MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

Size: px
Start display at page:

Download "MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR"

Transcription

1 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) Fax: (0761) / Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC014880, -mdtransco.nic.co.in No.07-05/SG-9B-II/146 Jabalpur, dated: To As per distribution list Sub: Minutes of 67 th meeting of Operation and Coordination Committee of MP. The Minutes of 67 th meeting of the Operation and Coordination Committee of MP held on 04 th January 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

2 Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No , The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur,.Fax No The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax , 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax , 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No , The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No The General Manager(PM), MPPMCL, Jabalpur 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No , 15. The Dy. General Manager (DCC CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No , The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No , The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No , 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No , 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No , 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal , Fax No , 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager s Office, Electrical Department, Jabalpur (MP), Fax: , - cede@wcr.gov.in, dyceetrdwcr@gmail.com, M , Mr.Satyendra Kumar (Dy.CE), Mob (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) , Fax No , nhdc-isp@rediffmail.com 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) , FaxNo , - pksaxena@nhdcl.com, saxena_pks123@rediffmail.com, omkareshwar.nhdc@gmail.com. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur , Fax No / , manish@bla.co.in 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina Distt- Sagar, Fax No , jbtppbina400kvswitchyard@gmail.com jptpp.switchyard@jalindia.co.in, 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, cbhandari@kalpatarupower.com 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore , id :-solar@ujaas.com 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, - deepesh.sankwa@suzlon.com, Indore , Badree.hirve@suzlon.com

3 MINUTES FOR 67 TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 04 th JANUARY 2019 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR. The 67th meeting of Operation & Coordination Committee of MP was held on 04 th January 2019 at 11:00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure Shri K.K.Parbhakar C.E.(SLDC) & Chairman OCC welcomed all the guests & participants for 67 th OCCM of MP. Chairman OCC stated that the demand trend has slightly changed compared to previous years. In the peak demand was met in the month of December and by January the demand starts decreasing whereas this year in January-19 the demand is in increasing trend and Maximum Demand is being met in January for There is an increase of 3032 MW in demand compared to previous year and till date maximum demand met is 13988MW. He has also mentioned that the energy supply is 17% more in this year. He emphasized that it has been possible to fulfill this demand with the cooperation of all stockholders, MPPTCL, MPPGCL, NHDC & JP BIna. He further underlined that the same support & cooperation are expected all entities in upcoming days as demand is expected to increase further till mid of January 2019, therefore the outage of any units is not warranted during this period. Chairman OCC further stated that the new DSM Regulation is implemented from 1 st January 2019, wherein sign reversal of deviation is to be done after every 6 th time block by each entity, failure to which will cause a heavy penalty of 20% of the base DSM of the concerned entity. He informed that the generating company can regulate its generation and can comply with the regulation for sign reversal but it is difficult for Discoms to reverse its sign after every 6 th time block as they do not have any variable/controllable quantum and will be liable to pay a heavy penalty. Hence Discoms shall take up the matter with MPPMCL and shall vary their schedule in coordination with MPPMCL.. Thereafter he requested Member Secretary to take up the agenda points. Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and participants for 67 th OCCM and requested all the participants for formal introduction. He informed the committee that recently in a meeting, Hon. Energy Minister of GOMP, has instructed to ensure uninterrupted supply to consumer along with quality supply i.e., to provide consumer supply 24X7 with proper voltage and adequate power to Agriculture consumer.. The Discoms and MPPTCL has been requested to provide adequate capacity of capacitor banks in low voltage pockets. Thereafter the agenda points were taken up which are narrated here under: - ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 66 th meeting of Operation & Coordination Committee of MP held on 17 th November 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No /SG-9B-II/3786 Jabalpur dated No comments have been received. [OCC may confirm the minutes] ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCTOBER 2018 TO NOVEMBER Frequency Particulars: The committee was apprised that during October 2018 the system frequency was below Hz for 12.05% of time against 10.92% of time during November The system frequency was above Hz for 8.75 % of time during October 2018 against 9.21 % of time during November The system frequency was within the IEGC range of Hz for % of the time during October 2018 against % of time during November The average monthly frequency was Hz during month of October 2018 and Hz during month of November The detailed frequency particulars for the month of October 2018 and November 2018 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minutes of 67th OCCM of MP 1

4 Month Average frequency Minimum Integrated frequency over an hour Maximum integrated frequency over an hour Instantaneous Minimum Frequency Instantaneous Maximum Frequency OCTOBER Hz Hz Hz Hz Hz NOVEMBER Hz Hz Hz Hz Hz Member Secretary OCC informed the committee that the new frequency band for DSM framework is Hz. applicable from 1st January 2019 as per CERC DSM Regulation Operational Matters Operational Discipline : The committee was apprised that the system operation in terms of frequency profile for the months OCTOBER 2018 and NOVEMBER 2018 is as given below for discussion by the committee : Month OCTOBER 2018 NOVEMBER 2018 % of time Frequency Below Hz % of time Frequency above Hz % of time frequency within the permissible range of Hz. Average monthly frequency 12.05% 8.75% 79.20% Hz 10.92% 9.21% 79.87% Hz Voltage Profile: The committee was apprised that during the months OCTOBER 2018 and NOVEMBER 2018 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:- Sr. No. Name of 400 KV Substation OCTOBER 2018 NOVEMBER 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Observed Observed Observed Observed Voltage KV Date Voltage KV Date Voltage KV Date Voltage KV Date 1 Indore Itarsi Bina Gwalior Nagda Satpura Birsinghpur ISP Bhopal Ashta Pithampur Minutes of 67th OCCM of MP 2

