1 FORM GEN. 160A (Rev. 1/82) CTY OF LOS' ANGELES NTER-DEPARTMENTAL CORRESPONDENCE 959 Seward St DOT Case No. CEN Date: August 29, To: Hadar Plafkin, City Planner Qepartment of City Planning F rom: Subject: Mike Bag eri, Transportatll7H~tt::l Department of Transportation TRAFFC MPACT STUDY FOR THE PROPOSED OFFCE PROJECT. LOCATED AT 959 SEWARD STREET The Department of Transportation (LADOT) has reviewed the traffic study, prepared by traffic consultant Crain and Associates, dated March 2007, for a proposed office project) located on the southwest. corner of Romaine Street and Seward Street. The study analyzed 18 intersections and determined that eleven of the study intersections would be significantly impacted by the project related traffic (see Attachment 1 and Attachment 2). The study could not find acceptable mitigation measures for ten of the eleven impacted intersections..~ DSCUSSON AND FNDNGS Project Description. ~~/ The proposed project consists of a new 237,568 square-foot (SF) office building with a 4,000 SF restaurant. The existing site is currently vacant. The project will provide 710 parking spaces in a new parking structure. Access to the site will be provided by a twoway driveway on Seward Street and on Romaine Avenue. The project is expected to be complete by Year Trip ~eneration The project will generate approximately 2,337 net daily trips with 336 net trips in the AM peak hour and 310 net trips in the PM peak hour (see Attachment 3). Significant Traffic mpact Locations The proposed project will experience a significant traffic impacts at the following locations:

2 Hadar Plafkin -2- August 29, Highland Avenue and Sunset Boulevard 2. Highland Avenue and Santa Monica Boulevard 3. Cahuenga Boulevard and Santa Monica Boulevard 4. Santa Monica Boulevard and Vine Street 5. Gower Street and Santa Monica Boulevard 6. Sew,ard Street and Willoughby Avenue 7. ' La BreC:l.Avenue and Melrose Avenue 8. Highland Avenue and Melrose Avenue 9. Melrose Avenue and Seward Street 10. Melrose Avenue' and Rossmore AvenueNine Street 11. Gower Street (North) and Melrose Avenu~ PROJECT REQUREMENTS A. Melrose Avenue and Rossmore AvenueNine Street (Attachment 4). Restrip~ northbound and southbound Rossmore Avenue and install a new northboufld right-turn only lane. The proposed improvement is acceptable to LADOT and would mitigate the impact to a level of insignificance. B. Seward Street and Willoughby Avenue nstall a new traffic signal to replace the existing stop-controlled intersection. f a new traffic signal is found to be warranted by the LADOT Hollywood Witshire District office, the developer shall pay the cost of planning, design, and, construction of a new traffic signal through the Bureau of Engineering (BOE) B-permit process. The proposed improvement, if approved, would mitigate the impact to a level of insignificance. 4 C. Santa Monica 86tl'evard and Vine Street Widen and restripe southbound Vine Street to provide a right-turn only lane. The proposed improvement is unacceptable because the widening required to accommodate the improvement would reduce the existing sidewalk to less than the standard width. No other alternative improvement is available, and the intersection remains impacted. D. Gower Street and Santa Monica Boulevard Widen and restripe southbound Gower Street to provide a right-tum only lane. The proposed improvement is unacceptable because the widening required to accommodate the improvement would reduce the existing sidewalk to less than the

3 Hadar PJafkin -3- August 29, 2007 standard width. No other alternative improvement is available and the intersection remains impacted. E. Highland Avenue and Sunset Boulevard Highland Avenue and Santa Monica Boulevard Cahuenga Boulevard and Santa Monica Boulevard La Brea Avenue and Melrose Avenue Highland Avenue and Melrose Avenue Melrose Avenue and S~ward Street Gower Street (North) and Melrose Avenue No feasi~le improvement measures were idt?ntified for the above intersections and they remain significantly impacted. F. Constru'ction mpacts LADOT recommends that a construction work site traffic control plan be submitted to LADOT for revlew and approval prior to the start of any construction work. The plan should show the location of any roadway or sidewalk closures r traffic detours, haul routes, hours of operation, protective devices, warning signs and access to abutting properties. LADOT also recommends that all construction related traffic be restricted to off-peak hours. G. Highway OedicationAnd Street Widening Requirements Barton Avenue, Romaine Street, and Seward Street are all classified as a Local Streets which require a 2D-foot half-width roadway on a 3D-foot half-width right-of- -~ way. t appears that additional highway dedication and street widening may be required. forthe proposed~roject. The developer must check with the Bureau of Engineering (BOE) Land Devejppment Group to defermine the highway dedication, street widening and sidewalk requirements for the project. H. Transportation Demand Management (TOM) and Trip Reduction Measures LADOT recommends that the-project comply with the provisions of Ordinance No. re8,700 in order to reduce some of the project trips. The applicant shall record a covenant and agreement to monitor and to submit annual reports on the progress. of the TOM plan to LADOT. Annual reports shall include a report on the van/bus ridership, and other transit-related measures.. Hollywood Area mprovements Given that there are 10 intersections which would remain significantly impacted due to lack of feasible physical improvements, DOT strongly believes that the project should be required to contribute to improving the area-wide transportation system as means to compensate for the unmitigated traffic impacts at these 10 intersections. f the project, as proposed, is approved with "over-riding

