1 East Allen County Schools Facilities History Calendar Years October 5, 2015

2 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and Painted Interior 2 nd -Story 2008: Installed New Cabinets and Floor Tile in Art Room; Installed New Cabinets and Floor Tile in Old FACS; Moved Journalism Room Downstairs and Installed New Floor Tile; Added New Parking at Junior High Gym; Repaved Back Parking Lot and Rear Drive ; Wired New Exterior Sign; New Gym Lighting; Re-Surfaced Track; and New Band Tower 2009: Roof Replacement; Replaced Exhaust Fans; Replaced Well House Doors and Frame 2010: New Gate at the Football Field; New Exhaust Fans; Repaired Junior High Gym Lot Lights; and Concrete Repair at Bus Entrance 2011: Split Classroom and Built Wall to divide the Classroom ; Installed Air Conditioning Unit; Installed New Lockers (Qty. 100); and New Roof (Gym Area) 2012: ADA Ramp & Door; Roof Replacement (Shop Area) 2014: K-12 Project Competed (August 2014); Security Camera System Upgrade 2015: Driveway Lights; Install Sidewalk; Underground Fuel Tank Removal; Band/Choir Flooring; Rewire Ag Shop Electrical; and Build Time Out Room Leo Attendance Area Cedarville Elementary 2007: Roof Repair; and 2 Cameras & New Video System 2008: Security Lock & Buzzer Front Entrance; New Playground Fence; and New Exterior Gym Doors 2010: Updated Front Landscaping 2011: Split Art Room into two Classrooms 2012: Roof Replacement thru wall flashings; and Asphalt Work front drive repair 2014: Roofing Project 2015: Drainage & Sidewalk Repairs Leo Elementary 2007: Repaved Back Parking Lot; and Front Door Lock with Intercom Security 2008: Replaced Interior Classroom Doors & Locks; Replaced Walk-in Cooler & Freezer; and Replaced Upper Cabinets in Six (6) Classrooms 2009: Replaced Thirty (30) Interior Doors & Hardware; Replaced Boiler Room Doors & Frames; Replaced Heating, Cooling, and Ventilation System; Removed Partitions and Built 4 Block Walls; Built Time-out Room; Installed New Light Fixtures in Classrooms (Qty 6); and Connected Building to City Water 2010: Asphalt Bus Lot; Rebuilt Clinic Restroom (for Special Needs Student); Updated Front Entrance Landscaping; and Replaced Parking Lot Lights 2011: Replaced Hallway Flooring; Moved Computer Room; Removed Wall in Media Center Office Area; and Replaced Playground Backstop Leo High School 2007: Roof Work; South Parking Lot Pylons; Replaced Football Pressbox; New Lockers (Qty. 350); Replaced Chiller Pumps; and Pavement Work

3 2008: Security Buzzer and Lock System at Front Entrance; Removed Wall in Computer Lab and New Carpet; New Exterior Doors & Frames at Four (4) Locations; Added 2 nd Entrance on North Parking Lot; Added New Lockers (Qty. 350); and Replaced Restroom Interior Doors 2009: Replaced Softball Bleachers; Installed New Softball Scoreboard; Installed New Baseball Scoreboard; Installed New Football Scoreboard; Replaced Walk-in Freezer and Cooler; Added ADA Entrance Door; Installed New Drinking Fountains; Installed New Whiteboards; Installed New Lockers (Qty 300); Hallway Gate for Spectator Access; and Installed New Gym Doors and Hardware 2010: Replacement/Repair of Sewer Line; Resurfaced and Lined Track; Installation of New Fire Alarm; Replaced Columns on Football Bleachers on Visitor Side 2011: Installed New Lockers (Qty. 170); Replaced Lockers (Qty. 300); Expanded Bus Bullpen; New Flooring in Rooms ; Replaced Two (2) Doors Out Building; Fire Alarm Replacement; and Major Repair to Football Bleachers 2012: Asphalt Work Back Drive 2014: Boiler Replacement; Asphalt Replacement; and Security Camera System Upgrade 2015: Junior High Locker Room Replacement; Kitchen Ceiling/Lighting Replacement; Tennis Court Repair; Junior High Gym Divider Curtain Replacement; ADA Ramp (Door 8); and Install of Pole Vault Pit New Haven Attendance Area New Haven Intermediate 2007: Front Door Lock with Intercom Security; New Tile in 5 Classrooms; New Ceiling Tile and Lights in 5 Classrooms; Replace Door #11; Replaced 12 Interior Doors; and Replaced 6 Rooftop Exterior Fans 2008: Replaced Floor Tile in Three (3) Classrooms, Clinic, Lounge & Copy Room; Replaced Exterior Door & Frame; and Replaced Six (6) Exhaust Fans on Roof 2009: Replaced Exhaust Fans; Landscaped Front Entrance; and Moved Bookroom and Wired for Computers 2010: Installed New Door between Classrooms for Special Ed; Playground Mulch; Built New Walk-In Freezer; Built New Walk-In Cooler; and Tile Flooring in Food Storage Area 2014: Re-Roofing Project 2015: Flooring/Lighting/Ceiling Replacement New Haven Middle 2007: Replaced Sewage Lines; Roof Replacement; Floor Tile in 8 Classrooms; Front Door Lock with Intercom Security; and Built Wall in Special Education Room 2008: Security Buzzer and Lock System at ADA Entrance (East Gym); Installed New White Boards; Added Security Gate; and Continuation of Roofing Project 2012: Interior Renovation Time Out Room 2014: Elevator Upgrade; and Fire Alarm System Upgrade 2015: Classroom Painting New Haven High 2007: New Main Entrance Doors; Front Door Lock with Intercom Security; Gym Floor Ground and Re-Finished; Replaced Office Rooftop Air Conditioner; New Student Lockers (Qty. 200); New Bleacher Mules (Qty. 2); and Replaced John Young Stadium

