TOC Waiver Reference No 12460

Size: px
Start display at page:

Download "TOC Waiver Reference No 12460"

Transcription

1 TOC Waiver Reference No Distributed To: ARTC Website Distribution Date: 01/05/2014 Requested By: Subject: Effective Period: TOC Waiver is now cancelled and replaced as follows. ARTC Amendment to ARTC TOC Manual Section 10 Notes to allow revised Speed/Axleload combinations for the Broken Hill to route. Until published TOC waiver issued on 11 March 2011 provided interim interface details on the maximum speed of rollingstock and the inclusion of the Parkes - line as a line for note b and c application as per the ARTC TOC Manual. Further work has now been done between West and Broken Hill and the following table sets out the context for the amendments to the Speed /Axleload combinations now permitted: ROUTE PREVIOUS LIMITS NEW LIMITS Broken Hill to Parkes km/h km/h km/h Parkes to km/h km/h km/h The ARTC TOC Manual only allows these changes to be circulated by reference to the notes placed wagon codes in Section 10. Any wagon code with the Note b will now be able to travel up to 100 km/h on the above routes. At present there are only two codes of wagons published in the TOC Manual that would likely take advantage of the km/h i.e. MGFH and NGXH grain wagons. A new Note w is placed against the MGFH and NGXH wagons when loaded to 25 tonne axleload. More recently registered vehicles already have note w against them in the relevant TOC Waivers. TOC Waiver is now withdrawn. Further detail repeating parts of TOC Waiver and additional detail of new maximum speeds for rolling stock is given on the following pages. Jess Tai Australian Rail Track Corporation 1 of 5

2 A - ARTC TOC Manual - General Instruction pages - Section 10 Refer to Locomotive and Rollingstock pages and all TOC Waivers issued where note b or w is tagged to rollingstock. Explanation of Notes: Replace existing Note b which reads: b b These vehicles must operate on Class 1, 1C, 1XC and Parkes to only when loaded to 92 tonnes (for 4 axles) gross or 23 tonnes per axle at a maximum speed of 80 km/h. Between West & North (both directions) vehicles loaded to 92 tonnes (for 4 axles) gross or 23 tonnes per axle can operate at a maximum speed of 25 km/h. Wheel tread hollowing must not exceed 2mm. These vehicles when loaded to 23 tonnes per axle may operate at a maximum speed of 25 km per hour on the following line: D11 North Junction- West section These vehicles when loaded to 23 tonnes per axle may operate at a maximum speed of 80 km per hour on the following D33 Acacia Ridge to Maitland D45 Enfield West to Leightonfield D51 Macarthur to Albury D52 Moss Vale to Unanderra H1 Islington to Muswellbrook H2 Muswellbrook to Werris Creek H3 Werris Creek to Narrabri H4 Muswellbrook to Ulan Balloon Loop I7 Ulan Balloon Loop to Gulgong section These vehicles when loaded to 23 tonnes per axle may operate at a maximum speed of 100 km per hour on the following D11 West to Stockinbingal section D11 Stockinbingal to Parkes section D14 Parkes to Broken Hill Insert new Note w which reads: w These vehicles when loaded to 25 tonnes per axle must NOT operate on the following D33 Acacia Ridge to Stratford Junction I4 Gap to Dubbo I5 Dubbo to Goobang Junction I7 Ulan Balloon Loop to Gulgong section I7 Gulgong to Merrygoen section I6 Narrabri to North Star These vehicles when loaded to 25 tonnes per axle may operate at a maximum speed of 15 km per hour on the following line: D11 North Junction- West section These vehicles when loaded to 25 tonnes per axle may operate at a maximum speed of 50 km per hour on the following line: D52 Robertson to Unanderra section These vehicles when loaded to 25 tonnes per axle may operate at a maximum speed of 60 km per hour on the following line: H1 Waratah to Islington Junction section These vehicles when loaded to 25 tonnes per axle may operate at a maximum speed of 65 km per hour on the following D52 Moss Vale to Robertson section H1 Islington Junction to Maitland (down main) section These vehicles when loaded to 25 tonnes per axle may operate at a maximum speed of 80 km per hour on the following D11 West to Stockinbingal section D11 Stockinbingal to Parkes section D14 Parkes to Broken Hill D45 Enfield West to Leightonfield D51 Macarthur to Albury H1 Maitland to Waratah (up main) section H1 Maitland to Waratah (up & down coal roads) section H2 Muswellbrook to Werris Creek H3 Werris Creek to Narrabri H4 Muswellbrook to Ulan Balloon Loop 2 of 5

