Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018
|
|
- Diane Edwina Small
- 5 years ago
- Views:
Transcription
1 Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Amarpal Matharu, PE, MBA Traffic Operation Manager, Illinois Tollway Michel Lavigne, P.Eng, MBA ITS Director, Illinois Tollway General Engineering Consultant Ardmore Roderick
2 Agenda ITS Infrastructure ITS Preventive Maintenance Program Cost Benefit Analysis Transitioning to an Accelerated ITS Design Phase
3 ITS Infrastructure Device type additions Total Percentage Increase Closed-circuit television (CCTV) 1, ,111 10% Dynamic message signs (DMS) % Lane-use control signs (LCS) Vehicle detection systems (VDS) % Roadway weather information stations (RWIS) % Weigh-in-motion (WIM) % Flashing beacons % Total devices 1, ,990 37% 3
4 ITS Preventive Maintenance History : Reliability-centered maintenance Was repair when needed In 2015 Started PM on DMS as pilot 2014: ITS maintenance contractor (Meade Electric) 2017: Parson to manage ITS maintenance contractor 2018: Contract for ITS PM on CCTV, MVDS and DMS as pilot
5 Preventive Maintenance: CCTV Preventive Maintenance includes Inspection of the pole structure Clean camera dome Inspect dome and housing Report any anomaly Results Older cameras showed water and bugs intrusion PM enabled better planning and maintenance Reduces response time and cost to each issue
6 Preventive Maintenance: VDS Vehicle detection systems types MVDS In-pavement VDS Bluetooth Preventive maintenance includes MVDS: Manual vehicle count per lane and travel speed compared to MVDS data In-pavement VDS: Monitor battery life of wireless sensors Results Increases reliability and accuracy Provides accurate travel time
7 Preventive Maintenance: DMS Visual inspection of DMS site and display; replace parts if needed Full diagnostic of DMS sign through controller Inspect and clean DMS sign and cabinet Testing and maintenance of batteries Verify power supply for any sign of failure Repair and/or replacement of components
8 Preventive Maintenance DMS Issues & Preventive Maintenance by Year Number of Tickets for Issues or Issue Issue (39) (39) (46) (56) (64) (Number of DMS on the Tollway system for each year)
9 2018 Preventive Maintenance Contract - Pilot Conducted PM on 196 ITS Devices 140 CCTV: 19.3% (27) required replacement 53 MVDS: 28.3% (15) were out of alignment 3 Type 1 DMS : After 1 year in service they required replacement of air filter, due to high concentration dust from road construction
10 ITS Maintenance Costs by Device ITS device replacement cost at the end of its lifecycle Portion of various additional maintenance costs: ITS maintenance staff (Tollway and consultant) Material and labor for ITS device replacement
11 ITS Maintenance Costs Analysis 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% Pole-mounted CCTV 19.9% Tower-mounted CCTV (200') 3.1% Microwave Vehicle Detection System 10.9% In-Pavement Vehicle Detection System Bluetooth Vehicle Detection System 0.2% 0.9% Walk-in Dynamic Message Sign 13.4% Front Access Dynamic Message Sign 1.6% Roadway Weather Information System 3.4% Weigh-in-Motion 6.1% ITS Enclosure (cabinet) 19.5% Fixed Security Camera 4.5% Lane Control System (I-90) 16.5%
