2 NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study West Trenton, NJ to Manville, NJ 10/26/2007 PREFERRED ALTERNATIVE CAPITAL COST ESTIMATE Table of Contents FTA Main Worksheet Segment Descriptions and summary of costs Summary of Soft Costs FTA Worksheet Segment Segment 1 Detail FTA Worksheet Segment Segment 2 Detail FTA Worksheet Segment Segment 3 Detail FTA Worksheet Segment Segment 4 Detail FTA Worksheet Segment Segment 5 Detail FTA Worksheet Segment Segment 6 Detail FTA Worksheet Segment Segment 7 Detail FTA Worksheet Projectwide Projectwide Detail Unit Costs Property Acquistion Summary Station Element Matrix Bridge List

3

4 Major Capital Project Costs Main Worksheet Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Phase AA Contracting Method Design Bid Build Number of Route Miles Yr of Revenue Ops Forecast Year Number of Stations Quantity Base Yr Dollars Total (X$000) Base Year Dollars Unit Cost (X$000) Base Dollars % of Construction Base Yr Dollars % of Total Project Cost YOE Dollars Total (X$000)* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) ,220 $ 1,054 38% 13% Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) Guideway: Atgrade in mixed traffic Guideway: Aerial structure 3, Guideway: Builtup fill Guideway: Underground cut & cover Guideway: Underground tunnel Guideway: Retained cut or fill Track: Direct fixation Track: Embedded Track: Ballasted 19, Track: Special (switches, turnouts) 4, Track: Vibration and noise dampening STATIONS, STOPS, TERMINALS, INTERMODAL (number) 5 4,722 $ 944 6% 2% Atgrade station, stop, shelter, mall, terminal, platform 5 2,224 $ Aerial station, stop, shelter, mall, terminal, platform Underground station, stop, shelter, mall, terminal, platform Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development Automobile parking multistory structure Elevators, escalators 2, SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION ,431 $ % 4% Administration Building: Office, sales, storage, revenue counting Light Maintenance Facility 2, Heavy Maintenance Facility Storage or Maintenance of Way Building Yard and Yard Track 5, SITEWORK & SPECIAL CONDITIONS ,774 $ % 9% Demolition, Clearing, Earthwork 2, Site Utilities, Utility Relocation 1, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments Environmental mitigation, e.g. wetlands, historic/archeologic, parks Site structures including retaining walls, sound walls 1, Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 3, Automobile, bus, van accessways including roads, parking lots 4, Temporary facilities and other indirect costs during construction 4, Public Art SYSTEMS ,073 $ % 8% Train control and signals 9, Traffic signals and crossing protection 2, Traction power supply: substations Traction power distribution: catenary and third rail Communications 3, Fare collection system and equipment Central Control 541 Construction Subtotal (15) ,220 $ 2, % 36% ROW, LAND, EXISTING IMPROVEMENTS (acres) ,233 $ 36 1% Purchase or lease of real estate , Relocation of existing households and businesses VEHICLES (number) 32 79,000 $ 2,469 37% Light Rail Heavy Rail Commuter Rail 32 79,000 $ 2, Bus Other Nonrevenue vehicles Spare parts SOFT COSTS ,324 $ % Preliminary Engineering 4, Final Design 4, Project Management for Design and Construction 3, Construction Administration & Management 9, Insurance, Legal, Permits, Review Fees 2, Surveys, Testing, Investigation, Inspection Agency Force Account Work 2, FINANCE CHARGES 0 0% CONTINGENCY 29,646 14% 0 Total Project Cost (110) YOE Construction Cost per Mile (X000) YOE Total Project Cost per Mile (X000) Total Escalation (YOEBase Yr)/Base Yr Base Yr. Soft Costs & Contingency/Construction (8+10)/(15) Notes: * YOE costs automatically arrive from "Inflation Calc to YOE" ,423 $ 7, % 0 $ $ 100% 74% Main Worksheet Pref Alt 1

5 NJ TRANSIT West Trenton Rail Line Passenger Service Restoration Study 10/26/2007 Preferred Alternative Capital Cost Estimate Summary Sheet FTA No. Description Est. Cost ($1,000's) Summary 1 Materials, Labor and Equipment 1. Guideway & Track Elements 28, Stations, Stops, Terminals, Intermodal 4, Support Facilities: Yards, Shops, Administration 7, Sitework & Special Conditions 18, Systems 16,073 Subtotal ( ) 75,220 Summary 2 Land 6. RoW, Land, Existing Improvements 1,233 Summary 3 Rolling Stock 7. Vehicles 79, Soft Costs (Applied to only) 26, Preliminary 6% 4, Final 6% 4, Project Management for Design and 5% 3, Construction Administration and 12% 9, Insurance, Legal fees, Permit fees, Review 3% 2, Surveys, Testing, Investigation, 3% 2, Finance Charges Contingency 29, % of ( ) 19, % of (7+8) 10,532 Subtotal 211,423 Overhead and 10% of ( ) 7,522 GRAND TOTAL ( O&P) 218,945 Segment Summary Pref Alt 2

6 NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study West Trenton, NJ to Manville, NJ 10/26/2007 SOFT COSTS The following are applied to all infrastructure costs, and are NOT applied to Vehicles, Property Acquisition or Flagging 1. Preliminary Engineering 6% 2. Final Design 6% 3. Mobilization 0% FTA Maintenance and Protection of Traffic 0% FTA Project Management for Design and Construction 5% 6. Construction Administration and Management 12% 7. Insurance, Legal fees, Permit fees, Review fees 3% 8. Surveys, Testing, Investigation, Inspection 3% 9. Finance Charges 0% 10. General Contractor O/P, markup on subs, insurance 10% FTA 4.08 Force account flagging costs are per person per day 11. Force Account flagging 2,400 $/day 12. Contingency Soft Costs 3

7 [THIS PAGE INTENTIONALLY LEFT BLANK AND NOT NUMBERED]

8 Major Capital Project Costs By Segment Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Number of Route Miles in the Segment 0.75 Number of Stations 0 Segment No. 1 of 7 (attach plan of segment and typical sections through segment, along with cost estimate per typical section) Low costs in Base Yr (X$000) for potential cost savings* "Most Likely" cost estimate in Base Yr (X$000) High costs in Base Yr Dollars (X$000) for potential cost increases* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) $ $ 73 $ 1.01 Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) $ 1.03 Guideway: Atgrade in mixed traffic $ 1.04 Guideway: Aerial structure $ 1.05 Guideway: Builtup fill $ 1.06 Guideway: Underground cut & cover $ 1.07 Guideway: Underground tunnel $ 1.08 Guideway: Retained cut or fill $ 1.09 Track: Direct fixation $ 1.10 Track: Embedded $ 1.11 Track: Ballasted $ Track: Special (switches, turnouts) $ 1.13 Track: Vibration and noise dampening $ 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) $ $ $ 2.01 Atgrade station, stop, shelter, mall, terminal, platform $ 2.02 Aerial station, stop, shelter, mall, terminal, platform $ 2.03 Underground station, stop, shelter, mall, terminal, platform $ 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. $ 2.05 Joint development $ 2.06 Automobile parking multistory structure $ 2.07 Elevators, escalators $ 3.00 SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION $ $ 7,431 $ 3.01 Administration Building: Office, sales, storage, revenue counting $ 3.02 Light Maintenance Facility $ 2, Heavy Maintenance Facility $ 3.04 Storage or Maintenance of Way Building $ Yard and Yard Track $ 5, SITEWORK & SPECIAL CONDITIONS $ $ 1,404 $ 4.01 Demolition, Clearing, Earthwork $ Site Utilities, Utility Relocation $ Haz. mat'l, contam'd soil removal/mitigation, ground water treatments $ 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks $ 4.05 Site structures including retaining walls, sound walls $ 4.06 Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing $ Automobile, bus, van accessways including roads, parking lots $ Temporary facilities and other indirect costs during construction $ Public Art $ 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) $ $ 316 $ 6.01 Purchase or lease of real estate $ Relocation of existing households and businesses $ TOTAL SEGMENT COST $ $ 9,224 $ * Describe the risks, uncertainties, and opportunities associated with this segment, that prompted the inclusion Using costs from of a low or high cost, in addition to a "most likely cost" for particular line items. this column, total all segments and insert into Main Worksheet Base Yr Dollars Total (X$000) Segment 1 4

