Fiscal Years Metropolitan Transportation Improvement Program
|
|
- Anabel Howard
- 5 years ago
- Views:
Transcription
1 Winston-Salem Urban Area MEROPOLIAN PLANNING ORGANIZAION Fiscal Years Metropolitan ransportation Improvement Program How to Read the FY Metropolitan ransportation Improvement Program FY Metropolitan ransportation Improvement Program (MIP) Projects and Mapping for the Winston-Salem Urban Area MPO * Street and Highway, Feasibility Study, Bridge, Safety and Congestion Mitigation (CMAQ) * Aviation, Bicycle and Pedestrian, Public ransportation, and Passenger Rail * MIP Amendments to the FY State ransportation Improvement Program * Surface ransportation Program - Direct Attributable Funded Projects in the MPO FY Statewide MIP Projects * Statewide Highway, Feasibility Study, Bridge, Mitigation, Safety, CMAQ, Enhancements, Safe Routes to School, and Roadside Environmental * Statewide Bicycle and Pedestrian, Public ransportation, and Passenger Rail Funding Documents for the Winston-Salem Urban Area MPO FY MIP * Funding Summary able for FY * Fiscal Constraint of the FY MIP * 2014 Federal/State Obligated Funds Pinnacle Stokes County King Germanton obaccoville Rural Hall Forsyth County Adopted September 17, 2015 Lewisville Bethania Winston- Salem Walkertown Kernersville he Winston-Salem Urban Area Planning Boundary Hillsdale Bermuda Run Davie County Advance Clemmons Wallburg Davidson County Midway Welcome
2 How to Read the FY Metropolitan ransportation Improvement Program (MIP) Highway Program he Highway portion of the MIP funding elements are in categories: Interstate, Rural and Urban Roadways Projects, Feasibility Studies, Federal Bridge Projects, Municipal Bridge Projects, Mitigation Projects, Highway Safety Projects, and Congestion Mitigation Projects. he County, State Route Numbers, Location/Description, Length of the Project and otal Project and Prior Year Costs are shown in thousands of dollars. he fiscal year schedule and the type or phase of work is shown for each project with costs and anticipated funding sources. Each project has its own identification code. he starting letter indicates the funding program, while the number uniquely identifies the project. Specific projects are listed by funding program and are listed in order of route number I Interstate EB Bicycle and Pedestrian SR Safe Routes to School R Rural EE Mitigation Y-Z Railroad/highway Crossing Projects U Urban K Rest Area W Highway Hazard (Highway Safety) B Bridge Replacement M Mitigation/Haudralics FS Feasibility Study BK Bridge Preservation P Passenger Rail C Congestion Mitigation Highway Program Funding Categories he Strategic ransportation Investment legislation has categorized projects into three tiers Statewide (), Regional (REG) and Division () level projects. Some projects may be constructed with other State funds (HF) or be considered transitional projects from the prior ransportation Improvement Program (RN). he Federal Aid Construction Program is subject to overall federal budget constraints. Highway funds are identified by the following programs: APD Appalachian Development NHPB National Highway Performance Program (Bridge) BA Bonus Allocation NHPBA National Highway Performance Program (Bonus Allocation) BOND ( R ) Revenue Bond NHPIM National Highway Performance Program (Interstate Maintenance) CMAQ Congestion Mitigation Air Quality O Others DP Discretionary/ Demonstration S State ER Emergency Relief Funds S(M) State Match HFB Highway Fund Bridge Replacement Program SP Surface ransportation Program HP Federal Aid High Priority SPDA SP Direct Attributable HRRR High Risk Rural Roads SPOFF SP Off System Bridge HSIP Highway Safety Improvement Program SPON SP On System Bridge L Local Matching Share Highway rust Fund NHP National Highway Performance Program Highway Program Work Categories Work type activities are identified by the following codes: A Acquisition O Operations C Construction P Paving CG Construction (GARVEE) PE Preliminary Engineering F Feasibility Study R Right-Of-Way G Grading and Structures RG Right-Of-Way (GARVEE) I Implementation S Structures L Landscaping U Utilities M Mitigation Winston-Salem Urban Area MPO 2040 Metropolitan ransportation Plan How to Read the MIP - Page 1
3 Non-Highway Program and Public ransportation Funding Categories Funds for non-highway projects Public ransportation are identified by the following programs: ADAP Appalachian Development ransportation L Local Assistance Program CMAQ Congestion Mitigation Air Quality O Other DP Discretionary/ Demonstration RR Rail-Highway Safety FBUS Bus and Bus Facilities Earmark (5309) RAP Rural ransit Assistance Program FED Federal Unfunded Projects S State FEPD Elderly and Persons with Disability (5310) S(M) State Match FF Federal Ferry SMAP Urban Area Maintenance Assistance FLAP Federal Lands Access Program SRS Safe Routes to School FMOD Fixed Guideway Modifications SA State FMPL Metropolitan Planning (5303) SHSR Stimulus High Speed Rail FNF New Freedom Program SP Surface ransportation Program FNS New Starts Capital (5309) SPDA SP Direct Attributable FNU Non-Urbanized Area Formula Program (5311) SPDE SP Enhancements FSGR State of Good Repair SPDEB SP Enhancements (Bike) FSPR State Planning and Research State Highway rust Funds FUZ Urbanized Area Formula Program (5307) 2001 State Rail Funds HP Federal Aid High Priority AP ransportation Alternatives Program JARC Job Access and Reverse Commute APDA AP Direct Attributable IGER DISC IGER Discretionary Grants Public ransportation Program Each project has its own identification code. he starting letter indicates the funding program, while the number uniquely identifies the project. ID Program ype General Project ype Detailed Program ype A Urban Capital Vehicles B Rural Capital Vehicles C Rural Capital Vehicles D Urban Capital Facilities E Urban-New Start Capital Facilities/Vehicles/etc. F Rural Capital Facilities G Urban (For DA: Include Preventive Maintenance, ADA service, etc.) Capital Routine Capital H Urban Capital Routine Capital I Rural/Statewide (Inter-City 5311f) Operating Operating J Rural/Statewide (State Work First) Operating Operating K Rural (5311 & 5310) Capital/Administration L Rural EDAP Operation Operating M Other N State Human Service Administration O Urban, small urban operating (SMAP) Operating Operating P Urban Planning/Statewide (5303, 5307, 5313) Planning Planning Q Rural Planning/Statewide (5311) Planning Planning R Rural RGP Operating Operating S Statewide raining RAP raining raining Urban/Statewide echnology Capital echnology U Rural/Statewide echnology Capital echnology Winston-Salem Urban Area MPO 2040 Metropolitan ransportation Plan How to Read the MIP - Page 2
4 Winston-Salem Urban Area MEROPOLIAN PLANNING ORGANIZAION Fiscal Years Metropolitan ransportation Improvement Program FY Metropolitan ransportation Improvement Program (MIP) Mapping and Projects Street and Highway, Feasibility Study, Bridge, Safety and Congestion Mitigation (CMAQ) Aviation, Bicycle and Pedestrian, Public ransportation, and Passenger Rail MIP Amendments to the FY State ransportation Improvement Program Surface ransportation Program-Direct Attributable (SP-DA) Funded Projects in the MPO