5 12 Singhaji Member Secretary OCC stated that the low voltages were observed in Indore, Pithampur & Ashta area. The Generators were requested to provide requisite MVAR support in order to maintain voltage Status of Capacitor Banks in sub-transmission system: The committee was apprised about the updated information of the status of capacitor banks in sub-transmission system as on 31 th NOVEMBER 2018 as submitted by DISCOMs is detailed below: DISCOM Capacitor bank Capacitor installed in good Banks healthy condition (No) but not in service due to control ckt problem KVAR KVAR KVAR Capacitor bank Require Requiremen Capacitor Balance installed but ment of t against banks already capacitor defective & are repair nonrepairable covered under banks to be repairable (No) against each capacitor ADB T-V covered in other unit (No) banks schemes No of KVA R KVA R KVA KVAR KVAR KVAR R KVAR Units KVAR KVAR KVAR KVAR KVAR KVAR required EZ CZ WZ It is pointed out that Central Discom is being not furnishing data as per prescribed format and the Capacitor Banks healthy but not in service due to control ckt problem have not been included in the details submitted by Central Discom. Member Secretary OCC stated that Discoms shall provide information of minimum voltage reached and the low voltage pockets identified at distribution level so that planning at EHV level could be done accordingly and needed remedial steps could be ensured Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: : The committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on as submitted by MPPTCL is given below:- Voltage Capacitor bank Capacity Added Capacitor banks TOTAL Capacitor Bank Class installed as on after Last OCC already covered CAPACITY AS Installed but (MVAR) Meeting (MVAR) under ADB T-V ON defective & are not (MVAR) repairable (No & MVAR) 220 KV All in Service 132 KV KV Total The committee has noted the same. Minutes of 67th OCCM of MP 3

6 2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: : The committee was apprised about the various ongoing Transmission Schemes completed during the financial year (up to NOVEMBER 2018) and plan for completion of various ongoing Transmission Schemes for the Year is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively U/F and df/dt Relay Operation (i) (ii) U/F and df/dt Relay Operation: : The committee was informed that the frequency did not touch Hz during OCTOBER 2018 and NOVEMBER There was no df/dt operation during the same period. Defective u/f, df/dt relays: : The committee was apprised that MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & at 132KV S/S Chapda the df/dt protection is provided through df/dt feature of DPR. All U/F stages are in good/ healthy & working condition. 2.3 Power Cuts / Load restrictions/differential Load Shedding by DISCOMS & group allocation to 33 KV feeders: (i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic categories during the period OCTOBER 2018 and NOVEMBER 2018 is enclosed at Annexure 2.3(i). Member Secretary OCC informed the committee as directed by Hon. Energy Minister of MP, the Supply Hours for Agriculture should be at least 10 Hrs. & other than Agriculture supply should be 24 Hrs. Hence all the Discoms are requested to ensure the supply hours to consumers along with quality of supply as per directives of Govt. of MP. (ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:- SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur Sagar 00 EAST 03 Rewa Total Indore WEST Ujjain Total Bhopal CENTRAL Gwalior Total 21 TOTAL Grand Total 38 Minutes of 67th OCCM of MP 4

7 Representative from East Discom informed the committee that the 02 no. 33 KV feeders in Jabalpur region have been allocated group & the group allocation for 01 no. 33KV feeder is under process and will be done at the earliest. Representative from West Discom informed the committee that the group allocation for 33KV Mittal Corp-2 feeder has been done and the proposal for group allocation of 09 no. 33 KV feeders in Indore Region & 01 no. 33 KV feeder in Ujjain region is under final stage. Representative from Central Discom informed the committee that the efforts are being made to expedite the process of group allocation of 33 KV feeders and shall be completed within a month. ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The committee was apprised about the annual maintenance /outages of thermal generating units of MPPGCL during December 2018 to January 2019 is NIL as intimated by ED(O&M:Gen.).The details of hydel unit planned outage was submitted by representative from (O&M:Hydel), MPPGCL in the meeting. 3.2 Proposed shutdown programme of Transmission lines / Transformers: The committee was apprised about the proposed shutdown of transmission elements for the period to submitted by MPPTCL is enclosed as Annexure-3.2. [Committee May like to discuss] 3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:- Sr. Line/Transformer/ etc Outage date Reason Response from Utility No under long Outage 1. 16MVA BBL make X mer at 132KV S/S Berasiya X mer tripped on Differential & Buchholz Trip Indications MPPTCL informed that X mer is declared faulty & replacement is expected in Jan MVA EMCO X mer at 132KV S/S Chicholi Tripped on Buchholz trip indications. X mer replaced by another 20MVA transformer on dt UAT-7B, STPS, Sarni Differential relay & bucholz relay operated. Order placed to M/s Shree Abirami Engineering works Chennai, Tamil Nadu on dtd MPPGCL informed the committee that work is under progress and will be in service at the earliest MVA, 400/220 KV X mer at STPS X mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from to for CPRI oil filtering and RLA testing work. MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted. Chairman OCC stated that the matter is under dispute, as MPPTCL has shown reluctance for decommissioning of ICT looking to Minutes of 67th OCCM of MP 5

