1 FIRE DEPARTMENT PROJECT DESCRIPTIONS As a city wide Capital Improvement Plan (CIP) is developed, major capital improvements for the Brookville Fire Department (BFD) may include the following: Apparatus: purchase and/or refurbishment of fire engines; ambulances; heavy rescue vehicles; aerials; ladder trucks; water tankers; command vehicles; utility vehicles; light trucks; sport utility vehicles and equipment trailers. Major equipment: purchase and/or replacement of personal protective equipment (PPE); self contained breathing apparatus (SCBA); and advanced life support (ALS) medical equipment. Facilities: new construction and/or renovation of fire stations; training facilities (manipulative drill ground buildings and props); emergency operations centers, and accessory buildings. TABLE 1 FIRE DEPARTMENT CAPITAL IMPROVEMENTS ITEM Apparatus $36,000 $225,000 $350,000 $850,000 $70,000 PPE $30,000 $30,000 $15,000 $15,500 $16,000 Thermal Imagers $12,000 Cardiac Monitor $35,000 Power Cot $17,000 Chest Compression Device 20,000 $10,500 $10,500 Facilities $50,000 $10,000 TOTALS $165,000 $300,500 $385,500 $865,500 $86,000 Estimated apparatus expenditures include the following: Apparatus Replacement: Currently the BFD has no standard apparatus or equipment depreciation and replacement schedule, nor does it have an amortized equipment replacement fund. Monies set aside typically can cover the need to purchase ambulances when necessary; however, in 2015, for the first time in the history of the BFD, a used fire engine was purchased to replace a 29 year old pumper that was in poor condition. Prior to this purchase, only new pumpers had ever been purchased throughout the 144 year history of the BFD. Whether purchasing new or quality used apparatus, the one constant with a department the size of the BFD is an annual, recurring need to address significant capital needs. The current funding stream is not sufficient to replace firefighting apparatus on a reasonable schedule of 10 years of front line service and 10 years of reserve service. Even with an extension of that replacement schedule to 15 years front line service and 10 years of reserve service for a total of 25 years, revenue is insufficient given the present number of front line fire apparatus, and the problem will only compound over time.
2 A similar situation exists with ambulance replacement. The additional of a third ambulance to the fleet in 2015 has helped keep two ambulances available for front line service 99% of the time; however, the lack of scheduled replacement of ambulances has led to inefficient use. A procedural adjustment in 2016 has established a rotation which minimizes use of the newest ambulance (keeping it from running out of warranty prematurely) and maximizes use of the most troublesome ambulance (in an effort to position it for replacement). A standard cycle of fire apparatus replacement for a modern suburban department would likely by as previously stated: 10 years of front line service and 10 years of reserve service before being cycled out of the fleet. However, given the available resources of the BFD, it may be more practical to extend the service life to 15 years of front line service followed by a minimum of 5 years of reserve service. Given our current call volume, a standard cycle of ambulance replacement for the BFD should be four years front line and eight years backup / reserve. Given the recent move to a three ambulance fleet, two ambulances with high mileage will need to be replaced/refurbished to permit the four year rotation to be implemented. Adjusting service life of apparatus (up or down in the number of service years) is based on the continual analysis of on going maintenance costs to determine trends in exceptional costs that are in excess of routine preventative and regular maintenance expenditures. Apparatus maintenance records should indicate how much time is spent in time and materials for maintenance costs on a single piece of apparatus. This analysis will allow the ability to flag apparatus that has gone beyond cost effectiveness equilibrium. Apparatus Recommendations: Adopt and implement an apparatus replacement schedule policy. The policy should also require the maintenance of equipment and accurate repair records. This data will support the evaluation of useful service life for each apparatus, and it will take into account any necessary adjustments to either extend or reduce front line or reserve service status. Another consideration is that the 2013 Insurance Services Office (ISO) evaluation of the BFD identified the department lacks the necessary apparatus to receive full credit (i.e., an additional pumper and an aerial device for the fleet). Much like the addition of the ambulance to the fleet as detailed above, a forth pumper would need to be added to make a pumper replacement schedule functional. TABLE 2 APPARATUS and VEHICLE REPLACEMENT SCHEDULE (VRS) Apparatus Front Line Backup / Reserve Decommission Class A Pumper (1000 gal) years 5 10 years 25 years Class A Pumper/Tanker ( gal) years 5 10 years 25 years Ladder Truck years 5 10 years 25 years Heavy Rescue Truck years 25 years Ambulance 4 years 8 years 12 years Utility Vehicles 5 10 years 5 years 15 years Equipment Trailer 25 years 25 years 2
3 Vehicle Class A Pumper This vehicle served the BFD as the primary front line pumper from 1986 until 2010; reserve pumper from 2010 to 2012; front line pumper / tanker from 2012 until decommissioned in TABLE 3 BROOKVILLE FIRE DEPARTMENT (with ISO recommendations) Vehicle Type Apparatus & Year Front Line Backup / Reserve Decommission Backup (3 rd )Pumper Vehicle Heavy Rescue Truck Vehicle n/a 2027 Brush Truck Vehicle n/a 2031 Primary (1 st ) Pumper Vehicle Backup Ambulance Vehicle Utility Pickup Vehicle Utility SUV Vehicle Command Pickup Vehicle Reserve Ambulance Vehicle * Pumper/Tanker Vehicle (2 nd Pumper) (acquired in 2014) Frontline Ambulance Vehicle ; Equipment Trailer Vehicle n/a 2041 ** New or Used Aerial TBD ** New or Used Pumper/Tanker (4 th Pumper) TBD * Vehicle 310 was classified as a 2013 model, but it went into service May, 2012; and was refurbished in ** ISO recommended apparatus additions 3
