1 Elected Officials Briefing North Metro Rail Line Update February 9, 2017

2 Dave Genova, RTD General Manager and CEO

3 Openings Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22, 2016 B Line, July 25, 2016 G Line, TBD R Line, Feb. 24, 2017

4 Ridership Flatiron Flyer A year later, averaging more than 14,400 passengers per weekday University of Colorado A Line 16,870 passengers per weekday 12,260 passengers per Saturday 10,720 passengers per Sunday and Holidays B Line 1,250 passengers per weekday 530 passengers per Saturday 440 passengers per Sunday and Holidays

5 R Line Opening Feb. 24, miles of light rail 16 stations 5 new Park-n-Rides Regional connections to the University of Colorado A Line and Southeast Rail Line

6 R Line Opening Feb. 24, 2017 Where commuter rail meets light rail

7 Real Time Launched NextRide Beta release includes: Real-time predictions and vehicle locations for buses Vehicle location for light rail Neither vehicle locations or predictions for commuter rail Easy-to-use app, optimized for mobile devices

8 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs

9 FasTracks Status West (W) Line Open, April 2013 Denver Union Station Open, May 2014 East/Gold/Northwest Lines (EAGLE) University of Colorado A Line opened April 22, B Line opened July 25, G Line is scheduled to open in I-225 (R) Rail Line Opening Feb. 24, 2017 U.S. 36 BRT Flatiron Flyer service began Jan. 3, 2016; Express Lanes complete. North Metro (N) Line Construction continues on all rail bridges; station work is ongoing. Southeast Rail Extension Construction on the RidgeGate Parkway parking garage continues. Mass earthwork and excavation west of I-25 continues. Over 300,000 cubic yards of dirt have been moved to date. Drainage work continues at Grange Hall near 112th-Northglenn Station on the N Line RidgeGate Parkway parking garage second level deck pour on the Southeast Rail Extension Updated 2/6/17

10 EAGLE project updates UNIVERSITY OF COLORADO A LINE and B LINE: RTD met with FRA officials on Jan. 23 in Washington, D.C. to update them on the progress. FRA has granted waiver extension through April 30, 2017 and has lifted the 10 mph speed restriction on the gated crossings on the B Line. Denver Transit Partners/RTD making software, hardware and circuit upgrades to get the activation time to match the design time. Since opening: University of Colorado A Line (April 2016), the daily, average on-time performance is 87.3% (90% is our goal on commuter rail and light rail; light rail is about 94%). B Line (opened July 2016) average on-time performance is 95.9%.

11 EAGLE project updates G LINE: Once RTD has certification of the University of Colorado A and B lines from the FRA, RTD s attention will turn to testing along the G line, which provides service from Denver Union Station through Adams County, Arvada and Wheat Ridge. RTD is excited to open this much anticipated line and expect to do so in 2017.

12 Southeast Rail Extension Extends the existing Southeast Line 2.3 miles from Lincoln Station to RidgeGate Parkway in the City of Lone Tree; scheduled to open in 2019 Will serve existing RTD light rail lines E, F and R Three new stations - Sky Ridge Avenue - Future Lone Tree City Center - RidgeGate Parkway

13 Southeast Rail Extension

14 Current and upcoming projects Civic Center renovation: - 40 percent complete; scheduled to open in 2017 Route 15L: - Most used route in RTD system - RTD received grant funds from FTA and CDOT to provide transit enhancements on East Colfax, specifically at 15L bus stops. - RTD is in process of completing Environmental Clearance and Preliminary Design for the stop improvements. State Highway 119 (SH119) BRT: - RTD issued a RFP for SH119 BRT study, for consultant services to assist with environmental review and preliminary engineering work. - Through the Northwest Area Mobility Study (NAMS) stakeholders identified SH119 as a top priority

15 Ron Enserro, RTD North Metro Deputy Project Manager, Design

16 North Metro Rail Line 18.5 miles, 13 under construction Electrified commuter rail 8 stations, 6 under construction Frequency 20-minute peak 30-minute off-peak 27 minutes Union Station to Eastlake 124 th Single track with multiple passing tracks Serves Denver, Commerce City, Thornton, Northglenn, Adams County

17 Schedule Construction: Civil & Infrastructure Systems & Stations 2018 Testing & Training 2018 Open to the public

18 Differences between N Line & Eagle Project Lessons learned No quad gates Do not have adjacent freight lines Do not have as complex roadway geometry and associated traffic signals as Eagle Project

19 University of Colo. A Line Monaco Crossing

20 University of Colo. A Line Monaco Crossing

21 N Line 112th Avenue Crossing

22 N Line 112th Avenue Crossing

23 Design Status All areas A H (Denver Union to Eastlake-124th Station) is Issued For Construction (IFC) Bridges are all at IFC Stations at IFC 48th & Brighton-National Western Center Commerce City-72nd Original Thornton-88th Eastlake-124th Thornton Crossroads-104th Station Civil at 90% Garage at 60% Northglenn-112th Station is at 100%

