Maintenance for HV Cables and Accessories. December 2014 Tutorial, WG B1.40

Size: px
Start display at page:

Download "Maintenance for HV Cables and Accessories. December 2014 Tutorial, WG B1.40"

Transcription

1 Maintenance for HV Cables and Accessories December 2014 Tutorial, WG B1.40 1

2 Table of Contents Introduction Definitions Maintenance strategies Survey of presently used maintenance programs Failure modes/related detection meth./maint. actions Available diagnostic tools Maintenance case studies Recommendations Future developments Conclusions

3 Introduction CIGRE WG B1-04 completed a report in 2005, dealing with the following aspects of maintenance on HV cables: - What maintenance practices are being applied at present? - What are the causes of failure for cables and accessories? - How can potential failures be detected? - What guidelines can be given to improve.

4 Introduction (2) The CIGRE report TB 279: Maintenance strategies A survey of presently used maintenance programs A list of common failure modes for cable systems, related detection methods and maintenance actions A list of diagnostic tools Recommendations for effective and efficient maintenance Maintenance case studies Future developments

5 Introduction (3) Attention has been focussed on predictive maintenance because: - Predictive maintenance (to avoid failures) may contribute to higher reliability and reduced maintenance costs - The application of predictive maintenance is not yet common utility practice - More tools are now becoming available for a successful application of predictive maintenance

6 Introduction (4) The economics of a predictive maintenance program has not been considered, because: - Wide variations in operating frameworks between different countries and/or companies - More important to focus on assisting cable users to identify diagnostic tools and methodologies

7 Definitions (IEC 60050) Maintenance, the combination of all technical and administrative actions, including supervision actions, intended to retain an item, or restore it to, a state in which it can perform a required function Predictive Maintenance, an equipment maintenance strategy based on measuring the condition of equipment in order to assess whether it will fail during some future period, and then taking appropriate action to avoid the consequences of that failure

8 Definitions (2) Preventive maintenance, the maintenance carried out at predetermined intervals or according to prescribed criteria and intended to reduce the probability of failure or the degradation of the functioning item

9 Practical definitions (1) - Corrective Maintenance, to repair or to replace broken components - Time Based Maintenance, to perform maintenance on a predetermined schedule= preventive maintenance - Condition Based Maintenance, to perform maintenance, based on the results of condition assessment of the component= predictive maintenance

10 Practical definitions (2) Maintenance before a failure: - Time based (Preventive) maintenance - Condition based maintenance (Predictive maintenance) Maintenance after a failure - Corrective maintenance

11 Why Maintenance? To avoid failures To avoid environmental damage To avoid more expensive maintenance later To extend cable life To avoid unsafe situations To repair failed components To avoid penalties

12 Maintenance strategies (1) According to a CIGRE questionnaire comparing maintenance on switchgear, transformers, lines and cables, cables have the lowest expenditure on predictive maintenance and the highest expenditure on corrective maintenance Possible explanation: - Cables are usually invisible - Cables do not have moving parts - Cables have low risk of explosion

13 Maintenance strategy (2) The available budget is at present obviously not assigned to improve the overall system reliability Cables should have a higher maintenance priority as cable and accessory are subject to failure and outage. A CBM approach appears to offer opportunities to detect potential failures and to reduce the probability of failures in service

14 Questionnaire Utility members of WG B1-04 were approached informally: - What is present maintenance policy? - What maintenance actions are taken?

15 Survey of presently used maintenance programs To avoid 3 rd party damage - Inspections of cable routes - Administrative procedures to provide cable route information to other parties (using a central ofice to coordinate)

16 Survey of maintenance programs (2) Extruded cables - Serving test - Visual inspection of terminations - Thermal monitoring - Inspection of alarm equipment (if installed in tunnel)

17 Survey of maintenance programs (3) FF cables - Serving test - Inspection of terminations - Inspection of fluid equipment (pressure, tank) - Inspection of fluid alarm equipment - DGA

18 Survey of maintenance programs (4) Test on specially bonded systems - Inspection of link box - Inspection of surge arrestor - Current measurement To collect statistical data Innovative actions - Tan delta measurement - PD measurement - Advanced failure analysis

19 Survey of maintenance programs (5) Conclusions: - Preventive maintenance rather than only corrective maintenance - Frequency of maintenance actions decided by the utility involved - Predictive maintenance (CBM) under development - Failure analysis - Investigation of coincidental samples - Collecting information in data base

20 Failuremodes/detection methods/maintenance actions Identification of the main cause of failure Which diagnostic method is available to detect? What are the following maintenance actions?

