1 Page 1 of 11 R1 ****This Standard Supercedes CE Macros MPR1S, MUR1S, MPR3S & MUR3S and portions of BECo Standards CS , CS & CS **** PRIMARY URD RISER CONSTRUCTION TABLE OF CONTENTS Page 1 Scope Safety Bill of Material Compatible Units 3 5 Construction Signatures.. 11

2 Page 2 of Purpose 1.1 The purpose of this construction standard is to show the installation of a primary URD riser, for voltages 25kV and below. Risers shall be built to the highest standard operating voltage in the service center, but arresters shall be matched to the operating voltage. 2.0 Safety 2.1 Follow all appropriate safety procedures and adhere to all safety requirements for the use of personal protective equipment, headgear, and eye protection. All covered primary taps are to be treated as if bare. 3.0 Bill of Materials ITEM DESCRIPTION CAT ID Compatible Unit 1 Fused Cutout Polymer, for seacoast use 650 (15 kv) 9045 (27 kv) (27kV) CCOFM CCOFH CCOFHP 2 Single phase equip bracket Si Coated, for seacoast use 934 (fiberglass) 1590 (Silicone) PBE1 PBE1-SIL 3 Surge Arrester System Voltages: 3740GY or 4160GY 400 delta or 320GY 13200GY 1300GY 2260GY (rating) 42 (3 kv) 43 (6 kv) 47 (10 kv) (12 kv) 4 (1 kv) CSA3 CSA6 CSA10-R CSA12-R CSA1-R 4 Cold Shrink Termination for 15 kv (#1sol, #2str) & kv (#2str, 1/0sol) UT-URD 17 Cable Grip 15/25 kv (1 1 ¼ ) Cable Support Bracket 94 UT-BKT 6,7 Ground Rod (5/ ) & Connctr 9229, 9009 Wire, #4 Cu, ground wire Ground Wire Molding Cable U guard molding 2 Cable U guard molding RS Conduit, 10 ft length RS Quarter bend, 36 radius PVC to RS Coupling Ground connector for 4 steel riser pipe and sweep 16 4 Conduit Strap 1234 CGNP, NCRS4 UGARD3 UGARD2 NCRS4

3 Page 3 of 11 ITEM DESCRIPTION CAT ID Compatible Unit 15 4 to 3 PVC riser adapter 9402 NFP4-A32 16 Listed after #14 17 Listed after #4 1 Duct Seal 9469 (1 lb) NADUX kv, #2 Cu EPR/Hypalon CWT Position Equipment Bracket SI Coated, for seacoast use PBE3 PBE3-SIL kv Spacer Anti-sway Bar 51 CSP-MAS 22 Small, bronze hot line connctr Line Duc for messenger, 4ft 735 CSP-LDUC 24 4 PVC cap, external fit 9460 NFP4-CAP 25 Crossarm, double fir 39 ( pin) 26 Crossarm braces, flat 92 PCD10 27 Slip Coupling, 4 cast iron 1345 NCRS4 2 Ground Bushing connector 11 NFS4-GNDBUSH 4.0 Compatible Units Compatible Units (CUs) are materials used together to build to standards. They may include individual or groups of items, sometimes called Compatible Unit Assemblies. Below are key riser CU Assemblies and related items. CU Name NCRS4 CGNP UT-URD UTUA-3PH Title Riser, 4"x10 steel standpipe w/ sweep #4 Cu Pole Ground Cable Termination 15/25KV, single, #1S-1/0S-#2 Al/Cu URD Termination Assembly, 15/25KV 3 Ph, #1S-1/0S-#2 Al/Cu, w/ crossarms & U-guard Components CatID Description CatID Qty All materials detailed in bill of materials to build single riser steel conduit, sweep & ground rod Pole ground w/ 35 ft of #4 Cu Wire, connect to grounding installed with riser pipe Single cold shrink termination for 25/15kV URD cable 1/0sol, #1 sol or #2 str with pin terminal connector and cable grip 15/25 kv Cold Shrink Termination Cable Grips pin arms & braces U-guard, 10 ft 753 2