24 Systems Status General signals design is at IFC System-wide electrical design is at IFC General communications design is at IFC Traction Electrification and Overhead Catenary design is at IFC Xorail signals/communications detailed design is at preliminary (~90%) and moving toward final design

25 Dave Trent, RRP North Metro Project Director

26 Eastlake-124th Station November 2016 January 2017

27 120 th Avenue Bridge

28 Northglenn-112th Station

29 Grange Hall

30 104 th Avenue Bridge

31 88 th Avenue Bridge

32 Hoffman, Lower Clear Creek, Settlers Chase and School Tributary

33 South Platte 3 Rehabilitation

34 Commerce City- 72nd Station November 2016 January 2017

35 70 th Avenue Bridge

36 Skyway Bridge Longest bridge in the state 9,533 feet 63 piers/64 spans 7,626 fasteners, no ballast

37

38 Washington Bridge October 2016 February 2017

39 Wall 225 Panels

40 Denargo Bridge

41 Ductbank Installation

42 OCS Pole Installation

43 Systems Signal Houses

44 Track Work

45 Upcoming Construction Ballasted track 112 th to 124 th Avenues 104 th Avenue Bridge direct fixation Thornton Crossroads-104th Station tunnel work Original Thornton-88th Station tunnel work and platform walls Hoffman Drainage, Phase 2 70 th Avenue Bridge deck pour 48th & Brighton-National Western Center Station platform walls 46 th Avenue Bridge deck pour Washington Bridge direct fixation

46 Upcoming Construction Ballasted track 112th to 124th Avenues OCS installation between 72nd and 104th Avenue School Tributary General drainage Questions: pipe Lindsey Smith Continued work at Grange Hall 46 th Avenue Bridge; 70th Avenue Bridge girder sets and Construction Questions: deck pours Kathy Berumen Girder sets and plinth pour on Skyway Bridge

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016 Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April

More information

Elected Officials Briefing North Metro Rail Line Update. August 11, 2016

Elected Officials Briefing North Metro Rail Line Update. August 11, 2016 Elected Officials Briefing North Metro Rail Line Update August 11, 2016 1 Christina Henderson, Suncor Director of Energy Pipelines U.S. 2 August 11, 2016 RTD Update Christina Henderson Director, Suncor

More information

Community Meeting Station Elements

Community Meeting Station Elements Community Meeting Station Elements North Metro Rail Line September 25, 2014 1 RRP Shawn Plichta Design Build Coordination Manager 2 RTD Jane Donovan Deputy Project Manager 3 The RTD FasTracks Plan 122

More information

North Metro Rail Line Elected Officials Briefing. August 10, 2017

North Metro Rail Line Elected Officials Briefing. August 10, 2017 North Metro Rail Line Elected Officials Briefing August 10, 2017 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs University of Colo. A Line, B Line & G Line: Update RTD met with Federal

More information

Denver Metro Association of Realtors

Denver Metro Association of Realtors Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;

More information

8/18/2014. Peoria Station Meeting. August 14, Project Update. Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager

8/18/2014. Peoria Station Meeting. August 14, Project Update. Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager Peoria Station Meeting August 14, 2014 1 Project Update Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager 2 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles

More information

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014 Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014 RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;

More information

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016 July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit

More information

RTD Commuter Rail System APTA Rail Conference June 23, 2015

RTD Commuter Rail System APTA Rail Conference June 23, 2015 RTD Commuter Rail System APTA Rail Conference June 23, 2015 RTD Eagle & North Metro Commuter Rail System Today s Presentation Eagle Design, Construction, Systems Commuter Rail Vehicles and CRMF/OCC EC

More information

Regional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015

Regional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015 Regional Transportation District Dave Genova Interim General Manager and CEO August 21, 2015 About RTD Created in 1969 Eight-county service area Service area: 2,340 square miles 2.8 million population

More information

The Southeast Rail Line extension is officially moving forward

The Southeast Rail Line extension is officially moving forward November 2015 Welcome to Inside FasTracks -- your monthly update about FasTracks news, progress and people FasTracks News The Southeast Rail Line extension is officially moving forward Lone Tree Mayor

More information

Eagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013

Eagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013 Construction of Peña Bridge - March 2013 South Platte River Bridge Eagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013 Today s Agenda Project background Schedule Design Systems Rail cars

More information

I-225 Rail Line 2 nd /Abilene Station Design Public Meeting

I-225 Rail Line 2 nd /Abilene Station Design Public Meeting I-225 Rail Line 2 nd /Abilene Station Design Public Meeting Jan. 29, 2014 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18