9 Segment 1: Yard Begin Station: End Station: SCC No. SCC Description/Location Qty Cost (x$1k) Seg No Segment Description Begin Station End Station Item No. Item Item Qty Units Unit Cost Cost Ext GUIDEWAY & TRACK ELEMENTS (route miles) 1.01 Guideway: Atgrade exclusive rightofway miles CSX Trenton Line ,980 feet 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) 1.03 Guideway: Atgrade in mixed traffic 1.04 Guideway: Aerial structure 1.05 Guideway: Builtup fill 1.06 Guideway: Underground cut & cover 1.07 Guideway: Underground tunnel 1.08 Guideway: Retained cut or fill 1.09 Track: Direct fixation 1.10 Track: Embedded 1.11 Track: Ballasted 73 73,181 Line and surface track c Line and surface balla 3,980 feet 18 73, Track: Special (switches, turnouts) 1.13 Track: Vibration and noise dampening 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 2.01 Atgrade station, stop, shelter, mall, terminal, platform 2.02 Aerial station, stop, shelter, mall, terminal, platform 2.03 Underground station, stop, shelter, mall, terminal, platform 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development 2.06 Automobile parking multistory structure 2.07 Elevators, escalators 3.00 SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION 3.01 Administration Building: Office, sales, storage, revenue counting 3.02 Light Maintenance Facility 2,380 2,379,520 Yard Locomotive servicing facility 0302a Locomotive servicing 1 allowance 2,379,520 2,379, Heavy Maintenance Facility 3.04 Storage or Maintenance of Way Building 48 47,590 Yard Employee facilty and storage building 0304a Employee facilty and 1,000 square feet 48 47, Yard and Yard Track 5,003 5,003,076 South Yard Lead a Ballasted track, wood 760 track feet ,633 Yard Track 1 (pit track with canopy) b Pit/posted track with 1,480 track feet 952 1,408,676 Yard Track a Ballasted yard track 1,060 track feet ,115 Yard Track a Ballasted yard track 1,060 track feet ,115 Yard Track a Ballasted yard track 1,150 track feet ,822 Yard Track a Ballasted yard track 1,150 track feet ,822 Yard Track a Ballasted yard track 1,250 track feet ,720 Yard Track 7 (fueling track) 0305a Ballasted yard track 1,200 track feet ,771 Misc. Track in South Ladder 0305a Ballasted yard track 100 track feet ,898 North Yard Lead a Ballasted track, wood 750 track feet ,848 Misc. Track in North Ladder 0305a Ballasted yard track 100 track feet ,898 Remove track at South Yard Lead Turnout 0111b Remove ballasted tra 115 track feet 36 4,105 Remove track at North Yard Lead Turnout 0111b Remove ballasted tra 220 track feet 36 7,852 Remove track at Crossover north of yard 0111b Remove ballasted tra 440 track feet 36 15,705 South Yard Lead Turnout New No c10 Turnout, No. 10, we 1 each 104, ,699 South Yard Ladder Turnouts 0112c10 Turnout, No. 10, we 6 each 104, ,193 North Yard Ladder Turnouts 0112c10 Turnout, No. 10, we 6 each 104, ,193 North Yard Lead Turnout New No c20 Turnout, No. 20, we 1 each 187, ,982 No. 20 Crossover north of yard b20 Crossover, No. 20, w 1 each 375, ,964 Compressed air lines 0305c Compressed air lines 3,000 feet 2 6,490 Yard site lighting, metal halide, 400 W on 20' aluminum pole 0305d Yard site lighting, me 30 each 2,974 89,232 Hotel power 0305e Hotel power 3,000 feet 12 35,693 Hot and cold water lines with hydrants every 2 cars 0305f Hot and cold water 3,000 feet 12 35,693 Toilet dumping facility and waste water treatment 0305g Toilet dumping facilit 1 allowance 29,744 29,744 Stormwater collection with oil/water separator 0305h Stormwater collectio 1 allowance 59,488 59,488 Noisewalls 0305i Noisewalls 2,000 feet 30 60,570 Paved aisle between tracks 0305j Paved aisle, asphalt, 8 3,000 feet 24 71,386 Fence 0305k Chain link fence w/3 4,000 feet , SITEWORK & SPECIAL CONDITIONS 4.01 Demolition, Clearing, Earthwork ,488 Borrow fill 0401a Unclassified cuts and 20,000 cubic yards ,904 Stormwater management basin 0401b Stormwater managem 40,000 square feet 6 259, Site Utilities, Utility Relocation 36 35,931 Relocate fiberoptic for north yard lead 0402b Relocate fiberoptic in 750 feet 24 17,846 Relocate fiberoptic for south yard lead 0402b Relocate fiberoptic in 760 feet 24 18, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4.05 Site structures including retaining walls, sound walls 4.06 Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 95 94,705 Rightofway fencing, both sides 0406e RightofWay fence 7,960 feet 12 94, Automobile, bus, van accessways including roads, parking lots ,672 Parking 0407a Station parking 30 stall 2,974 89,232 Roads 0407b Access/circulation ro 2,500 feet , Temporary facilities and other indirect costs during construction ,337 Mobilization Maintenance and Protection of Traffic General Contractor O/P, markup on subs, insurance Agency Force Account: Flagging 0408a Flagging (Inhouse $1 53 days 2, , Public Art 5.00 SYSTEMS 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) 6.01 Purchase or lease of real estate ,087 Property acquisition for yard 316, Relocation of existing households and businesses 7.00 VEHICLES (number) 8.00 SOFT COSTS 8.01 Preliminary Engineering 534 6% 534, Final Design 534 6% 534, Project Management for Design and Construction 445 5% 445,000 Segment 1 Detail 5

10 Segment 1: Yard Begin Station: End Station: SCC No. SCC Description/Location Qty Cost (x$1k) Seg No Segment Description Begin Station End Station Item No. Item Item Qty Units Unit Cost Cost Ext Construction Administration & Management 1,069 12% 1,069, Insurance, Legal, Permits, Review Fees 267 3% 267, Surveys, Testing, Investigation, Inspection 267 3% 267, Agency Force Account Work 0408a 9.00 FINANCE CHARGES 0% CONTINGENCY 2,618 2,618,000 Contingency on FTA items % 2,306,000 Contingency on FTA items % 312,000 Segment 1 Detail 6

11 [THIS PAGE INTENTIONALLY LEFT BLANK AND NOT NUMBERED]

