Association of Major Power Customers of BC (AMPC) BCUC Inquiry into the BC MRS Program, Project No:
|
|
- George Gaines
- 5 years ago
- Views:
Transcription
1 C14-8 Association of Major Power Customers of BC (AMPC) BCUC Inquiry into the BC MRS Program, Project No: Response to Information Request No.1 of FortisBC April 26, Reference: B. General Views Concerning MRS in BC, Page 4 Preamble: AMPC states that in the U.S., Alberta, and other Canadian provinces, only transmission facility operators and generators are typically subject to MRS standards, and not customers. 1.1 Please provide examples supporting this statement, as it relates to the WECC region. Response: AMPC s knowledge comes largely from the experience of its members. AMPC members report they do not experience the onerous obligations placed on them in B.C. in other jurisdictions, and that the involvement of many B.C. industrial customers in the B.C. MRS program arises from the ownership of small sections of transmission infrastructure such as on-site transformation, or under-frequency load-shedding equipment. 1 This ownership is required by BC Hydro inter-connection agreements. Only Alberta and B.C. are within the WECC region in Canada. The compliance registry links for B.C., Alberta and NERC (which can be sorted to show WECC-only) are found below: %20-%20BCUC%20Registered%20Entities%20- %20Functions%20Report.xlsx xls AMPC s conclusions from comparing the registries follow. Alberta Only a few Alberta entities appear to be in any relevant way similar to B.C. large industrial loads. AMPC understands that the Alberta Functional Model Table 2 applies to activities in 2013 and beyond and reflects revised functional model definitions. 1 Mandatory Reliability Standards Regulation, ss. 1, 2(b), (c)(ii)(a).
2 AMPC Response to FortisBC IR No. 1 April 26, 2013 BCUC Inquiry into the BC MRS Program Page 2 of 3 The link to the consolidated Alberta Reliability Standards (ARS) is here: pdates_mar_14_2013_ap.pdf There are only two standards applicable to transmission level customers in this document ( a market participant receiving service under Rate DTS of the ISO tariff ) who do not have other operating characteristics attracting ARS compliance, such as selfgeneration or operating an electric distribution system. They are: EOP 003 AB1 1 Load Shedding Plans (universal) PRC 021 AB1 1 Under Voltage Load Shedding Program Data (restricted to DTS customers that own an under voltage load shed system) In B.C., operating under-frequency load-shedding equipment triggers eligibility for MRS standards generally. Conversely, in Alberta being a transmission level customer triggers much less onerous obligations to adhere to up to two specific load shedding standards. EOP 003 AB1 1 requires transmission level customers to shed load when directed, be capable of manually shedding load, and maintain electronic records of shedding load. PRC 021 AB1 1 requires transmission level customers to provide under voltage load shedding data to the AESO on request. WECC As a general rule, industrial customers are absent from the WECC portion of the NERC registry. To illustrate, AMPC filtered the NERC registry to only show entities in WECC that registered on the basis of one or more of the following functions: LSE (load-serving entity), DP (distribution provider), TP (transmission provider), or TOP (transmission operator). The choice of these functions reflects the registrations of B.C. industrial customers (excepting self-generation). The resulting three page list is attached as FortisBC-AMPC-1.1-Attachment A and does not appear to include industrial customers.
3 AMPC Response to FortisBC IR No. 1 April 26, 2013 BCUC Inquiry into the BC MRS Program Page 3 of Reference: Section 2, Streamlining the De-Registration Process, Page 6 Preamble: If entities can decide when MRS applies to them, they should be permitted to deregister unless someone in authority objects for cause. 2.1 Please elaborate on who would be someone in authority. Would it include the Balancing Authority and/or the Regional Entity? Response: In drafting the referenced section, AMPC contemplated WECC (and identifies WECC in this role elsewhere in its submission). AMPC agrees with FortisBC s implicit observation that the Balancing Authority has relevant technical expertise and familiarity with the BC system. This expertise should also exist within WECC, and AMPC would prefer to use WECC on enforcement matters because AMPC does not support expanding the Balancing Authority s current role to include enforcement of MRS standards.