4 Estimated major equipment expenditures include the following: Major Equipment Replacement: Replacing major equipment on an established schedule is more difficult than apparatus. Some items, such as PPE and SCBA have specific target dates for replacement, while rescue tools can last a number of years, but then suddenly become ineffective on new automotive metals that come into the marketplace. Major Equipment Recommendations: Adopt and implement a major equipment replacement schedule policy. The policy should also require the maintenance of equipment and accurate repair records. This data will support the evaluation of useful service life for each piece of major equipment, and it will take into account any necessary adjustments to either extend or reduce front line or reserve service status. TABLE 4 MAJOR EQUIPMENT REPLACEMENT SCHEDULE (MERS) Equipment Front Line Backup / Reserve Decommission Structural Fire Gear 7 years 3 years 10 years Structural Fire Helmet 10 years n/a 10 years SCBA Assembly 15 years n/a 15 years SCBA Cylinder 15 years n/a 15 years Thermal Imaging Camera 10 years 5 years 15 years Power Cot 7 years n/a 7 years Rescue Air Bags 10 years n/a 10 years Estimated facility expenditures include the following: New Fire Station Equipment: The 2018 capital budget anticipates at least $50,000 of soft costs related to the new fire station project. One of the features built into the new fire station is an Emergency Operations Center for our region. In 2017 we were awarded a grant to help cover costs related to our EOC. 4
5 1. Project Descriptions Apparatus a) Backup (3 rd ) Pumper Vehicle 302 This vehicle was purchased new in 1995 and currently has 19,332 miles and 2,023.2 engine hours. It was first used as the front line pumper from Fire Station 2, and then front line pumper from Fire Station 1 until This vehicle was designed as a basic Class A pumper and lacks many features required of a front line pumper in the BFD today. Some of these missing features include an integrated generator and light tower; integrated foam capabilities; and necessary body compartments to carry all required tools and equipment. This vehicle does feature stainless steel piping an attribute that will prolong its useful life. Historically it is the pump and its related components that become the biggest maintenance challenges once a vehicle reaches the 20 year mark. This vehicle would be a prime candidate for refurbishment into a pumper / tanker. As stated above, the vehicle is not well designed for use as a front line pumper, but through the refurbishment process the vehicle could easily meet the department s needs for a pumper / tanker / 4 th pumper. The estimated cost of refurbishment/replacement is $350,000 and should be completed no later than b) Heavy Rescue Truck Vehicle 303 This vehicle was purchased new in 2002 and currently has 18,400 miles and engine hours. It was well designed for the current and future needs of the BFD. Although the BFD does not currently have or anticipate a need to maintain a Reserve Heavy Rescue Truck, this vehicle is so configured that it could have a future use as a water main repair vehicle to be utilized by the Brookville Service Department. In addition to allowing storage and organization of many important service department tools, the vehicle s integrated generator and light tower would be very helpful for many Service Department projects. The estimated replacement cost is $350,000 and should be completed no later than
6 c) Brush Truck Vehicle 304 This vehicle was purchased new in 2006 and currently has 3067 miles and engine hours. This vehicle lacks the preferred extended cab or crew cab configuration, but otherwise meets the current and anticipated future needs of the BFD. This vehicle was made with as short a wheelbase as possible due to space restrictions at Fire Station 2. The water tank and fire pump are of a skid type design, allowing for fairly easy removal of these components. Once a new fire station is in operation, consideration can be given to moving the skid unit to a larger pickup truck chassis. In turn, this pickup has extremely low mileage and can be utilized as a utility vehicle as needed. The estimated replacement cost for the chassis is $25,000 and should be completed no later than d) Primary (1 st ) Pumper Vehicle 305 This vehicle was purchased new in 2007 and has 25,047 miles and hours. It was purchased with the help of an Assistance to Firefighter s Grant (AFG) and currently serves are the primary pumper for BFD from Fire Station 1. This vehicle originally replaced an aging pumper/tanker. It was welldesigned and meets the current needs of the BFD for a primary pumper. The estimated replacement cost for this pumper is $550,000; it should be moved to a backup or reserve role no later than 2022, and should be replaced no later than e) Backup Ambulance Vehicle 306 This vehicle was purchased new in 2007 and currently has 124,566 miles and 5635 engine hours*. This ambulance is one of two the BFD owned that were maintenance nightmares. The true problem was identified BFD has too much of a demand for ambulance service to spread across just two ambulances. A 2004 ambulance was decommissioned in 2012, and this 2007 model required a $10,000 motor rebuild* in Now that it operates in a three 6
7 ambulance rotation, its maintenance issues have decreased significantly. It functions well in its current role and should be able to continue to be functional until its anticipated replacement date. The estimated replacement cost is $225,000 and should be completed no later than f) First Responder Pickup Vehicle 307 This vehicle was purchased new in 2009 and currently has 35,007 miles. Instead of sending pumpers along with ambulances to service emergency medical services (EMS) calls, the BFD uses utility vehicles. This significantly prolongs the life of the pumpers we can wear out more than twenty utility vehicles for the cost of one pumper. The problem we currently experience with utility vehicles (as pickups or SUV s) is storage space. The tools and equipment we attempt to carry are necessitating a move towards a vehicle that has a service body design. (Refurb in progress) We hope to refurbish this vehicle to incorporate this concept in This chassis will work excellent as it has relatively low mileage, ample cab room, four wheel drive and is already totally outfitted with emergency warning and communications equipment. The estimated cost of refurbishment will not exceed $20,000 and will be similar to the image shown here. g) Utility SUV Vehicle 308 This vehicle was purchased new in 2009 and currently has 48,207 miles. This unit originally served as the Fire Chief s vehicle until It lacks space for necessary tools equipment and has been re purposed for utility tasks. The lack of space issue has us considering alternative uses. The estimated replacement cost is $35,000 and should be completed no later than