8 system constrain and proposed to commission GIS at STPS with 500 MVA ICT in service in review meeting of Energy department. Therefore MPPGCL & MPPTCL shall discuss the matter with each other and resolve the matter at the earliest & intimate to SLDC MVAR (Make GE) Line Reactor at 400KV Sarni- Asta Ckt-I Under outage since due to concentration of Acetylene gas. DGA test of transformer oil of reactor was carried out by M/s CPRI, Bhopal. To carry out the internal inspection of reactor, NIT will be opened on 15th September 2018 and certain queries on techno commercial issues have been sought from M/s GE(T&D) India (OEM). Price bid opened on 5 th December 2018 and under security. Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The matter was discussed in the meeting. ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2018 AND NOVEMBER 2018: The committee was apprised about the details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Annex. 4.2.i Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Power Supply Position(Energy Balance Sheet). 4.2.ii. Power Supply Position Scenario:- The matter was discussed in the meeting and the committee was briefed the Generation, Demand management scenario in moth of Oct & Nov 19 POWER SUPPLY POSITION FOR THE MONTH : Oct 18 Particulars Max Dem Met on : 31-Oct-18 AT : Average Oct Average Oct Average Oct All Fig in MW Average Monthly STATE PEAK DEMAND MET BREAKUP :- Total Energy (LU) STATE THERMAL (Actual Gen) STATE THERMAL (RSD) Total MW STATE HYDEL IPP (STATE) Minutes of 67th OCCM of MP 6

9 CENTRAL SECTOR (Schedule) CENTRAL SECTOR (Surrender) IPP (INTER STATE) RAILWAY RENEWABLE ENERGY OTHERS BANKING / PURCHASE / SALE DEVIATION DEVIATION (AVERAGE) 206 Between (-648 to 772) Between (-834 to 414) Between (-802 to 579) Between (-834 to 772) ENERGY SUPPLY STATE (LU) POWER SUPPLY POSITION FOR THE MONTH : Nov 18 Particulars Max Dem Met on : 27-Nov-18 AT : Average Nov Average Nov Average Nov All Fig in MW Average Monthly STATE PEAK DEMAND MET BREAKUP :- Total Energy (LU) STATE THERMAL (Actual Gen) STATE THERMAL (RSD) Total MW STATE HYDEL IPP (STATE) CENTRAL SECTOR (Schedule) CENTRAL SECTOR (Surrender) IPP (INTER STATE) RAILWAY RENEWABLE ENERGY OTHERS BANKING / PURCHASE / SALE DEVIATION DEVIATION (AVERAGE) -72 Between (-727 to 544) Between (-781 to 477) Between (-904 to 510) Between (-904 to 544) ENERGY SUPPLY STATE (LU) Minutes of 67th OCCM of MP 7

10 ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF OCTOBER 2018 AND NOVEMBER 2018: The committee was apprised about the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5. ITEM NO.6 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status regarding schedule and commissioning of reactors / transmission elements is as below:- S.No. 400 KV S/s Size MVAR 1. Bus Reactor : ISP 2. Line Reactor on 400 kv Sapura ISP line at STPS 3. Bus Reactor at SSTPS Implementing Agency 125 MVAR NHDC 50 MVAR MPPGCL 125 MVAR MPPGCL Expected Date of Commissioning as intimated in last OCC Bus reactor test charged on However for final charging telemetry compliance required to be completed. In 66 th OCC ISP informed the committee that the reactor cannot be configured in the existing RTU as the RTU is of old configuration, hence purchase of new RTU is being processed. In the multifunction meter is under repair thereafter the existing RTU can be used to integrate telemetry. NHDC is requested to provide the expected date of commissioning. In 66 th OCC MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by June Chairman OCC stated that MPPGCL shall install the reactor on priority basis due to system requirement. Work will be carried out under PSDF as intimated by MPPGCL in 62 nd OCC in 66 th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March Chairman OCC stated that MPPGCL shall install the reactor on priority basis due to system requirement. The matter was discussed in the meeting. 6.2 GENERATOR DATA SHEET OF SINGHAJI TPS UNIT # 1, 2, 3 & 4:- The committee was apprised that as per clause 11, 12, 13 of Manual on Transmission Planning Criteria Of CEA the generator data is required for modeling the generators for simulation studies. It is also to mention that due to integration of RE Generators in the grid & its variable generation for which the precise simulation studies have Minutes of 67th OCCM of MP 8