3 Amend MGFH wagon data which reads: MGFH Grain hopper C B MGFH vehicles are permitted to operate when empty, in all areas where Class C type vehicles are permitted to run. These vehicles are only permitted to operate when loaded up to 100 tonnes gross mass, on Class 1, 1C or 1XC track with the following exceptions:- SECTION MAXIMUM SPEED Narrabri Moree Narrabri 40km/h North West North 15km/h Stockinbingal Parkes Stockinbingal 40km/h 2. These vehicles are also permitted to operate, when loaded up to 81 tonnes gross mass, in all areas where Class E vehicles are permitted to run. Refer to the MAXIMUM SPEED OF LOCOMOTIVES AND ROLLING STOCK page for each section in the respective Working Timetable for this information. 3. A maximum speed of 10km/h must be observed at the following bridge location when these vehicles are loaded to 100 tonnes gross mass:- Stockinbingal to Parkes line kilometres MGFH Grain hopper C B4 e, w Amend NGXH wagon data which reads: NGXH 3 permanently coupled grain hoppers A B4 80 p 84 r 92 b F 100 # # Maximum speed when loaded to 100 tonnes gross mass: Class 1 track = 65 km/h, Class 1C track = 65km/h, Class 1XC track = 80 km/h NGXH *3 permanently coupled grain hoppers A * B4 80 p 84 r 92 b C 100 w 3 of 5

4 B - ARTC TOC Manual Western Section pages Section 8 Refer to Maximum Speed of Locomotives and Rolling Stock. Replace the existing detail in the ARTC TOC Manual with the below table (reproduced from withdrawn TOC waiver 11205): Maximum Speed of Locomotives and Rollingstock SECTION Coota North Jun- West to Parkes West West Class of track note 1 Line reference C C map Locomotives All these locos speeds same as now All these locos speeds same as now S1 N/A N/A N/A S S S S S S S S S S S S Freight Class A 60 note Class B 60 note Class C 60 note Class D 60 note Class E 60 note Class F N/A N/A N/A Class G N/A N/A N/A Passenger XPT N/A N/A N/A Xplorer N/A N/A N/A Diesel Train Loco Hauled Accident Cranes 70 tonne tonne tonne Notes: 1 - Between West and North the maximum speed for any class of wagon able to be loaded up to 23 tonne axle load is 25 km per hour 4 of 5

5 C - ARTC TOC Manual Western Section pages Section 8 Refer to Location of Speed Signs - replace details in ARTC TOC Manual with the following consolidated list (reproduced from withdrawn TOC Waiver 11205): Location Kilometrage DOWN UP Normal XPT Normal XPT Nth Jct Triangle Loops West Stockinbingal Milvale Weedallion Bribbaree Quandialla Caragabal Wirrinya Back Creek Garema Grawlin Plains Red Bend Forbes Parkes Parkes South West Fork Indicates a conditional level crossing speed sign detailed in Safe Notice perm_0019 (2004) END OF DETAIL. 5 of 5

Discipline: Engineering (Signalling) Category: Standard. Braking Distance SDS 03. Applicability. Primary Source

Discipline: Engineering (Signalling) Category: Standard. Braking Distance SDS 03. Applicability. Primary Source Discipline: Engineering (Signalling) Category: Standard SDS 03 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 13 01 03 SP Version 3.0 Document Status Version Date Reviewed

More information

Route Access Condition Notice

Route Access Condition Notice Operations Interface Procedure Form OGP-30-01 Route Access Condition Notices Form number: OGP3001F-02 Route Access Condition Notice 13-00043 Distributed To: ARTC Website Distribution Date: 10/04/14 Requested

More information

Australian Rail Track Corporation Ltd. NSW Annual Condition Report (July 09 to June 10) 2009/2010 NSW Lease Annual Condition Report

Australian Rail Track Corporation Ltd. NSW Annual Condition Report (July 09 to June 10) 2009/2010 NSW Lease Annual Condition Report 2009/2010 NSW Lease Annual Condition Report Produced by Network Performance - Page 1-28/07/2010 Executive Summary... 3 (a) Material Changes in Condition... 3 (b) Performance against KPI s... 3 (c) Register

More information

TOC Waiver. ARTC website

TOC Waiver. ARTC website TOC Waiver Reference Number 12475 Distributed To: ARTC website Distribution Date: 05/06/2014 Requested By: Subject: Effective Period: ARTC RAS Manual Stage 1 implementation for the ARTC in New South Wales

More information

Route Access Condition Notice

Route Access Condition Notice Route Access Condition Notice 13-00030 Distributed To: ARTC Website Distribution Date: 04/10/13 Requested By: ARTC ref: OGP-30-01 000131 Subject: Effective Period: Amendment Type: New curve speed board

