1 UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement. Any other location requires conduit and a waterproof-dead front disconnect at meter. Meter base (furnished by Kosciusko REMC) by member s electrician. S.E. cable or conductors in conduit to member s service equipment size to be #2 aluminum or #2 copper for 100 amps., or #3/O copper or #4/O aluminum for 200 amps. Disconnect Switch Box (Type RH insulation required if aluminum conductors are used.) Two 5/8 x 8 copper ground rods spaced 6 apart. Attached to disconnect. Grade Level 18 6 conduit or Schedule 80 plastic conduit from meter base to 18 below grade. Locknuts and insulated bushings are needed at top and bottom if galvanized. Leave a 14 width from the center of conduit to allow for digging. Customer should supply conduit if underground service goes under a drive. A minimum of 2½ Schedule 40 conduit is required for 4/0 underground or wire, 350 MCM underground wire and 3 Schedule 40 conduit for 500 MCM underground wire. 200 AMP. to be in this conduit as Kosciusko REMC will install them when running the underground service. GROUNDING Two 5/8 x 8 ground rods are required. METER HEIGHT 14 GENERAL INFORMATION FOR UNDERGROUND SERVICES No meter base or entrance should be installed before a Kosciusko REMC engineer has checked the proposed location. Kosciusko REMC - Revised 2014

2 WIRING DIAGRAM IF DISCONNECT SWITCH IS IN THE BASEMENT Customer s Conduit KREMC Conduit WIRING DIAGRAM IF DISCONNECT SWITCH IS ON THE OPPOSITE SIDE OF THE WALL KREMC Conduit To disconnect switch box. KREMC Hot Legs Consumer Conductors Neutral

3 WIRING PROCEDURE IN LIEU OF USING METER PEDESTAL FOR UNDERGROUND ON 6X6 No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Kosciusko REMC will furnish the Underground Meter Base. The customer will furnish and install a structure (described below) for mounting the meter base and the weatherproof main disconnect panel. 8 x 6 x 6 treated posts with 2 x 6 treated cross members. Meter base furnished by Kosciusko REMC installed 3 minimum 100 or 200 amp weather proof main disconnect. 3-#2 aluminum for 100 amp, 3-#3/O copper or 3-#4/O aluminum for 200 amp. ground by customers electrician. Customer to install conduit or Schedule 80 plastic conduit from meter base to 18 below grade with locknuts and insulated bushing at top and bottom if galvanized. Leave a 14 width from the center of conduit to allow for digging. 2 ground rods 5/8 x 8 copper weld 5 3 Grade level No. 6 (minimum) copper ground wire from disconnect switch to ground rod AMP. GENERAL INFORMATION FOR UNDERGROUND SERVICES level. No wires to be in this conduit as Kosciusko REMC will install them when running the underground service. GROUNDING Two 5/8 x 8 ground rods are required. METER HEIGHT No meter base or entrance should be installed before a Kosciusko REMC engineer has checked the proposed location. Kosciusko REMC - Revised 2014

4 WIRING DIAGRAM FOR 6X6 UNDERGROUND To customer s disconnect KREMC Conduit KREMC Hot Legs Consumer Conductors Neutral

5 SERVICE WHERE BUILDING IS OVER 12 HIGH TO THE EAVES No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Insulator and wire by KREMC. Service cables or conduit 3-#4 aluminum for 60 amp 3-#2 aluminum for 100 amp 3-#3/O copper or 3-#4/O aluminum for 200 amp Weatherhead 12 high or higher if 18 Drip Loop (mark neutral with tape or strip 1 at end) Disconnect switch box must be directly through the wall or directly under meter in basement. Any other location requires conduit and a waterproof dead front disconnect at meter. Disconnect Switch Box Conduit or service cable straps as required. Busings and locknuts at all connections. Weatherproof bushing for cable #6 (minimum) copper ground wire from disconnect switch box to ground rod. (may be run inside of wall if desired) by Kosciusko REMC installed approximately Ground Clamps Two ground rods 6 apart. 5/8 x 8 copper weld Kosciusko REMC - Revised 2014

