1 Document Number: EDS Network(s): Summary: ENGINEERING DESIGN STANDARD EDS POLE-MOUNTED EQUIPMENT EARTHING DESIGN EPN, SPN This standard details the design requirements for the earthing of 33kV, 11kV and 6.6kV pole-mounted equipment. Author: Stephen Tucker Approver: Steve Mockford Date: 21/01/2015 This document forms part of the Company s Integrated Business System and its requirements are mandatory throughout UK Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset Management. If you have any queries about this document please contact the author or owner of the current issue. Applicable To UK Power Networks External Asset Management G81 Website Capital Programme UK Power Networks Services Connections Contractors Health & Safety ICPs/IDNOs Legal Meter Operators Network Operations Procurement Strategy & Regulation Technical Training THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE

2 Revision Record Version 4.1 Review Date 21/11/2019 Date 10/10/2017 Author Lee Strachan Why has the document been updated Minor version update What has been updated Reference to EDS changed to EDS Version 4.0 Review Date 21/11/2019 Date 09/12/2014 Author Stephen Tucker Why has the document been updated Periodic review What has been updated - Updated to ensure consistency with the revised Overhead Line Manual. Changes include: ing depth standardised at 1m (Section 5.4 and 7). Preformed copper lattice earth mat introduced (Section 6.4). Segregation on poles reduced to 120 and slow bend added to underground earthing on drawings (Section 7). Additional LV PME earths added (Section 7.4). leakage solution added (Section 8.4). Version 3.0 Review Date 19/01/2015 Date 13/10/2011 Author Stephen Tucker Use of aluminium conductors added Version 2.2 Review Date 19/01/2015 Date 26/09/2011 Author Stephen Tucker Reclassification of document from ing Design Manual Section 5 Version 2.0 Review Date 19/01/2015 Date 16/03/2010 Author Stephen Tucker Completely rewritten to provide a more consistent and practical approach and developed alongside the new Overhead Line Manual Version 1.0 Review Date 31/03/2013 Date 31/03/2008 Author Stephen Tucker Original UK Power Networks 2015 All rights reserved 2 of 31

3 Contents 1 Introduction Scope Glossary and Abbreviations Definitions Design Criteria General Criteria Potential Rise Touch and Step Potentials Electrode System Surge Arresters ing Requirements Resistance Values Electrodes ing and Bonding Conductors Mat Auxiliary Supply Cables ing Arrangements General Steelwork HV Steelwork H-Poles LV Steelwork Anti-Climbing Device Stays LV PME s Pole-mounted Transformer Cable Termination Handle-Operated Air-Break Switch Disconnectors (ABSD) Handle-Operated ABSD Handle-Operated ABSD and Cable Termination Pole-Mounted Switches, Reclosers and Sectionalisers Low-Level Control Unit High-Level Control Unit Hook-Stick Operated Equipment General Hook-Stick Operated Equipment and Cable Termination UK Power Networks 2015 All rights reserved 3 of 31

4 7.9.3 Hook-Stick Operated Equipment and Transformer Special Situations HV and LV Combined Construction Third-Party Equipment on Shared HV or 33kV Poles Supplies to Mobile Phone Masts on National Grid Towers Leakage References Appendix A Typical Electrode Systems Figures Figure 6-1 Buried Mat Figure 7-1 Pole-mounted Transformer with HV Overhead Line and LV Overhead Line Figure 7-2 Pole-mounted Transformer with HV Overhead Line and LV Cable Figure 7-3 Cable Termination with Surge Arresters Figure 7-4 Handle-Operated ABSD Figure 7-5 Handle-Operated ABSD with Cable Termination Figure 7-6 Pole-mounted Switchgear with Low-Level Control Unit Figure 7-7 Pole-mounted Switchgear with High-Level Control Unit Figure 7-8 Hook-Stick Operated ABSD Figure 7-9 Hook-Stick Operated ABSD with Cable Termination Figure 7-10 Hook-stick Operated Equipment with Cable Termination Figure 7-11 Hook-Stick Operated Equipment with a Pole-mounted Transformer Figure 8-1 Metallic Strip Leakage Device Tables Table 5-1 Maximum EPR for a COLD Site Classification... 8 Table 6-1 Resistance Values Table 6-2 Minimum Electrodes (below ground) Table 6-3 Minimum ing and Bonding Conductors (above ground) Table Ω and 20Ω Electrode Values UK Power Networks 2015 All rights reserved 4 of 31

5 1 Introduction This standard (previously Section 5 of the ing Design Manual) details the design requirements for the earthing of 33kV, 11kV and 6.6kV pole-mounted equipment and includes standard arrangements for the installation of earthing and bonding. Note: 132kV equipment is beyond the scope of this standard. The second issue of this standard aims to build on the original while providing a more consistent and practical approach. It has also been developed alongside the new Overhead Line Manual. It supersedes issue 1 and all previous EPN, SPN specific guidance on polemounted earthing. Although this standard covers most aspects of pole-mounted earthing there will be some situations where advice from an earthing specialist is required, refer to EDS for further details. The earthing design for secondary substations and LV networks (including LV overhead networks) are covered respectively in EDS and EDS The construction of overhead networks including earthing is covered in further detail in the Overhead Line Manual. This standard is divided into the following sub-sections: Design criteria. ing requirements. ing arrangements. Special situations. Significant changes from existing practice or previous version: Based on the guidance given in overhead line section of ENA TS issued in Comprehensive and practical earthing arrangements are now included for: pole-mounted transformers, cable terminations, handle-operated ABSDs, pole-mounted switchgear and hook-stick operated equipment. 2 Scope This standard applies to the earthing for all new poles and any existing pole at voltages up to and including 33kV where refurbishment or a material alteration is to take place e.g. equipment replacement, installation or removal. The earthing of towers and tower lines is outside of the scope of this standard and reference should be made to BS EN This document is intended for internal and external use. 3 Glossary and Abbreviations Term Definition EPR potential rise (refer to Section 4) ROEP Rise of earth potential (refer to Section 4) NetMap UK Power Networks graphical information system (GIS). UK Power Networks 2015 All rights reserved 5 of 31

6 4 Definitions Potential Rise (EPR) or Rise of Potential (ROEP) EPR or ROEP is the potential (or voltage) rise that occurs on any steelwork due to the current that flows through the ground when an earth fault occurs on the HV or LV network. Touch Potential The touch potential is the potential difference between a person s hands and feet when standing up to 1m away from any earthed steelwork they are touching. Step Potential The step potential is the potential difference between a person s feet assumed to be 1m apart. Transfer Potential The transfer potential is the potential transferred by means of a conductor between an area with a significant rise of earth potential and an area with little or no rise of earth potential, and results in a potential difference between the conductor and earth in both locations. Substation ing Database The substation earthing database contains the classification (HOT or COLD) of all grid and primary substations together with the details of the EPR and other relevant earthing information. Refer to EDS for further details. Cold Site A COLD site is a primary or secondary substation where the EPR is less than 430V, or 650V for sites with high reliability protection (refer to Table 5-1). HOT Site A HOT site is a primary or secondary substation where the EPR is greater than 430V, or 650V for sites with high reliability protection (refer to Table 5-1). At a HOT secondary site the HV and LV earths must be segregated so that the potential on the HV earth during an earth fault is not transferred to the customer's LV earth terminal. Combined Neutral and (CNE) Typically used to describe a cable with a combined neutral and earth metallic outer sheath with a PVC covering, or overhead line with a combined neutral and earth conductor. Combined Construction Combined construction is the installation of an HV and LV overhead line on the same pole. The LV overhead line is erected below the HV overhead line. Typically modern construction of this type of overhead line will consist of HV Covered Conductor and LV ABC although existing configurations of PVC covered HV and LV conductors are still in use. UK Power Networks 2015 All rights reserved 6 of 31