12 Major Capital Project Costs By Segment Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Number of Route Miles in the Segment 3.50 Number of Stations 2 Segment No. 2 of 7 (attach plan of segment and typical sections through segment, along with cost estimate per typical section) Low costs in Base Yr (X$000) for potential cost savings* "Most Likely" cost estimate in Base Yr (X$000) High costs in Base Yr Dollars (X$000) for potential cost increases* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) $ $ 2,000 $ 1.01 Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) $ 1.03 Guideway: Atgrade in mixed traffic $ 1.04 Guideway: Aerial structure $ Guideway: Builtup fill $ 1.06 Guideway: Underground cut & cover $ 1.07 Guideway: Underground tunnel $ 1.08 Guideway: Retained cut or fill $ 1.09 Track: Direct fixation $ 1.10 Track: Embedded $ 1.11 Track: Ballasted $ 1, Track: Special (switches, turnouts) $ Track: Vibration and noise dampening $ 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) $ $ 2,492 $ 2.01 Atgrade station, stop, shelter, mall, terminal, platform $ Aerial station, stop, shelter, mall, terminal, platform $ 2.03 Underground station, stop, shelter, mall, terminal, platform $ 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. $ 2.05 Joint development $ 2.06 Automobile parking multistory structure $ 2.07 Elevators, escalators $ 2, SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION $ $ $ 3.01 Administration Building: Office, sales, storage, revenue counting $ 3.02 Light Maintenance Facility $ 3.03 Heavy Maintenance Facility $ 3.04 Storage or Maintenance of Way Building $ 3.05 Yard and Yard Track $ 4.00 SITEWORK & SPECIAL CONDITIONS $ $ 3,662 $ 4.01 Demolition, Clearing, Earthwork $ Site Utilities, Utility Relocation $ Haz. mat'l, contam'd soil removal/mitigation, ground water treatments $ 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks $ 4.05 Site structures including retaining walls, sound walls $ Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing $ Automobile, bus, van accessways including roads, parking lots $ Temporary facilities and other indirect costs during construction $ Public Art $ 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) $ $ 94 $ 6.01 Purchase or lease of real estate $ Relocation of existing households and businesses $ TOTAL SEGMENT COST $ $ 8,248 $ * Describe the risks, uncertainties, and opportunities associated with this segment, that prompted the inclusion Using costs from of a low or high cost, in addition to a "most likely cost" for particular line items. this column, total all segments and insert into Main Worksheet Base Yr Dollars Total (X$000) Segment 2 7

13 Segment 2: W. Trenton to "Wing" Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext GUIDEWAY & TRACK ELEMENTS (route miles) 1.01 Guideway: Atgrade exclusive rightofway 3.50 miles CSX Trenton Line 18,460 feet 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) 1.03 Guideway: Atgrade in mixed traffic 1.04 Guideway: Aerial structure 760,581 Rehabilitate existing bridges Grand Avenue (NJ579) UG Sta Fair condition: Rehab 6,000 square feet ,157 Parkway Avenue UG Sta Poor condition: Reha 3,600 square feet ,325 Scotch Road UG Sta Fair condition: Rehab 3,600 square feet ,494 I95 UG Sta Excellent condition: R 7,200 square feet ,388 Ewing Creek UG Sta Fair condition: Rehab 3,200 square feet , Guideway: Builtup fill 1.06 Guideway: Underground cut & cover 1.07 Guideway: Underground tunnel 1.08 Guideway: Retained cut or fill 1.09 Track: Direct fixation 1.10 Track: Embedded 1.11 Track: Ballasted 1,033,069 Line and surface track 1 Line and surface balla 16,080 feet ,666 Line and surface track 2 Line and surface balla 18,460 feet ,428 New track to move location of "Wing" Ballasted track, wood 2,160 track feet ,482 Remove track Remove ballasted tra 350 track feet 36 12, Track: Special (switches, turnouts) 205,828 New No. 20 turnout at new "Wing" location Turnout, No. 20, we 1 each 187, ,982 Remove No. 15 turnout Remove No. 15 turn 1 each 17,846 17, Track: Vibration and noise dampening 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 2.01 Atgrade station, stop, shelter, mall, terminal, platform 410,467 West Trenton Station Stabilize existing historic building Stabilize existing hist square feet 119 Rehabilitate existing historic building Rehabilitate existing square feet 595 Lowlevel platform Lowlevel platform each 321,235 Mini highlevel platform Mini highlevel platfo 2 each 29,744 59,488 I95 Station Stabilize existing historic building Stabilize existing hist square feet 119 Rehabilitate existing historic building Rehabilitate existing square feet 595 Lowlevel platform Lowlevel platform 1 each 321, ,235 Mini highlevel platform Mini highlevel platfo 1 each 29,744 29, Aerial station, stop, shelter, mall, terminal, platform 2.03 Underground station, stop, shelter, mall, terminal, platform 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development 2.06 Automobile parking multistory structure 2.07 Elevators, escalators 2,082,080 West Trenton Station Elevators Heavy duty elevator 2 each 416, ,832 I95 Station Elevators Heavy duty elevator 3 each 416,416 1,249, SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION 3.01 Administration Building: Office, sales, storage, revenue counting 3.02 Light Maintenance Facility 3.03 Heavy Maintenance Facility 3.04 Storage or Maintenance of Way Building 3.05 Yard and Yard Track Segment 2 Detail 8

14 Segment 2: W. Trenton to "Wing" Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext SITEWORK & SPECIAL CONDITIONS 4.01 Demolition, Clearing, Earthwork 344,814 West Trenton Station Earthwork Unclassified cuts and cubic yards 24 Stormwater management basin Stormwater managem 10,800 square feet 6 70,088 I95 Station Earthwork Unclassified cuts and 5,000 cubic yards ,976 Stormwater management basin Stormwater managem 24,000 square feet 6 155, Site Utilities, Utility Relocation 153,717 West Trenton Station Utilities Station utilities station 102,319 I95 Station Utilities Station utilities 1 station 102, ,319 Relocate fiberoptic at Wing Relocate fiberoptic in 2,160 feet 24 51, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4.05 Site structures including retaining walls, sound walls 892,320 West Trenton Station Pedestrian overpass Pedestrian overpass w each 892,320 I95 Station Pedestrian overpass Pedestrian overpass w 1 each 892, , Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 641,519 West Trenton Station Landscaping Station landscaping 1 acre 14,872 14,872 Signage Station signage 1 station 29,744 29,744 Amenities Station amenities station 17,846 Intertrack fence Intertrack fence feet 36 I95 Station Landscaping Station landscaping 5 acre 14,872 74,360 Signage Station signage 1 station 29,744 29,744 Amenities Station amenities 1 station 17,846 17,846 Intertrack fence Intertrack fence 1,000 feet 36 35,693 Rightofway fencing, both sides RightofWay fence 36,920 feet , Automobile, bus, van accessways including roads, parking lots 904,218 West Trenton Station Parking Station parking 90 stall 2, ,696 Roads Access/circulation ro 400 feet ,590 I95 Station Parking Station parking 150 stall 2, ,160 Roads Access/circulation ro 1,200 feet , Temporary facilities and other indirect costs during construction 725,278 Mobilization Maintenance and Protection of Traffic General Contractor O/P, markup on subs, insurance Agency Force Account: Flagging Flagging (Inhouse $1 254 days 2, , Public Art 5.00 SYSTEMS 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) 6.01 Purchase or lease of real estate 94,489 Property acquisition for West Trenton Station 94, Relocation of existing households and businesses 7.00 VEHICLES (number) 8.00 SOFT COSTS 8.01 Preliminary Engineering 6% 489, Final Design 6% 489,000 Segment 2 Detail 9