12 Benefits of ITS Preventive Maintenance Increases reliability and functional lifespan of all ITS devices Reduces downtime and cost of repair for critical equipment Reduces long-term replacement costs Maximum benefits of ITS equipment to support Traffic Operations Center
13 ITS Benefits ITS for Benefits Illinois for Tollway Illinois Tollway Estimated benefit-to-cost ratios: by U.S. DOT ITS Joint Program Office ITS device Lowest industry-estimated benefit-to-cost ratios CCTV 7.6 : 1 Roadway weather information System 1.8 : 1 Weigh-in-motion 6.0 : 1 Vehicle-detection systems 4.5 : 1 Dynamic message sign 2.0 : 1
14 Summary for Preventive Maintenance Program Reduces maintenance frequency and costs; PM outside peak travel hours Increases the lifespan of each ITS device and long-term replacement costs Improvements in operational performance Enhance reliability of the overall system
15 Accelerated ITS Design Approach 15
16 Accelerated Design ITS Systemwide Program Opportunity to accelerate design work Identify ITS sites into typical sites and non-typical sites Benefits of methodology 16
17 Design consists of typical sites and non-typical sites 9 categories of typical sites: C1 CCTV on fiber and AC (replace CCTV) C2 CCTV and MVDS with fiber and AC (replace device) M1 MVDS on cellular and solar power (replace MVDS only) M2 MVDS on cellular and solar (remove and replace on CCTV pole) M3 MVDS on fiber and AC (replace MVDS only) M4 MVDS on cellular and solar (convert site to fiber and AC) P1 Ramp plaza camera connected to data cabinet P2 Ramp plaza camera connected to plaza building R1 RWIS on AC and cellular
18 Non-typical site design differences The work for non-typical locations is shown on site-specific plan sheets Site-specific sheets detail information regarding power runs, communications runs and barrier warrant analysis Schedule of quantities table is created on each site-specific plan sheet Site-specific locations needed more analysis to locate each new pole
19 SITE ID TYPICAL SITE PLAN TYPICAL SITE DETAIL ROUTE M.P. DIRECTION LATITUDE LONGITUDE REMOVE ETHERNET RELAY INSTALL ETHERNET RELAY INSTALL ETHERNET SWITCH REMOVE & REPLACE SOLAR GENERATOR BATTERY REMOVE AND REPLACE CONDUIT BODY ITS CABINET LABELS CLOSED CIRCUIT TELEVISION CAMERA, ITS ASSEMBLY REMOVE CCTV CAMERA, STRUCTURE MOUNTED REMOVE CCTV CAMERA, POLE MOUNTED MICROWAVE VEHICLE DETECTION SYSTEM (MVDS), ITS ASSEMBLY REMOVE MVDS CONCRETE SERVICE PAD, TYPE A FURNISH COMMUNICATIONS SYSTEM UPGRADE Site Quantity Table (SQT) EXISTING ITS ENCLOSURE MODIFICATIONS CCTV CAMERA WORK MVDS WORK SERVICE PAD WORK PLAZA WORK JT JT JT JT JT JT JT JT JT JT JT JT JT SB-28 C1 C1 I SB 41 32'19.45"N 87 57'45.32"W SB-27 C1 C1 I SB 41 32'37.90"N 87 58'4.21"W SB-26 M1 M1 I SB 41 32'44.56"N 87 58'14.04"W x PL 101 I SB-25 P1 P1 I SB 41 32'57.34"N 87 58'48.49"W SB-24 C1 C1 I SB 41 32'57.73"N 87 58'35.18"W NB-01 M1 M1 I NB 41 33'18.36"N 87 59'1.87"W NB-02 C3* C3* I NB SEE SHEET ITS-046 FOR QUANTITIES AND SITE PLAN 355-NB-03 C1 C1 I NB 41 34'5.50"N 87 59'36.20"W SB-23 M1 M1 I SB 41 34'4.63"N 87 59'38.87"W PL 99 I SB-22 C1 C1 I SB 41 34'57.17"N 88 0'12.31"W NB-04 M1 M1 I NB 41 34'58.84"N 88 0'10.18"W SB-21 C3 * C3 * I SB SEE SHEET ITS-047 FOR QUANTITIES AND SITE PLAN 355-SB-20 M1 M1 I SB 