More information

MOOLARBEN COAL PROJECT

MOOLARBEN COAL PROJECT MOOLARBEN COAL PROJECT Stage 2 APPENDIX 13 Rail Traffic Impact Assessment Moolarben Coal Mines Pty Limited Moolarben Coal Project - Stage 2 RAIL TRAFFIC ASSESSMENT Final Rev 2 10 February 2009 Moolarben

More information

Hunter Valley Corridor Capacity Improvement Strategy

Hunter Valley Corridor Capacity Improvement Strategy 1 Hunter Valley Corridor Capacity Improvement Strategy Executive Summary Hunter Valley Corridor Capacity Improvement Strategy Introduction On 5 September 2004, the Australian Rail Track Corporation (ARTC)

More information

PORTLAND TO MAROONA ROUTE ACCESS STANDARDS

PORTLAND TO MAROONA ROUTE ACCESS STANDARDS PORTLAND TO MAROONA ROUTE ACCESS STANDARDS 1. MAXIMUM AUTHORISED LOADING OUTLINES The loading of all vehicles operating within the Network, or passing through the Network to or from other systems, shall

More information

Route Access Condition Notice

Route Access Condition Notice Route Access Condition Notice 13-00039 Distributed To: ARTC Website Distribution Date: 04/04/14 Requested By: Subject: Effective Period: Amendment Type: ARTC General Review by Rules Team Until Published

More information

SECTION 23 CLASSIFICATION AND NUMBERING OF FREIGHT VEHICLES

SECTION 23 CLASSIFICATION AND NUMBERING OF FREIGHT VEHICLES SECTION 23 CLASSIFICATION AND NUMBERING OF FREIGHT VEHICLES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 23 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED TABLE OF CONTENTS Section Description

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

Minimum Operating Standards for. Rolling Stock WOS 01

Minimum Operating Standards for. Rolling Stock WOS 01 Discipline Engineering Standard Category Rolling Stock Minimum Operating Standards for Rolling Stock WOS 01 Applicability ARTC Network wide New South Wales Western Jurisdiction Victoria Primary Source

More information

Enterprise Services, General Manager Technical Standards. Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01

Enterprise Services, General Manager Technical Standards. Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01 TO FROM Network Wide Enterprise Services, General Manager Technical Standards DATE 09/11/2017 SUBJECT Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01 TITLE Technical Note

More information

Management of Clearances

Management of Clearances Discipline: Engineering (Track & Civil) Category: Standard Management of Clearances ETM-7-1 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC Standards BDS 9, BDS 11, BDS 12, BDS 13, BDS

More information

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04

More information

BULK MATERIAL HANDLING SYSTEM

BULK MATERIAL HANDLING SYSTEM (PTY) Ltd BULK MATERIAL HANDLING SPECIALISTS We are proud members of the South African Institute of Materials Handling BULK MATERIAL HANDLING SYSTEM Deebar Rail-Veyor PTY (Ltd) was the first company to

More information

Locomotive Hauled Passenger Vehicle Specific Interface Requirements WOS

Locomotive Hauled Passenger Vehicle Specific Interface Requirements WOS Discipline Engineering Standard Category Rolling Stock Locomotive Hauled Passenger Vehicle Specific Interface Requirements WOS 01.500 Applicability ARTC Network wide New South Wales Western Jurisdiction

More information

Traffic and Transport Impact Assessment

Traffic and Transport Impact Assessment Traffic and Transport Impact Assessment BYLONG COAL PROJECT Environmental Impact Statement Hansen Bailey Bylong Coal Project Traffic and Transport Impact Assessment 16 July 215 Hansen Bailey Bylong Coal

More information

DEEP BASIN, FOX CREEK AND GOLD CREEK RULES OF THE ROAD

DEEP BASIN, FOX CREEK AND GOLD CREEK RULES OF THE ROAD DEEP BASIN, FOX CREEK AND GOLD CREEK RULES OF THE ROAD Version 4 September, 2014 SAFETY MESSAGE Road conditions vary during the day as does volume of traffic. Stay alert and be prepared for the unexpected.