21 Different type of cables - Low pressure self contained fluid filled - High pressure fluid filled - Gas compression cables - Extruded cables

22 Failuremodes/detection methods /maintenance actions (2) A standard list has been compiled according to the following headings: - Item, identifies the component in the system involved - Event/cause, describes the event that has occured to cause failure, damage or degradation - Consequence, desccribes the effect of the event - Probability of occurence,high, medium low

23 Failure modes/detection modes /maintenance actions (3) - Impact, categorised into: Health & Safety, Environment, System - Diagnostic indicator, the measurable property that changes as a result of the event - Maintenance action, to reduce the probability of the occurrence of the event - Effectiveness, well established/under development - On line/off-line

24 Failure Mode Analysis Tabel Table headings Example Event Consequence of the event Probability of occurrence (H/L) Impact (S, H&S, E) Diagnostic indicator Maintenance action Effectiveness (WE/UD) On-line/off-line Damaged outer sheath Corrosion sheath High System Loss of insulation Serving test+repair Well established Off line

25 Failure modes of SCFF cables Damaged cable/oversheath/metal sheath by 3 rd party Damaged metal sheath by corrosion or fatigue Ingress of water in cable/accessory or link boxes External mechanical stress due to ground changes, thermal expansion/contraction and improper clamping Assembly errors Thermal ageing of insulation Failure of fluid pressure gauges/transducers or gauge contacts Movement of cable due to poor clamping

26 Failure modes of HPFF cables Damaged cable by 3 rd party Leaking or damaged steel pipe due to corrosion Assembly errors Leakage of fluid from termination Failure of fluid feeding and pressurisation system due to fluid leaks in pipework/tank, fluid pump failure, faulty gauges

27 Failure modes of Gas pressure cables Damged cable by 3 rd party Leaking or damaged steel pipe due to corrosion Assembly errors Leakage of internal fluid from termination Failure of gas pressure system due to gas leaks, in associated pip work, gas leak from canister and faulty gauges

28 Failure modes of Extruded cables Damaged cable, oversheath, metal sheath by 3 rd party Damaged metal sheath due to corrosion or fatigue Ingress of water in cable accessory of link box External mechanical stress due to ground changes, thermal expansion/contraction (snaking) and improper clamping Thermal ageing of insulation Assembly errors Movement of cable due to thermal cycling or poor clamping

29 Diagnostic tools What major diagnostic tools are available? Why and how are they applied? What is the status of acceptance?

30 Available diagnostic tools A list of available diagnostic tools has been compiled under the following headings: - Tool, identifies the available diagnostic tool - Description of method, summarizes basic principles - Event/cause detected, describes the event/cause that has occurred to cause the system failure which are detectable with the diagnostic tool - Comment, regarding the tool - On-line/off-line

31 Available Diagnostic Methods Table headings Example Tool Description of method Application Effectiveness On-line/off-line Serving test DC test 5 min Damaged outer sheath Effective Off- line

32 Available diagnostic tools Cable route inspections Cable system inspection Serving test Temperature measurement Tan delta test Thermal backfill survey PD measurement Chemical/physical analysis of fluid X-ray of accessories Sheath voltage limiter test Bonding system test

33 Additional diagnostic tools for FF cable Indication of falling pressure Regular gauge maintenance and calibration Regular testing of gauge/transducer alarm functionality Electrical test on pipe coating Inspection of CP system

34 Maintenance case studies Practical examples of present maintenance actions The cases demonstrate benefits of mostly preventive maintenance actions

35 Case studies Administr.method to avoid 3 rd party damage in the NL The serving test on 150 kv cables in the NL Fluid pressure monitoring in Belgium Early leak detection in HPFF cable systems in Canada Locating leaks in SCFF cables in Canada, using tracer technology Experiences with CBM on MV power cable systems using PD diagnostics in the NL and Italy Condition assessment with PD measurements Probalistic optimisation for external cable damage in France

36 Adminisitr. method to avoid 3rd p.d. Planned work in the soil at a certain site has to be reported to central office KLIC KLIC registers request and sends messages to all underground services, who have underground systems in the vicinity of the site The owner is asked to provide maps and to give permission to start work The owner makes a staff member available to attend and to guide work For each particular activity in the soil specific instructions are given

37 Serving test procedure Purpose of the oversheath: - To protect the cable against mechanical forces during installation - To protect the metallic sheath against corrosion - To isolate the metallic sheath from earth for cross bonding - To protect the insulation against ingress of water

38 Procedure of the serving test (4kV/mm- 10kV,5min) Voltage between sheath and earth If there is a defect, a high leakage current will flow (>10mA) The fault is pinpointed using fault localisation techniques After repair the test will be repeated

39 Fluid pressure monitoring in Belgium Pressure must be between bar (8 bar for transient pressure) Pressure loss can indicate defect in metal sheath, causing water ingress+ environmental impact Preferably loss of fluid pressure should be detected prior to alarm activation (fluid pressure within safe limits) Visual inspection of termination and fluid tanks Pressure gauge readings are taken at each injection point and are compared with previous measurements

40 Fluid pressure monitoring (2) Urgency leak location: - Circuit criticality - Leakage rate - Proximity to water - Environmental legislation - Public perception

41 Fluid pressure monitoring (3) Cost comparison: Preventive maintenance (without fluid loss) - hours of operator to check Corrective maintenance (with fluid loss) - hours of operator - Localisation - Repair of sheath - Decontamination of the soil

42 Fluid pressure monitoring (4) Correct maintenance (loss of fluid + electric failure) - Localisation - Repair - Decontamination of soil - All costs related to an electric failure: - Repair of cable - Ingress of water - Damage to other equipment - Power interruption

43 Advanced leak detection methods Early leak detection using artificial neural networks - In case of small leaks monitoring of fluid level is interfered by fluid movement because of load fluctuations - Input parameters are: load current, cable fluid pressure, cable fluid temperature, soil temperature - Output from the ELD system, includes the instantaneous leak rate in l/h