41 35'25.00"N 88 0'29.90"W NB-05 C1 C1 I NB 41 35'30.20"N 88 0'29.81"W SB-19 C1 C1 I SB 41 35'33.11"N 88 0'32.74"W SB-18 C1 C1 I SB 41 35'56.28"N 88 0'41.83"W NB-06 P1 P1 I NB 41 36'1.31"N 88 0'38.48"W SB-17 P2 P2 I SB 41 36'1.55"N 88 0'43.16"W x 355-SB-16 M1 M1 I SB 41 36'17.85"N 88 0'45.97"W SB-15 C1 C1 I SB 41 36'52.26"N 88 0'50.47"W NB-07 M1 M1 I NB 41 37'4.95"N 88 0'44.56"W NB-08 M1 M1 I NB 41 37'54.92"N 88 0'39.41"W SB-14 C1 C1 I SB 41 37'55.69"N 88 0'42.15"W SB-13 P2 P2 I SB 41 38'8.19"N 88 0'47.05"W x 355-NB-09 P1 P1 I NB 41 38'11.85"N 88 0'41.15"W NB-10 C2* C2* I NB 355-SB-12 C2* C2* I SB SEE SHEET ITS-048 FOR QUANTITIES AND SITE PLAN SEE SHEET ITS-048 FOR QUANTITIES AND SITE PLAN
20 20
21 Benefits of Methodology Site details are shown and reported on SQT Reduce number of drawings and RFIs Reduction in overall Pay Items Simplified construction walk-throughs
22 ITS. Benefits for Illinois Tollway Sources for ITS benefit analysis: Federal Highway Administration Tool for Operations Benefit/Cost Analysis (FHWA TOPS-BC) U.S. Department of Transportation ITS Joint Program Office
23 Questions 23
Transportation Highway Engineering Conference February 24, 2015
Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013
MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross
More informationThe Evolution of Transportation Technology in an Increasingly Smart Society. Presented by: Matthew J. Schiemer, PE September 12, 2017
The Evolution of Transportation Technology in an Increasingly Smart Society Presented by: Matthew J. Schiemer, PE September 12, 2017 Traffic Signal Systems 1914 to Present First electric traffic signal
More informationCommercial Vehicle Pre-Clearance and Compliance Best Practices. RANDY HANSON International Road Dynamics
Commercial Vehicle Pre-Clearance and Compliance Best Practices RANDY HANSON International Road Dynamics Commercial Vehicle Compliance Best Practices Agenda Weigh Station Configurations Mainline, Ramp,
More informationITS INITIATIVES. Charlie Farnham ITS Branch Manager, TxDOT-TRF October 16, Transportation Short Course
ITS INITIATIVES Charlie Farnham ITS Branch Manager, TxDOT-TRF October 16, 2013 2013 Transportation Short Course Table of Contents 1 2 3 4 5 6 7 Lonestar ITS Data Dissemination Systems Support Initiatives
More informationSpecial Specification 7193 Traffic Management Maintenance
Special Specification Traffic Management Maintenance 1. DESCRIPTION Maintain, furnish, install, modify, repair, replace, or remove components of a Traffic Management System. For the purpose of this contract
More informationTxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE. ITS Texas 2016
TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE ITS Texas 2016 November 10, 2016 TxDOT- Traffic Operations Division November 10, 2016 Performance Measures (Lonestar ATMS) Lonestar ATMS Upgraded to Support Incident
More informationTRAF-TEX, INC. LABOR BID 12/10/08
TRAF-TEX, INC. TXDOT CMBL LABOR L-1 BARRICADES,SIGNS AND TRAFFIC HANDLING FOR MAIN LANES OF FRWY CYC L-2 BARRICADES,SIGNS AND TRAFFIC HANDLING FOR SERVICE ROADS CYC L-3 BARRICADES,SIGNS AND TRAFFIC HANDLING
More informationWIM #29 was operational for the entire month of October Volume was computed using all monthly data.