11 to be done for proper grid management. Further vide dtd & Singhat TPS was requested to submit the generator data of Singhaji TPS Unit #1,2,3&4 including following details:- 1. Generator Datasheet provided by OEM for all the units (to model generator). 2. Technical Datasheet of the Generator transformers for Unit-1,2,3,4. 3. Open circuit magnetization curve/open circuit and short circuit test results performed during the commissioning (for validation of system study model at our end), type of saturation to be provided. 4. Excitation systema. Type of excitation system its block diagram(transfer function) and adopted parameters (commissioning report for model validation) b. PSS- Block diagram(transfer function) and its adopted parameter, commissioning report( to validate the model). 5. Turbine Governor systema. Turbine and Governor system datasheet. b. Block diagram(transfer function) of Turbine governor system and its parameters (commissioning report for model validation). The committee was informed that despite of several & telephonic conversations made with Singhaji TPS, the above data has not been furnished to SLDC/WRLDC. Hence seeing to the security of the grid the modeling of generators for precise simulation studies has to be done, therefore Singhaji TPS, MPPGCL is requested to comply with CEA regulations and kindly furnish the required details for modeling of generators for simulatuion studies at the earliest to this office for further submission to WRLDC. The matter was discussed and representative from MPPGCL informed that the data will be provided at the earliest. 6.3 ABNORMAL DELAY IN CONVEYING TRIPPING DETAILS TO SLDC CONSEQUENT UPON TRIPPING OF 63 MVA 132/33KV TRANSFORMER AT MANSAKRA SUB STATION: The committee was apprised that 63MVA, 132/33KV transformer at 132 KV S/s Mansakra tripped on at 08:25 hrs on buchholz indication. The tripping details were conveyed to SLDC at 13:11 hrs, approximately laps of five hours of incidence took place. As per provisions of Grid Code, keeping the EHV elements out of service without knowledge of SLDC is violation of Grid Code. More over whenever such incidence of tripping took place, it should have intimated to SLDC immediately. It is therefore requested that report on the matter may be furnished to the SLDC and concerned officials may please be instructed suitably to avoid reoccurrence of such incidence and strictly adhered with grid code. The matter was discussed in the meeting and Representative from T&C ensured that suitable instructions have been issued to concerned officials and such incidences shall not be repeated in future. During discussion, another similar case was pointed out and committee was apprised that on Pench HPS took outage on one of the units and stopped the unit without obtaining code from SLDC. Such incidents should not be repeated to avoid threat to grid security and officials shall be suitably instructed to avoid such reoccurrence. Minutes of 67th OCCM of MP 9

12 6.4 THREE HOURS AND 33 MINUTE INTERRUPTION TO BIRSINGHPUR & UMARIYA SUBSTATION DUE TO TRIPPING OF 220/132 KV TRANSFORMER AT 220 KV S/s BIRSINGHPUR (PALI):- The committee was apprised that on dtd at 06:40 hrs 160MVA 220/132 KV transformer EMCO make tripped on OSR indication, this caused total interruption to Birsinghpur(Pali) and Umariya substation. As reported in flash report, the reason of operation of OSR relay indicated therein, is low oil level in the transformer due to oil leakage. In this context, it is desired that the remedial measures taken for avoiding reoccurrence of such incidence may please be appraised to SLDC. The detailed report of tripping was also soughed from T&C. 6.5 PROTECTION AUDIT OF HYDEL POWER STATIONS OF MPPGCL:- The committee was apprised that MPPGCL vide letter No /601-PSDF, dtd 21/02/2018 has conveyed that protection audit of switchyard associated with 10 hydro power plants of MPPGCL is required to be carried out by WRPC. Further, it was decided that work or protection audit of all switchyard carried by a team constituted by WRPC accordingly nominations were invited from utilities for protection audit team. Vide this office dtd the name of officers from MPPTCL, NHDC and MPPGCL was conveyed to WRPC. MPPGCL is insisting for early completion of aforesaid protection audit, considering provisions of MOM of TESG meeting of PSDF regarding the observations for PSDF grant on MPPGCL proposal in 37th meeting held on As a sequel to above, SE (Protection), WRPC has intimated that looking to difficulties at WRPC level to constitute a committee for aforesaid work, it has been directed that committee may be constituted MP- SLDC. However, detailed programme for Protection Audit to be carried out be intimated to WRPC, so that WRPC may depute one member from WRPC their end. MPPGCL is therefore requested to furnish detailed programme for conducting Protection Audit along with data required in this regard as requested by WRPC earlier, so that proposed Protection Audit could be carried out. It is mentioned that the matter has been discussed in 66th Meeting of OCCM, thereafter the matter has been perused with C.E. (Hydel), however requisite details of Hydel Power Station of MPPGCL have not been provided yet. Therefore, the Protection Audit Activities still could not initiate further. The matter may please be expedited and needed information be provided to SLDC without further delay. Representative from MPPGCL ensured that the desired details will be submitted at the earliest. 6.6 REAL TIME OPERATIONAL DIFFICULTIES DUE TO NON AVAILABILITY OF TELEMETRY DATA OF ISP HPS UNIT#2:- The committee was apprised that the telemetry of ISP HPS Unit #2 is out since long. The matter has been persuaded number of times with ISP Authority, however the telemetry of Unit # 2 has not been made available, this cause lot of difficulties in real time operation of system. It is therefore desired that telemetry of above unit may be rectified and made available immediately. Member Secretary OCC stated that telemetry availability is a regulatory requirement and ISP shall ensure the telemetry of ISP Unit#2 as SLDC will be liable to put the unit under outage in case of non availability of telemetry. Minutes of 67th OCCM of MP 10

