HYDRAULICALLY REGULATED DOOR CLOSER

Size: px
Start display at page:

Download "HYDRAULICALLY REGULATED DOOR CLOSER"

Transcription

1 DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref.CRO 22 / MDD-1 13 Dec 2013 Please find enclosed the following draft certification manual : HYDRAULICALLY REGULATED DOOR CLOSER Kindly examine the draft product certification manual and forward your comments on the draft manuals. Last date for comments: 30 Dec Comments, if any, may please be made in the format as given below and mailed to DLBO (MCM) at the following id: mdd1.bis Sl. No. Name of RO / BO Clause/ Sub clause Paragraph / Figure / Table Type of comment (General / Technical / Editorial) Comments Proposed Change Note: Separate sheets may be attached incase comments are lengthy and cannot be incorporated in the

2 DRAFT PRODUCT MANUAL ON HYDRAULICALLY REGULATED DOOR CLOSER IS 3564 : P age ISSUE NO 1

3 BUREAU OF INDIAN STANDARDS MARKS DEPARTMENT DELHI I 0.0 AMENDMENT SHEET S NO AMENDMENT NO DATE PAGE NO CLAUSE NO 3 P age ISSUE NO 1

4 0.1 FOREWORD Automatic door closers are being increasingly used at present in buildings. They are particularly needed in air-conditioned buildings, restaurants, hospitals and other public buildings where doors are frequently used and keeping them in closed position after usage is considered essential to reduce outside noise, to maintain inside temperature condition and privacy. Door closers are made in several designs and types; some are made to be fixed in concealed positions while others are made to function in exposed positions; some work only on spring action while others require hydraulic check to arrest motion/speed in closing the door and to avert banging. This manual covers the hydraulic door closers of exposed type which are being widely used in the country and lays down the requirements for their manufacture and performance. 4 P age ISSUE NO 1

5 0.2 TABLE OF CONTENTS SECTION CONTENT DETAIL PAGE NO. I PRODUCT DESCRIPTION 5 8 II RAW MATERIALS/COMPONENTS 9 10 III MANUFACTURING PROCESS & IN PROCESS QUALITY CONTROLS IV CERTIFICATION CRITERIA V INSPECTION AND TESTING P age ISSUE NO 1

6 PRODUCT DESCRIPTION SECTION 1.1 DESCRIPTION OF PRODUCT This standard covers the requirements for exposed type hydraulically regulated door closers for vertical hinge type doors opening to one side only and not weighing more than 80 kg. This standard does not cover the requirements for concealed type hydraulic door closers and also the pneumatic or mechanical type of door closers. Designation of Door Closers is as given in Table 1 below. SI No. (1) Designation of Closer (2) Table 1 Designation of Door Closers (Clause 6) Mass of the Door Width of the Door (3) (4) Remarks (5) i) 1 Up to 35 Up to 700 For light doors, such as double leaved and toilet doors ii) 2 36 to to 850 Interior doors, such as of bedrooms, kitchen and store iii) 3 61 to to 1000 Main doors in a building, such as entrance doors SECTION 1.2 LATEST INDIAN STANDARDS WITH PRODUCT TITLE AND NUMBER OF AMENDMENTS 6 P age ISSUE NO 1

7 IS 3564 : 1995 AMENDMENTS: NIL SECTION 1.3 LIST OF REFERRED INDIAN STANDARDS FOR RAW MATERIALS/COMPONENTS AND TEST METHODS IS NO. 28 : 1985 Phosphor bronze ingots, and castings (fourth revision) (Reaffirmed 1991) 110 : 1983 Ready mixed paint, brushing, grey filler, for enamels for use over primers (first revision) (Reaffirmed 1991) 210 : 1978 Grey iron castings (third revision) (Amendments 2 (Reaffirmed 1991) 292 : 1983 Leaded brass ingots and castings (second revision) (Amendment 1) (Reaffirmed 1988) 513 : 1994 Cold rolled low carbon steel sheets and strips (fourth revision) (Reaffirmed 1992) 617 : 1975 Aluminium and aluminium alloy ingots and casting for general engineering purposes (Second revision) (Amendments 3) (Reaffirmed 1991) 737 : 1986 Wrought aluminium and aluminium alloy sheet and strip for general engineering purposes (third revision) (Reaffirmed 1991) 742 : 1981 Zinc base alloy die castings (second revision) (Reaffirmed 1993) 1868 : 1982 Anodic coatings on aluminium and its alloys (second revision) (Reaffirmed 1991) 1875 : 1992 Carbon steel billets, blooms, slabs and bars for forgoing (fifth revision) (Amendment 1) 2062 : 1992 Steel for general structural purposes (fourth revision) (Supersedes IS 226 : 1975) 2507 : 1975 Cold rolled steel strips for springs (first revision) (Amendments 2) (Reaffirmed 1992) 3098 : 1983 Specification for oil, hydraulic, mineral oil type (second revision) (Reaffirmed 1988) 3618 : 1966 Phosphate treatment of iron and steel for protection against corrosion (Reaffirmed 1991) 4253 (Part 1) : 1980 Cork composition sheets : Part 1 Plain cork (Amendments 2) (reaffirmed 1989) Title 7 P age ISSUE NO 1

8 4454 (Part 2) : 1975 Steel wires for could formed springs: Part 2 oil hardened and tempered springs steel wire and value spring wire unalloyed (first revision). (Amendment 1) (Reaffirmed 1992) 4905 : 1968 Method for random sampling. (Amendment 1) ( Reaffirmed 1991) 7283 :1992 Hot rolled bars foe production of bright bars and machined parts for engineering applications (first revision) SECTION 1.4 A CHECK LIST FOR SUBMISSION OF AN APPLICATION FOR GRANT OF LICENCE 8 P age ISSUE NO 1