15 Segment 2: W. Trenton to "Wing" Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext Project Management for Design and Construction 5% 408, Construction Administration & Management 12% 978, Insurance, Legal, Permits, Review Fees 3% 245, Surveys, Testing, Investigation, Inspection 3% 245, Agency Force Account Work 9.00 FINANCE CHARGES 0% CONTINGENCY 2,347,000 Contingency on FTA items % 2,062,000 Contingency on FTA items % 285,000 Segment 2 Detail 10

16 Major Capital Project Costs By Segment Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Number of Route Miles in the Segment 4.26 Number of Stations 0 Segment No. 3 of 7 (attach plan of segment and typical sections through segment, along with cost estimate per typical section) Low costs in Base Yr (X$000) for potential cost savings* "Most Likely" cost estimate in Base Yr (X$000) High costs in Base Yr Dollars (X$000) for potential cost increases* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) $ $ 1,099 $ 1.01 Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) $ 1.03 Guideway: Atgrade in mixed traffic $ 1.04 Guideway: Aerial structure $ Guideway: Builtup fill $ 1.06 Guideway: Underground cut & cover $ 1.07 Guideway: Underground tunnel $ 1.08 Guideway: Retained cut or fill $ 1.09 Track: Direct fixation $ 1.10 Track: Embedded $ 1.11 Track: Ballasted $ Track: Special (switches, turnouts) $ 1.13 Track: Vibration and noise dampening $ 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) $ $ $ 2.01 Atgrade station, stop, shelter, mall, terminal, platform $ 2.02 Aerial station, stop, shelter, mall, terminal, platform $ 2.03 Underground station, stop, shelter, mall, terminal, platform $ 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. $ 2.05 Joint development $ 2.06 Automobile parking multistory structure $ 2.07 Elevators, escalators $ 3.00 SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION $ $ $ 3.01 Administration Building: Office, sales, storage, revenue counting $ 3.02 Light Maintenance Facility $ 3.03 Heavy Maintenance Facility $ 3.04 Storage or Maintenance of Way Building $ 3.05 Yard and Yard Track $ 4.00 SITEWORK & SPECIAL CONDITIONS $ $ 879 $ 4.01 Demolition, Clearing, Earthwork $ 4.02 Site Utilities, Utility Relocation $ 4.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments $ 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks $ 4.05 Site structures including retaining walls, sound walls $ 4.06 Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing $ Automobile, bus, van accessways including roads, parking lots $ 4.08 Temporary facilities and other indirect costs during construction $ Public Art $ 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) $ $ $ 6.01 Purchase or lease of real estate $ 6.02 Relocation of existing households and businesses $ TOTAL SEGMENT COST $ $ 1,978 $ * Describe the risks, uncertainties, and opportunities associated with this segment, that prompted the inclusion Using costs from of a low or high cost, in addition to a "most likely cost" for particular line items. this column, total all segments and insert into Main Worksheet Base Yr Dollars Total (X$000) Segment 3 11

17 Segment 3: "Wing" to W of Hopewell Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext GUIDEWAY & TRACK ELEMENTS (route miles) 1.01 Guideway: Atgrade exclusive rightofway 4.26 miles CSX Trenton Line 22,510 feet 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) 1.03 Guideway: Atgrade in mixed traffic 1.04 Guideway: Aerial structure 685,302 Rehabilitate existing bridges Washington CrossingPennington Road (NJ546) OH Sta NJ31 OH Sta Delaware Avenue OH Sta Broemel Place OH Sta North Main Street OH Sta Baldwin Brook UG Sta Fair condition: Rehab 2,000 square feet 36 71,386 Titus Mill Road UG Sta Fair condition: Rehab 1,600 square feet 36 57,108 Hihoula Brook UG Sta Fair condition: Rehab 1,200 square feet 36 42,831 Pennington Road (NJ518) UG Sta Fair condition: Rehab 7,200 square feet ,988 Stony Brook UG Sta Fair condition: Rehab 7,200 square feet , Guideway: Builtup fill 1.06 Guideway: Underground cut & cover 1.07 Guideway: Underground tunnel 1.08 Guideway: Retained cut or fill 1.09 Track: Direct fixation 1.10 Track: Embedded 1.11 Track: Ballasted 413,896 Line and surface track 1 Line and surface balla 22,510 feet , Track: Special (switches, turnouts) 1.13 Track: Vibration and noise dampening 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 2.01 Atgrade station, stop, shelter, mall, terminal, platform 2.02 Aerial station, stop, shelter, mall, terminal, platform 2.03 Underground station, stop, shelter, mall, terminal, platform 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development 2.06 Automobile parking multistory structure 2.07 Elevators, escalators 3.00 SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION 3.01 Administration Building: Office, sales, storage, revenue counting 3.02 Light Maintenance Facility 3.03 Heavy Maintenance Facility 3.04 Storage or Maintenance of Way Building 3.05 Yard and Yard Track 4.00 SITEWORK & SPECIAL CONDITIONS 4.01 Demolition, Clearing, Earthwork 4.02 Site Utilities, Utility Relocation 4.03 Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4.05 Site structures including retaining walls, sound walls 4.06 Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 535,630 Rightofway fencing, both sides RightofWay fence 45,020 feet , Automobile, bus, van accessways including roads, parking lots 4.08 Temporary facilities and other indirect costs during construction 342,651 Mobilization Maintenance and Protection of Traffic General Contractor O/P, markup on subs, insurance Agency Force Account: Flagging Flagging (Inhouse $1 120 days 2, ,651 Segment 3 Detail 12

18 Segment 3: "Wing" to W of Hopewell Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext Public Art 5.00 SYSTEMS 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) 6.01 Purchase or lease of real estate 6.02 Relocation of existing households and businesses 7.00 VEHICLES (number) 8.00 SOFT COSTS 8.01 Preliminary Engineering 6% 119, Final Design 6% 119, Project Management for Design and Construction 5% 99, Construction Administration & Management 12% 237, Insurance, Legal, Permits, Review Fees 3% 59, Surveys, Testing, Investigation, Inspection 3% 59, Agency Force Account Work 9.00 FINANCE CHARGES 0% CONTINGENCY 563,000 Contingency on FTA items % 494,000 Contingency on FTA items % 69,000 Segment 3 Detail 13

19 [THIS PAGE INTENTIONALLY LEFT BLANK AND NOT NUMBERED]

20 Major Capital Project Costs By Segment Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Number of Route Miles in the Segment 9.70 Number of Stations 1 Segment No. 4 of 7 (attach plan of segment and typical sections through segment, along with cost estimate per typical section) Low costs in Base Yr (X$000) for potential cost savings* "Most Likely" cost estimate in Base Yr (X$000) High costs in Base Yr Dollars (X$000) for potential cost increases* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) $ $ 13,353 $ 1.01 Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) $ 1.03 Guideway: Atgrade in mixed traffic $ 1.04 Guideway: Aerial structure $ Guideway: Builtup fill $ 1.06 Guideway: Underground cut & cover $ 1.07 Guideway: Underground tunnel $ 1.08 Guideway: Retained cut or fill $ 1.09 Track: Direct fixation $ 1.10 Track: Embedded $ 1.11 Track: Ballasted $ 11, Track: Special (switches, turnouts) $ 1, Track: Vibration and noise dampening $ 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) $ $ 767 $ 2.01 Atgrade station, stop, shelter, mall, terminal, platform $ Aerial station, stop, shelter, mall, terminal, platform $ 2.03 Underground station, stop, shelter, mall, terminal, platform $ 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. $ 2.05 Joint development $ 2.06 Automobile parking multistory structure $ 2.07 Elevators, escalators $ SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION $ $ $ 3.01 Administration Building: Office, sales, storage, revenue counting $ 3.02 Light Maintenance Facility $ 3.03 Heavy Maintenance Facility $ 3.04 Storage or Maintenance of Way Building $ 3.05 Yard and Yard Track $ 4.00 SITEWORK & SPECIAL CONDITIONS $ $ 5,561 $ 4.01 Demolition, Clearing, Earthwork $ Site Utilities, Utility Relocation $ 1, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments $ 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks $ 4.05 Site structures including retaining walls, sound walls $ Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing $ 1, Automobile, bus, van accessways including roads, parking lots $ Temporary facilities and other indirect costs during construction $ 1, Public Art $ 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) $ $ 317 $ 6.01 Purchase or lease of real estate $ Relocation of existing households and businesses $ TOTAL SEGMENT COST $ $ 19,998 $ * Describe the risks, uncertainties, and opportunities associated with this segment, that prompted the inclusion Using costs from of a low or high cost, in addition to a "most likely cost" for particular line items. this column, total all segments and insert into Main Worksheet Base Yr Dollars Total (X$000) Segment 4 14