4 FortisBC-AMPC-1.1-Attachment A NCR Matrix (with Dates) NCR ID# Entity Name NCR10042 Alameda Municipal Power NCR05024 Benton Rural Electric Association NCR05025 Big Bend Electric Cooperative, Inc. NCR05028 Blachly Lane Electric Coop/PNGC NCR05033 Bountiful City Light & Power NCR05061 Central Electric Coop/PNGC NCR05062 Central Lincoln People's Utility District NCR05063 Central New Mexico Electric Cooperative, Inc. NCR05076 City of Ellensburg NCR10040 City of Forest Grove Light and Power NCR05079 City of Fort Collins NCR05489 City of Gallup NCR05492 City of Lodi NCR05493 City of Lompoc, A Municipal Corporation NCR05086 City of Longmont NCR05087 City of Loveland, Colorado NCR05089 City of Palo Alto NCR05092 City of Richland Energy Services Department NCR05095 City of Shasta Lake NCR05494 City of Ukiah NCR05099 Clallam County PUD No.1 NCR05101 Clearwater Power Company NCR05109 Columbia River People's Utility District NCR05110 Columbia Rural Electric Assoc. NCR05114 Consumer's Power, Inc. Page 1
5 FortisBC-AMPC-1.1-Attachment A NCR Matrix (with Dates) NCR05115 Continental Divide Electric Cooperative NCR05116 Coos Curry Electric Cooperative, Inc. NCR05498 Delta Montrose Electric Association NCR05130 Dixie Escalante Rural Electric Association, Inc. NCR05142 Electrical District No. 2 NCR05144 Elmhurst Mutual Power & Light Company NCR05147 Empire Electric Association, Inc. NCR05154 Fall River Rural Electric/PNGC NCR05156 Flathead Electric Cooperative, Inc. NCR05167 Garkane Energy Cooperative, Inc. NCR05171 Glacier Electric Cooperative, Inc. NCR05178 Harney Electric Cooperative, Inc. NCR05185 High Plains Power, Inc. NCR05186 High West Energy, Inc. NCR06003 Highline Electric Association NCR05190 Holy Cross Energy NCR05198 Inland Power and Light Company NCR11226 Intermountain Rural Electric Association NCR05202 K.C. Electric Association, Inc. NCR05203 Kaysville City Corporation NCR05506 Kit Carson Electric Cooperative, Inc. NCR05209 Kootenai Electric Cooperative Inc. NCR05507 La Plata Electric Association, Inc. NCR05211 Lakeview Light & Power NCR05212 Lane Electric Cooperative, Inc./PNGC NCR05216 Lassen Municipal Utility District NCR05218 Lehi City Corporation NCR02920 Logan City Light and Power NCR05225 Lower Valley Energy NCR05233 Mason County PUD No. 3 NCR05237 Midstate Electric Cooperative, Inc. NCR05241 Mission Valley Power NCR05242 Missoula Electric Cooperative, Inc. NCR05243 Modern Electric Water Company NCR05248 Moon Lake Electric Assn., Inc. NCR05249 Morgan County Rural Electric Association NCR05513 Mountain Parks Electric, Inc. NCR05251 Mountain View Electric Association, Inc. NCR05255 Mt. Wheeler Power, Inc. NCR05257 Murray City Corporation NCR10260 National Nuclear Security Administration and Sandia National Laboratories NCR05259 Navajo Tribal Utility Authority NCR05260 Navopache Electric Cooperative, Inc. NCR05279 Northern Lights/PNGC NCR05280 Northern Wasco County People's Utility District NCR05287 Oregon Trail Electric Consumers Cooperative Page 2
6 FortisBC-AMPC-1.1-Attachment A NCR Matrix (with Dates) NCR05314 Parkland Light and Water Company NCR05316 Peninsula Light Company, Inc. NCR05322 Plumas Sierra Rural Electric Cooperative NCR05519 Poudre Valley Rural Electric Assoc., Inc. NCR05332 Provo City Corporation NCR05341 Public Utility District No. 1 of Skamania County NCR05522 Public Utility District No. 1 of Whatcom County NCR05336 Public Utility District No. 2 of Pacific County NCR05346 Raft River Rural Electric Coop/PNGC NCR05370 Salem Electric NCR05371 Salmon River Electric Cooperative NCR05376 San Carlos Irrigation Project NCR05379 San Isabel Electric Association, Inc. NCR05524 San Luis Valley Rural Electric Cooperative, Inc. NCR05525 San Miguel Power Association, Inc. NCR05403 Southwestern Electric Cooperative, Inc. NCR05404 Springer Electric Cooperative, Inc. NCR05405 Springfield Utility Board NCR05532 The Socorro Electric Cooperative, Inc. NCR05427 Tillamook People's Utility District NCR05428 Town of Estes Park Light and Power Department NCR03036 Trans Bay Cable LLC NCR05436 Umatilla Electric Cooperative Assoc. NCR05437 United Electric Co op, Inc. NCR05536 United Power, Inc NCR05442 US Department Of Energy Richland Operations Office NCR05444 US Navy, Naval Base Kitsap NCR05448 Vera Water and Power NCR05541 Vigilante Electric Cooperative, Inc. NCR05458 Wells Rural Electric Company NCR05471 Wheat Belt Public Power District NCR05472 White River Electric Association, Inc. NCR05549 Y W Electric Association, Inc. Page 3
DISCLAIMER This document is intended to provide an illustrative example of the cost allocation provisions of the Draft Agreement.