44 Advanced leak location methods Tracer technology: - After detection of leak injection of a harmless tracer gas (perfuorinated chemical) in the fluid reservoir - The leaked tracer evaporates from the fluid, moves up through the soil and can be detected in the air above the cable route - Accuracy 0.001%

45 Probabilistic maintenance optimalisation for 3 rd party damage Application of econmic modeling to a maintenance policy The method expresses the links between the failure and the maintenance tasks The knowledge of an expert will be combined with statistical data, resulting in the optimal maintenance solution: - 32% preventive maintenance (route inspection, serving test - 68% corrective maintenance cost - Frequency cable route inspec. 1m; serving test 3-6 y

46 CBM on MV power cables in the NL Maintenance strategy is developed to detect potential failures by diagnostic testing (lfpdd) Cost/benefit analysis confirms the economical feasibility: Cost Diagnostics Personnel Early replacement Engineering Benefit Outage costs Follow up failures Claims Penalties Bad reputation

47 CBM on MV power cables in the NL(2) Selection ctiteria for cable circuits to be diagnosed are based on the following issues: - Expected outage time - Type of region - Current loading - Load pattern - Number of joints - Type of soil - Failure data Circuits are excluded from testing, if there are no joints and if they meet n-1 criterion

48 CBM on MV power cables in the NL(3) Each selection criteria is given a value between 1-4 First selection: Circuits with total value > 26 Second selection values Circuits with values < 21 are not selected Conclusions: Cost/benefit ratio <1 Reliabilty is increased

49 Remaining Life Management Maintenance and RL are related: - Life extension requires maintenance action - No maintenance if RL=0 RLM will not be dealt with in this tutorial, but in following tutorial, by Frank de Wild: Remaining Life Management and Replacement Planning

50 Recommendations for performing maintenance Recommendations to be separated in: The general recommendations, summarizing the key findings of the report (the 7 commandments ) The recommendations are specified per cable type

51 General Recommendations Carry out maintenance with a clear strategy A statistical approach should be used in formulating maintenance policy Keep maintenance strategy under review Develop and maintain a data base of cable system failures

52 General Recommendations (2) Fully investigate failures or material that comes available, due to cable replacement Pay particular attention to minimising 3rd party damage Implement preventive actions, as part of basic maintenance, appropriate to the cable type

53 Basic Maintenance Ensure that cable route information is available and procedures are in place to exchange information Periodic inspections along the route Periodic serving test Periodic inspection of outdoor terminations Periodic inspection of link boxes Data base including failure events

54 Additional maintenance FF cables Continuous measurement of fluid pressure and pressure alarm Periodic inspection program covering the entire fluid feeding system Periodic pipe caoting survey/ monitoring pipe to soil potential

55 Future developments Improved hardware and software (PDD on line) Characterisation of extruded insulation (Ageing mechanisms) Improved non-destructive tets (Diagnostics) Linking field tests to laboratory tests (Accelerated ageing)

56 Conclusions Cable owners should decide on a clear maintenance strategy which balances predictive, preventive and corrective maintenance Maintenance strategy should be related to a clear budget: - Investments: Predictive& Preventive - Costs: Corrective

57 Conclusions (2) Maintenance trends are moving in the direction of predictive maintenance More cooperation needed between utilities to share knowledge and experience

58 Main References Maintenance for HV cables and accessories, prepared by CIGRE WG B1-04. Published in August 2005 as CIGRE Technical Report 279 Diagnostiv methods for HV paper cables and accessories, CIGREWG Published in February 1998, Technical Report 2001

59 Final page Thank you for your attention.

Switchgear and Distribution Systems for Engineers and Technicians

Switchgear and Distribution Systems for Engineers and Technicians Switchgear and Distribution Systems for Engineers and Technicians WHAT YOU WILL LEARN: How to identify typical characteristics of an industrial distribution system Become familiar with the main components

More information

Low and medium voltage service. Power Care Customer Support Agreements

Low and medium voltage service. Power Care Customer Support Agreements Low and medium voltage service Power Care Customer Support Agreements Power Care Power Care is the best, most convenient and guaranteed way of ensuring electrification system availability and reliability.

More information

High Voltage Technology & Testing

High Voltage Technology & Testing The Power of Trust. The Future of Energy. HIGH VOLTAGE TESTING Qualification testing, condition assessment, and forensic analysis Manufacturers and utility users of high-voltage electrical equipment face

More information

DG system integration in distribution networks. The transition from passive to active grids

DG system integration in distribution networks. The transition from passive to active grids DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Equipment Strategy for Stand By Diesel Generators Strategy

Equipment Strategy for Stand By Diesel Generators Strategy Equipment Strategy for Stand By Diesel Generators Strategy Current version: 26/06/2018 EXTERNAL USE Page 1 of 6 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Defined terms...