OCTOBER 2015 WIM Site Location WIM #29 is located on US 53 near Cotton in St Louis county. System Operation WIM #29 was operational for the entire month of October 2015. Volume was computed using all monthly
More informationNATIONAL COMPANY FOR ROADS INFRASTRUCTURE ADMINISTRATION. ITS Romania Congress, 3-4 November 2016, Bucharest, Romania
NATIONAL COMPANY FOR ROADS INFRASTRUCTURE ADMINISTRATION Summary ITS start in Romania; Implemented Projects; A1 Project description; Implementation; Monitoring Services; Information Services; Communication
More informationNorthwest Region ITS Benefit/Cost Analysis Final Report
Northwest Region ITS Benefit/Cost Analysis Final Report prepared for Wisconsin Department of Transportation prepared by SRF Consulting Group, Inc. in conjunction with Cambridge Systematics, Inc. WISCONSIN
More informationNCSL. Surface Transportation Reauthorization Working Group Miller Nash Conference Room 34 th Floor U.S. Bancorp Building Friday, June 13, 2008
NCSL Surface Transportation Reauthorization Working Group Miller Nash Conference Room 34 th Floor U.S. Bancorp Building Friday, June 13, 2008 Oregon Green Light CVO Project OREGON DEPARTMENT OF TRANSPORTATION
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More information2016 Traffic Signal System Performance Metrics Update Kumar Neppalli, Traffic Engineering, Public Works John Richardson, Planning and Sustainability
2016 Traffic Signal System Performance Metrics Update Kumar Neppalli, Traffic Engineering, Public Works John Richardson, Planning and Sustainability Executive Summary: The purpose of this biennial report
More informationWIM #40 is located on US 52 near South St. Paul in Dakota county.
WIM Site Location WIM #40 is located on US 52 near South St. Paul in Dakota county. System Operation WIM #40 was operational for the entire month of November 2017. Volume was computed using all monthly
More informationWinter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015
Winter Maintenance on Provincial Highways District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Outline 1. Auditor General s Report 2. MTO Action Plan 3. Recent Winter Maintenance
More information6 Things to Consider when Selecting a Weigh Station Bypass System
6 Things to Consider when Selecting a Weigh Station Bypass System Moving truck freight from one point to another often comes with delays; including weather, road conditions, accidents, and potential enforcement
More informationDIVISION V SURFACINGS AND PAVEMENTS
36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness
More informationRecent Transportation Projects
Dr. Dazhi Sun Associate Professor Director of Texas Transportation Institute Regional Division Department of Civil & Architectural Engineering Texas A&M University-Kingsville 1 Recent Transportation Projects
More information2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT
2 VALUE PROPOSITION The purpose of the Value Proposition is to define a number of metrics or interesting facts that clearly demonstrate the value of the existing Xpress system to external audiences including
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More informationDevelopment of Weight-in-Motion Data Analysis Software
Development of Weight-in-Motion Data Analysis Software Rafiqul A. Tarefder and Md Amanul Hasan Abstract While volumetric data were sufficient for roadway design in the past, weight data are needed for
More informationWEIGH IN MOTION AND DIRECT ENFORCEMENT
WEIGH IN MOTION AND DIRECT ENFORCEMENT CrossWIM PRE-SELECTION AND ENFORCEMENT WEIGH-IN-MOTION CERTIFIED FOR DIRECT ENFORCEMENT Weigh-in-Motion and Direct Enforcement CrossWIM SIZE MEASUREMENT SENSOR LPR
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationWIM #48 is located on CSAH 5 near Storden in Cottonwood county.
WIM Site Location WIM #48 is located on CSAH 5 near Storden in Cottonwood county. System Operation WIM #48 was operational for the entire month of August 2017. Volume was computed using all monthly data.