DISCLAIMER This document is intended to provide an illustrative example of the cost allocation provisions of the Draft Agreement. This document is not, and cannot be relied upon as, legal advice or as
More informationNWPPA announces 2015 Excellence in Communication awards
FOR IMMEDIATE RELEASE September 23, 2015 Contact: Brenda Dunn (brenda@nwppa.org) (360) 816-1453 NWPPA announces 2015 Excellence in Communication awards The 2015 Excellence in Communication winners at last
More informationAttending Meeting (has not voted) Advance Bylaw Ballot
Not Voted / Meeting (has 1 Arizona Public Service 1 1 Avista Corporation 1 1 Balancing Authority of Northern California 1 1 1 1 BC Hydro 1 1 Black Hills Corporation 1 1 Bonneville Power Administration
More informationat the business (operating) level (not at the holding company level).
Introduction The purpose of this report is to provide ready access to utility information for the state of Montana. The source of the data is the U.S. Department of Energy, Energy Information Administration
More informationElectric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP
Electric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP The electric generation forecast is based on an analysis of the plant s operation in the western electric market using the Market Analytics
More informationNorthwest Communications & Energy Innovations Conference. September 16 19, 2018 Coeur d'alene, Idaho
Northwest Communications & Energy Innovations Conference September 16 19, 2018 Coeur d'alene, Idaho Conference Sponsors Enhanced sponsor Basic sponsors Thank you to our volunteer judges! Kimberly Bernick,
More informationRepresenting Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities.
Representing Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities. Prepared for the Governor s Committee on Energy Choice Workgroups Generation, Transmission & Delivery Energy
More informationEXHIBIT A EMISSION PERFORMANCE STANDARDS (EPS) COMPLIANCE FILING FOR THE INTERMOUNTAIN POWER PROJECT (IPP) REPOWERING PROJECT
EXHIBIT A October 27, 2016 California Energy Commission EPS Compliance 1516 Ninth Street Sacramento, CA 95814-5512 Attention: Compliance Filing SUBJECT: EMISSION PERFORMANCE STANDARDS (EPS) COMPLIANCE
More informationOregon Smoke Management Annual Report
Oregon Smoke Management Annual Report OREGON DEPARTMENT OF FORESTRY FIRE PROTECTION DIVISION SMOKE MANAGEMENT AND FUELS General File 1-2-5-910 OREGON SMOKE MANAGEMENT ANNUAL REPORT Prepared By: FIRE PROTECTION
More informationMeasuring Electric Service Reliability. Office of Public Accountability/ Ratepayer Advocate City of Los Angeles tel.