21 Segment 4: W of Hopewell to W of Belle Mead Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext GUIDEWAY & TRACK ELEMENTS (route miles) 1.01 Guideway: Atgrade exclusive rightofway 9.70 miles CSX Trenton Line 51,210 feet 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) 1.03 Guideway: Atgrade in mixed traffic 1.04 Guideway: Aerial structure 260,557 Rehabilitate existing bridges Mine Road UG Sta Fair condition: Rehab 1,200 square feet 36 42,831 Van Dyke Road OH Sta Stream UG Sta Fair condition: Rehab 300 square feet 36 10,708 Greenwood Avenue OH Sta Bedens Brook UG Sta Poor condition: Reha 1,200 square feet 48 57,108 HopewellAmwell Road OH Sta Rock Brook UG Sta Fair condition: Rehab 2,400 square feet 36 85,663 Camp Meeting Road OH Sta DutchtownHarlingen Road OH Sta Roaring Brook UG Sta Fair condition: Rehab 1,800 square feet 36 64, Guideway: Builtup fill 1.06 Guideway: Underground cut & cover 1.07 Guideway: Underground tunnel 1.08 Guideway: Retained cut or fill 1.09 Track: Direct fixation 1.10 Track: Embedded 1.11 Track: Ballasted 11,795,843 Main line tracks Line and surface track 1 Line and surface balla 13,610 feet ,250 Line and surface track 1 Line and surface balla 36,100 feet ,778 New track 2 Ballasted track, wood 50,990 track feet 178 9,099,879 Trackwork at Hopewell Station Remove track Remove ballasted tra 1,550 track feet 36 55,324 New track 1 Ballasted track, wood 1,550 track feet ,619 Move Skillman siding Remove track Remove ballasted tra 5,700 track feet ,449 New track 1 Ballasted track, wood 5,700 track feet 178 1,017,245 3M Siding Shift track Shift existing welded 500 feet 30 15,142 Grade Crossing: track only Louellen Street Sta Precast concrete gra 70 track feet ,970 Province Line Road Sta Precast concrete gra 40 track feet ,554 Spring Hill Road Sta Precast concrete gra 40 track feet ,554 Hollow Road Sta Precast concrete gra 40 track feet ,554 NJ Sta Precast concrete gra 110 track feet , Track: Special (switches, turnouts) 1,296,125 Main line tracks New No. 20 turnout west of Hopewell Turnout, No. 20, we 1 each 187, ,982 Move Skillman siding Remove No. 10 turnout Remove No. 10 turn 1 each 14,039 14,039 Remove No. 10 turnout Remove No. 10 turn 1 each 14,039 14,039 New No. 10 turnout Turnout, No. 10, we 1 each 104, ,699 New No. 10 turnout Turnout, No. 10, we 1 each 104, ,699 New "CP SKILLMAN" interlocking New No. 20 crossover Crossover, No. 20, w 2 each 375, ,928 3M Siding Remove No. 10 turnout Remove No. 10 turn 1 each 14,039 14,039 New No. 10 turnout Turnout, No. 10, we 1 each 104, , Track: Vibration and noise dampening 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) Segment 4 Detail 15

22 Segment 4: W of Hopewell to W of Belle Mead Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext Atgrade station, stop, shelter, mall, terminal, platform 350,979 Hopewell Stabilize existing historic building Stabilize existing histo square feet 119 Rehabilitate existing historic building Rehabilitate existing square feet 595 Lowlevel platform Lowlevel platform 1 each 321, ,235 Mini highlevel platform Mini highlevel platfo 1 each 29,744 29, Aerial station, stop, shelter, mall, terminal, platform 2.03 Underground station, stop, shelter, mall, terminal, platform 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development 2.06 Automobile parking multistory structure 2.07 Elevators, escalators 416,416 Hopewell Elevators Heavy duty elevator 1 each 416, , SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION 3.01 Administration Building: Office, sales, storage, revenue counting 3.02 Light Maintenance Facility 3.03 Heavy Maintenance Facility 3.04 Storage or Maintenance of Way Building 3.05 Yard and Yard Track 4.00 SITEWORK & SPECIAL CONDITIONS 4.01 Demolition, Clearing, Earthwork 266,074 Hopewell Earthwork Unclassified cuts and 6,000 cubic yards ,771 Stormwater management basin Stormwater managem 19,000 square feet 6 123, Site Utilities, Utility Relocation 1,315,637 Hopewell Utilities Station utilities 1 station 102, ,319 Relocate fiberoptic at new track 2 Relocate fiberoptic in 50,990 feet 24 1,213, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4.05 Site structures including retaining walls, sound walls 892,320 Hopewell Pedestrian overpass Pedestrian overpass w 1 each 892, , Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 1,361,323 Hopewell Landscaping Station landscaping 4 acre 14,872 59,488 Signage Station signage 1 station 29,744 29,744 Amenities Station amenities 1 station 17,846 17,846 Intertrack fence Intertrack fence 1,000 feet 36 35,693 Rightofway fencing, both sides RightofWay fence 102,420 feet 12 1,218, Automobile, bus, van accessways including roads, parking lots 380,723 Hopewell Parking Station parking 100 stall 2, ,440 Roads Access/circulation ro 700 feet , Temporary facilities and other indirect costs during construction 1,344,905 Mobilization Maintenance and Protection of Traffic General Contractor O/P, markup on subs, insurance Agency Force Account: Flagging Flagging (Inhouse $1 471 days 2,855 1,344, Public Art 5.00 SYSTEMS 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) 6.01 Purchase or lease of real estate 317,212 Property acquisition for Hopewell Station 158,606 Easment for RoW owned by Hopewell Borough 158, Relocation of existing households and businesses Segment 4 Detail 16

23 Segment 4: W of Hopewell to W of Belle Mead Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext VEHICLES (number) 8.00 SOFT COSTS 8.01 Preliminary Engineering 6% 1,181, Final Design 6% 1,181, Project Management for Design and Construction 5% 984, Construction Administration & Management 12% 2,362, Insurance, Legal, Permits, Review Fees 3% 590, Surveys, Testing, Investigation, Inspection 3% 590, Agency Force Account Work 9.00 FINANCE CHARGES 0% CONTINGENCY 5,689,000 Contingency on FTA items % 5,000,000 Contingency on FTA items % 689,000 Segment 4 Detail 17