9 9 P age ISSUE NO 1

10 SECTION 1.4 B 10 P age ISSUE NO 1

11 RAW MATERIALS/ COMPONENTS SECTION 2.1 LIST OF IMPORTATNT RAW MATERIALS/COMPONENTS INCLUDING THOSE WHICH ARE REQUIRED TO CONFORM TO RELEVANT INDIAN STANDARDS The materials used for the manufacture of different component parts shall conform to the requirements given in Table 2 below. Table 2 Materials for Component Parts of Hydraulically Regulated Door Closer (Clause 7) SI No. Component Part Suitable Material Ref to IS No. (1) (2) (3) (4) i) Non porous body and back Cast iron/aluminium 210 : 1978/617 : 1975/742 plate alloy/zinc alloy : 1981 ii) Torsion spring helical spring Steel 4454 (part 2) : 1975/ 2507 : 1975 iii) Nuts Cast iron/steel/brass 210 : 1978/7283 : 1992/292 : 1983 iv) Piston or Rack piston/pinion Cast iron/ Steel/Aluminium 210 : 1978/7283 : 1992/ alloy/zinc alloy 617 : 1975/742 : 1981 v) Packing/washers Cork 4253 (Part 1) : 1980 sheet/nylon/neoprene rubber vi) Control valve screw Brass/Bronze/Aluminium 292 : 1983/28 : 1985/ alloy/steel/zinc alloy 617 : 1975/ Grade A of 2062 : 1992/742 : 1981 vii) All weather resistant Hydraulic oil 3098 : 1983 homogenous high viscosity hydraulic fluid viii) Adjusting arm Aluminium alloy/steel/zinc 617 : 1975/7283 : 1992/ alloy/forged steel 742: 1981/1875 : 1992 ix) Main arm Aluminium alloy/steel/zinc 617 : 1975/7283 : 1992/ alloy/forged steel 742: 1981/1875 : 1992 x) Clamp Cast iron/steel/forged 210 : 1978/7283 : 1992/ steel 1875 : 1992 xi) Concentric ratchet (For bottle Steel/Aluminium alloy/zinc 7283 : 1992/617 : type) alloy 1975/742 : 1981 xii) Eccentric shaft Steel 7283 : 1992 xiii) Internal bearing and gland Cast iron/brass/steel/with 210 : 1978/292 : 1983/ 11 Page ISSUE NO 1

12 washer made out of 7283 : 1992 mineral oil resistant material xiv) Main arm bolt Steel 7283 : 1992 xv) Top nut Steel 7283 : 1992 xvi) Pawl Steel/Brass 7283 : 1992/292 : 1983 xvii) Top lid Steel sheet/aluminium alloy sheet/cast iron/zinc alloy/aluminium alloy 513 : 1994/737 : : 1978/742 : 1981/ 617 : P age ISSUE NO 1

13 MANUFACTURING PROCESS AND IN PROCESS QUALITY CONTROLS SECTION 3.1 DESCRIPTION OF MANUFACTURING PROCESS(ES) (TYPICAL) MANUFACTURING FLOW CHART FOR Hydraulically Regulated Door Closer RAW MATERIAL (ALUMINIUM/CAST IRON SECTION) CUTTING MILLING LATHE PROCESSING BROACH WORK DRILLING WASHING FITTING 13 P age ISSUE NO 1

14 BURRING PAINTING PACKING TESTING DESPATCH 14 P age ISSUE NO 1

15 DESCRIPTION OF MANUFACTURING PROCESSES & QUALITY CONTROL The raw material (Aluminium/Cast Iron section) is cut as per requirement and then milling is done. After milling material is processed on lathe as per drawing. Then broach work is done. After broaching drilling of holes is done. Then material is washed and fitted. Next burring is done followed by painting. The final product is packed and tested as per STI before despatch. SECTION 3.2 INFRASTRUCTURE FOR PRODUCTION Following infrastructure is generally required for production of HYDRAULICALLY REGULATED DOOR CLOSER as List Of Machinery SI. No. Machinery Make Capacity Number Remarks 1 Lathe Machine KALSI 4.5 Feet 4 2 Broach machine SATKAR 9 Feet 1 3 Broach Machine SATKAR 4.5 Feet 1 4 Cutting machine JASWANT 1 Feet 1 5 Milling Machine KALSI 2.5 Feet 1 6 Lathe Machine MATCHLESS 4 Feet 1 7 Drill Machine MATCHLESS 2 Feet 1 8 Lathe Machine MATCHLESS 2.5 Feet 1 9 Painting Spray M/C LOCAL 1 10 Buffing M/C LOCAL 2 Note: Adequate Electric Power and Water supply is required 15 P age ISSUE NO 1

16 CERTIFICATION CRITERIA SECTION 4.1 CRITICAL REQUIREMENTS OF THE INDIAN STANDARD To be provided by CMD SECTION 4.2 SCHEME OF TESTING AND INSPECTION DOC : STI/3564/6 Oct : 1997 SCHEME OF TESTING AND INSEPCTION FOR CERTIFICATION OF HYDRAULICALLY REGULATED DOOR CLOSERS ACCORDING TO IS 3564 : 1995 (Fourth Revision) 1.0 LABORATRY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests given in the specification shall be carried out in accordance with the methods given in the specification. 1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. 2.0 TEST RECORDS All records of tests and inspection shall be kept in suitable form approved by the Bureau. 2.1 Copied of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. 16 P age ISSUE NO 1