4 Hadar Plafkin -4- August 29, 2007 considerations'\ DOT recommends that applicant be required to participate in a proportionate fair share cost program to fund other area-wide transportation improvements currently being considered as part of the Hollywood Community Plan update process to improve multi-modal mobility, transit ridership, demand management and walkability. Prior -to the issuance of any building permits, the applicant shall be required to coordinate with DOT in identifying potential measures and determining the appropriate level offinancial participation. Furthermore, prior to the issuance of any occupancy permits, the applicant shall be required to pay the amount of fair share contribution identified. The following is a partial list of potential improvements for fair share consideration: Contribute funds to provide alternate pedestrian access points, via planned knock-off panels, to the Metro Red-Line stations,, Contribute fund forthe enhancement of the existing ATSAC/ATCS systems, Contribute funds to mprove the advance warning system/signage for special events - Contribute funds for Metro Rapid Bus system Contribute funds for the construction of neighborhood parking garage structures for parking impacted areas J. mprovement and Mitigation Measures mplementation Unless otherwise specified, the proposed mitigation measures and improvements shall be implemented through the Bureau of Engineering (BOE) B-Permit process. Construction of the improvements to the satisfaction of LADOT and BOE must be completed- before issuance of any certificate of occupancy. Should any improvement not receive required approval, the City may substitute an alternative measure of an equivalent cost and effectiveness. Prior to setting the bond amount, BOE shall require that the developer's engineer or contractor contact LADOT's B-Permit Coorcijnator, telephone (213) , to arrange a pre-design meeting to finalize the prffposed design needed for the project. K. Parking Analysis As noted previously, the traffic study indicated that the total number of proposed parking spaces would be 710. The developer should also check with the Department of Building and Safety on the number of Code required parking spaces needed for the project. L. Driveway Access The review of this study does not constitute approval of the driveway access and circulation scheme. ~hose require separate review and approval and should be coordinated as soon as possible with LAD at's Citywide Planning Coordination Section (201 N. Figueroa Street, 4th Floor, Station ) to avoid delays in the building permit approval process. n order to minimize and prevent last minute building design changes, it is highly imperative that the applicant, prior m

5 Hadar Plafkin August 29, 2007 to-the commencement of building or parking layout design efforts, contact LADOT for driveway width and internal circulation requirements so that such traffic flow considerations are designed and incorporated early into the building and parking layout pjans to avoid any unnecessary time delays and potential costs associated with late design changes. All driveways should be Case 2 driveways and 30 feet and 18 feet wide for two-way and one-way operations, respectively. (See Attachment ~) f you have any questions, please contact Wes Pring e of my staff at (213) Attachments' s :\letlers\cen _ 959 _ seward_office. wpd c: Renee Weitzer, Council District 4 Mitch 0' Farr~l, Council District 13 Jeannie Shen,.Hollywood-Wilshire District Tim Conger, Design Division, LADOT Taimour Tanavoli, Citywide Planning Coordination Section, LADOT Carl Mills, Central District, BOE Kipp Rudd, era Crain and Associates

6 Attachment 1 LEVEL OF SERVCE DEFNTONS FOR SGNALZED NTERSECTON l Level of Service Volume/Capacity Ratio Defmition A EXCELLENT. No vehicle waits ionger than one red light and no approach phase is fully used. B VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C GOOD. Occasionally, illivers may have to wait through more than one red light; backups may develop behind turning vehicles. D FAR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E POOR. Represents the most vehicles that intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F Greater than F AlLURE. Backups from nearby intersections or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Tremendous delays with continuously increasing queue lengths.. SGNFCANT TRANSPORTATON MPACT CRTERA 1. A transpoft~tion impact on an intersection shall be deemed "significant" in accordance with the following table ;-xcept as otherwise specified in a TSP, rco or C1v1P: SGNFCANT TRANSPORTATON MP ACT Level of Service Final VC Ratio Project-Related ncrease n VC C > equal to or greater than D > equal to or greater than E,F > equal to or greater than Source: Transportation Research Board, nterim Materials on Highway Capacity, Transportation Research Circular No. 212, January 1980.