4 2008: Replaced Restroom Partitions Upstairs Main Commons (Boys & Girls) 2009: Re-sealed and Lined Track; Replaced Parking Lot Islands; Rebuilt Tennis Courts; Rebuilt Discus Pads; Added New Softball Fence; Wired New Computer Lab; Landscaped Front Entrance; and New Fire Alarm (D Area) 2010: Installation of Six (6) New Cameras and Monitor; Seal Exterior Building Brick; Installed New Tennis Bleachers; Exterior Concrete Repairs; Painted Outside Entrances; New HVAC Compressor; and Replacement of Dimmer Switch in Stage Area 2011: Replaced Lower Gym Bleachers; Cement Work; Installed New Lockers 2014: Upgraded Elevator and Security Camera System Upgrade 2015: Re-sealed and Lined Track; and Special Ed Flooring New Haven Primary 2007: New Floor Tile in Cafeteria; Front Door Lock with Intercom Security; and Painted Cap on Building 2008: Repaved Four (4) Playgrounds; Repaved Rear Parking Lot & Replaced Rear Concrete Walk; Rebuilt Nine (9) Classroom Restrooms; Replaced Kitchen Floor Tile; and Replaced Hot Water Heater 2009: Remodeled Restrooms in Classrooms (Qty 3); Replaced 80 ft. of Precast Cap; and Replaced Condenser for Walk-in Freezer 2010: Replaced Switch Gear (Electrical); Replaced Boilers; Remodeled Restrooms in Classrooms (Qty. 6); Installed Rock Climbing Wall in Gym; and Outside Concrete Repairs 2011: Remodeled Restrooms in Classrooms (Qty 6); Replaced Flooring in Classrooms (Qty. 2); Installed Door Between Classrooms 19 and 21; Removed two (2) Modulars (Trailers); and Installed two (2) Bulletin Boards 2012: Classroom Addition (Qty. 2); Remodeled Classrooms (Qty. 2); and Expanded Rear Parking Lot and Drive New Haven Elementary 2007: New Tile in Classrooms (Qty. 5); New Ceiling Tile and Lights in Classrooms (Qty. 5); and New Swing Sets 2008: Security Lock, Buzzer Front Entrance, and Front Entrance Doors; Replaced Classroom Floor Tile, Ceiling Tile and Lights (Qty. 1); Replaced 2 nd Story Hallway Floor Tile, Ceiling Tile and Lights; Installed New Front Visitor Parking Lot and Landscape; Removed Front Awning; Added Third Entrance Lane in Rear Lot; Repaved Teachers Parking Lot; Replaced Gym Windows with New Block; Added Playground Equipment & Mulch; Resealed Playground; Rebuilt Walk-in Freezer and Cooler; and Removed Office Restroom and Installed Teacher s Mailboxes 2009: New Floor Tile for 1 st Floor Hallway; New Ceiling Tile for 1 st Floor Hallway; New Light Fixtures 1 st Floor Hallway; Replaced Windows in Kindergarten Classrooms (Qty. 3); Landscaped Rear Entrance; Installed New Kitchen Ovens; and New Floor Tile in Kitchen and Food Storage 2010: New Flooring in Conference Room; Updated Front Entrance Landscaping; and Installed Rock Climbing Wall in Gym 2015: Re-roofing Project; and Remodel Restrooms (Qty. 2)