13 6.7 MODIFICATION/SHIFTING OF 220 KV SUKHI-SEVANIA-ASHTA LINE FROM LOC. NO. 87 TO 90 FOR LOWERING DOWN THE LINE FOR MAINTAINING CLEARANCE BETWEEN THE E/W OF 220 KV LINE WITH BOTTOM CONDUCTOR OF NEWLY CONSTRUCTED 765 KV BHOPAL-INDORE S/C LINE OF M/S BHOPAL DHULE TRANSMISSION CO. LTD. (M/S AS BDTCL) UNDER CONSUMER CONTRIBUTION WORK: The committee was apprised that MPPTCL has conveyed approval for crossing of 765 KV Bhopal- Indore S/C line with various transmission lines of MPPTCL vide letter No /B-3132/P&D-TLD/389 dated based on the proposal and profile submitted by M/s Bhopal Dhule Transmission Co Ltd. However, after completion of erection work, BDTCL has observed that the electrical clearance of 765 KV line with 220 KV SukhiSevania-Ashta line between location No. 87 to 90 was not adequate. It had probably happened due to negligence workmanship as line was not erected exactly as per provisions of profile. Thereafter the BDTCL has submitted their request to MPPTCL vide letter dated wherein request was made for modification / shifting of 220 KV SukhiSevania-Ashta line (crossing loc. No. 88 & 89) in order to maintain adequate electrical clearance along with consent for bearing the cost of work. Based on the request of M/s BDTCL, looking to target date ofcharging of 765 KV Bhopal Indore Single ckt line an agreement between MPPTCL and BDTL was executed and MPPTCL has accorded permission for lowering down the E/W of 220 KV line as a special case as an interim arrangement till 220 KV line is modified or shifted. After lapse of about 2 years, M/s BDTCL has not undertaken the required modification/ shifting work, evenafter persisting pursuance at different level.the E/W of 220 KV line is still in lowered position due to which the conductors are unprotected against lightening. Moreover, in case of snapping of conductor of 765 KV on 220 KV line would initiate serious fault. In above scenario, it is felt that BDTCL may be advised to complete modification/ shifting work of 220 KV SukhiSevania- Astha line immediately under consumer contribution as per mutual agreement looking to protection issue of 220 KV SukhiSevania-Ashta line. Representative from EHT-M&I informed the committee that BDTCL has submitted the amount for supervision work and also hired a consultant who has visited the site. Further the proposal by consultant for work to be done has been put up to P&D, MPPTCL for approval. Member Secretary OCC stated that EHT-M&I and P&D, MPPTCL shall take up the matter with BDTCL and expedite the work. 6.8 LOAD DROPPING SCHEME AT 400KV & 220 KV SUBSTATIONS TO HANDLE EMERGENCY CONDITION: - The committee was apprised that on dtd at 09:55 Hrs. 160MVA 220/120 KV X mer no-2 at 220 CT No.-II at 220 KV S/s Malanpur tripped on on PRV indication due to cable fault. Consequently following X mers and circuits also tripped:- S.NO ELEMENT NAME INDICATION TRIPPING TIME MVA X MER 1 at 220 KV S/s Malanpur MVA X mer-1 at 220 KV S/s Mehgaon MVA X mer-2 at 220 KV S/s Mehgaon. 132 KV side tripped due to over loading. O/C O/C 09:55 Hrs. 09:55 Hrs. 09:55 Hrs. Minutes of 67th OCCM of MP 11

14 4 160 MVA X mer at 220 O/C, E/F 09:55 Hrs. KV S/s Morena KV Banmore O/C from Banmore end. 09:55 Hrs. Motijheel Ckt KV Banmore O/C from Banmore end. 09:55 Hrs. Motijheel Ckt - 2 Due to above tripping interruption occurred at 15 no. sub stations causing the load loss of about 615 MW as detailed below: KV Malanpur KV S/s Morena KV S/s Mehgaon KVS/s Bhind KV S/s Seondha KV S/s Lahar KV S/s Ron KV S/s Porsa KV S/s Pratpura KV S/s Barnmore KV S/s Ambah KV S/s Morar KV S/s Gohad KV S/s Morena KV S/s Badgaon Dimni KV Hitampur Railway Traction. In view of above it becomes necessary that in every 400KV & 220KV substation, load dropping scheme invariably made functional so that in case of any emergency situation under N-1 condition, the loading on ICT should not crossed dangerous level. It is gathered that the existing load drop scheme at 220 KV S/s Malanpur is provided on 220 KV Malanpur Gwalior(PG) Ckt- I & II and does not cover the 160 MVA, 220/132 KV X mer I & II at 220 KV S/s Malanpur. Therefore to avoid overload tripping of transmission elements at Malanpur, Mehgaon & Morena it is proposed to review the load drop scheme installed at at these sub stations. However, if load dropping scheme have not been made, so far, it is requested to formulate suitable load dropping scheme to handle sudden emergency as elaborated above in Gwalior area & as well as other important nodes of MP Grid. The Committee may discuss the matter. Representative from MPPTCL informed the committee that the load dropping scheme has been revised and implemented on 160 MVA, 220/132 KV X mer-i & II along with the 220 KB Malanpur Gwalior Ckt- I & II and 132 KV Badagaon Ckt, 132 KV Gohad Ckt-I&II and 132 KV Mehgaon Ckt has been included in the revised load drop scheme. Member Secretary OCC requested MPPTCL to provide the updated status of load dropping scheme installed at MPPTCL substations. 6.9 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that for safe & secure operation of integrated system, the under-frequency relay should be connected in the system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of Minutes of 67th OCCM of MP 12