8 h) Command Pickup Vehicle 309 This vehicle was purchased new in 2012 and currently has 57,490 miles and 2969 engine hours. This vehicle continues to meet the needs of the Fire Chief s vehicle; however, given its current level of use, this vehicle will likely require replacement wellahead of the Replacement Schedule. Rotation of this vehicle to a utility use is planned for 2018, before its mileage and maintenance needs lead to premature disposal. Another pickup will be purchase for use as a Command Pickup. The estimated replacement cost is $35,000 and should be completed no later than i) Reserve Ambulance Vehicle 310 This vehicle was purchased new in May 2012 (considered a 2013 model) and currently has 108,241 miles. Although a well designed ambulance, this chassis has been, and continues to be, a maintenance nightmare. This chassis has been towed numerous times, and has spent weeks out of service for multiple repairs over the last four plus years. This vehicle is a prime candidate for a re chassis procedure. (Refurb in progress) Additional information must be considered before a decision is made about the future of this vehicle. It is anticipated that fitting this patient compartment onto a new chassis will prolong the useful life of this ambulance. There is also the potential the existing chassis could be utilized by the Service Department. Although the chassis has been a maintenance problem as detailed above, the issues are directly related to the heavy, on going service this vehicle sees as the front line ambulance. Occasional use in another, less intense role will likely allow this chassis to be used in some fashion toward its anticipated VRS date. The estimated replacement cost is $225,000; re chassis cost is expected to be much less and should be completed no later than
9 j) Primary (2 nd Pumper) Pumper/Tanker Vehicle 311 This vehicle was purchased used in 2014 and has 23,722 miles and hours. This vehicle was originally purchased in 2000 as a rural pumper by the Cypress Creek (Houston), Texas Fire Department. This vehicle meets the current and future Pumper/Tanker needs of the BFD. Although 14 years old when purchased, this vehicle should easily serve through the target VRS date. Vehicle 311 prepared for remarking Vehicle 311 as Cypress Engine 21 Vehicle 311 in service as Brookville Engine Tanker 77 k) Frontline Ambulance Vehicle 312 This vehicle was purchased new in 2015 and currently has 22,495 miles and engine hours. This vehicle has successfully proved that the newest ambulance introduced to our three vehicle rotation should serve initially as the reserve vehicle. This will serve to keep the vehicle from prematurely falling out of its manufacturer s warranty. Due to how quickly a front line ambulance accumulates miles, the vehicle warranty typically is voided years ahead of standard expiration. The estimated replacement cost is $225,000 and should be completed no later than
10 l) Equipment Trailer Vehicle 313 This trailer was purchased new in 2016 and is part of a multi year project. The trailer and a minimal amount of traffic control devices were initially purchased in 2016; additional traffic control devices are planned for The estimated replacement cost is $2,500 and should be completed no later than m) New or Used Aerial Device A 2014 ISO evaluation identified that the BFD should have an aerial device within its fleet. This is based on the type, kind, and number of buildings the BFD is expected to protect from fire. We anticipate the ability to locate and acquire a used aerial device that would still offer several serviceable years at a minimum cost, similar to the purchase of Vehicle 311. The BFD currently lacks an interior fire station location where such a vehicle can be housed. The new fire station will provide ample space for an aerial device. The estimated cost of a new aerial device will be at least $850,000; a used vehicle is anticipated to cost much less than this. The addition of an aerial device cannot happen prior to completion of the new fire station in n) New or Used Pumper/Tanker/4 th Pumper A recent ISO evaluation identified that the BFD should have an 4 th Pumper within its fleet. This is based on the type, kind, and number of buildings the BFD is expected to protect from fire Gallon Pumper / Tanker 10
11 New or Used Pumper/Tanker/4 th Pumper (continued) This addition to the fleet would be totally determined by decisions made above. Based on what happens with other vehicles (refurbishment versus replacement, addition of an aerial device can count as a pumper as well, etc.), this piece of apparatus could be a Class A pumper with 1250 gallon tank, a fully capable pumper/tanker, or a straight tanker piece of equipment Gallon Straight Tanker Each 1250 Gallon Class A Pumper piece will have advantages and disadvantages, and could range in cost from $250,000 to $500,000. Ultimately the type of apparatus selected must compliment the overall fleet and fill the current and anticipated needs of the BFD. 2. Project Descriptions Major Equipment a) Personal Protective Equipment (PPE) The structural firefighting PPE utilized by the BFD is a protective envelop from head to toe. The helmet, hood, coat, gloves, pants, and boots have a life span (per national standard) of 10 years. The BFD has had a successful gear replacement program that has replaced five sets of gear per year. This rotation has assured that all personnel have a proper fitting set of gear available to them that is within its usable life span. This program had to be restructured beginning in Recent research has identified significant carcinogen exposure for firefighters after structural firefighting. To minimize exposure, firefighters must decontaminate their protective gear immediately after exposure a process that will leave the PPE unavailable for use for a few hours. This requires BFD to have additional PPE available for temporary use. The availability of spare PPE is limited, and having spare PPE that would properly fit more than 40 firefighters of all shapes and sizes proves challenging to say the least. 11 The 2017 gear replacement program has increased gear replacement to a minimum of ten sets per year. Five of the sets will replace five that were due, and an additional five or more sets will be purchased to create a cache of spare gear. This spare gear will be in sizes that will fit as many of our
