1 1 Tennessee Gas Pipeline Enfield Customer Meeting October 19, 2016

2 Agenda Brian Merchant Director, Engineering Gas Control, KMI East Region Ron Besette Director, OPS, Division 10 Office, KMI East Region Don Perkins Manager, OPS, Agawam STA 261, KMI East Region Cathy Soape Hutton Manager, Trans and Storage Svc, KMI East Region TGP Gas Control Organizational Structure TGP System Overview Winter Look Back ( 15/16) Summer Preview ( 16) Operations Overview Winter Readiness Scheduled Maintenance Scheduling Update

3 TGP Gas Control Organizational Structure

4 GAS CONTROL ORGANIZATIONAL STRUCTURE June

5 TGP CONTROL ORGANIZATIONAL STRUCTURE June

6 TGP System Overview

7 Tennessee Gas Pipeline System Overview 11,900 miles of pipeline 96 Bcf of storage capacity ~9.6 Bcf/d design capacity Abundant & Growing Supply Northeast Utica Shale Marcellus Shale Haynesville Shale Southeast EagleFord Shale 7

8 System Flows 2016 TGP Operations Marcellus ~3.5 Bcf/d Utica ~1.3 Bcf/d ~ Bcf/d South flow at Sta 87 Consistent exports to Mexico and Canada High system utilization 200 Line 300 Line 200 Line Sta Line 100 Line 800 Line Long Haul to the south 8

9 MDth/d TGP Increasing Annual Deliveries 9,000 8, % +6% +1% 7,000 6,000 5,000 4,000 3,000 2,000 Zone 6 Zone 5 Zone 4 Zone 3 Zone 2 Zone 1 Zone L Zone 0 1, YTD *YTD through September 9

10 Winter Look Back Summary Peak Day was ~10.3 Bcfd on Jan 19, Deliveries Peak Day was ~1.3 Bcfd on Jan 22, 2016 Storage (withdrawal) Peak Day was ~1.9 Bcfd on Feb 9, 2016 Power Plant Load Winter OFO count 2015/2016 Zones 5 & 6-21 vs 11 in 2014/ OFO s were directed at power plants (Dec/Jan) vs 5 in 2014/ /2016 All other zones - 6 vs 5 in 2014/2015 Storage Inventories remained at high levels 29% higher than the levels for 2014/15 and 45% higher than 2013/14. System Challenges Short Term Unit/Pipeline Issues Continuous communication between Commercial, Scheduling and Gas Control Groups

11 Winter Summary - System Deliveries % Change LDC 2,046 2,087 1,657-21% Power 1,096 1,258 1,375 +9% Interconnects 4,841 5,014 5,397 +8% Other* % TOTAL 8,192 8,598 8,795 +2% Volumes are MDth/d *Other includes fuel, storage and industrial 11

12 MDth/d Winter Total System Power Deliveries 1,600 1,400 1,200-2% +14% +9% 1, Zone 6 Zone 5 Zone 4 Zone 2 Zone 1 Zone

13 Winter Northeast Market Deliveries % Change LDC 1,467 1,511 1,180-22% Power % Interconnects 1, ,485 +9% TOTAL 3,057 3,187 2,992-6% Volumes are MDth/d 13

14 MDth/d Winter North Supply Analysis 6, % 5, % 4,000 3,000 2,000 1, % Wright Utica Shelton Rex Marcellus Distrigas Dracut Broad Run Winter Period (Nov-Mar) Average MDth/d 14

15 MDth/d Segment 245 Scheduled Volumes 1,200 1, /1/ /1/2015 1/1/2016 2/1/2016 3/1/2016 4/1/2016 Timely Cycle Capacity Winter Period (Nov-Mar) 15

16 MDth/d Segment 321 Scheduled Volumes 1,800 1,600 1,400 1,200 1, /1/ /1/2015 1/1/2016 2/1/2016 3/1/2016 4/1/2016 Timely Cycle Capacity Winter Period (Nov-Mar) 16