7 5 Design Criteria 5.1 General Criteria Pole-mounted equipment is generally considered out of reach if situated 4.3m or more above ground level. As such, touch potentials are not a consideration unless the steelwork extends below 4.3m or is connected to exposed metallic cable sheaths extending below this level. For new construction the equipment shall be a minimum of 5.1m (5.8m adjacent to roads) above ground or any object within 1.5m of the pole. Therefore some poles may be left unearthed e.g. cross-arms and hook-stick operated equipment. The following items of equipment shall always be earthed: Transformers. Switchgear with control units. Switchgear with operating handles at low level. Cable terminations. Surge arresters. Where any item of equipment on the pole is connected to earth all steelwork on the pole above 3.0m, including cross arms, pilot insulator pins, trussing gear, high voltage cable boxes etc., shall be connected to the main earth. Steelwork below 3.0m, such as low level 33kV cable support steelwork, shall have a separate earth electrode installed and shall not be bonded to the main earth On combined HV/LV construction the support steelwork and LV neutral/earth of the LV conductor system shall not be earthed or bonded to the main earth. Pole-mounted earthing, where installed, shall be effective enough to provide the following function: To pass the fault current during an earth fault back to the system neutral and therefore operate the source protection. To limit the touch/step potential risk to staff operating switchgear to a safe value. To prevent dangerous potentials appearing on the customers LV neutral/earth. To discharge any lightning surges to earth. The above requirements will be satisfied if the following design criteria are used for all new and refurbished pole earthing: The maximum HV earth resistance value shall be 10Ω. The maximum LV earth resistance value shall be 20Ω. All above ground earth conductors shall be insulated for a minimum of 3m above ground level and mechanically protected (in accordance with the Overhead Line Manual) for a minimum of 2m above ground level. The HV earth electrode shall be installed at the base of the pole except at locations where it is necessary for an operator to carry out switching operations. At these locations the HV earth electrode shall be installed on the opposite side of the pole to the operating position and 5m away from the operating position. Any earth conductor within 5m of the operating position shall be insulated except pole-mounted switchgear with low level control units (Figure 7-6). The HV earth electrode system shall be installed at a minimum depth of 1m. UK Power Networks 2015 All rights reserved 7 of 31

8 The main earth conductor/electrode shall be insulated for a minimum of 1m below ground level. Bare HV and LV earth electrodes buried in the ground shall be separated by a minimum of 8m. Covered HV and LV earth conductors buried in the ground shall be separated by a minimum of 100mm. HV and LV earthing systems on the same pole shall be segregated by 120. ing conductors associated with surge protection shall be kept as straight as possible with no sharp bends. 5.2 Potential Rise When an earth fault occurs on a cable or at a substation or pole, a proportion of the fault current will return to the source substation through the ground. This current will flow into the ground through the earth connection closest to the fault and will cause the voltage to rise above that of a remote (or true) earth. This voltage is known as earth potential rise (EPR) or rise of earth potential (ROEP) and is the earth fault current multiplied by the earth electrode resistance. Note: Some current will flow through the cable sheath back to the source and some will flow through the ground, it is only the current that flows through the ground that causes the EPR. A site is classified as HOT when the EPR exceeds 430V, or 650V (for high reliability circuits) as defined in Table 5-1. However, at pole-mounted sites as there is no metallic earth return path, all of the current will flow through the ground. Therefore the EPR generally exceeds these values and the site is assumed to be HOT. Table 5-1 Maximum EPR for a COLD Site Classification Substation Voltage Source Circuit Protection EPR Comments 400kV, 275kV, 132kV, 66kV, 33kV, 25kV High reliability 650V Main protection systems that clear the earth fault current within 200ms Normal reliability 430V Main protection systems that clear the earth fault current in excess of 200ms 20kV, 11kV, 6.6kV Normal reliability 430V 5.3 Touch and Step Potentials It is not always practicable to ensure that the step potentials directly above an installed earth electrode system remain below tolerable limits under earth fault conditions. It is generally considered that the probability of an earth fault occurring whilst an individual happens to be walking across the earth electrode at the same time, is extremely small. Additional protection is often afforded by the wearing of normal footwear which increases the foot-to-foot resistance. Therefore, in most circumstances no special precautions are required. However, at sensitive locations that are often frequented by people, particularly barefoot children, and concentrations of livestock in stables or pens for example, precautions may be justified to eliminate or minimise the risk. This can usually be achieved by careful site selection or at the time of installation by installing the earth electrode in a direction away from the area of concern, burying the electrode as deep as practicable, and/or fencing the electrode off to prevent access. UK Power Networks 2015 All rights reserved 8 of 31

9 In high risk areas, such as horse riding schools or near milking parlours, special designs may be necessary and specialist advice should be sought. The layout of earthing and bonding shall be so designed as to prevent dangerous potential gradients arising, from either step potentials on the ground, or touch potentials between adjacent parts of the installation. The former is achieved by having the external electrode at a suitable depth. The latter requirement is achieved by bonding. However, at switchgear poles with low level handles or control units it is not possible to maintain the touch and step potentials to safe values for all foreseeable circumstances particularly during switching operations. Installing and maintaining an elaborate electrode system at a pole site, e.g. perimeter grading electrodes/rings, is not deemed to be practical and the integrity of this type of earthing system cannot always be assured. Therefore as it is not possible to control the touch and step potentials at low level control boxes and handles the following control measures shall be adopted to mitigate the risk: Dielectric boots and gloves shall be used for all switching operations at the poles with low level handles or control units. Preferably, access to the equipment should be restricted e.g. by installing control units above 3m and installing hook-stick operated ABSDs. 5.4 Electrode System A purpose designed electrode system will provide the necessary potential grading, minimise the step potential risk to humans and animals, cater for high frequency discharges from the surge arresters and provide sufficient separation between any operating platform and the high frequency electrode. Any deviation from these arrangements, or failure to maintain the local earthing systems, can result in operators being placed at unacceptable risk. The bare electrode system shall be: Installed at a minimum depth of 1m. Installed at a minimum distance of 5m and at least 120 away from any handle, cubicle or rod/hook-stick operating position. Insulated within 5m of the operating position. In addition to the above, the electrode system shall preferably be installed alongside hedges or other features. The following locations shall be avoided if possible: Where persons could stand whilst operating any pole-top equipment. Near metal fences, fence posts, buried cables, pipes. Near camping or caravan parks where persons may be bare foot. Across main farm gates. Near drinking troughs or areas where livestock regularly congregate. Across open fields where there is a risk of damage by ploughing or drainage works. Examples of electrode systems for types of pole-mounted plant are shown in Section 7. Appendix A contains tables showing examples of the numbers and length of rods required to provide 10 ohm and 20 ohm electrode systems. UK Power Networks 2015 All rights reserved 9 of 31