5 Metropolitan ransportation Improvement Program S U R R Y I-5887 S O K E S R O C K I N G H A M Roadway Projects R-2247EC R-2247EA FS-1509A U-2579F R-2577B R-2247EB U-2579E Y A D K I N U-2729 U-2579D U-5824 R-2247D Legend Project Category Highway Interchange Highway Feasibility Study Base Map Freeway/Expressway/Boulevard Major horoughfare Minor horoughfare Proposed Freeway/Expressway/Boulevard Proposed Major horoughfare Proposed Minor horoughfare Counties Yadkin River Metropolitan Area Boundary I-5794 R-2247CB U-5551 R-2247CA R-2247CD R-2247B U-2707 F O R S Y H U-4918B U-2827B U-2925 I-5766 I-5880 I-5857 U-2579C U-2579B R-2577A U-5760 U-2579G U-2579AB U-2579AA I-5795 U-4909 I-5767 I-5511 U-4734 U-2800 I-5814 G U I L F O R D I-3600 U-5786 Map Date: July 9, 2015 D A V I E D A V I D S O N Produced by: Winston-Salem Urban Area Metropolitan Planning Organization 0 ½ Miles R A N D O L P H
6 Metropolitan ransportation Improvement Program S U R R Y B-4645 S O K E S B-5509 R O C K I N G H A M Bridge, Enhancement and Safety Projects B-4506 B-5771 Y A D K I N Legend Project Category Aviation Bridge Intersection Improvement Intersection Improvement (CMAQ) Safety - Intersection ransit Safety - Street Base Map Freeway/Expressway/Boulevard Major horoughfare Minor horoughfare Proposed Freeway/Expressway/Boulevard Proposed Major horoughfare Proposed Minor horoughfare Counties Yadkin River Metropolitan Area Boundary B-4746 F O R S Y H AV-5738 B-5775 B-4509 B-4511 B-5007 B-2882 B-5148 D-4743 B-5004 SF-4909F B-5770 B-5152 W-5304 B-3637 B-5781 B-5107 G U I L F O R D B-4741 W-5115 B-5765 Map Date: July 9, 2015 D A V I E B-5165 D A V I D S O N Produced by: Winston-Salem Urban Area B-5774 Metropolitan Planning Organization 0 ½ Miles R A N D O L P H
7 ISION 00 HIGHWAY PROGRAM COUNY ROUE/CIY ID NUMBER LOCAION / DESCRIPION LENGH (MILES) OAL PROJEC COS (HOU) PRIOR YEARS COS (HOU) FUNDS YPE OF WORK / ESIMAED COS IN HOUSANDS / PROJEC BREAKS SAE RANSPORAION IMPROVEMEN PROGRAM DEVELOPMENAL PROGRAM FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 UNFUNDED FUURE YEARS WAKE NC 00 ROUE/CIY I - Interstate US or NC Routes SR - Secondary Road Various - multiple routes NEW ROUE or City R-0000 I-40 O NC 96 EAS OF HOMEOWN. WIDEN O A FOUR-LANE FACILIY WIH A BYPASS OF HOMEOWN ON NEW LOCAION. LOCAION / DESCRIPION Project termini and a general work description , NHP R NHP M NHP U NHP NHP NHP NHP NHP A C 9000 A U 5000 B C 5000 B C 5000 B C 5000 B R C C C IDENIFICAION NUMBER Assigned to each project at conception and remains with project until completion. FUNDING SOURCE (2) See Highway Funding Key for an explanation of funding categories used for each project phase. FUNDING CAEGORY (1) Identifies the "SI" Funding Category for the project and any project breaks. A B C I-40 O NC 3 NC 3 O SR 1003 SR 1003 O NC 96 PROJEC BREAKS One or two letter designation for project break. WORK YPE (ACIVIY) Phases of implementation: Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. For other work types or activities see Work ype (Activity) box ESIMAED COS Preliminary Engineering, Right of Way, Utility, Mitigation and Construction cost estimates by funding category in current dollars. Cost may include one or more funding types. Multi-year funding of a project segment indicates (Cash-Flow Funding) with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand ofdollars.) UNFUNDED FFUURE COMMIMENS (1) FUNDING CAEGORY - Division EX - Exempt HF - State Dollars (Non-SI) REG - Regional - Statewide RN -ransition Project (2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES (3) WORK YPE (ACIVIY) APD - Appalachian Development BA - Bonus Allocation BOND (R) - Revenue Bond CMAQ - Congestion Mitigation DP - Discretionary or Demonstration ER - Emergency Relief Funds NHPB - National Highway Performance Program (Bridge) NHPBA - National Highway Performance Program (Bonus Allocation) NHPIM - National Highway Performance Program (Interstate Maintenance) O - Others S - State S (M) - State Match A - Acquisition C - Construction CG - Construction (GARVEE) F - Feasibility Study G - Grading and Structures I - Implementation HFB - Highway Fund Bridge Replacement Program SP - Surface ransportation Program L - Landscaping HP - Federal-Aid High Priority SPDA - Surface ransportation Program - Direct Attributable M - Mitigation HRRR - High Risk Rural Roads SPOFF -Surface ransportation Program (Off System Bridge) O - Operations HSIP - Highway Safety Improvement Program SPON - Surface ransportation Program Bridge (On System Bridge) P - Paving L - Local NHP - National Highway Performance Program - State Highway rust Funds PE - Preliminary Engineering R - Right of Way RG - Right of Way (GARVEE) S - Structure U - Utilities
8 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY INERSAE PROJECS I-5794 I MILE WES OF NC 801 IN DAVIE COUNY O SR 1101 (HARPER ROAD) IN FORSYH CONSRUCION NHPIM DAVIE COUINY. PAVEMEN REHABILIAION. FORSYH I-3600 I-40 SR 1436 (PINEBROOK DRIVE) O WES OF NC 801. PAVEMEN REHABILIAION CONSRUCION (GARVEE) IMPM RN DAVIE PROJEC COMPLEE-GARVEE BOND FUNDING $13.8 MILLION; PAYBACK FY FY 2018 I-5766 I MILES EAS OF NC 150 (PEERS CREEK PARKWAY) O NC 109 (HOMASVILLE ROAD) CONSRUCION NHPIM FORSYH IN WINSON-SALEM. PAVEMEN REHABILIAION. COORDINAE WIH I-5857 I-5814 I MILE EAS OF SR 2632 (OLD SALEM ROAD) IN FORSYH COUNY O 0.3 MILE CONSRUCION NHPIM FORSYH WES OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNY. PAVEMEN REHABILIAION. GUILFORD I-5795 I MILES EAS OF SR 1003 (HIGH POIN ROAD) O 0.4 MILE EAS OF SR 2632 (OLD CONSRUCION NHPIM FORSYH SALEM ROAD) IN WINSON-SALEM AND KERNERSVILLE. PAVEMEN REHABILIAION. I-5857 I MILE EAS OF SR 3153 (HANES MALL BOULEVARD) O 1.8 MILES EAS OF SR CONSRUCION NHPIM FORSYH (HIGH POIN ROAD) IN WINSON-SALEM. PAVEMEN REHABILIAION. COORDINAE WIH I-5766 I-5880 I-40 / US 311 NC 109 (HOMASVILLE ROAD) / CLEMMONSVILLE ROAD SPLI-DIAMOND RIGH-OF-WAY NHP REG FORSYH INERCHANGE IN WINSON-SALEM. CONVER HALF DIAMOND INERCHANGE A CONSRUCION NHP NC 109 O FULL DIAMOND, AND REMOVE CONNECOR ROADS AND HALF DIAMOND INERCHANGE A CLEMMONSVILLE ROAD PLANNING / DESIGN I-5511 I-74 / US 311 I-40 IN FORSYH COUNY O EAS OF SR 1980 (OLD PLANK ROAD) IN GUILFORD RN FORSYH COUNY. INSALL SIGNAGE O REFLEC INERSAE DESIGNAION. GUILFORD UNDER CONSRUCION I-5767 I-74 / US 311 I-40 O GUILFORD COUNY LINE. PAVEMEN REHABILIAION CONSRUCION NHPIM FORSYH O BE LE WIH I-5736 I-5887 US 52 / FUURE I-74 SR 1102 (RINIY CHURCH ROAD) NEAR KING. CONVER EXISING GRADE RIGH-OF-WAY SOKES SEPARAION O FULL-MOVEMEN INERCHANGE. CONSRUCION CONSRUCION 5130 UNFUNDED PLANNING / DESIGN RURAL PROJECS R-2577* US 158 MULLANES NORH OF US 421 / I-40 BUSINESS IN WINSON-SALEM O US 220 IN FORSYH SOKESDALE. WIDEN O MULILANES. GUILFORD SRAEGIC HIGHWAY CORRIDOR PROJEC - *INRASAE PROJEC PLANNING / DESIGN A MULI-LANES NORH OF US 421 / I-40 BUSINESS O SR 1965 (BELEWS CREEK ROAD) RIGH-OF-WAY NHP REG UILIIES NHP CONSRUCION NHP CONSRUCION NHP UNFUNDED B SR 1965 (BELEWS CREEK ROAD) IN FORSYH COUNY O SR 2034 (ANHONY ROAD) RIGH-OF-WAY 6800 UNFUNDED IN GUILFORD COUNY CONSRUCION UNFUNDED C NORH OF SR 2034 (ANHONY ROAD) O US 220 RIGH-OF-WAY 4800 UNFUNDED CONSRUCION UNFUNDED Metropolitan ransportation Improvement Program Highway Program Page 1