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E8: Battery Condition Assessment E8.1 GENERAL Plant or station batteries are key components in hydroelectric powerplants and are appropriate for

More information

SENTINEL BATTERY MONITORING

SENTINEL BATTERY MONITORING Protecting your power supply SENTINEL BATTERY MONITORING Helios Power Solutions If you re operating mission critical systems and relying on the protection of a UPS and battery bank, then it has to make

More information

NZQA Expiring unit standard 893 version 5 Page 1 of 5. Diagnose and rectify vehicle emission control system faults

NZQA Expiring unit standard 893 version 5 Page 1 of 5. Diagnose and rectify vehicle emission control system faults Page 1 of 5 Title Diagnose and rectify vehicle emission control system faults Level 4 Credits 3 Purpose This unit standard is for people in the automotive repair industry. People credited with this unit

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella

More information

LECTURE 12 MAINTENANCE: BASIC CONCEPTS

LECTURE 12 MAINTENANCE: BASIC CONCEPTS LECTURE 12 MAINTENANCE: BASIC CONCEPTS Politecnico di Milano, Italy piero.baraldi@polimi.it 1 LECTURE 12 PART 1: Introduction to maintenance PART 2: Condition-Based and Predictive Maintenance 2 PART 1:

More information

Alvin Xu & Johnny Wang, ABB Xiamen Switchgear Co,. Ltd., November, 2016 ABB lead the intelligent revolution Intelligent technology (Part 2)

Alvin Xu & Johnny Wang, ABB Xiamen Switchgear Co,. Ltd., November, 2016 ABB lead the intelligent revolution Intelligent technology (Part 2) Alvin Xu & Johnny Wang, ABB Xiamen Switchgear Co,. Ltd., ABB lead the intelligent revolution Intelligent technology (Part 2) Slide 1 Intelligent Monitor and Diagnosis The Expert System for Switchgear Slide

More information

Experience on Deterioration Survey of Aged 550 kv GIS and Optimized Evaluation Model in Thailand

Experience on Deterioration Survey of Aged 550 kv GIS and Optimized Evaluation Model in Thailand PS1 Experience on Deterioration Survey of Aged 550 kv GIS and Optimized Evaluation Model in Thailand S. Singharerg T. Watanabe Electricity Generating Authority of Thailand Chubu Electric Power Co., Inc.

More information

PROXIMITY DETECTION. AA Coutinho Acting Director Mine Safety

PROXIMITY DETECTION. AA Coutinho Acting Director Mine Safety PROXIMITY DETECTION AA Coutinho Acting Director Mine Safety Contents Background Accident Statistics Proximity detection devices Regulations 27 February 2017 Levels of control Regulations to be promulgated

More information

Important instructions

Important instructions Operation manual Please read this manual, before starting the unit. It contains important notes on commissioning and handling. Keep these instructions for future reference. Be careful even if you pass

More information

Site Services. Asset Management for Modern Networks

Site Services. Asset Management for Modern Networks Site Services Asset Management for Modern Networks The core expertise of Fundamentals relates to voltage control for electrical power networks. This comes from a deep understanding and practical experience

More information

N-03 STEERING GEAR CONTROL SYSTEMS

N-03 STEERING GEAR CONTROL SYSTEMS Guideline No.: N-03(201510) N-03 STEERING GEAR CONTROL SYSTEMS Issued date: October 20,2015 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical requirements,

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 PREPARED BY: Electricity System Operations Planning and Performance DATE: 22 March 2012 FINAL

More information

Improving predictive maintenance with oil condition monitoring.

Improving predictive maintenance with oil condition monitoring. Improving predictive maintenance with oil condition monitoring. Contents 1. Introduction 2. The Big Five 3. Pros and cons 4. The perfect match? 5. Two is better than one 6. Gearboxes, for example 7. What

More information

Cigre SC B4 Activities Towards HVDC Grids. HVDC Grid Workshop Belgium

Cigre SC B4 Activities Towards HVDC Grids. HVDC Grid Workshop Belgium Cigre SC B4 Activities Towards HVDC Grids Bjarne Andersen Chairman of Cigre Study Committee B4 HVDC and Power Electronics HVDC Grid Workshop Belgium 2014 1 Contents Why build HVDC Grids? Types of HVDC

More information

At 6 AM on November 8, 2010, the second day of a voyage from Long Beach, CA to the

At 6 AM on November 8, 2010, the second day of a voyage from Long Beach, CA to the Think CRANKCASE EXPLOSIONS don t happen much anymore? Think Again At 6 AM on November 8, 2010, the second day of a voyage from Long Beach, CA to the Mexican Riviera, the 952-foot cruise ship Carnival Splendor

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

High Voltage Electrician Training

High Voltage Electrician Training High Voltage Electrician Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Our 2-Day High Voltage Electrician

More information

Integrated Inverter/Battery Monitoring System (IBMS)

Integrated Inverter/Battery Monitoring System (IBMS) Integrated Inverter/Battery Monitoring System (IBMS) Battery monitoring at its finest Maintenance Bypass Switch Input AC to DC Converter DC to AC Inverter Static Bypass Switch Output Operations: Normal

More information

Asian paper mill increases control system utilization with ABB Advanced Services

Asian paper mill increases control system utilization with ABB Advanced Services Case Study Asian paper mill increases control system utilization with ABB Advanced Services A Southeast Asian paper mill has 13 paper machines, which creates significant production complexity. They have

More information

Dual Power. Protection. Protection

Dual Power. Protection. Protection 54 Fault Clearing Systems by Damien Tholomier., AREVA T&D Automation, Canada Dual Power Single Battery What if it? Short circuits and other abnormal power system conditions are very rear, but may result

More information

DYNAMIC POSITIONING CONFERENCE October 13-14, 2015 THRUSTERS. Preventative Maintenance Methods for Heavy Duty Azimuth Thrusters