More information

REMTECHSTROY GROUP. REMTECH RAILWAY Mechanization and Wagons - Supply 2008 v.1.0 REMTECHNOLOGY

REMTECHSTROY GROUP. REMTECH RAILWAY Mechanization and Wagons - Supply 2008 v.1.0 REMTECHNOLOGY REMTECH RAILWAY Mechanization and Wagons - Supply 2008 v.1.0 1 Quality Management System Others Management System ISO9001:2000; ISO14001:1996 2 Patents Type Rkl Four / Rod Linkage Bogie with Low Track

More information

Economics of Steam Traction for the Transportation of Coal by Rail. Chris Newman Beijing, China

Economics of Steam Traction for the Transportation of Coal by Rail. Chris Newman Beijing, China Economics of Steam Traction for the Transportation of Coal by Rail Chris Newman Beijing, China Synopsis There is unfinished business in improving the design of steam traction; Development continued through

More information

1 Example calculation

1 Example calculation Annex 6.3 xample of calculation of electricity cost Content 1 xample calculation... 1 1.1 Introduction... 1 1.2 Charge for access to electricity for the holding of vehicles (6.3.3)... 1 1.2.1 xample calculation

More information

London Transport Heritage Collection

London Transport Heritage Collection London Transport Heritage Collection 1 ROLLING STOCK... 4 1.1 Class 20... 4 1.1.1 Background...4 1.1.2 Design & Specification...5 1.2 Pannier 5700 Class... 5 1.2.1 Background...6 1.2.2 Design & Specification...6

More information

All trains resume and regular services run from 12pm Sunday 31 December until 12pm Monday 1 January. Last updated 21 December 2017 Page 1 of 9

All trains resume and regular services run from 12pm Sunday 31 December until 12pm Monday 1 January. Last updated 21 December 2017 Page 1 of 9 Future trackwork calendar Here is the latest six month update for trackwork which may affect your journey. We try to keep this information as accurate as possible; however alterations in the schedule do

More information

WTT NETWORK CONFIGURATION SYSTEM REQUIREMENTS (L1-CHE-MAN-011)

WTT NETWORK CONFIGURATION SYSTEM REQUIREMENTS (L1-CHE-MAN-011) WTT NETWORK CONFIGURATION SYSTEM REQUIREMENTS (L1-CHE-MAN-011) Table of Contents [NC 1] SYSTEM REQUIREMENTS... 4 1.1 PURPOSE... 4 1.2 SCOPE... 4 1.3 RESPONSIBILITY... 4 1.4 DOCUMENT MANAGEMENT... 4 1.5

More information

David W. Salter Collection

David W. Salter Collection Southern Museum of Civil War And Locomotive History Archives & Library David W. Salter Collection Graham County Railroad/Railway Photographs MS2010.014 P2010.014 Provenance: The David W. Salter Collection

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

Class 24 BR Blue. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0

Class 24 BR Blue. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0 Class 24 BR Blue 1 BACKGROUND... 3 1.1 Class 24... 3 1.2 Design & Specification... 3 2 ROLLING STOCK... 4 2.1 Class 24... 4 2.2 BR Blue Mk1 FK... 4 2.3 BR Blue Mk1 SK... 5 2.4 BR Blue Mk1 BG... 5 2.5 Hopper

More information

Vertical Loads from North American Rolling Stock for Bridge Design and Rating

Vertical Loads from North American Rolling Stock for Bridge Design and Rating Vertical Loads from North American Rolling Stock for Bridge Design and Rating By Duane Otter, Ph.D., P.E., and MaryClara Jones Transportation Technology Center, Inc., Pueblo, Colorado Abstract As a part

More information

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide. Discipline: Engineering (Track & Civil) Category: Code Practice Clearances Section 7 Applicability ARTC Network wide Primary Source Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES

SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 8 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED Portions of this Section of the ROA

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

Network Information Book

Network Information Book Network Information Book Table of Contents Network Information Book Tarcoola CTC & Whyalla Train Order Spencer Jct (exc) to Tarcoola (inc) & Spencer Jct (exc) to Whyalla (exc) Applicability Interstate

More information

Haoma Mining NL. 7.10g/t, 84 to 86m 6.83g/t, 76 to 100m

Haoma Mining NL. 7.10g/t, 84 to 86m 6.83g/t, 76 to 100m Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: 411 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250

More information

District of Columbia

District of Columbia Oversize/ Overweight Permit Manual District of Columbia Foreword The Specialized Carriers & Rigging Association is pleased to publish this Oversize/ Overweight Permit Manual. Each state analysis includes

More information

NSW Road Train Modernisation Program B-Triple & AB-Triple Operating Conditions

NSW Road Train Modernisation Program B-Triple & AB-Triple Operating Conditions NSW Road Train Modernisation Program B-Triple & AB-Triple Operating Conditions Application These operating conditions apply to: B-Triples, which are a vehicle combinations consisting of a prime mover towing

More information

DB BR152. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0

DB BR152. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0 DB BR152 1 BACKGROUND... 3 1.1 Loco... 3 1.2 Design & Specification... 3 2 ROLLING STOCK... 4 2.1 DB BR152... 4 3 DRIVING THE BR152... 5 3.1 Cab Controls and image... 5 3.2 Keyboard Controls... 7 3.3 General

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

General Interface Requirements

General Interface Requirements Discipline: Engineering (Rolling Stock) Category: Standard General Interface Requirements WOS 01.100 Applicability New South Wales Primary Source RIC Standard RSU 100 Series Version 2.0 Document Status

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Capped Price Servicing Program. Terms and conditions.