17 3.0 QUALITY CONTROL It is recommended that, as far as possible, Satisfaction Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397 (Part I) : 1972, IS 397 (Part 2) : 1985 and IS 397 (part 3 ) : 1980]. 3.1 In addition, effort should be made to gradually introduce a Quality Management System in accordance with the Quality System Modules as per IS/ISO 9001 or IS/ISO 9002 or IS/ISO 9003 as appropriate to the activities of the organization. 4.0 STANDARD MARK The door closer shall carry the Standard Mark as Given in Column (1) of the First Schedule of the licence, in the form of paper labels or transfix labels or the Standard door closer to which the Mark is thus applied conforms to every requirement of the specification. 5.0 MARKING In addition each door closer shall be marked with following information : a) Manufacturer s name or trade mark : b) Brand name, if any : c) Right closer, left closer or universal closer or R L or U respectively, whichever is applicable; d) Size / designation of the door closer : e) Type of the closer, f) Serial number : g) Made in India, if required and h) Licence No. (CM/L No..) 6.0 PACKING The door closer shall be packed in individual cardboard/wooden boxes, with reinforcing board or straw to prevent damage to painting, Packing shall be of such type and quality that it prevents ingress of the moisture during storage. It shall be ensured that every door closer is accompanied with (a) one fitting key or a suitable spanner for adjusting the spring valve and regulating screw (b) leaflet furnishing instruction for adjustment of regulating screw as per Note below Clause 8.3 of Specification. 7.0 LEVELS OF CONTROL The tests and inspection as indicated in Table 1 attached and the levels of control specified therein, covered by this scheme and appropriate records & charts production which conforms to the Indian Standard and covered by this licence shall be marked with BIS Certification Mark. 7.1 On the basis of test results, the decision regarding conformity or otherwise of door closer to the requirements shall be made as follows : Every door closer shall be examined for construction, finish, dimensions, interchangeability of parts and tested for performance. Those found defective shall be suitably rectified, shall again be tested for all the above tests. 7.2 The door closer shall meet the requirements of clause 8 of the specification and tested to check any sign of leakage, closing time / performance at the specified temperatures. 7.3 Mild steel parts shall be given the treatment as given in clause & In respect of all other clauses of the specification and at all stages of manufacture, the factory shall maintain appropriate controls and checks to ensure that their product conforms to the requirements of these clauses. 17 P age ISSUE NO 1

18 9.0 MATERIALS Materials to be used for main component parts of door closers are given in Table 2 of IS 3564 : REJECTIONS A separate record shall be maintained given information relating to the rejection of the production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no case be stored together with that conforming to the specification SAMPLES The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as subsequently amended, from the factory or godowns. The Bureau shall pay for the samples taken by it from the open market REPLACEMENT Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods or their components are replaced or repaired three of cost by the licensee in case the complaint is repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty to judge the conformity of the product to the Indian standard shall be with the Bureau STOP MARKING The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is some difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. The markings may be resumed as soon as the defects are removed under intimation to Bureau. The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of marking shall also be sent to the Bureau PRODUCTION DATA The licensee shall maintain production data as per enclosed Performa 1, which may be authenticated by a Chartered Accountant or by the licensee by giving affidavit (which may be required along with renewal application). The licensee shall sent to the Bureau as per the enclosed, Performa 2 and Performa 3 a statement of quantity produced, marked and exported by him and the trade value thereof during the half year ending 3 0 June and 31 December. This statement is required to be forwarded to the Bureau on or before 31 st day of July and January for the preceding half year IS 3564: 1995 HYDRAULICALLY REGULATED DOOR CLOSERS TABLE 1 LEVELS OF CONTROL (Para 7 of the Scheme of Testing and Inspection) TEST DETAILS LEVELS OF CONTROL Test Method No. of Samples Frequency Remarks Clause Requirements Clause Reference 8.2 Device for adjusting the speed and 8.2 IS 3564:1995 Each door closer 18 P age ISSUE NO 1

19 closing time 9.1 Thickness of anodize coating (if applicable) IS 1868: Visual Inspection B-1.2 IS 3564:1995 One Surface B-1.3 -do- -do- 10 Performance test do- -do- 10 Endurance test B-1.5 B-1.4 -do- -do- Each door closer One batch/lot of bodies anodized at the same time. -do- -do- Every six months In case the sample fails, two more samples shall be tested and if both pass, the lot say be considered as conforming to specification : other wise, it shall be rejected. In case of failure the marking shall be stopped. Matter should then be investigated and improvements be made Construction, finish dimensions, inter do- Each door closer From the improved lot, two more samples shall be tested and subjected to endurance test. If both samples pass, marking any be resumed. SECTION 4.3 MARKING FEE RATES 19 P age ISSUE NO 1

20 Description Value L S Marking Fee S S Marking Fee Unit 1 Piece Rate of one unit Rs. 2.6 SECTION 4.4 GROUPING GUIDELINES: NIL. SECTION 4.5 GUIDELINES FOR WRITING SCOPE OF LICENCE The scope of licence shall include Name of the product; Type as per clause 4; Material as per clause 7 and Designation as per Table 1 of IS 3564 : SECTION 4.6 GUIDELINES FOR INCLUSION OF NEW VARIETIES NIL. SECTION 4.7 SAMPLE SIZE Product One sample comprising of one number of HYDRAULICALLY REGULATED DOOR CLOSER SECTION 4.8 MANNER OF SEALING OF SAMPLE(S) 20 P age ISSUE NO 1

21 Samples may be wrapped with suitable packing material, labeled and wax sealed or as an alternate code no and signatures of IO may be marked with a permanent marker pen on the product. SECTION 4.9 REMNANTS ARE RETURNABLE/NON RETURNABLE, TO BE SCRAPPED/USED OR TO BE DESHAPED BEFORE DISPOSAL IN CASE OFSAFETY ITEMS Sample is normally consumed in testing and Remnants are not returnable and may be suitably disposed off by the laboratory. SECTION 4.10 PROCEDURE TO BE FOLLOWED FOR DESTROYING/DESHAPING/RECYCLING THE PRODUCT THAT DOES NOT MEET THE QUALITY PARAMETERS DURING REGULAR PRODUCTION BIS Standard Mark to be marked only after ascertaining the quality of the material after testing as per Indian standard and STI. 21 P age ISSUE NO 1

22 INSPECTION AND TESTING SECTION 5.1 PACKING MATERIAL REQUIRED FOR PACKING/DISPATCH OF SAMPLES Any suitable material may be used for wrapping the sample to avoid any damage during transit. SECTION 5.2 LIST OF REQUIRED TEST EQUIPMENT/FACILITIES WITH REQUIREMENT & FREQUENCY OF CALIBRATION To be provided by CL. However, tentative list is given below. SI. No. Test Equipment/Chemicals And Identification Number (Where Applicable) Least Count & Range (Where applicable) Valid Calibration (Where required) Yes/No Test Used In with Clause Reference Remarks (Indicate Number Of Equipment) 22 P age ISSUE NO 1