6 OVERHEAD SERVICE WHERE BUILDING IS OVER 12 HIGH TO THE EAVES Used for 100 AMP OVERHEAD SERVICE. #2 copper or aluminum service entrance cable from weatherhead to meter base, and from base to breaker or fuse panel. Weatherproof connector must be used in top of base. 200 Amp 2 Hub For 200 AMP OVERHEAD SERVICE with 2 conduit. #3/O copper or #4/O aluminum single conductors to be used from weatherhead to meter base and from meter base to breaker panel. Height or Weatherhead (Entrance Head) For all overhead installations, the weatherhead must be a minimum of 12 above the grade level, and higher if service drop crosses over a driveway. Driveways and roads require 16½ clearance. Overhead Services For all overhead services, a minimum of 18 of all conductors must extend out of the weatherhead. If all conductors are the same To Weatherhead WIRING DIAGRAMS To Weatherhead Conduit must be 1¼ or 2 Schedule 40 or steel. Ground from the disconnect switch. To Disconnect When disconnect switch box is under the meter base. When disconnect switch box is on the inside wall. KREMC Hot Legs Consumer Conductors Neutral

7 SERVICE WHERE BUILDING IS OVER 12 HIGH TO THE EAVES No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Insulator and wire by KREMC. Service cables or conduit 3-#4 aluminum for 60 amp 3-#2 aluminum for 100 amp 3-#3/O copper or 3-#4/O aluminum for 200 amp Weatherhead 12 high or higher if 18 Drip Loop (mark neutral with tape or strip 1 at end) Disconnect switch box must be directly through the wall or directly under meter in basement. Any other location requires conduit and a waterproof dead front disconnect at meter. Disconnect Switch Box Conduit or service cable straps as required. Busings and locknuts at all connections. Weatherproof bushing for cable #6 (minimum) copper ground wire from disconnect switch box to ground rod. (may be run inside of wall if desired) by Kosciusko REMC installed approximately Ground Clamps Two ground rods 6 apart. 5/8 x 8 copper weld Kosciusko REMC - Revised 2014

8 OVERHEAD SERVICE WHERE BUILDING IS UNDER 12 HIGH TO THE EAVES 100 Amp 2 Hub Used for 100 AMP OVERHEAD SERVICE. Where riser is used through the roof. Riser is 2 rigid conduit. #2 single conductors to be used from weatherhead to meter base and from base to fuse or breaker panel. 200 Amp 2 Hub For 200 AMP OVERHEAD SERVICE with 2 conduit. #3/O copper or #4/O aluminum single conductors to be used from weatherhead to meter base and from meter base to breaker panel. Height or Weatherhead (Entrance Head) For all overhead installations, the weatherhead must be a minimum of 12 above the grade level, and higher if service drop crosses over a driveway. Driveways and roads require 16½ clearance. Overhead Services For all overhead services, a minimum of 18 of all conductors must extend out of the weatherhead. If all conductors are the same Riser Height and 4 maximum. minimum Entrance Location Entrance should be installed before a Kosciusko REMC engineer has checked the proposed location. To Weatherhead WIRING DIAGRAMS To Weatherhead Conduit must be 2 steel. Ground from the disconnect switch box. To Disconnect When disconnect switch box is under the meter base. When disconnect switch box is on the inside wall. KREMC Hot Legs Consumer Conductors Neutral

9 OVERHEAD SERVICE ON METER POLE No meter base or entrance should be installed before a KREMC engineer has checked the proposed location. Mobile homes require an electrician to install four wires from pole to home. 30 treated pole (5 diameter at top). To be paid for by member. Weatherhead 18 Drip loop Service entrance cable, galvanized steel or Schedule 40 conduit may be used from meter base up to entrance head. Conduit or service cable straps as required. 3-#2 aluminum for 100 amp. 3-#3/O copper or 3-#4/O aluminum for 200 amp. Weatherproof busings and locknuts at all connections. above grade by customers electrician. Weatherproof 100, or 200 amp main disconnect. Number 6 (minimum) copper ground wire from disconnect switch to ground rod stapled to pole. Grade Level Ground Clamps Pole set 6 in ground. Two ground rods 6 apart. 5/8 x 8 copper weld Kosciusko REMC - Revised 2015