Capped Price Servicing Program. Terms and conditions. Capped Price Servicing Program. Terms and conditions. Last updated June 2015 Terms and Conditions These Terms and Conditions govern the Mercedes-Benz Capped Price Servicing Program provided by Mercedes-Benz

More information

Land Transport Rule: Heavy-vehicle Brakes 2006

Land Transport Rule: Heavy-vehicle Brakes 2006 Land Transport Rule: Heavy-vehicle Brakes 2006 Rule 32015 Part 1 Rule requirements... 3 Section 1 Application...3 1.1 Title...3 1.2 Scope of the Rule...3 1.3 Date when Rule comes into force...3 1.4 Application

More information

Gazette GOVERNMENT NOTICES

Gazette GOVERNMENT NOTICES Commonwealth of Australia Published by the Commonwealth of Australia Gazette GOVERNMENT NOTICES HEAVY VEHICLE NATIONAL LAW NATIONAL CLASS 2 HEAVY VEHICLE ROAD TRAIN AUTHORISATION (NOTICE) 2014 (No. 1)

More information

Land Transport Rule Traction Engines [2008]

Land Transport Rule Traction Engines [2008] Land Transport Rule Traction Engines [2008] Rule 63001 Overview Land Transport Rules are law produced by Land Transport New Zealand for the Minister of Transport. Land Transport NZ drafts Rules in plain

More information

Buffer Stops and Restraining Devices for Dead End Tracks

Buffer Stops and Restraining Devices for Dead End Tracks Engineering (Track & Civil) Guideline Buffer Stops and Restraining Devices for Dead End Tracks ETH-00-01 Applicability ARTC Network Wide Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

Land Transport Rule: Heavy-vehicle Brakes 2006 Rule Rule requirements...3

Land Transport Rule: Heavy-vehicle Brakes 2006 Rule Rule requirements...3 Part 1 Land Transport Rule: Heavy-vehicle Brakes 2006 Rule 32015 Rule requirements...3 Section 1 Application...3 1.1 Title...3 1.2 Scope of the Rule...3 1.3 Date when Rule comes into force...3 1.4 Application

More information

České dráhy, a.s Statistical Yearbook

České dráhy, a.s Statistical Yearbook České dráhy, a.s. 2005 Statistical Yearbook Chart of railway infrastructure maintained and operated on a contractual basis with highlighted corridor sections and location of the regional cities 1 Karlovy

More information

Schedule PART 1: PRELIMINARY

Schedule PART 1: PRELIMINARY Roads and Maritime Services Class 1 Special Purpose Vehicles Notice 2014 I, Peter Duncan, Chief Executive Roads and Maritime Services (RMS), pursuant to Clause 12 of the Road Transport (Mass, Loading and

More information

EMD SD45 for Train Simulator 2013 Owner s Manual

EMD SD45 for Train Simulator 2013 Owner s Manual EMD SD45 for Train Simulator 2013 Owner s Manual A little bit of history The EMD SD45 is a six-axle diesel-electric locomotive built by General Motors Electro-Motive Division between December, 1965, and

More information

Transportation of sugarcane by rail

Transportation of sugarcane by rail Transportation of sugarcane by rail Geoff Kent Queensland University of Technology 1 2 Acknowledgement Video footage used in this presentation taken from an episode of the Canadian TV series Megatrains

More information

Locomotive Specific Interface Requirements WOS

Locomotive Specific Interface Requirements WOS Discipline Engineering Standard Category Rolling Stock Locomotive Specific Interface Requirements WOS 01.300 Applicability ARTC Network wide New South Wales Western Jurisdiction Victoria Primary Source

More information

Compatibility Requirements for Braking Systems of Rail Vehicles

Compatibility Requirements for Braking Systems of Rail Vehicles GMRT2043 Iss 2, GMRT2044 Iss 4, Iss 3, GMRT2046 Iss 1, GMGN2615 Iss 1 (G 2.1.83 to G 2.1.132 inclusive) Compatibility Requirements for Braking Systems of Rail Synopsis This document defines the compatibility

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Synopsis This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. [This document contains one or more pages which contain colour] Copyright

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

17. INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: (i) Central, (ii) Eastern,

17. INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: (i) Central, (ii) Eastern, 17. INDIAN RAILWAY This section includes tables providing statistics of passenger and goods traffic, revenue and expenditure and general working of Indian Railways. The statistics are collected by the

More information

Title Requirements for Electric Aerials Crossing ARTC Infrastructure. Reference Number PYS 02 - (RIC Standard: EP SP)

