

Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART II 135 05-1 Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART II TURBINE-GENERATOR: rhipping AND ALARM CIRCUITS i.o' I titrodljction Following on from Lessons 135.03-1 and 135.04-1,

More information

Catalog HA Edition up to 24 kv, Air-Insulated, Extendable. Medium-Voltage Switchgear. siemens.com/simosec

Catalog HA Edition up to 24 kv, Air-Insulated, Extendable. Medium-Voltage Switchgear. siemens.com/simosec Catalog HA 41.43 Edition 2018 Switchgear Type SIMOSEC, up to 24 kv, Air-Insulated, Extendable Medium-Voltage Switchgear siemens.com/simosec Application Typical uses R-HA41-135.tif R-HA40-112.tif R-HA41-115.tif

More information

Grounding Of Standby & Emergency Power Systems

Grounding Of Standby & Emergency Power Systems July / August 2007 ELECTRICAL LINE 53 Grounding Of Standby & Emergency Power Systems By Andrew Cochran Power continuity is essential in many industrial and commercial installations where a trip out due

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY Phone: +91 431 257 79 38 Fax

More information

T-Line Generator Control, Protection and Monitoring

T-Line Generator Control, Protection and Monitoring T-Line Generator Control, Protection and Monitoring» Control. Monitor. Protect. SELCO T-Line The SELCO T-line offers a complete range of system components for generator control, protection and power monitoring.

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Embedded Generation - Technical Access Standards Embedded Generation - 5 MW or Greater ELE SP 0003 Public 1 October 2014 TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations...

More information

B kv T&D GAS INSULATED SWITCHGEAR

B kv T&D GAS INSULATED SWITCHGEAR GAS INSULATED SWITCHGEAR B 105 170 300 kv The increasing demand for electrical power in cities and industrial centers necessitates the installation of a compact and efficient distribution and transmission

More information

Power IT Air Insulated Cubicle Uniswitch

Power IT Air Insulated Cubicle Uniswitch - 1-4/2/2003 Secondary Distribution Switchgear Power IT Air Insulated Cubicle Uniswitch Table of Contents Market segment Ratings New for 2003 Technical features Advantages Market segment Uniswitch Switchgear

More information

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS TITLE SPECIFICATION FOR POLE- MOUNTED DATE: JUNE 2006 PAGE: 1 OF 17 TABLE OF CONTENTS Page FOREWORD...2 INTRODUCTION...3 1 SCOPE...3 2 NORMATIVE S...3 3 DEFINITIONS AND ABBIATIONS...3 4 REQUIREMENTS...3

More information

Cobra-S. Catalog Cobra-S

Cobra-S. Catalog Cobra-S Cobra-S Solid Dielectric, Three Phase Reclosers Providing electronic three phase overcurrent protection for systems rated through 38kV, 800A continuous current, 12.5/16kA symmetrical interrupting Control

More information

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION Form G5-1 Page 1 of 3 PACIFIC GAS AND ELECTRIC COMPANY PG&E LOG WO/GM D&C Name of Project: Location: Transmission Line No. Distance Circuit No. 1. Maintenance Data: Generation Customer s Maintenance Chief

More information

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI Case Study on On EHV Circuit Breaker Flashover AUTHORS: B. K. SINGH (AGM-ELECT) S.C.SINGH (SUPDT-ELECT) MANOJ SHARMA (Dy SUPDT-ELECT) ANAND PANDEY (ENGR-ELECT) BREAKER-FLASHOVER There has been a rising

More information

Motor Protection. Voltage Unbalance & Single-Phasing

Motor Protection. Voltage Unbalance & Single-Phasing For Summary of Suggestions to Protect Three-Phase Motors Against Single-Phasing see the end of this section, page 137. Historically, the causes of motor failure can be attributed to: Overloads 30% Contaminants

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

SF 6 gas insulated RMU SafePlus 24 kv. ABB SafePlus 24 kv SF6 gas insulated RMU 1

SF 6 gas insulated RMU SafePlus 24 kv. ABB SafePlus 24 kv SF6 gas insulated RMU 1 SF 6 gas insulated RMU SafePlus 24 kv 25.03.2010 SafePlus 24 kv SF6 gas insulated RMU 1 Secondary distribution 400 kv Transmission substation Transformer 40-70 kv 130 kv Main Substation Secondary distribution

More information

Solid Dielectric, Triple Option Reclosers Catalog O-vst14

Solid Dielectric, Triple Option Reclosers Catalog O-vst14 Solid Dielectric, Triple Option Reclosers Providing electronic overcurrent protection for single or three phase operation on systems rated through 38kV, 800A continuous current, 12.5kA symmetrical interrupting

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information