10 5.5 Surge Arresters The object of a surge arrester earthing is to: Provide an easy, accessible and sufficient path to earth where the lightning current surge can be harmlessly dissipated. Limit the voltage difference between the components of the protected equipment to prevent any insulation between them being stressed beyond its capabilities. Therefore where surge arresters are installed: The main earth conductor between the surge arrester and the electrode system shall be as short and straight as possible with no sharp bends. Except at locations where it is necessary for an operator to carry out switching operations the electrode shall be installed at the base of the pole. The main earth conductor shall be insulated to a depth of 1m below ground level (to reduce high step potentials). At locations where it is necessary for an operator to carry out switching operations the earth electrode shall be installed 5m away from the base of pole to avoid unacceptable step potentials close to the operator. Any earth conductor within 5m of the operating position shall be insulated. The insulated conductor shall be installed inside a PVC duct to provide additional mechanical protection and insulation. It also serves to maintain the conductor in a slow bend which improves lightning performance. The earth electrode resistance value shall not exceed 10Ω 1. 1 It is generally accepted that 10Ω is the preferred maximum value and is in line with BS EN (Protection against lightning). UK Power Networks 2015 All rights reserved 10 of 31

11 6 ing Requirements 6.1 Resistance Values A summary of earth resistance values is given in Table 6-1. Electrode systems to achieve these values are given in Appendix A. Table 6-1 Resistance Values Electrode Resistance Value HV 10Ω 2 Main LV 20Ω Additional LV PME 100Ω 6.2 Electrodes The permitted earth electrodes are given in Table 6-2. Table 6-2 Minimum Electrodes (below ground) Function Network Fault Level Electrode 3 Electrode EPN Up to 4kA 35mm² bare stranded copper cable SPN Up to 8kA 70mm² bare stranded copper cable rod Electrode EPN/SPN All 1m or 1.2m copper clad rods 6.3 ing and Bonding Conductors The minimum size of earthing and bonding conductors are given in Table 6-3. Table 6-3 Minimum ing and Bonding Conductors (above ground) Function Network Fault Level ing and Bonding Conductors 3 Conductor EPN Up to 4kA 50mm 2 covered stranded aluminium cable 35mm 2 covered stranded copper cable SPN Up to 8kA 120mm 2 covered stranded aluminium cable 70mm 2 covered stranded copper cable Bonding Conductor EPN/SPN All 35mm 2 covered stranded aluminium cable 16mm 2 covered stranded copper cable 2 The legacy earth resistance value for SPN 6.6kV networks was 6Ω however in practice this value wasn't widely adopted or obtainable therefore for consistency across the networks a maximum value of 10Ω has been selected. 3 Refer to EAS for a complete available range of earthing materials. UK Power Networks 2015 All rights reserved 11 of 31

12 6.4 Mat An earth mat is required for switchgear operated from ground level. An earth mat shall be: Installed directly below where the operator will stand when operating the switchgear. Connected to the switch handle or control unit. Approximately 1m x 1m in size and installed at a depth of 300mm below ground. Constructed from a preformed copper lattice mat. Alternatively it may be formed from a loop of appropriate sized HV earth conductor (Table 6-2) although this solution is not as effective. Segregated from all other earthing conductors. Protected from third party interference above ground by a cable guard. Embedded below ground in earthing compound to protect against theft (preformed mat only). (a) Preformed Copper Lattice Mat (b) Mat using Bare Conductor 300 mm 1000mm 300 mm 300 mm 1000mm 1000mm Figure 6-1 Buried Mat 6.5 Auxiliary Supply Cables To protect staff during operation and maintenance of control equipment and to ensure the correct operation of the equipment, any auxiliary supply or umbilical cables shall be earthed in accordance with the relevant installation and commissioning procedures (available from the document library). UK Power Networks 2015 All rights reserved 12 of 31

13 7 ing Arrangements 7.1 General The standard earthing arrangements detailed in this section satisfy the design criteria and earthing requirements outlined in the previous sections and include: HV and LV steelwork. Stays. Pole-mounted transformers with LV overhead line and LV cable. Switches, reclosers and sectionalisers. Handle-operated air-break switch disconnectors. Hook-stick operated equipment. Note: These arrangements demonstrate the earthing principles and should be constructed in accordance with the Overhead Line Manual. These arrangements can be applied to 33kV, 11kV and 6.6kV installations as required. 7.2 Steelwork HV Steelwork All HV pole-top steelwork supporting live equipment e.g. cross-arms, equipment supports etc., shall always be bonded together using the bonding conductor detailed in Table 6-3. However, the bonded steelwork shall only be earthed if it is necessary to earth other equipment on the pole H-Poles Where H-poles are fitted with cross-bracing equipment, the lowest cross brace member shall be not less than 3m above the ground; where a cross-brace is found to be less than 3m above ground it shall be repositioned. Additionally: On an earthed pole the cross-brace or tie-angle shall be bonded to the pole-top steelwork. On an unearthed pole the cross-brace or tie-angle shall remain unbonded and unearthed. On poles with low level cable support steelwork all steelwork less than 3m from the ground shall be independently earthed and shall not be bonded to the main HV earth LV Steelwork LV pole-mounted equipment including voltage regulators, static balancers, metalclad fusegear, street lighting brackets, CNE cable sheaths, SNE cable sheaths and armours shall be bonded to the neutral earth conductor using the bonding conductor detailed in Table 6-3. Reel insulator supports, pole bolts, D-irons and stay make-offs do not require bonding together Anti-Climbing Device The anti-climbing device shall not be bonded to any other steelwork or connected to earth. UK Power Networks 2015 All rights reserved 13 of 31

14 7.3 Stays All stays attached to a pole shall have a fully rated insulator or insulator(s) fitted in the stay in accordance with the Overhead Line Manual to prevent the bottom of the stay becoming live in the event of a pole-top insulation failure. The pole-top make-off of all HV stays shall be bonded to the steelwork in accordance with the Overhead Line Manual. The pole top make-offs of LV stays shall not be bonded to the steelwork. 7.4 LV PME s On LV PME networks, additional earth electrodes are required at locations specified in EDS The additional PME earths shall be installed in accordance with the Overhead Line Manual. 7.5 Pole-mounted Transformer The earthing system requirements for a pole-mounted transformer are outlined below and examples are shown Figure 7-1 and Figure 7-2. The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated at the bottom of the pole. The HV earth shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 1m below ground level. The maximum value of the HV electrode shall be 10Ω. All other steelwork shall be bonded to the main HV earthing. An LV earth conductor shall be connected from the transformer neutral to an LV underground electrode system with a maximum value of 20Ω and segregated from the HV electrode system by at least 8m. The HV and LV earth conductors shall be segregated by at least 120 on the pole. UK Power Networks 2015 All rights reserved 14 of 31

15 Key: Covered Aluminium Conductor All Steelwork Connected to HV L N Transformer Terminal Covered Copper Conductor Bare Conductor Phase Conductor Neutral Conductor Bare LV Overhead Line HV Note: Anti-climbing Guards Not Shown (100mm below lowest crimp) L1 L2 L3 N LV Network either ABC or Open Wire Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m LV ( mm above ground) ( mm above ground) Ground Level 1m 2.4m min Min 8m Separation HV Electrode (to achieve max 10Ω) LV Electrode (to achieve max 20Ω) ` Figure 7-1 Pole-mounted Transformer with HV Overhead Line and LV Overhead Line UK Power Networks 2015 All rights reserved 15 of 31