4 Page 4 of 11 UTUA-1PH UTUA- 2PH URD Termination Assembly, 15/25KV 1 Ph, #1S-1/0S-#2 Al/Cu, w/ fiberglass bracket & U-guard URD Termination Assembly, 15/25KV 2 Ph, #1S-1/0S-#2 Al/Cu, w/ fiberglass brackets & U-guard 15/25 kv Cold Shrink Termination Cable Grips Fiberglass Equip Bracket, U-guard, 10 ft /25 kv Cold Shrink Termination Cable Grips Fiberglass Equip Bracket, U-guard, 10 ft CSA Surge Arrester(s) Match Arrester to operating voltage, specify qty 5.0 Construction 5.1 Locate the riser and spare duct according to Figure 1. If it is necessary to install a second riser (single phase only) on a pole, locate as indicated. 5.1a No more than 2-single phase or 1-three phase primary risers shall be allowed on a pole. 5.1b At ground level, the pole s circumference cannot be more than 45% encircled with risers from all utilities. Figure 1 Location of Riser

5 Page 5 of Cables that are not to be immediately terminated shall be left individually coiled, with adequate length to apply a termination & connect to the primaries, and supported above the steel riser pipe. Minimum safe bending radius for the cable is 12X cable diameter. Coils left above the riser shall have a 36 diameter to avoid cable damage. 5.3 If the cables left coiled above the riser are not of adequate length to connect to the primary, they shall be the contractor s, installer of the cable, responsibility to replace. 5.4 Surge arrester leads should be kept as short as possible to maximize protection. 5.5 Riser Grounding (See C5000 for more grounding details) 5.5a Bond all steel riser pipes to pole ground. Note: Grounding bushings may be used as an alternative to the U shaped pipe ground connector. 5.5b If cast iron slip couplings are used, the steel sweep bellow ground shall have its own ground connector connected to the pole ground and rod. 5.5c To prevent theft and vandalism the ground wire molding shall be stapled every d In NSTAR south locations, a bare 1/0 copper ground wire shall be installed, in the trench, from the riser to the first pad or pull box ground ring. 5.5e In 400 Volt delta primary areas, do not connect the arrester grounds to the secondary/system neutral. See C4402 for more details 5.6 Seal any gaps between the cable and the riser cap or adapter with duct seal. Any unused ducts shall be capped. 5.7 Minimum 45 pole size is preferred, however, 40 poles may be utilized where clearances allow.

6 Page 6 of 11 LA TOP VIEW " J-HOOK SUPPORTS CABLE GRIP TAPE GROUND WIRE & CONNECTION TO AT LEAST BELOW TERMINATION TIE-WRAP AT THE BOTTOM DUCT SEAL " RISER GROUND CLAMP IF USING SLIP COUPLING, A GROUND IS REQUIRED ON THE SWEEP BELOW GRADE " 6 12 FRONT VIEW 13 SIDE VIEW Figure 2 Single-Phase Riser - Open Wire Main Line

7 Page 7 of " J-HOOK SUPPORTS CABLE GRIP TAPE GROUND WIRE & CONNECTION TO AT LEAST BELOW TERMINATION TIE-WRAP AT THE BOTTOM DUCT SEAL " RISER GROUND CLAMP IF USING SLIP COUPLING, A GROUND IS REQUIRED ON THE SWEEP BELOW GRADE " 6 12 FRONT VIEW 13 SIDE VIEW Figure 3 Single-Phase Riser - Spacer Cable Main Line

8 Page of 11 3 LA LA LA USE ' GUY INSUL. IF GUY IS REQ'D OR ELSE ATTACH LOWER 36" MIN J-HOOK SUPPORTS CABLE GRIPS TAPE GROUND WIRE & CONNECTION TO AT LEAST BELOW TERMINATION TIE-WRAP AT THE BOTTOM DUCT SEAL " IF USING SLIP COUPLING, A GROUND IS REQUIRED ON THE SWEEP BELOW GRADE. Figure 4 - Three-Phase Riser - Open Wire Main Line

