1 FORM GEN. 160A (Rev. 1/82) CTY OF LOS' ANGELES NTER-DEPARTMENTAL CORRESPONDENCE 959 Seward St DOT Case No. CEN Date: August 29, To: Hadar Plafkin, City Planner Qepartment of City Planning F rom: Subject: Mike Bag eri, Transportatll7H~tt::l Department of Transportation TRAFFC MPACT STUDY FOR THE PROPOSED OFFCE PROJECT. LOCATED AT 959 SEWARD STREET The Department of Transportation (LADOT) has reviewed the traffic study, prepared by traffic consultant Crain and Associates, dated March 2007, for a proposed office project) located on the southwest. corner of Romaine Street and Seward Street. The study analyzed 18 intersections and determined that eleven of the study intersections would be significantly impacted by the project related traffic (see Attachment 1 and Attachment 2). The study could not find acceptable mitigation measures for ten of the eleven impacted intersections..~ DSCUSSON AND FNDNGS Project Description. ~~/ The proposed project consists of a new 237,568 square-foot (SF) office building with a 4,000 SF restaurant. The existing site is currently vacant. The project will provide 710 parking spaces in a new parking structure. Access to the site will be provided by a twoway driveway on Seward Street and on Romaine Avenue. The project is expected to be complete by Year Trip ~eneration The project will generate approximately 2,337 net daily trips with 336 net trips in the AM peak hour and 310 net trips in the PM peak hour (see Attachment 3). Significant Traffic mpact Locations The proposed project will experience a significant traffic impacts at the following locations:
2 Hadar Plafkin -2- August 29, Highland Avenue and Sunset Boulevard 2. Highland Avenue and Santa Monica Boulevard 3. Cahuenga Boulevard and Santa Monica Boulevard 4. Santa Monica Boulevard and Vine Street 5. Gower Street and Santa Monica Boulevard 6. Sew,ard Street and Willoughby Avenue 7. ' La BreC:l.Avenue and Melrose Avenue 8. Highland Avenue and Melrose Avenue 9. Melrose Avenue and Seward Street 10. Melrose Avenue' and Rossmore AvenueNine Street 11. Gower Street (North) and Melrose Avenu~ PROJECT REQUREMENTS A. Melrose Avenue and Rossmore AvenueNine Street (Attachment 4). Restrip~ northbound and southbound Rossmore Avenue and install a new northboufld right-turn only lane. The proposed improvement is acceptable to LADOT and would mitigate the impact to a level of insignificance. B. Seward Street and Willoughby Avenue nstall a new traffic signal to replace the existing stop-controlled intersection. f a new traffic signal is found to be warranted by the LADOT Hollywood Witshire District office, the developer shall pay the cost of planning, design, and, construction of a new traffic signal through the Bureau of Engineering (BOE) B-permit process. The proposed improvement, if approved, would mitigate the impact to a level of insignificance. 4 C. Santa Monica 86tl'evard and Vine Street Widen and restripe southbound Vine Street to provide a right-turn only lane. The proposed improvement is unacceptable because the widening required to accommodate the improvement would reduce the existing sidewalk to less than the standard width. No other alternative improvement is available, and the intersection remains impacted. D. Gower Street and Santa Monica Boulevard Widen and restripe southbound Gower Street to provide a right-tum only lane. The proposed improvement is unacceptable because the widening required to accommodate the improvement would reduce the existing sidewalk to less than the
3 Hadar PJafkin -3- August 29, 2007 standard width. No other alternative improvement is available and the intersection remains impacted. E. Highland Avenue and Sunset Boulevard Highland Avenue and Santa Monica Boulevard Cahuenga Boulevard and Santa Monica Boulevard La Brea Avenue and Melrose Avenue Highland Avenue and Melrose Avenue Melrose Avenue and S~ward Street Gower Street (North) and Melrose Avenue No feasi~le improvement measures were idt?ntified for the above intersections and they remain significantly impacted. F. Constru'ction mpacts LADOT recommends that a construction work site traffic control plan be submitted to LADOT for revlew and approval prior to the start of any construction work. The plan should show the location of any roadway or sidewalk closures r traffic detours, haul routes, hours of operation, protective devices, warning signs and access to abutting properties. LADOT also recommends that all construction related traffic be restricted to off-peak hours. G. Highway OedicationAnd Street Widening Requirements Barton Avenue, Romaine Street, and Seward Street are all classified as a Local Streets which require a 2D-foot half-width roadway on a 3D-foot half-width right-of- -~ way. t appears that additional highway dedication and street widening may be required. forthe proposed~roject. The developer must check with the Bureau of Engineering (BOE) Land Devejppment Group to defermine the highway dedication, street widening and sidewalk requirements for the project. H. Transportation Demand Management (TOM) and Trip Reduction Measures LADOT recommends that the-project comply with the provisions of Ordinance No. re8,700 in order to reduce some of the project trips. The applicant shall record a covenant and agreement to monitor and to submit annual reports on the progress. of the TOM plan to LADOT. Annual reports shall include a report on the van/bus ridership, and other transit-related measures.. Hollywood Area mprovements Given that there are 10 intersections which would remain significantly impacted due to lack of feasible physical improvements, DOT strongly believes that the project should be required to contribute to improving the area-wide transportation system as means to compensate for the unmitigated traffic impacts at these 10 intersections. f the project, as proposed, is approved with "over-riding