16 All Steelwork Connected to HV L N Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor Phase Conductor Neutral Conductor HV (100mm below lowest crimp) Transformer Terminal Note: Anti-climbing Guards Not Shown Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m LV Bond to LV CNE Cable Shealth LV CNE Cable (PVC Covered) ( mm above ground) ( mm above ground) Ground Level 1m 2.4m min HV Electrode (to achieve max 10Ω) 8m Separation LV Electrode (to achieve max 20Ω) Figure 7-2 Pole-mounted Transformer with HV Overhead Line and LV Cable Note: Where a metallic sheathed hessian served LV cable is connected to a pole-mounted transformer the cable shall be replaced with a plastic sheathed cable for a minimum length of 8m to ensure HV/LV earth segregation is maintained. UK Power Networks 2015 All rights reserved 16 of 31

17 7.6 Cable Termination The earthing system requirements for a cable termination are outlined below and shown in Figure 7-3. Refer to Section and for cable terminations associated with air-break switch disconnectors and hook-stick operated equipment. The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated at the bottom of the pole. The HV earth shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 1m below ground level. The maximum value of the HV electrode shall be 10Ω. All steelwork shall be bonded to the main HV earthing conductor. Note: Where a section of cable is installed between two sections of overhead line an earth electrode system shall be installed at each end of the cable. Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV (100mm below lowest crimp) HV HV Cable Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level 1m 2.4m min HV Electrode (to achieve max 10Ω) Figure 7-3 Cable Termination with Surge Arresters UK Power Networks 2015 All rights reserved 17 of 31

18 7.7 Handle-Operated Air-Break Switch Disconnectors (ABSD) Handle-Operated ABSD The earthing system requirements for a handle-operated ABSD are outlined below and shown in Figure 7-4. The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated 5m away from operating position and shall be kept as straight as possible with no sharp bends The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 5m below ground level and shall be installed in a duct between the pole and the first earth electrode. The maximum value of the HV electrode shall be 10Ω. The operating rod shall include a fully rated insulator. All other steelwork, including the ABSD, above the operating rod insulator shall be bonded to the main HV earthing conductor. An earth mat (refer to Section 6.4) shall be installed for the operator to stand on. The earth mat shall be connected to the switch handle but shall not be connected to the HV earth Handle-Operated ABSD and Cable Termination The requirements of a handle-operated ABSD earthing system when installed on the same pole as a cable termination are outlined below and shown Figure 7-5. However, the preferred option is to install the ABSD on a separate pole where practical: The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated 5m away from switch operating position and shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 5m below ground level and shall be installed in a duct between the pole and the first earth electrode. The maximum value of the HV electrode shall be 10Ω. The operating rod shall include a fully rated insulator. All steelwork above the operating rod insulator shall be bonded to the main HV earthing conductor. An earth mat (refer to Section 6.4) shall be installed for the operator to stand on. The earth mat shall be connected to the switch handle but shall not be connected to the HV earth. If a metallic sheathed hessian served cable is present either the equipment shall be moved to another pole or the cable in contact with the ground replaced with a modern PVC insulated equivalent for a minimum length of 5m. UK Power Networks 2015 All rights reserved 18 of 31

19 HV Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV (100mm below lowest crimp) Operating Rod Insulator Switch Handle Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level Mat 300 mm PVC Duct Installed from Pole to Rod 1m 5m Separation 2.4m min HV Electrode (to achieve max 10Ω) Plan View Figure 7-4 Handle-Operated ABSD UK Power Networks 2015 All rights reserved 19 of 31

20 HV Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV (100mm below lowest crimp) HV Cable Operating Rod Insulator Switch Handle Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level Mat 300 mm 1m PVC Duct Installed from Pole to Rod 5m Separation 2.4m min HV Electrode (to achieve max 10Ω) Plan View Figure 7-5 Handle-Operated ABSD with Cable Termination UK Power Networks 2015 All rights reserved 20 of 31

21 7.8 Pole-Mounted Switches, Reclosers and Sectionalisers Low-Level Control Unit The earthing system requirements for pole-mounted switchgear with a low-level control unit are outlined below and shown in Figure 7-6. The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated at the bottom of the pole and shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 1m below ground level. The maximum value of the HV electrode shall be 10Ω. All other steelwork, including switchgear, surge arresters, voltage transformer, control unit etc, shall be connected to the main HV earthing. The neutral of the auxiliary supply voltage transformer shall be connected to the HV earthing conductor. An earth mat (refer to Section 6.4) shall be installed for the operator to stand on. The earth mat shall be connected to the control unit or main earth electrode. Auxiliary supply and umbilical cables shall be earthed in accordance with the relevant installation procedure High-Level Control Unit The earthing system requirements for pole-mounted switchgear with a high-level control unit are outlined below and shown in Figure 7-7. The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated 5m away from switch operating position and shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 5m below ground level and shall be installed in a duct between the pole and the first earth electrode. The maximum value of the HV electrode shall be 10Ω. All other steelwork, including switchgear, surge arresters, voltage transformer, control unit etc, shall be connected to the main HV earthing conductor. The neutral of the auxiliary supply voltage transformer shall be connected to the HV earthing conductor. Auxiliary supply and umbilical cables shall be earthed in accordance with the relevant installation procedure. UK Power Networks 2015 All rights reserved 21 of 31

22 Direction of Supply Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV Note: Anti-climbing Guards Not Shown (100mm below lowest crimp) Note: VT Neutral Not Shown HV Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level 1m 300 mm Mat 2.4m min HV Electrode (to achieve max 10Ω) Plan View Figure 7-6 Pole-mounted Switchgear with Low-Level Control Unit UK Power Networks 2015 All rights reserved 22 of 31

23 Direction of Supply Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor Note: Anti-climbing Guards Not Shown All Steelwork Connected to HV Note: VT Neutral Not Shown (100mm below lowest crimp) HV Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level Ground Level 1m 2.4m min PVC Duct Installed from Pole to Rod 5m Separation HV Electrode (to achieve max 10Ω) Figure 7-7 Pole-mounted Switchgear with High-Level Control Unit UK Power Networks 2015 All rights reserved 23 of 31

24 7.9 Hook-Stick Operated Equipment General Rod or hook-stick operated equipment consists of ABSDs, fusegear, automatic sectionalising links (ASL) etc. When hook-stick operated equipment is installed on an unearthed pole an earthing system is not required however all of the steelwork shall be bonded together as shown in the ABSD example in Figure 7-8. Refer to Section and if the hook-stick operated equipment is installed on the same pole as other equipment. All Steelwork Bonded Together Key: Covered Copper Conductor Ground Level Figure 7-8 Hook-Stick Operated ABSD UK Power Networks 2015 All rights reserved 24 of 31

25 7.9.2 Hook-Stick Operated Equipment and Cable Termination The earthing system requirements for hook-stick operated equipment installed on a pole with a cable termination are outlined below and shown in Figure 7-9 and Figure The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground earth electrode situated 5m away from switch operating position and shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 5m below ground level and shall be installed in a duct between the pole and the first earth electrode. The maximum value of the HV electrode shall be 10Ω. All other steelwork shall be bonded to the main HV earthing conductor. If a metallic sheathed hessian served cable is present either the equipment shall be moved to another pole or the cable in contact with the ground replaced with a modern PVC insulated equivalent for a minimum length of 5m. HV Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV HV Cable (100mm below lowest crimp) Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level 1m PVC Duct Installed from Pole to Rod 5m Separation 2.4m min HV Electrode (to achieve max 10Ω) Figure 7-9 Hook-Stick Operated ABSD with Cable Termination UK Power Networks 2015 All rights reserved 25 of 31