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationWestern ND Meeting. February 19, 2014 Grant Levi, NDDOT Director
Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationWIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT
WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of
More informationSTREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR
CIP Title FINAL2:Layout 1 7/27/17 3:34 PM Page 6 STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221
More informationSECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS
SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16
17,810.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16-65.00 125 CONTRACT ID: 118802088 PROJECT: STP 2014(614)G CONTRACT: 05143227 AWARD AMOUNT: $600,782.63 PROJECTED AMOUNT: $632,782.63 ADJ. PROJECTED
More informationDynamic Hard Shoulder Running
Dynamic Hard Shoulder Running Lessons Learned from the US and UK Experience Ryan Gulick, PE David Kamnitzer 1 Overview What is Hard Shoulder Running? HSR in the US Washington State DOT Experience HSR in
More informationEasily monitor road usage
Easily monitor road usage Traffic data collection The key to a sustainably managed & well protected road infrastructure. KiTraffic Statistics system is easy and fast to install thanks to its pre-wired
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationRAILROAD PREEMPTION FORMS. Mark Johnson, P.E.
RAILROAD PREEMPTION FORMS Mark Johnson, P.E. October 12, 2016 The Basic Problem Vehicles stop on tracks Need to interconnect traffic signal with railroad cabinet 2 Preemption Process: ROW Transfer 1 st
More informationAutomated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune
Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune 2016 TRB Managed Lanes Conference May 5th, Session 6 Presentation Background Outline Metro ExpressLanes
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationV2V Advancements in the last 12 months. CAMP and related activities
V2V Advancements in the last 12 months CAMP and related activities Mike Shulman, Ford April 22, 2014 Connected Transportation Environment: Future Vision Mobility Safety Environment Global Gridlock 2 US:
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationLouisiana s s Work Zone Task Force Work Zone Improvements
Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana Asphalt Technology Conference Shreveport, Louisiana February 24, 2005 Charles Adams, P.E., PTOE Why Improve Work Zones? Number of Work
More informationEffectiveness of Median Cable Barriers and Rumble Strips
Effectiveness of Median Cable Barriers and Rumble Strips Chris Poole, Iowa Department of Transportation Peter Savolainen, Iowa State University Mid-Continent Transportation Research Symposium August 16,
More informationLaDOTD s s New Traffic Control Details
LaDOTD s s New Traffic Control Details Louisiana Pavement Conference Baton Rouge, Louisiana October 7, 2004 Charles Adams, P.E., PTOE Objectives Traffic Background Information What Drove the Department
More informationFY Capital Improvement Program Street Lighting
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 In-Fill and Repair and/or Replacement of Existing Systems FY 216-22 (74413) High Voltage Series Street Light
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY.
808.01 Description 808.02 Materials 808.03 Design Speed 808.04 Construction 808.05 Method of Measurement 808.06 Basis of Payment STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationBennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017
Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,
More informationDOCUMENTATION WORKBOOK FY 2017
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationSmart City/Smart Mobility Strategy. Hans Larsen, Fremont Public Works Director May 2, 2018
Smart City/Smart Mobility Strategy Hans Larsen, Fremont Public Works Director May 2, 2018 About Fremont 230,000 Population; 4 th Largest City in Bay Area About Fremont #1 Happiest Place to Live in America
More informationEnhancing a Vehicle Re-Identification Methodology based on WIM Data to Minimize the Need for Ground Truth Data
Enhancing a Vehicle Re-Identification Methodology based on WIM Data to Minimize the Need for Ground Truth Data Andrew P. Nichols, PhD, PE Director of ITS, Rahall Transportation Institute Associate Professor,
More informationAN The SmartSensor HD as an Automatic Traffic Recorder. Automatic Traffic Recorders
AN-0006 The SmartSensor HD as an Automatic Traffic Recorder The Wavetronix SmartSensor HD can be used as an automatic traffic recorder (ATR) in the process of gathering, storing and analyzing traffic data.