DYNAMIC POSITIONING CONFERENCE October 13-14, 2015 THRUSTERS. Preventative Maintenance Methods for Heavy Duty Azimuth Thrusters DYNAMIC POSITIONING CONFERENCE October 13-14, 2015 THRUSTERS Preventative Maintenance Methods for Heavy Duty Azimuth Thrusters Frank Zeller Schottel Preventive maintenance methods for heavy duty azimuth

More information

Risk Based Maintenance

Risk Based Maintenance Dai Richards ABB Eutech Risk Based Maintenance ABB Industries - 1 - Overview Delivering sustainable improvements is hard No time Changing priorities BU concepts appear well understood ABB Industries -

More information

Using cloud to develop and deploy advanced fault management strategies

Using cloud to develop and deploy advanced fault management strategies Using cloud to develop and deploy advanced fault management strategies next generation vehicle telemetry V 1.0 05/08/18 Abstract Vantage Power designs and manufactures technologies that can connect and

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding 2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding By George Ardavanis, PhD Keywords: overhead catenary system (OCS), electric multiple unit (EMU), grounding and bonding (G&B), overhead contact line (OCL),

More information

Dr. Christopher Ganz, ABB, Group Vice President Extending the Industrial Intranet to the Internet of Things, Services, and People (EU6)

Dr. Christopher Ganz, ABB, Group Vice President Extending the Industrial Intranet to the Internet of Things, Services, and People (EU6) Dr. Christopher Ganz, ABB, Group Vice President Extending the Industrial Intranet to the Internet of Things, Services, and People (EU6) Slide 1 ABB paves the way for the big shifts Internet of Things,

More information

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger

Information to ASB2013/02/18 Containment Risk for NA and NR Turbochargers. MAN Diesel & Turbo SE Business Unit Turbocharger Containment Risk for NA and NR Turbochargers MAN Diesel & Turbo SE Business Unit Turbocharger MAN Diesel & Turbo BU Turbocharger 19.08.2014 < 1 > Agenda 1 Why has MAN released ASB2013/02/18 and Supplement

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Consumer Goods and EU Satellite navigation programmes Automotive industry Brussels, 08 April 2010 ENTR.F1/KS D(2010) European feed back to

More information

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Gerrit van Middelkoop Bianca Coolen Page 1 2015 DEKRA 06.11.2015 Contents Company introduction Condition

More information

E-15 Uninterruptible Power Systems (UPS)

E-15 Uninterruptible Power Systems (UPS) Guideline No.E-15 (201705) E-15 Uninterruptible Power Systems (UPS) Issued date: May 9, 2017 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains technical requirements,

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2008 SEC(2008) 2861 COMMISSION STAFF WORKING DOCUMT Accompanying document to the Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL

More information

Customer presentation, PG Service, BU Motors and Generators ABB LEAP Stator Winding-Condition & Lifetime assessment

Customer presentation, PG Service, BU Motors and Generators ABB LEAP Stator Winding-Condition & Lifetime assessment Customer presentation, PG Service, BU Motors and Generators ABB LEAP Stator Winding-Condition & Lifetime assessment ABB LEAP Overview ABB LEAP - Benefits for customer Motivation to perform LEAP Failures

More information

CHAIN WEAR ANALYSIS WITH LUBECON

CHAIN WEAR ANALYSIS WITH LUBECON CHAIN WEAR ANALYSIS WITH LUBECON LUBECON THE EXPERT IN CHAIN WEAR ANALYSIS CASTROL S LUBECON BRAND OFFERS YOU A COMPLETE RANGE OF WORLD-CLASS CHAIN LUBRICANTS, LUBRICATING EQUIPMENT AND PRODUCT SUPPORT

More information

Independent Testing Laboratory for High Voltage Equipment

Independent Testing Laboratory for High Voltage Equipment T E S T I N G L A B O R A T O R Y Independent Testing Laboratory for High Voltage Equipment 1 CHALLENGING ENVIRONMENT The primary concern for utilities is to ensure grid reliability, efficiency, and security.

More information

UniSec Maintenance solutions

UniSec Maintenance solutions DISTRIBUTION SOLUTIONS UniSec Maintenance solutions ABB supports you to improve the reliability, safety and efficiency of your electrical equipment UniSec Maintenance solutions Table of contents 004 00

More information

IMILV01 Carry out routine light vehicle maintenance

IMILV01 Carry out routine light vehicle maintenance IMILV01 Carry out routine light vehicle maintenance Overview This NOS is about conducting routine maintenance, adjustment and replacement activities as part of the periodic servicing of light vehicles.