9 Page 9 of " J-HOOK SUPPORTS CABLE GRIPS TAPE GROUND WIRE & CONNECTION TO AT LEAST BELOW TERMINATION TIE-WRAP AT THE BOTTOM DUCT SEAL " IF USING SLIP COUPLING, A GROUND IS REQUIRED ON THE SWEEP BELOW GRADE Figure 5 - Three-Phase Riser - Spacer Cable Main Line

10 Page 10 of 11 LA LA TOP VIEW " TAPE GROUND WIRE & CONNECTION TO AT LEAST BELOW TERMINATION TIE-WRAP AT THE BOTTOM J-HOOK SUPPORTS CABLE GRIP DUCT SEAL " RISER GROUND CLAMP (TYP) IF USING SLIP COUPLING, A GROUND IS REQUIRED ON THE SWEEP BELOW GRADE. 7 30" 6 12 FRONT VIEW 13 SIDE VIEW Figure 6 - Single-Phase Loop Riser

11 Page 11 of Approval Signature Approved by: Amin Jessa Director, Distribution Engineering

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

SYSTEM PROTECTION - PLATING

SYSTEM PROTECTION - PLATING INTRODUCTION 1. Plates F1 thru F10 supply only the material required for one-phase. Therefore, for threephase construction, you will be required to call for the specified plate three times at that station.

More information

MATERIAL SPECIFICATION ELECTRIC OPERATIONS ORGANIZATION. M3902 ****Supercedes BECo Standard E and ComElectric Spec ****

MATERIAL SPECIFICATION ELECTRIC OPERATIONS ORGANIZATION. M3902 ****Supercedes BECo Standard E and ComElectric Spec **** Page 1 of 8 ****Supercedes BECo Standard E2.12-2.12 and ComElectric Spec 6-0895**** 1.0 General Requirements SINGLE PHASE PAD-MOUNTED DISTRIBUTION TRANSFORMERS 1.1 These specifications cover single-phase

More information

MATERIAL STANDARD ELECTRIC OPERATIONS ORGANIZATION. ****Supercedes BECo Standard E and ComElectric Spec ****

MATERIAL STANDARD ELECTRIC OPERATIONS ORGANIZATION. ****Supercedes BECo Standard E and ComElectric Spec **** Page 1 of 8 ****Supercedes BECo Standard E2.12-2.14 and ComElectric Spec 7-0895**** THREE-PHASE DEADFRONT PAD-MOUNTED DISTRIBUTION TRANSFORMERS, LOOP & RADIAL FEED DESIGNS 1.0 General Requirements 1.1

More information

CABLE TERMINALS

CABLE TERMINALS 14 00 00 01 Sheet 1 of 1 TABLE OF CONTENTS LOCATION & PLACEMENT OF RISERS ON JOINT USE POLES STANDOFF BRACKET PLACEMENT AND GROUNDING ONE RISER WITH U GUARD, 2, 3, 4, & 5 SPLIT CONDUIT OR SCHEDULE 40 0

More information

RISER POLES RISER POLES. Overhead Electric Distribution Standards INTRODUCTION

RISER POLES RISER POLES. Overhead Electric Distribution Standards INTRODUCTION INTRODUCTION. For proper fuse coordination, refer to the SYSTEM PROTECTION section to select the appropriate fuse for underground risers.. Terminators or Potheads and their mounting brackets are included

More information

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS 08.00 GENERAL DISTRIBUTION SURGE ARRESTERS 08.00-0 CUTOUTS AND ARRESTERS GENERAL 08.00-03 08.0 CUTOUTS AND ARRESTERS METAL OXIDE ARRESTERS WITH POLYMER HOUSINGS 08.0-0 APPLICATION OF DIRECT CONNECTED ARRESTERS

More information

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS 03.00 GENERAL CONSTRUCTION NOTES PRIMARY CONSTRUCTION PRIMARY CONSTRUCTION PIN INSULATOR INSTALLATION 03.00-02 03.00-04 03.00-20 03.02 CONNECTORS AUTOMATIC SPLICE INSTALLATION 03.02-01 INSTALLATION GUIDE

More information

THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1

THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1 THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 SCHEDULE 1 Schedule of fees and charges used for determining sacrifice value, excess height and/or strength and sale costs of poles. Year % Set