9 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY R-2247* NEW ROUE WINSON-SALEM NORHERN BELWAY, WESERN SECION, I-40 O US 52. FOUR FORSYH LANE EXPRESAY ON NEW LOCAION. GARVEE BOND FUNDING $5 M FOR SEGMEN CD - PAYBACK FY ; GARVEE BOND FUNDING $10 M FOR SEGMEN EC - PAYBACK FY B WINSON-SALEM NORHERN BELWAY, WESERN SECION, SOUH OF I-40 O RIGH-OF-WAY UNFUNDED SOUH OF US 421 INERCHANGE CONSRUCION UNFUNDED CA WINSON-SALEM NORHERN BELWAY, WESERN SECION, INERCHANGE RIGH-OF-WAY 650 UNFUNDED WIH US 421 AND INERCHANGE WIH SR 1140 (PEACE HAVEN ROAD) CONSRUCION UNFUNDED CB WINSON-SALEM NORHERN BELWAY, WESERN SECION, RIGH-OF-WAY 7750 UNFUNDED NORH OF US 421 INERCHANGE O SR 1348 (ROBINHOOD ROAD) CONSRUCION UNFUNDED CC WINSON-SALEM NORHERN BELWAY, WESERN SECION, MUDDY CREEK. REPLACE BRIDGE NO. 221 AND BRIDGE NO COMPLEE - WORK ACCOMPLISHED UNDER B-4507 CD SR 1891 / NON-SYSEM (PEACE HAVEN ROAD) - US 421 INERCHANGE RIGH-OF-WAY NHP AND APPROACHES - DESIGN-BUILD PROJEC CONSRUCION S(M) CONSRUCION NHP CONSRUCION (GARVEE) NHP CONSRUCION (GARVEE) NHP 2145 UNFUNDED D WINSON-SALEM NORHERN BELWAY, WESERN SECION, RIGH-OF-WAY UNFUNDED NORH OF SR 1348 (MEADOWLARK DRIVE-ROBINHOOD ROAD) O NC 67 CONSRUCION UNFUNDED EA WINSON-SALEM NORHERN BELWAY, WESERN SECION, NC 67 O SOUH OF US 52 RIGH-OF-WAY 6200 UNFUNDED CONSRUCION UNFUNDED EB WINSON-SALEM NORHERN BELWAY, WESERN SECION, INERCHANGE A US 52 RIGH-OF-WAY UNFUNDED CONSRUCION UNFUNDED EC NC 65 INERCHANGE. RECONSRUC INERCHANGE. - DESIGN-BUILD PROJEC RIGH-OF-WAY NHP CONSRUCION S(M) CONSRUCION NHP CONSRUCION (GARVEE) NHP CONSRUCION (GARVEE) NHP 4290 UNFUNDED F WINSON-SALEM NORHERN BELWAY, WESERN SECION, INELLIGEN RANSPORAION CONSRUCION 8570 UNFUNDED SYSEMS DEPLOYMEN FOR SEGMENS BA, BB, CA, CB, D, EA AND EB URBAN PROJECS U-2827 US 158 / US 421 / NC 150 / I-40 O WES OF US 158 IN WINSON-SALEM. PAVEMEN REHABILIAION, BUSINESS 40 REPLACE BRIDGES , , , , , , , FORSYH , AND SAFEY IMPROVEMENS. PAR B DESIGN-BUILD PROJEC A WES OF OLD VINEYARD ROAD O EAS OF US 158 (SRAFORD ROAD) COMPLEE B WES OF FOURH SREE O EAS OF CHURCH SREE RIGH-OF-WAY HP REG RIGH-OF-WAY NHP UILIIES NHP CONSRUCION NHP PLANNING / DESIGN C WES OF US 311 (MARIN LUHER KING, JR. DRIVE) O WES OF US 158 COMPLEE U-5824 NC 66 (OLD HOLLOW ROAD) HARLEY DRIVE O BELLAIRE CIRCLE / WHIEHALL VILLAGE LANE IN RIGH-OF-WAY FORSYH WALKEROWN. WIDEN O MULILANES. UILIIES CONSRUCION PLANNING / DESIGN Metropolitan ransportation Improvement Program Highway Program Page 2
10 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY U-5786 SR 1508 (HICKORY REE ROAD) US 52 / NC 8 / FUURE I-285 O NC 150. WIDEN O MULILANES RIGH-OF-WAY DAVIDSON UILIIES CONSRUCION PLANNING / DESIGN U-2729 SR 1672 (HANES MILL ROAD) MUSEUM DRIVE O SR 4000 (UNIVERSIY PARKWAY) IN WINSON-SALEM. WIDEN O RIGH-OF-WAY FORSYH MULILANES. UILIIES CONSRUCION PLANNING / DESIGN U-2800 SR 2601 (MACY GROVE ROAD) INDUSRIAL PARK DRIVE O SR 1005 (EAS MOUNAIN SREE) IN KERNERSVILLE RN FORSYH WIDEN O FOUR LANES WIH WIDE OUSIDE LANES, CURB AND GUER, PAR ON NEW LOCAION; AND CONVER GRADE SEPARAION A I-40 BUSINESS O AN INERCHANGE. DESIGN-BUILD PROJEC - UNDER CONSRUCION U-4909 SR 2643 (UNION CROSS ROAD) SR 2691 (WALLBURG ROAD) O SR 2632 (SEDGE GARDEN ROAD) IN WINSON-SALEM RN FORSYH AND KERNERSVILLE. WIDEN O MULILANES. UNDER CONSRUCION A INSALLAION OF IS COMPONENS RN PLANNING / DESIGN U-2707 SR 3000 (IDOLS ROAD) SR 2999 (HAMPON ROAD) O US 158 IN CLEMMONS. WO LANE SHOULDER CONSRUCION FORSYH SECION ON NEW LOCAION RIGH OF WAY - COORDINAE WIH B-5781 U-5536 NEW ROUE PROPOSED GREA WAGON ROAD FROM SHALLOWFORD ROAD (SR 1001) O RIGH-OF-WAY SP FORSYH LEWISVILLE-VIENNA ROAD (SR 1308) IN LEWISVILLE. MULILANE FACILIY ON NEW RIGH-OF-WAY L LOCAION WIH BICYCLE AND PEDESRIAN ACCOMMODAIONS. UILIIES SP UILIIES L CONSRUCION SP CONSRUCION L PLANNING / DESIGN BY OWN OF LEWISVILLE - U-2925 NEW ROUE SALEM CREEK CONNECOR, SR 4326 (RAMS DRIVE) O SR 4325 (MARIN LUHER KING, RN FORSYH JR. DRIVE) IN WINSON-SALEM. MULILANE FACILIY ON NEW LOCAION. DESIGN-BUILD PROJEC - UNDER CONSRUCION U-5551 NEW ROUE EAS OF SR 1101 (HARPER ROAD) O SR 1103 (LEWISVILLE-CLEMMONS ROAD) IN FORSYH CLEMMONS. CONSRUC 3-LANE FACILIY ON NEW LOCAION. ECONOMIC DEVELOPMEN PROJEC - U-4734 NEW ROUE MACY GROVE ROAD EXENSION, SR 1005 (EAS MOUNAIN SREE) O NC RIGH-OF-WAY FORSYH (NORH MAIN SREE) IN KERNERSVILLE. FOUR-LANE IDED FACILIY ON NEW UILIIES LOCAION. CONSRUCION CONSRUCION U-5022 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION CONSRUCION SPDA DAVIDSON (WSUAMPO) SPDA FUNDS DAVIE FORSYH SOKES RESERVED FOR FUURE PROGRAMMING U-4951 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION DAVIDSON PLANNING (PL) SUPPLEMEN. DAVIE FORSYH SOKES FORMERLY U-9999D Metropolitan ransportation Improvement Program Highway Program Page 3
11 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY U-4918 US 52 / US 421 / I-40 BUSINESS VICINIY A WAKE FORES INNOVAION QUARER RN FORSYH (FORMERLY PIEDMON RIAD RESEARCH PARK) IN WINSON-SALEM. RANSPORAION IMPROVEMENS. A SADIUM DRIVE O HIRD SREE - UNDER CONSRUCION BY OHERS ECONOMIC DEVELOPMEN PROGRAM PROJEC B CONSRUC MULIUSE RAIL FROM HIRD SREE O RAMS DRIVE; CONSRUC RN PEDESRIAN AMENIIES AND PROVIDE LANDSCAPING ON FOGLE SREE AND EXEND ROAWAY FROM EXISING ERMINUS O RESEARCH PARKWAY; CONSRUC CENRAL POND GREENWAY; CONSRUC PAERSON ALLEY SIDEWALK. PLANNING / DESIGN U-4742 INERSECION IMPROVEMEN PROJECS IN HE WINSON-SALEM URBAN AREA DAVIDSON MEROPOLIAN PLANNING ORGANIZAION (WSUAMPO) AREA. DAVIE FORSYH SOKES PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY OHERS - U-2579* FUURE I-74 WINSON-SALEM NORHERN BELWAY, EASERN SECION, I-74 / US 311 O US FORSYH MULILANE FREEWAY ON NEW LOCAION. GARVEE BOND FUNDING $96.1 M FOR SEGMEN B, PAYBACK FY ; $9 M FOR SEGMEN C RIGH OF WAY, PAYBACK FY AA WINSON-SALEM NORHERN BELWAY, EASERN SECION, I-74 / US 311 O I-40 RIGH-OF-WAY REG UILIIES CONSRUCION AB WINSON-SALEM NORHERN BELWAY, EASERN SECION, I-40 O US 421 / NC 150 / BUSINESS 40 RIGH-OF-WAY REG UILIIES CONSRUCION B WINSON-SALEM NORHERN BELWAY, EASERN SECION, US 421 / NC 150 / BUSINESS 40 O US UNDER CONSRUCION CONSRUCION (GARVEE) NHP RN CONSRUCION (GARVEE) NHP 9853 UNFUNDED CONSRUCION S(M) C WINSON-SALEM NORHERN BELWAY, EASERN SECION, US 158 O US 311 RIGH-OF-WAY (GARVEE) NHP REG RIGH-OF-WAY (GARVEE) NHP 3860 UNFUNDED RIGH-OF-WAY S(M) RIGH-OF-WAY NHP CONSRUCION D WINSON-SALEM NORHERN BELWAY, EASERN SECION, US 311 O SR 2211 (BAUX MOUNAIN ROAD) RIGH-OF-WAY UNFUNDED UILIIES 400 UNFUNDED CONSRUCION UNFUNDED E WINSON-SALEM NORHERN BELWAY, EASERN SECION, SR 2211 (BAUX MOUNAIN ROAD) O NC 8 RIGH-OF-WAY UNFUNDED UILIIES 360 UNFUNDED CONSRUCION UNFUNDED F WINSON-SALEM NORHERN BELWAY, EASERN SECION, NC 8 O EAS OF US 52 RIGH-OF-WAY UNFUNDED UILIIES 440 UNFUNDED CONSRUCION UNFUNDED G WINSON-SALEM NORHERN BELWAY, EASERN SECION, BRIDGE NO. 366 OVER US 421 / NC 150 / BUSINESS 40 PROJEC COMPLEE U-5760 KERNERSVILLE SOUHERN LOOP US 421 / BUSINESS 40 O NC 66 (WES MOUNAIN SREE) IN KERNERSVILLE RIGH-OF-WAY (PHASE I) WIDEN BIG MILL FARM ROAD AND SR 2649 (HOPKINS ROAD) AND CONSRUC UILIIES FORSYH INERCHANGE A US 421 / NC 150 / BUSINESS 40. CONSRUCION PLANNING / DESIGN Metropolitan ransportation Improvement Program Highway Program Page 4
