1 East Allen County Schools Facilities History Calendar Years October 5, 2015
2 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and Painted Interior 2 nd -Story 2008: Installed New Cabinets and Floor Tile in Art Room; Installed New Cabinets and Floor Tile in Old FACS; Moved Journalism Room Downstairs and Installed New Floor Tile; Added New Parking at Junior High Gym; Repaved Back Parking Lot and Rear Drive ; Wired New Exterior Sign; New Gym Lighting; Re-Surfaced Track; and New Band Tower 2009: Roof Replacement; Replaced Exhaust Fans; Replaced Well House Doors and Frame 2010: New Gate at the Football Field; New Exhaust Fans; Repaired Junior High Gym Lot Lights; and Concrete Repair at Bus Entrance 2011: Split Classroom and Built Wall to divide the Classroom ; Installed Air Conditioning Unit; Installed New Lockers (Qty. 100); and New Roof (Gym Area) 2012: ADA Ramp & Door; Roof Replacement (Shop Area) 2014: K-12 Project Competed (August 2014); Security Camera System Upgrade 2015: Driveway Lights; Install Sidewalk; Underground Fuel Tank Removal; Band/Choir Flooring; Rewire Ag Shop Electrical; and Build Time Out Room Leo Attendance Area Cedarville Elementary 2007: Roof Repair; and 2 Cameras & New Video System 2008: Security Lock & Buzzer Front Entrance; New Playground Fence; and New Exterior Gym Doors 2010: Updated Front Landscaping 2011: Split Art Room into two Classrooms 2012: Roof Replacement thru wall flashings; and Asphalt Work front drive repair 2014: Roofing Project 2015: Drainage & Sidewalk Repairs Leo Elementary 2007: Repaved Back Parking Lot; and Front Door Lock with Intercom Security 2008: Replaced Interior Classroom Doors & Locks; Replaced Walk-in Cooler & Freezer; and Replaced Upper Cabinets in Six (6) Classrooms 2009: Replaced Thirty (30) Interior Doors & Hardware; Replaced Boiler Room Doors & Frames; Replaced Heating, Cooling, and Ventilation System; Removed Partitions and Built 4 Block Walls; Built Time-out Room; Installed New Light Fixtures in Classrooms (Qty 6); and Connected Building to City Water 2010: Asphalt Bus Lot; Rebuilt Clinic Restroom (for Special Needs Student); Updated Front Entrance Landscaping; and Replaced Parking Lot Lights 2011: Replaced Hallway Flooring; Moved Computer Room; Removed Wall in Media Center Office Area; and Replaced Playground Backstop Leo High School 2007: Roof Work; South Parking Lot Pylons; Replaced Football Pressbox; New Lockers (Qty. 350); Replaced Chiller Pumps; and Pavement Work
3 2008: Security Buzzer and Lock System at Front Entrance; Removed Wall in Computer Lab and New Carpet; New Exterior Doors & Frames at Four (4) Locations; Added 2 nd Entrance on North Parking Lot; Added New Lockers (Qty. 350); and Replaced Restroom Interior Doors 2009: Replaced Softball Bleachers; Installed New Softball Scoreboard; Installed New Baseball Scoreboard; Installed New Football Scoreboard; Replaced Walk-in Freezer and Cooler; Added ADA Entrance Door; Installed New Drinking Fountains; Installed New Whiteboards; Installed New Lockers (Qty 300); Hallway Gate for Spectator Access; and Installed New Gym Doors and Hardware 2010: Replacement/Repair of Sewer Line; Resurfaced and Lined Track; Installation of New Fire Alarm; Replaced Columns on Football Bleachers on Visitor Side 2011: Installed New Lockers (Qty. 170); Replaced Lockers (Qty. 300); Expanded Bus Bullpen; New Flooring in Rooms ; Replaced Two (2) Doors Out Building; Fire Alarm Replacement; and Major Repair to Football Bleachers 2012: Asphalt Work Back Drive 2014: Boiler Replacement; Asphalt Replacement; and Security Camera System Upgrade 2015: Junior High Locker Room Replacement; Kitchen Ceiling/Lighting Replacement; Tennis Court Repair; Junior High Gym Divider Curtain Replacement; ADA Ramp (Door 8); and Install of Pole