More information

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION I. INTRODUCTION Electric Distribution Standards Design, Construction & Material Standards formed a special committee to establish some basic design guidelines for construction alternatives to be used for

More information

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company

More information

SECTION 300 OVERHEAD SERVICE

SECTION 300 OVERHEAD SERVICE SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to

More information

WILDLIFE PROTECTION

WILDLIFE PROTECTION 05 00 00 01 TABLE OF CONTENTS GENERAL INFORMATION INSTALLATION OF CRITTER LINE GUARDS INSTALLATION OF TANK MOUNTED LIGHTNING ARRESTER BRACKET GUARDS 25KV & BELOW EXISTING STRUCTURE MODIFICATION 05 00 00

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

Distribution Arresters

Distribution Arresters Heavy Duty & Riser Pole Ÿ Tested to the latest IEEE C62.11 standards Ÿ High Strength Fiberglass Isolator Brackets Ÿ Ground Lead Disconnect will operate with a minimum of 1 amp Ÿ Protective Cap RUS APPROVED

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016 No Description/ Specification Amendment 1 EDD 1 :2008 11/0.415 kv Distribution Transformer, Oil Filled - 2 ED 2 :1987 The Galvanization of Iron and Steel, Articles Other Than Steel Wire - 3 ED 3 :1979

More information

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877 CAT-1 Series 3 Installation Guide The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877 (203) 431-0262 (203) 431-0296 FAX tvg@cat-1.com Installation of Load Cells for CAT-1 Systems

More information

BRENCO. Aerial Tools & Equipment

BRENCO. Aerial Tools & Equipment BRENCO 81 C2 Cable Lasher For cables or cable bundles up to 1.87 in. (4.7 cm) on strands 1/4 in. to 3/8 in. Positive mechanical brake prevents lasher back-up until brake is released. Built to last, the

More information

For mounting. cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT MOUNTS

For mounting. cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT MOUNTS For mounting cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT Index Introduction.... 1 Typical Installation.... 2 Aluminum Three Phase Cutout & Arrester Mounts.... 3 Aluminum

More information

BRACKETS, MOUNTS & HARDWARE

BRACKETS, MOUNTS & HARDWARE HIGH VOLTAGE SWITCHGEAR & AUTOMATION EQUIPMENT SECTION 6 Brackets, Mounts & Misc. Hardware CAT. NO: 040930G May, 2008 INERTIA Engineering & Machine Works, INC. Fax: (209) 931-8186 6665 Hardaway Road, Stockton,

More information

7 Single Family Service

7 Single Family Service 7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

Single phase pole mounted. 11kV. Electrical Engineer KEU ID#:

Single phase pole mounted. 11kV. Electrical Engineer KEU ID#: Single phase pole mounted Distribution Transformers 11kV Prepared by: ARY SAIDAHMED SHEKSAEED Electrical Engineer KEU ID#: 4252 Email: ary.sayd@hotmail.com 1 S # Contents Page # 1 Introduction 3 2 Type

More information

PART NUMBER POLE DIAMETER RANGE CARTON QTY " to 5" " to 6 3 4" " to 7 3 4" " to 8 3 4" 10

PART NUMBER POLE DIAMETER RANGE CARTON QTY  to 5  to 6 3 4  to 7 3 4  to 8 3 4 10 PH1 Offset Pole Band Bands Single Double Offset Pole Bands are used for dead-ending, guying, and mounting secondary racks on metal poles, pipe masts, or conduit. Each Pole Band Assembly contains two 1

More information

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles 103 09-17 103 Index Section 103 Joint Use Title Date Number General Requirements for Installation of Attachments on Oncor Poles... 103-100 Supply and Communication Space... 103-105 Communication Lines

More information

Index. Aluma Form, ALUMA-FORMEQUIPMENT MOUNTS Inc. WORLD S MOST COMPLETE LINE

Index. Aluma Form, ALUMA-FORMEQUIPMENT MOUNTS Inc. WORLD S MOST COMPLETE LINE Aluma Form, Index ALUMA-FORMEQUIPMENT MOUNTS Inc. Introduction.............................. 3 Typical Installation......................... 4 Aluminum Three Phase Cutout & Arrester Mounts..........................