12 personnel as possible. A couple of years of gear replacement at this level should put the BFD ahead of the curve and allow for measured replacement, while maintaining multiple sets of usable gear while other sets are being decontaminated. The estimated annual cost is approximately $30,000 until we build up the cache of additional gear; then approximately $15,000 thereafter. b) Thermal Imaging Cameras The BFD utilizes thermal imaging cameras that are at or past the recommended service life date. We have a need to replace four existing thermal imagers over the next couple of years. The approximate annual cost of this would be $15,000. c) EMS Equipment Cardiac Monitor The BFD has one older cardiac monitor left to replace. The final existing LifePak 12 is nearing end of life. Replacing it in 2019 with a LifePak 15 will standardize the cardiac monitor defibrillators in all three medic units, and set the stage for potential trade in valve of the LP 12 before total failure. The estimated cost of a new LifePak 15 (without any trade in value for the LifePak 12) would be $35,000. d) EMS Equipment Power Cot BFD was the recipient of an Ohio BWC Safety Grant in This grant provided two power patient cots and one power cot loading system. As a part of the grant, BFD committed to adding power cot loading systems to new ambulances that replace two existing ambulances (cost of the load system would be included with the overall cost of the ambulance). The estimated cost of a new Stryker PowerPro patient cot is $17,
13 e) EMS Equipment Chest Compression Unit Innovations in EMS patient care equipment continue to allow us to do more with less with regards to advanced life support. What would have taken five or six personnel to accomplish just a few years ago can be accomplished with just two or three personnel. A device that absolutely contributes to replacing one person s role in cardiac arrest management is a chest compression unit. Until recently these units have cost $17,000 or more and we have not seriously considered them at that price. Competition in the marketplace has finally offered alternatives including more affordable pricing. The chest compression unit is ideal for us as we work to maximize our available staffing and only commit the necessary amount of personnel to an incident. The estimated cost of a new chest compression unit is $20,000. We anticipate adding four of these over the life of this CIP. 3. Project Descriptions Facilities a) New Fire Station Equipment We have a large list of items for the new fire station that are either Owner Furnished, Contractor Installed or Owner Furnished, Owner Installed. These items will be prioritized and may require purchasing from both the 2017 and 2018 CIP s. b) Fire Training Center Additions The tax payer investment in the Brookville Fire Training Center has been minimal over the years. The Brookville Firefighters Association has contributed much of the financial support for the Center over the years. Money allocated in 2020 would be used to complete construction of the multi story burn facility. 13
Fairview Fire District
Fairview Fire District Apparatus Replacement Plan Created January 2016 1 P age Introduction: It is the mission of the Fairview Fire District (FFD) is to protect lives and property from the adverse effects
More informationMilton Fire-Rescue Capital Improvement Plan
Milton Fire-Rescue 2018-2023 Capital Improvement Plan Capital Overview 2 Fire Stations 3 Engines 1 Ladder Truck 2 Ambulances 1 Forestry 2 Staff Vehicles 3 Sets of Extrication Tools 2 Thermal Imagers 2
More informationBusiness Plan We will reflect the National Treasure in which we live
Business Plan 2017 We will reflect the National Treasure in which we live Fire Departments depend on equipment and personnel to accomplish their tasks. Those tasks vary from each agency but the City of
More informationMilton Fire-Rescue Capital Improvement Plan
Milton Fire-Rescue 2019-2024 Capital Improvement Plan Capital Overview 2 Fire Stations 3 Engines 1 Ladder Truck 2 Ambulances 1 Forestry 2 Staff Vehicles 3 Sets of Extrication Tools 2 Thermal Imagers 2
More informationREQUEST FOR COUNCIL ACTION
REQUEST FOR COUNCIL ACTION Date:February 25, 2013 Item No.: 10.b Department Approval City Manager Approval Item Description: Flammable Liquid Response & Mitigation Enhancement 1 2 3 4 5 6 7 8 9 10 11 12
More informationFleet Size and Replacement Criteria
Fleet Size and Replacement Criteria Please consider the following questions from a system wide perspective, relying on other station and/or county resources where appropriate. Answer the questions in the
More informationOffice of the Fire Chief City of Richland Hills, Texas
7A - 1 Office of the Fire Chief City of Richland Hills, Texas Memorandum To: Honorable Mayor Bill Agan and members of the Richland Hills City Council From: W. Bell, Fire Chief Date: May 14, 2014 Subject:
More informationSTANDARD ADMINISTRATIVE POLICY
Department of Fire Rescue Subject: Apparatus Replacement Guidelines Reference Number: SAP-DEP-025 Effective Date: Last Revision Date: Signature of Approval: J. Dan Eggleston, Chief Purpose: The purpose
More informationApparatus Replacement
Apparatus Replacement An analysis of the RVFD Fleet to reduce Risk and Financial Liability Submitted by: Fire Chief Armstrong Working Document ver. 4.18.17 Apparatus repairs and the associated cost have
More information2015 Fire Department
2015 Fire Department CAPITAL PROJECTS AND CAPITAL EQUIPMENT SUMMARY: 2015-2019 - Structure/USAR Rescue Gear Each firefighter is issued two sets of protective equipment: one set of structural gear for structure
More informationApparatus Replacement Policy
WASHINGTON COUNTY FIRE & EMS OVERSIGHT COMMITTEE Apparatus Replacement Policy Page 1 of 10 Purpose: The purpose of this policy is to outline the apparatus replacement guidelines for fire, rescue, & EMS
More informationApparatus Replacement Program
Apparatus Replacement Program Getting right to the point The fire fleet is old The fleet is out of date In some cases trucks are not cost effective to repair parts are no longer available to repair them
More information2013 Capital Improvement Budget Anchorage Fire Department
Capital Improvement Budget (in thousands) Projects Bonds State Federal Other AFD Dry Suit - 20 - - 20 Fire 4-Wheeler Emergency Rescue Equipment - 15 - - 15 Fire Ambulance 795 - - - 795 Fire Engine - Chugiak
More informationPlacement on the fireground simply refers to how and where an apparatus is placed at the scene.
Placement on the fireground simply refers to how and where an apparatus is placed at the scene. The success of fireground operations can directly or indirectly depend on the effective placement of fire
More informationMeasure South Lane County Fire & Rescue General Obligation Bond November 3, 2015
Measure 20-237 South Lane County Fire & Rescue General Obligation Bond November 3, 2015 Measure 20-237 Impacts Measure 20-237 is for 5.5 years, funding needed fire apparatus Measure 20-237 is projected
More informationFleet Size. Presentation to Albemarle County Board of Supervisors
Fleet Size Presentation to Albemarle County Board of Supervisors Principles of Determining Fleet Size 1. System wide approach 2. Resource Efficiency by implementation of a system wide reserve fleet 3.