Measuring Electric Service Reliability Office of Public Accountability/ Ratepayer Advocate City of Los Angeles opa@lacity.org tel. 213-978-0220 July 24, 2018 Typical Utility Definitions of Service Reliability
More information,610 7,755 7,590 8,210 9,000 fi 18,829 16,812 18,335 18,273 20,658
: Commodity Data Sheet All Hay Order from: Economic Information Office Agricultural and Resource Economics Oregon State University 29 Ballard Extension Hall Corvallis, OR 9733 360 Item and Area Oregon
More informationOFFICE OF THE CITY ADMINISTRATIVE
REPORT FROM OFFICE OF THE CITY ADMINISTRATIVE OFFICER Date: April 15, 2013 0150-09963-0000 Council File No. -- Council Districts: Citywide To: The Mayor The City Council From: Miguel A. Santana, City Administrative
More informationNew West Partnership Deliverables July 2011/2012 Reporting
Area 1 - Vehicle Weights and Dimensions Steering Axle Weight Limits July 2011 Changes to vehicle design and It is Alberta s position, jointly agreed upon by other New West additional required equipment
More informationTri-State December 2013 Board Meeting
1 For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org)
More information2.0 Reference: None. Explain the cost/benefit of the privatization for BC Hydro and for the BC Hydro customer. RESPONSE:
Information Request No...0 Dated: 2 March 2004.0 Reference: None..0 Please explain the rationale for the restructuring and privatization. What were the costs for the restructuring and privatization? What
More informationYour 21st Century Energy Resource
Your 21st Century Energy Resource 6855 S. Havana St, Ste 430 Centennial, CO 80112 (303) 865-55445544 fax (303) 865-55485548 www.rmel.org RMEL is a not-for-profit, 100+ year old association for electric
More informationRATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015
Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF a motion by the Ontario Energy Board to
More informationNotice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule
Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule For Periodic Data Submittals, Self-certification, and NERC Facility Rating Alert Revised November 18, 2015 SPP RE Table of Contents
More information2015 CPS2 Bounds (Effective June 15, 2015)
Bias/ Eastern Interconnection 621,697 6,303.01 1.01 100.00 FRCC 50,282 503.65 1.00 7.99 City of Homestead HST 97 1.00 1.03 0.02 7.47 City of Tallahassee TAL 543 5.43 1.00 0.09 17.40 Duke Energy of Florida
More informationNWPPA Announces 2017 Excellence in Communication Winners
FOR IMMEDIATE RELEASE September 28, 2017 Contact: Brenda Dunn (brenda@nwppa.org) (360) 816-1453 NWPPA Announces 2017 Excellence in Communication Winners The 2017 Excellence in Communication winners at
More informationUNITED STATES DEPARTMENT OF AGRICULTURE. Compilation of Statistical Material. Pacific Northwest Federal Milk Marketing Order. Federal Order No.
UNITED STATES DEPARTMENT OF AGRICULTURE 1930-220th St. SE, Ste. 102 AGRICULTURAL MARKETING SERVICE 10050 N 25th Ave., Ste. 302 Bothell, WA 98021-8471 DAIRY PROGRAMS Phoenix, AZ 85021-1664 Phone: (425)
More informationCITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS
CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.
More informationPatrick Wruck Commission Secretary
Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 June 15, 2018 Sent via
More informationWholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources
Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources Outline Tri-State Background Tri-State Generation Mix Power Delivery Wholesale Electricity Markets
More informationMEMORANDUM OF UNDERSTANDING Between Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming Regional Electric Vehicle Plan for the West
MEMORANDUM OF UNDERSTANDING Between Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming Regional Electric Vehicle Plan for the West THIS MEMORANDUM OF UNDERSTANDING (Memorandum) is made on this
More informationAlternative Fuel Requirements for School Districts. Peter Moulton Alternative Fuels & Vehicles Lead Energy Division
Alternative Fuel Requirements for School Districts Peter Moulton Alternative Fuels & Vehicles Lead Energy Division May 2016 Extent Practicable Rules Mission: Define practicability and how state and local
More informationSHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC
SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC 28 January, 2015 INTRODUCTION OUTLINE 1. Introduction 2. Background and Context Shore power Need for a Shore Power Rate: Port requests Initiatives
More informationChild Passenger Safety Senior Checker Update. Ruth Harshfield, Safe Kids Oregon Director February 4, 2015
Child Passenger Safety Senior Checker Update Ruth Harshfield, Safe Kids Oregon Director February 4, 2015 Webinar Objectives Safe Kids Buckle Up (SKBU) Program Senior Checker Protocol Hot Tips Safe Kids
More informationOilseeds and Biofuels in Washington State, 2017
Oilseeds and Biofuels in Washington State, 2017 Mary Beth Lang, Bioenergy Coordinator Bioenergy Goals Reduce dependence on foreign oil Improve environment / public health Support WA agriculture and rural
More informationChapter 7: Corridor Visions
Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) ER Operator Corporation ) )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ER0- -000 ) ) DIRECT TESTIMONY OF DEBORAH A. LE VINE ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION Page
More informationPUD ELECTRIC SYSTEM INTERCONNECTION
APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures
More informationKettle River Transmission Project
April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator
More informationEmergency Vehicle Application Package
Emergency Vehicle Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page 3. Complete
More informationThe Case for EV s in Local Government Fleets
The Case for EV s in Local Government Fleets Nov 17, 2016 Charlotte Argue & Ryan Davis Fraser Basin Council Hosted by FBC One of Many WCEF Partners 2 Today s Speakers Jessica Sutorus, Environmental Conservation
More informationD.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES
220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:
More informationMarch 7, Subject: Southern California Edison 2011 Annual Progress Report
March 7, 2011 Mr. Kyle Kohne Mr. Kent Bolton Chair, WECC Technical Studies Subcommittee WECC Technical Staff Bonneville Power Administration University of Utah Research Park P.O. Box 61409 615 Arapeen
More informationMCE SPECIAL MEETING Friday, September 28, :00 A.M. Agenda Page 1 of 2
MCE SPECIAL MEETING Friday, September 28, 2018 9:00 A.M. City of Richmond Memorial Auditorium 403 Civic Center Plaza, Richmond, CA Agenda Page 1 of 2 New Board Member Meet and Greet (8:30-9:00) Swearing
More informationBEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1452
ENTERED JAN 222014 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1452 In the Matter of PUBLIC UTILITY COMMISSION OF OREGON, ORDER Investigation into Pilot Programs to demonstrate the use and effectiveness
More informationSolar Electric Interest Group (SEIG) June 3, 2008
Solar Electric Interest Group (SEIG) June 3, 2008 Announcement Webcast Recording Notice We are recording this webcast and its audio discussion Your continuing participation in this webcast provides consent
More informationPacific Northwest/Canada To Northern California Transmission Feasibility Study
Pacific Nthwest/Canada To Nthern Califnia Transmission Feasibility Study Technical Analysis Committee Presentation By Ben Mris, PG&E 1 December 12, 2006 Topics Study Objectives Alternatives Considered
More informationVOUCHER INCENTIVE PROGRAM Application Package
VOUCHER INCENTIVE PROGRAM Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page
More informationENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION
ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy
More informationNERC-led Review Panel Decision on the Request of City of Pasadena Water and Power
NERC-led Review Panel Decision on the Request of City of Pasadena Water and Power The North American Electric Reliability Corporation (NERC)-led Review Panel (Panel) has completed its evaluation of the
More informationArizona Transmission Challenges
Power Task Force Agenda Number 2. Arizona Transmission Challenges Central Arizona Water Conservation District Power Committee Presentation May 18, 2017 Transmission Planning Efforts NATIONAL Section 368
More informationMarch 17, To: Nelson Hydro Customers
March 17, 2017 To: Nelson Hydro Customers Over the course of the last few weeks through various forums (Blogs, Editorials and Open houses) we have heard various critical comments relating to Nelson Hydro
More informationGridlines. Composite Reinforced. Aluminum Conductor. In This Issue: AECC Uses 3M ACCR to Complete Challenging Upgrades...1
Aluminum Conductor Composite Reinforced Gridlines Summer 2014 In This Issue: AECC Uses 3M ACCR to Complete Challenging Upgrades...1 Arkansas Electric Cooperative Corp. is the latest rural electric co-op
More informationFour Corners Queue Transmission Interconnection Study
Four Corners Queue Transmission Interconnection Study Facility Study Results By Arizona Public Service Company Transmission Planning & Interconnection Development March 22, 2016 Version 1 FACILITIES STUDY
More information144 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. South Louisiana Electric Cooperative Association
144 FERC 61,050 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. South
More informationCurrant Lake Transmission Project
Currant Lake Transmission Project September 2010 Why are you receiving this project information package? New transmission facilities are needed in the Monitor area of southeastern Alberta. ATCO Electric
More informationVOUCHER INCENTIVE PROGRAM Application Package
VOUCHER INCENTIVE PROGRAM Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page
More informationBohn to Kettle River Transmission Project
April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator
More informationTransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal
TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission
More informationJoint Operating Procedures for First Nations Consultation on Energy Resource Activities
Joint Operating Procedures for First Nations Consultation on Energy Resource Activities October 31, 2018 Contents Revision History... iv Definitions of Key Terms... v 1 Background... 1 2 Roles and Responsibilities...