More information

METRO Light Rail Update

METRO Light Rail Update American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations

More information

Positive Train Control (PTC)

Positive Train Control (PTC) Positive Train Control (PTC) PTC at a glance FasTracks systems have Positive Train Control (PTC) technology called I-ETMS. This is a complex GPS-and-communications-based system that reduces the risk of

More information

East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015

East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015 1 East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015 Today s Agenda Safety Eagle P3 Project Commuter rail vehicle East Rail Line Economic impacts DBE/SBE/WIN status Progress

More information

I-225 Rail Line Iliff and Florida Stations Information Meeting

I-225 Rail Line Iliff and Florida Stations Information Meeting I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project

More information

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014 Aurora Line/I-225 Rail Project Update Public Meeting June 4, 2014 FasTracks and I-225 Rail Line Update Danielle Smith I-225 Rail Line Design/Build Coordination Manager 2 The RTD FasTracks Plan 122 miles

More information

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013 I-225 Rail Line 13 th Avenue Station Information Meeting July 25, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18 miles

More information

Construction Review Council. Sept. 13, 2011

Construction Review Council. Sept. 13, 2011 Construction Review Council Sept. 13, 2011 Introduction Rick Clarke, Assistant General Manager, Capital Programs FasTracks Program Update and Schedule Del Walker, Deputy Assistant General Manager, Capital

More information

ARTERIAL BRT OVERVIEW

ARTERIAL BRT OVERVIEW ARTERIAL BRT OVERVIEW Key Question: Could arterial Bus Rapid Transit (BRT) routes improve near-term mobility in the northwest area until rail can be built? Key Findings: 6 arterial BRT routes have been

More information

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives

More information

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 1 B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 Northwest Rail (B) Line 6.2 miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

UPGRADING THE AMTRAK KEYSTONE CORRIDOR UPGRADING THE AMTRAK KEYSTONE CORRIDOR Mark A. Wurpel Director Project Initiation & Development Amtrak 2005 AREMA Conference & Exposition Chicago, Illinois ABSTRACT: Upgrading the Amtrak Keystone Corridor

More information

Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people

Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people December 2014 Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people FasTracks News I hear the train a- comin RTD s first electric commuter rail cars arrive in Denver

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

Northwest Rail Environmental Evaluation. Governments Team. September 13, 2007

Northwest Rail Environmental Evaluation. Governments Team. September 13, 2007 Northwest Rail Environmental Evaluation Governments Team September 13, 2007 1 Agenda Welcome and introductions Commuter rail technology discussion History Technology review Technology evaluation criteria

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org Capital Metro Plans & Projects Update NASWC July 27, 2017 1 Capital Metro at a Glance Established in 1985 535 square mile service area 1,079,995 population 7 Member Cities Austin Leander Manor Lago Vista

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

CREATING CONNECTIONS IN THE CITY OF WATERLOO

CREATING CONNECTIONS IN THE CITY OF WATERLOO CREATING CONNECTIONS IN THE CITY OF WATERLOO GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE METROLINX ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX METROLINX PRESENTATION TO

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Train Cars Are On The Move! Trains are rolling on the Eagle P3 Project.

Train Cars Are On The Move! Trains are rolling on the Eagle P3 Project. In This Issue Page 2 Transit-Oriented Development Good for Communities Page 3 Eagle P3 Public Tours are Back! Denver Stands Up for Transportation Page 4 $1.19 Billion: Eagle P3 Project Builds Local Economy

More information

Valley Metro: Past, Present and Future. September 11, 2014

Valley Metro: Past, Present and Future. September 11, 2014 Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro

More information

FASTRACKS SYSTEM MAP: ALL CORRIDORS

FASTRACKS SYSTEM MAP: ALL CORRIDORS FASTRACKS SYSTEM MAP: ALL CORRIDORS SOURCE: RTD NMC - 1403-09/06 FASTRACKS SYSTEM MAP: NORTHWEST RAIL CORRIDOR Current FasTracks Plan for Northwest Rail Corridor Final alignment, technology, and stations

More information

CREATING CONNECTIONS IN WATERLOO REGION

CREATING CONNECTIONS IN WATERLOO REGION CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018 Confederation Line Stage 1 and 2 Our Lady of Fatima Church May 10 th, 2018 Agenda Confederation Line Stage 1 Overview project, consortium, vehicles Confederation Line Stage 2 Overview project, benefits

More information

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018 I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

MetroExpress Improvements

MetroExpress Improvements Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

Strategies to keep people and goods moving in and through Seattle

Strategies to keep people and goods moving in and through Seattle Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 LAX Specific Plan Amendment Study CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 Agenda Background on public planning process Regional planning update LAWA progress on settlement commitments