5 Paul Harding Attendance Area Southwick Elementary 2007: New Swing Sets (Qty. 2); Roof Replacement; and New PA System 2008: Security Lock, and Buzzer Front Entrance; New Front Entrance Doors & Frames; Replaced Classroom Windows (Qty. 3); Wired New Exterior Sign; Paved New Walkway for Students Walking to/from Southwick Addition; Added Parking Spaces Visitors Lot & Repaved; Continuation of Roofing Project; :ower Level Sidewalk Repaired; and Wired 2 nd Computer Lab 2009: Asphalt Main Parking Lot; Striped Parking Lot; Replaced Main Parking Lot Lights; Replaced two (2) Hot Water Heaters; Roof Replacement; Replaced three (3) Classroom Windows; Repaired Crawl Space Wall (Kitchen Area); Replaced Sidewalk; and New Condenser Food Storage 2010: Updated Well Vestibule Area; and Replaced Windows and Door at Courtyard 2011: Replaced Courtyard Windows; Moved Principal Office; Replaced Stage Lighting 2011; and Installed Bulletin Boards (Qty. 2) 2012: Roof Replacement Gym; and Asphalt Work Playground 2014: Window Replacement; and Exterior Lighting 2015: Landscaping; and Sidewalk Repair Prince Chapman Academy 2007: Front Door Lock with Intercom 2010: Repaired Exterior Cement at Doors 5, 6 and : Installed New Playground and moved Playground Equipment from Village Paul Harding Junior High/East Allen University 2007: New Carpet in Main Commons; New Pressbox Door; New Office Air Conditioner Rooftop Unit; and Clinic Restroom ADA 2008: Security Buzzer and Lock System at Front Entrance; Replaced Carpet in FACS Hallway; Replaced Hot Water Heater in Cafeteria; Installed New Dishwasher; Installed New Windows; and Replaced Two (2) Well Pumps 2009: Roof Replacement; Replaced Generator; Installed New Sound and Lights for Stage; Concrete Repairs; Replaced Hot Water Heater; Built Interior Classrooms (Qty 4); Installed Fifty (50) New Lockers 2010: Replaced Restroom Partitions (Restrooms Qty. 4); Roof Replacement 2011: Re-sealed Track; Cement Repairs; Landscaping at Front Entrance 2015: Lobby Restrooms Update; and Drinking Fountains Replacement Woodlan Attendance Area Woodlan Jr./Sr. High School (includes K-12) 2007: Re-Surfaced Track; Added Parking Lot Lights (West Side); Re-Configured Classroom for Special Ed; and Installed Door in Ag Office 2008: Security Buzzer and Lock System at Front Entrance; Tinted Glass on All Exterior Door Windows, Courtyard Windows, and Four (4) Classrooms to prepare for 7 th Grade Student; Changed Lighting in Computer Room, Ag Room and Clinic for 7 th Grade Student; and Replaced Gym Stairway Nosings

6 2009: Asphalt Work (New Bus Entrance); Tinted Classroom Windows (Qty 8 Rooms); Upgraded Stage Lighting; and Added Sidewalk 2010: Replaced Generator; and Installed a Door Between Two Classrooms for Special Ed; Tinted Classroom Windows (Qty. 36) 2011: Created two (2) Classrooms and Built two (2) Walls; Moved Teacher Lounge; Computer Lab Electrical; Roof Replacement (Media and Office Areas); Constructed New Intermediate Elementary Office; Built New Parking Lot and Installed New Parking Lot Lights; Built New Playground and moved Harlan Playground Equipment; Installed new Playground Fence; and Constructed New Media Center for Intermediate School 2012: ADA Door 2014: K-12 Project Completed (August 2014); and Security Camera System Upgrade 2015: Fence Work; Exterior Door; and Install Sidewalk Service Center 2007: Replaced Overhead Doors (Qty. 7) 2012: Asphalt Work Front Lot/Drive & Bus Garage Area; and Underground Fuel Lines Replacement 2014: Re-Roofing Project

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200 PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,

More information

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS MSD OF WAYNE TOWNSHIP 2017-2018 SUSTAINABILITY PROJECTS 2017 Superintendent Goals #2 Continued work towards increasing revenue and reducing expenditures including a reduction in the M.S.D. of Wayne Township

More information

Watauga County Schools Capital Improvement Plan 2015

Watauga County Schools Capital Improvement Plan 2015 Watauga County Schools Capital Improvement Plan 2015 WATAUGA COUNTY SCHOOLS CAPITAL IMPROVEMENT PLAN 2015 In an effort to meet the standards of the North Carolina Building Code and North Carolina Public

More information

BOE Facilities Capital Project Priority List

BOE Facilities Capital Project Priority List Cat 1 BOE Safety/ Security CPB504 A) Upgrade/ Replace Doors - System Wide 200 250 450 1 3 B) Roxbury/ Toquam Safety Playground Upgrades 250 100 350 1 1 C) Vestibule- Springdale 100 0 100 D) Vestibule-