12 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY FEASIBILIY SUDIES FS-1509A NEW ROUE FORUM PARKWAY CONNECOR, FORUM PARKWAY O NC 66 (UNIVERSIY PARKWAY) FORSYH IN RURAL HALL. 2-LANE FACILIY ON NEW LOCAION. SCHEDULED FOR FEASIBILIY SUDY FEDERAL BRIDGE PROJECS B-4506 US 52 REHABILIAE BRIDGE , AND BRIDGE OVER SR 1620 (OBACCOVILLE FORSYH ROAD) IN OBACCOVILLE. UNDER CONSRUCION B-4645 US 52 REPLACE BRIDGE AND BRIDGE OVER LILE YADKIN RIVER SOKES UNDER CONSRUCION B-3637 NC 801 REPLACE BRIDGE AND REVISE INERCHANGE A I CONSRUCION (GARVEE) NHP RN DAVIE PROJEC COMPLEE - GARVEE BOND FUNDING $11.5 MILLION; PAYBACK FY FY 2018 B-5148 SR 1001 (COUNRY CLUB ROAD) REPLACE BRIDGE OVER NC 67 IN WINSON-SALEM RIGH-OF-WAY HFB HF FORSYH CONSRUCION HFB PLANNING / DESIGN B-5107 SR 1003 (HIGH POIN ROAD) REPLACE BRIDGE OVER ABBOS CREEK FORSYH UNDER CONSRUCION B-5152 SR 1100 (LASAER ROAD) REPLACE BRIDGE OVER BLANKE CREEK IN CLEMMONS RIGH-OF-WAY HFB HF FORSYH CONSRUCION HFB PLANNING / DESIGN B-5165 SR 1485 (HAMPON ROAD) REPLACE BRIDGE OVER MUDDY CREEK RIGH-OF-WAY HFB HF DAVIDSON CONSRUCION HFB PLANNING / DESIGN B-4741 SR 1493 (FRYE BRIDGE ROAD) REPLACE BRIDGE OVER MUDDY CREEK RN DAVIDSON UNDER CONSRUCION B-5771 SR 1611 (MAIN SREE) REPLACE BRIDGE OVER MUDDY CREEK IN BEHANIA RIGH-OF-WAY HFB HF FORSYH CONSRUCION HFB B-5765 SR 1711 (GUMREE ROAD) REPLACE BRIDGE OVER WINSON-SALEM SOUHBOUND RAILWAY RIGH-OF-WAY HFB HF DAVIDSON CONSRUCION HFB B-5774 SR 1810 (CLODFELER ROAD) REPLACE BRIDGE OVER BUSHY FORK CREEK RIGH-OF-WAY HFB HF DAVIDSON CONSRUCION HFB COORDINAE WIH B-5776 B-5509 SR 1961 (BOLEJACK ROAD) REPLACE BRIDGE OVER NEAMAN CREEK RIGH-OF-WAY HFB HF SOKES CONSRUCION HFB B-4746 SR 2264 (AKRON DRIVE) REPLACE BRIDGE OVER NORFOLK SOUHERN RAILROAD IN WINSON-SALEM CONSRUCION HFB FORSYH PLANNING / DESIGN B-4509 SR 2377 REPLACE BRIDGE OVER SALEM CREEK IN WINSON-SALEM RIGH-OF-WAY SPOFF (OLD GREENSBORO ROAD) CONSRUCION SPOFF FORSYH B-4511 SR 2667 (HASINGS HILL ROAD) REPLACE BRIDGE OVER KERNER'S MILL CREEK IN WINSON-SALEM RN FORSYH UNDER CONSRUCION B-5781 SR 2999 (HAMPON ROAD) REPLACE BRIDGE OVER NORFOLK SOUHERN RAILROAD RIGH-OF-WAY HFB HF FORSYH CONSRUCION HFB COORDINAE WIH U Metropolitan ransportation Improvement Program Highway Program Page 5
13 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY BD-5109 ISION 9 PURCHASE ORDER CONRAC BRIDGE REPLACEMEN PROJECS A DAVIDSON SELECED LOCAIONS. DAVIE FORSYH ROWAN SOKES - BRIDGE PURCHASE ORDER CONRAC (BPOC) B-5775 ROBINHOOD ROAD REPLACE BRIDGE OVER NC 67 IN WINSON-SALEM RIGH-OF-WAY HFB HF FORSYH CONSRUCION HFB B-5770 SALISBURY RIDGE ROAD REPLACE BRIDGE OVER NC 150 IN WINSON-SALEM RIGH-OF-WAY SPOFF FORSYH CONSRUCION SPOFF CONSRUCION SPOFF PLANNING / DESIGN MUNICIPAL BRIDGE PROJECS B-2882 GLADE SREE REPLACE BRIDGE OVER PEERS CREEK IN WINSON-SALEM. 577 RIGH-OF-WAY SPOFF FORSYH RIGH-OF-WAY L CONSRUCION SPOFF CONSRUCION L PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY CIY OF WINSON-SALEM - MUNICIPAL BRIDGE B-5004 REYNOLDS PARK ROAD REPLACE BRIDGE OVER SALEM CREEK AND BRIDGE OVER BRUSHY RN FORSYH FORK CREEK IN WINSON-SALEM. RIGH OF WAY BY CIY OF WINSON-SALEM - MUNICIPAL BRIDGE B-5007 WES FIRS SREE REPLACE BRIDGE OVER NORFOLK SOUHERN RAILWAY IN WINSON-SALEM RIGH-OF-WAY SPOFF FORSYH RIGH-OF-WAY L CONSRUCION SPOFF CONSRUCION L PLANNING / DESIGN BY CIY OF WINSON-SALEM - MUNICIPAL BRIDGE MIIGAION PROJECS EE-4909 ECOSYSEM ENHANCEMEN PROGRAM FOR ISION 9 PROJEC MIIGAION DAVIDSON DAVIE FORSYH ROWAN SOKES HIGHWAY SAFEY PROJECS W-5115 NC 150 SR 1533 (LEONARD BARRIER ROAD) AND SR 1515 (MOUN OLIVE CHURCH ROAD) DAVIDSON CONSRUC LEF URN LANE. UNDER CONSRUCION SF-4909F SR 1173 (WILLIAMS ROAD) EAS OF SR 3652 (CRESVIEW ROAD) AND WES OF SR 1175 (HAUSER ROAD). INSALL FORSYH GUARDRAIL A WO CULVERS. UNDER CONSRUCION W-5304 SR 2692 (GUMREE ROAD) SR 2693 (SAWMILL ROAD) AND SR 4203 (REID ROAD). IMPROVE INERSECIONS FORSYH UNDER CONSRUCION W-5510 SR 4315 (SOUH MAIN SREE); SR 4315 (SOUH MAIN SREE), BUSINESS 40 / US 421 / NC 150 O NORH OF SR CONSRUCION HSIP SR 2648 (OLD WINSON ROAD) (SOUH CHERRY SREE), AND SR 2648 (OLD WINSON ROAD), WES OF SOUH CONSRUCION SPDA FORSYH CHERRY SREE O SOUH MAIN SREE IN KERNERSVILLE. SAFEY IMPROVEMENS, CONSRUCION L INCLUDING RAISED MEDIAN, URN LANES, ADDIIONAL LANE, ROUNDABOU, AND INERSECION RELOCAION. RIGH OF WAY Metropolitan ransportation Improvement Program Highway Program Page 6
14 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY W-5209 ISION 9 RUMBLE SRIPS, GUARDRAIL, SAFEY AND LIGHING IMPROVEMENS A DAVIDSON SELECED LOCAIONS. DAVIE FORSYH ROWAN SOKES CONGESION MIIGAION AND AIR QUALIY PROJECS C-5224 UPGRADE CIY OF WINSON-SALEM SIGNAL SYSEM EX FORSYH UNDER CONSRUCION C-4936 PIEDMON AUHORIY FOR REGIONAL RANSPORAION (PAR). IMPLEMEN A EX CAELL REGIONAL AIR QUALIY AWARENESS PROGRAM. DAVIDSON FORSYH GUILFORD MONGOMERY RANDOLPH ROCKINGHAM BY PIEDMON AUHORIY FOR REGIONAL RANSPORAION C-5620 PROJECS O IMPROVE CONGESION AND AIR QUALIY IN HE WINSON-SALEM 3732 CONSRUCION CMAQ EX DAVIDSON URBAN AREA MPO. DAVIE FORSYH Metropolitan ransportation Improvement Program Highway Program Page 7
15 ISION 00 NON HIGHWAY PROGRAM COUNY ROUE / CIY / RANSI PARNER ID NUMBER LOCAION / DESCRIPION OAL PROJEC COS (HOU) PRIOR YEARS COS (HOU) FUNDS YPE OF WORK / ESIMAED COS IN HOUSANDS / PROJEC BREAKS SAE RANSPORAION IMPROVEMEN PROGRAM DEVELOPMENAL PROGRAM FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 UNFUNDED FUURE YEARS DURHAM DURHAM AREA A-4738 PASSENGER AMENIIES - BUS SOP RANSI AUHORIY SHELERS, BENCHES, SHOP EQUIPMEN, SPARE PARS, ENGINES, SERVICE ROUE / CIY / VEHICLES, EC. RANSI PARNER LOCAION / DESCRIPION I - Interstate Project termini and a general US or NC Routes work description. SR - Secondary Road Various - multiple routes FUNDING SOURCE (2) NEW ROUE or City See Highway Funding Key RANSI PARNER for an explanation of funding categories used for each project phase. IDENIFICAION NUMBER Assigned to each project at conception and remains with FUNDING CAEGORY (1) project until completion. Identifies the "SI" Funding Category for the project and any project breaks. FUZ CP FUZ CP A B C 4000 A 700 A CP 9000 A CP BUS SOP SHELER AND BENCHES LOCAED A HOLLOWAY SREE BUS SOP SHELER AND BENCHES LOCAED A GREGSON AVENUE SHOP EQUIPMEN, SPARE PARS, ENGINES, SERVICE VEHICLES, EC. PROJEC BREAKS WORK YPE (ACIVIY) (3) One or two letter Phases of implementation: designation for project Preliminary Engineering, break. Right of Way, Mitigation, Utilities or Construction. For other work types or activities see Work ype (Activity) box bel 5000 B CP 5000 B CP 5000 B CP 5000 B CP C CP C ESIMAED COS Preliminary Engineering, Right of Way, Utility, Mitigation and Construction cost estimates by funding category in UNFUNDED current dollars. Cost may include one or more FFUURE funding types. Multi-year