26 Fuses or Links Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor All Steelwork Connected to HV (100mm below lowest crimp) HV Cable HV Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Ground Level 1m PVC Duct Installed from Pole to Rod 5m Separation 2.4m min HV Electrode (to achieve max 10Ω) Figure 7-10 Hook-stick Operated Equipment with Cable Termination UK Power Networks 2015 All rights reserved 26 of 31

27 7.9.3 Hook-Stick Operated Equipment and Transformer The earthing system requirements for hook-stick operated equipment when installed on a pole with a transformer are outlined below and shown in Figure 7-11: The main HV earth conductor shall be connected from the pole-top steelwork to an HV underground electrode situated 5m away from switch operating position and shall be kept as straight as possible with no sharp bends. The HV earth electrode shall be installed at minimum a depth of 1m. The main earth conductor/electrode shall be insulated for a minimum of 5m below ground level and shall be installed in a duct between the pole and the first earth electrode. The maximum value of the HV electrode shall be 10Ω. All other steelwork shall be bonded to the main HV earthing. An LV earth conductor shall be connected from the transformer neutral to an LV underground electrode system with a maximum value of 20Ω and segregated from the HV electrode system by at least 8m. The HV and LV earths shall be segregated on the pole by at least 120. Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor Phase Conductor Neutral Conductor All Steelwork Connected to HV Fuses or Links Note: Anti-climbing Guards Not Shown HV L N Transformer Terminal (100mm below lowest crimp) LV Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m ( mm above ground) Bond to LV CNE Cable Shealth LV CNE Cable (PVC Covered) ( mm above ground) Ground Level 1m 2.4m min HV Electrode (to achieve max 10Ω) PVC Duct Installed from Pole to Rod 5m Separation min 8m Separation LV Electrode (to achieve max 20Ω) Figure 7-11 Hook-Stick Operated Equipment with a Pole-mounted Transformer UK Power Networks 2015 All rights reserved 27 of 31

28 8 Special Situations 8.1 HV and LV Combined Construction The earthing requirements for HV and LV combined construction poles are outlined below: The HV steelwork and any HV stays shall be connected to an earth electrode at the base of the pole. The maximum value of the HV electrode shall be 10Ω. The LV steelwork and any LV stays shall not be earthed or bonded to the HV steelwork. Any HV and LV earth electrode below ground shall be separated by a minimum of 8m. HV and LV earths on the same pole shall be segregated by at least Third-Party Equipment on Shared HV or 33kV Poles On existing 33kV or HV poles shared with third parties (e.g. BT) the steelwork and any stays shall be connected to an earth electrode at the base of the pole. The maximum value of the HV electrode shall be 10Ω. Alternatively an earth leakage device consisting of a metallic strip encircling the pole and connected to earth may be present (Figure 8-1). Note: It is no longer permissible to install third party equipment on UK Power Networks 33kV or HV poles. Refer to the Overhead Line Manual for further information. 8.3 Supplies to Mobile Phone Masts on National Grid Towers Special earthing requirements (not covered in this standard) are required for supplies to mobile phone masts on National Grid towers. Refer to EDS for further information. 8.4 Leakage Where leakage potentials are detected an earth leakage device consisting of a metallic strip encircling the pole and connected to earth (Figure 8-1) shall be installed in accordance with the overhead line manual. UK Power Networks 2015 All rights reserved 28 of 31

29 Leakage Band Key: Covered Aluminium Conductor Covered Copper Conductor Bare Conductor Danger of Death Sign placed over Leakage Band after Installation Insulated for a Minimum of 3m Above Ground Level Mechanical Protection for a Minimum of 2m 3m ( mm above ground) Ground Level 1.2m Figure 8-1 Metallic Strip Leakage Device UK Power Networks 2015 All rights reserved 29 of 31

30 9 References EDS ing Standard EDS EDS EDS EDS Secondary Substation ing Design LV Network ing Design NetMap ing Information System (internal document only) LV Supplies to Mobile Phone Base Stations Mounted on Transmission Towers Overhead Line Manual ENA TS Section 15 BS EN BS EN ing associated with HV Distribution Overhead Line Networks (excluding Tower Lines and Pole Transformers) Protection against Lightning Overhead electrical lines exceeding AC 1kV Part 1: General requirements Common specifications UK Power Networks 2015 All rights reserved 30 of 31

31 Appendix A Typical Electrode Systems Table 9-1 shows various options for achieving HV and LV earth resistance values. Note: NetMap also contains earthing maps showing the earthing requirements to achieve 10Ω and 20Ω earths (refer to EDS ). Actual earthing installation methods and arrangements are covered in the Overhead Line Manual and may help to achieve the desired value of earth resistance. Table Ω and 20Ω Electrode Values Typical Soil Type/Resistivity 10Ω Resistance 20Ω Resistance (a) (b) (a) (b) Loam 25Ωm 1 x 2.4m 1 x 2.4m 1 x 1.2m 1 x 2.4m Chalk 50Ωm 1 x 6.0m 2 x 2.4m 1 x 2.4m 1 x 2.4m Clay 100Ωm 3 x 4.8m 4 x 2.4m 2 x 4.8m 2 x 2.4m Sand, Gravel, Clay mix <150Ωm 4 x 4.8m 7 x 2.4m 2 x 4.8m 3 x 2.4m <200Ωm 5 x 4.8m 9 x 2.4m 3 x 4.8m 4 x 2.4m >200Ωm Site specific design required Slate, Shale, Rock 500Ωm Site specific design required Column (a) denotes Deep-driven Vertical and Horizontal Electrodes Each deep-driven vertical electrode comprises of 1.2m rods coupled together to form the final vertical length e.g. 4.8m = 4 x 1.2m. Where there is more than one rod required, the spacing between them is 5m. The top of each electrode should be at a minimum depth of 0.6m below ground level 1.2-6m 5m Column (b) denotes Short Vertical and Horizontal Electrodes Each short-vertical electrode comprises of 1.2m rods coupled together to form the final vertical length e.g. 2.4m = 2 x 1.2m. Where there is more than 1 rod required, the spacing between them is 3m. The top of each electrode should be at a minimum depth of 0.6m below ground level 2.4m 3m UK Power Networks 2015 All rights reserved 31 of 31

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 03-0054 CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This standard details the procedures to be undertaken

More information

EDS CUSTOMER EHV AND HV CONNECTIONS (INCLUDING GENERATION) EARTHING DESIGN AND CONSTRUCTION GUIDELINES

EDS CUSTOMER EHV AND HV CONNECTIONS (INCLUDING GENERATION) EARTHING DESIGN AND CONSTRUCTION GUIDELINES ENGINEERING DESIGN STANDARD EDS 06-0019 CUSTOMER EHV AND HV CONNECTIONS (INCLUDING GENERATION) EARTHING DESIGN AND CONSTRUCTION GUIDELINES Network(s): EPN, LPN, SPN Summary: This standard provides guidance

More information

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS Document Number: EDS 05-4001 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 05-4001 FUSE RATINGS AT DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This design standard details the HV and LV fuse ratings

More information

EDS CUSTOMER LV INSTALLATION EARTHING DESIGN

EDS CUSTOMER LV INSTALLATION EARTHING DESIGN Document Number: EDS 06-0017 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 06-0017 CUSTOMER LV INSTALLATION EARTHING DESIGN EPN, LPN, SPN This standard provides guidance on the earthing of customer