Vault Pit New Haven Attendance Area New Haven Intermediate 2007: Front Door Lock with Intercom Security; New Tile in 5 Classrooms; New Ceiling Tile and Lights in 5 Classrooms; Replace Door #11; Replaced 12 Interior Doors; and Replaced 6 Rooftop Exterior Fans 2008: Replaced Floor Tile in Three (3) Classrooms, Clinic, Lounge & Copy Room; Replaced Exterior Door & Frame; and Replaced Six (6) Exhaust Fans on Roof 2009: Replaced Exhaust Fans; Landscaped Front Entrance; and Moved Bookroom and Wired for Computers 2010: Installed New Door between Classrooms for Special Ed; Playground Mulch; Built New Walk-In Freezer; Built New Walk-In Cooler; and Tile Flooring in Food Storage Area 2014: Re-Roofing Project 2015: Flooring/Lighting/Ceiling Replacement New Haven Middle 2007: Replaced Sewage Lines; Roof Replacement; Floor Tile in 8 Classrooms; Front Door Lock with Intercom Security; and Built Wall in Special Education Room 2008: Security Buzzer and Lock System at ADA Entrance (East Gym); Installed New White Boards; Added Security Gate; and Continuation of Roofing Project 2012: Interior Renovation Time Out Room 2014: Elevator Upgrade; and Fire Alarm System Upgrade 2015: Classroom Painting New Haven High 2007: New Main Entrance Doors; Front Door Lock with Intercom Security; Gym Floor Ground and Re-Finished; Replaced Office Rooftop Air Conditioner; New Student Lockers (Qty. 200); New Bleacher Mules (Qty. 2); and Replaced John Young Stadium
4 2008: Replaced Restroom Partitions Upstairs Main Commons (Boys & Girls) 2009: Re-sealed and Lined Track; Replaced Parking Lot Islands; Rebuilt Tennis Courts; Rebuilt Discus Pads; Added New Softball Fence; Wired New Computer Lab; Landscaped Front Entrance; and New Fire Alarm (D Area) 2010: Installation of Six (6) New Cameras and Monitor; Seal Exterior Building Brick; Installed New Tennis Bleachers; Exterior Concrete Repairs; Painted Outside Entrances; New HVAC Compressor; and Replacement of Dimmer Switch in Stage Area 2011: Replaced Lower Gym Bleachers; Cement Work; Installed New Lockers 2014: Upgraded Elevator and Security Camera System Upgrade 2015: Re-sealed and Lined Track; and Special Ed Flooring New Haven Primary 2007: New Floor Tile in Cafeteria; Front Door Lock with Intercom Security; and Painted Cap on Building 2008: Repaved Four (4) Playgrounds; Repaved Rear Parking Lot & Replaced Rear Concrete Walk; Rebuilt Nine (9) Classroom Restrooms; Replaced Kitchen Floor Tile; and Replaced Hot Water Heater 2009: Remodeled Restrooms in Classrooms (Qty 3); Replaced 80 ft. of Precast Cap; and Replaced Condenser for Walk-in Freezer 2010: Replaced Switch Gear (Electrical); Replaced Boilers; Remodeled Restrooms in Classrooms (Qty. 6); Installed Rock Climbing Wall in Gym; and Outside Concrete Repairs 2011: Remodeled Restrooms in Classrooms (Qty 6); Replaced Flooring in Classrooms (Qty. 2); Installed Door Between Classrooms 19 and 21; Removed two (2) Modulars (Trailers); and Installed two (2) Bulletin Boards 2012: Classroom Addition (Qty. 2); Remodeled Classrooms (Qty. 2); and Expanded Rear Parking Lot and Drive New Haven Elementary 2007: New Tile in Classrooms (Qty. 5); New Ceiling Tile and Lights in Classrooms (Qty. 5); and New Swing Sets 2008: Security Lock, Buzzer Front Entrance, and Front Entrance Doors; Replaced Classroom Floor Tile, Ceiling Tile and Lights (Qty. 1); Replaced 2 nd Story Hallway Floor Tile, Ceiling Tile and Lights; Installed New Front Visitor Parking Lot and Landscape; Removed Front Awning; Added Third Entrance Lane in Rear Lot; Repaved Teachers Parking Lot; Replaced Gym Windows with New Block; Added Playground Equipment & Mulch; Resealed Playground; Rebuilt Walk-in Freezer and Cooler; and Removed Office Restroom and Installed Teacher s Mailboxes 2009: New Floor Tile for 1 st Floor Hallway; New Ceiling Tile for 1 st Floor Hallway; New Light Fixtures 1 st Floor Hallway; Replaced Windows in Kindergarten Classrooms (Qty. 3); Landscaped Rear Entrance; Installed New Kitchen Ovens; and New Floor Tile in Kitchen and Food Storage 2010: New Flooring in Conference Room; Updated Front Entrance Landscaping; and Installed Rock Climbing Wall in Gym 2015: Re-roofing Project; and Remodel Restrooms (Qty. 2)