funding of a project segment COMMIMENS indicates (Cash-Flow Funding) with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of dollars.) (1) FUNDING CAEGORY - Division HF - State Dollars (Non-SI) REG - Regional - Statewide ADAP - Applalachian Development ransportation Assistance Pgm. CMAQ - Congestion Mitigation DP - Discretionary or Demonstration FBUS - Capital Program - Bus Earmark (5309) FED - Federal Rail Funds FEPD - Elderly and Persons with Disablity (5310) FF - Federal Ferry FLAP - Federal Lands Access Program FMOD - Fixed Guideway Modifications FMPL - Metropolitan Planning (5303) FNF - New Freedom Program FNS - New Starts - Capital (5309) FNU - Non Urbanized Area Formula Program (5311) FSGR - State of Good Repair FSPR - State Planning and Research FUZ - Urbanized Area Formula Program (5307) HP - Federal-Aid High Priority JARC - Job Assistance and Reverse Commute (3037) (2) FUNDING SOURCES KEY L - Local O - Other RR - Rail-Highway Safety RAP - Rural ransit Assistance Program S - State S (M) - State Match SMAP - Operating Assistance and State Maintenance SRS - Safe Routes to School SA - State SHSR - Stimulus High Speed Rail SP - Surface ransportation Program SPDA - Surface ransportation Program - Direct Attributable SPE - Surface ransportation Program, Enhancements SPEB - Surface ransportation Program, Enhancements (Bike) - State Highway rust Funds State Rail Funds AP - ransportation Alternatives Program APDA - ransportation Alternatives Program - Direct Attributable IGER DISC - IGER Discretionary Grants (3) WORK YPE (ACIVIY) A - Acquisition AD - Administrative C - Construction CP - Capital I - Impementation O - Operations Oc - OPS Funded Capital PE - Preliminary Engineering PL - Planning / Design R - Right-of-Way
16 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY AVIAION PROJECS AV-5738 SMIH REYNOLDS AIRPOR (IN) ACQUIRE LAND AND CLEAR ERRAIN OBSRUCIONS EAS OF RUNWAY O 2100 CONSRUCION FORSYH DRAIN AND GRADE MAERIAL IN PLACE. CONSRUCION L BICYCLE AND PEDESRIAN PROJECS EB-5722 NC 67 BOLON SREE O LOCKLAND AVENUE IN WINSON-SALEM. CONSRUC SIDEWALK PRELIMINARY ENGINEERING AP (SILAS CREEK PARKWAY) ON NORH SIDE O CONNEC EXISING SECIONS. PRELIMINARY ENGINEERING L FORSYH CONSRUCION AP CONSRUCION L U-4741 BICYCLE, PEDESRIAN, AND RANSPORAION ALERNAIVES CONSRUCION APDA DAVIDSON PROGRAM (AP)-ELIGIBLE PROJECS IN HE WINSON-SALEM URBAN AREA DAVIE MEROPOLIAN PLANNING ORGANIZAION (MPO) AREA.. FORSYH PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY OHERS - ; SOKES APDA FUNDING REFLECS UNPROGRAMMED BALANCE - PROGRAMMING SUBJEC O MPO APPROVAL U-5539 SREESCAPE IMPROVEMEN PROJECS IN HE WINSON-SALEM URBAN AREA PRELIMINARY ENGINEERING SPDA DAVIDSON MEROPOLIAN PLANNING ORGANIZAION (MPO) AREA. PRELIMINARY ENGINEERING L DAVIE RIGH-OF-WAY SPDA FORSYH RIGH-OF-WAY L SOKES CONSRUCION SPDA CONSRUCION L PRELIMINARY ENGINEERING SPDA PRELIMINARY ENGINEERING L RIGH-OF-WAY SPDA RIGH-OF-WAY L CONSRUCION SPDA CONSRUCION L PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY OHERS - EB-4020 BRUSHY FORK GREENWAY WAERWORKS ROAD O REYNOLDS PARK ROAD IN WINSON-SALEM. PAVED RN FORSYH MULIUSE RAIL. PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY CIY OF WINSON-SALEM A WAERWORKS ROAD O OLD GREENSBORO ROAD COMPLEE B OLD GREENSBORO ROAD O LOWERY SREE COMPLEE C LOWERY SREE O REYNOLDS PARK ROAD PLANNING / DESIGN RN EB-5523 MUDDY CREEK / CEDAR RAIL CEDAR RAIL O MUDDY CREEK GREENWAY IN WINSON-SALEM RN CONNECION CONSRUC MULIUSE PAH AND PEDESRIAN BRIDGE OVER MUDDY CREEK. FORSYH PLANNING / DESIGN / RIGH OF WAY / CONSRUCION BY CIY OF WINSON-SALEM Metropolitan ransportation Improvement Program Non Highway Program Page 1
17 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY PUBLIC RANSPORAION PROJECS A-6522 PIEDMON AUHORIY PURCHASE VANS SPDA, L HF FOR REGIONAL RANS. FORSYH GUILFORD G-5226 PIEDMON AUHORIY PREVENIVE MAINENANCE SPDA HF FOR REGIONAL RANS. FORSYH GUILFORD M-5135 PIEDMON AUHORIY OPERAING ASSISANCE OPERAIONS JARC HF FOR REGIONAL RANS. OPERAIONS L FORSYH S-5115 PIEDMON AUHORIY SAFEY & SECURIY - MIN. 1% SE ASIDE CAPIAL FUZ HF FOR REGIONAL RANS. FORSYH GUILFORD Q-6170 OWN OF KERNERSVILLE OPERAING ASSISANCE -PURCHASE OF SERVICE FEPD, L, S HF FORSYH A-5127 WINSON SALEM RANSI REPLACEMEN BUSES - LARGE AND SMALL CMAQ, L HF FORSYH A-4795A WINSON SALEM RANSI REPLACEMEN BUS CAPIAL SPDA HF FORSYH CAPIAL L CMAQ, FBUS, FUZ G-4805 WINSON SALEM RANSI ROUINE CAPIAL - BUS SOP SHELERS, BENCHES, SHOP EQUIPMEN, SPARE CAPIAL FUZ HF FORSYH PARS, ENGINES, FAREBOX, SERVICE VEHICLES, EC CAPIAL L CAPIAL FUZ CAPIAL L CAPIAL SPDA CAPIAL L G-5241 WINSON SALEM RANSI PREVENIVE MAINENANCE CAPIAL FUZ HF FORSYH CAPIAL L M-5309 WINSON SALEM RANSI FA SECION 5307 WINSON-SALEM URBANIZED AREA SE ASIDE FOR JOB OPERAIONS JARC HF FORSYH ACCESS REVERSE COMMUE (JARC) PROJECS OPERAIONS L O-5126 WINSON SALEM RANSI OPERAING ASSISANCE OPERAIONS FUZ HF FORSYH OPERAIONS L OPERAIONS SMAP Metropolitan ransportation Improvement Program Non Highway Program Page 2
18 WINSON-SALEM URBAN AREA MEROPOLIAN PLANNING ORGANIZAION RANSPORAION IMPROVEMEN PROGRAM COS ID ROUE DISANCE OAL PRIOR YEARS WORK YPE FUNDING ESIMAES SCHEDULE NUMBER CIY / COUNY DESCRIPION (MILES) ES. COS COS (HOU) SOURCE PER FY (HOUS.) FY P-5105 WINSON SALEM RANSI PLANNING ASSISANCE CAPIAL FMPL HF FORSYH CAPIAL L CAPIAL S CAPIAL FMPL CAPIAL L CAPIAL S Q-6782 WINSON SALEM RANSI FA SECION 5310 WINSON-SALEM ALLOCAION SE ASIDE FOR COMPE OPERAIONS FEPD HF FORSYH GRAN O ELIGIBLE AGENCIES O ASSIS IN MEEING HE RANSPORAION NEEDS OPERAIONS L OF LOW INCOME, DISABLED, AND ELDERLY POPULAIONS OPERAIONS FEPD OPERAIONS L OPERAIONS FEPD OPERAIONS L OPERAIONS FEPD OPERAIONS L Q-7001 WINSON SALEM RANSI ENHANCED MOBILIY OF SENIORS AND INIDUALS WIH DISABILIIES (SECION ADMINISRAIVE FEPD HF FORSYH 5310) ADMINISRAIVE ADMINISRAIVE FEPD S-5120 WINSON SALEM RANSI SAFEY & SECURIY - MIN. 1% SE ASIDE CAPIAL FUZ HF FORSYH CAPIAL L CAPIAL FUZ CAPIAL L CAPIAL SMAP D-4743 WINSON-SALEM RESORE FORMER PASSENGER RAIL SAION FOR USE AS A REGIONAL / LOCAL CONSRUCION FED INERMODAL RANSPORAION BUS ERMINAL AND FUURE RAIL SAION. CONSRUCION FACILIY CONSRUCION L FORSYH PASSENGER RAIL P-4405 PRIVAE CROSSING SAFEY INIIAIVE O CLOSE OR ENHANCE PROECION A CONSRUCION SHSR RN ALAMANCE RAILROAD CROSSINGS BEWEEN RALEIGH AND CHARLOE. CONSRUCION SHSR CABARRUS CONSRUCION O DAVIDSON DURHAM GUILFORD MECKLENBURG ORANGE ROWAN WAKE Metropolitan ransportation Improvement Program Non Highway Program Page 3