23 1 Endurance Testing Door Sec/ operation 2 Oven L.C C Range C 3 Deep Freezer L.C C Range C 4 External Micrometer L.C 0.01mm Range 0 25mm 5 External Micrometer L.C 0.01mm Range 25 50mm 6 Digital Stop Watch L.C 0.01Sec. Range 0 30Min. 7 Spring Balance L.C 500g Range 0 50kg 8 Vernier Caliper L.C 0.02 mm Range 0 200mm 9 Dry Wet Thermometer L.C 1 0 C Range C SECTION 5.3 STATUS OF TEST FACILITIES IN BIS LAB AND OSLs WITH TESTING CHARGES AND APPROXIMATE TIME REQUIRED FOR TESTING BY BIS LABs/OSLs For latest information, please check the BIS web site or click the following link &Submit=Run+Query List of BIS Laboratories Lab Quantity Lab Type Testing Facility Remarks 23 P age ISSUE NO 1

24 IS Number :- IS : 1986 NROL Mech C IS Number :- IS : 1995 CL Mech C IS No. Testing Charges Remarks IS 3564 : 1995 Rs 2900/- Testing Facility:: C=Complete Test facility / P=Partial Test Facility/ N=No Test Facility List of Outside Recognized Laboratories Sl No. 1 Bharat Test House 454/2, 1st Floor, Timber Market, Azadpur Delhi Delhi Contact : Mr. Rajiv Gupta, CEO Tel : Fax : IS Number :- IS DOOR CLOSURES (HYDRAULICALLY REGULATED) Name of the Recognized Laboratory Lab Code Testing Charges Remarks 2 Gujarat Test House Plot No.292, Road No.4, GIDC Kathwada Ahmedabad Gujarat Contact : Shri A.N. Barua, CEO Tel : Fax : Hindustaan Test House 80-HSIIDC, 2nd Floor, Industrial Area, Ambala Cantt Haryana Contact : Ms. Rachna Nayyar, CEO Tel : Fax : BIS TESTING CHARGES [10% discount to BIS] BIS testing charges Included w.e.f.07-feb Rs.26,000/- (20% discount for BIS on the given charges)(except Material test ) Included w.e.f. 01-Oct P age ISSUE NO 1

25 SECTION 5.4 WHETHER GRANT OF LICENCE WILL BE BASED ON: FACTORY TESTING BASIS No INDEPENDENT TESTING BASIS Yes MIXED(FACTORY TESTING BASIS PLUS INDEPENDENT TESTING OF SOME RAW MATERIALS) No SECTION 5.5 DETAILS OF TESTS TO BE CARRIED OUT IN FACTORY IN CASE OF: APPLICANT SAMPLES/VERIFICATION SAMPLES Closing time Closing angle Performance test at 10 0 C Performance test at C Finish SURVEILLANCE SAMPLES Closing time Closing angle Performance test at 10 0 C Performance test at C Finish 25 P age ISSUE NO 1

26 RAW MATERIAL SAMPLES TO BE GOT TESTED AS PER RELEVANT ISS GIVEN IN TABLE 2 (Clause 7) 26 P age ISSUE NO 1

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO DOC:STI/778/4 1 LABORATORY - A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests given

More information

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards. SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF LABORATORY GLASSWARE GRADUATED MEASURING CYLINDERS ACCORDING TO IS 878:2008/ISO 4788:2005 (Second Revision) DOC: STI/878/2 1.0 Laboratory - A laboratory

More information

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. SCHEME OF TESTING AND INSPECITON FOR CERTIFICATION OF ELECTRICAL ACCESSORIES CIRCUIT BREAKERS FOR OVER CURRENT PROTECTION FOR HOUSEHOLD AND SIMILAR INSTALLATIONS PART1 CIRCUIT BREAKERS FOR ac OPERATION

More information

4. MARKING: Each cistern shall be provided with a label containing the following information or the information paper strip pasted to it.

4. MARKING: Each cistern shall be provided with a label containing the following information or the information paper strip pasted to it. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FLUSHING CISTERNS FOR WATER CLOSETS AND URINALS (SECOND REVISION) ACCORDING TO IS: 7231-1994 1. LABORATORY: A testing laboratory shall be maintained

More information

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005. BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:8034 25 Oct 2004 Subject: Implementation of revised IS 8034:2002 Submersible Pump Sets and revised STI (Doc:STI/8034/5 ) IS

More information

2.0 TEST RECORDS - All records of inspection and tests shall be kept in suitable forms approved by the Bureau of Indian Standard (BIS).

2.0 TEST RECORDS - All records of inspection and tests shall be kept in suitable forms approved by the Bureau of Indian Standard (BIS). SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PROTECTIVE HELMETS FOR MOTOR CYCLE RIDERS ACCORDING TO IS 4151:1993 1.0 LABORATORY A laboratory shall be maintained which shall be suitably equipped

More information

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/CHBO(MCM) 05 Dec 2013

DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref.: NRO/CHBO(MCM) 05 Dec 2013 DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref.: NRO/CHBO(MCM) 05 Dec 2013 Please find enclosed the following draft certification manual: Copper Alloy Gate, Globe and Check Valves for Waterworks

More information

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting Description Value Unit 100 METRE L S Marking Fee 34000 S S Marking Fee 29000 Slab 1 Rate 17.3 Slab 1 Qty All Enforcement

More information

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

DOC: STI/10322(Part 5/Sec 3)/2, September 2016 क न द र य म ह व भ ग 3 भ स द भ- क न द र य म ह व भ ग -3/16: आई एस IS 10322 5(Part /sec3) 04 अक त बभ 2016 ग षय म ह- आईएस IS 10322 5 (Part /sec3): 2012 क पवनभ क ष त एसट आई (एसट आई/10322 Part 5/Sec (3)/2, ससत

More information

2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. SCHEME FOR TESTING AND INSPECTION FOR CERTIFICATION OF DOMESTIC GAS STOVE FOR USE WITH LIQUIFIED PETROLEUM GASES ACCORDING TO IS 4246:2002 (FIFTH REVISION) 1. LABORATORY: A laboratory shall be maintained