More information

EDS SUBSTATION LVAC SUPPLIES

EDS SUBSTATION LVAC SUPPLIES Document Number: EDS 08-1112 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1112 SUBSTATION LVAC SUPPLIES The standard details the requirements and options for the provision of LVAC

More information

EARTHING YOUR QUESTIONS ANSWERED

EARTHING YOUR QUESTIONS ANSWERED 18 EARTHING YOUR QUESTIONS ANSWERED By Geoff Cronshaw What are earthed and unearthed systems? What are the requirements of BS 7671? What are the advantages and disadvantages of the various types of earthing

More information

EDS CUSTOMER LV INSTALLATION EARTHING DESIGN

EDS CUSTOMER LV INSTALLATION EARTHING DESIGN Document Number: EDS 06-0017 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 06-0017 CUSTOMER LV INSTALLATION EARTHING DESIGN EPN, LPN, SPN This standard provides guidance on the earthing of customer

More information

EOS HAWKER SIDDELEY SWITCHGEAR ECLIPSE - ACTUATOR FUSE

EOS HAWKER SIDDELEY SWITCHGEAR ECLIPSE - ACTUATOR FUSE Document Number: EOS 03-0049 ENGINEERING OPERATION STANDARD EOS 03-0049 HAWKER SIDDELEY SWITCHGEAR ECLIPSE - ACTUATOR FUSE Network(s): Summary: EPN, LPN, SPN This standard advises staff of the requirments

More information

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title High Voltage and 1500 System Earthing References and Definitions Reference Number PDS 02 (RIC Standard: EP 12 00 00 01 SP) Document Control

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11 British Railways Board Group Standard Page 1 of 11 Part A Synopsis This Directive gives the general requirements of telecommunications earthing systems, and encompasses the requirements for the earthing

More information

A guide for the connection of a low voltage installation to The Guernsey Electricity Network

A guide for the connection of a low voltage installation to The Guernsey Electricity Network A guide for the connection of a low voltage installation to The Guernsey Electricity Network Guernsey Electricity Limited (GEL) - January 2017 2 Contents Definitions 3 Introduction 5 Scope 6 Sections 1

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

EDS ELECTRIC VEHICLE CONNECTIONS

EDS ELECTRIC VEHICLE CONNECTIONS Document Number: EDS 08-5050 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-5050 ELECTRIC VEHICLE CONNECTIONS EPN, LPN, SPN This standard outlines the design requirements for the connection of

More information

3 o/c 2 An area or temporary structure used for display, marketing or sales is defined as a a booth b a stand c an exhibition d a show.

3 o/c 2 An area or temporary structure used for display, marketing or sales is defined as a a booth b a stand c an exhibition d a show. 1 PAPER 7 Sample Questions - C&G 2382 17th Edition paper C 1 o/c 1 - BS 7671 relates to permanent and temporary installations for equipment on: a marinas. b ships. c equipment on aircraft. d railway traction

More information

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2 3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level

More information

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED PART B-07 TITLE: SERVICE CONNECTIONS SPECIFICTION NO: B-07 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) AMENDMENTS / REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

Technical Specification 43-8 Issue Amendment

Technical Specification 43-8 Issue Amendment PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 43-8 Issue 4 2015 + Amendment 1 2016 Overhead line clearances www.energynetworks.org PUBLISHING AND COPYRIGHT

More information

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims Research Brief Impact of higher 25kV fault currents Background Increasing the maximum fault levels at traction feeder stations has the potential to reduce the costs of electrification schemes. The potential

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

Underground Distribution Construction Manual

Underground Distribution Construction Manual Underground Distribution Construction Manual Section E7 Earthing Approved by: A Smith de Perez Energex Limited 2014 ABN 40 078 849 055 MANUAL 00305 1. INSTALLATION Detailed earthing information may be

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and HIGH VOLTAGE METAL CLAD SWITCHGEAR WITH SPOUTS Copyright National Grid plc 2014, all rights reserved. No part of this publication

More information

STANDARD TECHNIQUE : SD5P/2

STANDARD TECHNIQUE : SD5P/2 Company Directive STANDARD TECHNIQUE : SD5P/2 Design of Un-metered Connections ST:SD5P/2 7 th December 2009-1 of 10 - 1.0 INTRODUCTION This document specifies the requirements for the design of un-metered

More information

33kV Connection up to 90MVA

33kV Connection up to 90MVA Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords

More information

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements Company Directive STANDARD TECHNIQUE: SD4O/1 Standard HV Connection Arrangements Policy Summary This document specifies the standard arrangements for HV metered connections. NOTE: The current version of

More information

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES MINISTRY OF LABOUR, INDUSTRIAL RELATIONS AND EMPLOYMENT GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES Occupational Safety & Health Inspectorate These guidelines should be used with approved standards:

More information

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category General Title Reference Number PMP 01 (RIC Standard: EP 00 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards and

More information

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Equipotential Bonding of Rail Vehicles to Running Rail Potential Railway Group Standard Equipotential Bonding of Rail Vehicles to Running Rail Potential Synopsis This standard mandates the requirements for equipotenial bonding of rail vehicles to comply with the Electricity

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance WASHING HIGH VOLTAGE INSULATORS USING PORTABLE WASHING EQUIPMENT Copyright National Grid plc 2014, all rights reserved.

More information

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Low Voltage Distribution and Installations Earthing References and Definitions Reference Number PDS 03 (ARTC Standard: EP 12 00 00 02 SP) Document

More information

Substation Lightning Protection. Document Number: 1-11-FR-11

Substation Lightning Protection. Document Number: 1-11-FR-11 Substation Lightning Protection Document Number: 1-11-FR-11 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-11 Substation Lightning Protection Asset

More information

SWITCHGEAR FOR SERVICE UP TO 36kV (CABLE AND OVERHEAD CONDUCTOR CONNECTED)

SWITCHGEAR FOR SERVICE UP TO 36kV (CABLE AND OVERHEAD CONDUCTOR CONNECTED) PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Issue 3 2012 SWITCHGEAR FOR SERVICE UP TO 36kV (CABLE AND OVERHEAD CONDUCTOR CONNECTED) www.energynetworks.org 2012 Energy Networks

More information

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS 717.1 Scope The particular requirements of this section apply to a.c. and d.c. installations for mobile or transportable

More information

Guidance for Low Voltage Electrical Installations

Guidance for Low Voltage Electrical Installations Guidance for Low Voltage Electrical Synopsis This document provides information in support of GI/RT7007 Low Voltage Electrical. Signatures removed from electronic version Submitted by Anne E Blakeney Standards

More information

Electrical Awareness and Considerations

Electrical Awareness and Considerations Electrical Awareness and Considerations By David Taylor FIHE MIET IEng Objectives Awareness of specifications. Awareness of Distribution Network Operators (DNO) earthing arrangements. Awareness of basic

More information

Electrical Awareness for Construction Activities. Overhead Power Lines & Underground Cables

Electrical Awareness for Construction Activities. Overhead Power Lines & Underground Cables Electrical Awareness for Construction Activities Overhead Power Lines & Underground Cables Electrical Awareness for Construction Activities Electrical appreciation Agenda Overview of the electrical distribution

More information

Steve Summers Region Sales Manager

Steve Summers Region Sales Manager Steve Summers Region Sales Manager Institute For Animal Healthcare LV Switchgear Package Package Subs LV Switchboards PDU s LV sub Distribution MCC s MV Switchgear Established in 1972 manufacturing control