5 Paul Harding Attendance Area Southwick Elementary 2007: New Swing Sets (Qty. 2); Roof Replacement; and New PA System 2008: Security Lock, and Buzzer Front Entrance; New Front Entrance Doors & Frames; Replaced Classroom Windows (Qty. 3); Wired New Exterior Sign; Paved New Walkway for Students Walking to/from Southwick Addition; Added Parking Spaces Visitors Lot & Repaved; Continuation of Roofing Project; :ower Level Sidewalk Repaired; and Wired 2 nd Computer Lab 2009: Asphalt Main Parking Lot; Striped Parking Lot; Replaced Main Parking Lot Lights; Replaced two (2) Hot Water Heaters; Roof Replacement; Replaced three (3) Classroom Windows; Repaired Crawl Space Wall (Kitchen Area); Replaced Sidewalk; and New Condenser Food Storage 2010: Updated Well Vestibule Area; and Replaced Windows and Door at Courtyard 2011: Replaced Courtyard Windows; Moved Principal Office; Replaced Stage Lighting 2011; and Installed Bulletin Boards (Qty. 2) 2012: Roof Replacement Gym; and Asphalt Work Playground 2014: Window Replacement; and Exterior Lighting 2015: Landscaping; and Sidewalk Repair Prince Chapman Academy 2007: Front Door Lock with Intercom 2010: Repaired Exterior Cement at Doors 5, 6 and : Installed New Playground and moved Playground Equipment from Village Paul Harding Junior High/East Allen University 2007: New Carpet in Main Commons; New Pressbox Door; New Office Air Conditioner Rooftop Unit; and Clinic Restroom ADA 2008: Security Buzzer and Lock System at Front Entrance; Replaced Carpet in FACS Hallway; Replaced Hot Water Heater in Cafeteria; Installed New Dishwasher; Installed New Windows; and Replaced Two (2) Well Pumps 2009: Roof Replacement; Replaced Generator; Installed New Sound and Lights for Stage; Concrete Repairs; Replaced Hot Water Heater; Built Interior Classrooms (Qty 4); Installed Fifty (50) New Lockers 2010: Replaced Restroom Partitions (Restrooms Qty. 4); Roof Replacement 2011: Re-sealed Track; Cement Repairs; Landscaping at Front Entrance 2015: Lobby Restrooms Update; and Drinking Fountains Replacement Woodlan Attendance Area Woodlan Jr./Sr. High School (includes K-12) 2007: Re-Surfaced Track; Added Parking Lot Lights (West Side); Re-Configured Classroom for Special Ed; and Installed Door in Ag Office 2008: Security Buzzer and Lock System at Front Entrance; Tinted Glass on All Exterior Door Windows, Courtyard Windows, and Four (4) Classrooms to prepare for 7 th Grade Student; Changed Lighting in Computer Room, Ag Room and Clinic for 7 th Grade Student; and Replaced Gym Stairway Nosings
6 2009: Asphalt Work (New Bus Entrance); Tinted Classroom Windows (Qty 8 Rooms); Upgraded Stage Lighting; and Added Sidewalk 2010: Replaced Generator; and Installed a Door Between Two Classrooms for Special Ed; Tinted Classroom Windows (Qty. 36) 2011: Created two (2) Classrooms and Built two (2) Walls; Moved Teacher Lounge; Computer Lab Electrical; Roof Replacement (Media and Office Areas); Constructed New Intermediate Elementary Office; Built New Parking Lot and Installed New Parking Lot Lights; Built New Playground and moved Harlan Playground Equipment; Installed new Playground Fence; and Constructed New Media Center for Intermediate School 2012: ADA Door 2014: K-12 Project Completed (August 2014); and Security Camera System Upgrade 2015: Fence Work; Exterior Door; and Install Sidewalk Service Center 2007: Replaced Overhead Doors (Qty. 7) 2012: Asphalt Work Front Lot/Drive & Bus Garage Area; and Underground Fuel Lines Replacement 2014: Re-Roofing Project