Title Requirements for Electric Aerials Crossing ARTC Infrastructure. Reference Number PYS 02 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Requirements for Electric Aerials Crossing ARTC Infrastructure Reference Number PYS 02 - (RIC Standard: EP 10 01 00 05 SP) Document Control

More information

Signalling Rolling Stock Interface

Signalling Rolling Stock Interface Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Signalling Rolling Stock Interface Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

ASHPRINGTON ROAD Part 1

ASHPRINGTON ROAD Part 1 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter

More information

INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: Besides above, the following 7 new Zones have also been set up

INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: Besides above, the following 7 new Zones have also been set up INDIAN RAILWAY This section includes tables providing statistics of passenger and goods traffic, revenue and expenditure and general working of Indian Railways. The statistics are collected by the Ministry

More information

Issued: July 17 PORT LOAD CHART

Issued: July 17 PORT LOAD CHART 1 of 6 PRT LAD CHART About the Port Load Chart The Port Load Chart is intended to provide guidance on the maximum allowable loads permitted on wharves, piers and shed floors at PoM owned facilities within

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

E71 E70. Ticketing and Service Information. Ticketing & PrePay Information. Lost Property

E71 E70. Ticketing and Service Information. Ticketing & PrePay Information. Lost Property Ticketing and Service Information Sydney Buses Timetable & to City & Ticketing & PrePay Information PrePay allows faster passenger boarding, improving the reliability of bus services. On PrePay-only bus

More information

SOUTH AFRICAN NATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD ISBN 978-0-626-23806-3 SOUTH AFRICAN NATIONAL STANDARD The handling, storage, distribution and maintenance of liquefied petroleum gas in domestic, commercial and industrial installations Part 4: The transportation

More information

Tomorrow and beyond in Equipment Evolution Innovations & Trends

Tomorrow and beyond in Equipment Evolution Innovations & Trends Tomorrow and beyond in Equipment Evolution Innovations & Trends Presented by Robert E. Pickel Senior Vice President, Marketing and Sales National Steel Car N.A. Inc. June 18, 2013 1 Today s Railcars Provide

More information

SP2 Requirements toward the freight system of FFE (Madrid Spain) 21 September 2017

SP2 Requirements toward the freight system of FFE (Madrid Spain) 21 September 2017 Capacity for Rail SP2 Requirements toward the freight system of 2030-2050 FFE (Madrid Spain) 21 September 2017 Bo-Lennart NELLDAL Project Leader WP2.1 Content 1. Today s market 2. Demand for rail and freight

More information

Interstate Freight in Australia,

Interstate Freight in Australia, Interstate Freight in Australia, 1972 2005 Leo Soames, Afzal Hossain and David Gargett Bureau of Transport and Regional Economics, Department of Transport and Regional Services, Canberra, ACT, Australia

More information

Section 2B.59 Weight Limit Signs - Interim Revisions

Section 2B.59 Weight Limit Signs - Interim Revisions Note: this document is an interim modification to Section 2B.59 of the Virginia Supplement to the MUTCD, Revision #1. Once the VDOT District Structure & Bridge section has made the determination that a

More information

Gauging the Future: Passenger Gauge 3, Locomotive Gauge, W13

Gauging the Future: Passenger Gauge 3, Locomotive Gauge, W13 Gauging the Future: Passenger Gauge 3, Locomotive Gauge, W13 Presented by Tim Fuller Senior Gauging Engineer, Network Rail 4 th November 2015 Introduction What s in the V/S SIC Crystal Ball, in the immediate

More information

Permissible Track Forces for Railway Vehicles

Permissible Track Forces for Railway Vehicles British Railways Board Page 1 of 11 Part A Synopsis This document prescribes design and maintenance requirements for traction and rolling stock and for on track plant to ensure that interactive forces

More information

Track Vehicles ANWT 316. Applicability. Publication Requirement. Document Status NSW SMS. External Only September 2018.

Track Vehicles ANWT 316. Applicability. Publication Requirement. Document Status NSW SMS. External Only September 2018. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 3.1 16 September 2018 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Diesel Locomotive Train Driver Performance Checklist

Diesel Locomotive Train Driver Performance Checklist Diesel Locomotive Train Driver Performance Checklist (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by the

More information

Class 66 Diesel Locomotive Pack 03 Add-on

Class 66 Diesel Locomotive Pack 03 Add-on Class 66 Diesel Locomotive Pack 03 Add-on 1 BACKGROUND... 2 1.1 Class 66... 2 1.2 Technical Specification... 2 2 LOCOMOTIVE AND ROLLING STOCK... 3 2.1 EWS Class 66 Locomotive... 3 2.2 JGA Aggregate Hopper