More information

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF AUTOMOTIVE VEHICLES PNEUMATIC TYRES FOR PASSENGER CAR VECHICLES DIAGONAL AND RADIAL PLY ACCORDING TO IS 15633:2005 1. LABORATORY A laboratory shall

More information

BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014

BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014 BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014 Sub: Preparation & review of draft manuals for product

More information

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF AUTOMOTIVE VEHICLES PNEUMATIC TYRES FOR PASSENGER CAR VECHICLES DIAGONAL AND RADIAL PLY ACCORDING TO IS 15633:2005 1. LABORATORY A laboratory shall

More information

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017 क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 12406 07 न म बभ 2017 ग षय म ह- आई एस 12406 : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न

More information

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:15633 11 06 2015 Subject:Finalization and Implementation of revised STI DOC:STI/15633/4 March 2015 for Automotive vehicles - Pneumatic tyres for

More information

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 14587 07 न म बभ 2017 ग षय म ह- आई एस 14587 : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न

More information

For BIS Use Only Doc: CED 50(7436) BUREAU OF INDIAN STANDARDS

For BIS Use Only Doc: CED 50(7436) BUREAU OF INDIAN STANDARDS For BIS Use Only Doc: CED 50(7436) BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY (Not to be reproduced without the permission of BIS or used as an Indian Standard) Draft Indian Standard SPECIFICATION

More information

Draft Indian Standard SAFES Part 1 Specification (Fifth Revision)

Draft Indian Standard SAFES Part 1 Specification (Fifth Revision) Draft for Comments Only Draft Indian Standard SAFES Part 1 Specification (Fifth Revision) Not to be reproduced without the permission of Last date for receipt of BIS or used as a STANDARD comments is 31-01-2014

More information

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: 8737 31 03 2015 Subject: Revision of existing STI DOC:STI/8737/5 July 1999 for Valve fittings for use with LPG Cylinder of more than 5 litre water

More information

Draft Indian Standard SYN GAS/ AMMONIA TURBO COMPRESSOR LUBRICATING OILS SPECIFICATION

Draft Indian Standard SYN GAS/ AMMONIA TURBO COMPRESSOR LUBRICATING OILS SPECIFICATION Comments Only BUREAU OF INDIAN STANDARDS Draft Indian Standard Doc:PCD 3(2537)C September 2012 SYN GAS/ AMMONIA TURBO COMPRESSOR LUBRICATING OILS SPECIFICATION Not to be reproduced without the permission

More information

Draft Indian Standard FUSIBLE PLUG FOR DISSOLVED ACETYLENE GAS CYLINDER SPECIFICATION (first revision of IS 13497) (ICS )

Draft Indian Standard FUSIBLE PLUG FOR DISSOLVED ACETYLENE GAS CYLINDER SPECIFICATION (first revision of IS 13497) (ICS ) DRAFT STANDARD IN WIDE CIRCULATION DOCUMENT DESPATCH ADVICE Ref: MED 16 :3/T- 14 Date: 06-01-2015 Gas Cylinders, Sectional Committee, MED 16 TO: a) The interested members of Mechanical Engineering Division

More information

532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision)

532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision) For BIS use only Draft Indian Standard CYCLE RUBBER TUBES (MOULDED/JOINTED) SPECIFICATION (fourth revision of IS 2415) Not to be reproduced without the permission Last date for receipt of comments is of

More information

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:- Revision 3 Date: 28/01/2016 Amendment to Schedule 6 for Induction Motor In the said schedule, (i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:- Effective from 1 st

More information

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE The hardware fittings suitable for tension string to be used for 11KV consisting of following

More information

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT / SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT / 2005-06 SR.NO ITEM PAGE 1. SCOPE 2 2. WEATHER CONDITIONS 2 3. RATED VOLTAGE & FREQUENCY 2 4. GENERAL REQUIREMENT

More information

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE The hardware fittings suitable for tension string to be used for 11KV / 22 KV consisting of following components.

More information

PRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017

PRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017 PM/IS 1061/1/August 2018 PRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017 This Product Manual shall be used as reference material by all Regional/Branch Offices & licensees

More information

Schedule No.: 13. Diesel Engine Driven Monoset Pumps for Agricultural Purposes

Schedule No.: 13. Diesel Engine Driven Monoset Pumps for Agricultural Purposes Revision-1 Date: 08.01.2016 Schedule No.: 13 Diesel Engine Driven Monoset Pumps for Agricultural Purposes 1. Scope 1.1 This schedule specifies the Fuel Consumption norms leading to Star Labeling Programme

More information

/ I S S : / S T S I

/ I S S : / S T S I Agenda Electrical Transformers (Quality Control) Order Obtaining BIS Licence Requirements of Guidelines / IS 1180-1: 1: 2014 / STI Concerns in Getting BIS Licence Experience with BEE Regulations Recommendations

More information

SPECIFICATION FOR BUTTON HEAD CEASE NIPPLES

SPECIFICATION FOR BUTTON HEAD CEASE NIPPLES INTER PLANT STANDARD IN STEEL INDUSTRY SPECIFICATION FOR BUTTON HEAD CEASE NIPPLES IPSS: 1-02-061-18 (Second Revision) IPSS BASED ON IS4009 (Part 1): 1981 Formerly: IPSS: 1-02-061-97 (First Revision) 0.