24 Major Capital Project Costs By Segment Project NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study Today's Date 10/26/07 Location West Trenton, NJ to Manville, NJ Yr of Base Year Dollars 2007 Pjt. No (this number is automatically assigned by Fast Track) Number of Route Miles in the Segment 4.64 Number of Stations 2 Segment No. 5 of 7 (attach plan of segment and typical sections through segment, along with cost estimate per typical section) Low costs in Base Yr (X$000) for potential cost savings* "Most Likely" cost estimate in Base Yr (X$000) High costs in Base Yr Dollars (X$000) for potential cost increases* 1.00 GUIDEWAY & TRACK ELEMENTS (route miles) $ $ 2,062 $ 1.01 Guideway: Atgrade exclusive rightofway $ 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) $ 1.03 Guideway: Atgrade in mixed traffic $ 1.04 Guideway: Aerial structure $ Guideway: Builtup fill $ 1.06 Guideway: Underground cut & cover $ 1.07 Guideway: Underground tunnel $ 1.08 Guideway: Retained cut or fill $ 1.09 Track: Direct fixation $ 1.10 Track: Embedded $ 1.11 Track: Ballasted $ 1, Track: Special (switches, turnouts) $ Track: Vibration and noise dampening $ 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) $ $ 1,463 $ 2.01 Atgrade station, stop, shelter, mall, terminal, platform $ 1, Aerial station, stop, shelter, mall, terminal, platform $ 2.03 Underground station, stop, shelter, mall, terminal, platform $ 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc. $ 2.05 Joint development $ 2.06 Automobile parking multistory structure $ 2.07 Elevators, escalators $ 3.00 SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION $ $ $ 3.01 Administration Building: Office, sales, storage, revenue counting $ 3.02 Light Maintenance Facility $ 3.03 Heavy Maintenance Facility $ 3.04 Storage or Maintenance of Way Building $ 3.05 Yard and Yard Track $ 4.00 SITEWORK & SPECIAL CONDITIONS $ $ 5,454 $ 4.01 Demolition, Clearing, Earthwork $ Site Utilities, Utility Relocation $ Haz. mat'l, contam'd soil removal/mitigation, ground water treatments $ 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks $ 4.05 Site structures including retaining walls, sound walls $ 4.06 Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing $ Automobile, bus, van accessways including roads, parking lots $ 2, Temporary facilities and other indirect costs during construction $ Public Art $ 6.00 ROW, LAND, EXISTING IMPROVEMENTS (acres) $ $ 506 $ 6.01 Purchase or lease of real estate $ Relocation of existing households and businesses $ TOTAL SEGMENT COST $ $ 9,485 $ * Describe the risks, uncertainties, and opportunities associated with this segment, that prompted the inclusion Using costs from of a low or high cost, in addition to a "most likely cost" for particular line items. this column, total all segments and insert into Main Worksheet Base Yr Dollars Total (X$000) Segment 5 18

25 Segment 5: W of Belle Mead to E of Sunnymead Road Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext GUIDEWAY & TRACK ELEMENTS (route miles) 1.01 Guideway: Atgrade exclusive rightofway 4.64 miles CSX Trenton Line 24,500 feet 1.02 Guideway: Atgrade semiexclusive (allows crosstraffic) 1.03 Guideway: Atgrade in mixed traffic 1.04 Guideway: Aerial structure 635,332 Rehabilitate existing bridges NJ206 OH Sta Hillsborough Road OH Sta Homestead Road OH Sta Amwell Road OH Sta Royce Brook UG Sta Fair condition: Rehab 1,800 square feet 36 64,247 Hamilton Road OH Sta Replace existing bridge deck Pike Run UG Sta Replace bridge deck 2,700 square feet ,235 Royce Creek UG Sta Replace bridge deck 2,100 square feet , Guideway: Builtup fill 1.06 Guideway: Underground cut & cover 1.07 Guideway: Underground tunnel 1.08 Guideway: Retained cut or fill 1.09 Track: Direct fixation 1.10 Track: Embedded 1.11 Track: Ballasted 1,050,828 Main line tracks Line and surface track 1 Line and surface balla 250 feet 18 4,597 Line and surface track 1 Line and surface balla 22,250 feet ,115 New track 1 Ballasted track, wood 460 track feet ,093 New track 2 Ballasted track, wood 460 track feet ,093 New track 2 Ballasted track, wood 480 track feet ,663 Trackwork at Belle Mead Station Remove track Remove ballasted tra 2,000 track feet 36 71,386 New track 1 Ballasted track, wood 1,570 track feet ,188 Grade Crossing: track only Sunnymeade Road Sta Precast concrete gra 50 track feet , Track: Special (switches, turnouts) 375,964 Main line tracks New No. 20 turnout west of Belle Mead Turnout, No. 20, we 1 each 187, ,982 New No. 20 turnout east of Hillsborough Turnout, No. 20, we 1 each 187, , Track: Vibration and noise dampening 2.00 STATIONS, STOPS, TERMINALS, INTERMODAL (number) 2.01 Atgrade station, stop, shelter, mall, terminal, platform 1,463,405 Belle Mead Station Stabilize existing historic station building (40 ft by 60 ft) Stabilize existing histo 2,400 square feet ,542 Rehabilitate existing historic shelter house (20 ft by 40 ft) Rehabilitate existing 800 square feet ,904 Lowlevel platform Lowlevel platform 1 each 321, ,235 Mini highlevel platform Mini highlevel platfo 1 each 29,744 29,744 Hillsborough Station Stabilize existing historic building Stabilize existing histo square feet 119 Rehabilitate existing historic building Rehabilitate existing square feet 595 Lowlevel platform Lowlevel platform 1 each 321, ,235 Mini highlevel platform Mini highlevel platfo 1 each 29,744 29, Aerial station, stop, shelter, mall, terminal, platform 2.03 Underground station, stop, shelter, mall, terminal, platform 2.04 Other stations, landings, terminals: Intermodal, ferry, trolley, etc Joint development 2.06 Automobile parking multistory structure 2.07 Elevators, escalators Segment 5 Detail 19

26 Segment 5: W of Belle Mead to E of Sunnymead Road Begin Station: End Station: SCC No. SCC Description/Location Item Item Qty Units Unit Cost Cost Ext. Belle Mead Station Elevators Heavy duty elevator each 416,416 Hillsborough Station Elevators Heavy duty elevator each 416, SUPPORT FACILITIES: YARDS, SHOPS, ADMINISTRATION 3.01 Administration Building: Office, sales, storage, revenue counting 3.02 Light Maintenance Facility 3.03 Heavy Maintenance Facility 3.04 Storage or Maintenance of Way Building 3.05 Yard and Yard Track 4.00 SITEWORK & SPECIAL CONDITIONS 4.01 Demolition, Clearing, Earthwork 889,075 Belle Mead Station Earthwork Unclassified cuts and 8,000 cubic yards ,362 Stormwater management basin Stormwater managem 36,000 square feet 6 233,626 Hillsborough Station Earthwork Unclassified cuts and 10,000 cubic yards ,952 Stormwater management basin Stormwater managem 35,000 square feet 6 227, Site Utilities, Utility Relocation 275,310 Belle Mead Station Utilities Station utilities 1 station 102, ,319 Hillsborough Station Utilities Station utilities 1 station 102, ,319 Relocate fiberoptic at new track Relocate fiberoptic in 2,970 feet 24 70, Haz. mat'l, contam'd soil removal/mitigation, ground water treatments 4.04 Environmental mitigation, e.g. wetlands, historic/archeologic, parks 4.05 Site structures including retaining walls, sound walls Belle Mead Station Pedestrian overpass Pedestrian overpass w each 892,320 Hillsborough Station Pedestrian overpass Pedestrian overpass w each 892, Walks, plazas, landscape, furniture, lighting, bike fac., signage, fencing 886,371 Belle Mead Station Landscaping Station landscaping 7 acre 14, ,104 Signage Station signage 1 station 29,744 29,744 Amenities Station amenities 1 station 17,846 17,846 Intertrack fence Intertrack fence feet 36 Hillsborough Station Landscaping Station landscaping 7 acre 14, ,104 Signage Station signage 1 station 29,744 29,744 Amenities Station amenities 1 station 17,846 17,846 Intertrack fence Intertrack fence feet 36 Rightofway fencing, both sides RightofWay fence 49,000 feet , Automobile, bus, van accessways including roads, parking lots 2,739,422 Belle Mead Station Parking Station parking 450 stall 2,974 1,338,480 Roads Access/circulation ro 900 feet ,078 Hillsborough Station Parking Station parking 375 stall 2,974 1,115,400 Roads Access/circulation ro 1,500 feet , Temporary facilities and other indirect costs during construction 665,314 Mobilization Maintenance and Protection of Traffic General Contractor O/P, markup on subs, insurance Agency Force Account: Flagging Flagging (Inhouse $1 233 days 2, , Public Art 5.00 SYSTEMS Segment 5 Detail 20