More information

Low Voltage Power Supplies in Electrified Areas

Low Voltage Power Supplies in Electrified Areas Low Voltage Power Supplies in Electrified Areas Synopsis This document mandates requirements for control of return and stray currents and the management of earthing for low voltage power supplies in electrified

More information

Service and Rehabilitation Electrical Power Systems

Service and Rehabilitation Electrical Power Systems Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading

More information

WIRING MATTERS SEPTEMBER 2018

WIRING MATTERS SEPTEMBER 2018 WIRING MATTERS SEPTEMBER 2018 The 18 th Edition (BS 7671:2018) launch - revisited This is the second of two articles on the launch of the 18 th Edition (BS 7671:2018). The first article covered electric

More information

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS... TITLE SPECIFICATION FOR PORTABLE DATE: JULY 2006 PAGE: 1 OF 25 TABLE OF CONTENTS Page FOREWORD...3 INTRODUCTION...4 1 SCOPE...4 2 NORMATIVE S...4 3 DEFINITIONS AND ABBIATIONS...4 4 REQUIREMENTS...5 4.1

More information

SUBSTATION DESIGN TRAINING

SUBSTATION DESIGN TRAINING 2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near

More information

Electrical Installation Lecture No.14 Dr.Mohammed Tawfeeq Alzuhairi

Electrical Installation Lecture No.14 Dr.Mohammed Tawfeeq Alzuhairi Earthing systems What is earthing? The whole of the world may be considered as a vast conductor which is at reference (zero) potential. In the UK it is referred to this as 'earth' whilst in the USA it

More information

The impact of the 18 th Edition (BS 7671:2018) Sections 722, 753 and [new] 730

The impact of the 18 th Edition (BS 7671:2018) Sections 722, 753 and [new] 730 The impact of the 18 th Edition (BS 7671:2018) Sections 722, 753 and [new] 730 In this article, Geoff Cronshaw looks at the impact that some of the proposed changes in the DPC (draft for public comment)

More information

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2 Electrical Learning Notes MODULE 2.2 UNIT 2.2.6 Installation Techniques Earthing & Bonding PHASE:2 Table of Contents INTRODUCTION... 3 DEFINITIONS... 4 EARTHING... 5 TYPES OF SYSTEM EARTHING... 10 EQUIPOTENTIAL

More information

The Licensed Distribution Network Operators of Great Britain

The Licensed Distribution Network Operators of Great Britain DCRP_12_04_07 The Licensed Distribution Network Operators of Great Britain A review of Engineering Recommendation G12/3 Requirements for the Application of Protective Multiple Earthing to Low Voltage Networks.

More information

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016 No Description/ Specification Amendment 1 EDD 1 :2008 11/0.415 kv Distribution Transformer, Oil Filled - 2 ED 2 :1987 The Galvanization of Iron and Steel, Articles Other Than Steel Wire - 3 ED 3 :1979

More information

Document No Amendment No Approved By Approval Date Review Date NS116 DESIGN STANDARDS FOR DISTRIBUTION EQUIPMENT EARTHING

Document No Amendment No Approved By Approval Date Review Date NS116 DESIGN STANDARDS FOR DISTRIBUTION EQUIPMENT EARTHING Network Standard NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-S0051 2 Head of AEP & S 22/06/2016 22/06/2019 Minor amendments approved 13.02.2018 NW000-S0051 NS116

More information

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding 2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding By George Ardavanis, PhD Keywords: overhead catenary system (OCS), electric multiple unit (EMU), grounding and bonding (G&B), overhead contact line (OCL),

More information

Earthing Calculation. Contents. Introduction. From Open Electrical

Earthing Calculation. Contents. Introduction. From Open Electrical Earthing Calculation From Open Electrical Contents 1 Introduction 1.1 Why do the calculation? 1.2 When to do the calculation? 1.3 When is the calculation unnecessary? 2 Calculation Methodology 2.1 Prerequisites

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) (Corr.1 June 2018) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines. 1 PAPER 4 Sample Questions - C&G 2382 17th Edition full paper D 1 o/c 1 - A recommendation for the interval to the first periodic inspection shall be made by: a the installation electrician. b the main

More information

NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links

NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links Version:- 7.0 Date of Issue:- July 2017 Page 1 of 19 NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links 1. Purpose The purpose of this document is to detail

More information

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Requirements for Secondary Voltage Revenue Metering (750 V and less) Requirements for Secondary Voltage Revenue Metering (750 V and less) To view the latest revision of this document go to: http://www.bchydro.com/ext/metering/ January 28, 2010 Copyright 2008 by BC Hydro.

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Major changes within the New 18 th Edition Wiring Regulations announced by The IET

Major changes within the New 18 th Edition Wiring Regulations announced by The IET Major changes within the New 18 th Edition Wiring Regulations announced by The IET BS 7671:2018 Requirements for Electrical Installations will be issued on 2 nd July 2018 and is intended to come into effect

More information

/12/$ IEEE. M. Bashir M.Sc student, Student Member, IEEE Ferdowsi University of Mashhad Mashhad, Iran

/12/$ IEEE. M. Bashir M.Sc student, Student Member, IEEE Ferdowsi University of Mashhad Mashhad, Iran Effect of Increasing the Grounding Grid Resistance of a Ground System at a Substation on the Safety and Transient Overvoltage on the Interior Equipments M. Bashir M.Sc student, Student Member, IEEE Ferdowsi

More information

Chapter 6 Generator-Voltage System

Chapter 6 Generator-Voltage System Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals

More information

Proving High Voltage Conductors De-Energised

Proving High Voltage Conductors De-Energised Proving High Voltage Conductors De-Energised Summary This procedure supports the Power System Safety Rules and its requirements assembled under Making High Voltage Apparatus Safe for Work Category 5.5;

More information

Boardworks Ltd Mains Electricity

Boardworks Ltd Mains Electricity 1 of 22 Boardworks Ltd 2016 Mains Electricity Mains Electricity 2 of 22 Boardworks Ltd 2016 Direct current 3 of 22 Boardworks Ltd 2016 There are two main types of electric current: direct current (DC)

More information

Specification for 11kV and 33kV Overhead Lines of Unearthed Construction on Single and H Type Wood Poles

Specification for 11kV and 33kV Overhead Lines of Unearthed Construction on Single and H Type Wood Poles 1. SCOPE Specification for 11kV and 33kV overhead power lines of unearthed construction employing AAAC conductors, supported on single and H type wood pole supports. 2. ISSUE RECORD This is a Reference

More information

Independent Testing Laboratory for High Voltage Equipment

Independent Testing Laboratory for High Voltage Equipment T E S T I N G L A B O R A T O R Y Independent Testing Laboratory for High Voltage Equipment 1 CHALLENGING ENVIRONMENT The primary concern for utilities is to ensure grid reliability, efficiency, and security.

More information

B kv Gas-insulated Substations

B kv Gas-insulated Substations 72.5 145 kv Gas-insulated Substations The increasing demand for electrical power in cities and industrial centres requires the installation of a compact and efficient distribution and transmission network.