More informationAssignment 4:Rail Analysis and Stopping/Passing Distances
CEE 3604: Introduction to Transportation Engineering Fall 2011 Date Due: September 26, 2011 Assignment 4:Rail Analysis and Stopping/Passing Distances Instructor: Trani Problem 1 The basic resistance of
More informationBeyond ATC and ITS Standards. Edward Fok USDOT/FHWA - RESOURCE CENTER San Francisco
Beyond ATC and ITS Standards Edward Fok USDOT/FHWA - RESOURCE CENTER San Francisco May, 2014 Signal Control is only the beginning Connected Vehicles Automated Vehicles Infrastructure Data: Fully Connected
More informationConnected Vehicles for Safety
Connected Vehicles for Safety Shelley Row Director Intelligent Transportation Systems Joint Program Office Research and Innovative Technology Administration, USDOT The Problem Safety 32,788 highway deaths
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:
209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :
More informationUNDERSTANDING THE SIGNIFICANCE OF AXLE VERSUS LENGTH CLASSIFICATION ON AXLE FACTORS AND THE EFFECT ON AADT TO ENSURE RELIABLE TRAFFIC DATA
WISCONSIN DOT CASE STUDY FINDINGS UNDERSTANDING THE SIGNIFICANCE OF AXLE VERSUS LENGTH CLASSIFICATION ON AXLE FACTORS AND THE EFFECT ON AADT TO ENSURE RELIABLE TRAFFIC DATA NATMEC 2014, Chicago, Illinois
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More informationstreet LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932
street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital
More informationRailroad Impact Study
Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More informationCompact Solar School Zone Flashers The Next Generation
Compact Solar School Zone Flashers The Next Generation Submitted by Greg Miller, Business Development Manager Roadways Division In school zones across North America, flashing beacons increase safety by
More informationFAST-TRAC and Other Innovations at the Road Commission for Oakland. County
FAST-TRAC and Other Innovations at the Road Commission for Oakland Presented by: Danielle Deneau P.E. Director of Traffic Safety www.rcocweb.org County AGENDA ABOUT RCOC FAST- TRAC Comms/ Detection Other
More informationMO 370 Interchange Ramp at Salt River Road - Phase 1
MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00
More informationKapsch CVE Solutions: Commercial Vehicle Enforcement.
Kapsch TrafficCom US Kapsch CVE Solutions: Commercial Vehicle Enforcement. always one step ahead Kapsch CVE Solutions: End2End Commercial Vehicle Operations Solutions. The nation s infrastructure continues
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007
07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE
More information2017 Annual Report Kansas Department of Transportation
2017 Annual Report Kansas Department of Transportation Wichita, Kansas ii ACKNOWLEDGEMENTS The 2017 Annual Report brought to you by the Kansas Department of Transportation (KDOT). iii INTRODUCTION The
More informationNovember 16, 1998 Refer to: HNG-14. Mr. David Allardyce Mechanical Engineer B&B Electromatic Main Street Norwood, Louisiana 70761
November 16, 1998 Refer to: HNG-14 Mr. David Allardyce Mechanical Engineer B&B Electromatic 14113 Main Street Norwood, Louisiana 70761 Dear Mr. Allardyce: In your August 31 letter, you presented some preliminary
More informationTraffic Data Services: reporting and data analytics using cellular data
Make traffic and population movement analysis smart, fast, pervasive and cost-effective. Data sheet Traffic Data Services: reporting and data analytics using cellular data Accurate data collection and
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
287,585.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 184 38.00 CONTRACT ID: 004301079 PROJECT: NH 2016(310) CONTRACT: 11153208 AWARD : $1,893,993.41 PROJECTED : $1,893,993.41 ADJ. PROJECTED :
More informationSpecial Specification 6058 Battery Back-Up System for Signal Cabinets
Special Specification Battery Back-Up System for Signal Cabinets 1. DESCRIPTION 2. DEFINITIONS Install a Battery Back-Up System (BBU System) for traffic signals that will provide reliable emergency power
More informationSTAYING CONNECTED UNDER SEVERE WEATHER CONDITIONS
Presenter: Roger Browne, M.A.SC., P. Eng. Senior Engineer Traffic Plant Installation & Maintenance City of Toronto Intelligent Transportation Systems STAYING CONNECTED UNDER SEVERE WEATHER CONDITIONS WARNING
More informationAPCO International. Emerging Technology Forum