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative PRELIMINARY ORDER OF MAGNITUDE CAPITAL COST ESTIMATING METHODOLOGY Technical Memorandum December 2011 Prepared for: Metropolitan Atlanta Rapid Transit Authority Atlanta, GA

More information

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team Durham-Orange County Corridor Alternatives Analysis Volume 3: Capital Cost Estimates Operations and Maintenance Cost Estimates Travel Time and Distance Calculations Ridership Summaries and Station to Station

More information

TECHNICAL MEMORANDUM. Nathan D. Maier Consulting Engineers

TECHNICAL MEMORANDUM. Nathan D. Maier Consulting Engineers TECHNICAL MEMORANDUM To: John Hoppie, DART From: URS Corporation Peng Zhao, PE Chad Allen, PE Lakhbir Chauhan, PE Herb Miller, PE Nancy Stavish Nathan D. Maier Consulting Engineers Bill Wallace, PE Heidi

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Cost to extending KC Streetcar north approximately ½ mile

Cost to extending KC Streetcar north approximately ½ mile Technical Memorandum September 22, 2015 Attention: Jason Waldron, PE From: Lucas L. Olson, PE; Cory Imhoff, PE RE: Cost to extending KC Streetcar north approximately ½ mile HDR was asked for their opinion

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2015-44 DATE: October 16, 2015 TO: FROM: Technical Advisory Committee TAC Funding and Programming Committee

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Northern Indiana Commuter Transportation District VENDOR OPEN HOUSE APRIL 17, 2019

Northern Indiana Commuter Transportation District VENDOR OPEN HOUSE APRIL 17, 2019 Northern Indiana Commuter Transportation District VENDOR OPEN HOUSE APRIL 17, 2019 VENDOR OPEN HOUSE AGENDA Welcome and Introductions Safety Briefing NICTD Website and Plan Room Upcoming Projects Disadvantaged

More information

WEST CONTRA COSTA HIGH-CAPACITY TRANSIT STUDY TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE

WEST CONTRA COSTA HIGH-CAPACITY TRANSIT STUDY TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST (AN OPINION OF PROBABLE CONSTRUCTION COST) BASED ON DRAFT TM #11 ALTERNATIVE REFINEMENT

More information

14.0 Capital Cost Estimate Methodology

14.0 Capital Cost Estimate Methodology 14.0 Capital Cost Estimate Methodology 14.1 Purpose of the Memorandum This memorandum documents the major assumptions that inform the conceptual capital cost estimates for the transit improvement alternatives

More information

engineering phase and during the procurement of design build contracts.

engineering phase and during the procurement of design build contracts. CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

WESTSIDE SUBWAY EXTENSION. Final Capital Cost Estimate Report (120F) Task Prepared for:

WESTSIDE SUBWAY EXTENSION. Final Capital Cost Estimate Report (120F) Task Prepared for: Project No. PS-435-2 Final Capital Estimate Report (12F) Task 9.22 Prepared for: Prepared by: Parsons Brinckerhf 444 South Flower Street, Ste 37 Los Angeles, CA 971 December 3, 21 (REV1 DEIS/DEIR) Table

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

Federal Transit Administration Scope & Activity Line Item Codes

Federal Transit Administration Scope & Activity Line Item Codes Page 1 of 9 SCOPE CODE CHART SCOPE CODES Category Capital Description Bus Rolling Stock Bus Transitways / Lines Bus Station Stops & Terminals Bus Support Equip / Facilities Bus Electification / Power Dist.

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

FINANCIAL ANALYSIS TECHNICAL MEMO

FINANCIAL ANALYSIS TECHNICAL MEMO FINANCIAL ANALYSIS TECHNICAL MEMO PREPARED BY: QUANDEL CONSULTANTS, LLC JANUARY 30, 2017 AECOM. BERGMANN ASSOCIATES. QUANDEL CONSULTANTS NorthSouth Commuter Rail Feasibility Study Financial Analysis Technical

More information

Update on Transportation Activities in Fairfax County

Update on Transportation Activities in Fairfax County Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation Association June 13, 2018 Tom Biesiadny, Director Fairfax County Continuing Project Implementation

More information

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018 TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track,

More information

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000. Urban Transit Agencies SEPTA - Philadelphia Elwyn-Wawa Service Restoration Project $7,300,000 SEPTA - Philadelphia Construction of New Signage $4,792,000 SEPTA - Philadelphia New Tunnel Lighting $2,044,800

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

Metcalf Avenue and Shawnee Mission Parkway Corridor

Metcalf Avenue and Shawnee Mission Parkway Corridor Metcalf Avenue and Shawnee Mission Parkway Corridor Improved transit service within the Metcalf and Shawnee Mission Parkway corridors is identified in the regional long range transportation plan and in

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE

RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE DULLES RAIL RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE ANALYSIS OF ALTERNATIVE AIRPORT ALIGNMENTS FOR METRORAIL AT WASHINGTON DULLES INTERNATIONAL AIRPORT MARCH 2011 PURPOSE This paper presents

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Transit Access to the National Harbor

Transit Access to the National Harbor Transit Access to the National Harbor December 2014 Table of Contents Executive Summary... 3 Introduction and Project Purpose... 6 Methodology.. 9 Definition of Alternatives..... 9 Similar Project Implementation

More information

CHAPTER SEVEN: EVALUATION METHODOLOGY FOR COST AND COST EFFECTIVENESS MEASURES Locally Preferred Alternative Report

CHAPTER SEVEN: EVALUATION METHODOLOGY FOR COST AND COST EFFECTIVENESS MEASURES Locally Preferred Alternative Report CHAPTER SEVEN: EVALUATION METHODOLOGY FOR COST AND COST EFFECTIVENESS MEASURES CHAPTER SEVEN: EVALUATION METHODOLOGY FOR COST AND COST EFFECTIVENESS MEASURES Capital cost estimates for each alternative

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

North Shore Alternatives Analysis. May 2012

North Shore Alternatives Analysis. May 2012 North Shore Alternatives Analysis May 2012 Agenda Study Process and Progress to Date Short List Alternatives Screening Traffic Analysis Conceptual Engineering Ridership Forecasts Refinement of Service