More information

2012 MULTIMODAL OPERATIONS WORKSHOP

2012 MULTIMODAL OPERATIONS WORKSHOP New Haven-Hartford-Springfield Rail Program Gateway to New England Jeffrey T. Schultz, PMP Senior Principal Technical Specialist Parsons Brinckerhoff Glastonbury, CT July 31, 2012 2012 MULTIMODAL OPERATIONS

More information

Confederation Line West Queensway Terrace North. May 27, 2017

Confederation Line West Queensway Terrace North. May 27, 2017 Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

Presentation of the Baltimore Metro System

Presentation of the Baltimore Metro System Presentation of the Baltimore Metro System Presenter: Michael S. Davis Deputy Administrator, Transit Operations Division March 2, 2010 Topics Early Planning for Rapid Rail Transit System Overview Section

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Paid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014

Paid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014 Paid Parking at Park & Ride Lots: Framing the Issues Capital Programs Committee May 2014 Outline Current Status Industry Review DART Case Study Issues Alternatives Mechanics 2 Current Status: All Lots

More information

Sound Transit Operations July 2016 Service Performance Report. Ridership

Sound Transit Operations July 2016 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE SAN FRANCISCO TO SAN JOSE PROJECT UPDATE San Francisco County Transportation Authority Tuesday, April 25, 2017 Ben Tripousis, Northern California Regional Director HIGH-SPEED RAIL: Connecting California

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

DART Capital Program Update

DART Capital Program Update DART Capital Program Update CMAA North Texas April 30, 2015 David Ehrlicher Assistant Vice President, Program Delivery Overview of DART System Multimodal System: 120 + bus routes 90 miles of Light Rail

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Confederation Line West Alignment Improvement. September 21, 2016

Confederation Line West Alignment Improvement. September 21, 2016 Confederation Line West Alignment Improvement September 21, 2016 Agenda Background Lincoln Fields Station and alignment improvement LRT alignment, west of Lincoln Fields to Queensview, including: Pedestrian

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

SWLRT Business Advisory Committee. October 10, 2012

SWLRT Business Advisory Committee. October 10, 2012 SWLRT Business Advisory Committee October 10, 2012 2 Today s Topics Approval of Meeting Minutes SWLRT 101 LRT 101 Guides to Commenting on the DEIS Future Topics of Interest Member/Committee Reports Public

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

TRANSFORMING THE WAY OUR REGION MOVES

TRANSFORMING THE WAY OUR REGION MOVES TRANSFORMING THE WAY OUR REGION MOVES Judy Pfeifer, Chief Communications and Public Affairs Officer Gord Troughton, Director, Corridor Infrastructure Chris Burke, Director, Service Planning GRIDLOCK COSTS

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Iliff and Florida Stations Meeting Q&A What is the elevation of the Iliff Station? How was it decided which direction of lanes Abilene loses?

Iliff and Florida Stations Meeting Q&A What is the elevation of the Iliff Station? How was it decided which direction of lanes Abilene loses? Iliff and Florida Stations Meeting Q&A RTD FasTracks I-225 Rail Line Iliff and Florida Stations Information Meeting Q & A May 15, 2013, 5:30 p.m. Aurora Association of Realtors Office 14201 E. Evans Avenue,

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014

Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014 Cobbs Creek Viaduct (4.79) Built in 1891 Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014 What Will Happen Without Additional Funding

More information

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Regional Transit Extension Studies Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Topics Virginia Beach Transit Extension Study (VBTES) Naval Station

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Program Description 1. Rapid Transit Corridors Bus Service Enhancements Transit Facilities Transit Amenities...

Program Description 1. Rapid Transit Corridors Bus Service Enhancements Transit Facilities Transit Amenities... Table of Contents Preface Executive Summary 1. Overview of FasTracks... ES-1 2. Key Components of FasTracks... ES-2 3. Benefits of FasTracks... ES-4 4. Development/Refinement of Plan Concept... ES-11 Program

More information

Green Line opens June 14

Green Line opens June 14 Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on

More information

What IS BRT, Really? Not BRT and RNY

What IS BRT, Really? Not BRT and RNY What IS BRT, Really? 2007 Winter TexITE Meeting Presented by Jeff Arndt, TTI Not BRT and RNY 1 What is Bus Rapid Transit? A flexible, rubber-tired from of rapid transit that combines stations, vehicles,

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

Ottawa LRT Stage 2. McKellar Park Information Session

Ottawa LRT Stage 2. McKellar Park Information Session Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville

More information

2. ALTERNATIVES CONSIDERED

2. ALTERNATIVES CONSIDERED 2. ALTERNATIVES CONSIDERED 2.1 INTRODUCTION This chapter describes the decision process to develop alternatives, identify screening criteria, screen alternatives, and identify a Build Alternative. For

More information