More information

Spoornet Technical: Evaluation, Acquisition and Review

Spoornet Technical: Evaluation, Acquisition and Review Document no: RSE\TE\TMO 0016 Rev no: 6 Page 2 of 36 5.5 EXITING BP EMULATION...15 6. ITC NETWORK COMMUNICATIONS REQUIREMENTS...16 6.1 GENERAL MESSAGING REQUIREMENTS...16 6.2 ECP SPOORNET-SPECIFIC EXTENSION

More information

Australian Standard. Cranes, hoists and winches. Part 18: Crane runways and monorails. AS (Incorporating Amendment Nos 1 and 2)

Australian Standard. Cranes, hoists and winches. Part 18: Crane runways and monorails. AS (Incorporating Amendment Nos 1 and 2) AS 1418.18 2001 (Incorporating Amendment Nos 1 and 2) AS 1418.18 Australian Standard A1 Cranes, hoists and winches Part 18: Crane runways and monorails This Australian Standard was prepared by Committee

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Report, construction machinery can be produced, and some of these products are exported.

Report, construction machinery can be produced, and some of these products are exported. China Railway a Equipment Industry Report, 2009 Railway transport is the main artery of China's economic development. Over a century of development, China railway equipment industry is self-sufficient

More information

David W. Salter Collection

David W. Salter Collection Southern Museum of Civil War And Locomotive History Archives & Library David W. Salter Collection Virginian Railway Photographs MS2010.014 P2010.014 Provenance: The David W. Salter Collection consists

More information

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies Explanatory Note accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies 1. Context A Consultation Forum was held on 18 April 2013 which

More information

Nathan's Trains N Toys P.O. Box 3053 Chermside West Queensland 4032 web: trainsntoys.com.au. Items List [Summary] Page 1

Nathan's Trains N Toys P.O. Box 3053 Chermside West Queensland 4032 web: trainsntoys.com.au. Items List [Summary] Page 1 P.O. Box 3053 Chermside West Queensland 4032 web: trainsntoys.com.au Page 1 M80318 2008 Insider Car "Z" 2 $69.95 M80319 2009 Insider Car 'Z' 1 $0.00 M80323 2013 Z Club Car 1 $0.00 M80327 2017 Insider Car

More information

contents MALLEABLE PIPE FITTINGS BUsHEs NiPPlEs PlUgs caps BENds BackNUTs UNioNs TEEs 171 cross PN25 p socket PN25 p socket PN25 p.

contents MALLEABLE PIPE FITTINGS BUsHEs NiPPlEs PlUgs caps BENds BackNUTs UNioNs TEEs 171 cross PN25 p socket PN25 p socket PN25 p. contents BUsHEs 140 Hexagon Bush p.5 NiPPlEs 144 octagon Nipple p.6 145 Hexagon Nipple p.6 PlUgs 146 Beaded Plug - solid p.7 147 Plain Plug - Hollow p.7 148 Plain Plug - solid p.7 149 countersunk Plug

More information

NETWORK. Annex AC. Aurizon Network Ballast Fouling, 4 March 2013

NETWORK. Annex AC. Aurizon Network Ballast Fouling, 4 March 2013 NETWORK Annex AC 4 March 2013 Aurizon Network Ballast Fouling, Overview of the problem Ballast is the material that is laid on the rail bed under the sleepers, providing stability and drainage to the track

More information

METHODOLOGY OF TRAIN SORTING ON ZAGREB RIJEKA RAILWAY LINE

METHODOLOGY OF TRAIN SORTING ON ZAGREB RIJEKA RAILWAY LINE METHODOLOGY OF TRAIN SORTING ON ZAGREB RIJEKA RAILWAY LINE MLINARIC, T.J., DUVNJAK, B., HARAMINA, H. Abstract: The absolute train sorting method was used to calculate the optimal method of train composition

More information

Gazette GOVERNMENT NOTICES

Gazette GOVERNMENT NOTICES Commonwealth of Australia Published by the Commonwealth of Australia Gazette GOVERNMENT NOTICES HEAVY VEHICLE NATIONAL LAW Queensland Class 1 Heavy Vehicle Christmas Curfew Derestriction Dimension Exemption

More information

Design and Engineering of VR Bogie Goods Wagons

Design and Engineering of VR Bogie Goods Wagons Design and Engineering of VR Bogie Goods Wagons Introduction Understanding the practices and standards used in the design of VR wagons will enhance your skills in building models of VR rollingstock. This

More information

User Guide Estimating the Incremental Cost Impact on Sealed Local Roads from Additional Freight Tasks