10 OVERHEAD SERVICE Used for 100 AMP OVERHEAD SERVICE. #2 copper or aluminum service entrance cable from weatherhead to meter base, and from base to breaker or fuse panel. Weatherproof connector must be used in top of base. 200 Amp 2 Hub For 200 AMP OVERHEAD SERVICE with 2 conduit. #3/O copper or #4/O aluminum single conductors to be used from weatherhead to meter base and from meter base to breaker panel. Overhead Services For all overhead services, a minimum of 18 of all conductors must extend out of the weatherhead. If all conductors are the same WIRING DIAGRAM To Weatherhead Conduit must be 1¼ or 2 Schedule 40 or steel. To Disconnect KREMC Hot Legs Consumer Conductors Neutral

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

320A Single Phase URD Meter Loop Installations

320A Single Phase URD Meter Loop Installations 320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company

More information

OVERHEAD SERVICE. Items to consider

OVERHEAD SERVICE. Items to consider OVERHEAD SERVICE Items to consider The maximum length of the service wire from the ComEd pole to the point of attachment on your residence is 150 feet, if practical. Your service wire installation must

More information

Revised: April 2018 ¹ SERVICE TO WIRELESS DEVICE ANTENNA ATTACHMENTS ON CUSTOMER SERVICE POLES (SHEET 1) CUSTOMER: 1. An overcurrent protective device including a disconnect switch shall

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

SINGLE PHASE WIRING SPECIFICATIONS

SINGLE PHASE WIRING SPECIFICATIONS SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

THREE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

Service Requirements

Service Requirements Service Requirements General Contact Idaho Power before beginning work on any new service. All meter installations must meet current electrical code requirements and display the proper electrical permit.

More information

WPS SERVICE MANUAL. Section Amp and Smaller - Common

WPS SERVICE MANUAL. Section Amp and Smaller - Common Revised 01/2017 Section 2 200 AMP AND SMALLER - COMMON Page 1 of 17 Section 2 200 Amp and Smaller - Common 2-0 General Metering Requirements... 2 2-1 Basic Calculations... 4 2-2 100-200 Amp Single-Phase

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

7 Single Family Service

7 Single Family Service 7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult

More information

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI New Service Guidelines and Diagrams From... BARRON www.barronelectric.com email: janderson@barronelectric.com Barron Office: P.O. Box 40 Barron, WI 54812-0040 Spooner Office: P.O. Box 261 Spooner, WI 54801-0261

More information

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II This section discusses the City of Palo Alto's requirements for establishing electric service to new or upgraded residential installations. The same requirements apply to both underground and

More information

Transmission & Distribution Glossary of Electrical Terms

Transmission & Distribution Glossary of Electrical Terms Transmission & Distribution Glossary of Electrical s Breaker Panel Bushing Circuit Circuit Breaker Conductor Conduit Consumption Current Distribution Electricity (Static vs. Current) Electron Feeder The

More information

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL INTRODUCTION This policy has been adopted by the Board of Public Works as a guide to obtaining electric service and to set forth the services available, conditions for service, and standards for materials

More information

JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017

JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017 JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017 JEA SHALL MAKE ALL METER SPOTS BEFORE ELECTRICAL WORK BEGINS AS TO DETERMINE THE POINT OF ATTACHMENT

More information

Installing or Rebuilding Your Electric Service

Installing or Rebuilding Your Electric Service Installing or Rebuilding Your Electric Service 2 3 Contents Policies for New and Rebuilt Electric Service 2-4 Paperwork and fees...2 Five-year policy...3 Proposed route location and conditions...3 Construction

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

SECTION 300 OVERHEAD SERVICE

SECTION 300 OVERHEAD SERVICE SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to

More information

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp Printed from NIPSCO.com 04-01-17 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS REVISION

More information

7. Residential Single-Family and Duplex Buildings (Dwellings)

7. Residential Single-Family and Duplex Buildings (Dwellings) Sin g le -F a mily a n d Du p le x Bu ild in g s 2016 Electric Service Requirements, 2 nd Edition Section 7 Section 7 Residential Single-Family and Duplex Buildings (Dwellings) Directory Page 7.1 General

More information

2016 METER SERVICES SPECIFICATION GUIDE

2016 METER SERVICES SPECIFICATION GUIDE 2016 METER SERVICES SPECIFICATION GUIDE 802.01.ST (10-16) CONTENTS Introduction 2 Disclaimers 2 LES contacts 3 Definitions 4 LES Meter Services department requirements for approval of connection to LES

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

Service Requirements

Service Requirements Service Requirements General Contact Idaho Power before beginning work on any new service. All meter installations must meet current electrical code requirements and display the proper electrical permit.