More information

Copy to : Head (ITSD)- With a request to host this circular on BIS Intranet and website. : Head (VZBO) : Head (MED)

Copy to : Head (ITSD)- With a request to host this circular on BIS Intranet and website. : Head (VZBO) : Head (MED) CENTRAL MARKS DEPARTMENT-II (Legal) Our Ref: CMD-II(L)/6:899 Subject: Implementation of IS 899:0 Liquefied Petroleum Gas (LPG) Containers for Automotive use - Specification (First Revision) The revision

More information

AUTOMOTIVE VEHICLES AIR BRAKE SYSTEMS PERFORMANCE REQUIREMENTS FOR DRAIN VALVES

AUTOMOTIVE VEHICLES AIR BRAKE SYSTEMS PERFORMANCE REQUIREMENTS FOR DRAIN VALVES For BIS use only Draft Indian Standard AUTOMOTIVE VEHICLES AIR BRAKE SYSTEMS PERFORMANCE REQUIREMENTS FOR DRAIN VALVES Not to be reproduced or used as a Standard without permission from BIS Foreword (Formal

More information

Ref:CL/Mech./ Cal /BID-01(13-14) Date: 10 July 2013

Ref:CL/Mech./ Cal /BID-01(13-14) Date: 10 July 2013 Ref:CL/Mech./ Cal /BID-0(3-4) Date: 0 July 203 SUBJECT: Procurement of Calibration Services for the Equipments in Central Laboratory (Mechanical). Dear Sirs, Technical & Commercial Bids are invited for

More information

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust

More information

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017 Airvisor Technologies Pvt. Ltd. H-155, Adhyapak Nagar, Nangloi, New Delhi 110041. CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES Cert Annex Drg Total 1 7 0 8 pgs Exhaust Gas Analyzer Model

More information

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street, I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg

More information

Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952.

Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952. Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 Section 1. Definitions. ARRANGEMENT OF SECTIONS 2. Application of sections 3 to 5. 3. Amendment of Part I of Schedule to Act of 1952. 4. Amendment

More information

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2017) XXX draft COMMISSION REGULATION (EU) / of XXX implementing Regulation (EU) No 595/2009 of the European Parliament and of the Council as regards the determination

More information

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg

More information

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 * SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 * PRODUCT: Replacement Flywheels and Clutch Assemblies 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum

More information

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply INDEX S. No. PARTICULARS PAGE NO. A EDS REPLY 1-3 ANNEXURE I ESSENTIAL DETAILS SOUGHT (EDS) 4-5 ANNEXURE II LEASE DOCUMENTS 6-58 ANNEXURE III AUTHENTICATED PAST PRODUCTION DATA 59 ANNEXURE IV CTE (AIR)

More information

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers. Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up

More information

Number 24 of 2008 MOTOR VEHICLE (DUTIES AND LICENCES) (NO. 2) ACT 2008 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952.

Number 24 of 2008 MOTOR VEHICLE (DUTIES AND LICENCES) (NO. 2) ACT 2008 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952. Number 24 of 2008 MOTOR VEHICLE (DUTIES AND LICENCES) (NO. 2) ACT 2008 Section 1. Definitions. ARRANGEMENT OF SECTIONS 2. Application of sections 3 to 5. 3. Amendment of Part I of Schedule to Act of 1952.

More information

Dakshin Gujarat Vij Company Limited

Dakshin Gujarat Vij Company Limited Dakshin Gujarat Vij Company Limited CIN U40102GJ2003SGCO42909 Regd. & Corporate Office: Urja Sadan, Nana Varachha Road, Kapodara Char Rasta,Surat 395 006 C & R DEPARTMENT Phone No.: 0261 2506100-200-175

More information

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet. SHEET 1 OF 5 1.0 GENERAL & SCOPE 1.1 This specification covers the design, material, construction features, manufacture, inspection & testing, Painting and packing requirements of Spring Loaded Bypass

More information

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES : TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES : 1. SCOPE : This specification covers design, manufacturing, testing at manufacturer s works, inspection, packing & delivery of 11 KV Air Break

More information

Expression of Interest

Expression of Interest Expression of Interest Bureau of Indian Standards Central laboratory Sahibabad is intended to purchase test equipments for creating complete test facility for Fire Extinguishers as per IS 15683:2006. Interested

More information

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and

More information

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR TRANSMISSION LINE GETCO/E/TS

More information

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Gen-Maint 106-107, New Diamond Premises Coop. Soc. Ltd. Off. Western Express Highway Goregaon (E) Mumbai 400 063 Cert Annex Drg Tot al

More information

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16: 15633 22 04 5 Subject: Coents on Draft Aendent 4 April 5 to IS 15633:2005 Specification for Autootive Vehicles Pneuatic Tyres for Passenger Car

More information

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 *

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 * SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 * PRODUCT: Crankshaft Hub Harmonic Dampers 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for

More information

Volume 1 Series 2200 Specification for Road Works. Clause Title Page

Volume 1 Series 2200 Specification for Road Works. Clause Title Page PARAPETS Contents Clause Title Page 2201 General... 2 2202 Vehicle... 2 2203 Anchorages and Attachment Systems for Vehicle... 2 2204 Amendments and Additions to BS 6779... 3 2205 Protection Against Corrosion...

More information

EU RO Mutual Recognition Technical Requirements

EU RO Mutual Recognition Technical Requirements 1. PRODUCT DESCRIPTION... 1 2. DESIGN EVALUATION... 2 3. PRODUCTION REQUIREMENTS... 5 4. MARKING REQUIREMENTS... 6 5. TYPE APPROVAL CERTIFICATE CONTENT... 6 6. APPROVAL DATE AND REVISION NUMBER... 6 7.

More information

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: July 2014

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: July 2014 CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: 8034 21 July 2014 Subject: Implementation of Amendment No 3 December 2013 to IS 8034:2002 Submersible Pumpsets - Specification Amendment No 3 December

More information

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official

More information

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-ACSR PANTHER CONDUCTOR FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-ACSR PANTHER CONDUCTOR FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-ACSR PANTHER CONDUCTOR FOR TRANSMISSION LINE GETCO/ENGG/TECH.

More information

Number 22 of 2001 MOTOR VEHICLE (DUTIES AND LICENCES) ACT, ARRANGEMENT OF SECTIONS. Section 1. Interpretation.

