7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.
|
|
- Alban Moore
- 5 years ago
- Views:
Transcription
1 BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16: Oct 2004 Subject: Implementation of revised IS 8034:2002 Submersible Pump Sets and revised STI (Doc:STI/8034/5 ) IS 8034:1989 has been revised and published as IS 8034:2002. Subsequently, Amendment No. 1 to IS 8034:2002 has also been published to take care of printing error. In the revision of IS 8034, following changes have been made: 5 All the five amendments issued to IS 8034:1989 have been incorporated. ii) Terminology of static water depth, draw down and submergence have been modified. iii) Some of the construction features have also been modified in line with the prevailing manufacturing practices. iv) Minimum efficiency has been increased by 5% over the existing pump efficiency and correspondingly the minimum overall efficiency would increase depending upon the motor rating. Accordingly minimum efficiency graphs given in Fig. 4 & Fig 5 have been modified The concept of nominal rating for the duty point has been introduced in this revision. On this nominal rating, specified tolerances may be made applicable so that there is no need to test the pump again at user s required duty point which fall within the tolerance and may be certified as such provided the pump meets all other requirements of standard at the user s required duty point. However, it would be desirable and more useful to apprise the user that certified pump at user s required duty point may conveniently be used, if within the specified tolerance of nominal duty and meeting other performance characteristics at user s required duty point rather than certifying the same pump again at user s required duty point. Referred testing standard IS 11346:1985 has also been revised and published as IS 11346:2002 and pumps are required to be tested as per revised specification. Consequent upon revision of IS 8034, STI has been revised as Doc:STI/8034/5 Aug 2004 (copy enclosed). While finalizing the STI, the recommendations of seminar on implementation of revised pump standards organized at Coimbatore in March 2004 have been considered. The changes in revised STI and the methodology for changeover was discussed and explained to the participants in the All India Seminar of Submersible Pump Sets organized at Ahmedabad on 21 Sep The licensees are required to examine the duty point of various models of pumps covered in their licence and re-declare the same wherever required in view of increased minimum efficiency in the revision. In view of changes to be incorporated by licensees in the design of the pumps for achieving higher efficiency, testing of the samples is required as per revised declaration wherever required, before endorsing the same in the licence as a result of implementation of revised IS 8034:2002. It is proposed that : 7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb BOs to inform the licensees under their jurisdiction about implementation of revised IS 8034:2002 and STI. 9 Licensees to re-examine declaration of duty point for various size of pumps covered in the licence and re-declare duty point wherever required due to increased minimum efficiency. The licensees shall also be asked to specifically declare the design changes made in the pump and/or motor to achieve the revised overall efficiency requirements. 10 In case the declared overall efficiency of a particular pump is already exceeding the revised minimum efficiency requirements, such pumps need not be subjected to any retesting and no fresh endorsement is required in the licence for this purpose. 11 In case where the declared overall efficiency was lower than the revised minimum efficiency, but the last independent test report indicates that the revised overall efficiency has been achieved at duty point, such pumps may not be taken up for retesting and endorsement may be made in the licence based on re-declared duty point. A clear undertaking be taken from the licensee that the design of the pumps shall ensure meeting the revised efficiency requirements on consistent basis. However, if the licensee proposes any design change in such pumps they should be taken up for classification and testing as per Annex I.
2 12 For all other cases, where the pumps were having overall efficiency lower than the required minimum efficiency, the licensee shall declare the design changes for each model. These pumps are required to be tested as per the sampling plan given in enclosed Annex I for re-declared duty point to cover the entire range of pumps already covered in the existing licence. In the revised version, there is no change in the performance requirements for the motors. Therefore, only performance of the pump sets to be verified for changeover. However, if the licensee has made design changes in the motors to achieve overall efficiency required, then verification of the motors is also required. The licensee is required to submit the test reports of the samples tested in the factory as per re-declared parameters (drawn as per Annex I) and to offer these samples for testing in independent laboratory. Based on the verification of the test reports submitted by the licensee, necessary endorsement be made in the licence for changeover to revise IS 8034:2002. The licensees should be informed that in case samples tested in independent laboratory are found not conforming to the declared parameters, BIS shall issue stop marking of those group of pumps which are represented by the samples found not conforming. The licensee may re-offer the sample within one month and in case the sample is not re-offered for independent testing or the second sample also fails, the corresponding varieties shall be deleted from the licence. Licensees are required to pay special inspection charges for the visit and testing charges for testing of samples in independent labs wherever applicable. 13 All pending applications where samples have already been drawn, applicants may be given option to re-declare the duty point and samples may be tested accordingly. In those cases, where test reports have been received as per IS 8034:1989 and either the applicant has not declared the revised duty point or the sample is not conforming to the re-declared duty point, licence may be granted as per earlier declaration as per IS 8034:1989 after taking an undertaking that firm will ensure implementation of revised IS 8034:2002 and revised STI by stipulated date as per the provision given in d) above. In all other cases, pending applications be processed as per IS 8034: BOs may advise the licensees that no extension will be given in the implementation date and in those cases where licensee failed to offer sample(s) by stipulated date, stop marking instructions will be issued and w.e.f. 1 Feb 2005 certification of submersible pump sets will be as per IS 8034:2002 only. Submitted for approval please. Sd/- (C.K. Veda) DCM-III DDGM - Sd/- Circulated to All ROs/BOs/BIS Labs/CMD-I/MED- for information and necessary action.