More information

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016 DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all

More information

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes. SERVICE TERMINATION IN A TERMINATION COMPARTMENT DIRECT BURIED OR CONCRETE ENCASED LATERAL ALL 1-PHASE VOLTAGES, 400-800 AMPERES ALL 3-PHASE VOLTAGES, 400-3000 AMPERES ONLY Obtain acceptance for 1-phase

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

Meter Installation. -and- Padmount Transformer Guide

Meter Installation. -and- Padmount Transformer Guide Meter Installation -and- Padmount Transformer Guide Feb. 2016 METERING REQUIREMENTS The following information shall be used as a guide for installing metering equipment. A self-contained meter has all

More information

Contents. Obtaining Electric Service from Your Cooperative...1. Bonding Frames of Major Appliances...4. Voltage Drop...8. Drawings...

Contents. Obtaining Electric Service from Your Cooperative...1. Bonding Frames of Major Appliances...4. Voltage Drop...8. Drawings... Contents Obtaining Electric Service from Your Cooperative...1 Bonding Frames of Major Appliances...4 Voltage Drop...8 Drawings...14 Agricultural Buildings...23 Optional Standby Systems...42 Grounding &

More information

CABINET - INSTRUMENT TRANSFORMER Indoor - Outdoor, 480 Volt Maximum 1200, 1600, 2000 Ampere

CABINET - INSTRUMENT TRANSFORMER Indoor - Outdoor, 480 Volt Maximum 1200, 1600, 2000 Ampere Printed from NIPSCO.com 04-01-17 PAGE 1 OF 6 USE: 1. For commercial and industrial installation, purchased and installed by the customer. 2. To enclose 600 volt insulation class instrument transformers

More information

Pretest Module 24 Three-phase Service Entrance

Pretest Module 24 Three-phase Service Entrance Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?

More information

Section 6 Electric Metering: Residential

Section 6 Electric Metering: Residential Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.

More information

Commercial Electric Policy

Commercial Electric Policy Commercial Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership.4 Multi-Unit/Multi-Service Buildings....4 Secondary Termination Enclosures.4 Meter Bases.5 Temporary

More information

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT Meter Installations There are three basic ways to measure electricity consumption: Small and medium services are metered directly using direct connect

More information

Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS

Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS REVISED FEBRUARY 2017 TABLE OF CONTENTS Metering Equipment & Installation Standards... 1 Metering Equipment & Installation Standards

More information

Three-Phase Pole Mounted Recloser

Three-Phase Pole Mounted Recloser Three-Phase Pole Mounted Recloser Page 1 of 8 Table of Contents 1 GENERAL... 3 2 CONSTRUCTION... 3-5 3 BUSHINGS... 5 4 LINE CONNECTOR... 5 5 TOOLS....5 6 NAMEPLATES..6 7 PAINT... 6 8 EXTERNAL HARDWARE

More information

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5 PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument

More information

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS 1. General Metering Requirements a. Interpretation The District s metering requirements shall not be interpreted to conflict with the

More information

Engineering Rules and Regulations for Electric Service Platte-Clay Electric Cooperative, Inc.

Engineering Rules and Regulations for Electric Service Platte-Clay Electric Cooperative, Inc. Engineering Rules and Regulations for Electric Service Platte-Clay Electric Cooperative, Inc. December 2016 (Expires 9/30/18) Kearney Cooperate Headquarters 1000 W. 92 Highway Kearney, MO Platte City District

More information

INSTALL SERVICE- ENTRANCE SYSTEMS

INSTALL SERVICE- ENTRANCE SYSTEMS SUBCOURSE EN5141 EDITION B US ARMY ENGINEER SCHOOL INSTALL SERVICE- ENTRANCE SYSTEMS INSTALL SERVICE- ENTRANCE SYSTEMS Subcourse Number EN5141 EDITION B United States Army Engineer School Fort Leonard