More information

V. Design, Application, Maintenance & Operation Technical Requirements

V. Design, Application, Maintenance & Operation Technical Requirements V. Design, Application, Maintenance & Operation Technical Requirements V.L Line & Substation Operation and Maintenance 1.0 General Requirements 1.1 Each facility owner shall have an established and documented

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

Technical information No. 01. IT systems. The basis for reliable power supply

Technical information No. 01. IT systems. The basis for reliable power supply IT systems The basis for reliable power supply FA01en/01.2004 IT systems The basis for reliable power supply in critical areas The advantages of sophisticated industrial systems can only be of use, if

More information

TDG-F-113 CEC New Test Development Proposal for a New Engine Fuels Test Procedure

TDG-F-113 CEC New Test Development Proposal for a New Engine Fuels Test Procedure TDG-F-113 CEC New Test Development Proposal for a New Engine Fuels Test Procedure DISI (Direct Injection spark ignited engine) Injector fouling Test 1. Demonstrated need- The proposed test will address

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

Overview Overvoltage protection

Overview Overvoltage protection A P P L I C AT I O N N OT E 1.0 Overview Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage protection Metal-oxide surge

More information

Introduction to Condition-Based Maintenance Best Practices

Introduction to Condition-Based Maintenance Best Practices Introduction to Condition-Based Maintenance Best Practices Maintenance Strategy Breakdown Maintenance Preventive Maintenance (Time Base) Predictive Maintenance Proactive Maintenance Rationalizing Spending

More information

Methodology and Practice

Methodology and Practice FOCUS Event 20 st ETH-NPC, June 16 th, 2016 DPF Inspection & Maintenance Methodology and Practice Thomas W. Lutz Th.Lutz) 30.06.2016 1 Maintenance must be a periodic routine Emission control must become

More information

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS 2013 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM POWER AND MOBILITY (P&M) MINI-SYMPOSIUM AUGUST 21-22, 2013 TROY, MICHIGAN HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

More information

ABB Drive Services Your choice, your future

ABB Drive Services Your choice, your future ABB Drive Services Your choice, your future Your choice, your future The future of your drives depends on the service you choose. Whatever you choose, it should be a well-informed decision. No guesswork.

More information

Experiences in a Motor Protection Retrofit

Experiences in a Motor Protection Retrofit Special Feature by Kyle Craig, Ontario Power Generation Amy Sinclair, Schweitzer Engineering Laboratories, Inc. Experiences in a Motor Protection Retrofit Introduction The initial stage of any project

More information

Diagnostic Experience on HV Bushings Retired from Service MANUEL GUZMÁN-V

Diagnostic Experience on HV Bushings Retired from Service MANUEL GUZMÁN-V Diagnostic Experience on HV Bushings Retired from Service MANUEL GUZMÁN-V Diagnostic experience on HV bushing retired from service. Manuel Guzmán; Fernando Elizarraraz; Ricardo Montes Comisión Federal

More information

THE TRANSRAPID MAGLEV MAINTENANCE PROCESS

THE TRANSRAPID MAGLEV MAINTENANCE PROCESS THE TRANSRAPID MAGLEV MAINTENANCE PROCESS (*) Dr.-Ing. Friedrich Löser, (**) Dr.-Ing. Chunguang Xu, (***) Dr. rer. nat. Edmund Haindl (*)ThyssenKrupp Transrapid GmbH, Moosacher Str. 58, 80809 Munich, Germany,

More information

Electrical Safety in the Workplace

Electrical Safety in the Workplace Electrical Safety in the Workplace Increasing Electrical Safety in the Workplace through Purchasing and Procurement Robert Mitchell, Safety and Technical Safety Advisor Safety Risk, Policy and Innovation

More information

Item 1: Contents of the complete training & CV of the lecturer

Item 1: Contents of the complete training & CV of the lecturer Course DESIGN CONCEPTS + software SwitchgearDesign for SWITCHGEAR, SWITCHBOARDS, BUSDUCTS & SUBSTATIONS" Item 1: Contents of the complete training & CV of the lecturer Presented by Sergio Feitoza Costa

More information

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications Contents 1. Laboratory Objective... 4 2. MECHANICAL OPERATION TESTS... 4 2.1 Purpose... 4 2.2 Procedure... 4 2.3 Results...

More information

Based on the findings, a preventive maintenance strategy can be prepared for the equipment in order to increase reliability and reduce costs.

Based on the findings, a preventive maintenance strategy can be prepared for the equipment in order to increase reliability and reduce costs. What is ABB MACHsense-R? ABB MACHsense-R is a service for monitoring the condition of motors and generators which is provided by ABB Local Service Centers. It is a remote monitoring service using sensors

More information

LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco

LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines Marcio Gennari ABB Brazil Automation Products Machines Service Osasco LEAP - Introduction ABB India (excellence center in insulation

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Protective firing in LCC HVDC: Purposes and present principles. Settings and behaviour. V. F. LESCALE* P. KARLSSON

Protective firing in LCC HVDC: Purposes and present principles. Settings and behaviour. V. F. LESCALE* P. KARLSSON 21, rue d Artois, F-75008 PARIS B4-70 CIGRE 2016 http : //www.cigre.org Protective firing in LCC HVDC: Purposes and present principles. Settings and behaviour. V. F. LESCALE* P. KARLSSON VILES Consulting

More information

Appendix 3. DRAFT Policy on Vehicle Activated Signs

Appendix 3. DRAFT Policy on Vehicle Activated Signs Appendix 3 DRAFT Policy on Vehicle Activated Signs Ealing Council has been installing vehicle activated signs for around three years and there are now 45 across the borough. These signs help to reduce

More information

Conveyor Condition Monitoring. Increase uptime, decrease damage, plan repairs, avoid disaster