3 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SUBMERSIBLE PUMPSETS ACCORDING TO IS 8034:2002 (Second Revision) (Incorporating Amendment No.1) DOC:STI/8034/5 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given in the specification shall be carried out in accordance with the methods given in the specification. 2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. 2.1 All testing apparatus/measuring instruments shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. 2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. 3. QUALITY CONTROL It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397(Part I):1972, IS 397(Part 2):1985 and IS 397(Part 3):1980]. 3.1 In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9001 as appropriate to the activities of the organization. 4.0 STANDARD MARK The Standard Mark, as given in Column (1) of the First Schedule of the licence, shall be applied on the name plate of each pump, provided always that each pump, so marked conforms to every requirement of the specification. 5.0 OTHER MARKING : In addition the following information shall be furnished on the name plate affixed to the pumpset: 5 Manufacturer s name or trade mark (if any) 6 Model, 7 Serial No.; 8 Number of stages; 9 Bore size, Min; 10 Head, at nominal duty point; 11 Discharge, at nominal duty point; 12 Overall efficiency; 13 Motor rating (kw); 14 Rated speed (rpm); 15 Maximum current (amp); 16 Rated voltage (v) with variation; 17 Rated frequency (Hz); 18 Connection star/delta; 19 Type of duty (whether continuous or not); 20 Delivery size; 21 Head range for non-overloading requirements; and 22 Licence number (CM/L.).
4 DOC:STI/8034/5 6.0 LEVELS OF CONTROL - The tests, as indicated in Table 1 and 2 attached and at the levels of control specified therein, shall be carried out on the whole production of the factory which is covered by this scheme and appropriate records and charts maintained in accordance with paragraph 2.0 above. All the production which conforms to the Indian Standards and covered by the licence shall be marked with certification mark of the Bureau. 7.0 In respect of all other clauses of the specification the factory will maintain appropriate control and checks to ensure that their product conforms to the various requirements of this specification. 8.0 RAW MATERIALS - It is recommended that, as far as possible, each consignment of the raw material should be accompanied by a test certificate certifying its conformity to the relevant Indian Standard. 9.0 REJECTIONS A separate record shall be maintained giving information relating to the rejection of the production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no circumstances be stored together with that conforming to the specification SAMPLES The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as subsequently amended, from the factory or godowns. The Bureau shall pay for the samples taken by it from the open market REPLACEMENT Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods or their components are replaced or repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. The final authority to judge the conformity of the product to the Indian Standard shall be with the Bureau In the event of any damages caused by the goods bearing the Standard Mark, or claim being filed by the consumers against BIS Standard Mark and not conforming to the relevant Indian Standard, entire liability arising out of such non conforming product shall be of licensee and BIS shall not in any way be responsible in such cases STOP MARKING The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is some difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. The marking may be resumed as soon as the defects are removed under intimation to Bureau The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of markings shall also be sent to the Bureau PRODUCTION DATA The licensee shall send to BIS as per the enclosed proforma-1 to be authenticated by a Chartered Accountant or by the manufacturer by giving an affidavit/undertaking, a statement of quantity produced, marked and exported by him and the trade value thereof at the end of each operative year of the licence. Table 1