User Guide Estimating the Incremental Cost Impact on Sealed Local Roads from Additional Freight Tasks User Guide Estimating the Incremental Cost Impact on Sealed Local Roads from Additional Freight Tasks DATE: MAY 2015 VERSION NO: 1 walga.asn.au WALGA ONE70, LV1, 170 Railway Parade, West Leederville, WA

More information

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES 0 13-Sep-05 Issued for Implementation GD DM PJ Rev # Date Revision Description By Checked Checked App d File

More information

Southern Railway s15 Class

Southern Railway s15 Class Southern Railway s15 Class 1 BACKGROUND... 3 1.1 SR S15 Class... 3 1.2 Design & Specification...3 2 ROLLING STOCK... 4 2.1 SR S15 Locomotive SR Olive Green...4 2.2 SR S15 Locomotive SR Black...4 2.3 SR

More information

United Wagon Company. Company Presentation

United Wagon Company. Company Presentation United Wagon Company Company Presentation UWC is the leading railcar holding in Russia and the CIS 2 No.1 by innovative car product range No.1 in freight car production TOP 5 in the operating lease market

More information

Great Western Mainline

Great Western Mainline Great Western Mainline CONTENTS 1 ROUTE INFORMATION...... 3 1.1 History...3 2 ROLLING STOCK......... 4 2.1 Locomotives...4 2.1.1 IC125 High Speed Train...4 2.1.2 Class 166 Thames Turbo DMU...5 2.1.3 Class

More information

DB BR261 - Voith Gravita 10BB

DB BR261 - Voith Gravita 10BB DB BR261 - Voith Gravita 10BB 1 BACKGROUND... 3 1.1 Loco...3 1.2 Design & Specification...3 2 ROLLING STOCK... 4 2.1 DB BR261 Voith Gravita...4 2.2 Zacns 95m Tanker...4 2.3 Rnoos 644...5 2.4 Cab Controls...6

More information

E/ECE/324/Rev.1/Add.48/Rev.6/Amend.3 E/ECE/TRANS/505/Rev.1/Add.48/Rev.6/Amend.3

E/ECE/324/Rev.1/Add.48/Rev.6/Amend.3 E/ECE/TRANS/505/Rev.1/Add.48/Rev.6/Amend.3 5 February 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

Code of Practice for Road Trains

Code of Practice for Road Trains MR417 06/11 Operating conditions when driving on roads in South Australia This Code of Practice should be read in conjunction with the Information Guide for Road Trains Code of Practice for Road Trains

More information

BR 266 Diesel Locomotive

BR 266 Diesel Locomotive BR 266 Diesel Locomotive 1 BACKGROUND... 3 1.1 History... 3 1.2 Design & Specification... 3 2 ROLLING STOCK... 4 2.1 BR266... 4 2.2 Megafret container wagons... 4 3 DRIVING THE BR266... 6 3.1 Cab Controls...

More information

Land Transport Rule: Steering Systems 2001 Rule 32003/1 Rule requirements...2

Land Transport Rule: Steering Systems 2001 Rule 32003/1 Rule requirements...2 Part 1 Land Transport Rule: Steering Systems 2001 Rule 32003/1 Rule requirements...2 Section 1 Application...2 1.1 Title...2 1.2 Scope of the rule...2 1.3 Date when rule comes into force...2 1.4 Application

More information

The Belt Railway Company of Chicago CORA Guide Revision

The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 July 19, 2013 Page 1 of 14 The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 Date: July 21, 2013 Belt Railway Company of Chicago CORA Guide

More information

Freight Wagon Development in China, Review and Prospect

Freight Wagon Development in China, Review and Prospect Speaker Yang Xiong Jing Freight Wagon Development in China, Review and Prospect China Northern Locomotive and Rolling Stock Industry (Group)Corporation 1. Company Profile CNR Profile A key State-owned

More information

(Text with EEA relevance)

(Text with EEA relevance) L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons

More information

The Registration Exemption and Reciprocity Regulations, 2014

The Registration Exemption and Reciprocity Regulations, 2014 1 AND RECIPROCITY, 2014 T-18.1 REG 13 The Registration Exemption and Reciprocity Regulations, 2014 being Chapter T-18.1 Reg 13 (effective June 27, 2014) as amended by Saskatchewan Regulations 50/2014 and

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Setting Back or Propelling on Running Lines Rule Number: 4015 Version 1.0, 31 March 2016 Setting Back or Propelling on Running Lines Rule Number: 4015 Document

More information

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17. High Plains ECONOMIC DEVELOPMENT D i s t r i c t Rail Transportation Southeast Wyoming Southeast Wyoming is served by both the Burlington Northern Santa Fe Railroad (BNSF) and the Union Pacific Railroad

More information