More information

BOE Facilities Capital Project Priority List FY 17/18 Fut. Yr. Total Proj. Overall Amount Amount Project Priority Priority

BOE Facilities Capital Project Priority List FY 17/18 Fut. Yr. Total Proj. Overall Amount Amount Project Priority Priority Cat 1 Project Category BOE Safety/ Security CPB504 A) Upgrade/ Replace Doors - System Wide 200 250 450 1 10 B) Roxbury/ Toquam Safety Playground Upgrades 250 100 350 1 1 C) Vestibule- Springdale 100 100

More information

Committee Approved Critical Repairs

Committee Approved Critical Repairs Location Description Estimate Apollo Extend walk-off mats $ 5,000 Food Services Equipment $ 61,200 Apollo Total $ 66,200 Briarwood Food Services Equipment $ 17,000 Reseal all gutter seams and flashing

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

FACILITIES NEEDS ASSESSMENT - FACILITY MASTER PLAN CONSTRUCTION COST ESTIMATE FULLERTON JOINT UNION HIGH SCHOOL DISTRICT

FACILITIES NEEDS ASSESSMENT - FACILITY MASTER PLAN CONSTRUCTION COST ESTIMATE FULLERTON JOINT UNION HIGH SCHOOL DISTRICT Buena Park High School 1 Deferred maintenance items Roofing NA 0 HVAC NA 0 Plumbing NA 0 Electrical - Repair Conduits on Roof $15.00 13,000 SF $ 195,000 $ 195,000 Lighting NA 0 Painting $0.20 8,608,000

More information

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested AMOUNT SOURCE General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 0 155 MIS Technology Infrastructure 300,000 300,000 Tax Levy 300,000 300,000

More information

Fair Park - Capital Needs Inventory

Fair Park - Capital Needs Inventory : 1: Permanent Facility with Occupant; : Year-Round Visitation; 3: Potential to Attract Year-Round or Tenants; 4:, Security, Code, ADA; 5: Urgent Major Maintenance 1 3 4 July 10, 017- DRAFT PRIORITIES

More information

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST 01. 2016 DESIGN SCHEME COMPARISONS SCHEME A: 2-Story building and parking garage, no code variance required. SCHEME B: 5-Story building(3 school

More information

ERUSD 2025 Board Workshop #1

ERUSD 2025 Board Workshop #1 The image part with relationship ID rid4 was not found in the file. ERUSD 2025 Board Workshop #1 December 12, 2017 12/5/17 1 Cabinet Meeting 12/4/2017 Cactus Group 7 School Allowance $ 1,101,039 Filed

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A PROJECT LIST as (Draft) Description Additional Campuses Initial Spent as 943 Acquisition of 535 Old County Rd., San Carlos 3,407,259 3,407,259 3,407,259 3,407,259 0 closed 944 Acquisition of 150 Jefferson

More information

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer. COMPREHENSIVE MAINTENANCE PLAN SCHOOL FACILITIES MAINTENANCE CATAGORIES 1 Structural Foundations Routine inspection for cracks, deterioration, infiltration. Localized repair of cracks and spalling with

More information

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets. Capital Project Description Capital Project Scopes Project Schedules Project Budgets Next Steps Page 1 Project Scope: Facilities Improvements District Wide Facilities Renovations Correct Drainage Issues

More information

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on 74.4 + /- acres Toano, Virginia (PRELIMINARY) F9 LUMBER LIQUIDATORS 3000 JOHN DEERE DR STONEHOUSE COMMERCE PARK SIZE: GROUND: NUMBER

More information

GREAT NECK UNION FREE SCHOOL DISTRICT

GREAT NECK UNION FREE SCHOOL DISTRICT GREA NECK UNION FREE SCHOOL DISRIC December March 13, 12, 2017 2016 RECOMMENDED BOND IEMS BBS ARCHIECS, LANDSCAPE ARCHIECS & ENGINEERS, P.C. BBS COS ELEMENS "A LIS" GREA NECK PUBLIC SCHOOLS BOND REFERENDUM

More information

Carson City School District Completed School Bond

Carson City School District Completed School Bond Carson City School District 2010 Completed School Bond Discussion Projects categorized and prioritized based on: Health safety & welfare Code compliance Energy and operational efficiency Educational program

More information

Greenbush School Maintenance Calendar

Greenbush School Maintenance Calendar Greenbush School Maintenance Calendar JULY Check clock systems Fertilize athletic fields Drag and roll baseball/softball fields Clean carpet in all buildings Annual cleaning at Board office Drag and roll

More information

Burlington Capital Improvement Plan: FY FY 2023

Burlington Capital Improvement Plan: FY FY 2023 General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 145 Treasurer/Collector Printer Replacement 155 MIS Software Upgrade Information Systems

More information

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS September 2010

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS September 2010 AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS September 2010 AUBURN RIVERSIDE HS & MT. BAKER MS HVAC IMPROVEMENTS PROGRESS: Auburn Riverside High School: New variable speed

More information

FOR SALE OR LEASE EBERHARDT & BARRY INC.