5 IS 9283:1995 MOTORS FOR SUBMERSIBLE PUMPSETS TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) DOC:STI/8034/5 TEST DETAILS Cl. Requirement Test Methods No. of samples Clause Reference 5 General 5.1 to IS 9283 Each motor Construction 5.3 Earthing 5.4 Finish of Bearings Balancing of Rotor 11.1 & IS & IS (Pt.1) 7.0 Dimensions 7.1 & Table Shaft 4. Extension run IS 2223 out, concentricity of mounting, mabbet and face run out 13 Terminal markings 16.2 (a) Insulation resistance before & after HV test 16.2 (b) High Voltage Test 16.2 (c) No load running of Motor and reading of current and voltage 16.2 (d) Locked rotor reading of Voltage, Current and Power input One Rotor/shaft /sleeve Each Rotor One Motor One Rotor Shaft 13 IS 9283 Each motor & IS or IS IS IS 7572 LEVELS OF CONTROL Lot Size Frequency Remarks One sample per week One sample per day
6 DOC:STI/8034/5 TEST DETAILS Cl. Requirement Test Methods 16.2 (e) Reduced voltage running up test at no-load (for 3 phase motors only) 16.1 (p) Leakage Current Test at rated voltage 16.1 (c) Measurement of Stator Resistance 16.1 (g) Full Load Reading of voltage, Current Power input and Slip 16.1 (h) Performance characteristics 16.1 (f) Locked rotor torque IS 9283:1995 MOTORS FOR SUBMERSIBLE PUMPSETS TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) No. of samples Clause Reference 16.2 (e) IS 9283 Each motor 23 One out of every 10 or less motors of identical type and design produced in a month. 6 IS 4029 or 7 IS IS 4029: or 8.4 IS & IS 9283 Table 2 a) IS 4029 or 8.2 IS 7552 One Motor LEVELS OF CONTROL Lot Size Frequency Remarks One out of every 50 or less motors of identical type and design produced in a month.
7 DOC:STI/8034/5 IS 9283:1995 MOTORS FOR SUBMERSIBLE PUMPSETS TABLE 1 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) TEST DETAILS Cl. Requirement Test Methods 16.1 (m) 16.1 (n) Momentary Overload Test Vibration Test No. Of samples Clause Reference 18 IS 9283 As per agreement with purchaser LEVELS OF CONTROL Lot Size Frequency Remarks See Note 3 Note 1 The tests given in Table 1 are applicable when motor is manufactured in house. If motor is bought out item and each consignment is accompanied by a test certificate indicating values as per IS 9283 or BIS certified tests as per Table 1 not required. Note 2 For performance other than at rated voltage, the performance values shall be checked as per the guidance given in note 3 under cl.17 of IS Note 3 Momentary overload and vibration test shall be carried out as per the mutual agreement with the purchaser.
8 Cl. IS 8034:2002 SUBMERSIBLE PUMPSETS TABLE 2 LEVELS OF CONTROL (Para 6.0 of the Scheme of Testing and Inspection) TEST DETAILS Requiremen Test Methods t Clause Reference 6.2 Material of construction of various parts (Mechanical test) Impeller balancing Pump shaft or protecting sleeve surface finish 9.1 Hydrostatic Test 11.2 Maximum Outside Diameter of submersible pump set Temperatur e rise Test at rated voltage Temperatur e rise test at reduced voltage 14.1 Pump Test and Verification of No. of samples 6.2 IS 8034: Each melt of various parts DOC:STI/8034/5 LEVELS OF CONTROL Lot Size Frequency Remarks The parts should conform to the relevant specifications as given in Cl.6.2 of IS 8034: Each impeller This is applicable for metallic impeller only One One sample per week 9.1 Each pump set This test to be carried out on individual casing part of pump as a 11.2 One One sample per day 15 One One out of every 50 pumpsets or less of indentical type & size produced in a month One whole assembled condition. 8 IS One In case of failure all the pumps shall be tested till five consecutive samples pass. Guarantees Note : In case of pump set, motor shall be tested for all routine tests as per cl.16.2 of Is 9283:1995 and type tests except full load test (16.1 (g)), performance characteristics (16.1 (h)), momentory overload (16.1 (m), and vibration test (16.1 (n) as per the frequency given in Table 1 of this STI. in
1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.
SCHEME OF TESTING AND INSPECITON FOR CERTIFICATION OF ELECTRICAL ACCESSORIES CIRCUIT BREAKERS FOR OVER CURRENT PROTECTION FOR HOUSEHOLD AND SIMILAR INSTALLATIONS PART1 CIRCUIT BREAKERS FOR ac OPERATION
More information2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.
SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF LABORATORY GLASSWARE GRADUATED MEASURING CYLINDERS ACCORDING TO IS 878:2008/ISO 4788:2005 (Second Revision) DOC: STI/878/2 1.0 Laboratory - A laboratory
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO DOC:STI/778/4 1 LABORATORY - A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests given
More information2.0 TEST RECORDS - All records of inspection and tests shall be kept in suitable forms approved by the Bureau of Indian Standard (BIS).
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PROTECTIVE HELMETS FOR MOTOR CYCLE RIDERS ACCORDING TO IS 4151:1993 1.0 LABORATORY A laboratory shall be maintained which shall be suitably equipped
More information2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.
SCHEME FOR TESTING AND INSPECTION FOR CERTIFICATION OF DOMESTIC GAS STOVE FOR USE WITH LIQUIFIED PETROLEUM GASES ACCORDING TO IS 4246:2002 (FIFTH REVISION) 1. LABORATORY: A laboratory shall be maintained
More information4. MARKING: Each cistern shall be provided with a label containing the following information or the information paper strip pasted to it.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FLUSHING CISTERNS FOR WATER CLOSETS AND URINALS (SECOND REVISION) ACCORDING TO IS: 7231-1994 1. LABORATORY: A testing laboratory shall be maintained
More information2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF AUTOMOTIVE VEHICLES PNEUMATIC TYRES FOR PASSENGER CAR VECHICLES DIAGONAL AND RADIAL PLY ACCORDING TO IS 15633:2005 1. LABORATORY A laboratory shall
More informationDOC: STI/10322(Part 5/Sec 3)/2, September 2016
क न द र य म ह व भ ग 3 भ स द भ- क न द र य म ह व भ ग -3/16: आई एस IS 10322 5(Part /sec3) 04 अक त बभ 2016 ग षय म ह- आईएस IS 10322 5 (Part /sec3): 2012 क पवनभ क ष त एसट आई (एसट आई/10322 Part 5/Sec (3)/2, ससत
More informationMarking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting
Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting Description Value Unit 100 METRE L S Marking Fee 34000 S S Marking Fee 29000 Slab 1 Rate 17.3 Slab 1 Qty All Enforcement
More informationक न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017
क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 12406 07 न म बभ 2017 ग षय म ह- आई एस 12406 : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न
More informationक न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017
क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 14587 07 न म बभ 2017 ग षय म ह- आई एस 14587 : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न
More information2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF AUTOMOTIVE VEHICLES PNEUMATIC TYRES FOR PASSENGER CAR VECHICLES DIAGONAL AND RADIAL PLY ACCORDING TO IS 15633:2005 1. LABORATORY A laboratory shall
More informationCENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:
CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:15633 11 06 2015 Subject:Finalization and Implementation of revised STI DOC:STI/15633/4 March 2015 for Automotive vehicles - Pneumatic tyres for
More informationCENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:
CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: 8737 31 03 2015 Subject: Revision of existing STI DOC:STI/8737/5 July 1999 for Valve fittings for use with LPG Cylinder of more than 5 litre water
More informationCENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: July 2014
CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: 8034 21 July 2014 Subject: Implementation of Amendment No 3 December 2013 to IS 8034:2002 Submersible Pumpsets - Specification Amendment No 3 December
More information/ I S S : / S T S I
Agenda Electrical Transformers (Quality Control) Order Obtaining BIS Licence Requirements of Guidelines / IS 1180-1: 1: 2014 / STI Concerns in Getting BIS Licence Experience with BEE Regulations Recommendations
More information(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-
Revision 3 Date: 28/01/2016 Amendment to Schedule 6 for Induction Motor In the said schedule, (i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:- Effective from 1 st
More informationSPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /
SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT / 2005-06 SR.NO ITEM PAGE 1. SCOPE 2 2. WEATHER CONDITIONS 2 3. RATED VOLTAGE & FREQUENCY 2 4. GENERAL REQUIREMENT
More informationINTER PLANT STANDARD STEEL INDUSTRY. Corresponding IS does not exist
INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR ac ROLLER TABLE MOTORS (Second Revision) Corresponding IS does not exist IPSS:1-03-007-14 Formerly : IPSS:1-03-007-03 0. FOREWORD 0.1 This Inter
More informationBUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014
BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014 Sub: Preparation & review of draft manuals for product
More informationTECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH
TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH 1.0 SCOPE:
More informationWP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests
WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests EMRS Working Practice Public Version: 2.0 Date: 13 October 2017 Table of Contents Change Amendment Record 3 1. Introduction
More informationCopy to : Head (ITSD)- With a request to host this circular on BIS Intranet and website. : Head (VZBO) : Head (MED)
CENTRAL MARKS DEPARTMENT-II (Legal) Our Ref: CMD-II(L)/6:899 Subject: Implementation of IS 899:0 Liquefied Petroleum Gas (LPG) Containers for Automotive use - Specification (First Revision) The revision
More informationSchedule No.: 13. Diesel Engine Driven Monoset Pumps for Agricultural Purposes
Revision-1 Date: 08.01.2016 Schedule No.: 13 Diesel Engine Driven Monoset Pumps for Agricultural Purposes 1. Scope 1.1 This schedule specifies the Fuel Consumption norms leading to Star Labeling Programme
More informationINTER PLANT STANDARD STEEL INDUSTRY. SPECIFICATION FOR GENERAL PURPOSE SQUIRREL CAGE INDUCTION MOTORS (Fifth Revision) BASED ON IS 325:1996
INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR GENERAL PURPOSE SQUIRREL CAGE INDUCTION MOTORS (Fifth Revision) BASED ON IS 325:1996 IPSS: 1-03-001-14 Formerly: IPSS:1-03-001-05 0. FOREWORD
More informationUK Weighing Federation Technical Articles
GLOSSARY The source of each definition is identified by the superscript number and listed out in full at the end of this glossary. Accuracy classification (1) classification as a Class I, Class II, Class
More informationPRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017
PM/IS 1061/1/August 2018 PRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017 This Product Manual shall be used as reference material by all Regional/Branch Offices & licensees
More informationCOMMISSION REGULATION (EC)
L 191/26 Official Journal of the European Union 23.7.2009 COMMISSION REGULATION (EC) No 640/2009 of 22 July 2009 implementing Directive 2005/32/EC of the European Parliament and of the Council with regard
More information(Text with EEA relevance)
L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons
More information013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS
013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEYLON ELECTRICITY BOARD SRI LANKA Specification for MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEB Specification
More informationHYDRAULICALLY REGULATED DOOR CLOSER
DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref.CRO 22 / MDD-1 13 Dec 2013 Please find enclosed the following draft certification manual : HYDRAULICALLY REGULATED DOOR CLOSER Kindly examine the
More informationINTER PLANT STANDARD STEEL INDUSTRY
INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR ac CRANE (Hoist and Winches) DUTY SQUIRREL CAGE INDUCTION MOTORS (Fourth Revision) BASED ON IS 325:1996 Formerly: IPSS:1-03-004-05 0. FOREWORD
More informationElectric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power
FINALISED DRAFT AUTOMOTIVE INDUSTRY STANDARDS Electric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power (Revision 1) ARAI Date of hosting on website : 9 th September 2014 Last
More informationDraft Indian Standard FUSIBLE PLUG FOR DISSOLVED ACETYLENE GAS CYLINDER SPECIFICATION (first revision of IS 13497) (ICS )
DRAFT STANDARD IN WIDE CIRCULATION DOCUMENT DESPATCH ADVICE Ref: MED 16 :3/T- 14 Date: 06-01-2015 Gas Cylinders, Sectional Committee, MED 16 TO: a) The interested members of Mechanical Engineering Division
More information532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision)
For BIS use only Draft Indian Standard CYCLE RUBBER TUBES (MOULDED/JOINTED) SPECIFICATION (fourth revision of IS 2415) Not to be reproduced without the permission Last date for receipt of comments is of
More informationCOMMISSION REGULATION (EU) / of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2017) XXX draft COMMISSION REGULATION (EU) / of XXX implementing Regulation (EU) No 595/2009 of the European Parliament and of the Council as regards the determination
More informationSSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy
1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Estimation and Costing & Utilization of Electrical Energy Estimation and Costing & Utilization of electrical Energy Estimation
More informationHMP. International Association of Independent Tanker Owners. October 2018 INTERTANKO. Leading the way; making a difference
2020 HMP October 2018 INTERTANKO International Association of Independent Tanker Owners 1. MFM Clause Where products are supplied using Mass Flow Meter (MFM) technology, an MFM system approved by coastal
More informationDraft Indian Standard SAFES Part 1 Specification (Fifth Revision)
Draft for Comments Only Draft Indian Standard SAFES Part 1 Specification (Fifth Revision) Not to be reproduced without the permission of Last date for receipt of BIS or used as a STANDARD comments is 31-01-2014
More informationNCC Leisure Battery Verification Scheme. Leisure Accommodation Vehicles
The UK trade body for the caravan, motorhome, caravan holiday and park home industry. NCC Leisure Battery Verification Scheme Leisure Accommodation Vehicles Page 1 of 11 1 Scope The NCC Battery Verification
More information11-Feb-14. VCA job number: CSP Date: 11 February Dear Sirs,
VCA job number: CSP286503 Date: 11 February 2014 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC
More informationVdS-Guidelines for water extinguishing systems. VdS en. Sprinkler Pumps. Requirements and test methods. VdS en : (03)
VdS-Guidelines for water extinguishing systems VdS 2100-07en Sprinkler Pumps Requirements and test methods VdS 2100-07en : 2013-05 (03) Publisher: VdS Schadenverhütung GmbH Publishing house: VdS Schadenverhütung
More informationE/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1
30 August 2011 Agreement Concerning the adoption of uniform technical prescriptions for wheeled vehicles, equipment and parts which can be fitted and/or be used on wheeled vehicles and the conditions for
More informationEUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0
Annex 1: Amendments to the technical specification for interoperability relating to the rolling stock locomotives and passenger rolling stock subsystem of the rail system in the European Union (Annex to
More informationEU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL
This document contains an EU proposal for a legal text on an annex on motor vehicles and equipment and parts thereof to the Trade in Goods chapter in the Trade Part of a possible modernised EU-Mexico Association
More informationARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017
Airvisor Technologies Pvt. Ltd. H-155, Adhyapak Nagar, Nangloi, New Delhi 110041. CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES Cert Annex Drg Total 1 7 0 8 pgs Exhaust Gas Analyzer Model
More informationST. VINCENT AND THE GRENADINES
ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 022 FUEL OIL CONSUMPTION DATA COLLECTION SYSTEM Amendments to MARPOL Annex VI, MEPC.278(70) TO: APPLICABLE TO: EFFECTIVE AS FROM: SHIPOWNERS,
More information10-Feb-14. VCA job number: CSP Date: 10 February Dear Sirs,
VCA job number: CSP286498 Date: 10 February 2014 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC
More information23-Jul-14. VCA job number: CSQ Date: 23 July Dear Sirs,
VCA job number: CSQ300864 Date: 23 July 2014 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC Directive
More informationImplementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E
1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of
More informationCHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.
25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements
More informationAPPLICATION FOR PRODUCT / ECO-LABELLING CERTIFICATION. GPS Coordinates. GPS Coordinates. Fax No. H/P No.
epcs/for/01-2 SIRIM QAS International Sdn. Bhd. (410334-X) SIRIM Complex, No. 1, Persiaran Dato Menteri, P.O. Box 7035, 40700 Shah Alam, Selangor Darul Ehsan, Malaysia. Tel: 603-5544 6402 Fax: 603-5544
More informationRESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE
RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973, AS MODIFIED
More informationST. VINCENT AND THE GRENADINES
ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N AFS 001 Rev.1 International Convention on the Control of Harmful Anti-fouling Systems on Ship Issuance of Statement of Compliance TO: APPLICABLE
More informationVolume 1 Series 2200 Specification for Road Works. Clause Title Page
PARAPETS Contents Clause Title Page 2201 General... 2 2202 Vehicle... 2 2203 Anchorages and Attachment Systems for Vehicle... 2 2204 Amendments and Additions to BS 6779... 3 2205 Protection Against Corrosion...