4 Hadar Plafkin -4- August 29, 2007 considerations'\ DOT recommends that applicant be required to participate in a proportionate fair share cost program to fund other area-wide transportation improvements currently being considered as part of the Hollywood Community Plan update process to improve multi-modal mobility, transit ridership, demand management and walkability. Prior -to the issuance of any building permits, the applicant shall be required to coordinate with DOT in identifying potential measures and determining the appropriate level offinancial participation. Furthermore, prior to the issuance of any occupancy permits, the applicant shall be required to pay the amount of fair share contribution identified. The following is a partial list of potential improvements for fair share consideration: Contribute funds to provide alternate pedestrian access points, via planned knock-off panels, to the Metro Red-Line stations,, Contribute fund forthe enhancement of the existing ATSAC/ATCS systems, Contribute funds to mprove the advance warning system/signage for special events - Contribute funds for Metro Rapid Bus system Contribute funds for the construction of neighborhood parking garage structures for parking impacted areas J. mprovement and Mitigation Measures mplementation Unless otherwise specified, the proposed mitigation measures and improvements shall be implemented through the Bureau of Engineering (BOE) B-Permit process. Construction of the improvements to the satisfaction of LADOT and BOE must be completed- before issuance of any certificate of occupancy. Should any improvement not receive required approval, the City may substitute an alternative measure of an equivalent cost and effectiveness. Prior to setting the bond amount, BOE shall require that the developer's engineer or contractor contact LADOT's B-Permit Coorcijnator, telephone (213) , to arrange a pre-design meeting to finalize the prffposed design needed for the project. K. Parking Analysis As noted previously, the traffic study indicated that the total number of proposed parking spaces would be 710. The developer should also check with the Department of Building and Safety on the number of Code required parking spaces needed for the project. L. Driveway Access The review of this study does not constitute approval of the driveway access and circulation scheme. ~hose require separate review and approval and should be coordinated as soon as possible with LAD at's Citywide Planning Coordination Section (201 N. Figueroa Street, 4th Floor, Station ) to avoid delays in the building permit approval process. n order to minimize and prevent last minute building design changes, it is highly imperative that the applicant, prior m
5 Hadar Plafkin August 29, 2007 to-the commencement of building or parking layout design efforts, contact LADOT for driveway width and internal circulation requirements so that such traffic flow considerations are designed and incorporated early into the building and parking layout pjans to avoid any unnecessary time delays and potential costs associated with late design changes. All driveways should be Case 2 driveways and 30 feet and 18 feet wide for two-way and one-way operations, respectively. (See Attachment ~) f you have any questions, please contact Wes Pring e of my staff at (213) Attachments' s :\letlers\cen _ 959 _ seward_office. wpd c: Renee Weitzer, Council District 4 Mitch 0' Farr~l, Council District 13 Jeannie Shen,.Hollywood-Wilshire District Tim Conger, Design Division, LADOT Taimour Tanavoli, Citywide Planning Coordination Section, LADOT Carl Mills, Central District, BOE Kipp Rudd, era Crain and Associates
6 Attachment 1 LEVEL OF SERVCE DEFNTONS FOR SGNALZED NTERSECTON l Level of Service Volume/Capacity Ratio Defmition A EXCELLENT. No vehicle waits ionger than one red light and no approach phase is fully used. B VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C GOOD. Occasionally, illivers may have to wait through more than one red light; backups may develop behind turning vehicles. D FAR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E POOR. Represents the most vehicles that intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F Greater than F AlLURE. Backups from nearby intersections or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Tremendous delays with continuously increasing queue lengths.. SGNFCANT TRANSPORTATON MPACT CRTERA 1. A transpoft~tion impact on an intersection shall be deemed "significant" in accordance with the following table ;-xcept as otherwise specified in a TSP, rco or C1v1P: SGNFCANT TRANSPORTATON MP ACT Level of Service Final VC Ratio Project-Related ncrease n VC C > equal to or greater than D > equal to or greater than E,F > equal to or greater than Source: Transportation Research Board, nterim Materials on Highway Capacity, Transportation Research Circular No. 212, January 1980.