APCO International Emerging Technology Forum Emerging Vehicle to Vehicle, Vehicle to Infrastructure Communications Cars talking to each other and talking to the supporting highway infrastructure The Regulatory
More informationCATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE
CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The
More informationMEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:
MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed
More informationAppendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationFreight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)
Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationVDOT 2008 Road and Bridge Standards Section Transition Curves
õíßáßáwúkÿîßá VDOT 2008 Road and Bridge s Page Title TC-5.01 & 5.04 802.01 802.02 802.03 802.04 802.05 802.06 Explanation of Tables and Instructions for Use General Conditions Transition Curves for Rural
More informationSite DNL Calculator. Guidelines:
http://portal.hud.gov/hudportal/hud?src=/program_offices/comm_planning/environment/... Page 1 of 3 1/9/214 HUD > Program Offices > Community Planning and Development > Environment > Site For more information
More informationAPPENDIX C CATEGORIZATION OF TRAFFIC LOADS
APPENDIX C CATEGORIZATION OF TRAFFIC LOADS TABLE OF CONTENTS Page INTRODUCTION...C-1 CATEGORIZATION OF TRAFFIC LOADS...C-1 Classification of Vehicles...C-2 Axle Load Distribution Factor...C-2 Estimation
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationThe Provincial Energy Goals. BC Provincial Energy Commitments: A Practical Solution. The Municipal Challenges
Roadway Lighting Conference Anchorage Alaska, Dec 08 LED and Adaptive Lighting Pilots in British Columbia Roy Hughes, P.Eng., LC The Provincial Energy Goals BC Provincial Energy Commitments: 50% of BC
More informationMotorways Route in Thailand. Sustainable Highway Design
Motorways Route in Thailand 2 2 Development of Highway Community Speed decreased Open Highway At Grade Median Opening Settlements along the highway (Ribbon Development) Non Control Access or Partial Control
More informationWIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT
WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT In order to understand the vehicle classes and groupings, the MnDOT Vehicle Classification Scheme and the Vehicle Classification
More informationI-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation
I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for Georgia (#03) I-75 Prepared by: Masoud Hamedi, Sanaz Aliari, Sara Zahedian University of Maryland, College
More informationCounty of Santa Cruz 0579
County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013
Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE
More informationHow did I get here! Brief History. A couple of highlights. Transportation Engineering Advances 8/30/2009
How did I get here! Transportation Engineering Advances Paul R. Olson, P.E., PTOE FHWA Resource Center Paul.olson@fhwa.dot.gov WSU Civil Grad 1980 WSDOT PNW Region Traffic Engineering WSDOT Assistant Project
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. Noise Variance for Construction Works at the Vancouver Landfill
The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: From: Mayor and Council Engineering Department File No.: 6280-01 Date: December 13,2016 Noise Variance for Construction Works at the Vancouver
More informationWIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT
WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings
More informationWSF Hybrid Electric Ferry Conversion Project
WSF Hybrid Electric Ferry Conversion Project PSRC CMAQ Regional Funding Amy Scarton, WSDOT Assistant Secretary Washington State Ferries Matt von Ruden, Director of Vessel Engineering and Maintenance April
More information2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary
8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.
More information2012 List Price Sheet
ITEM DESCRIPTION List Price Part # School Zone and Advance Warning Signs 1-2 UNITS 3-4 UNITS 5+ UNITS Continuous Operation Systems SPFB12-1 SPFB12-2 SPFB8-1 SPFB8-2 Single 12" LED Beacon Assembly for continuous
More informationNovember 6, Agenda
Ohio Canal Interceptor Tunnel OCIT-2 Site OCITConstruction Update Public Meeting November 6, 2014 2:00 pm November 6, 2014 Agenda OCIT Project Overview Purpose Noise Basics Noise Mitigation Measures Vibration
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More information