17 Summer Look back Summary System Demand relatively flat to previous year Power Loads Increased / LDC Loads Decreased Northeast Market Demand experienced slight increase Increase in Pipeline Interconnect deliveries Summer OFO count 2016 Zones 5 & 6-6 vs 8 in OFO s were directed at power plants 2015; 0 in 2016 in Zones 5 & All other zones - 15 through ; vs 16 in 2015 Storage Inventories remained at high levels for % higher going into summer compared to % higher going into summer compared to 2014 System Challenges Maintenance High Storage Inventory in Northern Storage Fields

18 Summer Summary - System Deliveries * % Change LDC % Power 1,296 1,584 1, % Interconnects 4,445 4,680 4,719 +1% Other** % TOTAL 7,110 7,632 7,586-1% Volumes are MDth/d **Other includes fuel, storage and industrial * Through September 18

19 MDth/d Summer Total System Power Deliveries 2,000 1,800 1, % +15% 1,400 1,200 1, Zone 6 Zone 5 Zone 4 Zone 2 Zone 1 Zone * * Through September 19

20 Power Generation Peak Days

21 Summer Northeast Market Deliveries * % Change LDC % Power % Interconnects 1,249 1,245 1, % TOTAL 2,313 2,326 2,462 6% Volumes are MDth/d * Through September 21

22 MDth/d Summer North Supply Analysis 5, % 4, % +16% 4,000 3,500 3,000 2, % +41% +17% Cobb Cornwell Distrigas Dracut Marcellus 2,000 1,500 Rex Shelton Utica 1,000 Wright * Summer Period (Apr-Oct) Average MDth/d * Through September 22

23 MDth/d Segment 245 Scheduled Volumes 1,200 1, /1/2016 5/1/2016 6/1/2016 7/1/2016 8/1/2016 9/1/ /1/2016 Timely Cycle Capacity Summer Period (Apr-Oct) 23

24 MDth/d Segment 321 Scheduled Volumes 1,800 1,600 1,400 1,200 1, /1/2016 5/1/2016 6/1/2016 7/1/2016 8/1/2016 9/1/ /1/2016 Timely Cycle Capacity Summer (Apr-Oct) 24

25 OPERATIONS OVERVIEW June

26 Division 10 Map June

27 New England Area Map June

28 OPERATIONS ORGANIZATIONAL STRUCTURE June

29 OPERATIONS ORGANIZATIONAL STRUCTURE June

30 Hamburg Area Projects Installation of NEW Launcher/Receiver at Niagara River Crossing Oct 2015 Station 230C New Dehydration Facility Niagara Spur Completed June 2015 Turbine Exchange (Unit 230C-1A) May Station 237 Unit Automation Upgrades July Station/Building Protection System Upgrade June Turbo Replacement (Unit 237-3A) - June Station 229 Foundation Replacement (Unit 229-3A) Complete by Oct 31 Turbocharger Replacement (Unit 229-5A) April June

31 Nassau Area Projects Station 241 Engine Overhaul (Unit 241-2B) Aug Turbo Replacement (Unit 241-3A) - Sept Automation Upgrade Oct Station 249 Engine Overhaul (Unit 249-2B) Sep Station 245 HP Replacement (Solar Taurus 70) Nov 2015 Turbocharger Replacement Aug Station 325 Turbine Overhaul Sep June

32 Coudersport Area Projects Station 317 Replacement/Upgrade VFD & Substation for Electric Compression Aug Station 315 Turbine Inspection/Repair (Unit 315-2A) Sep Turbine Inspection (Unit 315-1A) - Sep Station 323 Repair/Upgrade Standby Generator Sep Inspection/Repair of Motor Shaft/Compressor Seal Repair by October 31st June

33 New England Area Projects Station 267 Replace ESD Stand Complete by 10/31 Unit block valve installations Completed Oct Westfield SMS Replace Regulators June Station 260A Compressor Inspection Sep Motor/VFD Inspection Oct Station 261 Fuel System/Controls Upgrade (Unit 261-1C) Oct Block Valve Installation (Unit 261-1C) Sep Replace Station UPS Oct Replace Air Dryer Aug Station 264 Replace Station UPS - May Station 265E Replace Station UPS Nov 5-11 Cooler Bypass Repair Nov 5-11 June