More information

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

Commercial & Industrial

Commercial & Industrial The Empire District Electric Company Requirements For Electric Service And Meter Installations Commercial & Industrial (800) 206 2300 The latest revision of this book can be found at www.empiredistrict.com

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications

New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT New Panelboard for Lot H, EV Charger Energization, Las Positas College Scope of Work and Technical Specifications Chabot-Las Positas Community College District

More information

ELECTRIC SERVICE MANUAL

ELECTRIC SERVICE MANUAL ELECTRIC SERVICE MANUAL Issued: November 2018 For the most current version of the Jo-Carroll Energy electric service manual please visit www.jocarroll.com TABLE OF CONTENTS Chapter 1. General Information...1

More information

Marshfield Utilities Rules for Electric Service Installations. Table of Contents

Marshfield Utilities Rules for Electric Service Installations. Table of Contents ELECTRIC SERVICE MANUAL 2018 Marshfield Utilities Rules for Electric Service Installations Table of Contents Section Topic Page Table of Contents... I Mission and Vision Statements... VII Introduction

More information

JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018

JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018 JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018 GANADO OFFICE PHYSICAL ADDRESS: 8925 State Highway 111 E Ganado, TX 77962 Phone: (361)771-4400 BAY CITY OFFICE PHYSICAL ADDRESS: 100

More information

RESIDENTIAL ELECTRIC PERMIT (REP) Village of Montpelier 211 N. Jonesville Street, PO Box 148 Montpelier, OH P:

RESIDENTIAL ELECTRIC PERMIT (REP) Village of Montpelier 211 N. Jonesville Street, PO Box 148 Montpelier, OH P: Address: Date: Legal Owner: Address (if different than above): Electrical Contractor: Address: Phone: Size of New Service (amps): Location of New Service: RESIDENTIAL ELECTRIC PERMIT (REP) Village of Montpelier

More information

TEMPORARY ELECTRICAL SERVICE

TEMPORARY ELECTRICAL SERVICE ENERGY SERVICES ENGINEERING 840 Northgate Drive Telephone (509) 942-7403 Fax (509) 942-7405 P.O. Box 190 Richland, WA 99352 www.ci.richland.wa.us/energyservices TEMPORARY ELECTRICAL SERVICE A. INTRODUCTION

More information

Residential Application for New Electric Service

Residential Application for New Electric Service Attn: Engineering Department 42 Wescom Rd Johnson VT 05656 1-800-832-2667 ext. 1171 802-635-2331 ext. 1171 802-635-4210 fax Residential Application for New Electric Service INVOICE Attn: Engineering Department

More information

METERING REQUIREMENTS

METERING REQUIREMENTS METERING REQUIREMENTS KUA will not accept a non-securable service trough entrance. That is, all enclosed conductors prior to the meter (line side) will be securable by and accessible to KUA personnel only.

More information

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018. SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic

More information

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016 UTILITY/CATV SERVICES CHAPTER 9 900. GENERAL A. Alliant Energy receives many requests for electric service from other utilities; telephone, telecommunications companies, cable television, the Department

More information

Table of Contents. Electrical Service Requirements. 1. General Requirements

Table of Contents. Electrical Service Requirements. 1. General Requirements Table of Contents 1. General Requirements 1.1 General Definition.................................................... 1 1 1.2 Booklet Purpose and Organization....................................... 1-1

More information

Consider The Possibilities...

Consider The Possibilities... FS/FD Air-Cooled Fluid Cooler Catalog 710.1 Consider The Possibilities... Cools most any non-corrosive fluid Closed-circuit cooling avoids contamination Cold weather economizer for interior cooling loads

More information

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS ENERGY SERVICES ENGINEERING 840 Northgate Drive Telephone (509) 942-7403 Fax (509) 942-7405 P.O. Box 190 Richland, WA 99352 www.ci.richland.wa.us SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

More information

SECTION VII METERING INSTALLATIONS

SECTION VII METERING INSTALLATIONS SECTION VII METERING INSTALLATIONS 1. GENERAL Outdoor metering is required for all new service installations to one, two, and three family detached, semi-detached and row houses. 2. COMPANY FURNISHES AND