7 Attachment 2 Table 8 Critical Movement Analysis (CMA) Summary Future (2010) Traffic Conditions - Without and With Project Peak Without Project With Project No. ntersection Hour CMA.bQ CMA LOS m12act 1_ Sunset Boulevard & AM F 1_013 F * Highland Avenue PM E E Sunset Boulevard' & AM E E Cahueng~ ~oulevard PM D Santa Monica Boulevard & PM D D La Brea Avenue PM F F Santa Monica Boulevard & AM E E * Highland Avenue PM E E * 5. Santa Monica Boulevard & AM B B Las Palmas Avenue PM C C Santa Monica Boulevard & AM C C Seward Street PM Santa Monica Boulevard & AM E E * Cahuenga Boulevard PM C C 0.008, , Santa Monica Boulevard & AM F F * Vine Street PM F 1_103 F Santa Monica Boulevard & AM D D Gower Street PM D E * -~ 10. Romaine Street & m B Highland AvenlJ9 PM B Romaine Street & AM A A Seward Street ~- PM A A Willoughby Avenue 5..J~~: AM C C Highland Avenue PM C C Willoughby Avenue & AM B C * Seward street PM C E * 14. Melrose Avenue & PM F F * La Brea Avenue PM F F * 15. Melrose Avenue & AM F F * Highland Avenue PM F F * 16. "Melrose Avenue & ANt C * Seward Street PM C D * Melrose Avenue & AM F F * Rossmore AvenueNine Street PM F F * Gower Street (N.) PM D * ndicates a significant project impact, prior to mitigation. t '! 18. Melrose Avenue & AM D * 54
8 Attachment 3 J Table 4 Project Trip Generation AM Peak Hour PM Peak Hour Proposed Use Size Daily lib OB Total lib OB Total Office sf 2, Less transit 10% (260) (33) (5) (38) (6) (29) (35) Less nternal trips (corresponding (180) (1 ) (1).(2) (5) (10) (15) to restaurant use) Quality Restaurant sf ' Less nternal trips 50% (180) ill ill m l1q} { l tl } Net Project Trips. 2,
9 COrdon t Sf. V luaw4:lt:?uv ~ ~ ,:~~, '7 r ~ e=-'. - -!, )~~~ ~!lt~~ ~r f A E i A... i ~! ~ONCEPTUAL TRAFFC MTGATON PLAN FOR NTERSECTON OF MELROSE AVE. & VNE ST.lROSSMORE AVE. 0, A era N TransporfCJ!fon Planning ""' AOMEi"",._ n-.-a<l!avtatt.el.!ooe.~ watult f.. Trofflc Engrneering. " rj7~~... 'M PO/"7H~ F 3ll71.u4ml ASSOCA res
10 Attachment 5 6 NORTH SOlRCE: JEROEPARnERSHP FGURE 3 CONCEPTUALSTE PLAN na era N Transportation Planning ~... Traffic Engineering & r:'~~ ASSOCATES 1't/3OJ473~ FPDj04+Hl71 Y(W\'1'.cronoldossodales.com 6 «
IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC
IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential
More informationAPPENDIX C-2. Traffic Study Supplemental Analysis Memo
APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised
More informationMETRO Orange Line BRT American Boulevard Station Options
METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN
More informationCraig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject
TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022
More information2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street
IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee
More informationL. KASSAN, P.E. Consulting Traffic Engineer
ARTHUR L. KASSAN, P.E. Consulting Traffic Engineer Honorable Members of the Planning and Land Use Management Committee c/o City Clerk Room 395, City Hall 200 North Spring Street Los Angeles, CA 90012 Subject:
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC
IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),
More informationTRANSPORTATION 1. INTRODUCTION
IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study
More informationDowntown One Way Street Conversion Technical Feasibility Report
Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC
IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed
More informationTable Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily
5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING
IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationEXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.
EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and
More informationMANHATTAN VILLAGE ENHANCEMENT PROJECT
MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate
More informationService Quality: Higher Ridership: Very Affordable: Image:
Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to
More informationTraffic Impact Analysis for 2171 Rosecrans Avenue
Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationTRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT
DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899
More informationSection 3.12 Traffic and Transportation
Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An
More informationTRAFFIC PARKING ANALYSIS
TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,
More informationConstruction Staging Area 4 Avenue Road
REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More information4.1 Traffic, Circulation, and Parking
4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC
IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION
IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION 1. INTRODUCTION The following section summarizes the information provided in the following traffic studies and collectively referred to as
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More information8150 Sunset Bl Valet on Crescent Heights Bl 4 messages
Eileen Hunt 8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt To: Jeannie Shen Thu, Jan 30, 2014 at 11:11 AM
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationTIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:
TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive
More informationTABLE OF CONTENTS SECTION PAGE. Executive Summary... xii
TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description
More informationVanier Parkway and Presland Road Residential Development Transportation Impact Study
Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco
More informationPROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis
TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District
More informationTraffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT
Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main
More informationEscondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT
Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite
More informationCHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards
9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
DATE: May 10, 2013 CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM TO: FROM: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation
More information4.4 Transportation and Circulation
4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project
More informationTRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:
TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:
More informationHIGHWAY 28 FUNCTIONAL DESIGN
HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,
More informationTRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY
IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationSITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING
SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING 2 Site Plan Modifications From SPRC #1 &2 3 Current 4.1 Submission
More informationPreliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives
3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation
More informationLetter EL652 City of Mercer Island. Page 1. No comments n/a
Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION
IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared
More information5.9 TRANSPORTATION AND TRAFFIC
5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis
More informationMERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1
MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny
More informationMEMORANDUM. Figure 1. Roundabout Interchange under Alternative D
MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis
More informationKing Soopers #116 Thornton, Colorado
Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationTraffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015
Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast
More informationTraffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois
Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,
More informationOrange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019
Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 1 Measure M Transit Projects in San Fernando Valley 2 1 2 Measure M Transit Projects Schedule Project
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationDavid Martin, Director of Planning and Community Development. Establishment of LAX FlyAway Stop in Santa Monica
Information Item Date: January 31, 2014 To: From: Subject: Mayor and City Council David Martin, Director of Planning and Community Development Establishment of LAX FlyAway Stop in Santa Monica Introduction
More informationOperations Center FAQs
RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center May 27, 2010 Phase 1 Project Description 8.6 mile corridor from Downtown Los Angeles
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationExpo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011
Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor
More informationAppendix G Traffic and Parking Report
Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project
More informationAppendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization
Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles
More informationIV. REVISIONS TO THE DRAFT IS/MND
IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald
More informationProject Status Update January 2017
Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and
More informationENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION
IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,
More informationTable of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
More informationAPPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM
APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation
More informationAppendix C. Traffic Study
Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian
More informationVolume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.
Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared
More informationProposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA
Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be
More informationArterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014
Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update
More informationAPPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
More information4.14 TRANSPORTATION AND CIRCULATION
4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to
More informationCORE AREA SPECIFIC PLAN
only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is
More informationAddress Land Use Approximate GSF
M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected
More informationConstruction Realty Co.
MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:
More informationTALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:
TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555
More informationMONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA
MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss
More informationAppendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization
Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles
More informationTRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT
TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic
More informationRe: Residential Development - Ogilvie/Cummings Transportation Overview
1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7
More informationTraffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
More informationMoving Forward on Los Altos Parking Issues
Moving Forward on Los Altos Parking Issues Jean Mordo, with R. Bodner, K. Cranston, M. Rogge, D. Rock January 24, 2017 Preface What is the City-wide parking problem? City code needs to be simple, reasonable,
More informationIRSCH REEN Hirsch/Green Transportation Consulting, Inc.
IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip
More informationappendix 4: Parking Management Study, Phase II
appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.
More informationL1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:
L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES
More informationTRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina
TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact
More informationTrip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014
Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
Date: February 21,2013 CTY OF LOS ANGELES NTER-DEPARTMENTAL MEMORANDUM To: From: Subject: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation
More informationTRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION
TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationContinued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.
Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS
More informationMITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR)
MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) Prepared by: ENVIRONMENTAL MANAGEMENT DIVISION LOS ANGELES HARBOR DEPARTMENT With Assistance From: RBF CONSULTING Contact: ENVIRONMENTAL
More informationIV. Environmental Impact Analysis J. Traffic, Access, and Parking
IV. Environmental Impact Analysis J. Traffic, Access, and Parking 1. Introduction This section of the Draft EIR analyzes the proposed Project s potential impacts on traffic, access, and parking. This section
More information