34 New England Area Projects 2016 (Con t) Pipeline lowering - 270B-100 (Suncook, NH) Oct 6-21 Repair Exposed Pipe Tolland, MA Oct 24-Nov 4 (NO OUTAGE) Waterway Inspection Farmington River - June Station 264 Replace Station UPS - May Filter Separator Maintenance Station 266, 267 & Blackstone SMS June

35 New England Area Projects 2016 (Con t) ROW Projects Completed Marker Program Mowing 168 miles completed by 12/31 Side trim Program 30 miles completed by 12/31 June

36 In-Line Inspections/Direct Assessments Completed 2016 Direct Assessment (1 dig) In-Line Inspections to to Maintenance Pig Runs to to In-Line Inspections to to to Direct Assessments MLV 329 (2 Digs) Direct Assessments to (2 digs) Station 261 (1 dig) 264A-100 (4 digs) 265E-200 (3 digs) 339A-100 (4 digs) 340A-100 (4 digs) 345A-100 (4 digs) June

37 In-Line Inspections/Direct Assessments Completed 2016 In-Line Inspections 12 Worcester Delivery Gloucester Delivery 12 Haverhill Lateral 12 Bev Salem Lateral 12 Concord Lateral 12 Northampton Lateral 8 Northampton Lateral 10/12 Haverhill Lateral Complete 8/12 Bev Salem Lateral In-Line Inspection White Plains Delivery 334A-100 June

38 WINTER READINESS June

39 Winter Readiness - Operations Scheduled Maintenance All routine compressor station maintenance in the Market Area shall be completed by early November. Examples include: Station/Unit Protective Devices Compressor maintenance Borescope Inspections Device Calibration/Testing Test run units (as applicable) All routine pipeline and meter station maintenance in the Market Area shall be completed by early November. Examples include: Annual Valve Maintenance Auto Closure Checks Boiler Maintenance Device Calibration/Meter Tests (Ongoing) Winter Event Preparation Check/Test run emergency equipment (i.e. generators, heaters, etc) Field Operations will be on site at key compressor stations during significant winter events. June

40 SCHEDULING 40

41 TRANSPORTATION SERVICES ORGANIZATIONAL STRUCTURE DSRs DSRs

42 Winter Days % Restricted Nov - Mar

43 Winter Overview Storage Percent Full 43

44 Summer Days % Restricted Apr - Oct

45 Summer Overview Storage Percent Full 45

46 Possible Scheduling Processes Implemented during Winter No delivery nominations allowed at Receipt Meters No receipt nominations allowed at Delivery Meters No meter bounces allowed at Power Plants Meters held to EPSQ Restriction locations adjusted as capacity utilization changes Limitations of Storage Services/Linepack Services Imbalance Warnings Monthly OFOs Daily OFOs Meter Specific OFOs Hourly OFOs 46

47 Operational Flow Orders 47

48

49 CURRENT TGP SEGMENT MAP NORTH OF STA 87

50 TGP SEGMENT MAP WITH NEW SEGMENTS EFF Segment 345 Segment IROQUOIS/Shelton CONNNG/Milford CT YANK/Derby CT YANK/Wallingford CT CONN/New Britain CT CONN/Farmington CT CONNNG/Bloomfield CT CONNNG/N Bloomfield CT YANK/East Granby Pool 300 L Z6 Segment 110 Segment 111 Segment Col Gas/TGP Greenup OLIVHILL/Olive KY Col Gas/Mavity Pool 100 L Z LVILBrik/Grahn Brickyard MPC/UDP Naples Grayson/Grayson KY BigSandy/Glancy Riverside/Lawrence

51 51

52 APPENDIX 52

53 53 DISTRIGAS SCHEDULED FLOWS 2013/14 vs 2014/15 vs 2015/16 (DTH) 2,000,000 1,800,000 1,600,000 1,400,000 1,200,000 1,000, , , , ,000 0 NOV DEC JAN FEB MAR 2013/ / /16

54 54 MARITIMES DRACUT SCHEDULED FLOWS 2013/14 vs 2014/15 vs 2015/16 (DTH) 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 0 NOV DEC JAN FEB MAR 2013/ / /16