More informationWECC-0126 PRC-004-WECC-2 Protection System and Remedial Action Scheme Misoperation Final Voting Record
PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation Ballot Name: PRC-004-WECC-2 Protection and Remedial Action Scheme Misoperation After completing a routine 5-year review, the drafting team
More informationBC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).
Ken Duke Solicitor & Counsel Phone: 604-623-3623 Fax: 604-623-3606 bchydroregulatorygroup@bchydro.com April 30, 2014 Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Dear Ms. Hamilton: RE: (BCUC) British
More informationImplementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability
Implementation Plan PRC-023-3 Transmission Relay Loadability Project 2010-13.2 Phase II Relay Loadability Requested Approvals PRC-023-3 Transmission Relay Loadability Requested Retirements PRC-023-2 Transmission
More informationOREGON STATE FIRE MARSHAL Hazmat Rail Safety HB Chad Hawkins Hazmat Rail Coordinator
OREGON STATE FIRE MARSHAL Hazmat Rail Safety HB 3225 Chad Hawkins Hazmat Rail Coordinator Oil Train Routes Needs Assessment Survey Does your agency have necessary equipment? Level of Hazmat response to
More informationUniversity of Alberta
Decision 2012-355 Electric Distribution System December 21, 2012 The Alberta Utilities Commission Decision 2012-355: Electric Distribution System Application No. 1608052 Proceeding ID No. 1668 December
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of San Diego Gas & Electric Company (U902E) for Authority to Implement Optional Pilot Program to Increase Customer Access to
More informationENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE
ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF APRIL 1, 2018 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential
More informationOVERVIEW OF UNIFORM TRANSMISSION RATES
Exhibit H1 Tab 1 Schedule 1 Page 1 of 2 1 OVERVIEW OF UNIFORM TRANSMISSION RATES 2 3 4 5 6 7 8 9 Transmission rates in Ontario have been established on a uniform basis for all transmitters in Ontario since
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Exhibit Accompanying Direct Testimony of. Kurt G.
Application No. 18-04- BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP Exhibit Accompanying Direct Testimony of Kurt G. Strunk Allowed Return on Equity for Other Utilities
More informationVOUCHER INCENTIVE PROGRAM. Application Package
Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist. Complete one application for each
More informationCity of Palo Alto (ID # 6416) City Council Staff Report
City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building
More informationSANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT
SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa
More informationCity of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule
City of Lethbridge ELECTRIC UTILITY Electric Distribution Tariff Rate Schedule City of Lethbridge Bylaw 5789 Effective: January 1, 2013 City of Lethbridge Infrastructure Services Electric Utility Document
More informationDecision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.
Decision 2014-108 Application for an Exemption under Section 24 of the Hydro and Electric Energy Act April 17, 2014 The Alberta Utilities Commission Decision 2014-108: Application for an Exemption under
More informationManaging California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station
Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center
More informationCurrent State of Voluntary Renewable Energy Markets
Current State of Voluntary Renewable Energy Markets Lori Bird, NREL Renewable Energy Markets Conference 2012 Washington, D.C. September 25, 2012 NREL is a national laboratory of the U.S. Department of
More information(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.
D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering
More informationSTATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.