FOR SALE OR LEASE EBERHARDT & BARRY INC. FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,

More information

CAPITAL IMPROVEMENT PLAN FISCAL YEARS

CAPITAL IMPROVEMENT PLAN FISCAL YEARS CAPITAL IMPROVEMENT PLAN FISCAL YEARS 2018-2022 Approved - February 13, 2017 Published - February 28, 2017 Salem Elementary Freedom Middle School Chancellor High School Joint Fleet Transportation Facility

More information

District Technology Purchase and Replacement Plan for the 4-year Levy Cycle,

District Technology Purchase and Replacement Plan for the 4-year Levy Cycle, District Technology Purchase and Replacement Plan for the 4-year Levy Cycle, 2017-2020 The following pages, 2-8, identify Technology assets and cost of purchases/replacements for the 4-year levy cycle.

More information

Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)

Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17) SECTION 000110 VOLUME 1 INTRODUCTORY INFORMATION 000107 Seals Page... Sept. 1, 2017 000110 Table of Contents... Sept. 1, 2017 Sept. 21, 2017 DIVISION 00 - BIDDING REQUIREMENTS AND CONTRACT FORMS 003132

More information

Leander ISD General Stadium Information

Leander ISD General Stadium Information Leander ISD Athletic Administration 202 W. South, Street Leander, TX 78641 (512) 570-0170 Leander ISD General Stadium Information A.C. Bible Jr. Stadium: 3301 S Bagdad Rd, Leander, TX 78641 John Gupton

More information

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013. WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP 50-6-113 As of March 1, 2013 Class Code Sort CODE DESCRIPTION 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY

More information

2016 FACILITIES IMPROVEMENT PLAN

2016 FACILITIES IMPROVEMENT PLAN 2016 FACILITIES IMPROVEMENT PLAN HIGH QUALITY FACILITIES + BEST QUALITY EDUCATORS + LOCAL SUPPORT = HIGH PERFORMING STUDENTS June 19, 2015 McCourtney Rd. Adult Center Nevada Joint Union High School District

More information

BUILDING MAINTENANCE WORKER/DRIVER

BUILDING MAINTENANCE WORKER/DRIVER PERSONNEL COMMISSION Class Code: 0880 Salary Range: 24 (C2) BUILDING MAINTENANCE WORKER/DRIVER JOB SUMMARY Under general supervision, to perform work in connection with the repair or maintenance of school

More information

FPS Project Backlog Projected Completion

FPS Project Backlog Projected Completion FPS Project Backlog - 2016 Projected Completion Project Number KUCC-0101 FAC2012-143 FR2012-123 FAC2012-063 FR2012-137 FAC2012-079 Project Description University Stadium - Replace Synthetic Turf Projected

More information

CRDM Projects Approved

CRDM Projects Approved Date CRDM Bldg. CRDM s Approved 5/25/10 FY07-0001 P779440 529 Science Engineering classroom shades 20,167.00 Doyle Def Maint Arch 6/21/10 FY07-0002 P779444 551 S&R 2 4th flr filter vents 3,306.65 Madrigal

More information

Shelter: Primary Shelter Secondary Shelter Respite Site Only Client Service Center Pet Shelter

Shelter: Primary Shelter Secondary Shelter Respite Site Only Client Service Center Pet Shelter DIRECTIONS: Print legibly. Complete all sections as thoroughly as possible, indicating numbers, space dimensions, etc. Record only usable space. If a room is 600 square feet, but has furniture or fixtures

More information

ELASTRIX LLC 95,591 + /- Square Feet on /- acres Pilot Mountain, North Carolina

ELASTRIX LLC 95,591 + /- Square Feet on /- acres Pilot Mountain, North Carolina ELASTRIX LLC 95,591 + /- Square Feet on 19.13 + /- acres Pilot Mountain, North Carolina ELASTRIX, LLC 523 SOUTH STEPHENS ST. PILOT MOUNTAIN, NC 27041 SIZE: GROUND: NUMBER OF BUILDINGS: DIMENSIONS: Approximately

More information

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT Town of Middletown, RI Capital Improvement Program FY '4 FY '8 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 0 - School Department FY '4 FY '5 FY '6 FY '7 FY '8 Floor Strippers/Burnishers