15 healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in OCC meeting of MP in time to time, however the desired information are still awaited from utilities. It is therefore desired that the above matter may be treated as urgent and status of healthiness of Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall visit the sub-stations to ascertain the healthiness of under frequency relay PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In 60 TH OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has been discussed. However, no any fruitful progress has been observed so far. In the above context it is indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every Hydel Power station should be equipped with synchronization facilities invariably for system reliability and Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly provide status of making synchronization facility in aforesaid HPS. The matter was discussed with the committee and MPPTCL has been requested to provide the status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether synchronization facility could be provided at Karera & Pichhore substation on priority basis. The matter has been discussed with officers of T&C wing, it has been ensured that they are making arrangement for installation of synchronizing trolley at Pichhore and Karena S/s at the earliest DELAY IN SUBMISSION OF DOCUMENTS FOR FIRST TIME CHARGING OF ELEMENTS:- The committee was apprised the procedure for interconnection of new transmission elements is briefly narrated hereunder:- Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date of first time charging. Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days. Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days prior to anticipated date of first time charging. Minutes of 67th OCCM of MP 13

16 RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line charging approval shall be conveyed by SLDC: (within 2 days). Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to read the SEM data from the new meters. Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code shall be issued keeping view of grid reliability. Transmission Licensee submit Post Charging documents (Annexure C1 to C4). RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional lines / ISTS lines. The respective testing department shall furnish regarding measures taken to take care new element interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be provided. It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. It may also be ensured that FTC formalities should have completed before availing outage for integration of element. The authority submitted FTC document should ensure compliance of protection/ metering/telemetry issue in coordination with T&C official. It is also desired that all necessary data should have made available to all adjacent s/s for relay coordination well before targeted date. The authority submitted FTC document should ensure all formalities have been completed otherwise it would be difficult to obtain clearance from WRLDC. In general, non-attachment of requisite papers/ SLD/ document of standing committee approval /approval of Electrical inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly caused delay in obtaining FTC approval. Therefore, it is desired that FTC document completed in all respect may be provided in stipulated time schedule so that FTC formalities could be completed within targeted date of charging.the committee was apprised that WRLDC has developed web based FTC software for submitting FTC document / application to WRLDC for first time charging approval. The software is ready for registration and processing of FTC and trial operation applications. Hence, all concerned department have requested to register on the web based FTC software and initiate all the applications / requests through software only. A manual has also been forwarded to all utilities to understand the workability of FTC software. The matter was discussed with the committee TEN DAILY RESERVOIR OPERATION TABLE OF MPPGCL HPS: - In the meeting held in Regional Office of MPPMCL at Bhopal on to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54 th, 55 th & 56 th OCCM, request has been made to MPPGCL for furnishing the same to SLDC within a week. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of hydel power stations in coordination with NVDA and WRD for optimum utilization of available water in the reservoirs during the summer season. Minutes of 67th OCCM of MP 14

17 ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During the black start mock drill successfully carried out at Hydel power station as mentioned below:- S.NO. NAME OF HPS DATE OF MOCK DRILL 1 Pench & Bargi HPS Joint Mock Drill Gandhi Sagar HPS Rajghat HPS Manikheda HPS MPPGCL may apprise the same in the meeting. The Black Start Mock Drill at Birsinghpur HPS was conducted on but the mock drill was suspended due to abnormal sound observed from generator side during mock drill. The detailed report from Birsinghpur HPS, MPPGCL is still awaited. It to inform that the dates proposed to conduct the Black Start Mock Drill of various HPS is as below:- S.NO. NAME OF HPS DATE OF MOCK DRILL 1 ISP OSP In view of the above all the concerned entities were requested to confirm the proposed dates. Representative from NHDC confirmed the above dates for conducting the Black Start Mock Drill. ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 TESTING & CALLIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR DATA: 1. SLDC representative already requested CE(T&C) office in previous OCCMs to apprise the status of testing / calibration of interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010 to the committee. CE(T&C) office representative informed that calibration testing kit not available to all circles. Further, they have informed that telephonic disscution to ERDA & offer to contract testing / calibration of all interface meters and also contact to CPRI for testing and celibration of interface meters. 2. SLDC representative informed that inspite of the repeated requests made by SLDC in the previous OCCMs to issue instructions to all circle office for furnishing the JMR data in standard format is not received by SLDC by 7 th of every month and requested CE(T&C) office to furnish the same by 7 th of every month. CE(T&C) office has assured that instructions will be issued to all circle offices for furnishing the JMR data in standard format by 7 th of every month at id - abtmpsem@gmail.com. 3. SLDC representative already informed that CE(T&C) office in 66 th OCCM to provide list of 150 Nos newly commissioned interface points as per order no dated and subsequent Minutes of 67th OCCM of MP 15