More informationApparatus Purchasing. Travis Ownby Sales Manager Siddons-Martin Emergency Group
Apparatus Purchasing Travis Ownby Sales Manager Siddons-Martin Emergency Group The Process of Purchasing Apparatus 1. Determine the need -Assess apparatus -Qualify the need -NFPA, ISO, other 2. Ways to
More informationEXAMPLE STANDARD OPERATING PROCEDURE EXPOSURE PREVENTION AND DECONTAMINATION
EXAMPLE STANDARD OPERATING PROCEDURE EXPOSURE PREVENTION AND DECONTAMINATION A. Purpose: To provide Los Angeles County Fire Department policy and procedure regarding on scene decontamination of personal
More informationLEVEL 2 DEFENSIVE Standard Equipment Guide
LEVEL 2 DEFENSIVE Standard Guide This guidance document was developed to assist NWT fire departments with identifying the minimum equipment required for a Standard - Level 2 Defensive fire service as defined
More informationFire Engine Information
Fire Engine Information City of Thornton Fire Engine 71 2001 American La France This engine was built entirely by Freightliner/American La France. The National Fire Protection Association (NFPA) and Insurance
More informationANCHORAGE FIRE DEPARTMENT
ANCHORAGE FIRE DEPARTMENT Department Goal The goal of the Fire Department for the - Capital Improvement Budget/Program is to provide effective and efficient emergency operations, fire suppression and emergency
More informationUNIT CAD CLASSIFICATION DEFINITIONS. Northampton County Emergency Management Services
UNIT CAD CLASSIFICATION DEFINITIONS Northampton County Emergency Management Services ALS ALS Unit (Advance life Support) Ambulance--A vehicle specifically designed, constructed or modified and equipped,
More informationRural Water Supply Operations Seminar & Drill
Seneca County, New York Rural Water Supply Operations Seminar & Drill Tanker Shuttle Drill April 5, 2009 Summary Report Overview In April of 2009, the Seneca County, New York, Office of Emergency Services
More informationExecutive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico
: Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico The (ES) presents the main observations, conclusions, and recommendations resulting from the evaluation of the
More informationFire Apparatus Diesel Particulate Filter Reprocessing Henrico County, Virginia Page 1
Page 1 1. Program Overview Our ambulance fleet requires the diesel particulate filtration systems to be serviced on an annual basis. These systems exist to help ensure compliance with the latest environmental
More informationCurrent Equipment: Engine to Present $449,796 Ladder to Present $375,665 Engine to Present $602,463
Current Equipment: Engine 10 2009 to Present $449,796 Is a 2009 Spartan MetroStar custom chassis pumper which transports a crew of up to 6 firefighters. It has a 425 hp turbo charged Cummins engine, a
More informationDenver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15
Denver Volunteer Fire Department Insurance Services Office Rating: 5-9E Number of Volunteers on Roster: 15 Number of Paid Staff (including Part-time): 42 Main Station Location: Sub-Station Location: Sub-Station
More informationMOTION NO. M Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade PROPOSED ACTION
MOTION NO. M2017-152 Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION 12/07/2017 Final
More informationToo Good to Throw Away Implementation Strategy
Too Good to Throw Away Implementation Strategy Council Briefing by Sanitation Services October 4, 2006 Purpose of Briefing Summarize preparations for Too Good To Throw Away recycling services FY07 Recommend
More informationThe Funding of Pupil Transportation In North Carolina March, 2001
The Funding of Pupil Transportation In North Carolina March, 2001 North Carolina Department of Public Instruction Division of School Support, Transportation Services Three main components of pupil transportation
More informationGlendale Fire Department
Glendale Fire Department 1) The Glendale Fire Department has had two fire engines or pumpers since the twenties. 2) The primary issue is the responsibility to provide a safe and effective operation for
More informationHME PUMPERS. The HME Difference Industry Innovation
HME PUMPERS The HME Difference Industry Innovation Imaginative and innovative, HME leads the fire apparatus manufacturing industry with breakthrough engineering designs and the integration of leading technologies.
More informationAERIAL NEEDS ASSESSMENT FOR THE SOUTH SALEM FIRE DISTRICT
AERIAL NEEDS ASSESSMENT FOR THE SOUTH SALEM FIRE DISTRICT At the request of Chairman of the Board of Fire Commissioners Steven Angelilli, Emergency Vehicle Response was contacted to provide an Aerial Needs
More informationDEBBIE COMIS, CHIEF ADMINISTRATIVE OFFICER AERIAL LADDER FIRE RESCUE APPARATUS REPLACEMENT PURCHASE
September 27, 2017 REPORT TO: FROM: SUBJECT: PURPOSE: DEBBIE COMIS, CHIEF ADMINISTRATIVE OFFICER MARC NORRIS, FIRE CHIEF AERIAL LADDER FIRE RESCUE APPARATUS REPLACEMENT PURCHASE To request Council authorization
More informationINSTRUCTOR GUIDE TOPIC: APPARATUS RESPONSE LEVEL OF INSTRUCTION: TIME REQUIRED: TWO HOURS MATERIALS: APPROPRIATE AUDIO-VISUAL MATERIALS
TOPIC: APPARATUS RESPONSE LEVEL OF INSTRUCTION: TIME REQUIRED: TWO HOURS INSTRUCTOR GUIDE MATERIALS: APPROPRIATE AUDIO-VISUAL MATERIALS REFERENCES: Fire Department Safety Officer, 1st ed., International
More informationTHE CO$T OF DOING BU$INE$$
MOTOR VEHICLE COLLISION (Vehicle Rescue) MOTOR VEHICLE COLLISION (Vehicle Rescue) 2 Engines (> 6 personnel) $550,000/engine 1 Heavy Squad (> 1 person) $600,000/squad > 1 Ambulance (>2 personnel) $200,000/ambulance
More informationRAPID INTERVENTION TEAM STANDARD OPERATING PROCEDURES
RAPID INTERVENTION TEAM STANDARD OPERATING PROCEDURES RAPID INTERVENTION TEAM (R.I.T.) STANDARD OPERATING PROCEDURES I. R.I.T. PURPOSE (also referred to as F.A.S.T. Team) 1. Eliminate hazards that may
More informationElements of Innovation
P u m p e r s When lives are in the balance and seconds count Element s of Innovation Elements of Innovation Our business is really the same as yours it s about saving lives. It s also about protecting
More informationREPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE
September 7, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE PURPOSE To update Council on Kamloops
More informationNew Windsor, Maryland Rural Water Supply Drill. Tanker Shuttle Drill May 23, 2009 Summary Report
New Windsor, Maryland Rural Water Supply Drill Tanker Shuttle Drill May 23, 2009 Summary Report Overview On May 23, 2009, the New Windsor VFC of Carroll County, Maryland hosted a rural water supply drill.