The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200
PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,
More informationMSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS
MSD OF WAYNE TOWNSHIP 2017-2018 SUSTAINABILITY PROJECTS 2017 Superintendent Goals #2 Continued work towards increasing revenue and reducing expenditures including a reduction in the M.S.D. of Wayne Township
More informationWatauga County Schools Capital Improvement Plan 2015
Watauga County Schools Capital Improvement Plan 2015 WATAUGA COUNTY SCHOOLS CAPITAL IMPROVEMENT PLAN 2015 In an effort to meet the standards of the North Carolina Building Code and North Carolina Public
More informationBOE Facilities Capital Project Priority List
Cat 1 BOE Safety/ Security CPB504 A) Upgrade/ Replace Doors - System Wide 200 250 450 1 3 B) Roxbury/ Toquam Safety Playground Upgrades 250 100 350 1 1 C) Vestibule- Springdale 100 0 100 D) Vestibule-
More informationBOE Facilities Capital Project Priority List FY 17/18 Fut. Yr. Total Proj. Overall Amount Amount Project Priority Priority
Cat 1 Project Category BOE Safety/ Security CPB504 A) Upgrade/ Replace Doors - System Wide 200 250 450 1 10 B) Roxbury/ Toquam Safety Playground Upgrades 250 100 350 1 1 C) Vestibule- Springdale 100 100
More informationCommittee Approved Critical Repairs
Location Description Estimate Apollo Extend walk-off mats $ 5,000 Food Services Equipment $ 61,200 Apollo Total $ 66,200 Briarwood Food Services Equipment $ 17,000 Reseal all gutter seams and flashing
More informationMAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015
1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose
More informationFACILITIES NEEDS ASSESSMENT - FACILITY MASTER PLAN CONSTRUCTION COST ESTIMATE FULLERTON JOINT UNION HIGH SCHOOL DISTRICT
Buena Park High School 1 Deferred maintenance items Roofing NA 0 HVAC NA 0 Plumbing NA 0 Electrical - Repair Conduits on Roof $15.00 13,000 SF $ 195,000 $ 195,000 Lighting NA 0 Painting $0.20 8,608,000
More informationApproved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested
AMOUNT SOURCE General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 0 155 MIS Technology Infrastructure 300,000 300,000 Tax Levy 300,000 300,000
More informationFair Park - Capital Needs Inventory
: 1: Permanent Facility with Occupant; : Year-Round Visitation; 3: Potential to Attract Year-Round or Tenants; 4:, Security, Code, ADA; 5: Urgent Major Maintenance 1 3 4 July 10, 017- DRAFT PRIORITIES
More informationRISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST
RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST 01. 2016 DESIGN SCHEME COMPARISONS SCHEME A: 2-Story building and parking garage, no code variance required. SCHEME B: 5-Story building(3 school
More informationERUSD 2025 Board Workshop #1
The image part with relationship ID rid4 was not found in the file. ERUSD 2025 Board Workshop #1 December 12, 2017 12/5/17 1 Cabinet Meeting 12/4/2017 Cactus Group 7 School Allowance $ 1,101,039 Filed
More informationSEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A
PROJECT LIST as (Draft) Description Additional Campuses Initial Spent as 943 Acquisition of 535 Old County Rd., San Carlos 3,407,259 3,407,259 3,407,259 3,407,259 0 closed 944 Acquisition of 150 Jefferson
More informationMAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.
COMPREHENSIVE MAINTENANCE PLAN SCHOOL FACILITIES MAINTENANCE CATAGORIES 1 Structural Foundations Routine inspection for cracks, deterioration, infiltration. Localized repair of cracks and spalling with
More informationWappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.