18 amendment no dated placed on M/s Secure Meters Ltd. by CE(Procurement) office for AMC of 150 Nos AMR system (modem, optical cable, Yagi antenna, configuration). In the order it is mentioned the list of 150 Nos interface points shall be provided CE(T&C) office. Futher, SLDC vide letter No.07-05/SG-11/SEM/3504 on date requested CE(T&C) office to provide list of 150 interface points to M/s Secure Meters Ltd. so that integration of meters could be done. However, till date the list has not been issued by CE(T&C) office. He further informed that in the absence of list the meters are not integrated with AMR system of SLDC and thus the data is not being received by SLDC. Every month SLDC is assessing the data of around 100Nos of ABT meters due to non-availability of data. He requested CE(T&C) office to immediately issue the list of 150 nos. meters installed at the interface points to M/s Secure Meters Ltd. so that same are integrated with AMR System of SLDC. CE(T&C) office representative informed that two working days the final list of 150 nos. newly commissioned interface points provided to SLDC. 4. SLDC representative already inform that CE(T&C) office in 66 rd OCCM the data of ABT meters installed at the interface points of Open Access Customers ( M/s SEL, M/s Prism Cement Unit-2 & M/s Maihar Cement) is not being downloaded through AMR System of SLDC and site officials are also not furnishing the load survey data of these meters. He requested the CE(T&C) office to issue instructions to field offices for data downloading and furnishing the same to SLDC. CE(T&C) office assued that instructions shall be issued to site officials. 8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM: SLDC representative already informed that in 66 th OCCM the ABT meter data of following TSS of Railways is not being received through AMR system. 1. Railway TSS Bordhai. 2. Railway TSS Umreth. 3. Railway TSS Mansakra. Railway representative informed that Sim replacement procurement under process and Railways will coordinate with M/s Secure Meters Ltd. and MPPTCL for resolving the problems related with downloading of meter data of above TSS through AMR installed at SLDC. 8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL : SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and all the meters were successfully integrated with AMR server. He also informed that ABT meter data of 53 Nos meters were not received through AMR system in the month of November 2018, the status of data received through AMR system was also ed to GCC, MPPGCL on 3 rd December He requested MPPGCL to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL representative intimated that matter is being taken up with M/s Secure Meters Ltd for providing AMC of AMR system. Minutes of 67th OCCM of MP 16

19 SLDC representative requested MPPGCL to furnish the meter master of ABT meters installed at the interface points as standy meters and provide AMR facility on standby and check meters. MPPGCL assured that instructions will be issued to site officials for providing the meter master of standby meters. MPPGCL also assured to look into the matter for providing AMR facility on check and standby meters. SLDC representative requested MPPGCL to issue instructions to officials of SSTPS PH-I & II for furnishing the JMR data of Secure meters where AMR is provided and data is downloaded by SLDC. MPPGCL assured that instructions will be issued to site officials. He also informed that the 15 minutes blockwise data recorded in the meter no. XD installed at GT of SSTPS PH-II unit-iii do not match with midnight data i.e monthly injection data. MPPGCL representative intimated that the matter take up M/s Secure Meters Ltd. for resolving the problem. SLDC representative informed that, Sanjay Gandhi Thermal Power Stations of MPPGCL, the injection recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation recorded at Generator end and requested MPPGCL to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data. 8.4 NON RECEIPT OF ABT METER DATA OF ISP & OSP HPS THROUGH AMR SYSTEM: SLDC representative already informed that in 66 th OCCM the ABT meter data of ISP & OSP HPS is not being received through AMR system installed at SLDC and requested ISP & OSP to coordinate with M/s Secure Meters Ltd. & SLDC for resolving the problems related with downloading of meter data through AMR. ISP & OPS assured to coordinate with M/s Secure Meters Ltd and SLDC for downloading of meter data. 8.5 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF NEWLY COMMISSIONED WIND & SOLAR POWER PROJECT FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT : SLDC representative informed that the concerned SE(O&M) s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done. i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. having (Simcom(1MW), Eastman(4MW), Made Easy(10MW) connected through 33KV Ctk-I and 4 MW Solar Project of M/s Ramesh Steels connected through 33 Ckt-II at 220KV Ganjbasoda. SE(O&M) Vidisha. ii) 15MW Wind Power Project of M/s Tirupati Dhar Renewable Power Pvt. Ltd. connected at 33KV Jaitpura Dhar. SE(O&M) Dhar. iii) 15MW Wind Power Project of M/s Dhar Wind Power Projects Pvt. Ltd. connected at 33KV Dashera Maidan SE(O&M) Dhar. iv) 30MW Wind Power Project of M/s Sudheer Projects Pvt. Ltd. connected at 132KV Berchha SE(O&M) Sahajapur Minutes of 67th OCCM of MP 17

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

No.07-05/SG-9B-II/4084 Jabalpur, dated:

No.07-05/SG-9B-II/4084 Jabalpur, dated: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/4084

More information

No.07-05/SG-9B-II/1594 Jabalpur, dated

No.07-05/SG-9B-II/1594 Jabalpur, dated MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1594

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1234

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

In view of the above list of important grid element & exception list is as below:-

In view of the above list of important grid element & exception list is as below:- OUTAGE PROCEDURE As per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval.