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

1100 OVERHEAD TRANSFORMERS

1100 OVERHEAD TRANSFORMERS 00 OVEHEAD TANSFOMES //00 ~ F Pole Type - Transformer Fuse Schedule ~ T Transformer Field Stenciling Code ~ TA Transformer Coding for Material Mgmt System C T,TH Pole Mounted Transformer and Cutout on

More information

Double Hanger Only. Sheave Diameter " 3" Double Hanger Only

Double Hanger Only. Sheave Diameter  3 Double Hanger Only 32000 Series Fiber Optic s & Quadrants For pulling fiber optic cable, DCD has a special series of sheaves and quadrants that will allow the maximum possible bend radius for the application. All the sheaves

More information

PSC Terminations. Features Class 1 (outdoor) termination as defined in IEEE 48 standard. For use on all extruded dielectric cables.

PSC Terminations. Features Class 1 (outdoor) termination as defined in IEEE 48 standard. For use on all extruded dielectric cables. Features Class 1 (outdoor) termination as defined in IEEE 48 standard. For use on all extruded dielectric cables. Sizes are available for all shielded cables in voltage classes from 15kV through 46kV.

More information

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS The original TOMMY GATE hydraulic lift Assembling the Auxiliary Battery Box 1. Remove the cover from the auxiliary battery box by removing the two nuts and

More information

MCM CABLE 3/15/2010

MCM CABLE 3/15/2010 00 000 MCM CABLE //00 C UEE Elbow Enclosure - Deadend C UEE Elbow Enclosure - Feed-Through C UP 000 MCM Cable iser ~ UP 000MCM Power Cable iser Grounding Detail N UP 000 MCM Cable iser with Ø Switch N

More information

T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers ASPA ITEM NO.

T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers ASPA ITEM NO. T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers No ASPA ITEM NO. 1 69361525 2 69361537 3 69361550 Group 2: Poles DESCRIPTION Make/Model Cat/Spec QTY UNIT MEASURE UNIT

More information

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip Project Number: PAL -10-00063805 Project Name: Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip Bill of Quantities Package # 2 LOT 2: Supply of Electrical Materials The contract

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 11/2/2016 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 11/2/2016 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

Guying - Insulator Dimensional Requirements ** Lightning Protection & Grounding - Grounds

Guying - Insulator Dimensional Requirements ** Lightning Protection & Grounding - Grounds Standard Description 03 12 01 ** Configurations - Single Phase, 4 to 15kV 03 12 05 ** Configurations - Two or Three Phase Tangent or Angle on Wood Crossarm, 4 to 15 kv 03 12 07 ** Configurations - Two

More information

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS Larry Vogt Manager, Rates Minimum Distribution System What is MDS? MDS is an analysis module of the cost-of-service study in which distribution investment

More information

Outdoor Power Transmission & Distribution

Outdoor Power Transmission & Distribution Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

12. ILLUSTRATIONS 12.1 GENERAL

12. ILLUSTRATIONS 12.1 GENERAL 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this section as an aid to interpretation of these Electric Service Requirements. The illustrations

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE)

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) Please indicate which products and services your company can supply by checking the appropriate box(es). Check only the first box if your company can supply all of the products and services shown for this

More information

JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018

JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018 JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018 GANADO OFFICE PHYSICAL ADDRESS: 8925 State Highway 111 E Ganado, TX 77962 Phone: (361)771-4400 BAY CITY OFFICE PHYSICAL ADDRESS: 100

More information

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17 GENERAL INFORMATION SECTION GUIDE SECTION 10 PAGE 1 DESCRIPTION SECTION NUMBER GENERAL INFORMATION... 10 POLE MOUNT TRANSFORMER SINGLE PHASE... 15 PAD MOUNT TRANSFORMER SINGLE PHASE..... 16 POLE MOUNT

More information

Installation, Maintenance and Service Manual Power Cord

Installation, Maintenance and Service Manual Power Cord Installation, Maintenance and Service Manual Power Cord 45-081, REV. 8/14 1 of 8 Table Of Contents Section 1 Installation Procedure... 3 1.1 General...3 1.2 Sheave installation...4 1.3 Anchor installation...4