Capital Project Description Capital Project Scopes Project Schedules Project Budgets Next Steps Page 1 Project Scope: Facilities Improvements District Wide Facilities Renovations Correct Drainage Issues
More informationF9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia
F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on 74.4 + /- acres Toano, Virginia (PRELIMINARY) F9 LUMBER LIQUIDATORS 3000 JOHN DEERE DR STONEHOUSE COMMERCE PARK SIZE: GROUND: NUMBER
More informationGREAT NECK UNION FREE SCHOOL DISTRICT
GREA NECK UNION FREE SCHOOL DISRIC December March 13, 12, 2017 2016 RECOMMENDED BOND IEMS BBS ARCHIECS, LANDSCAPE ARCHIECS & ENGINEERS, P.C. BBS COS ELEMENS "A LIS" GREA NECK PUBLIC SCHOOLS BOND REFERENDUM
More informationCarson City School District Completed School Bond
Carson City School District 2010 Completed School Bond Discussion Projects categorized and prioritized based on: Health safety & welfare Code compliance Energy and operational efficiency Educational program
More informationGreenbush School Maintenance Calendar
Greenbush School Maintenance Calendar JULY Check clock systems Fertilize athletic fields Drag and roll baseball/softball fields Clean carpet in all buildings Annual cleaning at Board office Drag and roll
More informationBurlington Capital Improvement Plan: FY FY 2023
General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 145 Treasurer/Collector Printer Replacement 155 MIS Software Upgrade Information Systems
More informationAUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS September 2010
AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS September 2010 AUBURN RIVERSIDE HS & MT. BAKER MS HVAC IMPROVEMENTS PROGRESS: Auburn Riverside High School: New variable speed
More informationFOR SALE OR LEASE EBERHARDT & BARRY INC.
FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,
More informationCAPITAL IMPROVEMENT PLAN FISCAL YEARS
CAPITAL IMPROVEMENT PLAN FISCAL YEARS 2018-2022 Approved - February 13, 2017 Published - February 28, 2017 Salem Elementary Freedom Middle School Chancellor High School Joint Fleet Transportation Facility
More informationDistrict Technology Purchase and Replacement Plan for the 4-year Levy Cycle,
District Technology Purchase and Replacement Plan for the 4-year Levy Cycle, 2017-2020 The following pages, 2-8, identify Technology assets and cost of purchases/replacements for the 4-year levy cycle.
More informationHealth Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)
SECTION 000110 VOLUME 1 INTRODUCTORY INFORMATION 000107 Seals Page... Sept. 1, 2017 000110 Table of Contents... Sept. 1, 2017 Sept. 21, 2017 DIVISION 00 - BIDDING REQUIREMENTS AND CONTRACT FORMS 003132
More informationLeander ISD General Stadium Information
Leander ISD Athletic Administration 202 W. South, Street Leander, TX 78641 (512) 570-0170 Leander ISD General Stadium Information A.C. Bible Jr. Stadium: 3301 S Bagdad Rd, Leander, TX 78641 John Gupton
More informationWORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.
WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP 50-6-113 As of March 1, 2013 Class Code Sort CODE DESCRIPTION 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY
More information2016 FACILITIES IMPROVEMENT PLAN
2016 FACILITIES IMPROVEMENT PLAN HIGH QUALITY FACILITIES + BEST QUALITY EDUCATORS + LOCAL SUPPORT = HIGH PERFORMING STUDENTS June 19, 2015 McCourtney Rd. Adult Center Nevada Joint Union High School District
More informationBUILDING MAINTENANCE WORKER/DRIVER
PERSONNEL COMMISSION Class Code: 0880 Salary Range: 24 (C2) BUILDING MAINTENANCE WORKER/DRIVER JOB SUMMARY Under general supervision, to perform work in connection with the repair or maintenance of school
More informationFPS Project Backlog Projected Completion
FPS Project Backlog - 2016 Projected Completion Project Number KUCC-0101 FAC2012-143 FR2012-123 FAC2012-063 FR2012-137 FAC2012-079 Project Description University Stadium - Replace Synthetic Turf Projected
More informationCRDM Projects Approved
Date CRDM Bldg. CRDM s Approved 5/25/10 FY07-0001 P779440 529 Science Engineering classroom shades 20,167.00 Doyle Def Maint Arch 6/21/10 FY07-0002 P779444 551 S&R 2 4th flr filter vents 3,306.65 Madrigal
More informationShelter: Primary Shelter Secondary Shelter Respite Site Only Client Service Center Pet Shelter
DIRECTIONS: Print legibly. Complete all sections as thoroughly as possible, indicating numbers, space dimensions, etc. Record only usable space. If a room is 600 square feet, but has furniture or fixtures
More informationELASTRIX LLC 95,591 + /- Square Feet on /- acres Pilot Mountain, North Carolina
ELASTRIX LLC 95,591 + /- Square Feet on 19.13 + /- acres Pilot Mountain, North Carolina ELASTRIX, LLC 523 SOUTH STEPHENS ST. PILOT MOUNTAIN, NC 27041 SIZE: GROUND: NUMBER OF BUILDINGS: DIMENSIONS: Approximately
More informationTown of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT
Town of Middletown, RI Capital Improvement Program FY '4 FY '8 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 0 - School Department FY '4 FY '5 FY '6 FY '7 FY '8 Floor Strippers/Burnishers
More informationProject Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment
Project Summary *The Campus Construction Map PDF is linked to each map identification number, click the number on the map to view the corresponding project summary. Map Identification No: 1 Evanston Water
More informationCITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.
CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION
More informationTransportation and Facilities Report. Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities
1 Transportation and Facilities Report Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities 2 The Wheatland-Chili Central School community is committed to academic excellence
More informationNew Hanover County Schools Capital Outlay Summary &
New Hanover County Schools Capital Outlay Summary & Summary of Capital Requests: Category Total Requests Repairs & Renovations $ 3,488,500 $ 3,529,500 $ 7,018,000 Technology 1,835,100 4,104,600 5,939,700
More informationJames N Thorp Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAppendix C. Cost Estimates
O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master
More informationCapital Improvement Plan
PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by
More informationParking and Loading. Page 1 of 7
Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed
More informationLos Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES College Strategic Execution Plan Update District Citizens Oversight Committee October 9, 205 Los Angeles City College Strategic Execution
More informationAccessible Routes. Chapter 1. Accessible Routes & Clearances. General Notes
Chapter 1 Accessible Routes Accessible Routes & Clearances Accessible routes or paths of travel in new and existing projects are essential aspects of Accessible design. If you cannot even get to an area,
More informationGuideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement
Guideline for Square Footage Requirements for Educational Facilities 160-5-4-.16 (a) 4 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: July 25, 2010
More information355,100 Sq. Ft. Manufacturing/Warehouse Facility
Industrial Manufacturing/Distribution Building, Pennsauken, New Jersey 355,100 Sq. Ft. Manufacturing/Warehouse Facility Manufacturing/Warehouse 336,500 sq. ft. Office/Finished Space 18,600 sq. ft. Divisible
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationMetropolitan Council Metro Transit Project Description Budget Year
Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program
More informationCapital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish
Title I. Terminals Berth 90-93 - World Cruise Center 4. B. 93 - Cruise Terminal - Customs and Border Protection Improvements Conceptual (2525300) d 11/27/14 100% N/A $140,000 $73,479 52% 5. B. 91-93 -
More informationDSO Program Management Project List
DSO Program Management Project List Major & Minor Projects ADA 0 ADA MS Restroom Modifications (11 sites) 0 ADA Global Dressing Rooms (185 sites) Bear Lakes MS ADA Restrooms Calusa ES ADA Restrooms Calusa
More informationUpdated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs
BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs Classrooms (11 @ 1,000 ASF) 11,000 408A, 408B, 403, 402,101,102, 103, 104 6467 English Staff Work
More information77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK
More informationCOUNTY OF MONTGOMERY CAPITAL PLAN 2012 CAPITAL FUND BUDGET. Adopted April 19, 2012
2012 2016 CAPITAL PLAN Including 2012 CAPITAL FUND BUDGET Adopted April 19, 2012 2012 CAPITAL BUDGET SUMMARY ALL DEPARTMENTS 2012 Current 2012 Commitments 2013 2014 2015 2016 2012-2016 Public Property
More informationWindow Replacement/Window Treatments Across from room F111 eliminate 1 door and change to a window requested by maintenance 5,000
WILLMAR CAMPUS Painting Room B54 sprinkler pipes in shop 3,000 Student Services freshen up and repair Fix scuffs etc Erika Kellen/ Maint 500 Auto body shop 1st year and 2nd repaired/spring 18 Auto Body/
More informationARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS
ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS 1. APPLICABILITY : A. C-1 Exempt: Off-street parking and loading space, as required in this article, shall be provided for all new buildings or additions
More informationThe Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012.