More informationIMO fuel oil consumption data collection system
No. Subject: IMO fuel oil consumption data collection system IMO fuel oil consumption data collection system A similar scheme to EU MRV has also been adopted by IMO; according to Regulation 22A of MARPOL
More information1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL
[94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL. Noise limit for diesel generator sets (upto 000 KVA) manufactured on or after the [ st January, 005]. The maximum permissible sound pressure level for
More informationDiesel Exhaust Fluid Certification Program Overview FEBRUARY 2009 REVISION 01
Diesel Exhaust Fluid Certification Program Overview Foreword This overview describes the voluntary and is intended to explain to marketers how the API Diesel Exhaust Fluid Certification Mark is licensed
More informationTHE UNITED KINGDOM TYPE APPROVAL AUTHORITY
THE UNITED KINGDOM TYPE APPROVAL AUTHORITY Dear Sir / Madam. Date: 19 January 2015 1. The vehicle component / type described on the attached approval(s) has been tested and meets the requirements of the
More informationNot to be reproduced without permission Last date for receipt of BIS or used as STANDARD of comments 15 September 2011
For Comments Only Doc: TED 19(821)W July 2011 Draft Indian Standard SHIPBUILDING TESTING OF MARINE DIESEL ENGINES- CODE OF PRACTICE (Second Revision of IS 3979) Not to be reproduced without permission
More information020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)
020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB) CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS Page 1.0 Scope 3 2.0 System Parameters 3 3.0 Service
More informationPrinciple Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK
-GB-2017-01: Defining the requirements for a GS mark approval Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act about
More informationANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)
Annex 3, page 1 ANNEX 3 RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS,
More informationEU RO Mutual Recognition Technical Requirements
1. PRODUCT DESCRIPTION... 1 2. DESIGN EVALUATION... 2 3. PRODUCTION REQUIREMENTS... 6 4. MARKING REQUIREMENTS... 6 5. TYPE APPROVAL CERTIFICATE CONTENT... 7 6. APPROVAL DATE AND REVISION NUMBER... 7 7.
More information026-2 : 1996 CEB STANDARD
026-2 : 1996 CEB STANDARD COMPRESSION CONNECTORS & TERMINATIONS FOR OVERHEAD LINE CONDUCTORS CEYLON ELECTRICITY BOARD SRI LANKA CONTENTS 1. Scope 2 2. System Parameters 2 3. Service Conditions 2 4. Applicable
More informationMaharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in
More informationProcedure for Establishing Whole Vehicle Safety Conformity of Production (WVSCOP) for L M & N category of vehicles
DRAFT AUTOMOTIVE INDUSTRY STANDARD Procedure for Establishing Whole Vehicle Safety Conformity of Production (WVSCOP) for L M & N category of vehicles Date of hosting on website: 3 rd August 2018 Last date
More informationANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions
ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS Article 1 General Provisions 1. This Annex shall apply to motor vehicles in UNECE vehicle regulations' category M1 as well as parts and equipment regulated
More informationANNEX 8 RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS
RESOLUTION MEPC.102(48) Adopted on 11 October 2002 GUIDELINES FOR SURVEY AND CERTIFICATION OF ANTI-FOULING SYSTEMS ON SHIPS THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention
More informationUK Power Networks Use of System Charging Methodology
UK Power Networks Use of System Charging Methodology Effective From: 1 July 2018 Published: 15 June 2018 Contents General Introduction... 3 Who we are 3 Licence Obligations 3 Price Control 3 Connection
More informationARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Gen-Maint 106-107, New Diamond Premises Coop. Soc. Ltd. Off. Western Express Highway Goregaon (E) Mumbai 400 063 Cert Annex Drg Tot al
More informationElectric Power Train Vehicles - Method of Measuring the Range
FINALISED DRAFT AUTOMOTIVE INDUSTRY STANDARDS Electric Power Train Vehicles - Method of Measuring the Range (Revision 1) ARAI Date of hosting on website: 4 th Last date for comments : 5 th July 2014 1
More informationTECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE
TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE The hardware fittings suitable for tension string to be used for 11KV consisting of following
More informationE/ECE/324/Rev.2/Add.108/Rev.1/Amend.3 E/ECE/TRANS/505/Rev.2/Add.108/Rev.1/Amend.3
16 January 2019 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and
More informationUnderstanding BS 1363 Amendment No.4
Intertek Hilton House, Corporation Street, Rugby, Warwickshire, CV21 2DN UK info.uk@intertek.com 01788 578435 www.intertek.com Introduction A new Amendment applying to several parts of the BS 1363 standard
More informationINCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL
INCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL THE CONTENT OF THIS DOCUMENT IS THE PROPERTY OF ALENIA AERONAUTICA S.p.A. THIS DOCUMENT IS SUPPLIED IN CONFIDENCE AND COMMERCIAL
More informationFederal Railroad Administration, DOT CFR section Description Guideline PART 179
Federal Railroad Administration, DOT 210.3 PENALTY ASSESSMENT GUIDELINES Continued 49 CFR section Description Guideline PART 179 179.1(e)... Tank car not constructed according to specifications also cite
More informationINDUSTRIAL HAUL AGREEMENT
INDUSTRIAL HAUL AGREEMENT PUBLIC WORKS MEMORANDUM OF AGREEMENT entered into this day of, A.D., 20(yr). BETWEEN: PARKLAND COUNTY a County incorporated under the laws of the Province of Alberta, (hereinafter
More information30-Aug-11. VCA job number: CSM Date: 30 August Dear Sirs,
VCA job number: CSM241075 Date: 30 August 2011 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC Directive
More informationCEMA PT16 N09Rev2. Reference document: ENTR_F1_ _rev 16 v Article / clause Original text Proposal from CEMA Rationale and
CEMA PT16 N09Rev2 Reference document: ENTR_F1_030-99_rev 16 v030908 Article / clause Original text Proposal from CEMA Rationale and Art., clause 7 The fitment of anti-lock braking systems (ABS) is not
More informationARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street, I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg
More informationNote: it is a criminal offence to give false information in this application.