More informationMEMORANDUM SUBJECT: CONSIDERATION TO AUTHORIZE AN AWARD OF BID FOR THE PURCHASE OF A TRUCK AND DECLARING EXISTING VEHICLES AS SURPLUS PROPERTY
MEMORANDUM TO: FROM: CITY COUNCIL STEVEN N. ANNIBALI, CHIEF OF POLICE SUBJECT: CONSIDERATION TO AUTHORIZE AN AWARD OF BID FOR THE PURCHASE OF A TRUCK AND DECLARING EXISTING VEHICLES AS SURPLUS PROPERTY
More informationUNIVERSITY HEIGHTS FIRE DEPARTMENT LADDER TRUCK PROPOSAL 2018
UNIVERSITY HEIGHTS FIRE DEPARTMENT LADDER TRUCK PROPOSAL 2018 LADDER TRUCK (CURRENT) 1992 Pierce Arrow 75 Aerial Ladder 300 Gallon Water Tank 1500 GPM Pump 91 Ground Ladders 1500 Fire Hose NFPA 1911
More informationVehicle Replacement Policy - Toronto Police Service
STAFF REPORT June 21, 2000 To: From: Subject: Policy and Finance Committee Chairman, Toronto Police Services Board and City Auditor Vehicle Replacement Policy - Toronto Police Service Purpose: The purpose
More informationFleet Safety Initiative Status Summary
Fleet Safety Initiative Status Summary Deborah Majeski DTE Energy Company October 7, 2008 DTE Energy s Primary Subsidiaries are Gas and Electric Utilities 2 Non-Utility Energy Related Businesses 3 Impact
More informationESCONDIDO FIRE DEPARTMENT TRAINING MANUAL ENGINE MODULE HOSE PAGE 1 OF 20 Supply Hose Lays Revised
HOSE 12-01-16 PAGE 1 OF 20 There are five base North Zone supply hose lays: Forward Lay Spotting a Hydrant Stationary Lay Reverse Lay Split Lay Escondido Fire Department Core Hose Lays The Escondido Fire
More informationCaldwell County, North Carolina Capital Improvement Plan BUILDING A BETTER FUTURE FOR THE CITIZENS OF CALDWELL COUNTY
Caldwell County, North Carolina Capital Improvement Plan BUILDING A BETTER FUTURE FOR THE CITIZENS OF CALDWELL COUNTY PROGRESS THROUGH PLANNING TABLE OF CONTENTS Water Fund Summary General Fund Summary
More informationProcedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005
Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November 2008 1 January 2005 Reference Norwich Township Fire Department SOG #30 Page 1 of 6 Purpose: The purpose of this
More informationWinston-Salem State University
601 S. Martin Luther King Jr. Drive NC 27110 Fleet Information Fuel Information Fueling Infrastructure Total Leased Vehicles 20 State Titled Vehicles Only Location Age Size Fuel Total County Titled Vehicles
More informationSTANDARD OPERATING GUIDELINES
Missouri Valley Fire & Rescue Department 223 E. Erie St. Missouri Valley, IA 51555 Phone 712-642-2945 Emergency 911 STANDARD OPERATING GUIDELINES STANDARD OPERATING GUIDELINES Chronological History Effective:
More informationKME RESCUES LIKE NO OTHER
KME RESCUES LIKE NO OTHER KME Works for You. As a privately held family company since 1946, KME is truly an American success story. We ve experienced six decades of steady growth because we ve worked hard
More informationFire Rescue Budget FY 18/19
Fire Rescue Budget FY 18/19 Fire Rescue has remained fiscally responsible over the last ten years Lost staff during the downturn No administrative support staff help (need several to catch up) No logistical
More informationThe Apparatus Architect-Part 21. Designing Ladder Company Apparatus. In the last segment of the Apparatus Architect we discussed some of the
The Apparatus Architect-Part 21 Designing Ladder Company Apparatus In the last segment of the Apparatus Architect we discussed some of the concepts surrounding quint apparatus and some of the trade offs
More informationRural Water Supply Operations Seminar & Drill
Colton, New York Rural Water Supply Operations Seminar & Drill 75-min Tanker Shuttle Drill August 24, 2008 Summary Report Overview In August of 2008 the Colton Fire District, in conjunction with the Pierrepont
More informationU.S. Firefighter Fatalities in Road Vehicle Crashes
U.S. Firefighter Fatalities in Road Vehicle Crashes - 1998-2007 Rita F. Fahy Fire Analysis and Research Division National Fire Protection Association July 2008 \ National Fire Protection Association, 1
More informationHME AERIAL PRODUCTS. The HME Difference Industry Innovation
HME AERIAL PRODUCTS The HME Difference Industry Innovation Imaginative and innovative, HME leads the fire apparatus manufacturing industry with breakthrough engineering designs and the integration of leading
More informationLegislative Request 2013 Capital Project Heavy Rescue Apparatus Project Title: Purchase of a Heavy Duty Rescue Apparatus FY2014 State Funding Request: $625,000 Brief Description of the Project: Replace
More informationMOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion
MOTION NO. M2016-66 Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee 07/07/16
More informationEmergency Services Guidance for Competition Electric Vehicles
NEDRA Technical Information Bulletin 2013.001 Emergency Services Guidance for Competition Electric Vehicles Authors Michael Dunn Technical Director National Electric Drag Racing Association tech@nedra.com
More informationCategory V. Criterion 5H: Hazardous Materials (Hazmat)
Category V Criterion 5H: Hazardous Materials (Hazmat) The agency operates an adequate, effective, efficient, and safe hazardous materials program directed toward protecting the community from the hazards