Number 22 of 2001 MOTOR VEHICLE (DUTIES AND LICENCES) ACT, ARRANGEMENT OF SECTIONS. Section 1. Interpretation. Number 22 of 2001 MOTOR VEHICLE (DUTIES AND LICENCES) ACT, 2001. Section 1. Interpretation. ARRANGEMENT OF SECTIONS 2. Application of certain sections. 3. Amendment of Act of 1952. 4. Amendment of Act

More information

Schedule 3 Room Air Conditioners

Schedule 3 Room Air Conditioners Revision No. 3 Rev. Date: 26.05.2016 Schedule 3 Room Air Conditioners 1. Scope 1.1 This Standard specifies the energy labelling requirements for single-phase split and unitary air conditioners of the vapour

More information

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002 WELLINGTON, NEW ZEALAND PURSUANT to section 152 of the Land Transport Act 1998 I, Mark Gosche, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport Rule: Vehicle Standards Compliance

More information

INTER PLANT STANDARD STEEL INDUSTRY. Corresponding IS does not exist

INTER PLANT STANDARD STEEL INDUSTRY. Corresponding IS does not exist INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR ac ROLLER TABLE MOTORS (Second Revision) Corresponding IS does not exist IPSS:1-03-007-14 Formerly : IPSS:1-03-007-03 0. FOREWORD 0.1 This Inter

More information

ISO INTERNATIONAL STANDARD. Seal-less rotodynamic pumps Class II Specification

ISO INTERNATIONAL STANDARD. Seal-less rotodynamic pumps Class II Specification INTERNATIONAL STANDARD ISO 15783 First edition 2002-02-01 Seal-less rotodynamic pumps Class II Specification Pompes rotodynamiques sans dispositif d'étanchéité d'arbre Classe II Spécifications Reference

More information

ANNEXURE XI. (Ni Cd Battery Bank) TECHNICAL SPECIFICATIONS OF 125V STATION BATTERY BANK OF GTG I.

ANNEXURE XI. (Ni Cd Battery Bank) TECHNICAL SPECIFICATIONS OF 125V STATION BATTERY BANK OF GTG I. ANNEXURE XI (Ni Cd Battery Bank) TECHNICAL SPECIFICATIONS OF 125V STATION BATTERY BANK OF GTG I. Sr. No Technical Particulars Confirmation to be given by bidder (Please strike out which ever not applicable)

More information

MATERIAL AND EQUIPMENT STANDARD FOR FAST DRYING SYNTHETIC PRIMER TO BE USED WITH HOT APPLIED COAL TAR OR BITUMEN (ASPHALT) ENAMEL ORIGINAL EDITION

MATERIAL AND EQUIPMENT STANDARD FOR FAST DRYING SYNTHETIC PRIMER TO BE USED WITH HOT APPLIED COAL TAR OR BITUMEN (ASPHALT) ENAMEL ORIGINAL EDITION MATERIAL AND EQUIPMENT STANDARD FOR FAST DRYING SYNTHETIC PRIMER TO BE USED WITH HOT APPLIED COAL TAR OR BITUMEN (ASPHALT) ENAMEL ORIGINAL EDITION OCT. 1996 This standard specification is reviewed and

More information

MALAYSIA 2174 ENFORCEMENT OFFICERS IN 86 OFFICE IN MALAYSIA RATIONALE FOR LEGAL METROLGY LEGISLATION RATIONALE FOR LEGISLATION

MALAYSIA 2174 ENFORCEMENT OFFICERS IN 86 OFFICE IN MALAYSIA RATIONALE FOR LEGAL METROLGY LEGISLATION RATIONALE FOR LEGISLATION I. GENERAL INFORMATION MALAYSIA Population Size Domestic Trade per million population (in US$) (2007) Departmental Budget per million population (in US$) (2007) Staff Strength 27.17 MILLION GROSS DOMESTIC

More information

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 *

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 * SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 * PRODUCT: Stock Car Steel Wheels 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 110 V, 100 Ah / 250 Ah & 220 V, 250 Ah / 350Ah TUBULAR LEAD ACID BATTERY SETS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 110 V, 100 Ah / 250 Ah & 220 V, 250 Ah / 350Ah TUBULAR LEAD ACID BATTERY SETS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 110 V, 100 Ah / 250 Ah & 220 V, 250 Ah / 350Ah TUBULAR LEAD ACID BATTERY

More information

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts Revision 1 Date: 28/01/2016 Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts In the said schedule, (i) in paragraph 7, for sub-paragraph (i) the following shall be substituted,

More information

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC 62/24/Add.1 Annex 24, page 1 ANNEX 24 RESOLUTION MEPC.205(62) 2011 GUIDELINES AND SPECIFICATIONS FOR ADD-ON

More information

ENERGY STAR Program Requirements for Single Voltage External Ac-Dc and Ac-Ac Power Supplies. Eligibility Criteria.

ENERGY STAR Program Requirements for Single Voltage External Ac-Dc and Ac-Ac Power Supplies. Eligibility Criteria. ENERGY STAR Program Requirements for Single Voltage External Ac-Dc and Ac-Ac Power Supplies Eligibility Criteria Table of Contents Section 1: Definitions 2 Section 2: Qualifying Products 3 Section 3: Energy-Efficiency

More information

SPECIFICATIONS OF REWIRABLE KIT KAT FUSES

SPECIFICATIONS OF REWIRABLE KIT KAT FUSES SPECIFICATIONS OF REWIRABLE KIT KAT FUSES 1. SCOPE: This application cover the manufacture, testing at works and supply of porcelain rewire able kit kat fuses suitable for AC 3 phase 415 V 50 HZ solidly

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2018) XXX draft COMMISSION REGULATION (EU) / of XXX amending Regulation (EU) 2017/2400 and Directive 2007/46/EC of the European Parliament and of the Council as regards

More information

Titre / Title HIGH RELIABILITY RF COAXIAL LOADS AND ATTENUATORS GENERIC SPECIFICATION

Titre / Title HIGH RELIABILITY RF COAXIAL LOADS AND ATTENUATORS GENERIC SPECIFICATION Date: December 19 th, 16 ISSUE: 1/B PAGE: 1 / 21 Titre / Title HIGH RELIABILITY RF COAXIAL LOADS AND ATTENUATORS GENERIC SPECIFICATION Rédigé par / Written by Responsabilité / Responsibility Date Signature

More information

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY.

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY. TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY. 1.0 SCOPE: This specification covers the design, manufacturing and testing of LT Distribution

More information

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India. Document: BHEL/EDN/SCPV/D91/EOI Revision: 01 Date: 12-Oct-2009 EXPRESSION OF INTEREST (EOI) FOR TECHNOLOGY PARTNERSHIP IN SEMICONDUCTOR DEVICE MANUFACTURING (IGBT Encapsulation Technology, Expansion of

More information

This standard covers the requirements of lighting chains. This standard covers only the safety requirements.