STATE OF MINNESOTA Direct Testimony and Schedule OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION Amanda King IN THE MATTER OF THE ROUTE PERMIT APPLICATION FOR THE CAPX00 HAMPTON ROCHESTER
More informationWOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)
WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less) Issued and Effective: April 3, 2008 Agreement Between And
More informationDriving to Net Zero. County of Santa Clara Office of Sustainability. Submitted to: Santa Clara County Submitted by: ICF
Driving to Net Zero Submitted to: Santa Clara County Submitted by: ICF County of Santa Clara Office of Sustainability Funded through a grant awarded by the California Strategic Growth Council MARCH 9,
More informationROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE
ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE In this Section: Overview Evaluation of Initial Requests Rollover Request Competing Request Competing Examples 1.0 OVERVIEW Pursuant to Section 2.2
More informationState Zero-Emission Vehicle Programs Memorandum of Understanding
State Zero-Emission Vehicle Programs Memorandum of Understanding WHEREAS, the Signatory States have adopted regulations requiring increasing sales of zeroemission vehicles (ZEVs), or are considering doing
More informationARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423
ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 This proposal represents recommended highway segments for alternative fuel corridors for the State of Arizona. Included in this document are the
More informationSilicon Valley Power TAC Presentation Overview 8/28/2017
Silicon Valley Power TAC Presentation Overview 8/28/2017 Agenda Purpose of Silicon Valley Power s Comments These initial comments offered by SVP are preliminary in nature, mainly intending to raise ideas
More information1. Reference: BC Hydro Evidence - Page 5, line 12
1. Reference: BC Hydro Evidence - Page 5, line 12 C8-2 Preamble: The Evidence states: Transmission service is provided pursuant to a FERC Order 888-type tariff in British Columbia to ensure that BC Hydro's
More informationDecision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016
Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth
More informationBoard of Vocational Nursing and Psychiatric Technicians
Department of Consumer Affairs Board of Vocational Nursing and Psychiatric Technicians The table below represents the performance of all first - time program graduates who completed the NCLEX/PN during
More informationENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE
ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of January 1, 2018 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential
More informationENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE
Page 2 of 22 ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE RATES IN EFFECT AS OF APRIL 1, 2018 Page 2 of 22 Page 3 of 22 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description
More informationSTATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)
RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism
More informationCoalspur Mines (Operations) Ltd.
Decision 22744-D01-2017 Application for an Exemption Under Section 24 of the Hydro and Electric Energy Act October 5, 2017 Alberta Utilities Commission Decision 22744-D01-2017 Application for an Exemption
More informationMoving Renewable Energy to the User
Moving Renewable Energy to the User Bob Wilson, Energy Systems Engineer, REWilson@IEEE.org May 17, 2008 Outline Objectives & Legislation Moving megawatts Large pipe dreams Power electronics at the RE plant
More informationENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE
ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of July 1, 2011 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff Residential
More informationWA Plug-in Electric Vehicle Update through December 2018
WA Plug-in Electric Vehicle Update through December 2018 For the past several years, WSDOT has provided a semi-annual update on the number of plug-in electric vehicles (PEV) registered in the state. Department
More informationWASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM
WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM A. Application. The following tariff shall apply to members who: (1) take service under a rate within this electric service
More informationThese and other amendments are effected through the enclosed errata filing (Exhibit B-1-4) and explained in the attached errata sheet
BChydro m FOR GENERATIONS B-1-4 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604)623-4407 bchydroregulatorygroup@bchydro.com January 22, 2010 Ms. Erica M. Hamilton Commission Secretary
More informationbest to you all Gail Carbiener Page 1 of 5
Please accept this attachment as my up dated response to the B2H DEIS. If this is not acceptable, please let me know. Nice meeting last Monday in Boardman. 300316 best to you all Gail Carbiener 2 Page
More informationSubmission re: Proposed Enhancement s to Ontario Net Metering Framework. 2. Enhancements to Ontario Net Metering Framework
1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be
More informationAgriculture and Air Quality
South County Environmental Compliance Workshop Agriculture and Air Quality April 25, 2018 What is the Monterey Bay Air Resources District? A government agency responsible for: Air Monitoring Permitting
More informationENERGY STRATEGY FOR YUKON. Independent Power Production Policy
ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out
More informationSAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San
More informationEGUG 2008 Closing Session Southern California Public Power Authority
EGUG 2008 Closing Session Southern California Public Power Authority 2008 EGUG Conference 1 EGUG 2008 Theme: Riding the Winds of Change Rising to the Sun Project Management System Architecture Data Modeling
More informationNB Appendix CIP a-NB-0 - Cyber Security BES Cyber System Categorization
This appendix establishes modifications to the FERC approved NERC standard CIP-002-5.1a for its specific application in New Brunswick. This appendix must be read with CIP-002-5.1a to determine a full understanding
More informationCourse notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing
Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright 2018 Ross Baldick www.ece.utexas.edu/~baldick/classes/394v/ee394v.html 1 1 Recent History of
More informationProposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements
More informationo Payment Arrangements o Discontinuing Service o Filing a complaint Electric Service Rates Public Records Policy Annual Report Annual Fuel Mix
Table of Contents About the PUD--------------------------------------------2 Electric Rate Schedules: --------------------------------4-21 Schedule 4 Green Power ---------------------------------------------------------4
More information