More information

Conceptual Design Cost Estimates Report

Conceptual Design Cost Estimates Report SPOKANE REGIONAL LIGHT RAIL PROJECT Conceptual Design Cost Estimates Report Two New Low Cost Alternatives ~ U-City Light Rail Minimum Operable Segment (MOS) Bus Rapid Transit Alternative (BRT) Prepared

More information

CTA Capital Construction Update May 17, 2007

CTA Capital Construction Update May 17, 2007 Block 37 Signals Project Brown Line Howard CTA Capital Construction Update May 17, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block 37

More information

REFINEMENT PHASE PRELIMINARY REPORT BRIEFING PAPER. DRAFT November 28, 2011

REFINEMENT PHASE PRELIMINARY REPORT BRIEFING PAPER. DRAFT November 28, 2011 REFINEMENT PHASE PRELIMINARY REPORT BRIEFING PAPER DRAFT November 28, 2011 KEY OBJECTIVES OF REFINEMENT PHASE PRELIMINARY REPORT Respond to community concerns regarding cost and impacts, and to specific

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

Metropolitan Council Metro Transit Project Description Budget Year

Metropolitan Council Metro Transit Project Description Budget Year Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Meeting Purpose and Format Meeting Purpose and Format The purpose of tonight s meeting is to: Provide a final update

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

Appendix E: Basis for Comparative Cost Analysis

Appendix E: Basis for Comparative Cost Analysis DRAFT Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY Appendix E: Basis for Comparative Cost Analysis Estimated Probable Construction Costs DTX Future with Surface Rail (2026) Pennsylvania Avenue

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Planning, Development and Real Estate Committee Board Information Item III-A March 27, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of

More information

A428 Western Corridor Guided Bus Route Options

A428 Western Corridor Guided Bus Route Options Guided Bus Route Options for Cambridgeshire County Council Guided Bus Route Options Document Status Document status Revision Date Status or comment Prepared by Checked by Authorised by 10/08/2017 First

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014 Aurora Line/I-225 Rail Project Update Public Meeting June 4, 2014 FasTracks and I-225 Rail Line Update Danielle Smith I-225 Rail Line Design/Build Coordination Manager 2 The RTD FasTracks Plan 122 miles

More information

A Presentation to: Project Advisory Group Meeting #10

A Presentation to: Project Advisory Group Meeting #10 A Presentation to: Project Advisory Group Meeting #10 October 21, 2015 Agenda Introductions Action Items From Last PAG Meeting (August 26, 2015) Recent Agency Involvement Update on Refined Alternative

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

vision42

vision42 vision42 www.vision42.org vision42 auto-free light rail boulevard for 42nd Street Roxanne Warren, AIA, Chair George Haikalis, ASCE, Co-Chair Institute for Rational Urban Mobility,Inc. www.vision42.org

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

Group Class Code Listing

Group Class Code Listing Group Class Code Listing 1000 Automotive; Parts, Components, Vehicles 1160 Surplus - Bus & Bus Parts 1010 Automotive Parts 1200 Trolleys; Parts, Components 1020 Automotive - Testing Equipment 1202 Trolley

More information

4.2 Series Station Option Description

4.2 Series Station Option Description 4.2 Series Station Option Description The series station proposal features a new set of side platforms constructed approximately 250 feet north of the existing platforms. The two new platforms would extend

More information

Chicago Transit Authority Service Standards and Policies

Chicago Transit Authority Service Standards and Policies Chicago Transit Authority Service Standards and Policies Overview and Objectives The Chicago Transit Authority (CTA) has revised its Service Standards and Policies in accordance with Federal Transit Administration

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

Functional Design Presentation At-Grade Section: Don Mills to Ionview Please review the presentation and complete the survey. February 26, 2013 to

Functional Design Presentation At-Grade Section: Don Mills to Ionview Please review the presentation and complete the survey. February 26, 2013 to Functional Design Presentation At-Grade Section: Don Mills to Ionview Please review the presentation and complete the survey. February 26, 2013 to March 14, 2013 1 Online Consultation Overview Online Consultation

More information

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017 Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Customer Services, Operations, and Safety Committee Board Information III-D March 13, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) A: 2014 SFMTA TRANSIT SERVICE INFORMATION B: SFMTA TRAFFIC COUNT DATA C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) E: LAND USE AND VALUE

More information

GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2017 GRANT PROGRAM PROJECT DESCRIPTIONS

GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2017 GRANT PROGRAM PROJECT DESCRIPTIONS Section 5307 Capital Formula (OH-2017-XXXX) Information Technology Program This program is to purchase ADP hardware, ADP software and third party support for the upgrade of our Network Infrastructure,

More information

Minnesota Avenue Station Parking Garage Repair Project

Minnesota Avenue Station Parking Garage Repair Project Finance & Administration Committee Action Item III-B July 10, 2014 Minnesota Avenue Station Parking Garage Repair Project Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

7000 Series Railcar Program Overview

7000 Series Railcar Program Overview Finance, Administration and Oversight Committee Information Item IV-B November 6, 2008 7000 Series Railcar Program Overview Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

1.0 Detailed Definition of Alternatives

1.0 Detailed Definition of Alternatives 1.0 Detailed Definition of Alternatives 1.1 Introduction This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans)

More information

Attachment E3 Vibration Technical Memorandum

Attachment E3 Vibration Technical Memorandum Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By Presentation To HRTPO Board Meeting Agenda Item #11 HRTPO Strategic Campaign and Vision Plan for Passenger Rail Presentation By May 19, 2010 Transportation Economics & Management Systems, Inc. Study Timeline

More information

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue NORTHWEST HIGHWAY SCURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY Northwest Highway (US 14) From Seegers Road to Western Avenue Northwest Highway SCurve Pedestrian/Bicycle Access Feasibility Study City

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

Sinking Fund Forecast. for Strata Plan: located at 123 Example Street Suburb, NSW 2999

Sinking Fund Forecast. for Strata Plan: located at 123 Example Street Suburb, NSW 2999 Sinking Fund Forecast for Strata Plan: 99999 located at 123 Example Street Suburb, NSW 2999 24-Sep-13 The Owners Corporation - SP99999 c/- Any Strata Management PO Box 1111 Suburb NSW 2999 Dear Sir/Madam,

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 FY 2018 Capital Budget and 12-Year Capital Program

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station 203 North LaSalle Street, Suite 2100 Chicago, IL 60601 (312) 558-1345 Fax: (312) 346-9603 E-Mail: cquandel@quandelconsultants.com www.quandel.com Scope of Services January 26, 2010 Project Development

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

17.8 acres site 4.6 acres in floodplain & wetlands 3.5 acres of surface parking 9 acres of open space

17.8 acres site 4.6 acres in floodplain & wetlands 3.5 acres of surface parking 9 acres of open space Peter Allen Associates, Inc. Nederveld, Inc. Ann Arbor/Grand Rapids Riverfront Village LLC 17.8 acres site 4.6 acres in floodplain & wetlands 3.5 acres of surface parking 9 acres of open space 17,000 Hospital

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

Interstate Drive Extension

Interstate Drive Extension Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

CTA Blue Line Study Area

CTA Blue Line Study Area 1 CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental considerations)

Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental considerations) 9-34 Blair Station Maintenance and Storage Facility The proposed Maintenance and Storage Facility is an integral part of the project, as it will: House and service all of the trains needed to operate the

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

South Bend South Shore Line Station Alternatives Feasibility Study Executive Summary

South Bend South Shore Line Station Alternatives Feasibility Study Executive Summary South Bend South Shore Line Station Alternatives Feasibility Study Executive Summary April 2018 FINAL DRAFT South Bend South Shore Line Station Alternatives Feasibility Study Prepared for the City of South

More information