Tennessee Gas Pipeline Fall Operations Update Webex October 25, 2016

Tennessee Gas Pipeline Fall Operations Update Webex October 25, 2016 1 Tennessee Gas Pipeline 2016 Fall Operations Update Webex October 25, 2016 Agenda Sherri Glazebrook Director, Trans and Storage Svc, TGP & SNG, KMI East Region Brian Merchant Director, Engineering Gas

More information

Pre-Winter Operations Meeting October 2017

Pre-Winter Operations Meeting October 2017 Pre-Winter Operations Meeting October 2017 1 Agenda Brian Merchant Director, Engineering Gas Control, KMI East Region Tom Burgett Director, OPS, Division 10 Office, KMI East Region Don Perkins Manager,

More information

NGA Pre Winter Meeting

NGA Pre Winter Meeting NGA Pre Winter Meeting Mike Dirrane Director of Marketing November 6, 2014 Westboro, MA Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower 2,147,488

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 8-27-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

Regional Market Trends Forum April 21, 2016 Hartford, CT. Mike Dirrane Director, Northeast Marketing

Regional Market Trends Forum April 21, 2016 Hartford, CT. Mike Dirrane Director, Northeast Marketing Regional Market Trends Forum April 21, 2016 Hartford, CT Mike Dirrane Director, Northeast Marketing Spectra Energy s Portfolio of Assets Based in Houston, TX with operations in 30 states Transports 15%

More information

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing Association of Energy Engineers January 9, 2013 Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower

More information

Infrastructure Disruptions: What if?

Infrastructure Disruptions: What if? Infrastructure Disruptions: What if? NGA Executive Conference R.L.Levitan, rll@levitan.com September 12, 2016 Agenda Recap of TETCO Incident on 4/29/16 What if? Potential Impacts on Winter and Summer Peak

More information

Algonquin Gas Transmission Pre-Winter Operations Discussion

Algonquin Gas Transmission Pre-Winter Operations Discussion AGT PRE-WINTER OPERATIONS MEETING OCTOBER 22, 2013 Algonquin Gas Transmission Pre-Winter Operations Discussion October 22, 2013 Agenda Welcome & Opening Comments Operational Update Northeast Projects Update

More information

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter Rich Paglia Vice President Northeast Marketing Presentation Overview Spectra Energy Transmission and Power Plant

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Commuter Rail Update. October 25, 2018

Commuter Rail Update. October 25, 2018 Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES

More information

East Tennessee Natural Gas Shipper Meeting. Knoxville, Tennessee April 23, 2015

East Tennessee Natural Gas Shipper Meeting. Knoxville, Tennessee April 23, 2015 EAST TENNESSEE NATURAL GAS SHIPPER MEETING APRIL 23, 2015 East Tennessee Natural Gas Shipper Meeting Knoxville, Tennessee April 23, 2015 Agenda Introduction Winter Operations Maintenance Update LINK -

More information

TRAFFIC VOLUME TRENDS July 2002

TRAFFIC VOLUME TRENDS July 2002 TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West

More information

NJ Solar Market Update As of 10/31/15

NJ Solar Market Update As of 10/31/15 NJ Solar Market Update As of 10/31/15 Prepared by Charlie Garrison Renewable Energy Committee Meeting November 10, 2015 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 10/31/15

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas ENERGY SLIDESHOW Updated: January 16, 2019 ENERGY PRICES www.dallasfed.org/research/energy Brent & WTI & Crude Brent Oil Crude Oil Dollars per barrel 140 120 100 Brent (Jan 11 = $58.64) WTI (Jan 11 = $50.78)

More information

NJ Solar Market Update As of 6/30/15

NJ Solar Market Update As of 6/30/15 NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately

More information

Regulation Update. Operating Committee September 12, PJM 2017

Regulation Update. Operating Committee September 12, PJM 2017 Regulation Update Operating Committee September 12, 2017 Regulation Market Clearing Price *Data up to Aug 22 2 Mileage Ratio Mileage Ratio has increased since the new signal implementation Larger Utilization

More information

Wheat Marketing Situation

Wheat Marketing Situation Wheat Marketing Situation Prepared by: Darrell L. Hanavan Executive Director Colorado Wheat Administrative Committee If you would like to receive an email when this report is updated, email gmostek@coloradowheat.org