More information

Electric Service Rules

Electric Service Rules 2017 Electric Service Rules GENERAL INFORMATION TEMPORARY SERVICES OVERHEAD SERVICES UNDERGROUND SERVICES DISTRIBUTED GENERATION METERING HUD MANUFACTURED HOMES FARM SERVICES UTILITY/CATV SERVICES PRIMARY

More information

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

SECTION 500 METERING AND ASSOCIATED EQUIPMENT SECTION 500 METERING AND ASSOCIATED EQUIPMENT 500.0 General Meter sockets shall be provided, installed and maintained by Customer. When the ratings of meter sockets are exceeded, transockets shall be used.

More information

Home Electrical Wiring. Getting the electricity from the main power lines to a location in the house

Home Electrical Wiring. Getting the electricity from the main power lines to a location in the house Home Electrical Wiring Getting the electricity from the main power lines to a location in the house 90% of BC power comes from Hydro There is potential energy stored in a water reservoir behind a dam.

More information

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles 103 09-17 103 Index Section 103 Joint Use Title Date Number General Requirements for Installation of Attachments on Oncor Poles... 103-100 Supply and Communication Space... 103-105 Communication Lines

More information

1007 Elwell Court Palo Alto, CA 94303

1007 Elwell Court Palo Alto, CA 94303 1007 Elwell Court Palo Alto, CA 94303 August 1, 2016 CONTENTS IMPORTANT MESSAGE ABOUT REVISIONS NOTABLE CHANGES FROM THE PREVIOUS RELEASE INTRODUCTION ELECTRIC UTILITIES SERVICE DIRECTORY SECTION I TEMPORARY

More information

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES CONTENTS BY CHAPTER Chapter 1: GENERAL INFORMATION Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES Chapter 3: SERVICE ENTRANCES Chapter 4: METERING INSTALLATION Chapter 5: CUSTOMER-INSTALLED SERVICE

More information

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet DRAWING NUMBER INTRODUCTORY INFORMATION Important Notices Underground Plant Protection Information Code Clearances Commercial/Industrial Information Sheet Work Management Customer Projects Engineering

More information

Australian Wiring Instructions:

Australian Wiring Instructions: Australian Wiring Instructions: Generator/Switch Wiring: Remove the generator controller fascia and identify wire #44 going to the circuit breaker in the external connection box, this wire is the active

More information

Electrical Maintenance and Repair: Introduction to Basic Electricity

Electrical Maintenance and Repair: Introduction to Basic Electricity Electrical Maintenance and Repair: Introduction to Basic Electricity Common Electrical Maintenance Tasks The following are common electrical maintenance tasks you will encounter. Repairs Example: Replacing

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to

More information

Current Transformer, Termination & Disconnect Cabinets WE Energies Approved

Current Transformer, Termination & Disconnect Cabinets WE Energies Approved Current Transformer, Termination & Disconnect Cabinets WE Energies Approved 2 TABLE OF CONTENTS Table of Contents Current Transformer Cabinets Overhead Entry... 4 Underground Entry and Underground Exit...

More information

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE Electrical Service Requirements TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION Inspections and codes Underground Utility locates Meter socket requirements

More information

Customer Metering and Services Guide Revised: May 2017

Customer Metering and Services Guide Revised: May 2017 Revised: May 2017 This document is an uncontrolled copy and may not be the most current copy. The most current copy is available at atcoelectric.com. This document is the property of ATCO Electric and

More information

SPECIAL SPECIFICATION 6894 Communication Cabinet

SPECIAL SPECIFICATION 6894 Communication Cabinet 2004 Specification CSJ 0353-04-085, etc. SPECIAL SPECIFICATION 6894 Communication Cabinet 1. Description. Furnish and install communication cabinet to include the installation of the foundation, cabinet,

More information

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location.