More informationKEY LARGO FIRE RESCUE AND EMS DISTRICT FY BUDGET DETAILS - FIRE DEPARTMENT
120 Department: Regular Salaries & Wages: Administrative Stipend ($500 per month each Full Time FF) 18,000 18,000 9,000 18,000 - Full-time firefighter II / EMT Station Officer / Driver Engineer (7 full-time)
More informationManaging Particle Contamination with Chevron ISOCLEAN Certified Lubricants
Managing Particle Contamination with Chevron ISOCLEAN Certified Lubricants It s the Small Stuff Construction companies with new and older equipment in their fleets must make combating particle contamination
More informationScarborough Fire Department Scarborough, Maine Standard Operating Procedures
Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Emergency Operations Chapter: Rescue Operations Subject: 3620 - Extrication Team Revision Date: 6/15/06 [revised 4/26/2010]
More informationProTrucks Trucks and Trailers Solutions Guide
ProTrucks Trucks and Trailers Solutions Guide NOW OFFERING DAILY, WEEKLY, AND MONTHLY RENTAL RATES VOLUME 1.0 // Herc Rentals is a premier full-line equipment rental company providing our customers the
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Requesting authorization for the SFMTA, through the Director of Transportation,
More informationBETTER PERFORMANCE THROUGH BETTER IDEAS
BETTER PERFORMANCE THROUGH BETTER IDEAS KME Works for You. As a privately held family company since 1946, KME is truly an American success story. We ve experienced six decades of steady growth because
More informationFire Fighting, Police, and Emergency Equipment 135
www.revenue.state.mn.us Fire Fighting, Police, and Emergency Equipment 135 Sales Tax Fact Sheet 135 Fact Sheet What s New in 2016 We ve updated the layout to make this fact sheet easier to use. This fact
More informationFLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017
FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017 DESCRIPTION OF FLEET OPERATION Fleet operations include vehicle and equipment maintenance, procurement and surplus services,
More informationDakota County, Minnesota
APWA Public Works Expo August 2016 Kevin L. Schlangen, CPFP, CAFM, CEM Fleet Manager, Dakota County, Minnesota Dakota County, Minnesota 2013 population 408,509 3 rd largest MN County of 87 587 square miles
More informationSan Joaquin Valley Air Pollution Control District Governing Board Meeting. June 15, 2017
San Joaquin Valley Air Pollution Control District Governing Board Meeting June 15, 2017 May 2015, Board approved comprehensive action plan for securing the Valley s fair share of Cap and Trade funds 20
More informationFIVE YEAR CAPITAL IMPROVEMENT PROGRAM FY
FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FY 2019 2023 Village of River Forest Five Year Capital Improvement Program The Five Year Capital Improvement Program (CIP) is a planning tool for the Village that
More informationLife Cycle Analysis - Case Study Examples. Fleet Management Passenger Boarding Bridge - Repair vs. Replace Decision
Life Cycle Analysis - Case Study Examples Fleet Management Passenger Boarding Bridge - Repair vs. Replace Decision Cost / Year Financial and Service Performance Considerations Optimal replacement age Total
More informationSTANDARD LEVEL 2 DEFENSIVE Standard Firefighter Training I Minimum Equipment List
STANDARD LEVEL 2 DEFENSIVE Standard Firefighter Training I Minimum Equipment List The NWT has established recommended operational service levels which may be further broken down into sections to fit local
More informationConventional Fuel Management Strategies That Work
Conventional Fuel Management Strategies That Work THROUGH RESEARCH, REPLACEMENTS, AND PREVENTIVE MAINTENANCE, FLEET MANAGERS CAN GET THE BIGGEST BANG OUT OF THEIR FLEET DOLLARS. November 2013, By Brad
More informationDECONTAMINATE BY PRIORITY Items such as wheeled vehicles, forklifts, and railcars, which are critical to the site s overall mission, will need to rece
CHAPTER 5 DECONTAMINATION The idea behind decontamination is relatively the same for a fixed site as for a tactical unit. Personnel need to decontaminate to reduce the hazard and spread of a contaminating
More informationJoey Nunn Corporate Government Manager, Southeast US Ken Germano Director of Fleet Management, SC Bryan Jolliff Finance Manager, SC
Joey Nunn Corporate Government Manager, Southeast US Ken Germano Director of Fleet Management, SC Bryan Jolliff Finance Manager, SC Common Themes in Municipal Government Reduced Revenue Increased Expenses
More informationRoutine Emergencies are defined as incidents that do not require the deployment of hoselines. Ex. Fire alarms, smell of smoke, etc..
15. Riding Assignments 15.1 Assignments 15.1.1 The following assignments have been developed to alleviate duplication of tasks on the fire scene. These assignments are only guides and can be changed on
More informationCOSTS IN PREVENTION OF CRIME ON PUBLIC TRANSPORT
1. Introduction COSTS IN PREVENTION OF CRIME ON PUBLIC TRANSPORT APPENDIX 4 The Home Office costs of crime study include estimates for the costs incurred in anticipation (or prevention) of crime. These
More informationDefensive and Safe Driving Accidents. Why must we maintain defensive and safe driving practices?