Note: it is a criminal offence to give false information in this application. Section 1 - Your contact details (Please read Guidance Note 1) 1a) Please give full details of the person that can be contacted
More informationAQUAPUMP INDUSTRIES INSTALLATION & OPERATION MANUAL (SPARE PARTS LIST INCLUDED) MANUFACTURED BY: HORIZONTAL JET MONOBLOCK
HORIZONTAL JET MONOBLOCK INSTALLATION & OPERATION MANUAL (SPARE PARTS LIST INCLUDED) MANUFACTURED BY: AQUAPUMP INDUSTRIES TUDIYALUR POST COIMBATORE - 641 034. INDIA FUNNEL PRESSURE VALVE DISCHARGE UNION
More information08-Dec-10. VCA job number: CSL Date: 08 December Dear Sirs,
VCA job number: CSL225489 Date: 08 December 2010 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC
More informationARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust
More informationREPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS
REPUBLIC OF Marine Notice THE MARSHALL ISLANDS No. 7-051-2 OFFICE OF THE MARITIME ADMINISTRATOR Rev. 5/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED
More informationAGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103
21 March 1997 AGREEMENT CONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS WHICH CAN BE FITTED AND/OR BE USED ON WHEELED VEHICLES AND THE CONDITIONS FOR
More informationAmendment No th September 2016 To AIS 037: Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components
Amendment No. 6 28 th September 2016 To AIS 037: Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components 1. Page 6/15, Clause 9.6.2 Substitute following text
More informationAmendment No August, 2015 To AIS-037 Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components
Amendment No. 5 19 August, 2015 To AIS-037 Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components 1. Page No. 6/15, Clause 9.1 At the end of clause 9.1, insert
More informationKBA Kraftfahrt-Bundesamt
Kraftfahrt-Bundesamt (Federal Motor Transport Authority) Your central provider of services and information concerning vehicles and their users Vehicle Technology - Information Sheet on Approvals for New
More informationDecree of the Ministry of Transport and Communications
579/2000 Decree of the Ministry of Transport and Communications on transportable pressure equipment and tanks discharged or filled by pressure and used for the transport of dangerous goods Adopted in Helsinki,
More informationTECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK
TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV.CAPACITOR BANK 1.0 SCOPE: This specification covers
More informationSFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *
SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 * PRODUCT: Heavy Duty Stock Car Steel Wheels 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards
More informationRULES PUBLICATION NO. 98/P
RULES PUBLICATION NO. 98/P GUIDELINES REGARDING THE REQUIREMENTS FOR MARINE DIESEL ENGINES FITTED WITH NO X SELECTIVE CATALYTIC REDUCTION (SCR) SYSTEMS 2018 January Publications P (Additional Rule Requirements)
More informationRespondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad
1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website
More informationISO 2320 INTERNATIONAL STANDARD. Prevailing torque type steel nuts Mechanical and performance properties
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 2320 Fourth edition 2008-11-01 Prevailing torque type steel nuts Mechanical and performance properties Écrous autofreinés en acier Caractéristiques
More informationARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg
More information045 : 2000 CEB STANDARD
045 : 2000 CEB STANDARD LOW VOLTAGE FUSE SWITCH DISCONNECTOR CEYLON ELECTRICITY BOARD SRI LANKA Specification for LOW VOLTAGE FUSE SWITCH DISCONNECTOR CEB Standard 045 : 2000 CEYLON ELECTRICITY BOARD No.
More informationTEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION
TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION SPECIFICATION NO. AMENDED: NOVEMBER 2004** WARNING LIGHT SYSTEM, INCANDESCENT, LIGHTBAR PUBLICATION This specification is a product of the Texas
More information