More information

URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail

URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail Part 5 LV Underground Drawing Register Number U8 U9 Description URD Mini Pillar Installation Guide UDS Universal Pillar Installation Guide U10-1 UDS Universal Pillar Double Link Unit Drilling Detail U10-2

More information

Installation Instructions

Installation Instructions 517 Lyons Ave, Irvington, NJ 07111 Phone: 973-371-1771 Fax: 973-371-4304 Installation Instructions Deadbreak Elbow Applicable Current Ratings 600A (Aluminum) 900A (Copper) Applicable Catalog Prefix 35kV

More information

11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE

11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11.1 GENERAL Only single conductor cables as described in this section are acceptable for connection to PECO Energy Company

More information

INSTALLATION INSTRUCTION 88088

INSTALLATION INSTRUCTION 88088 INSTALLATION INSTRUCTION 88088 For Rancho Suspension Systems RS6588 & RS6589: FORD F-150 READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION Rev B IMPORTANT NOTES! WARNING:

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION Roseville Electric SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION REVISED 06/28/18 Commercial Construction Specifications Revision List REVISION Date Page No. Description 03/01/00 4.2-4.3 Changed leveling

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

INSTALLATION INSTRUCTION 88094

INSTALLATION INSTRUCTION 88094 INSTALLATION INSTRUCTION 88094 FOR RANCHO SUSPENSION SYSTEM RS6594B 4WD & 2WD NISSAN TITAN READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION Rev D IMPORTANT NOTES! WARNING:

More information

H1 H2 H3 X0 X1 X2 X3

H1 H2 H3 X0 X1 X2 X3 H0 H H H H0 H H H X0 X X X X0 X X X S- S- S- S- FB H0 H H H X0 X X X H0 H H H X0 X X X 7 NOTES:. ITEMS REMOVED FOR SHIPMENT. TANK DESIGNED FOR FULL VACUUM. MANUFACTURED IN ACCORDANCE WITH ANSI

More information

TubeTrace Tubing Bundles

TubeTrace Tubing Bundles for Custom CEMS and Analytical Umbilicals English Units Receiving, Storing and Handling... 1. Inspect materials for damage incurred during shipping. Report damages to carrier for settlement. 2. Identify

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

D4BL. Protective Doors Are Locked Until Machines Completely Stop Operating. Guard Lock Safety-door Switch. Model Number Structure.

D4BL. Protective Doors Are Locked Until Machines Completely Stop Operating. Guard Lock Safety-door Switch. Model Number Structure. Guard Lock Safety-door Switch Protective Doors Are Locked Until Machines Completely Stop Operating A mechanical lock is applied automatically when the Operation Key is inserted. A high level of safety

More information

M-Force three-phase switch

M-Force three-phase switch Supersedes K-SEC 926 December 2012 M-Force three-phase switch Description The M-Force switch from Eaton's Cooper Power Systems is a distribution-class, gangoperated, factory unitized three-phase overhead

More information

Technical Specification for Pole Mounted Capacitor Rack

Technical Specification for Pole Mounted Capacitor Rack Technical Specification for Pole Mounted Rack Page 1 1. Scope and Function a) Pole mounted capacitor racks shall be installed on a distribution feed as an economical means of applying capacitor units to

More information

BBCD063 SUZUKI JIMNY Ironman 4x4 BBCD063 Bull Bars fit to a Suzuki Jimny It will take about 3.5 hours to install.

BBCD063 SUZUKI JIMNY Ironman 4x4 BBCD063 Bull Bars fit to a Suzuki Jimny It will take about 3.5 hours to install. INSTALLATION GUIDE BBCD063 SUZUKI JIMNY 2012+ Ironman 4x4 BBCD063 Bull Bars fit to a Suzuki Jimny 2012+ It will take about 3.5 hours to install. NOTE: ALL DRILLED HOLES MUST HAVE ANTI-CORROSION TREATMENT

More information

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power Wisconsin Public Utility Institute June 28, 2017 Minimum Distribution Charges Larry Vogt Director, Rates Mississippi Power 1 Costs of Service vs. Cost Recovery Residential Service Example Assuming that