7 Attachment 2 Table 8 Critical Movement Analysis (CMA) Summary Future (2010) Traffic Conditions - Without and With Project Peak Without Project With Project No. ntersection Hour CMA.bQ CMA LOS m12act 1_ Sunset Boulevard & AM F 1_013 F * Highland Avenue PM E E Sunset Boulevard' & AM E E Cahueng~ ~oulevard PM D Santa Monica Boulevard & PM D D La Brea Avenue PM F F Santa Monica Boulevard & AM E E * Highland Avenue PM E E * 5. Santa Monica Boulevard & AM B B Las Palmas Avenue PM C C Santa Monica Boulevard & AM C C Seward Street PM Santa Monica Boulevard & AM E E * Cahuenga Boulevard PM C C 0.008, , Santa Monica Boulevard & AM F F * Vine Street PM F 1_103 F Santa Monica Boulevard & AM D D Gower Street PM D E * -~ 10. Romaine Street & m B Highland AvenlJ9 PM B Romaine Street & AM A A Seward Street ~- PM A A Willoughby Avenue 5..J~~: AM C C Highland Avenue PM C C Willoughby Avenue & AM B C * Seward street PM C E * 14. Melrose Avenue & PM F F * La Brea Avenue PM F F * 15. Melrose Avenue & AM F F * Highland Avenue PM F F * 16. "Melrose Avenue & ANt C * Seward Street PM C D * Melrose Avenue & AM F F * Rossmore AvenueNine Street PM F F * Gower Street (N.) PM D * ndicates a significant project impact, prior to mitigation. t '! 18. Melrose Avenue & AM D * 54

8 Attachment 3 J Table 4 Project Trip Generation AM Peak Hour PM Peak Hour Proposed Use Size Daily lib OB Total lib OB Total Office sf 2, Less transit 10% (260) (33) (5) (38) (6) (29) (35) Less nternal trips (corresponding (180) (1 ) (1).(2) (5) (10) (15) to restaurant use) Quality Restaurant sf ' Less nternal trips 50% (180) ill ill m l1q} { l tl } Net Project Trips. 2,

9 COrdon t Sf. V luaw4:lt:?uv ~ ~ ,:~~, '7 r ~ e=-'. - -!, )~~~ ~!lt~~ ~r f A E i A... i ~! ~ONCEPTUAL TRAFFC MTGATON PLAN FOR NTERSECTON OF MELROSE AVE. & VNE ST.lROSSMORE AVE. 0, A era N TransporfCJ!fon Planning ""' AOMEi"",._ n-.-a<l!avtatt.el.!ooe.~ watult f.. Trofflc Engrneering. " rj7~~... 'M PO/"7H~ F 3ll71.u4ml ASSOCA res

10 Attachment 5 6 NORTH SOlRCE: JEROEPARnERSHP FGURE 3 CONCEPTUALSTE PLAN na era N Transportation Planning ~... Traffic Engineering & r:'~~ ASSOCATES 1't/3OJ473~ FPDj04+Hl71 Y(W\'1'.cronoldossodales.com 6 «

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

L. KASSAN, P.E. Consulting Traffic Engineer

L. KASSAN, P.E. Consulting Traffic Engineer ARTHUR L. KASSAN, P.E. Consulting Traffic Engineer Honorable Members of the Planning and Land Use Management Committee c/o City Clerk Room 395, City Hall 200 North Spring Street Los Angeles, CA 90012 Subject:

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

MANHATTAN VILLAGE ENHANCEMENT PROJECT

MANHATTAN VILLAGE ENHANCEMENT PROJECT MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION 1. INTRODUCTION The following section summarizes the information provided in the following traffic studies and collectively referred to as

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

8150 Sunset Bl Valet on Crescent Heights Bl 4 messages

8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt 8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt To: Jeannie Shen Thu, Jan 30, 2014 at 11:11 AM

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Transportation Sustainability Program

Transportation Sustainability Program Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM DATE: May 10, 2013 CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM TO: FROM: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING 2 Site Plan Modifications From SPRC #1 &2 3 Current 4.1 Submission

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 1 Measure M Transit Projects in San Fernando Valley 2 1 2 Measure M Transit Projects Schedule Project

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

David Martin, Director of Planning and Community Development. Establishment of LAX FlyAway Stop in Santa Monica

David Martin, Director of Planning and Community Development. Establishment of LAX FlyAway Stop in Santa Monica Information Item Date: January 31, 2014 To: From: Subject: Mayor and City Council David Martin, Director of Planning and Community Development Establishment of LAX FlyAway Stop in Santa Monica Introduction

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center May 27, 2010 Phase 1 Project Description 8.6 mile corridor from Downtown Los Angeles

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011 Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Project Status Update January 2017

Project Status Update January 2017 Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Address Land Use Approximate GSF

Address Land Use Approximate GSF M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Moving Forward on Los Altos Parking Issues

Moving Forward on Los Altos Parking Issues Moving Forward on Los Altos Parking Issues Jean Mordo, with R. Bodner, K. Cranston, M. Rogge, D. Rock January 24, 2017 Preface What is the City-wide parking problem? City code needs to be simple, reasonable,

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: February 21,2013 CTY OF LOS ANGELES NTER-DEPARTMENTAL MEMORANDUM To: From: Subject: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site. Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS

More information

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR)

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) Prepared by: ENVIRONMENTAL MANAGEMENT DIVISION LOS ANGELES HARBOR DEPARTMENT With Assistance From: RBF CONSULTING Contact: ENVIRONMENTAL