Fund 3XX Capital Projects $12,, $1,, $8,, $6,, $4,, $2,, $ Fy 11 Fy 12 Fy 13 Fund 3XX Revenue vs Expenses FY14 Modified FY15 Adopted ESPLOST I Revenue ESPLOST I Expenditures Capital Projects - Facility
More information2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000
2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial Light Manufacturing 143,789
More informationFY Projects
FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel
More informationGroup Class Code Listing
Group Class Code Listing 1000 Automotive; Parts, Components, Vehicles 1160 Surplus - Bus & Bus Parts 1010 Automotive Parts 1200 Trolleys; Parts, Components 1020 Automotive - Testing Equipment 1202 Trolley
More informationCOMMERCIAL PROPERTIES FOR SALE
PENDING Address: 5492 Bushkill Falls Rd. PRICE: $149,500 City: Bushkill Township: Lehman Twp. FEATURES: Bank owned. Builders model Available SF: 2500 home, 3BR 2.5BA. Sits on 15.44 AC PM-40498 Minor work
More informationSECTION 500. PARKING, LOADING AND STORAGE REGULATIONS
SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS 501. Off-Street Parking Requirements Intent. The intent of this section is to provide for off-street parking adequate to each type of development in
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationTOWN OF MARANA, ARIZONA LAND DEVELOPMENT CODE
TITLE 22 OFF-STREET PARKING AND LOADING SECTIONS: 22.000 Purpose 22.010 When required 22.020 Size and access requirements 22.030 Number of spaces required for designated uses 22.050 Parking areas-development
More informationLeander ISD Stadium Rental Information
Leander ISD Stadium Rental Information A.C. Bible Jr. Stadium: 3301 S Bagdad Rd, Leander, TX 78641 Seating Capacity: 10,200 (5,100 each side) Parking Capacity: 1,100 John Gupton Stadium: 200 Gupton Way,
More informationBBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1
National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate
More informationSTANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES
STANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES Page Sec. 101 Scope 2 Sec. 102 General standards for parking space design 2 Sec. 103 Number of parking spaces required 3 Sec. 104 Number of loading
More informationDO NOT CALL FACILITIES. Food questions should be answered in this directions page or contact Host.
Name of Event: Palmetto 12's Date: 3/17/2018 Location: Camden & Lugoff, SC Host and Contact Info Paige Wilson/paige.wilson@kcsdschools.net Date completed or updated updated 1/21/18 For Parents ALWAYS CHECK
More informationFY17 All Scenarios by Funding Level
FY17 All Scenarios by FY17 FY17 GF TOTAL 296,595,999 128,300,000 123,400,000 118,500,000 Low ADA: Facilities GSA RED: 1650 Mission - ADA Upgrades 150,000 150,000 150,000 150,000 Low ADA: Facilities MOD
More informationPARKING AND TRAFFIC REGULATIONS
PARKING AND TRAFFIC REGULATIONS 2016-2017 Jersey Village High School 7600 Solomon Houston, Texas 77040 713-896-3400 CONTENTS Introduction Page 1 Guidelines Pages 2-7 1. Who must purchase a parking sticker?...2.............
More informationARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES
ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading
More informationSketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018
Sketch Plans for the Addition and Renovation of BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario September 26, 2018 Table of Contents 1.0 Building Program...1 2.0 Site Plan...4 3.0 Floor Plans...5
More informationBAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM
Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special
More information2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000
2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 INDUSTRIAL PROPERTY FOR SALE 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial
More informationOFF-STREET PARKING AND LOADING
PART 7 OFF-STREET PARKING AND LOADING 701 This section is intended for use at a future date. 702 This section is intended for use at a future date. 703 Non-Conformity in Off-Street Parking or Loading Spaces
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More informationOff-Street-Parking Requirements. A. General Provisions.
16-5-07 Off-Street-Parking Requirements A. General Provisions. 1. Floor Area. The term floor area, for the purpose of calculating the number of Off- Street-Parking Spaces required shall be determined on
More informationLocations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.