More information

CLIMATOLOGICAL SUMMARY

CLIMATOLOGICAL SUMMARY DEPARTMENT OF REGISTRATION AND EDUCATION CTATP OF ILLINOIS ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-19 Archive ISWS Illinois State Water Survey )CAL CLIMATOLOGICAL DATA MP-19 LOCAL

More information

LOCAL CLIMATOLOGICAL DATA

LOCAL CLIMATOLOGICAL DATA ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-21 Archive SWS0964 Illinois State Water Survey LOCAL CLIMATOLOGICAL DATA FDR HILLSBORO, IL. 1901-1962 LOCAL CLIMATOLOGICAL DATA 1901-1962 HILLSBORO

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

NJ Solar Market Update As of 2/29/16

NJ Solar Market Update As of 2/29/16 NJ Solar Market Update As of 2/29/16 Prepared by Charlie Garrison March 24, 2016 SOLAR INSTALLED CAPACITY DATA The installed solar capacity as of 2/29/16 is approximately 1,644.3 MW. Approximately 20.3

More information

Total Production by Month (Acre Feet)

Total Production by Month (Acre Feet) Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16

More information

NEU Electric and Natural Gas Price Update

NEU Electric and Natural Gas Price Update $ / MWH Jan-11 May-11 Sep-11 Sep-12 Jan-13 Electric: Short-Term Outlook The NYMEX Northern Illinois Hub 12-month forward price at the end of August 2016 for the September 2016 to August 2017 period was

More information

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas ENERGY SLIDESHOW Updated: March 13, 2018 ENERGY PRICES www.dallasfed.org/research/energy Brent & WTI & Crude Brent Oil Crude Oil Dollars per barrel 140 Brent (Mar 9 = $65.12) WTI (Mar 9 = $61.65) 120 100

More information

MARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky

MARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky MARKET RATES UPDATE I N T R O D U C T I O N BY: Paula Gold-Williams President & Chief Executive Officer (CEO) P R E S E N T E D BY: Cory Kuchinsky Interim Vice President, Financial Services September 24,

More information

Monthly Hog Market Update United States Hog Production

Monthly Hog Market Update United States Hog Production This information is provided as a resource by Saskatchewan Agriculture staff All prices are in Canadian dollars unless otherwise noted. Please use this information at your own risk. Monthly Hog Market

More information

Preston s Edmond Market Report

Preston s Edmond Market Report Preston s Edmond arket Report April 2 Prepared By Brian Preston RE/AX Associates obile: 45-826-5725 Office: 45-359-87 bpreston88@sbcglobal.net www.edmond4sale.com Realtor of the Year 1995 & 22 Lifetime

More information

NJ Solar Market Update

NJ Solar Market Update NJ Solar Market Update April 16, 20 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 3/31/ is approximately

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3. 1970 TABLE C-4. and inventories in manufacturing, 1947-69 Inyentories i 1947 1948 1949 1950 1951 195 1953 1954 1955 1956 1957 1958 1959 35,60 54,33 5,507 59,8 70,4 7,377,1 89,05 86,9 1.4 16,16 1,714,59

More information

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments

Global Threat Reduction Initiative Foreign Research Reactor Spent Nuclear Fuel Shipments FY1996 1. Sept. 22, 1996 280 assemblies in 8 casks to SRS [First East Coast Shipment] FY 1997 Sweden 64 Switzerland 42 Germany 125 Chile 28 Columbia 21 2. Dec. 15, 1996 41 spent fuel assemblies in one

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011 U.S. Manufacturing Technology Orders A statistical program of AMT NEWS Release FOR RELEASE: October 8, 2012 Contact: Pat McGibbon, AMT, 703-827-5255 Year-to-date U.S. manufacturing technology orders up

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Reliable Reduction of Chemical Usage in Field Injection Pumps

Reliable Reduction of Chemical Usage in Field Injection Pumps Reliable Reduction of Chemical Usage in Field Injection Pumps Shawn French President, Voodoo Injection Management Ltd. Mark Scantlebury President and CEO, Extreme Telematics Corp. 2 ETC Background ETC