Defensive and Safe Driving Accidents Why must we maintain defensive and safe driving practices? 1 Nation Wide Statistics Firefighter deaths #1 cause = Heart attack #2 cause = Traffic accidents Traffic
More informationThe Apparatus Architect. Part 22-Designing Ladder Company Apparatus
The Apparatus Architect Part 22-Designing Ladder Company Apparatus In the last installment of the Apparatus Architect we reviewed some of the considerations for designing adequate compartment space into
More informationAn Asset Management Plan for Transit And Access Transit Fleet
Header Title ATTACHMENT 1 Building Better Transit: An Asset Management Plan for Transit And Access Transit Fleet 2 June 2016 Transit & Access Transit Fleet INTRODUCTION The Saskatoon Transit fleet is currently
More informationCLEARWATER FIRE & RESCUE TRAINING BUREAU
CLEARWATER FIRE & RESCUE TRAINING BUREAU TRACTOR OPERATOR TASK BOOK #5 Candidate Name (printed) Signature Signature Beginning Beginning Date Date Candidate Station/Shift 08# Hire Date Lieutenant (print)
More informationATTACHMENT #1. TO: Patricia delabruere DATE: May 5, 2015 JNU Airport Manager
MEMO TO: Patricia delabruere DATE: May 5, 2015 JNU Airport Manager FROM: RE: Catherine Fritz, AIA JNU Airport Architect ARFF Project Formulation The Airport Board s funding authorization on February 11,
More informationReview of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach
ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)
More informationFAMA Initiative to Change California Weight Regulations For Tiller Tractors. Roger Lackore Pierce Manufacturing
FAMA Initiative to Change California Weight Regulations For Tiller Tractors Roger Lackore Pierce Manufacturing California Code of Regulations An aerial ladder fire truck, two vehicle combination, shall
More informationHow to Cut Costs in Transportation
1 How to Cut Costs in Transportation OSBA leads the way to educational excellence by serving Ohio s public school board members and the diverse districts they represent through superior service, unwavering
More informationTRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury
TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based
More informationNon Revenue Fleet Purchases
Non Revenue Fleet Purchases In order to support various operations, METRO has a fleet of 379 Non revenue vehicles (including MPD). After Rail line comes live the overall fleet size will be at 402 vehicles.
More informationFunding Scenario Descriptions & Performance
Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion
More informationApparatus Riding Assignments
Page: of 6 Apparatus Riding Assignments Table of Contents Page.0 Purpose.0 Responsibilities 3.0 General Rules Revisions & Effective Date Letter Description Date Prepared A New 06/0/04 TAB Prepared By:
More informationINSTRUCT-O-GRAM HOSE OPERATIONS THE HANDS ON TRAINING GUIDE FOR THE FIRE INSTRUCTOR VOLUME XI, ISSUE 9 HOSE OPERATIONS SEPTEMBER 1990 INSTRUCTOR TASK
INSTRUCT-O-GRAM THE HANDS ON TRAINING GUIDE FOR THE FIRE INSTRUCTOR VOLUME XI, ISSUE 9 HOSE OPERATIONS SEPTEMBER 1990 HOSE OPERATIONS INSTRUCTOR TASK To use hose lines within a structure to attack fire,
More informationCounty of Santa Clara Countywide Multi-Hazard / Multi-Disciplinary Task Force (CMTF)
County of Santa Clara Countywide Multi-Hazard / Multi-Disciplinary Task Force (CMTF) Office of Emergency Services 55 West Younger Avenue San Jose, California 95110 FIRE: 408.378.4010 EMS: 408.885.4259
More informationSTRATEGIC CAPITAL PANEL REPLACEMENT OF REFUSE COLLECTION FLEET
Report To: STRATEGIC CAPITAL PANEL Date: 14 March 2016 Reporting Officer: Subject: Report Summary: Ian Saxon Assistant Executive Director for Environmental Services REPLACEMENT OF REFUSE COLLECTION FLEET
More informationConventional Tow Truck
Thank you Chairman LaRose, Vice Chair Kunze, Ranking Member Tavares and members of the Senate Transportation, Commerce and Workforce Committee for the opportunity to testify as a proponent of HB 26. My
More informationThe Next Collection Contract
PUBLIC WORKS DEPARTMENT Waste Management Services The Next Collection Contract Opportunities to Increase Waste Diversion and Improve Efficiencies Presentation to Waste Management Planning Steering Committee
More informationLitchfield Fire Apparatus Job Descriptions:
The Litchfield Fire/Rescue Services provides emergency response to all fire, emergency medical, rescue, and hazardous materials incidents occurring in the town. In the event of natural or man-made disasters,
More informationECONOMIC COMPARISON OF TRUCK CONFIGURATIONS
ISSN 1171-( 1 NEW ZEi.,...., LIF ECONOMIC COMPARISON OF TRUCK CONFIGURATIONS Gareth Jones Figure 1-6x4 + 4 axle convertible; now able to load to 44 tonnes under the new regulations ABSTRACT An economic
More informationAGENDA Strategic Priorities Committee
AGENDA Strategic Priorities Committee August 13, 2018 9:00 am Council Chambers, Town Hall Pages 1. CALL TO ORDER 2. DECLARATIONS OF PECUNIARY INTEREST 3. AMENDMENTS AND APPROVAL OF THE AGENDA RECOMMENDATION
More informationLe Claire Fire Department Le Claire, Iowa. Rural Water Supply Opera9ons Seminar 2- hr Water Supply Drill March 29, 2015 Summary Report
Le Claire Fire Department Le Claire, Iowa Rural Water Supply Opera9ons Seminar 2- hr Water Supply Drill March 29, 2015 Summary Report The Purpose The purpose of the seminar and drill was to review the
More informationCorporate Communications. Media Information 2 August Check against delivery - Ladies and Gentlemen,
Media Information - Check against delivery - Statement Dr. Nicolas Peter Member of the Board of Management of BMW AG, Finance Conference Call Interim Report to 30 June 2018, 10:00 a.m. CEDT Ladies and
More informationTHE FRANCHISE GIANT. Three Strategies for Competing With the Big Boys DEALERSOCKET.COM/IND
THE FRANCHISE GIANT Three Strategies for Competing With the Big Boys Franchise dealers see an average 617 percent higher yield in gross profits selling used cars. Independent auto dealerships face a tough
More information