More information

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction Application This standard establishes the clearances that are required on utility pole structures between electrical supply facilities owned and operated by Tacoma Power and communication facilities owned

More information

320A Single Phase URD Meter Loop Installations

320A Single Phase URD Meter Loop Installations 320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal

More information

M-Force three-phase switch

M-Force three-phase switch Switches and Disconnects CA008004EN Supersedes May 2015 COOPER POWER SERIES M-Force three-phase switch Description Eaton's Cooper Power series M-Force switch is a distribution-class, gang-operated, factory

More information

Upper Arm. Shoulder. Lower Arm. Stationary Base. Motoman MH180 Home Position

Upper Arm. Shoulder. Lower Arm. Stationary Base. Motoman MH180 Home Position ROBOSUIT INSTALLATION INSTRUCTIONS FOR THE MOTOMAN MH180 Prior to installing the Robosuit, clean the robot surface, particularly if the robot has been in operation without any effective protection. This

More information

THIS MATERIAL IS MEANT TO BE USED ALONG WITH OUR CATALOG IT IS NOT A SUBSTITUTE FOR THE CATALOG

THIS MATERIAL IS MEANT TO BE USED ALONG WITH OUR CATALOG IT IS NOT A SUBSTITUTE FOR THE CATALOG THIS MATERIAL IS MEANT TO BE USED ALONG WITH OUR CATALOG IT IS NOT A SUBSTITUTE FOR THE CATALOG COMPANY OVERVIEW Since 1970, we have been pioneering new developments in heater technology and providing

More information

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01 SECTION H EARTHING ABC Earthing Kits H01 ABC Earthing Kit 4 legged ABC earth kit. Each leg of the earth truss terminates with a female bayonet type pipe connector with a protective rubber hand guard. These

More information

INSTALLATION INSTRUCTIONS 88511

INSTALLATION INSTRUCTIONS 88511 INSTALLATION INSTRUCTIONS 88511 For Suspension System RS6511: Ford Super Duty Requires coil spring kit RS80117 or RS80119 for a complete installation READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE

11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11. CABLE SPECIFICATIONS 5kV, 15kV, AND 35kV RUBBER OR PLASTIC INSULATED CABLE 11.1 GENERAL Only single conductor cables as described in this section are acceptable for connection to PECO Energy Company

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 9/12/2011 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 9/12/2011 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

Easy-On II Terminations

Easy-On II Terminations Features Class 1 (outdoor) termination as defined in IEEE 48 standard. For use on all extruded dielectric cables, concentric neutral, metal tape shielded or wire shielded cables without need for additional

More information

PRODUCTS FOR THE RAIL AND UTILITY INDUSTRY

PRODUCTS FOR THE RAIL AND UTILITY INDUSTRY PRODUCTS FOR THE RAIL AND UTILITY INDUSTRY connectorproducts.com 1300 John Tipton Blvd. Pennsauken, NJ 08110 Phone: 856.829.9190 Fax: 856.829.9195 Catalog IX.1 American Design American Made Our success

More information

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS Originated 1/85 Revised 6/95 Revised 6/02 Revised 11/05 Revised 4/08 Revised 11/09 Revised 1/12 Revised 11/12 Revised

More information

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION I. FUSE COORDINATION I.1. GENERAL I.1.1. The purpose of protective coordination is to provide isolation of a fault as close to the fault as possible so that a minimum of customers will be affected. The

More information

Customer Requirements Pole Attachment Requirements for Telecommunications (non-rf)

Customer Requirements Pole Attachment Requirements for Telecommunications (non-rf) Application This standard establishes the attachment requirements to utility pole structures owned and operated by Tacoma Power and communication facilities owned and operated by others. This standard

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes. SERVICE TERMINATION IN A TERMINATION COMPARTMENT DIRECT BURIED OR CONCRETE ENCASED LATERAL ALL 1-PHASE VOLTAGES, 400-800 AMPERES ALL 3-PHASE VOLTAGES, 400-3000 AMPERES ONLY Obtain acceptance for 1-phase