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000

More information

NEU Electric and Natural Gas Price Update

NEU Electric and Natural Gas Price Update Exelon s $24 Billion Energy Bill Senate Bill 2814 Short-Term Energy Price Outlook On November 15, 2016, Exelon, through its legislative supporters, introduced Senate Bill 2814, a massive 446 page document

More information

System Management Principles Statement

System Management Principles Statement System Management Principles Statement Compliance report for June 214 to August 214 Summary of balancing actions and breaches for June 214 to Aug 214 Performance compared to last year Summary Report Jun-14

More information

2019 Western North Carolina Weather Calendar. Department of Atmospheric Sciences The University of North Carolina at Asheville

2019 Western North Carolina Weather Calendar. Department of Atmospheric Sciences The University of North Carolina at Asheville 209 Western North Carolina Weather Calendar Department of Atmospheric Sciences The University of North Carolina at Asheville www.atms.unca.edu 209 Western North Carolina Weather Calendar Climatological

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000

More information

Design Criteria Data

Design Criteria Data LOUISVILLE/STANDIFORD KY Latitude = 38.18 N WMO No. 72423 Longitude = 85.73 W Elevation = 489 feet Period of Record = 1973 to 1996 Average Pressure = 29.49 inches Hg Design Criteria Data Mean Coincident

More information

M onthly arket. Jan Table of Contents. Monthly Highlights

M onthly arket.   Jan Table of Contents. Monthly Highlights Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family

More information

[Amounts in millions of dollars] Nondurable. Total. goods. equipment 34,415 30,717 24,506 8,868 9,566 8,981

[Amounts in millions of dollars] Nondurable. Total. goods. equipment 34,415 30,717 24,506 8,868 9,566 8,981 1970 TABLE C-44. Manufacturers 1 new and unfilled orders, 1947-69 Unfilled orders2 Unfilled orders-shipments Machinery and equipment 1947.. 1948.. 1949.. 23,53.3 3 3 4 3 1961 * 31,085 15,698 17,026 18,522

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data BOSTON/LOGAN MA Latitude = 42.37 N WMO No. 7259 Longitude = 71.3 W Elevation = 3 feet Period of Record = 1967 to 1996 Average Pressure = 29.95 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013

More information

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods. TABLE C-43. Manufacturers' new and unfilled orders, -74 {Amounts in millions of dollars] New orders t, I960. 27, 559 26, 903 30,672 30,115 31,086 33,005 35,322 37,952 41, 803 45, 944 46,763 50, 243 53,

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000

More information

VEHICLE / PEDESTRIAN COLLISIONS

VEHICLE / PEDESTRIAN COLLISIONS Info item No. 1 Crosswalk Safety Advisory Committee March 31, 2016 VEHICLE / PEDESTRIAN COLLISIONS HRM: January December 20 DISCLAIMER: All figures presented in this report reflect the information held

More information

Price Category Breakdown - February 2010

Price Category Breakdown - February 2010 SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool 2018 6 1 1:Sun, 2:Mon 2018-2019 Date Event or Holiday Aug 16 Board Meeting 6pm Aug 23 Open House June 2018 July 2018 August 2018 Sep 06 Board Meeting 6pm Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th

More information

System Management Principles Statement

System Management Principles Statement System Management Principles Statement Compliance report for September 214 and October 214 Summary of balancing actions and breaches for September 214 October 214 Performance compared to last year Summary

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

System Status Briefing

System Status Briefing System Status Briefing Phakamani Hadebe Interim Group Chief Executive 3 May 2018 Contents 1 Performance summary 2 Operational highlights 3 Generation performance 4 Distribution overview 5 Transmission

More information

Design Criteria Data

Design Criteria Data BURLINGTON VT Latitude = 44.47 N WMO No. 72617 Longitude = 73.15 W Elevation = 341 feet Period of Record = 1973 to 1996 Average Pressure = 29.61 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Valley Real Estate Review

Valley Real Estate Review Valley Real Estate Review 35, 3, 25, 2, 15, 1, 5, December 218 Listings Months of Inventory 217 218 % of Change 2,479 2,74 1.53% 2.46 2.77 12.6% Offices Combined Force Total Listing Issued Total Annual