Conveyor Condition Monitoring. Increase uptime, decrease damage, plan repairs, avoid disaster Conveyor Condition Monitoring Increase uptime, decrease damage, plan repairs, avoid disaster Reliability through Condition Based Monitoring Benefits: Early identification of potential failures Reduce correction

More information

June Safety Measurement System Changes

June Safety Measurement System Changes June 2012 Safety Measurement System Changes The Federal Motor Carrier Safety Administration s (FMCSA) Safety Measurement System (SMS) quantifies the on-road safety performance and compliance history of

More information

E-15 Uninterruptible Power Systems (UPS)

E-15 Uninterruptible Power Systems (UPS) Guideline No.E-15 (201510) E-15 Uninterruptible Power Systems (UPS) Issued date:20 October, 2015 China Classification Society Foreword This Guide is a part of CCS Rules, which contains technical requirements,

More information

Service and Rehabilitation Electrical Power Systems

Service and Rehabilitation Electrical Power Systems Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading

More information

ABB Services for Low Voltage equipment Your choice, your future

ABB Services for Low Voltage equipment Your choice, your future ABB Services for Low Voltage equipment Your choice, your future You choose, we respond. Globally. The future of your equipment depends on the service you choose Whatever you choose, it should be a well-informed

More information

A DIAGNOSTIC MAINTENANCE SYSTEM FOR COMMERICIAL AND NAVAL VESSELS JANE CULLUM

A DIAGNOSTIC MAINTENANCE SYSTEM FOR COMMERICIAL AND NAVAL VESSELS JANE CULLUM A DIAGNOSTIC MAINTENANCE SYSTEM FOR COMMERICIAL AND NAVAL VESSELS JANE CULLUM jane.cullum@utas.edu.au SUPERVISORS: Associate Professor Jonathan Binns, Professor Kiril Tenekedjiev, Dr. Rouzbeh Abbassi,

More information

DESIGN AND RETROFITTING OF LOW VOLTAGE AIR CIRCUIT BREAKERS.

DESIGN AND RETROFITTING OF LOW VOLTAGE AIR CIRCUIT BREAKERS. DESIGN AND RETROFITTING OF LOW VOLTAGE AIR CIRCUIT BREAKERS. Terasaki Electric Europe Ltd, UK 80 Beardmore Way, Clydebank Industrial Estate, Glasgow G81 4HT By Peter Anderson Abstract Throughout the world

More information

Understanding the benefits of using a digital valve controller. Mark Buzzell Business Manager, Metso Flow Control

Understanding the benefits of using a digital valve controller. Mark Buzzell Business Manager, Metso Flow Control Understanding the benefits of using a digital valve controller Mark Buzzell Business Manager, Metso Flow Control Evolution of Valve Positioners Digital (Next Generation) Digital (First Generation) Analog

More information

Transformer oils - Production, performance and in-service behaviour

Transformer oils - Production, performance and in-service behaviour Transformer oils - Production, performance and in-service behaviour Johan Grövik Nynas AB TRANSFORM Partner Nynas Nynas AB founded 1928 Swedish based company Approximately 850 employees Turnover 2 billion

More information

SINAMICS GM150 IGCT version

SINAMICS GM150 IGCT version /2 Overview /2 Benefits /2 Design /6 Function /8 Selection and ordering data /8 Options Technical data /14 General technical data /15 Control properties /15 Ambient conditions /16 Installation conditions

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MOTIVATION OF THE RESEARCH Electrical Machinery is more than 100 years old. While new types of machines have emerged recently (for example stepper motor, switched reluctance

More information

A manufacturer s view of bushing reliability, testing and analysis. Lars Jonsson Håkan Rudegard

A manufacturer s view of bushing reliability, testing and analysis. Lars Jonsson Håkan Rudegard A manufacturer s view of bushing reliability, testing and analysis By Lars Jonsson Håkan Rudegard 1 A manufacturer s view of bushing reliability, testing and analysis Lars Jonsson Håkan Rudegard ABB Sweden

More information

GREENER SHIPPING SUMMIT 2017

GREENER SHIPPING SUMMIT 2017 GREENER SHIPPING SUMMIT 2017 EU MRV Regulation Methods of Data Collection of Fuel Differences/Consequences/Evaluation of Methods Antonios Georgantzis 14 November 2017 Eugenides Foundation The EU MRV Timeline

More information

Hans-Paul Siderius Chairperson 4E. London, 14 September 2010

Hans-Paul Siderius Chairperson 4E. London, 14 September 2010 4E and MVE Hans-Paul Siderius Chairperson 4E London, 14 September 2010 4E at a glance 4E provides an international forum for governments and other stakeholders to: Share expertise and develop understanding

More information

Grounding Of Standby & Emergency Power Systems

Grounding Of Standby & Emergency Power Systems July / August 2007 ELECTRICAL LINE 53 Grounding Of Standby & Emergency Power Systems By Andrew Cochran Power continuity is essential in many industrial and commercial installations where a trip out due

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

White paper: Pneumatics or electrics important criteria when choosing technology

White paper: Pneumatics or electrics important criteria when choosing technology White paper: Pneumatics or electrics important criteria when choosing technology The requirements for modern production plants are becoming increasingly complex. It is therefore essential that the drive