19 Winston-Salem Urban Area MPO MIP Amendments Additions, Modifications and Deletions June 2015 to November 2015 June 2015 ADDIION Revisions to the SIP and SIP Highway I-5767 I-74/US 311, I-40 to Guilford County Line, Forsyth County. Pavement Rehabilitation. FY 2016 SI Project added to FY SIP to allow engineering to commence. Construction FFY 16 - $2,377,000 (NHPIM) Construction FFY 17 - $2,377,000 (NHPIM) otal Cost $4,754,000 I-5794 I-40, 0.3 miles west of NC 801 in Davie County to Harper Road (SR 1101) in Forsyth County. Pavement Rehabilitation. FY 2016 SI Project added to FY SIP to allow engineering to commence. Construction FFY 16 - $1,505,000 (NHPIM) otal Cost $1,505,000 MODIFICAIONS Congestion Mitigation Air Quality (CMAQ) C-5620 Business-40/US 421 Multi-Use Path (U-2827) Construct a 12 foot wide multi-use path within the Business 40 right-of-way from Lockland Avenue to West First Street in Forsyth County. Construction FFY 16 - $1,493,541 (CMAQ) Construction FFY 16 - $ 373,385 (L) otal Cost $1,866,926 Piedmont Authority for Regional ransportation (PAR) Heavy Duty Bus Replacement Purchase a replacement heavy duty diesel bus with higher capacity and higher engine emission standards as directed by EPA. Bus Purchase FFY 16 - $ 372,000 (CMAQ flexed to FA) Bus Purchase FFY 16 - $ 93,000 (L) otal Cost $ 465,000 Non-Highway - Public ransportation I. D. No. System Description Funding FFY A-5180 Winston-Salem ransit Authority Purchase of twelve (12) small, low-floor, light FBUS $ 1,296, duty gasoline engine, expansion buses for ADA S $ 0 para-transit services L $ 228,784 OAL $ 1,525,227 Winston Salem Urban Area MPO MIP and SIP Amendments and Modifications Page 1
20 September 2015 Revisions to the SIP and SIP MODIFICAIONS Non-Highway U-4741 OI Wake Forest Innovation Quarter Rail with rail he project consists of approximately 2,600 ft. of 10 ft. wide greenway trial with concrete shoulders from Martin Luther King Jr. Drive to just south of hird Street in Winston Salem including clearing, grading, drainage, paving, pedestrian bridge, pedestrian scale lighting, and pedestrian and bicycle amenities. he City of Winston Salem would like to exchange $1,120,000 in SP DA funds with available AP DA funds. A funding source exchange would allow the MPO to obligate a significant portion of its AP DA funds before they expire in September, September 17, 2015 $2,080,000 SP DA $520,000 local match $2,600,000 total September 17, 2015 $1,120,000 AP DA $280,000 local match $1,400,000 total September 17, 2015 $1,200,000 SP EB $300,000 state match $1,500,000 total $5,500,000 total November 2015 Revisions to the SIP and SIP MODIFICAIONS Non-Highway hese modifications include the allocation of existing SP DA and AP funds to work type line items per fiscal year for the following MIP projects: U-4741 Bicycle, Pedestrian and ransportation Alternatives Program Projects Fund Source Work ype Fiscal Year Allocations U-4742 Intersection Improvement Projects Fund Source Work ype Fiscal Year Allocations Winston Salem Urban Area MPO MIP and SIP Amendments and Modifications Page 2
21 U-5022 Winston-Salem Urban Area MPO SPDA Funds Reserved for Future Programming Fund Work Fiscal Year Allocations Source ype SPDA C U-5539 A Martin Luther King Jr. Drive Streetscape Improvements (Previously Streetscape Improvements) he project includes the installation of streetscape enhancements on Martin Luther King Jr. Drive between US 52 and Business 40 to include landscaping/trees, pedestrian crosswalks, fencing, signage, enhanced lighting, Concrete median stain treatment and public art. Fund Source Work ype Fiscal Year Allocations EB-4020 C Brushy Fork Greenway Lowery Street to Reynolds Park Road Fund Source Work ype Fiscal Year Allocations EB-5523 Muddy Creek Greenway - Cedar rail Connection Fund Source Work ype Fiscal Year Allocations Winston Salem Urban Area MPO MIP and SIP Amendments and Modifications Page 3
22 2015 Surface ransportation Program - Direct Attributable (SP-DA) Projects S U R R Y U-4741OJ S O K E S R O C K I N G H A M Legend Project Category Intersection Improvement Greenway Improvement Highway Safety Greenway Sidewalk Sidewalk (AP) Streetscape Base Map Freeway/Expressway/Boulevard Major horoughfare Minor horoughfare Proposed Freeway/Expressway/Boulevard Proposed Major horoughfare Proposed Minor horoughfare Counties Yadkin River Metropolitan Area Boundary Y A D K I N U-4741OH U-4741OL U-5536 EB-5523 U-4742KC U-4742NB U-4741OF U-4741OG U-4741PE U-4741PD U-4742MA F O R S Y H U-4741OI U-5539A EB-4020C U-4742NC U U-4741LD U-4741OK U-4741NB U-4742I W-5510 U-4741H G U I L F O R D Map Date: July 9, 2015 D A V I E D A V I D S O N Produced by: Winston-Salem Urban Area Metropolitan Planning Organization 0 ½ Miles R A N D O L P H
23 Winston-Salem Urban Area Metropolitan Planning Organization 2040 Fiscally Constrained Metropolitan ransportation Plan 2015 Surface ransportation Program - Direct Attributable (SP-DA) Projects SIP Project Project Description Project Number Name and Limits Category Jurisdiction U-4742 MA Roundabout he design and construction of a roundabout near the west side of the Kathryn Crosby Bridge on US Hwy 158 at the westbound intersection with wins Way and the eastbound intersection with Bermuda Run Drive Intersection Improvement Bermuda Run U-4741 PD he project consists of approximately 314 linear feet of 5 foot sidewalk along Middlebrook Dr and Middlebrook Drive & Hwy 158 the installation of two crosswalks (the sidewalk across and ADA accessible ramps at Middlebrook Crosswalk/Sidewalk Project Dr and Hwy 158) Bicycle & Pedestrian Clemmons U-4741 PE W-5510 Highway 158 Sidewalk and Yadkin River Greenway, Phase I South Main/Old Winston Road Intersection U-4741 NB Kerner Mill Creek Greenway U-4741 H Century Place Boulevard Sidewalk Construction of a sidewalk along Hwy 158 from Middlebrook Dr to Asbury Place (approximately 3500 linear feet) and construction of the connecting Yadkin River Greenway, Phase I (approximately 9200 linear feet) Improvements on SR 4315 (South Main St) from I-40 to 500 feet past Cherry St and SR 2648 (Old Winston Rd) from South Main St to 500 feet past Cherry St in Kernersville to include: installation of a raised median; relocation of signalized ntersection on Old Winston Rd; construction of dual left turn lanes; installation of a roundabout on Old Winston Rd at Cherry St; and addition of a lane on South Main St Construction of the Kerners Mill Creek Greenway from Oakhurst St to Kilburn Way Lane with neighborhood connectors and a small parking lot off of Oakhurst St., programmed 1,600 linear feet of 5' sidewalk from South Main St to the end of the existing sidewalk on both sides of the st Bicycle & Pedestrian Small Roadway Improvement Bicycle & Pedestrian Bicycle & Pedestrian Clemmons Kernersville Kernersville Kernersville U-4742 I South Main St South Main Street and Old Winston road turn Lanes Intersection Improvement Kernersville U-5536 Great Wagon Road - PE Only U-4742 KC Lewisville Roundabout U-4741 OL Lewisville Vienna Road Sidewalk Developing construction documents for approximately 2500 linear feet of new road to be known as the Great Wagon Rd (GWR) in Lewisville. he design will include an intersecting side st and a roundabout at the intersection of the GWR and Shallowford Rd. he project will also identify and survey a corridor for the construction of the northern section of the GWR Construction of a single-lane roundabout to replace a "" intersection located at the intersection of Shallowford and Williams Rd he construction of approximately 1100 linear feet of sidewalk from ullyries Lane to Riverwood Dr on the west side of Lewisville-Vienna Rd Small Roadway Improvement Intersection Improvement Bicycle & Pedestrian U-4742 NB Country Club Road Right urn lane on Country Club at Medowlark Drive and/or extend left turn lane Intersection Improvement Winston-Salem U-4742 NC Hickory ree Road Install left turn lane on SR 1508 Hickory ree Rd at Mendehall Road Intersection Improvement Winston-Salem Lewisville Lewisville Lewisville 2040 Metropolitan ransportation Plan Surface ransportation Program - Direct Attributable (SP-DA) Project List