More information

Design Criteria Data

Design Criteria Data RAPID CITY SD Latitude = 44.5 N WMO No. 72662 Longitude =3. W Elevation = 3169 feet Period of Record = 1973 to 1996 Average Pressure = 26.67 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data COLUMBIA SC Latitude = 33.95 N WMO No. 7231 Longitude = 81.12 W Elevation = 226 feet Period of Record = 1973 to 1996 Average Pressure = 29.8 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data PHILADELPHIA PA Latitude = 39.88 N WMO No. 7248 Longitude = 75.25 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data HONOLULU/OAHU HI Latitude = 21.35 N WMO No. 91182 Longitude =157.9 W Elevation = 16 feet Period of Record = 1967 to 1996 Average Pressure = 29.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PIERRE SD Latitude = 44.38 N WMO No. 726686 Longitude =1.2 W Elevation = 1742 feet Period of Record = 1973 to 1996 Average Pressure = 28.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016 2016/2 ELECTRICITY GENERATION & DISTRIBUTION STATS BRIEF, FIRST QUARTER 2016 Copyrights Statistics Botswana 2016 Statistics Botswana. Private Bag 0024 Botswana Tel: (267) 367 1300. Fax: (267) 395 2201.

More information

Design Criteria Data

Design Criteria Data MACON/LEWIS WILSON GA Latitude = 32.7 N WMO No. 72217 Longitude = 83.65 W Elevation = 361 feet Period of Record = 1973 to 1996 Average Pressure = 29.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data ANCHORAGE AK Latitude = 61.17 N WMO No. 7273 Longitude =15. W Elevation = 131 feet Period of Record = 1973 to 1996 Average Pressure = 29.6 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Presentation Outline Understanding LPEA s expenses and what drives them Economics of net metering

More information

Design Criteria Data

Design Criteria Data DENVER/STAPLETON CO Latitude = 39.75 N WMO No. 72469 Longitude =14.8 W Elevation = 5332 feet Period of Record = 1973 to 1995 Average Pressure = 24.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data JACKSONVILLE FL Latitude = 3.5 N WMO No. 7226 Longitude = 81.7 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 3.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Petroleum and Natural Gas Situation

Petroleum and Natural Gas Situation Petroleum and Natural Gas Situation John C. Felmy Chief Economist and Director Statistics Department American Petroleum Institute Felmyj@api.org www.api.org www.gasolineandyou.org www.naturalgasfacts.org

More information

Design Criteria Data

Design Criteria Data SPOKANE WA Latitude = 47.63 N WMO No. 72785 Longitude =117.5 W Elevation = 2366 feet Period of Record = 1973 to 1996 Average Pressure = 27.5 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 1 BNSF is a Leading U.S. Railroad A Berkshire Hathaway company 32,500 route miles in 28 states and two Canadian

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

Design Criteria Data

Design Criteria Data DAYTON/JAMES M COX OH Latitude = 39.9 N WMO No. 72429 Longitude = 84.2 W Elevation = 14 feet Period of Record = 1973 to 1996 Average Pressure = 28.95 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data SPRINGFLD MO Latitude = 37.23 N WMO No. 7244 Longitude = 93.38 W Elevation = 127 feet Period of Record = 1973 to 1996 Average Pressure = 28.66 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data BIRMINGHAM AL Latitude = 33.57 N WMO No. 72228 Longitude = 86.75 W Elevation = 63 feet Period of Record = 1973 to 1996 Average Pressure = 29.36 inches Hg Design Criteria Data Mean Coincident (Average)

More information

GoToBermuda.com. Q3 Arrivals and Statistics at September 30 th 2015

GoToBermuda.com. Q3 Arrivals and Statistics at September 30 th 2015 Q3 Arrivals and Statistics at September 30 th 2015 1 Q3 Total Vacation Visitor Arrivals Q3 Arrivals 2014 2015 YTD 2014 YTD 2015 Air - Vacation 54,305 54,473 0.31% 168 117,639 116,700-0.80% (939) Cruise

More information

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2, Contact Statistician: Otsile Chelenyane Industry Statistics Unit Email: ochelenyane@statsbots.org.bw Tel: (+267) 367 1300; Ext. 333 ELECTRICITY GENERATION AND DISTRIBUTION Stats Brief, Quarter 2, 2018