Locations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.) JV and Varsity Basketball, Volleyball, and Wrestling Reading High School
More informationBINSWANGER AVAILABLE CRANE/RAIL SERVED FACILITY 547,533 SF ON ACRES 2401 S. 30 TH STREET MANITOWOC, WI 54220
BINSWANGER AVAILABLE CRANE/RAIL SERVED FACILITY 547,533 SF ON 97.92 ACRES 2401 S. 30 TH STREET MANITOWOC, WI 54220 For more information, please contact: Zach Binswanger Vice President T: 312-655-9500 C:
More information2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE
TO CAPITAL REQUESTS SUMMARY Recomm ended /Grants/ Debt nded /Grants/ Debt GENERAL GOVERNMENT Server hardware replacement Server software replacement General Government Totals FIRE & EMERGENCY Erin Exhaust
More informationCITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description
2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW
More informationQUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status
or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting
More informationInformational Pre-Budget and CIP Council Workshop
Informational Pre-Budget and CIP Council Workshop Mike Tubbs June 20, 2012 Fleet and Facilities Maintenance Fleet Mission Statement To provide City departments with safe, reliable and economically sound
More information$1.50 per hour. (includes custodial) custodial* (if necessary) $10.00 per hour plus $20.00 per hour plus $60.00 per hour plus
District Facilities/Equipment not listed on following Fee Schedules are not available for use. Application Fee (per application) $10.00 $20.00 $20.00 Non-Refundable Classroom $1.50 per hour $3.00 per hour
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation
More informationHome Maintenance Schedule
January January Chores Clean sink & tub drains with baking soda. Pour water down unused drains. Apply wood protectant to cabinets & trim. Check window & door tracks to see if weep holes are open. Clean
More informationOur mission is to support the kids and make them successful. We work for them and allow them to lead whenever possible.
Document: Enloe Front Line Crew Procedures Historical Dates: 9/23/2013 added 2013 diagram and clarified trash can locations 8/18/2013 renamed org from Pit, specified platform shelf bolt connections 12/5/2012
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationFOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16.
FOR SALE EBERHARDT & BARRY INC. PROPERTY VIDEO: https://youtu.be/1hpliyviors https://youtu.be/-tlmoozdcr0 Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three
More informationGARDEN HOMES CITY HOMES. East 3 Street. Moody Avenue. Moody Avenue
GARDEN HOMES rd East 3 Street Moody Avenue CITY HOMES rd East 3 Street Moody Avenue TYPICAL UNIT A 3 OR 4 BED + DEN + 3.5 BATH TOTAL: 2317-2412 sq.ft. INDOOR: 1765-1860 sq.ft. OUTDOOR: 552 sq.ft. *UNIT
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationPark District of Oak Park Facilities & Equipment Replacement Schedule Date
Park District of Oak Park Facilities & Equipment Replacement Schedule Date Administrative Center Fire Alarm 1990 20 yrs $30,000 Burglar Alarm 1990 20 yrs $15,000 HVAC Combined #1 1990 15 20 yrs $30,000
More informationTotal $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800
Capital Investments - General Fund 1% Sales Tax 2% Sales Tax Occupation Fees in Lieu and/or "2A" CI CE Tax or PEG Contributions Total 2015 Budget - Original H Street Re-build - Phase 2 $ 595,800 $ 184,200
More informationCity of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT
City of Monroe, Wisconsin Capital Improvement Plan FY '13 FY '17 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Administration Replace Computer AD-15-01 3 Administration Administration
More informationConstruction Staging Area 4 Avenue Road
REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationCity of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions
Drainage Southshore Lagoon Dredging $525,000 74 Prepare drawings and design deepening or removal of sediment from lagoons. Marina Village Park $580,500 70 Resolve the drainage issue in the Marina Village
More informationFARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY
FARRAGUT NORTH AND FARRAGUT WEST PEDESTRIAN PASSAGEWAY TUNNEL STUDY Washington Metropolitan Area Transit Authority DEPARTMENT OF PLANNING AND STRATEGIC PROGRAMS OFFICE OF BUSINESS PLANNING AND PROJECT
More informationMayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator
City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement
More informationRIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN
RIVERSIDE 300 RIVERSIDE DR. REVISION 0-6-05 TABLE OF CONTENTS ID0.0 INTERIOR DESIGN COVER SHEET ID.0 LEASING FINISH PLAN ID. CLUB ROOM FINISH PLAN ID. WIFI/ FINISH PLAN ID.3 ID.4 ID.0 ID. ID. ID.3 ID.4
More informationORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS
ORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS An ordinance amending Section 12.04 of the Los Angeles Municipal Code by a amending the zoning map.
More informationWilson Pacific Elementary and Middle School. Departures Committee 28 May 2014
Wilson Pacific Elementary and Middle School Departures Committee 28 May 2014 Departure Agenda Introductions / Departure Process Project Update Departure Request: Building Height Departure Request: Parking
More information