24 Winston-Salem Urban Area Metropolitan Planning Organization 2040 Fiscally Constrained Metropolitan ransportation Plan 2015 Surface ransportation Program - Direct Attributable (SP-DA) Projects SIP Project Project Description Project Number Name and Limits Category Jurisdiction U-4741 OJ NC 65 West Sidewalk U NC66 & US158 Intersection Improvements Construction of sidewalks, curbing, and drainage on NC 65 West. South side from runningbrook Lane to Norvasa St and on the north side from Forum Parkway to the McDonald's driveway. A crosswalk at Forum Parkway at the signal. otal length is approx 3,300 linear feet Widen a portion of NC highway 66 from the intersection of US158 to the existing 3-lane curb and gutter section of Bellaire Circle/Whitehall Village Lane Bicycle & Pedestrian Intersection Improvement Rural Hall Walkertown U-4741 LD Darrow Road Sidewalk Approximately 3200 If of concrete sidewalk (5-foot width) along with curb and gutter on Darrow Rd (SR 2385) from Old Hollow Rd (NC Highway 66) to the Walkertown Community Park Entrance Installation of streetscape enhancements on Martin Luther King Jr Dr between US 52 and U-5539 A MLK Streetscape Business 40 to include landscaping/trees, pedestrian crosswalks, fencing, signage, enhanced lighting, concrete median stain treatment and public art Brushy Fork Creek Greenway- he preliminary engineering and construction of a 10-foot wide paved multi-use trail from Lowery EB-4020 C Lowery Street to Reynolds Park St to Reynolds Park Rd, including some right-of-way acquisition Road A 3,250 feet long, 10 feet wide paved surface greenway, with grassed shoulders, connection from EB-5523 Cedar rail to Muddy Creek Cedar rail to the existing Muddy Creek Greenway U-4741 OK Piedmont Regional Greenway Construction of approximately 6,500 lf of the Piedmont Regional Greenway along Kerners Mills Creek from Linville Rd to Hastings Hill Rd to include a pedestrian culvert under Hastings Hill Rd U-4741 OI Piedmont riad Research Park Rail with rail U-4741 OH Muddy Creek Greenway railhead U-4741 OG Lantern Ridge Greenway Connector U-4741 OF Kirklees Sidewalk Approximately 2,600 ft. of 10 ft. wide greenway trial with concrete shoulders from Martin Luther King Jr. Dr to just south of hird St in Winston-Salem including clearing, grading, drainage, paving, pedestrian bridge, pedestrian scale lighting, and pedestrian and bicycle amenities Construction of a greenway trailhead parking lot, with approximately 40 to 60 spaces, off of Robinhood Rd and construction of approximately 200 linear feet of greenway connecting to Muddy Creek Greenway that includes a pedestrian bridge across Muddy Creek Construction of approximately 800 linear feet of 10-foot wide greenway from Lantern Ridge Dr to Muddy Creek Greenway to include construction of a pedestrian bridge across Muddy Creek Construction of new sidewalk on the south side of Kirklees Rd from Silas Creek Parkway to Friar uck Rd; construction of new sidewalk on the west side Hertford Rd from existing sidewalk at Doncaster Rd to Chester Rd; construction of new sidewalk on Chester Rd from Hertford Rd to Peace Haven Rd; installation of high visibility crosswalks at the intersections of Kirklees and Archer Rd, Kirklees Rd and Hertford Rd, Doncaster Rd and Hertford Rd, and Chester Rd and Hertford Bicycle & Pedestrian Small Roadway Improvement Bicycle & Pedestrian Bicycle & Pedestrian Bicycle & Pedestrian Bicycle & Pedestrian Bicycle & Pedestrian Bicycle & Pedestrian Bicycle & Pedestrian Walkertown Winston-Salem Winston-Salem Winston-Salem Winston-Salem Winston-Salem Winston-Salem Winston-Salem Winston-Salem 2040 Metropolitan ransportation Plan Surface ransportation Program - Direct Attributable (SP-DA) Project List
COMPLETED PLANNING DOCUMENTS
Winston-Salem Urban Area METROPOLITAN PLANNING ORGANIZATION COMPLETED PLANNING DOCUMENTS FY 2012-2018 Metropolitan Transportation Improvement Program (MTIP) Adopted July 21, 2011 FY 2012-2018 MTIP Amendments
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationPrioritization 4.0: Identification of Projects for Evaluation by NCDOT
Prioritization 4.0: Identification of s for Evaluation by NCDOT Background The original Transportation Reform was initiated under Executive Order No. 2 in 200. It mandates a professional approval process
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationSTATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
SAE RANSPORAION IMPROVEMEN PROGRAM (SIP) WINSON-SAEM URBAN AREA MEROPOIAN PANNING ORGANIZAION 2015 2016-2025 JUNE 2015 North arolina Department of ransportation ISION 00 OUNY ROUE/IY (MIES) OA PROJE OS
More information2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018
Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)
More informationDRAFT STIP PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION
Division 11 DRAFT STIP 2015-2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY Transition State Transportation Improvement Program (Construction Schedules) Developmental
More informationBINGHAMTON METROPOLITAN TRANSPORTATION STUDY
BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments
More informationTransportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1
Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network
More informationTSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0
TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationWilliamson County Projects
Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationFY Regional Surface Transportation Program (RSTP) Allocations *
FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationPublic Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationLeadership NC. November 8, 2018
v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the
More informationDixie Transportation Planning Office
A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationFFY Transportation Improvement Program (TIP) Development
FFY 2016-2019 Transportation Improvement Program (TIP) Development MAY 18, 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION Highway Funding Regional s Year STP HSIP CMAQ FFY 2016 2019 TOTAL Regional with
More informationMUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1
MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationNASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER
WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air
More informationWICHITA AREA METROPOLITAN PLANNING ORGANIZATION
WICHITA AREA METROPOLITAN PLANNING ORGANIZATION March 18, Stephanie Watts Bureau of Transportation Planning Kansas Department of Transportation 700 S.W. Harrison Street Topeka, KS 66603 3754 Dear Ms. Watts:
More informationAnderson Area Transportation Study ANATS Transportation Improvement Plan FY
Anderson Area Transportation Study ANATS Transportation Improvement Plan FY 2017-2022 www.cityofandersonsc.com Table of Contents Introduction 1 Process 2 Products 3 Funding 4 Certification 6 Financial
More informationDIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION
DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara
More informationMarch 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming
COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What
More informationPUBLIC TRANSPORTATION
PUBLIC TRANSPORTATION PROJECT TITLE U-MED DISTRICT MULTI-MODAL IMPROVEMENTS- PHASE II Transit Vehicles and Upgrades MUNICIPALITY OF ANCHORAGE Capital Improvement Program PROJECT LIST BY DEPARTMENT Public
More informationMid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018
Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT
More informationDRAFT STIP PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION
Division 1 DRAFT STIP 2015-2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY Transition State Transportation Improvement Program (Construction Schedules) Developmental
More informationTriangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority
Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority Strategic Transportation Investments Prioritization Mark Ahrendsen Durham-Chapel Hill-Carrboro MPO Alex Rickard
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationWorkshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion
Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide
More informationWAKE TRANSIT PLAN Summer 2018
WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.
More informationRecommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017
Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationDRAFT STIP PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION
Division 2 DRAFT STIP 2015-2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY Transition State Transportation Improvement Program (Construction Schedules) Developmental
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning
More informationTRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015 Overview Transportation Alternatives Program (TAP) overview MPO TAP Scoring
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationUnified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report
Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations
More informationChicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015
Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In
More informationBuilding our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013
Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,
More informationCharlotte-Mecklenburg Region Rapid Transit and Land-Use Integration
Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationDelaware County Engineer s Office
Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying
More informationMIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS
TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express
More informationCity of Pacific Grove
Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 ATLANTA DISTRICT March 06 Out of Cycle Revisions 2009 Quarterly Revisions 3-03-2009 FY 2008-2011 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationSFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000
SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST
More informationresidents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by
2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there
More informationThe Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit
The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,
More informationCity of University Place
City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationChallenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007
EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationUS 70 Corridor Planning for the Future
New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session
More informationTransportation Improvement Program
FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone:
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationPoint A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017
Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationCity of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County
Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE
More informationGTA West Corridor Planning and EA Study Stage 1
GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:
More informationCITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:
435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey
More informationAgenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan
Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.
More informationSC Highway 41 Existing Conditions
SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next
More informationChapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle
Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP
More informationCity of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt
Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program
More informationMajor Widening/New Roadway
Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information
More informationTransportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.
Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,
More informationRecommended Transportation. Capital Improvement Program
Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More informationTransNet Dollars Keep San Diego Moving
TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationSummary of the Alcoa Highway Redevelopment Project
Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)
More information5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES
5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More information2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016
2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)
More informationTRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA
TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)
More informationThe Eastern Connector Study November, 2007 planning for the future
The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationSales and Use Transportation Tax Implementation Plan
Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,
More informationCorridor Sketch Summary
Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins
More informationMetropolitan Council Transit Capital Improvement Plan. September 23, 2009
1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationCONCEPTUAL ENGINEERING REPORT
CONCEPTUAL ENGINEERING REPORT May 2013 CONTENTS 1 Introduction... 1 1.1 Project Background... 1 1.2 Purpose of Document... 1 2 Design Principles... 2 2.1 Track / Guideway Element... 2 2.2 Roadway... 3
More informationCAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS
9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000
More information