More information

Project Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment

Project Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment Project Summary *The Campus Construction Map PDF is linked to each map identification number, click the number on the map to view the corresponding project summary. Map Identification No: 1 Evanston Water

More information

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete. CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION

More information

Transportation and Facilities Report. Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities

Transportation and Facilities Report. Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities 1 Transportation and Facilities Report Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities 2 The Wheatland-Chili Central School community is committed to academic excellence

More information

New Hanover County Schools Capital Outlay Summary &

New Hanover County Schools Capital Outlay Summary & New Hanover County Schools Capital Outlay Summary & Summary of Capital Requests: Category Total Requests Repairs & Renovations $ 3,488,500 $ 3,529,500 $ 7,018,000 Technology 1,835,100 4,104,600 5,939,700

More information

James N Thorp Elementary School

James N Thorp Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Parking and Loading. Page 1 of 7

Parking and Loading. Page 1 of 7 Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update Los Angeles Community College District PROGRAM MANAGEMENT SERVICES College Strategic Execution Plan Update District Citizens Oversight Committee October 9, 205 Los Angeles City College Strategic Execution

More information

Accessible Routes. Chapter 1. Accessible Routes & Clearances. General Notes

Accessible Routes. Chapter 1. Accessible Routes & Clearances. General Notes Chapter 1 Accessible Routes Accessible Routes & Clearances Accessible routes or paths of travel in new and existing projects are essential aspects of Accessible design. If you cannot even get to an area,

More information

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement Guideline for Square Footage Requirements for Educational Facilities 160-5-4-.16 (a) 4 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: July 25, 2010

More information

355,100 Sq. Ft. Manufacturing/Warehouse Facility

355,100 Sq. Ft. Manufacturing/Warehouse Facility Industrial Manufacturing/Distribution Building, Pennsauken, New Jersey 355,100 Sq. Ft. Manufacturing/Warehouse Facility Manufacturing/Warehouse 336,500 sq. ft. Office/Finished Space 18,600 sq. ft. Divisible

More information

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit. We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the

More information

Metropolitan Council Metro Transit Project Description Budget Year

Metropolitan Council Metro Transit Project Description Budget Year Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program

More information

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 4. B. 93 - Cruise Terminal - Customs and Border Protection Improvements Conceptual (2525300) d 11/27/14 100% N/A $140,000 $73,479 52% 5. B. 91-93 -

More information

DSO Program Management Project List

DSO Program Management Project List DSO Program Management Project List Major & Minor Projects ADA 0 ADA MS Restroom Modifications (11 sites) 0 ADA Global Dressing Rooms (185 sites) Bear Lakes MS ADA Restrooms Calusa ES ADA Restrooms Calusa

More information

Updated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs

Updated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs Classrooms (11 @ 1,000 ASF) 11,000 408A, 408B, 403, 402,101,102, 103, 104 6467 English Staff Work

More information

77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK

More information

COUNTY OF MONTGOMERY CAPITAL PLAN 2012 CAPITAL FUND BUDGET. Adopted April 19, 2012

COUNTY OF MONTGOMERY CAPITAL PLAN 2012 CAPITAL FUND BUDGET. Adopted April 19, 2012 2012 2016 CAPITAL PLAN Including 2012 CAPITAL FUND BUDGET Adopted April 19, 2012 2012 CAPITAL BUDGET SUMMARY ALL DEPARTMENTS 2012 Current 2012 Commitments 2013 2014 2015 2016 2012-2016 Public Property

More information

Window Replacement/Window Treatments Across from room F111 eliminate 1 door and change to a window requested by maintenance 5,000

Window Replacement/Window Treatments Across from room F111 eliminate 1 door and change to a window requested by maintenance 5,000 WILLMAR CAMPUS Painting Room B54 sprinkler pipes in shop 3,000 Student Services freshen up and repair Fix scuffs etc Erika Kellen/ Maint 500 Auto body shop 1st year and 2nd repaired/spring 18 Auto Body/

More information

ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS

ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS 1. APPLICABILITY : A. C-1 Exempt: Off-street parking and loading space, as required in this article, shall be provided for all new buildings or additions

More information

The Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012.

The Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012. Fund 3XX Capital Projects $12,, $1,, $8,, $6,, $4,, $2,, $ Fy 11 Fy 12 Fy 13 Fund 3XX Revenue vs Expenses FY14 Modified FY15 Adopted ESPLOST I Revenue ESPLOST I Expenditures Capital Projects - Facility

More information

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000 2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial Light Manufacturing 143,789

More information

FY Projects

FY Projects FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel

More information

Group Class Code Listing

Group Class Code Listing Group Class Code Listing 1000 Automotive; Parts, Components, Vehicles 1160 Surplus - Bus & Bus Parts 1010 Automotive Parts 1200 Trolleys; Parts, Components 1020 Automotive - Testing Equipment 1202 Trolley

More information

COMMERCIAL PROPERTIES FOR SALE

COMMERCIAL PROPERTIES FOR SALE PENDING Address: 5492 Bushkill Falls Rd. PRICE: $149,500 City: Bushkill Township: Lehman Twp. FEATURES: Bank owned. Builders model Available SF: 2500 home, 3BR 2.5BA. Sits on 15.44 AC PM-40498 Minor work

More information

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS 501. Off-Street Parking Requirements Intent. The intent of this section is to provide for off-street parking adequate to each type of development in

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

TOWN OF MARANA, ARIZONA LAND DEVELOPMENT CODE

TOWN OF MARANA, ARIZONA LAND DEVELOPMENT CODE TITLE 22 OFF-STREET PARKING AND LOADING SECTIONS: 22.000 Purpose 22.010 When required 22.020 Size and access requirements 22.030 Number of spaces required for designated uses 22.050 Parking areas-development

More information

Leander ISD Stadium Rental Information

Leander ISD Stadium Rental Information Leander ISD Stadium Rental Information A.C. Bible Jr. Stadium: 3301 S Bagdad Rd, Leander, TX 78641 Seating Capacity: 10,200 (5,100 each side) Parking Capacity: 1,100 John Gupton Stadium: 200 Gupton Way,

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

STANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES

STANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES STANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES Page Sec. 101 Scope 2 Sec. 102 General standards for parking space design 2 Sec. 103 Number of parking spaces required 3 Sec. 104 Number of loading

More information

DO NOT CALL FACILITIES. Food questions should be answered in this directions page or contact Host.

DO NOT CALL FACILITIES. Food questions should be answered in this directions page or contact Host. Name of Event: Palmetto 12's Date: 3/17/2018 Location: Camden & Lugoff, SC Host and Contact Info Paige Wilson/paige.wilson@kcsdschools.net Date completed or updated updated 1/21/18 For Parents ALWAYS CHECK

More information

FY17 All Scenarios by Funding Level

FY17 All Scenarios by Funding Level FY17 All Scenarios by FY17 FY17 GF TOTAL 296,595,999 128,300,000 123,400,000 118,500,000 Low ADA: Facilities GSA RED: 1650 Mission - ADA Upgrades 150,000 150,000 150,000 150,000 Low ADA: Facilities MOD

More information

PARKING AND TRAFFIC REGULATIONS

PARKING AND TRAFFIC REGULATIONS PARKING AND TRAFFIC REGULATIONS 2016-2017 Jersey Village High School 7600 Solomon Houston, Texas 77040 713-896-3400 CONTENTS Introduction Page 1 Guidelines Pages 2-7 1. Who must purchase a parking sticker?...2.............

More information

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES

ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading

More information

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018 Sketch Plans for the Addition and Renovation of BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario September 26, 2018 Table of Contents 1.0 Building Program...1 2.0 Site Plan...4 3.0 Floor Plans...5

More information

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special

More information

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000 2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 INDUSTRIAL PROPERTY FOR SALE 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial

More information

OFF-STREET PARKING AND LOADING

OFF-STREET PARKING AND LOADING PART 7 OFF-STREET PARKING AND LOADING 701 This section is intended for use at a future date. 702 This section is intended for use at a future date. 703 Non-Conformity in Off-Street Parking or Loading Spaces

More information

Chapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS

Chapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient

More information

Off-Street-Parking Requirements. A. General Provisions.

Off-Street-Parking Requirements. A. General Provisions. 16-5-07 Off-Street-Parking Requirements A. General Provisions. 1. Floor Area. The term floor area, for the purpose of calculating the number of Off- Street-Parking Spaces required shall be determined on

More information

Locations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.

Locations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue. Locations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.) JV and Varsity Basketball, Volleyball, and Wrestling Reading High School

More information

BINSWANGER AVAILABLE CRANE/RAIL SERVED FACILITY 547,533 SF ON ACRES 2401 S. 30 TH STREET MANITOWOC, WI 54220

BINSWANGER AVAILABLE CRANE/RAIL SERVED FACILITY 547,533 SF ON ACRES 2401 S. 30 TH STREET MANITOWOC, WI 54220 BINSWANGER AVAILABLE CRANE/RAIL SERVED FACILITY 547,533 SF ON 97.92 ACRES 2401 S. 30 TH STREET MANITOWOC, WI 54220 For more information, please contact: Zach Binswanger Vice President T: 312-655-9500 C:

More information

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE TO CAPITAL REQUESTS SUMMARY Recomm ended /Grants/ Debt nded /Grants/ Debt GENERAL GOVERNMENT Server hardware replacement Server software replacement General Government Totals FIRE & EMERGENCY Erin Exhaust

More information

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description 2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW

More information

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting

More information

Informational Pre-Budget and CIP Council Workshop

Informational Pre-Budget and CIP Council Workshop Informational Pre-Budget and CIP Council Workshop Mike Tubbs June 20, 2012 Fleet and Facilities Maintenance Fleet Mission Statement To provide City departments with safe, reliable and economically sound

More information

$1.50 per hour. (includes custodial) custodial* (if necessary) $10.00 per hour plus $20.00 per hour plus $60.00 per hour plus

$1.50 per hour. (includes custodial) custodial* (if necessary) $10.00 per hour plus $20.00 per hour plus $60.00 per hour plus District Facilities/Equipment not listed on following Fee Schedules are not available for use. Application Fee (per application) $10.00 $20.00 $20.00 Non-Refundable Classroom $1.50 per hour $3.00 per hour

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation

More information

Home Maintenance Schedule

Home Maintenance Schedule January January Chores Clean sink & tub drains with baking soda. Pour water down unused drains. Apply wood protectant to cabinets & trim. Check window & door tracks to see if weep holes are open. Clean

More information

Our mission is to support the kids and make them successful. We work for them and allow them to lead whenever possible.

Our mission is to support the kids and make them successful. We work for them and allow them to lead whenever possible. Document: Enloe Front Line Crew Procedures Historical Dates: 9/23/2013 added 2013 diagram and clarified trash can locations 8/18/2013 renamed org from Pit, specified platform shelf bolt connections 12/5/2012

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

FOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16.

FOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16. FOR SALE EBERHARDT & BARRY INC. PROPERTY VIDEO: https://youtu.be/1hpliyviors https://youtu.be/-tlmoozdcr0 Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three

More information

GARDEN HOMES CITY HOMES. East 3 Street. Moody Avenue. Moody Avenue

GARDEN HOMES CITY HOMES. East 3 Street. Moody Avenue. Moody Avenue GARDEN HOMES rd East 3 Street Moody Avenue CITY HOMES rd East 3 Street Moody Avenue TYPICAL UNIT A 3 OR 4 BED + DEN + 3.5 BATH TOTAL: 2317-2412 sq.ft. INDOOR: 1765-1860 sq.ft. OUTDOOR: 552 sq.ft. *UNIT

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Park District of Oak Park Facilities & Equipment Replacement Schedule Date

Park District of Oak Park Facilities & Equipment Replacement Schedule Date Park District of Oak Park Facilities & Equipment Replacement Schedule Date Administrative Center Fire Alarm 1990 20 yrs $30,000 Burglar Alarm 1990 20 yrs $15,000 HVAC Combined #1 1990 15 20 yrs $30,000

More information

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800 Capital Investments - General Fund 1% Sales Tax 2% Sales Tax Occupation Fees in Lieu and/or "2A" CI CE Tax or PEG Contributions Total 2015 Budget - Original H Street Re-build - Phase 2 $ 595,800 $ 184,200

More information

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Monroe, Wisconsin Capital Improvement Plan FY '13 FY '17 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Administration Replace Computer AD-15-01 3 Administration Administration

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions Drainage Southshore Lagoon Dredging $525,000 74 Prepare drawings and design deepening or removal of sediment from lagoons. Marina Village Park $580,500 70 Resolve the drainage issue in the Marina Village

More information

FARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY

FARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY FARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY Washington Metropolitan Area Transit Authority DEPARTMENT OF PLANNING AND STRATEGIC PROGRAMS OFFICE OF BUSINESS PLANNING AND PROJECT

More information

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement

More information

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN RIVERSIDE 300 RIVERSIDE DR. REVISION 0-6-05 TABLE OF CONTENTS ID0.0 INTERIOR DESIGN COVER SHEET ID.0 LEASING FINISH PLAN ID. CLUB ROOM FINISH PLAN ID. WIFI/ FINISH PLAN ID.3 ID.4 ID.0 ID. ID. ID.3 ID.4

More information

ORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS

ORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS ORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS An ordinance amending Section 12.04 of the Los Angeles Municipal Code by a amending the zoning map.

More information

Wilson Pacific Elementary and Middle School. Departures Committee 28 May 2014

Wilson Pacific Elementary and Middle School. Departures Committee 28 May 2014 Wilson Pacific Elementary and Middle School Departures Committee 28 May 2014 Departure Agenda Introductions / Departure Process Project Update Departure Request: Building Height Departure Request: Parking