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location. I N T R O D U C T I O N - M-1 RIGHTS: PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location. NOTIFICATION: Customers planning to install or

More information

Air-Cooled Fluid Cooler

Air-Cooled Fluid Cooler Catalog KM-FSD-0313A FS/ FD Series Air-Cooled Fluid Cooler Consider The Possibilities Cools most any non-corrosive fl uid Closed-circuit cooling avoids contamination Cold weather economizer for interior

More information

UV DISINFECTION UNIT MODEL 3G

UV DISINFECTION UNIT MODEL 3G SALCOR INC. P. O. Box 1090 Fallbrook, CA 92088-1090 Telephone: (760) 731-0745 Fax: (760) 731-2405 INSTALLATION MANUAL UV DISINFECTION UNIT MODEL 3G February, 2011 I. INSTALLATION INSTRUCTIONS WARNING!

More information

SPECIAL SPECIFICATION 1788 Surveillance Cabinet

SPECIAL SPECIFICATION 1788 Surveillance Cabinet 1993 Specifications CSJ 2266-02-095 SPECIAL SPECIFICATION 1788 Surveillance Cabinet 1. General. This Item shall govern the furnishing and installation of Surveillance Cabinet to include the installation

More information

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction Application This standard establishes the clearances that are required on utility pole structures between electrical supply facilities owned and operated by Tacoma Power and communication facilities owned

More information

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL POWER DEPARTMENT EFFECTIVE AS OF FEBRUARY 1, 2008, REVISED JULY 1, 2013 STANDARDS ARE SUBJECT TO REVIEW TABLE OF CONTENTS Section 1 General Requirements Purpose...1.1 Codes and Ordinances...1.1 Changes

More information

Electric Vehicle Pricing Plan Contractor Set-Up Guide

Electric Vehicle Pricing Plan Contractor Set-Up Guide Electric Vehicle Pricing Plan Contractor Set-Up Guide Contractor s Set-Up Guide: Overview Pricing Plan Summary Our special Pricing plan makes it easy for electric vehicle owners to save on charging costs.

More information

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power

More information

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI New Service Guidelines and Diagrams From... BARRON www.barronelectric.com email: operations@barronelectric.com Barron Office: P.O. Box 40 Barron, WI 54812-0040 Spooner Office: P.O. Box 261 Spooner, WI

More information

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series:

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series: MAPA Products MPD-XX / Pedestal Disconnect 30, 60, 100 amp February 2014 Pedestal Disconnect Installation Instructions Parts List MAPA Products Fusible Rainproof Pedestal Mounted Safety Switch provides

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design The power supply to all single lot underground residential services is through front lot service. Single phase transformers

More information

ISIMET/MAPA, LLC, an affiliate of WCM Industries, Inc. 103 CJ Wise Parkway Naples, TX (903) fax (903)

ISIMET/MAPA, LLC, an affiliate of WCM Industries, Inc. 103 CJ Wise Parkway Naples, TX (903) fax (903) ISIMET/MAPA, LLC, an affiliate of WCM Industries, Inc. 103 CJ Wise Parkway Naples, TX 75568 (903) 897-0737 fax (903) 897-0740 Pedestal Starter-Disconnect Pedestal Starter Controller Installation Instructions

More information

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019 Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org Website http://www.gtcounty.org

More information

Options: PART NUMBER MAIN BREAKER PHASE VOLTAGE

Options: PART NUMBER MAIN BREAKER PHASE VOLTAGE BC Hydro Metering Kiosk BCH Metering and distribution kiosk built to BC Hydro distribution standards. Used for applications where secondary services are installed in weatherproof kiosks outside of a main

More information

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION CHAPTER 1 - GENERAL INFORMATION 100. Purpose 101. Codes and rules 102. Continuity of service 103. Frequency, Voltage, and Amperage Limitations 104. High voltages 105. Unusual capacity requirements 106.

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

Electric Service Guide. Commercial & Industrial

Electric Service Guide. Commercial & Industrial Electric Service Guide Commercial & Industrial January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website

More information

Published 2018 RULES AND REGULATIONS FOR ELECTRIC SERVICE

Published 2018 RULES AND REGULATIONS FOR ELECTRIC SERVICE Published 2018 RULES AND REGULATIONS FOR ELECTRIC SERVICE TABLE OF CONTENTS Page No. SECTION I INTRODUCTION 1 A. PURPOSE 1 B. SCOPE 1 C. CORPORATION 1 D. CODES 1 E. RESPONSIBILITY 1 F. INSPECTION 2 G.

More information