More information

TT6101 Rotary Tedder

TT6101 Rotary Tedder TT0 Rotary Tedder 0/0/0 Illustrated Parts Breakdown Page Chassis Assembly Page Page Transport Axle Assembly S/N - Transport Axle Assembly S/N + Page Page Page Page Page Transport Lock Assembly Lift Frame

More information

EDS POLE-MOUNTED EQUIPMENT EARTHING DESIGN

EDS POLE-MOUNTED EQUIPMENT EARTHING DESIGN Document Number: EDS 06-0015 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 06-0015 POLE-MOUNTED EQUIPMENT EARTHING DESIGN EPN, SPN This standard details the design requirements for the earthing

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Spare parts list ( ) Spare parts list KMR 1250 BAT

Spare parts list ( ) Spare parts list KMR 1250 BAT Spare parts list (5.963-806.0) Spare parts list KMR 1250 BAT 14.01.2013 www.kaercher.com EN Table of contents Spare parts list KMR 1250 BAT (5.963-806.0)... 6 10 Individual parts (0.209-961.0)... 7 11

More information

Kuhlman Electric Corporation Volt Instrument Transformers

Kuhlman Electric Corporation Volt Instrument Transformers Kuhlman Electric Corporation 34500 Volt Instrument Transformers 34500 Volt Table of Contents Description Model Page Wound, Dry-Type VT Y (High Accuracy available) PTT-200-9710(H) 3-4 Wound, Oil-Filled

More information

Suspension System RS6582B

Suspension System RS6582B Suspension System RS6582B Tahoe/Yukon READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION IMPORTANT NOTES! WARNING: This suspension system will enhance the off-road performance

More information

OVERHEAD SERVICE. Items to consider

OVERHEAD SERVICE. Items to consider OVERHEAD SERVICE Items to consider The maximum length of the service wire from the ComEd pole to the point of attachment on your residence is 150 feet, if practical. Your service wire installation must

More information

Type L Cutouts. UltraSIL Polymer-Insulated and Porcelain Type L Open Distribution Cutout. Description

Type L Cutouts. UltraSIL Polymer-Insulated and Porcelain Type L Open Distribution Cutout. Description Type L Cutouts UltraSIL Polymer-Insulated and Porcelain Type L Open Distribution Cutout Electrical Apparatus 327-30 Description Cooper Power Systems has set a new standard of excellence for polymer distribution

More information

SECTION 1 - OVERHEAD GENERAL TABLE OF CONTENTS

SECTION 1 - OVERHEAD GENERAL TABLE OF CONTENTS 01.00 GENERAL OVERHD 01.00-01 MECHANICAL LOADING REQUIREMENTS 01.00-02 FLORIDA EXTREME WIND REGIONS 01.00-03 POLEFOREMAN 01.00-06 POLEFOREMAN - OUTPUT EXAMPLE 01.00-07 GIS DEVICE DESCRIPTIONS 01.00-08A

More information

Jeep Wrangler (JK) Present

Jeep Wrangler (JK) Present Suspension System RS66110B (3 SPORT SYSTEM w/ Progressive Coil Springs Front & Rear) 2012 NEWER JEEP MODELS EQUIPPED WITH 3.6L V6 ENGINE NEED EXHAUST MODIFICATION KIT RS720003. OR REPLACEMENT FRONT DRIVESHAFT

More information

Catalog 14A January 2013

Catalog 14A January 2013 Catalog 14A January 2013 Page 1 January 2013 Type AR (Automation-Ready) Switch 14.4kV, 25kV or 34.5kV 900 Amperes Continuous/Interrupt Description The Hubbell unitized Type AR switch is a distribution-level,

More information

Recp Duplex 20A 250V 2P3W STR Swire WH

Recp Duplex 20A 250V 2P3W STR Swire WH 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 815WB0X Recp Duplex 20A 250V 2P3W STR Swire WH Eaton Wiring Devices Catalog Number Manufacturer Description Weight per

More information

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the

More information

Disconnect & ByPass Switches

Disconnect & ByPass Switches Disconnect & ByPass Switches Disconnect & Oil Circuit Recloser Bypass Switches; Regulator & Current Transformer Bypass Switches Electrical Apparatus K-SEC 060 & 090 Contents Type D-73 Distribution Class

More information