This standard covers the requirements of lighting chains. This standard covers only the safety requirements. FOREWORD (Formal clause will be added later) This standard covers the requirements of lighting chains. This standard covers only the safety requirements. This standard (Part 5/Section 7) is one among the

More information

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-AL 59 CONDUCTOR FOR 220 KV TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-AL 59 CONDUCTOR FOR 220 KV TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-AL 59 CONDUCTOR FOR 220 KV TRANSMISSION LINE GETCO/E/TS

More information

Certification Scheme

Certification Scheme Certification Scheme Barbecues burning solid fuels in accordance with DIN EN 1860-1 (Edition: August 2015) DIN CERTCO Alboinstrasse 56 12103 Berlin Tel.: +49 30 7562-1131 Fax: +49 30 7562-1141 E-mail:

More information

PETROLEUM PRODUCTS INSPECTION OPERATIONS MANUAL

PETROLEUM PRODUCTS INSPECTION OPERATIONS MANUAL Kenya Bureau of Standards PETROLEUM PRODUCTS INSPECTION OPERATIONS MANUAL 2016-01-14 Version 2.0 Page 1 1.0 INTRODUCTION 1.1 Purpose and Background This manual provides a frame work for inspection of petroleum

More information

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013.

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013. GOVERNMENT OF INDIA CENTRAL ELECTRICITY AUTHORITY (MINISTRY OF POWER) 6 th Floor (N), Sewa Bhawan, R. K. Puram, New Delhi-110066 Tel. Fax: 26103246, e.mail: celegal-cea@gov.in, website: www.cea.nic.in

More information

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION A site drawing depicting the UST Cathodic Protection (CP) system and all reference electrode placements should

More information

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS 013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEYLON ELECTRICITY BOARD SRI LANKA Specification for MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEB Specification

More information

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 * SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 * PRODUCT: Heavy Duty Stock Car Steel Wheels 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards

More information

No. TE/F-814/16/WO- 145/ Dt

No. TE/F-814/16/WO- 145/ Dt No. TE/F-814/16/WO- 145/ Dt. 30.11.2016 To M/s Jaikar Techno Private Limited Plot No. 43, Near Imam Kothi, Old Hazaribagh Road, Kokar, Ranchi - 834009 Dear Sir, Sub : Work order for the work of Renewal

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 December /3/06 REV 3 ADD 1. Interinstitutional File: 2003/ 0153(COD) ENT 84 CODEC 561

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 December /3/06 REV 3 ADD 1. Interinstitutional File: 2003/ 0153(COD) ENT 84 CODEC 561 COUNCIL OF THE EUROPEAN UNION Brussels, 11 December 2006 Interinstitutional File: 2003/ 0153(COD) 9911/3/06 REV 3 ADD 1 T 84 CODEC 561 STATEMT OF THE COUNCIL'S REASONS Subject : Common Position adopted

More information

شركة كهرباء محافظة القدس المساهمة المحدودة

شركة كهرباء محافظة القدس المساهمة المحدودة Our Ref: Date: Messrs. Dear Sir, Tender 22/2017 (re-bidding) 11& 33Kv Fuse Cutouts and Links You are kindly requested to bid for supply and delivery (DDP) for the medium voltage overhead line accessories

More information

Certification Scheme

Certification Scheme Certification Scheme Water-based surface-embedded heating and cooling systems in accordance with DIN EN 1264 (Version: November 2009) DIN CERTCO Alboinstraße 56 12103 Berlin Tel: +49 30 7562-1131 Fax:

More information

RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION July

RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION July RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION 2017 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules

More information

Official Journal of the European Union

Official Journal of the European Union L 140/8 COMMISSION DELEGATED REGULATION (EU) 2018/829 of 15 February 2018 amending and correcting Delegated Regulation (EU) 2015/208 supplementing Regulation (EU) No 167/2013 of the European Parliament

More information

INTER PLANT STANDARD STEEL INDUSTRY

INTER PLANT STANDARD STEEL INDUSTRY INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR ac CRANE (Hoist and Winches) DUTY SQUIRREL CAGE INDUCTION MOTORS (Fourth Revision) BASED ON IS 325:1996 Formerly: IPSS:1-03-004-05 0. FOREWORD

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels Scope: This program must be utilized by participating pellet fuel manufacturers to assure consistent quality

More information

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) No /.. of XXX EUROPEAN COMMISSION Brussels, XXX B4 1667206 [ ](2014) XXX DRAFT 30.04.2014 COMMISSION REGULATION (EU) No /.. of XXX supplementing Regulation (EC) No 661/2009 of the European Parliament and of the Council

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

An Urgent Bulletin from CSA Group

An Urgent Bulletin from CSA Group An Urgent Bulletin from CSA Group Occupational Health & Safety Products No. 115 (Replaces Occupational Health & Safety Products No. 92 Ref No. N16-002) Effective Date: July 1, 2019 Date: May 24, 2018 Apply

More information

Australian Standard. Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) AS AS 2788

Australian Standard. Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) AS AS 2788 AS 2788 2002 AS 2788 Australian Standard Pneumatic fluid power General requirements for systems (ISO 4414:1998, MOD) This Australian Standard was prepared by Committee ME-035, Fluid Power Systems and Components.

More information

1P D 6681 Final Report Cover Sheet

1P D 6681 Final Report Cover Sheet D 6681 Final Report Cover Sheet Method Version Conducted For V = Valid I = Invalid N = Results Cannot be Interpreted as Representative of Oil Performance (Non- Reference Oil) and Shall Not be Used in Determining

More information

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3 TITLE SPECIFICATION FOR MEDIUM VOLTAGE DATE: FEBRUARY 2015 PAGE: 1 OF 25 TABLE OF CONTENTS Page FOREWORD... 2 INTRODUCTION... 3 1 SCOPE... 3 2 NORMATIVE S... 3 3 DEFINITIONS AND ABBIATIONS... 3 4 REQUIREMENTS...

More information