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC and can be downloaded.

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC   and can be downloaded. MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in

More information

STATE LOAD DISPATCH CENTRES (SLDC)

STATE LOAD DISPATCH CENTRES (SLDC) ACTIVITIES OF SLDC STATE LOAD DISPATCH CENTRES (SLDC) **The State Load Despatch Centre:- As per section 33 of Electricity Act - 2003 (Central Act 36 of 2003), SLDC performs powers as defined below:- SLDC

More information

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Renewable Regulatory Fund (RRF) Mechanism : -

Renewable Regulatory Fund (RRF) Mechanism : - Renewable Regulatory Fund () Mechanism : - : Chronology of events Outline : Objectives at a glance : Approach : Applicability Role of different stakeholders Brief on CERC Orders on State Load Dispatch

More information

Case No. 163 of In the matter of

Case No. 163 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED GUIDELINES FOR EMPANELMENT OF GRID TIED INVERTER MANUFACTURERS FOR IMPLEMENTATION OF SRTPV PROGRAM IN BESCOM. I. NEW EMPANELMENT 1. The grid tied inverter manufacturer shall register their application

More information

Supply of Batteries

Supply of Batteries Supply of Batteries 207-8 SUPPLY OF BATTERIES OF VARIOUS RATINGS E-PROCUREMENT (REVERSE AUCTION) NIT No: 07/ 207-8 Name of the work Supply of Batteries to our Branches / Offices /ATM Completion Time EMD

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

UTTARAKHAND POWER CORPORATION LIMITED

UTTARAKHAND POWER CORPORATION LIMITED UTTARAKHAND POWER CORPORATION LIMITED PUBLIC-NOTICE In terms of the provisions of section 45 of the Electricity Act, 2003, the consumers and the general public are hereby informed of the tariff and charges

More information

In-House Paper on the implementation of Single Part Tariff in Power Distribution

In-House Paper on the implementation of Single Part Tariff in Power Distribution December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005. BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:8034 25 Oct 2004 Subject: Implementation of revised IS 8034:2002 Submersible Pump Sets and revised STI (Doc:STI/8034/5 ) IS

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

CASE No. 35 of In the matter of

CASE No. 35 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings

More information

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region -

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. No Date of Exemption To whom Exemption was granted Clause to which Exemption has been granted Concise

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

Case Nos. 12 & 48 of 2009

Case Nos. 12 & 48 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Generating Unit Model Validation Policy

Generating Unit Model Validation Policy Generating Unit Model Validation Policy approved by WECC BOT WECC Generator Testing Task Force History August 10, 1996 WSCC Outage 4600 Observed COI Power (Dittmer Control Center) Real event 4400 4200

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Exemptions currently in force

Exemptions currently in force exemptions by Western Power s currently in force Neerabup Units G11 & G12 3.3.3.1 (a) 16 Jan 2008 Ongoing Modified performance criteria: 0.8 Lagging 101.3 MVAr 0.9 Leading 68.5 MVAr Financial contribution

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India. Document: BHEL/EDN/SCPV/D91/EOI Revision: 01 Date: 12-Oct-2009 EXPRESSION OF INTEREST (EOI) FOR TECHNOLOGY PARTNERSHIP IN SEMICONDUCTOR DEVICE MANUFACTURING (IGBT Encapsulation Technology, Expansion of

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012 POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012 PREPARED BY: System Performance and Commercial DATE: 7 March 2013 FINAL Disclaimer Purpose This

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

Net Metering & Compensation Seminar

Net Metering & Compensation Seminar Net Metering & Compensation Seminar November 2, 2017 Eversource Energy Hadley, MA Changes Are Here Market Net Metering Credit was introduced: 60% Market equal to 60% of distribution, transition, transmission

More information

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007 to: details Version: 2007 Technical Rules 1 16-Jan-08 2 16-Jan-08 3 29-Jan-08 Neerabup (two generating units - Units G11 and G12) Neerabup (two generating units - Units G11 and G12) Bluewaters Power Station

More information

Enhancing Grid Stability in India

Enhancing Grid Stability in India India Japan Energy Forum 2017 Enhancing Grid Stability in India 9 January 2017 Nomura Research Institute 7 th Floor, Tower A, Building 5 DLF Cyber City, Phase III Gurgaon, India Otemachi Financial City

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. First Revision of Sheet No. 135.1 P.S.C.U. No. 50 Canceling Original Sheet No. 135.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH Net Metering Service Closed to Applications for

More information