More information

Appendix E Hydrology, Erosion and Sediment Transport Studies

Appendix E Hydrology, Erosion and Sediment Transport Studies Appendix E Hydrology, Erosion and Sediment Transport Studies Hatch 2012/10 Appendix E1 EA Hydrology Memorandum February 2011 (Hatch. 2011a) Hatch 2012/10 Project Memo February 23, 2011 TO: Larry King FROM:

More information

Design Criteria Data

Design Criteria Data MINNEAPOLIS-ST PAUL MN Latitude = 44.88 N WMO No. 72658 Longitude = 93.22 W Elevation = 837 feet Period of Record = 1973 to 1996 Average Pressure = 29.7 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MIDLAND TX Latitude = 31.95 N WMO No. 72265 Longitude =2. W Elevation = 2861 feet Period of Record = 1973 to 1996 Average Pressure = 27.3 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data NEW YORK/JOHN F KENNEDY NY Latitude = 4.65 N WMO No. 74486 Longitude = 73.78 W Elevation = 23 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data WASHINGTON/DULLES VA Latitude = 38.95 N WMO No. 7243 Longitude = 77.45 W Elevation = 322 feet Period of Record = 1973 to 1996 Average Pressure = 29.68 inches Hg Design Criteria Data Mean Coincident (Average)

More information

MONTHLY RIDERSHIP AND PERFORMANCE REPORT. July 2018 Monthly Performance Report

MONTHLY RIDERSHIP AND PERFORMANCE REPORT. July 2018 Monthly Performance Report MONTHLY RIDERSHIP AND PERFORMANCE REPORT July 2018 Monthly Performance Report JULY, 2018 MONTHLY PERFORMANCE REPORT Ridership Ridership for the month of July increased 1% when compared to July of 2017.

More information

Design Criteria Data

Design Criteria Data LANDER/HUNT WY Latitude = 42.82 N WMO No. 72576 Longitude =18.7 W Elevation = 5558 feet Period of Record = 1973 to 1996 Average Pressure = 24.44 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Spring 2016 Gas/Electric Forum. March 1, 2016 Waltham, MA

Spring 2016 Gas/Electric Forum. March 1, 2016 Waltham, MA Spring 2016 Gas/Electric Forum March 1, 2016 Waltham, MA Agenda Welcome Gas/Electric Harmonization Update Operations Update Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing

More information

Preliminary Steel Imports Decline 9% in September Import Market Share at 20%

Preliminary Steel Imports Decline 9% in September Import Market Share at 20% News Release FOR IMMEDIATE RELEASE October 25, 2011 CONTACT: NANCY GRAVATT 202.452.7115/ ngravatt@steel.org Preliminary Steel Imports Decline 9% in September Import Market Share at 20% Washington, D.C.

More information

Design Criteria Data

Design Criteria Data ALBUQUERQUE NM Latitude = 35.5 N WMO No. 72365 Longitude =16.6 W Elevation = 5315 feet Period of Record = 1967 to 1996 Average Pressure = 24.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DULUTH MN Latitude = 46.83 N WMO No. 72745 Longitude = 92.18 W Elevation = 1417 feet Period of Record = 1973 to 1996 Average Pressure = 28.43 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Virginia Tech Research Center Arlington, Virginia, USA. PPT slides will be available at

Virginia Tech Research Center Arlington, Virginia, USA. PPT slides will be available at SMART BUILDINGS & A SMART CITY CONNECTED COMMUNITY Guest Professor Inaugural Lecture at Tsinghua University Professor Saifur Rahman Director, Virginia Tech Advanced Research Inst., USA President-elect,

More information

Operational Opportunities to Minimize Renewables Curtailments

Operational Opportunities to Minimize Renewables Curtailments Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance

More information

2017 Adjusted Count Report February 12, 2018

2017 Adjusted Count Report February 12, 2018 A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at

More information

Design Criteria Data

Design Criteria Data MINOT AFB ND Latitude = 48.42 N WMO No. 727675 Longitude =11.3 W Elevation = 1667 feet Period of Record = 1967 to 1996 Average Pressure = 28.16 inches Hg Design Criteria Data Mean Coincident (Average)

More information

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: October 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information