More information

Sneak Circuit Analysis: Lessons Learned from Near Miss Event

Sneak Circuit Analysis: Lessons Learned from Near Miss Event Sneak Circuit Analysis: Lessons Learned from Near Miss Event James Li Centre of Competence for Mass Transit AME, Bombardier Transportation, Kingston, Canada Email: james.li@rail.bombardier.com (Received

More information

Positron Insulator Testers for High Voltage Live Line Testing

Positron Insulator Testers for High Voltage Live Line Testing Positron Insulator Testers for High Voltage Live Line Testing Why is insulator testing so important? Outages due to insulator failure are costly Live-line work requires that the insulators be in good condition

More information

Control System for a Diesel Generator and UPS

Control System for a Diesel Generator and UPS Control System for a Diesel Generator and UPS I. INTRODUCTION In recent years demand in the continuity of power supply in the local distributed areas is steadily increasing. Nowadays, more and more consumers

More information

Sales Application Engineering Europe & Russia. Application Engineering Training. Course description and Curriculum

Sales Application Engineering Europe & Russia. Application Engineering Training. Course description and Curriculum Sales Application Engineering Europe & Russia Application Engineering Training Course description and Curriculum Aim of the course The objective of this Application Engineering training is to provide a

More information

Life cycle services for protection and control relays Full support from start to finish

Life cycle services for protection and control relays Full support from start to finish Life cycle services for protection and control relays Full support from start to finish The main purpose of the protection and control relay is to protect both human lives and equipment as well as ensure

More information

Not all Low Voltage Switchgear is created equal

Not all Low Voltage Switchgear is created equal Not all Low Voltage Switchgear is created equal White Paper The must-have solution for power distribution systems Introduction Reliability and safety are the two most important criteria in the proper functioning

More information

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry ABB MEASUREMENT & ANALYTICS Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry 2 P R E D I C T I V E E M I S S I O N M O N I T O R I N G S Y S T E M S M O N

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS 1 GENERAL 3 2 PRE-INSPECTION DOCUMENTATION 3 2.1 General 3 2.2 Initial core loading of a nuclear power plant, new type of fuel or control rod or new

More information

Netherlands Russia United Kingdom United Arab Emirates. Gas turbine maintenance improvement GE LM1600 LM2500/+ LM6000

Netherlands Russia United Kingdom United Arab Emirates. Gas turbine maintenance improvement GE LM1600 LM2500/+ LM6000 Netherlands Russia United Kingdom United Arab Emirates Gas turbine maintenance improvement GE LM1600 LM2500/+ LM6000 VBR customer value proposition We support GE LM users to improve reliability, availability

More information

Overview of CIGRÉ C6 Activities

Overview of CIGRÉ C6 Activities Overview of CIGRÉ C6 Activities Fourth International Conference on Integration of Renewables and Distributed Energy Resources post-conference Workshop Albuquerque, NM, USA December 10, 2010 Mark McGranaghan

More information

Health Based Asset Management. rjd

Health Based Asset Management. rjd Health Based Asset Management 1 Health Care Proactive and Reactive Approaches Physical Routine Screenings Symptoms Targeted Diagnostics Emergency Targeted Diagnostics 2 What is the health of the assets?

More information

Expand your vibration program to new heights.

Expand your vibration program to new heights. Expand your vibration program to new heights. Cooling Tower Monitoring Wireless Vibration Monitoring for Motor and Gearbox Combination Monitoring your cooling towers presents a unique set of challenges

More information

OPTIMORE - Optimised Modular Range Extender for every day customer usage AVL SCHRICK project summary

OPTIMORE - Optimised Modular Range Extender for every day customer usage AVL SCHRICK project summary AVL SCHRICK project summary GA05 / final meeting 18./19. September 2014 Gothenburg, Sweden AVL SCHRICK work packages and deliverables overview Work Package 5 Functional Safety (WP lead) D 5.1 - Item Definition

More information

ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS. UAE, Sharjah, Copthorne Hotel Sharjah

ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS. UAE, Sharjah, Copthorne Hotel Sharjah Training Course : ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS Training Course For One Week In UAE, Sharjah, Copthorne Hotel Sharjah Which Be Held

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15 COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #15 Cost To Complete Total Program Element - 5.833

More information

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES Table of contents TABLE OF CONTENTS Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF CONTENTS TABLE OF TABLES TABLE OF FIGURES INTRODUCTION I.1. Motivations I.2. Objectives I.3. Contents and structure I.4. Contributions

More information

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018 Performance of Batteries in Grid Connected Energy Storage Systems June 2018 PERFORMANCE OF BATTERIES IN GRID CONNECTED ENERGY STORAGE SYSTEMS Authors Laurie Florence, Principal Engineer, UL LLC Northbrook,

More information

Alstom Grid provides smart, efficient and environmentally-friendly solutions to deliver electricity reliably across the world GRID

Alstom Grid provides smart, efficient and environmentally-friendly solutions to deliver electricity reliably across the world GRID Alstom Grid provides smart, efficient and environmentally-friendly solutions to deliver electricity reliably across the world GRID Maintenance & Onsite Repair of Transformers NTPC O&M Conference IPS 2013,

More information

New illustration is coming

New illustration is coming New illustration is coming MINING USER CONFERENCE, MAY 3-5, 2017 IGBT Utilization and Life Cycle With heavy duty load requirements on Electric Rope Shovels Boris Rathmann, Product Manager Shovel & Dragline

More information