More information

with Vacuum Circuit Breaker HAF

with Vacuum Circuit Breaker HAF M E T A L - C L A D S W I T C H G E A R Safety and Reliability with Vacuum Circuit Breaker HAF Flexible Design and Compact with Vacuum Circuit Breaker HVF Easy Installation and Maintenance We build a better

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and EARTHING HIGH VOLTAGE EQUIPMENT Copyright National Grid plc 2016, all rights reserved. No part of this publication may be reproduced,

More information

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011)

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011) (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011) Author: IET Publications (edited by Mark Coles) Book details Author: IET Publications (edited by Mark Coles) Year: 2011 Format: Paperback,

More information

LV MV HV SPECIALISTS. Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS

LV MV HV SPECIALISTS. Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS LV MV HV SPECIALISTS Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS 100,000+ PRODUCTS 100+ BRANDS International were established in 1985 and are

More information

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 ER42 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 Int QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers White Paper Ground Fault Application Guide WL Low Voltage Power Circuit Breakers Table of Contents Introduction 3 Need for ground fault tripping 3 Requirements from industry standards 3 National Electrical

More information

Company Directive STANDARD TECHNIQUE : TP4B/2. Relating to 11kV and 6.6kV Transformer Protection

Company Directive STANDARD TECHNIQUE : TP4B/2. Relating to 11kV and 6.6kV Transformer Protection Company Directive STANDARD TECHNIQUE : TP4B/2 Relating to 11kV and 6.6kV Protection Policy Summary This document describes the detailed requirements for 11kV/415V and 6.6kV/415V distribution transformer

More information

Engineering Recommendation P26

Engineering Recommendation P26 Engineering Recommendation P26 The Estimation of the Maximum Prospective Short-Circuit Current for Three Phase 415V Supplies Document originally produced by the Electricity Association. 2003 Energy Networks

More information

Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment

Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment Technical Guidance Note 287 Third-party guidance for working near National Grid Electricity Transmission equipment 02 Purpose and scope... 3 Contact National Grid... 3 How to identify specific National

More information

NXPLUS C Single busbar. Maintenance-free for lifetime

NXPLUS C Single busbar. Maintenance-free for lifetime NXPLUS C Single busbar Maintenance-free for lifetime Energy Distribution Welcome! Page 2 Content Overview Technical data Typicals Panel design Circuit-Breaker panel Busbar Operation Metering Low-voltage

More information

Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective

Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective D. K. Chaturvedi (NTPC) Harshvardhan Senghani (NTPC) K Venugopal (CS Electric) This paper appraise user on the termination

More information

The Management of Electrical Safety in Quarries, Associated Plant and Equipment

The Management of Electrical Safety in Quarries, Associated Plant and Equipment Quarries National Joint Advisory Committee (QNJAC) Plant Information Sheet 1 (Version 1, November 2015, review date: 2020) The Management of Electrical Safety in Quarries, Associated Plant and Equipment

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

Assembly instructions

Assembly instructions Please carefully read the assembly instructions before beginning the installation, operation and maintenance of the solar facility. Noncompliance could cause injury to persons or damage to the equipment.

More information

SNZ TR 6120:2014. New Zealand Technical Report. Low voltage supply earthing systems SNZ TR 6120:2014

SNZ TR 6120:2014. New Zealand Technical Report. Low voltage supply earthing systems SNZ TR 6120:2014 New Zealand Technical Report Low voltage supply earthing systems SNZ TR 6120:2014 COMMITTEE REPRESENTATION This technical report was prepared under the supervision of the LV Supply Earthing Systems Review

More information

Transmission & Distribution Glossary of Electrical Terms

Transmission & Distribution Glossary of Electrical Terms Transmission & Distribution Glossary of Electrical s Breaker Panel Bushing Circuit Circuit Breaker Conductor Conduit Consumption Current Distribution Electricity (Static vs. Current) Electron Feeder The

More information

Three days training program (Oct 5-7) on. Substation Earthing, Industrial earthing and Neutral earthing. at IEI Mysore, Karnataka India

Three days training program (Oct 5-7) on. Substation Earthing, Industrial earthing and Neutral earthing. at IEI Mysore, Karnataka India Three days training program (Oct 5-7) on Substation Earthing, Industrial earthing and Neutral earthing at IEI Mysore, Karnataka India Training program is helpful for students, Engineers working in Design

More information

Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( )

Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( ) Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 (2382-18) March 2018 Version 1.0 FAQs 1 18 th Edition IET Wiring Regulations 2018 FAQs When will the 18 th Edition of BS 7671

More information

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours Candidate Code No. IT 36 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01 SECTION H EARTHING ABC Earthing Kits H01 ABC Earthing Kit 4 legged ABC earth kit. Each leg of the earth truss terminates with a female bayonet type pipe connector with a protective rubber hand guard. These

More information

THE PROTEAN AND POC-MAST DESIGN

THE PROTEAN AND POC-MAST DESIGN THE PROTEAN AND POC-MAST DESIGN Contents 1. The changing landscape of generation for power transmission and distribution. 2. The Holford rules and recommendations for OHL routing and design. 3. The current

More information

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Construction and Wiring Guidelines for Ergon Energy Substation Panels Construction and Wiring Guidelines for Ergon Energy Substation Panels Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 Panel Wiring...

More information

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926)

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926) OSHA Update Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926) 5/14/2014 Significant Changes to the Standards General Training Host Employer & Contractor Responsibilities

More information

Standards, Procedures and Policies for Grid Connection

Standards, Procedures and Policies for Grid Connection Standards, Procedures and Policies for Grid Connection CONTENTS 1 INTRODUCTION 1 2 EMBEDDED GENERATION 1 2.1.1 OUTLINE OF EMBEDDED GENERATION 1 2.1.2 CHANGES IN EMBEDDED GENERATION 1 2.1.3 ASPECTS OF EMBEDDED

More information

B kv T&D GAS INSULATED SWITCHGEAR

B kv T&D GAS INSULATED SWITCHGEAR GAS INSULATED SWITCHGEAR B 105 170 300 kv The increasing demand for electrical power in cities and industrial centers necessitates the installation of a compact and efficient distribution and transmission

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers DISTRIBUTION CODE Contents 1 Introduction 2. Advisory and Information Systems 3. Supply 3.1 Quality of Electric Supply 3.2 Interference with other Customers 3.3 Application for the Supply of Electricity

More information

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015 Engineering Procedure Electrical Distribution Unit PR D 78500 Electrical s Version 1.0 Date in Force: 4 November 2015 Procedure UNCONTROLLED COPY WHEN PRINTED Approved by: Sean Budge Manager Electrical

More information

Grounding Systems. Equipment Grounding & Grounded Conductors

Grounding Systems. Equipment Grounding & Grounded Conductors Grounding Systems Equipment Grounding & Grounded Conductors Definitions A Grounded or Earthed system is one that is connected to the earth Grounded Conductor is a conductor that normally carries current

More information

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours Candidate Code No. IT 32 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

Customer Substation Manual

Customer Substation Manual Customer Substation Manual Table of Contents Section Page 2 of 81 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation

More information

KD1E Range Potential Indicators

KD1E Range Potential Indicators KD1E Range Potential Indicators Operating Instructions 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Limited Warranty & Limitation

More information

National Certificate in Electricity Supply (Sub Station Maintainer) (Level 4)

National Certificate in Electricity Supply (Sub Station Maintainer) (Level 4) NZQF NQ Ref 1118 Version 2 Page 1 of 7 (Sub Station Maintainer) (Level 4) Level 4 Credits 140 This qualification has been reviewed. The last date to meet the requirements is 31 December 2018. Transition

More information